DL = 35 kN DL = 35 kN
LL = 25 kN LL = 25 kN

1000 mm
DL = 25 kN/m
LL = 20 kN/m
150 mm
?

? 750 mm

?
2.25 m 4.5 m 2.25 m

350 mm

Gunakan fy = 400 MPa, fys = 400 MPa, f’c = 25 MPa, Es = 200 GPa. ->
β1 = 0.85
Diktat UTS
Struktur Beton 1

1. U = 1.2DL + 1.6LL

DL = 42 kN/m DL = 42 kN/m
LL = 40 kN/m LL = 40 kN/m

DL = 40.37 kN/m
LL = 32 kN/m

A C D E
B

2.25 m 4.5 m 2.25 m

407.67

244.84

162.84

Diagram L

-162.84

-244.84

-407.67

Diagram M

917.23
Diktat UTS
Struktur Beton 1

I. Reaksi perletakan
Σ V = 0
VA + VB – 72.37·9 – 82 - 82 = 0
VA + VB = 815.33 kN

Simetri pada pembebanan balok memberikan VA = VB = 407.67 kN

II. Gaya dalam


• interval A-C (0 ≤ x ≤ 2.25 m) lihat kiri

L = 407.67 – 72.37x
407.67
72.37
M • x = 0, LA = 407.67
• x = 2.25, LC = 244.84
M = 407.67x – 36.19x2

x • x = 0, MA = 0

L • x = 2.25, MC = 734.05
• x = 5.633 (tidak valid)

Simetri pada pembebanan balok memberikan peninjauan gaya dalam cukup


setengah bentang saja
• interval C-D (0 ≤ x ≤ 2.25 m) lihat kiri

82 L = 162.84 – 72.37x
244.84
72.37 • x = 0, LC = 144.74
734.05 M
• x = 2.25, LD = 0
M = 734.05 + 162.84x – 36.19x2

x • x = 0, MC = 734.05
L • x = 2.25, MD = Mext = 917.23
Diktat UTS
Struktur Beton 1

2.
Step 1: Hitung b
b = 1000 mm
Step 2: Hitung momen terfaktor Mu
Mu = 917.23 kN.m
Step 3: Asumsikan d = (h – 90) mm
d = 660 mm
Step 4: Hitung luas penampang As
3 0.85f'c·β1
As = ( )bwd
8 fy
3 0.85·25·0.85
= ( )·350·660
8 400
= 3911.66 mm2
Step 5: Hitung ϕMn, dan bandingkan hasilnya dengan Mu
As ·fy
• a =
0.85f'c·b
3911.66·400
=
0.85·25·1000
= 73.63 mm
1
ϕMn = 0.9·0.85f’c·ab(d - a)
2
1
= 0.9·0.85·25000·0.074·1(0.66 - ·0.074)
2
= 881.7 kN.m
ϕMn < Mu, maka balok perlu tulangan tekan
Mu
Step 6: Nyatakan Mn = M2, lalu hitung M1 = – M2
ϕ
917.23
M2 = 979.67 kN.m -> M1 = – 979.67
0.9
= 39.47 kN.m
Diktat UTS
Struktur Beton 1

Step 7: Asumsikan d’ = 65 mm
Step 8: Cek hubungan antara εs’ dengan εy
a - β1 d'
εs’ = 0.003( )
a
73.63 - 0.85·65
= 0.003( )
73.63
= 0.0007
fy
εy =
Es
400
=
200000
= 0.002
εs’ < εy, maka tulangan tekan belum leleh, fs’ = Es·εs’
Step 9: Hitung As1 dan As2, lalu pilih penulangan
39.47
As1 =
150000(0.66 - 0.065)
= 0.0004 m2 -> 442.24 mm2
As2 = 3911.66 mm2
Digunakan penulangan tekan 2D25: As’ = 981.75 mm2
tarik 8D25: As = 3926.99 mm2
bmin = 325 mm ≤ 350 (terpenuhi)
Step 10: Asumsikan fs = fs’ = 420 MPa
Step 11: Cek As ≥ As,min
0.25√f'c·bw d 1.4bw d
As,min ≥ dan As,min ≥
fy fy

0.25√25·350·660 1.4·350·660
≥ dan ≥
420 420
≥ 687.5 mm2 dan ≥ 770 mm2
Diktat UTS
Struktur Beton 1

Step 12: Gunakan kesetimbangan gaya tekan-tarik untuk menentukan nilai a


0.85f’c·ab + As’·fy = AS·fy
(AS - As ')fy
a =
0.85f’c·b
3926.99·400
=
0.85·25·1000
= 73.49 mm
Step 13: Cek hubungan antara εs’ dengan εy
a - β1 d'
εs’ = 0.003( )
a
73.49 - 0.85·65
= 0.003( )
73.49
= 0.0007
fy
εy =
Es
400
=
200000
= 0.002
εs’ ≥ εy, maka tulangan tekan belum leleh
Karena tulangan tekan belum leleh, maka revisi asumsi fs’ = Es·εs’, dan
ulangi step 3
0.85f’c·ab + As’·fs’ = AS·fy
0.85f’c·ab + As’·Es·εs’ = AS·fy
a - β1 d'
0.85f’c·ab + As’·Es·0.003( ) = AS·fy
a
21.25a2 – 1.37a – 0.033 = 0
diperoleh a = 0.08 m -> 83.15 mm
a ≤ hf, maka dilakukan analisis balok sederhana
Diktat UTS
Struktur Beton 1

Step 14: Hitung momen nominal Mn


1
Mn = 0.85f’c·ab(d - a) + As’·fy(d – d’)
2
1
= 0.85·25000·0.083·1(0.66 - ·0.083) +
2
981.75·10-6·201300(0.66 - 0.065)
= 1208.47 kN.m
Step 15: Hitung momen rencana MR
β 1 dt - a
• εt = 0.003( )
a
0.85·660 - 83.15
= 0.003( )
83.15
= 0.017 -> ϕ = 0.9
MR = ϕMn
= 0.9·1208.47
= 1087.62 kN.m
ϕMn ≥ Mu, maka perhitungan selesai
Diktat UTS
Struktur Beton 1

3.
Step 1: Hitung geser terfaktor Vu dari diagram gaya geser
Vu diambil dari diagram L pada jarak d dari ujung

407.67
Vu
407.67 - Vu 0.66
244.84
=
162.83 2.25
917.26 – 2.25Vu = 107.47
2.25Vu = 809.79
Vu = 359.91 kN

660 mm

2.25 m

Step 2: Hitung Vc
1
Vc = √f'c·bwd
6
1
= √25·0.35·0.66
6

= 0.193 MN -> 192.5 kN


1
Step 3: Hitung ϕVc dan bandingkan dengan Vu
2
1 1
ϕVc = ·0.75·192.5
2 2

= 72.19 kN
1
Vu > ϕVc, maka balok memerlukan tulangan geser
2
Diktat UTS
Struktur Beton 1

Vu 1
Step 4: Cek Vs,max > - Vc > Vs,max
ϕ 2
2
Vs,max = √f'c·bwd
3
2
= √25·0.35·0.66
3

= 0.77 MN -> 770 kN


Vu 359.91
- Vc = – 192.5
ϕ 0.75

= 287.38 kN
1
Vs,max = 385 kN
2
Vu
Vs,max > - Vc, maka dimensi penampang cukup
ϕ

Vu 1
- Vc < Vs,max, maka spasi maksimum tulangan geser tetap
ϕ 2

Step 5: Hitung luas penampang Av


1
Digunakan penulangan ∅10 -> Av = 2· π∅2
4
1
= 2· π·102
4

= 157.08 mm2
Diktat UTS
Struktur Beton 1

Step 6: Cek Av,min dengan spacing maksimum


1
• smax ≤ d dan smax ≤ 600
2
1
≤ ·660 dan ≤ 600
2
≤ 330 -> 325 mm dan ≤ 600
0.062√f'c·bw s 0.35bw s
Av,min ≥ dan Av,min ≥
fys fys

0.062√25·350·330 0.35·350·330
≥ dan ≥
400 400
2
≥ 89.51 mm dan ≥ 101.06 mm2
Step 7: Hitung spacing minimum
Av ·fys d
smin = V
u - V
c
ϕ
-6
157.08·10 ·400000·0.66
=
287.38
= 0.144 m -> 125 mm
Diktat UTS
Struktur Beton 1

4.

125 mm 325 mm
a b

potongan a

2.25 m 4.5 m 2.25 m

potongan b
Diktat UTS
Struktur Beton 1
Diktat UTS
Struktur Beton 1

1500 mm
DL = 1.6 kN/m
LL = 14 kN/m
120 mm
?

? 800 mm

6 m
400 mm

Gunakan fy = 400 MPa, fys = 240 MPa, f’c = 25 MPa, Es = 200 GPa. ->
β1 = 0.85
Diktat UTS
Struktur Beton 1

a, b. U = 1.2DL + 1.6LL

DL = 14.94 kN/m
LL = 22.4 kN/m

6 m

224.04

Diagram L

-672.12

Diagram M
Diktat UTS
Struktur Beton 1

I. Reaksi perletakan
Σ V = 0
VA – 37.34·6 = 0
VA = 224.04 kN

Σ M = 0
MA + 37.34·6·3 = 0
MA = -672.12 kN.m

II. Gaya dalam


• interval A-B (0 ≤ x ≤ 6 m) lihat kiri

L = 224.04 – 37.34x
224.04
37.34 • x = 0, LA = 327.72
M
• x = 6, LB = 0
672.12 M = -672.12 + 224.04x – 18.67x2

x • x = 0, MA = -983.16

L • x = 6, MB = Mext = 0
Diktat UTS
Struktur Beton 1

c.
• titik A
Step 1: Hitung b
b = 960 mm
Step 2: Hitung momen terfaktor Mu
Mu = 672.12 kN.m
Step 3: Asumsikan d = (h – 65) mm
d = 735 mm
Step 4: Hitung luas penampang As
3 0.85f'c·β1
As = ( )bwd
8 fy
3 0.85·25·0.85
= ( )·400·735
8 400
= 4978.48 mm2
Diktat UTS
Struktur Beton 1

Step 5: Hitung ϕMn, dan bandingkan hasilnya dengan Mu


As ·fy
• a =
0.85f'c·bw
4978.48·400
=
0.85·25·400
= 234.28 mm
1
ϕMn = 0.9·0.85f’c·abw(d - a)
2
1
= 0.9·0.85·25000·0.234·0.4(0.735 - ·0.234)
2
= 1106.28 kN.m
ϕMn ≥ Mu, maka balok tidak perlu tulangan tekan dan ulangi step 4.
Tetapi untuk memudahkan pemasangan sengkang, maka sebagian dari As
dipindahkan untuk As’
Mu
As =
0.9fy ·0.95d
-3
672.12·10
=
0.9·400·0.95·0.735
= 0.0027 m2 -> 2673.83 mm2
Digunakan penulangan tekan 3D19: As’ = 850.58 mm2
tarik 7D19: As = 1984.7 mm2
Step 6: Asumsikan d’ = 65 mm
Step 7: Asumsikan fs = fs’ = 420 MPa
Step 8: Cek As ≥ As,min
0.25√f'c·bw d 1.4bw d
As,min ≥ dan As,min ≥
fy fy

0.25√25·400·735 1.4·400·735
≥ dan ≥
400 400
2
≥ 918.75 mm dan ≥ 1029 mm2
Diktat UTS
Struktur Beton 1

Step 9: Gunakan kesetimbangan gaya tekan-tarik untuk menentukan nilai a


0.85f’c·ab + As’·fy = AS·fy
(AS - As ')fy
a =
0.85f’c·bw
1984.7·400
=
0.85·25·400
= 93.4 mm
Step 10: Cek hubungan antara εs’ dengan εy
a - β1 d'
εs’ = 0.003( )
a
93.4 - 0.85·65
= 0.003( )
93.4
= 0.0012
fy
εy =
Es
400
=
200000
= 0.002
εs’ ≥ εy, maka tulangan tekan belum leleh
Karena tulangan tekan belum leleh, maka revisi asumsi fs’ = Es·εs’, dan
ulangi step 3
0.85f’c·abw + As’·fs’ = AS·fy
0.85f’c·abw + As’·Es·εs’ = AS·fy
a - β1 d'
0.85f’c·abw + As’·Es·0.003( ) = AS·fy
a
8.5a2 – 0.62a – 0.028 = 0
diperoleh a = 0.1 m -> 104.47 mm
a ≤ hf, maka dilakukan analisis balok sederhana
Diktat UTS
Struktur Beton 1

Step 11: Hitung momen nominal Mn


1
Mn = 0.85f’c·abw(d - a) + As’·fy(d – d’)
2
1
= 0.85·25000·0.104·0.4(0.735 - ·0.104) +
2
850.58·10-6·282700(0.735 - 0.065)
= 764.88 kN.m
Step 12: Hitung momen rencana MR
β 1 dt - a
• εt = 0.003( )
a
0.85·735 - 104.47
= 0.003( )
104.47
= 0.015 -> ϕ = 0.9
MR = ϕMn
= 0.9·764.88
= 688.39 kN.m
ϕMn ≥ Mu, maka perhitungan selesai
Diktat UTS
Struktur Beton 1

d.
Step 1: Hitung geser terfaktor Vu dari diagram gaya geser
Vu diambil dari diagram L pada jarak d dari ujung

224.04
Vu
224.04 - Vu 0.735
=
224.04 6
1344.24 – 6Vu = 164.67
6Vu = 1179.57
Vu = 196.6 kN
0

735 mm

6 m

Step 2: Hitung Vc
1
Vc = √f'c·bwd
6
1
= √25·0.4·0.735
6

= 0.245 MN -> 245 kN


1
Step 3: Hitung ϕVc dan bandingkan dengan Vu
2
1 1
ϕVc = ·0.75·245
2 2

= 91.88 kN
1
Vu > ϕVc, maka balok memerlukan tulangan geser
2
Diktat UTS
Struktur Beton 1

Vu 1
Step 4: Cek Vs,max > - Vc > Vs,max
ϕ 2
2
Vs,max = √f'c·bwd
3
2
= √25·0.4·0.735
3

= 0.98 MN -> 980 kN


Vu 196.6
- Vc = – 245
ϕ 0.75

= 17.13 kN
1
Vs,max = 490 kN
2
Vu
Vs,max > - Vc, maka dimensi penampang cukup
ϕ

Vu 1
- Vc < Vs,max, maka spasi maksimum tulangan geser tetap
ϕ 2

Step 5: Hitung luas penampang Av


1
Digunakan penulangan ∅10 -> Av = 3· π∅2
4
1
= 3· π·102
4

= 235.62 mm2
Diktat UTS
Struktur Beton 1

Step 6: Cek Av,min dengan spacing maksimum


1
• smax ≤ d dan smax ≤ 600
2
1
≤ ·735 dan ≤ 600
2
≤ 367.5 -> 350 mm dan ≤ 600
0.062√f'c·bw s 0.35bw s
Av,min ≥ dan Av,min ≥
fys fys

0.062√25·400·367.5 0.35·400·367.5
≥ dan ≥
240 240
2
≥ 189.88 mm dan ≥ 214.38 mm2
Step 7: Hitung spacing minimum
Av ·fys d
smin = V
u - V
c
ϕ
-6
235.62·10 ·240000·0.735
=
17.13
= 2.426 m -> 350 mm
Diktat UTS
Struktur Beton 1

e.

350 mm
a b

potongan a

1.5 m 4.5 m

potongan b
Diktat UTS
Struktur Beton 1
Diktat UTS
Struktur Beton 1

1000 mm
DL = 30 kN/m
LL = 40 kN/m
150 mm

600 mm

2.5 m 7.5 m 2.5 m

300 mm

Gunakan fy = 400 MPa, f’c = 35 MPa, Es = 200 GPa. -> β1 = 0.8


Diktat UTS
Struktur Beton 1

1. U = 1.2DL + 1.6LL

DL = 44.21 kN/m
LL = 64 kN/m

A B D
C

2.5 m 7.5 m 2.5 m

405.79
270.53

Diagram L

-270.53

-405.79

-338.19 -338.19

Diagram M

422.6
Diktat UTS
Struktur Beton 1

I. Reaksi perletakan
Σ V = 0
VA + VB – 108.21·12.5 = 0
VA + VB = 1352.63 kN

Simetri pada pembebanan balok memberikan VA = VB = 676.32 kN

II. Gaya dalam


• interval A-B (0 ≤ x ≤ 2.5 m) lihat kiri

L = -108.21x
108.21
M • x = 0, LA = 0
• x = 2.5, LB = -270.53
M = -54.11x2
x • x = 0, MA = Mext = 0
L • x = 2.5, MB = -338.19

Simetri pada pembebanan balok memberikan peninjauan gaya dalam cukup


setengah bentang saja
• interval B-X (0 ≤ x ≤ 3.75 m) lihat kiri

L = 405.79 – 108.21x
676.32
108.21 • x = 0, LB = 405.79
M
• x = 3.75, LX = 0
M = -338.19 + 405.79x – 54.11x2

338.19 x • x = 0, MB = -338.19
270.53 L • x = 3.75, MX = Mext = 422.6
Diktat UTS
Struktur Beton 1

2.
1000 mm

73.5 mm 150 mm

6D22
600 mm 539 mm

2D22

300 mm

Step 1: Asumsikan fs = fs’ = 400 MPa


Step 2: Cek As ≥ As,min
1
As = 6· πD2
4
1
= 6· π·222
4
= 2280.8 mm2
0.25√f'c·bw d 1.4bw d
As,min ≥ dan As,min ≥
fy fy

0.25√35·300·526.5 1.4·300·526.5
≥ dan ≥
400 400
≥ 584.03 mm2 dan ≥ 552.83 mm2
Step 3: Gunakan kesetimbangan gaya tekan-tarik untuk menentukan nilai a
0.85f’c·ab + As’·fy = As·fy
(As - As ')fy
a =
0.85f’c·bw
(2280.8 - 760.27)·400
=
0.85·35·300
= 68.15 mm
a ≤ hf, maka dilakukan analisis balok sederhana
Diktat UTS
Struktur Beton 1

Step 4: Cek hubungan antara εs dan εs’ dengan εy


β1 d - a
εs = 0.003( )
a
0.8·526.5 - 68.15
= 0.003( )
68.15
= 0.016
a - β1 d'
εs’ = 0.003( )
a
68.15 - 0.8·61
= 0.003( )
68.15
= 0.0009
fy
εy =
Es
400
=
200000
= 0.002
εs ≥ εy, maka tulangan tarik sudah leleh
εs’ < εy, maka tulangan tekan belum leleh
Karena tulangan tekan belum leleh, maka revisi asumsi fs’ = Es·εs’, dan
ulangi step 3
0.85f’c·abw + As’·fs’ = As·fy
0.85f’c·abw + As’·Es·εs’ = As·fy
a - β1 d'
0.85f’c·abw + As’·Es·0.003( ) = As·fy
a
8.93a2 - 0.46a – 0.024 = 0
diperoleh a = 0.08 m -> 83.64 mm
Step 5: Hitung momen nominal Mn
1
Mn = 0.85f’c·abw(d - a) + As’·fs’(d – d’)
2
1
= 0.85·35000·0.084·0.3(0.527 - ·0.084) +
2
760.27·10-6·170400(0.527 - 0.061)
= 423.97 kN.m
Diktat UTS
Struktur Beton 1

Step 6: Hitung momen rencana MR dan bandingkan dengan Mu = 338.19 kN.m


β 1 dt - a
• εt = 0.003( )
a
0.8·539 - 68.15
= 0.003( )
68.15
= 0.016 -> ϕ = 0.9
MR = ϕMn
= 0.9·423.97
= 381.57 kN.m
ϕMn ≥ Mu, maka tulangan cukup menahan momen
Diktat UTS
Struktur Beton 1

3.
Step 1: Hitung b
b = 1000 mm
Step 2: Hitung momen terfaktor Mu
Mu = 422.6 kN.m
Step 3: Asumsikan d = (h – 90) mm
d = 510 mm
Step 4: Hitung luas penampang As
3 0.85f'c·β1
As = ( )bwd
8 fy
3 0.85·35·0.8
= ( )·300·510
8 400
= 3413.81 mm2
Step 5: Hitung ϕMn, dan bandingkan hasilnya dengan Mu
As ·fy
• a =
0.85f'c·b
3413.81·400
=
0.85·35·1000
= 45.9 mm
1
ϕMn = 0.9·0.85f’c·ab(d - a)
2
1
= 0.9·0.85·35000·0.046·1(0.535 - ·0.046)
2
= 630.6 kN.m
ϕMn ≥ Mu, maka balok tidak perlu tulangan tekan dan ulangi step 4.
Mu
As =
0.9fy ·0.95d
-3
422.6·10
=
0.9·400·0.95·0.51
= 0.0024 m2 -> 2422.89 mm2
Digunakan penulangan tekan 7D22: As = 2660.93 mm2
bmin = 263 mm ≤ 300 (terpenuhi)
Diktat UTS
Struktur Beton 1

Step 6: Cek As ≥ As,min


0.25√f'c·bw d 1.4bw d
As,min ≥ dan As,min ≥
fy fy

0.25√35·300·510 1.4·300·510
≥ dan ≥
400 400
≥ 565.73 mm2 dan ≥ 535.5 mm2
Step 7: Gunakan kesetimbangan gaya tekan-tarik untuk menentukan nilai a
0.85f’c·ab = As·fy
As ·fy
a =
0.85f’c·b
2660.93·400
=
0.85·35·1000
= 35.78 mm
a ≤ hf, maka dilakukan analisis balok sederhana
Step 8: Cek hubungan antara εs dengan εy
β1 d - a
εs = 0.003( )
a
0.8·510 - 35.78
= 0.003( )
35.78
= 0.031
fy
εy =
Es
400
=
200000
= 0.002
εs ≥ εy, maka tulangan tarik sudah leleh
Step 9: Hitung momen nominal Mn
1
Mn = 0.85f’c·ab(d - a)
2
1
= 0.85·35000·0.036·1(0.51 - ·0.036)
2
= 526.93 kN.m
Diktat UTS
Struktur Beton 1

Step 10: Hitung momen rencana MR dan bandingkan hasilnya dengan Mu


β 1 dt - a
• εt = 0.003( )
a
0.8·535 - 35.78
= 0.003( )
35.78
= 0.033 -> ϕ = 0.9
MR = ϕMn
= 0.9·526.93
= 474.24 kN.m
ϕMn ≥ Mu, maka perhitungan selesai
Diktat UTS
Struktur Beton 1

4.
a b

potongan a

2.5 m 1.875 m 3.75 m 1.875 m 2.5 m

potongan b

Anda mungkin juga menyukai