Anda di halaman 1dari 3

PEMBANGUNAN JALAN TOL SOLO-NGAWI-KERTOSONO RUAS : NGAWI - KERTOSONO

PAKET 2 : STA .110 +250 - STA.118+700


PERHITUNGAN LUAS AREA
BAB 4 PEKERJAAN TANAH RAMP 4
4.05.(1) GALIAN RETAINING WALL
Gambar Sket : STA. 0+475

99.000
6; 98.580 5; 98.580

3; 97.680 98.000
4; 97.680
1; 97.480
7; 2; 97.480

97.000

96.000
-14.600 -14.400 -14.200 -14.000 -13.800 -13.600 -13.400 -13.200 -13.000 -12.800

Rencana Timbunan
No. Nilai Titik Koordinat Luas Penampang (m2) Keterangan
X (Jarak) Y (Elevasi) Xn * (Yn+1) Yn * (Xn+1) (Xn-Yn)/2

1 -14.400 97.480 - - -
2 -14.111 97.480 (1,403.712) (1,375.540) (14.086)
3 -13.861 97.680 (1,378.362) (1,351.170) (13.596)
4 -12.896 97.680 (1,353.942) (1,259.681) (47.130)
5 -12.896 98.580 (1,271.288) (1,259.681) (5.803)
6 -14.396 98.580 (1,271.288) (1,419.158) 73.935
7 -14.400 97.480 (1,403.322) (1,419.552) 8.115

Total Luas / Ʃ (m2) 1.434

Disetujui ; Diperiksa Disiapkan / diajukan


Konsultan Pengawas Kontraktor
PT. NGAWI KERTOSONO JAYA PT. BUANA ARCHICON PT . ADHI KARYA (Persero) Tbk.
at point X= -14.4 Y= 7.48 Z= 0
at point X= -14.1113 Y= 7.48 Z= 0
at point X= -13.8613 Y= 7.68 Z= 0
at point X= -12.8964 Y= 7.68 Z= 0
at point X= -12.8964 Y= 8.58 Z= 0
at point X= -14.3964 Y= 8.58 Z= 0
at point X= -14.4 Y= 7.48 Z= 0
90
-14.4 97.48
-14.111 97.48
-13.861 97.68
-12.896 97.68
-12.896 98.58
-14.396 98.58
-14.4 97.48

Anda mungkin juga menyukai