UPK Sebalang
Job Card Report
JOB CARD
No. WO : WO27626 PM SBLG TU 00 AMMONIA DOSING PUMP #1 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28629
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27626 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:18.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #1
QCA10AP001
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27627 PM SBLG TU 00 AMMONIA DOSING PUMP #2 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28630
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27627 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:21.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #2
QCA10AP002
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27628 PM SBLG TU 00 AMMONIA DOSING PUMP #3 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28631
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27628 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:23.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #3
QCA10AP003
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27629 PM SBLG TU 00 AMMONIA DOSING PUMP #4 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28632
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27629 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:26.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #4
QCA10AP004
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27630 PM SBLG TU 00 AMMONIA DOSING PUMP #5 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28633
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27630 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:29.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #5
QCA10AP005
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27631 PM SBLG TU 00 AMMONIA DOSING PUMP #6 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28634
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27631 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:32.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AMMONIA DOSING PUMP #6
QCA10AP006
Location : 1810000001UMA01R001
POWER HOUSE RUANG INJEKSI KIMIA LANTAI 1
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27636 PM SBLG TU 00 ACID UNLOADING PUMP-1 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28639
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27636 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:45.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 ACID UNLOADING PUMP-1
GDN40AP001
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27637 PM SBLG TU 00 ACID UNLOADING PUMP-2 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28640
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27637 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:48.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 ACID UNLOADING PUMP-2
GDN40AP002
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27638 PM BLG TU 00 AIR BLOWER 1 FOR MGF - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU BLOWER MGF - 14D
FAN-06-30
Task : WT28641
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:15:00.0
Parent : WO27638 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:51.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-BLOWER01 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR BLOWER 1 FOR MGF
GDB10AN001
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
1. SAFETY HELMET
2. SAFETY SHOES
3. EAR PLUG
4. MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN :
1. VISUAL CEK, PASTIKAN TIDAK ADA KEBOCORAN [ ] OK
2. CEK BELT TENSION [ ] OK
3. CEK LEVEL OLI GEARBOX [ ] OK
4. CEK PARAMETER OPERASI
- VIBRASI [ ] OK
- TIDAK ADA KELAINAN SUARA [ ] OK
5. CLEANING PERALATAN
C. POST MAINTENANTE TEST :
1. TIDAK ADA KEBOCORAN
2. KEKENDORAN BELT (BELT TENSION) ± 1 CM
3. NORMAL LEVEL OLI GEARBOX (±50%)
4. PARAMETER OPERASI NORMAL
- VIBRASI <4,5 MM/S
- NOISE < 85 DB
5. PERALATAN DAN AREA BERSIH
Catatan:
JOB CARD
No. WO : WO27639 PM SBLG TU 00 AIR BLOWER 2 FOR MGF - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU AIR BLOWER FOR DEGASSER TOWER - 14D
FAN-07-30
Task : WT28642
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27639 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:54.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-BLOWER01 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR BLOWER 2 FOR MGF
GDB10AN002
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. Pastikan kelengkapan APD (Alat lindung Diri)
- Safety Helmet
- Safety Shoes
- Ear Plug
- Masker
2. Siapkan tool dan material yang dibutuhkan
3. Apabila equipment dalam kondisi operasi jangan melakukan tindakan pemeliharaan yang dapat mengganggu
jalannya sistem operasi
B. LANGKAH PEKERJAAN :
1. CEK BELT TENSION [ ] OK
2. CEK LEVEL OLI GEARBOX [ ] OK
3. CEK PARAMETER OPERASI
- VIBRASI [ ] OK
- TIDAK ADA KELAINAN SUARA [ ] OK
4. INSPEKSI KEBOCORAN UDARA PADA LINE
5. CLEANING PERALATAN
Catatan:
PLN Nusantara Power
UPK Sebalang
Job Card Report
JOB CARD
No. WO : WO27640 PM SBLG TU 00 AIR COMPRESSOR A - NEW RO - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU AIR COMPRESSOR KAESAR- 14D
COM-03-30
Task : WT28643
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27640 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:56.0 Reported By : 95191660ZY
Assign : Failure Class : ROTCMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR COMPRESSOR A - NEW RO
GDP11AN003
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. PERSIAPAN
1. GUNAKAN APD (SAFETY HELMET, SAFETY SHOES, EARPLUG)
2. PERSIAPKAN TOOL & MATERIAL
3. KOORDINASI DENGAN OPERATOR
B. LANGKAH KERJA
1. CEK KEBOCORAN PADA COMPREESSOR, PIPA DAN HOSE (ADA/TIDAK)
2. CEK KONDISI SEMUA HOSE [ ] OK
3. CATAT TOTAL RUNNING HOURS DI DISPLAY (.............)
4. CEK INDIKASI ALARM DI DISPLAY, CATAT JIKA ADA (............................)
5. CEK LEVEL OLI DAN COOLANT [ ] OK
6. CEK KEBISINGAN/KELAINAN SUARA [ ] OK
7. CLEANING PERALATAN [ ] OK
C. POST MAINTENANCE
1. TIDAK ADA KEBOCORAN OLI, AIR DAN UDARA
2. HOSE KONDISI BAIK (TIDAK BOCOR, CRACK DAN HARDENING)
3. PRESSURE COMPRESSOR NORMAL (SETTING LOAD 4,5 BAR, UNLOAD 5 BAR)
4. TIDAK ADA INDIKASI ALARM DI DIPLAY
5. LEVEL OLI DAN WATER COOLER NORMAL (50 % -75% PADA SIGH GLASS)
6. KEBISINGAN SUARA NORMAL <75 Db
7. PERALATAN BERSIH (TIDAK BERDEBU)
Planned & Actual Labor
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
WT28643 HELPER 1 0.75
WT28643 MECH1 JUNIOR 1 0.75
Catatan:
PLN Nusantara Power
UPK Sebalang
Job Card Report
JOB CARD
No. WO : WO27641 PM SBLG TU 00 AIR COMPRESSOR B - NEW RO - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU AIR COMPRESSOR KAESAR- 14D
COM-03-30
Task : WT28644
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27641 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:43:59.0 Reported By : 95191660ZY
Assign : Failure Class : ROTCMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR COMPRESSOR B - NEW RO
GDP11AN004
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. PERSIAPAN
1. GUNAKAN APD (SAFETY HELMET, SAFETY SHOES, EARPLUG)
2. PERSIAPKAN TOOL & MATERIAL
3. KOORDINASI DENGAN OPERATOR
B. LANGKAH KERJA
1. CEK KEBOCORAN PADA COMPREESSOR, PIPA DAN HOSE (ADA/TIDAK)
2. CEK KONDISI SEMUA HOSE [ ] OK
3. CATAT TOTAL RUNNING HOURS DI DISPLAY (.............)
4. CEK INDIKASI ALARM DI DISPLAY, CATAT JIKA ADA (............................)
5. CEK LEVEL OLI DAN COOLANT [ ] OK
6. CEK KEBISINGAN/KELAINAN SUARA [ ] OK
7. CLEANING PERALATAN [ ] OK
C. POST MAINTENANCE
1. TIDAK ADA KEBOCORAN OLI, AIR DAN UDARA
2. HOSE KONDISI BAIK (TIDAK BOCOR, CRACK DAN HARDENING)
3. PRESSURE COMPRESSOR NORMAL (SETTING LOAD 4,5 BAR, UNLOAD 5 BAR)
4. TIDAK ADA INDIKASI ALARM DI DIPLAY
5. LEVEL OLI DAN WATER COOLER NORMAL (50 % -75% PADA SIGH GLASS)
6. KEBISINGAN SUARA NORMAL <75 Db
7. PERALATAN BERSIH (TIDAK BERDEBU)
Planned & Actual Labor
Task ID Craft Skill Level Labor Planned Quantity Planned Hours Actual Quantity Actual Hours
WT28644 HELPER 1 0.75
WT28644 MECH1 JUNIOR 1 0.75
Catatan:
PLN Nusantara Power
UPK Sebalang
Job Card Report
JOB CARD
No. WO : WO27642 PM SBLG TU 00 AIR DRYER INSTRUMENT A - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU AIR DRYER-14D
DRY-01-30
Task : WT28645
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27642 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:44:02.0 Reported By : 95191660ZY
Assign : Failure Class : GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR DRYER INSTRUMENT A
QFA10AH001
Location : 181000 PLTU SEBALANG
B. LANGKAH PEKERJAAN
1. PERIKSA LEVEL OLI [ ] OK
2. PERIKSA PANEL FILTER [ ] OK
3. CLEANING AIR COOLED [ ] OK
4. PERIKSA AUTO DRAIN ( PASTIKAN BEKERJA) [ ] OK
5. PERIKSA / CLEANING DRAIN TRAP [ ] OK
6. CLEANING PERALATAN [ ] OK
Catatan:
JOB CARD
No. WO : WO27643 PM SBLG TU 00 AIR DRYER INSTRUMENT B - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU AIR DRYER-14D
DRY-01-30
Task : WT28646
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27643 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:44:05.0 Reported By : 95191660ZY
Assign : Failure Class : ROTCMP GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 AIR DRYER INSTRUMENT B
QFA20AH001
Location : 181000 PLTU SEBALANG
B. LANGKAH PEKERJAAN
1. PERIKSA LEVEL OLI [ ] OK
2. PERIKSA PANEL FILTER [ ] OK
3. CLEANING AIR COOLED [ ] OK
4. PERIKSA AUTO DRAIN ( PASTIKAN BEKERJA) [ ] OK
5. PERIKSA / CLEANING DRAIN TRAP [ ] OK
6. CLEANING PERALATAN [ ] OK
Catatan:
JOB CARD
No. WO : WO27669 PM SBLG TU 00 MICRON CARTRIDGE FILTER-B (SWRO SYSTEM) - 7D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU MICRON CATRIDGE FILTER SWRO - 14D
FTR-03-30
Task : WT28672
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:15:00.0
Parent : WO27669 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:45:14.0 Reported By : 95191660ZY
Assign : Failure Class : FILTER GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 MICRON CARTRIDGE FILTER-B (MCF SWRO SYSTEM)
GDF10AT102
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
1. SAFETY HELMET
2. SAFETY SHOES
3. EAR PLUG
4. MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN :
Catatan:
JOB CARD
No. WO : WO27671 PM SBLG TU 00 SEA WATER SUPPLY PUMP A (VERTICAL) - 7D
Job Plan : SBLG-TU-JP-PMM1- PM POMPA 400 V - 7D
PMP-03-20
Task : WT28674
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27671 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:45:20.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 SEA WATER SUPPLY PUMP A (VERTICAL)
GDK11AP003
Location : 1810000001UPC01S001
SUMP PIT CWP
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27672 PM SBLG TU 00 SEA WATER SUPPLY PUMP B (VERTICAL) - 7D
Job Plan : SBLG-TU-JP-PMM1- PM POMPA 400 V - 7D
PMP-03-20
Task : WT28675
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27672 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:45:23.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 SEA WATER SUPPLY PUMP B (VERTICAL)
GDK11AP004
Location : 1810000001UPC01S001
SUMP PIT CWP
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27676 PM SBLG TU 00 SERVICE WATER PUMP-1 - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28679
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27676 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:45:34.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 SERVICE WATER PUMP-1
GHD10AP001
Location : 1810000001UGD01S003
RAW WATER TANK AREA
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27685 PM SBLG TU 00 SWRO FEED PUMP A - NEW RO - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28688
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27685 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:45:58.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 SWRO FEED PUMP A - NEW RO
GDF11AP001
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27686 PM SBLG TU 00 SWRO FEED PUMP B - NEW RO - 14D
Job Plan : SBLG-TU-JP-PMM1- PM PLTU POMPA - 7D
PMP-02-20
Task : WT28689
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27686 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:46:00.0 Reported By : 95191660ZY
Assign : Failure Class : CMB-CFGPMP07 GL Account : A-
SB-12-263-000-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-00- SBLG TU 00 SWRO FEED PUMP B - NEW RO
GDF11AP002
Location : 1810000001UGD01S001
REVERSE OSMOSIS PLANT
A. SAFETY INDUCTION :
1. PASTIKAN KELENGKAPAN APD (ALAT LINDUNG DIRI)
- SAFETY HELMET
- SAFETY SHOES
- EAR PLUG
- MASKER
2. SIAPKAN TOOL DAN MATERIAL YANG DIBUTUHKAN
3. APABILA EQUIPMENT DALAM KONDISI OPERASI JANGAN MELAKUKAN TINDAKAN PEMELIHARAAN YANG
DAPAT MENGGANGGU JALANNYA SISTEM OPERASI
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27730 PM SBLG TU 10 EH OIL PUMP A UNIT 1 - 7D
Job Plan : SBLG-TU-JP-PMM1- PM POMPA 400 V - 7D
PMP-03-20
Task : WT28733
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27730 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:47:57.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-001-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-10- SBLG TU 10 EH OIL PUMP 1A
MAX10AP001
Location : 1810000001UMA02S001
POWER HOUSE LANTAI 2 UNIT 1
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan:
JOB CARD
No. WO : WO27731 PM SBLG TU 10 EH OIL PUMP B UNIT 1 - 7D
Job Plan : SBLG-TU-JP-PMM1- PM POMPA 400 V - 7D
PMP-03-20
Task : WT28734
Status : APPR Target Start : 2023-09-04 00:00:00.0 Target Finish : 2023-09-04 04:45:00.0
Parent : WO27731 Actual Start : Actual Finish :
Work Type : PM Report Date : 2023-08-26 13:48:00.0 Reported By : 95191660ZY
Assign : Failure Class : RECPMP GL Account : A-
SB-12-263-001-99-20
Priority : Person Group : MECHU1
Asset : SBLG-TU-10- SBLG TU 10 EH OIL PUMP 1B
MAX10AP002
Location : 1810000001UMA02S001
POWER HOUSE LANTAI 2 UNIT 1
B. LANGKAH PEKERJAAN:
1. CEK VISUAL KEBOCORAN MECHANICAL SEAL ATAU GLAND PACKING [ ] OK
2. CEK PRESURE DISCHARGE POMPA [ ] OK
3. CEK KELAINAN SUARA [ ] OK
4. CEK KEKENCANGAN BAUT PEDESTAL [ ] OK
5. CEK KEBOCORAN PADA LINE [ ] OK
6. CEK LEVEL OLI (JIKA ADA) [ ] OK
7. CLEANING PERALATAN & AREA[ ] OK
Catatan: