Anda di halaman 1dari 1

3.

29
Pipa Ø 10"
7
3.9
3.9 DETAIL A
7
Profil WF 300x150x6,5x9
0.59
Beton K.225
Canal 125x65x6x8 1/2 Profil WF 300x150x6,5x9
Canal 125x65x6x8 Tee All Flange Ø250x90 DCI
Pipa Ø 10" GI Pipa Ø 10" GI

0.59
Flange Spigot Ø 10"GI Flange Spigot Ø 10" GI
Flange Adaptor Ø 10" DCI Flange Adaptor Ø 250 DCI

0.61
Pasangan Batu Kali 1 pc : 3 pp

0.10
Pondasi
Tanah Galian
0.10
2.30
0.63
2.00 10.00 2.00
PROFILE JEMBATAN PIPA
Out Flap Ø 90 DCI
Flange Socket Ø 90 PVC
Beton K.225 Bend 90° Ø 90 PVC

6,00
Pipa PVC Ø 90 Flange Adaptor Ø 90 DCI
Gate Valve Ø 90 DCI
Clamp Ø 10 mm
Pipa Ø 250 GI 1:2 0.05 1:2 Tee All Flange Ø250x90 DCI
5 Pipa Ø 250 GI
0.7

0.54

1.05

1.25
Flange Spigot Ø 250 GI
Flange Spigot Ø 250 GI 1:2 1:2
Canal 125x65x6x8 Siku 50x50x5
Profil WF 300x150x6,5x9 Flange Adaptor Ø 250 DCI
Angker Baut Ø 25 mm
Flange Adaptor Ø 250 DCI Pasangan Batu Kali 1:4
Plat Landas 2324x600x12
PLAN JEMBATAN PIPA
Skala 1 : 100
0 1 2 3 4 5m
0 0.5 1.0 1.5 2.0 2.5 m
Skala 1 : 50
Provinsi
Sulawesi Selatan
Proyek
DD Pembangunan Intake Dan Jaringan Pipa
Transmisi Air Baku Kab. Bantaeng
Kabupaten
POTONGAN 2 & 3 BAK PELEPAS TEKAN (BPT
DETAIL A No. Lembar
Bantaeng
Skala 1 : 20 Ketua Tim Lutfi, ST No. Register
Direktur Jinno Christian, ST Tanggal No. Kontrak
Diperiksa Direksi Pekerjaan Hj. Hasrawati Rahim, ST., MT
27 Feb HK.02.03/BBWS-PJ/PPK-
Disetujui PPK Perencanaan dan Program Fajar Arif Nurdin, ST.,MT 2017 PP/28/II/2017
Mengetahui Kabid. Pelaksanaan Jaringan Pemanfaatan Air Suryadarma Hasyim, ST., MT

Anda mungkin juga menyukai