DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2022
DRAFT TRIWULAN I TAHUN 2022
A. DAFTAR HARGA RATA-RATA BAHAN BANGUNAN (HARGA BELUM TERMASUK PPN 10%,OVERHEAD DAN PROFIT
1 2 3 4
IV BAHAN BESI/LOGAM
1 Besi begel/baut - kg
2 Besi beton polos - kg
3 Besi beton ulir - kg
4 Pipa besi galvanis medium B (tebal 2,4 mm) Ø1/2" - 6 m btg
5 Pipa besi galvanis medium B (tebal 3 mm) Ø1" - 6 m btg
6 Pipa besi galvanis medium B (tebal 3 mm) Ø1,5" - 6 m btg
7 Pipa besi galvanis medium B (tebal 3,3 mm) Ø2" - 6 m btg
8 Pipa besi galvanis medium B (tebal 3,3 mm) Ø2,5" - 6 m btg
9 Besi plat tebal 2 mm 4' x 8' lbr
10 Besi plat tebal 3 mm 4' x 8' lbr
11 Besi plat tebal 4 mm 4' x 8' lbr
12 Besi plat bordes tebal 6 mm 4' x 8' lbr
13 Besi plat strip panjang tebal 2 mm 5x2x6m ljr
14 Baja struktur - kg
15 Kawat harmonika - m²
16 Kawat ikat beton (bendrat) - kg
17 Bondex (galvalum) 0.75X1.00 m²
18 Pintu Alumunium (kualitas II) 70 x 200 cm lbr
19 Pintu PVC (kualitas baik) 70 x 210 cm lbr
20 Kawat kasa alumunium - m²
21 Pagar besi ulir komplit dg mainan - m²
22 Pintu pagar besi ulir komplit dg mainan - m²
23 Pintu rolling door - m²
24 Pintu plat harmonika t=1.2 mm m²
25 Atap twin lite rangka pipa stainless steel terpasang m²
26 Atap twin lite rangka pipa besi / hollow terpasang m²
27 Teralis besi - m²
28 Teralis aluminium - m²
29 Railling stainless steel Ø2" m²
30 Seng galvalum t=0.30 mm m²
t=0.75 mm jarak
31 Pasang rangka galvalum (terpasang) m²
kuda2=mm
t=0.75 1.20 m
jarak
32 Pasang rangka galvalum (terpasang) m²
kuda2= 1.00
t=0.75 mm jarak m
33 Pasang rangka galvalum (terpasang) m²
kuda2=mm
t=1.00 0.80 m
jarak
34 Pasang rangka galvalum (terpasang) m²
kuda2= 1.20
t=1.00 mm jarak m
35 Pasang rangka galvalum (terpasang) m²
kuda2= 1.00 m
36 Pasang rangka galvalum (terpasang) t=1.00 mm jarak kuda2= 0.80 m m²
37 Baut drilling sds 12x20 bh
38 Baut drilling sds 8x1/2 bh
39 Dinabolt 8x65 bh
40 Kusen Pintu&jendela Aluminium Silver "HC" 4" m¹
41 Kusen Pintu&jendela Aluminium Silver "ALEXINDO" 4" m¹
42 Kusen Pintu&jendela Aluminium silver "YKK" 4" m¹
43 Kusen Pintu&jendela Aluminium Coklat "HC" 4" m¹
44 Kusen Pintu&jendela Aluminium Coklat "ALEXINDO" 4" m¹
45 Kusen Pintu&jendela Aluminium Coklat "ALEXINDO" 3" m¹
46 Kusen Pintu&jendela Aluminium Coklat "YKK" 4" m¹
Kusen Pintu&jendela Aluminium Putih/super white
47 4" m¹
"ALEXINDO"
48 Sealent - tube
V BAHAN LANTAI
1 Paving stone 3 berlian warna, cetak basah 10.5 x 21 x 6 (cm) m²
2 Paving stone 3 berlian netral, cetak basah 10.5 x 21 x 6 (cm) m²
3 Paving stone segi 6 warna, cetak basah 10.5 x 21 x 6 (cm) m²
4 Paving stone segi 6 netal, cetak basah 10.5 x 21 x 6 (cm) m²
5 Paving stone persegi warna,cetak basah 10.5 x 21 x 6 (cm) m²
6 Paving stone per segi abu-abu, cetak basah 10.5 x 21 x 8 (cm) m²
7 Paving stone 3 berlian warna, cetak basah 10.5 x 21 x 8 (cm) m²
8 Paving stone 3 berlian netral, cetak basah 10.5 x 21 x 8 (cm) m²
9 Paving stone segi 6 warna, cetak basah 10.5 x 21 x 8 (cm) m²
10 Paving stone segi 6 netal, cetak basah 10.5 x 21 x 8 (cm) m²
11 Paving stone persegi netral, cetak basah 10.5 x 21 x 8 (cm) m²
12 Paving stone persegi warna, cetak basah 10.5 x 21 x 8 (cm) m²
13 Paving 3 Dimensi ,cetak basah t=6 (cm) m²
18 Paving Kotak netral,cetak basah 21x21x8 (cm) m²
19 Paving Kotak warna,cetak basah 21x21x8 (cm) m²
20 Kanstin 15x25x40 bh
21 Kanstin 15x30x50 bh
22 Kanstin 20x30x50 bh
23 Topi uskup t=6 cm bh
24 Topi uskup t=8 cm bh
25 Keramik, Roman polos 40 x 40 m²
26 Keramik, Roman polos 50 x50 m²
27 Keramik, Roman warna 40 x 40 m²
28 Keramik, Roman Type Alur 33 x 33 m²
29 Keramik, KIA polos 20 x 20 m²
30 Keramik, KIA polos 20 x 25 m²
39 Keramik, KIA warna 20 x 25 m²
40 Tegel keramik, KIA warna 30 x 30 m²
41 Tegel keramik, KIA warna 40 x 40 m²
42 Tegel keramik, KIA kasar 30 x 30 m²
40 Keramik, KIA warna 30 x 30 m²
41 Keramik, KIA warna 40 x 40 m²
42 Keramik, Platinum polos 40 x 40 m²
43 Keramik, Platinum polos 50 x 50 m²
44 Keramik, Platinum warna 30 x 30 m²
45 Keramik, Platinum warna 40 x 40 m²
46 Keramik, Platinum warna 50 x 50 m²
47 Keramik, Platinum warna 25 x 40 m²
48 Keramik, Platinum warna 60 x 60 m²
50 Keramik, Arwana Putih 20 x 25 m²
51 Keramik, Arwana Putih 30 x 30 m²
52 Keramik, Arwana Putih 40 x 40 m²
53 Keramik, Arwana Warna 20 x 25 m²
54 Keramik, Arwana Warna 30 x 30 m²
55 Keramik, Arwana Warna 40 x 40 m²
56 Keramik, Arwana Kasar 30 x 30 m²
57 Keramik, Asia Putih 30 x 30 m²
58 Keramik, Asia Putih 40 x 40 m²
59 Keramik, Asia Warna 20 x 25 m²
60 Keramik, Asia Warna 30 x 30 m²
61 Keramik, Asia Warna 40 x 40 m²
62 Keramik, Asia Kasar 30 x 30 m²
63 Tegel keramik, Essenza polos 30 x 30 m²
64 Tegel keramik, Essenza polos 40 x 40 m²
65 Tegel keramik, Essenza polos 60 x 60 m²
66 Tegel keramik, Essenza warna 30 x 30 m²
67 Tegel keramik, Essenza warna 40 x 40 m²
68 Keramik, Asia Kasar 40 x 40 m²
69 Tegel plint keramik warna 10 x 30 m¹
70 Marmer ex. Tulungagung 40 x 60 m²
71 Keramik motif Granit, Granito polos 40 x 40 m²
72 Keramik motif Granit, Granito polos 60 x 60 m²
73 Keramik motif Granit, Granito warna 40 x 40 m²
74 Keramik motif, Granito warna 60 x 60 m²
75 Step nosing 8x 40 bh
76 Step nosing 7 x 30 bh
77 Keramik motif granit ex china 60 x 60 m²
78 Keramik, Asia (Oscar Red) 30x30 m²
79 Keramik motif Granit,Dakara polos 60x60 dos
80 Keramik motif Granit,Niro kasar 60x60 dos
81 Keramik motif Granit,Roman polos 60x60 dos
82 Keramik motif Granit,Garuda polos 60x60 dos
83 Plint granit polos 10x60 bh
84 Plint granit motif 10x60 bh
85 Granit difable 30x30 m²
86 Tegel difable 30x30 m²
VI BAHAN PENGECATAN
1 Cat besi Emco - kg
2 Cat kayu Emco - kg
3 Meni besi/kayu, cap Pedang - kg
4 Thinner A spesial "Bintang" - ltr
5 Thinner B spesial - ltr
6 Cat tembok Vinilex (Interior) - kg
7 Cat tembok Vinilex ( exterior) - kg
8 Cat tembok Decolith - kg
9 Cat tembok Dulux (Interior) - Ltr
10 Cat tembok Dulux (exterior) Ltr
11 Cat tembok Paragon - kg
12 Cat genteng Sanlex - kg
13 Cat genteng Matex - kg
14 Wallsealer/cat tembok dasar Vinilex - ltr
15 Wallsealer/cat tembok dasar Dulux - ltr
16 No Drop - kg
17 Aqua proof - kg
18 Serlak kripik "India" - kg
19 Wood Filler "Impra" - ltr
20 Wood Stain 'Impra" - ltr
21 Sanding Sealer "Impra" - ltr
22 Kertas gosok - lbr
23 Plamur tembok - kg
24 Plamur kayu - kg
25 Spiritus - ltr
26 Lem Rajawali untuk kayu (kuning) - kg
27 Lem Rajawali untuk tembok - kg
28 Soda Api - kg
29 Kuas Eterna 3" bh
30 Kuas Eterna 4" bh
31 Kuas Eterna 5" bh
32 Kalsium - kg
33 Coating batu alam ex-propan - ltr
25 Shower Set -
26 Floordrain -
27 Tempat Sabun -
28 Kran zink -
29 Kitchenzink -
30 Kran dinding -
31 Pelampung otomatis bh
32 Roof drain steinless 3" bh
HARGA DRAFT
TRIWULAN I 2022 KETERANGAN
(Rp)
5 6
7,000,000.00
7,300,000.00
6,500,000.00
6,000,000.00
10,500,000.00
11,200,000.00
9,300,000.00
7,800,000.00
2,292,000.00
4,160,000.00
3,750,000.00
3,645,000.00
3,330,000.00
5,500.00
8,000.00
15,000.00
20,000.00
126,800.00 Djabesmen
53,100.00 Djabesmen
37,400.00 Djabesmen
32,700.00 Djabesmen
75,500.00 Djabesmen
58,000.00 Djabesmen
63,350.00
21,500.00
95,000.00
65,000.00
17,000.00
56,000.00 APLUS
41,000.00
18,000.00
1,850.00
7,000.00
2,000.00
6,500.00
2,500.00
6,500.00
8,500.00 Monier
15,000.00 Monier
11,000.00 Milenio
10,000.00 Espanika
22,500.00 Kanmuri
9,500.00 KIA
20,000.00 KIA
10,500.00 M class
22,500.00 M class
27,000.00
25,000.00
59,000.00
70,000.00
57,000.00
70,000.00
82,000.00
110,000.00
125,000.00
45,000.00 APLUS
36,000.00
15,000.00
20,000.00
12,500.00 SNI
13,300.00 SNI
96,000.00
176,500.00
288,800.00
396,000.00
495,000.00
545,000.00
781,000.00
965,000.00
1,850,000.00
66,000.00
17,000.00
30,000.00
21,400.00
165,000.00 Kencana
1,550,000.00
440,000.00
45,000.00
675,000.00
775,000.00
575,000.00
1,200,000.00
700,000.00
575,000.00
475,000.00
525,000.00
950,000.00
39,000.00 Kencana
140,000.00 Kencana
150,000.00 Kencana
165,000.00 Kencana
155,000.00 Kencana
170,000.00 Kencana
185,000.00 Kencana
300.00 SEC
170.00 SEC
2,000.00 SEC
92,000.00 HC
117,500.00 ALEXINDO
375,000.00 YKK
105,000.00 HC
125,000.00 ALEXINDO
95,000.00 ALEXINDO
375,000.00 YKK
145,000.00 ALEXINDO
35,000.00
62,000.00 Emco
62,000.00 Emco
30,600.00 Pedang
38,200.00
25,900.00
32,000.00 Vinilex
32,000.00 Vinilex
24,600.00 Decolith
72,000.00 Dulux
126,000.00 Dulux
23,000.00 Paragon
36,700.00 Sanlex
32,800.00 Matex
49,000.00 Vinilex
55,400.00 Dulux
53,000.00
48,000.00
268,800.00
41,800.00
74,600.00
74,600.00
4,000.00
29,000.00
25,500.00
10,000.00
47,500.00
17,800.00
22,600.00
12,300.00
20,300.00
31,300.00
2,500.00
76,500.00 Propam
98,800.00 ELT
50,300.00 ELT
7,500.00
34,500.00 Vintage
8,000.00 Aomori
85,000.00 SES
112,500.00 SOLID
450,000.00 ELT
206,000.00 SOLID
63,500.00
118,000.00 DEKSON
330,000.00 ELT
499,000.00 ELT
25,000.00 SOLID
22,000.00 Vintage
284,000.00 DEKSON
198,000.00 SOLID
1,750,000.00 INA
1,500,000.00 KIA
2,600,000.00 TOTO Type 633
225,000.00 INA
400,000.00 TOTO
72,100.00 MOVE
79,600.00 MOVE
30,000.00
534,100.00 TOTO Type 247
633,300.00 TOTO Type 247
5,000.00
38,000.00
383,500.00
565,500.00 Type PMJ
29,000.00
INA Type U114N
2,250,000.00
URINAL
2,112,500.00
899,000.00
2,698,000.00
3,510,000.00
402,000.00
2,558,500.00
1,445,000.00 Shimizu Ps 150 Bit
type THX 20 NBPIV ex.
221,900.00
Toto
75,000.00
110,000.00
185,000.00
250,000.00
300,000.00
112,500.00
180,000.00
120,000.00
110,000.00
35,000.00 Maspion
43,000.00 Maspion
54,000.00 Maspion
99,000.00 Maspion
147,000.00 Maspion
189,000.00 Maspion
269,000.00 Maspion
391,000.00 Maspion
616,000.00 Maspion
814,000.00 Maspion
70,000.00 Maspion
104,000.00 Maspion
151,000.00 Maspion
212,000.00 Maspion
345,000.00 Maspion
419,000.00 Maspion
133,000.00 Move
5,000.00 Royal
11,000.00 Glue
21,000.00
21,000.00
21,000.00
21,000.00
30,000.00
65,000.00
21,000.00
20,000.00
11,300.00
3,000.00
6,500.00
14,300.00 Broco
13,500.00 Broco
19,400.00 Broco
399,300.00
34,500.00 Broco
34,500.00 Broco
34,500.00 Broco
65,000.00 Philips
367,000.00 Luxuri
278,000.00 Power
245,000.00 Luxuri
45,000.00 Masco
24,000.00 Masco
42,800.00 Philips
10,600.00 Broco
43,000.00 Broco
59,900.00 Broco
76,400.00 Broco
13,750.00 Kitani
12,000.00
15,500.00
7,650.00 Pertamina
5,150.00 Pertamina
9,000.00 Pertamina
11,150.00 Pertamina
11,220.00 Pertamina
46,000.00 Pertamina
42,000.00 Pertamina
42,600.00 Pertamina
7,800.00 Pertamina
9,700.00 Pertamina
2,200,000.00 PT TRIASINDOMIX
Tabel 2. Perhitungan Analisa Harga Satuan Pekerjaan Kota Blitar Tahun 2022
Harga Satuan Upah Bahan Jumlah Harga
NO Uraian Pekerjaan
(Rp) (Rp) (Rp) (Rp)
a b c d e f
I Pekerjaan Persiapan
1.1 1m^2 Pembersihan lahan
Upah
0.1 OH Pekerja 81,600.00 8,160.00
0.05 OH Mandor 102,500.00 5,125.00
Sub Jumlah 13,285.00 0.00 13,285.00
1.2 Pekerjaan pembuatan 1 m2
Bahankeliling
pagar
0.00
0.00
0.070 m3 Kayu 5/7 4.926.810 344.876,7
0.060 Kg Paku 16.64 1.00
Upah
0.400 OH Pekerja 3.059.617 1.223.846
0.200 OH Tukang Kayu 149.35 29.87
0.020 OH Mandor 165.83 3.32
Sub Jumlah 1.22 1.00 2.22
1.3 Pekerjaan Gudang
Bahan
Upah
0.78 OH Pekerja 3.059.617 917,885.10
0.39 OH Tukang Batu 149.35 58.25
0.039 OH Kepala Tukang 3.939.750 153.650,25
a b c d e f
0.200 OH Tukang Batu 149.35 29.87
0.075 OH Mandor 1,658,300.00 124,372.50
Sub Jumlah 1,042,287.47 31,692.63 1,073,980.10
a b c d e f
3.2 Pembuatan 1 m3 beton mutu
f'c = 19,3 MPa (K 225) slump
Bahan
215.000 Ltr Air 150.00 32,250.00
0.870 m3 Koral beton 183.65 159.78
50.000 Kg Semen / PC 6.15 307.25
0.411 m3 Pasir 252.12 103.62
Upah
1.650 OH Pekerja 3.059.617 917,885.10
0.028 OH Kepala Tukang 3.939.750 153.650,25
0.275 OH Tukang Batu 149.35 41.07
0.083 OH Mandor 1,658,300.00 137,638.90
Sub Jumlah 1,055,565.07 32,820.65 1,088,385.72
3.3 1 kg Pembesian dengan
tulangan ulir
Bahan
10.500 Kg Baja tulangan 17,000.00
ulir 178,500.00
0.150 m3 Kawat beton 22,400.00 3,360.00
Upah
0.070 OH Pekerja 3.059.617 917,885.10
0.007 OH Kepala Tukang 3.939.750 153.650,25
0.070 OH Tukang Besi 149.35 10.45
0.004 OH Mandor 1,658,300.00 6,633.20
Sub Jumlah 924,528.75 181,860.00 110,638.88
3.4 1 kg Pembesian dengan
tulangan polos
Bahan
10.500 Kg Baja tulangan 10,350.00
polos 108,675.00
0.150 m3 Kawat beton 22,400.00 3,360.00
Upah
0.070 OH Pekerja 3.059.617 917,885.10
0.007 OH Kepala Tukang 3.939.750 153,650.10
0.070 OH Tukang Besi 149.35 10.45
0.004 OH Mandor 1,658,300.00 6,633.20
Sub Jumlah 1,078,178.85 112,035.00 119,021.39
a b c d e f
3.5 Pemasangan 1 m2 bekisting
untuk pondasi
Bahan
0.040 m3 Kayu papan 181.63
bekisiting 7.27
0.300 Kg Paku 16.64 4.99
0.100 Ltr Minyak 4,749.00
bekisting 474.90
Upah
0.520 OH Pekerja 3.059.617 917,885.10
0.026 OH Kepala Tukang 3.939.750 153,650.10
0.260 OH Tukang Kayu 149.35 38.83
0.026 OH Mandor 1,658,300.00 43,115.80
Sub Jumlah 1,114,689.83 487.16 1,115,176.99
3.6 Pemasangan 1 m2 bekisting
untuk sloof
Bahan
0.045 m3 Kayu papan 181.63
bekisiting 8.17
a b c d e f
0.300 Kg Paku 16.64 4.99
0.100 Ltr Minyak 4,749.00
bekisting 474.90
Upah
0.520 OH Pekerja 3.059.617 917,885.10
0.026 OH Kepala Tukang 3.939.750 153,650.10
0.260 OH Tukang Kayu 149.35 38.83
0.026 OH Mandor 1,658,300.00 43,115.80
Sub Jumlah 1,114,689.83 488.07 1,115,177.90
3.7 Pemasangan 1 m2 bekisting
untuk kolom
Bahan
0.040 m3 Kayu papan 181.63
bekisiting 7.27
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak
bekisting 3.41
17.035
0.015 m3 Kayu bekisting 4,749.00 71.24
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
Upah
0.660 OH Pekerja 3.059.617 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 94.53 1,126,402.91
3.8 Pemasangan 1 m2 bekisting
untuk balok
Bahan
0.040 m3 Kayu papan 181.63
bekisiting 7.27
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak 17.04
bekisting 3.41
0.018 m3 Kayu bekisting 4,749.00 85.48
a b c d e f
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
Upah
0.660 OH Pekerja 3.059.617 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 108.77 1,126,417.16
3.9 Pemasangan 1 m2 bekisting
untuk plat lantai
Bahan
0.040 m3 Kayu papan 181.63
bekisiting 7.27
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak 17.04
bekisting 3.41
0.015 m3 Kayu bekisting 4,749.00 71.24
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
Upah
0.660 OH Pekerja 3.059.617 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 94.53 1,126,402.91
3.10 Pemasangan 1 m2 bekisting
untuk tangga
Bahan
0.030 m3 Kayu papan 181.63
bekisiting 5.45
0.400 Kg Paku 16.64 6.66
0.150 Ltr Minyak 17.04
bekisting 2.56
0.015 m3 Kayu bekisting 4,749.00 71.24
a b c d e f
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
Upah
0.660 OH Pekerja 3.059.617 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 91.86 1,126,400.24
IV Pekerjaan Pasangan
4.1 Pekerjaan Trasram (1:2)
Bahan
7 Kg Semen / PC 6.15 43.02
70 Buah Bata Merah 275.99 19,319.37
0.038 m3 Pasir Pasang 183.65 6.98
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 19,369.36 1,115,794.00
4.2 Pekerjaan Pasangan Dinding Lantai 1 (1:6)
Bahan
8.32 Kg Semen / PC 6.15 51.13
70 Buah Bata Merah 539.44 37,760.45
0.049 m3 Pasir Pasang 183.65 9.00
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 37,820.58 1,134,245.21
a b c d e f
4.3 Pekerjaan Pasangan Dinding Lantai 2 (1:6)
Bahan
8.32 Kg Semen / PC 6.15 51.13
70 Buah Bata Merah 539.44 37,760.45
0.049 m3 Pasir Pasang 183.65 9.00
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 37,820.58 1,134,245.21
4.4 Pekerjaan Pasangan Dinding Kamar Mandi Lantai 1 (1:4)
Bahan
6.24 Kg Semen / PC 6.15 38.34
72 Buah Bata Merah 539.44 38,839.32
0.043 m3 Pasir Pasang 183.65 7.90
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 38,885.56 1,135,310.20
4.5 Pekerjaan Pasangan Dinding Kamar Mandi Lantai 2 (1:4)
Bahan
6.24 Kg Semen / PC 6.15 38.34
72 Buah Bata Merah 539.44 38,839.32
0.043 m3 Pasir Pasang 183.65 7.90
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 38,885.56 1,135,310.20
4.6 Pekerjaan Plesteran Dinding Rumah (1:6)
a b c d e f
Bahan
4.416 Kg Semen / PC 6.15 27.14
0.027 m3 Pasir Pasang 183.65 4.96
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,432.10 32.09 1,096,464.20
a b c d e f
4.7 Pekerjaan Plesteran Dinding Kamar Mandi (1:4)
Bahan
6.24 Kg Semen / PC 6.15 38.34
0.024 m3 Pasir Pasang 183.65 4.41
Upah
0.3 OH Pekerja 3.059.617 917,885.10
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,432.10 42.75 1,096,474.85
4.8 Pekerjaan Plesteran Dinding Dalam Kamar Mandi (1:4)
Bahan
6.24 Kg Semen / PC 6.15 38.34
0.024 m3 Pasir Pasang 183.65 4.41
Upah
0.3 OH Pekerja 3.059.617 #VALUE!
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 #VALUE!
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah #VALUE! 42.75 #VALUE!
4.9 Pekerjaan Acian
Bahan
3.25 Kg Semen / PC 6.15 19.97
Upah
0.2 OH Pekerja 3.059.617 #VALUE!
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 #VALUE!
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah #VALUE! 19.97 #VALUE!
4.10 Pekerjaan Benangan Dalam
Bahan
0.1 Kg Semen /PC 6.15 0.61
Upah
0.05 OH Pekerja 3.059.617 #VALUE!
a b c d e f
0.0033 OH Mandor 1,658,300.00 5,538.72
Sub Jumlah #VALUE! 0.61 #VALUE!
4.11 Pekerjaan Benangan Luar
Bahan
0.1 Kg Semen /PC 6.15 0.61
Upah
0.05 OH Pekerja 3.059.617 #VALUE!
0.0033 OH Mandor 1,658,300.00 5,538.72
Sub Jumlah #VALUE! 0.61 #VALUE!
4.12 Pekerjaan Tali Air Kusen
Bahan
0.1 Kg Semen / PC 6.15 0.61
Upah
0.05 OH Pekerja 3.059.617 #VALUE!
0.034 OH Mandor 1,658,300.00 56,382.20
Sub Jumlah #VALUE! 0.61 #VALUE!
4.13 Pekerjaan Tali Air Ban Keramik
Bahan
0.1 Kg Semen / PC 6.15 0.61
Upah
0.05 OH Pekerja 3.059.617 #VALUE!
0.034 OH Mandor 1,658,300.00 56,382.20
Sub Jumlah #VALUE! 0.61 #VALUE!
V Pekerjaan Atap
5.1 Pekerjaan Rangka Kuda-Kuda
Bahan
1.1 m3 Balok Kayu 8/12 6,500,000.00 7,150,000.00
0.15 Kg Besi Strip 12,350.00 1,852.50
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3.059.617 #VALUE!
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 #VALUE!
0.003 OH Mandor 1,658,300.00 4,974.90
a b c d e f
Sub Jumlah #VALUE! 7,162,352.50 #VALUE!
5.2 Pekerjaan Balok Rangkai
Bahan
1.1 m3 Balok Kayu 8/12 6,500,000.00 7,150,000.00
0.15 Kg Besi Strip 12,350.00 1,852.50
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3.059.617 #VALUE!
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 #VALUE!
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah #VALUE! 7,162,352.50 #VALUE!
5.3 Pekerjaan Usuk 5/7
Bahan
0.6 m Usuk 5/7 5,200,000.00 3,120,000.00
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3.059.617 #VALUE!
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 #VALUE!
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah #VALUE! 3,130,500.00 #VALUE!
5.4 Pekerjaan Reng 2/3
Bahan
0.012 m Reng 2/3 4,900,000.00 58,800.00
0.15 Kg Paku 21,000.00 3,150.00
Upah
0.06 OH Pekerja 3.059.617 #VALUE!
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 #VALUE!
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah #VALUE! 61,950.00 #VALUE!
VI Pekerjaan Penutup Atap
6.1 Pekerjaan Genteng
a b c d e f
Bahan
30 buah Genteng M class 10,500.00 315,000.00
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.075 OH Tukang Kayu 149.35 11.20
0.008 OH Kepala Tukang 3.939.750 #VALUE!
0.008 OH Mandor 1,658,300.00 13,266.40
Sub Jumlah #VALUE! 315,000.00 #VALUE!
6.2 Pekerjaan Wuwung
Bahan
5 buah Genteng Wuwung 22,500.00 112,500.00
8 Kg Semen / PC 60,200.00 481,600.00
0.032 m3 Pasir urug 90,000.00 2,880.00
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.075 OH Tukang Kayu 149.35 11.20
0.008 OH Kepala Tukang 3.939.750 #VALUE!
0.008 OH Mandor 1,658,300.00 13,266.40
Sub Jumlah #VALUE! 596,980.00 #VALUE!
VII Pekerjaan Lisplank dan Plafond
7.1 Pekerjaan Lisplank
Bahan
0.011 m3 Kayu Balok 5,600,000.00 61,600.00
0.05 Kg Paku 21,000.00 1,050.00
Upah
0.1 OH Pekerja 3.059.617 #VALUE!
0.2 OH Tukang Kayu 149.35 29.87
0.02 OH Kepala Tukang 3.939.750 #VALUE!
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah #VALUE! 62,650.00 #VALUE!
7.2 Pekerjaan Rangka Plafond Lantai 1
Bahan
0.0154 m3 Kayu Balok 5,600,000.00 86,240.00
0.2 Kg Paku 21,000.00 4,200.00
a b c d e f
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah #VALUE! 90,440.00 #VALUE!
7.3 Pekerjaan Rangka Plafond Lantai 2
Bahan
0.0154 m3 Kayu Balok 5,600,000.00 86,240.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah #VALUE! 90,440.00 #VALUE!
7.4 Pekerjaan Plafond Lantai 1
Bahan
0.364 lbr gypsum 9 mm 56,000.00 20,384.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah #VALUE! 24,584.00 #VALUE!
7.5 Pekerjaan Plafond Lantai 2
Bahan
0.364 lbr gypsum 9 mm 56,000.00 20,384.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3.059.617 #VALUE!
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
a b c d e f
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah #VALUE! 24,584.00 #VALUE!
VIII Pekerjaan Kusen Pintu dan Jendela
8.1 Pekerjaan Kusen Pintu dan Jendela Kayu
Bahan
1.2 m2 Kayu Balok 8,900,000.00 10,680,000.00
1.25 Kg Paku 21,000.00 26,250.00
1 Kg Lem Kayu 47,500.00 47,500.00
Upah
6 OH Pekerja 3.059.617 #VALUE!
18 OH Tukang Kayu 149.35 2,688.30
1.8 OH Kepala Tukang 3.939.750 #VALUE!
0.3 OH Mandor 1,658,300.00 497,490.00
Sub Jumlah #VALUE! 10,753,750.00 #VALUE!
8.2 Pekerjaan Satu Set Pintu Alluminium
Bahan
1 Set Pintu Alluminium 1,550,000.00 1,550,000.00
Upah
0.085 OH Pekerja 3.059.617 #VALUE!
0.085 OH Tukang Kayu 149.35 12.69
0.0085 OH Kepala Tukang 3.939.750 #VALUE!
0.0042 OH Mandor 1,658,300.00 6,964.86
Sub Jumlah #VALUE! 1,550,000.00 #VALUE!
8.3 Pekerjaan 1 m2 Pintu / Jendela + Kaca
Bahan
0.024 m2 Papan Kayu 8,900,000.00 213,600.00
1.1 Kg Kaca 8 mm 185,000.00 203,500.00
0.3 Kg Lem Kayu 47,500.00 14,250.00
Upah
0.8 OH Pekerja 3.059.617 #VALUE!
2.4 OH Tukang Kayu 149.35 358.44
0.24 OH Kepala Tukang 3.939.750 #VALUE!
0.04 OH Mandor 1,658,300.00 66,332.00
Sub Jumlah #VALUE! 431,350.00 #VALUE!
a b c d e f
8.4 Pekerjaan Satu Set Boven
Bahan
1 Set Bovenlis Cor 250,000.00 250,000.00
Upah
0.085 OH Pekerja 3.059.617 #VALUE!
0.085 OH Tukang Kayu 149.35 12.69
0.0085 OH Kepala Tukang 3.939.750 #VALUE!
0.0042 OH Mandor 1,658,300.00 6,964.86
Sub Jumlah #VALUE! 250,000.00 #VALUE!
IX Pekerjaan Tegel Lantai
9.1 Pekerjaan Tegel Lantai 1 (Granit 60 x 60)
Bahan
1.075 KarduGranit 60 x 60 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 3.059.617 #VALUE!
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 3.939.750 #VALUE!
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah #VALUE! 907,191.00 #VALUE!
9.2 Pekerjaan Tegel Lantai 2 (Granit 60 x 60)
Bahan
1.075 KarduGranit 60 x 60 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 3.059.617 #VALUE!
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 3.939.750 #VALUE!
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah #VALUE! 907,191.00 #VALUE!
a b c d e f
9.3 Pekerjaan tegel granit teras (60 x 60)
Bahan
1.075 KarduGranit 60 x 60 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 3.059.617 #VALUE!
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 3.939.750 #VALUE!
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah #VALUE! 907,191.00 #VALUE!
9.4 Pekerjaan Tegel Lantai 1 (keramik 40 x 40)
Bahan
1.03 Kardukeramik 40 x 40 36,800.00 37,904.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.7 OH Pekerja 3.059.617 #VALUE!
0.35 OH Tukang Batu 149.35 52.27
0.035 OH Kepala Tukang 3.939.750 #VALUE!
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 654,845.00 #VALUE!
9.5 Pekerjaan Tegel Lantai 2 (keramik 40 x 40)
Bahan
1.03 Kardukeramik 40 x 40 36,800.00 37,904.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.7 OH Pekerja 3.059.617 #VALUE!
0.35 OH Tukang Batu 149.35 52.27
0.035 OH Kepala Tukang 3.939.750 #VALUE!
a b c d e f
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 654,845.00 #VALUE!
9.6 Pekerjaan Keramik Dinding KM Lt 1 (20 x 20)
Bahan
1.05 KarduKeramik Dinding 60,000.00 63,000.00
10 Kg Semen / PC 60,200.00 602,000.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
0.5 Kg Semen Warna 22,000.00 11,000.00
Upah
0.7 OH Pekerja 3.059.617 #VALUE!
0.35 OH Tukang Batu 149.35 52.27
0.0035 OH Kepala Tukang 3.939.750 #VALUE!
0.0035 OH Mandor 1,658,300.00 5,804.05
Sub Jumlah #VALUE! 682,021.00 #VALUE!
9.7 Pekerjaan Keramik Dinding KM Lt 2 (20 x 20)
Bahan
1.05 KarduKeramik Dinding 60,000.00 63,000.00
10 Kg Semen / PC 60,200.00 602,000.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
0.5 Kg Semen Warna 22,000.00 11,000.00
Upah
0.7 OH Pekerja 3.059.617 #VALUE!
0.35 OH Tukang Batu 149.35 52.27
0.0035 OH Kepala Tukang 3.939.750 #VALUE!
0.0035 OH Mandor 1,658,300.00 5,804.05
Sub Jumlah #VALUE! 682,021.00 #VALUE!
9.8 Pekerjaan Keramik List KM
Bahan
3.53 Buah Keramik List 14,000.00 49,420.00
1.14 Kg Semen / PC 60,200.00 68,628.00
0.003 m3 Pasir Pasang 133,800.00 401.40
0.1 Kg Semen Warna 22,000.00 2,200.00
Upah
0.09 OH Pekerja 3.059.617 #VALUE!
a b c d e f
0.09 OH Tukang Batu 149.35 13.44
0.009 OH Kepala Tukang 3.939.750 #VALUE!
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah #VALUE! 120,649.40 #VALUE!
9.9 Pekerjaan Keramik Ban
Bahan
4.05 Buah Keramik Ban 2,700.00 10,935.00
1.14 Kg Semen / PC 60,200.00 68,628.00
0.003 m3 Pasir Pasang 133,800.00 401.40
0.1 Kg Semen Warna 22,000.00 2,200.00
Upah
0.09 OH Pekerja 3.059.617 #VALUE!
0.09 OH Tukang Batu 149.35 13.44
0.009 OH Kepala Tukang 3.939.750 #VALUE!
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah #VALUE! 82164.4 #VALUE!
9.10 Pemasangan 1 m2 keramik
Bahan tangga 20 x 100 cm
dinding
1.000 buah Keramik dinding 65,000.00
tangga 20 x100 65,000.00
Upah
0.090 OH Pekerja 3.059.617 #VALUE!
0.060 OH Kepala Tukang 3.939.750 #VALUE!
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 45,000.00 #VALUE!
10.5 Pemasangan 1 buah stop
Bahan
kontak
1.000 buah Stop kontak 14,300.00 14,300.00
Upah
0.090 OH Pekerja 3.059.617 #VALUE!
0.060 OH Kepala Tukang 3.939.750 #VALUE!
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 14,300.00 #VALUE!
10.6 Pemasangan 1 buah saklar
Bahan
tunggal
1.000 buah Saklar tunggal 13,500.00 13,500.00
Upah
0.090 OH Pekerja 3.059.617 #VALUE!
0.060 OH Kepala Tukang 3.939.750 #VALUE!
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 13,500.00 #VALUE!
10.7 Pemasangan 1 buah saklar
Bahan
ganda
1.000 buah Saklar ganda 19,400.00 19,400.00
Upah
a b c d e f
0.090 OH Pekerja 3.059.617 #VALUE!
0.060 OH Kepala Tukang 3.939.750 #VALUE!
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 19,400.00 #VALUE!
10.8 Pemasangan 1 buah MCB
Bahan
1.000 buah MCB 34,500.00 34,500.00
Upah
0.090 OH Pekerja 3.059.617 #VALUE!
0.060 OH Kepala Tukang 3.939.750 #VALUE!
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah #VALUE! 34,500.00 #VALUE!
XI Pekerjaan Instalasi Air
11.1 Pemasangan 1 m Pipa PVC
Bahan
SNI Ø1/2"
0.250 m Pipa PVC SNI 35,000.00 8,750.00
Ø1/2"
Upah
0.060 OH Pekerja 3.059.617 #VALUE!
0.020 OH Kepala Tukang 3.939.750 #VALUE!
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah #VALUE! 8,750.00 #VALUE!
11.2 Pemasangan 1 m Pipa PVC
Bahan
SNI Ø4"
0.250 m Pipa PVC SNI 391,000.00 97,750.00
Ø4"
Upah
0.060 OH Pekerja 3.059.617 #VALUE!
0.020 OH Kepala Tukang 3.939.750 #VALUE!
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah #VALUE! 97,750.00 #VALUE!
11.3 Pemasangan 1 buah meteran
air
a
11.3 b c d e f
Bahan
1.000 buah Meteran air 450,000.00 450,000.00
Upah
0.060 OH Pekerja 3.059.617 #VALUE!
0.020 OH Kepala Tukang 3.939.750 #VALUE!
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah #VALUE! 450,000.00 #VALUE!
11.4 Pemasangan 1 buah pompa air
Bahan
1.000 buah Pompa air 1,445,000.00 1,445,000.00
Upah
0.060 OH Pekerja 3.059.617 #VALUE!
0.020 OH Kepala Tukang 3.939.750 #VALUE!
0.200 OH Tukang Batu 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah #VALUE! 1,445,000.00 #VALUE!
11.5 Pemasangan 1 buah kloset
Bahan
duduk
6% kloset Ls Perlengkapan 105,000.00 105,000.00
1.000 buah Kloset duduk 1,750,000.00 1,750,000.00
Upah
3.300 OH Pekerja 3.059.617 #VALUE!
0.010 OH Kepala Tukang 3.939.750 #VALUE!
a b c d e f
Upah
0.015 OH Pekerja 3.059.617 #VALUE!
0.015 OH Kepala Tukang 97,500.00 1,462.50
0.150 OH Tukang Kayu 92,500.00 13,875.00
0.008 OH Mandor 102,500.00 820.00
Sub Jumlah #VALUE! 98,800.00 #VALUE!
13.14 Pemasangan 1 set handle dan
Bahankunci
body
1.000 set handle dan body 330,000.00 330,000.00
kunci
Upah
0.025 OH Pekerja 3.059.617 #VALUE!
0.025 OH Kepala Tukang 97,500.00 2,437.50
0.250 OH Tukang Kayu 92,500.00 23,125.00
0.001 OH Mandor 102,500.00 133.25
Sub Jumlah #VALUE! 330,000.00 #VALUE!
13.15 Pemasangan 1 hak angin
Bahan
1.000 buah hak angin 41,465.00 41,465.00
Upah
0.015 OH Pekerja 3.059.617 #VALUE!
0.015 OH Kepala Tukang 97,500.00 1,462.50
0.150 OH Tukang Kayu 92,500.00 13,875.00
0.008 OH Mandor 102,500.00 820.00
Sub Jumlah #VALUE! 41,465.00 #VALUE!
13.16 Pemasangan 1 buah penangkal
Bahan
petir
1.000 set Penangkal petir 5,500,000.00 5,500,000.00
1.000 buah Pemasangan 1,464,000.00 1,464,000.00
grounding
Upah
0.070 OH Pekerja 3.059.617 #VALUE!
0.070 OH Kepala Tukang 97,500.00 6,825.00
0.700 OH Tukang listrik 92,500.00 64,750.00
0.008 OH Mandor 102,500.00 820.00
a b c d e f
Sub Jumlah #VALUE! 6,964,000.00 #VALUE!
13.17 Pemasangan 1 buah parabola
Bahan
1.000 buah Parabola TV 450,000.00 450,000.00
6% harga alat
Ls Perlengkapan 450,000.00 27,000.00
Upah
0.300 OH Pekerja 3.059.617 #VALUE!
0.045 OH Kepala Tukang 97,500.00 4,387.50
0.450 OH Tukang listrik 92,500.00 41,625.00
0.015 OH Mandor 102,500.00 1,537.50
Sub Jumlah #VALUE! 477,000.00 #VALUE!
13.18 Pemasangan 1 buah tandon air
Bahanliter
1050
1.000 buah Tandon Air PVC 899,000.00
899,000.00
= 17.6 x 15.8
= 278.65 m2
17.6
= 2 (19.6 + 17.8)
= 74.87 m'
17.6
= 3x5
= 15.00 m2
3.0
-1.30
-2.00
1.00
B Galian tanah pondasi Batu Kali
(A)
Galian tanah pondasi Batu Kali
(A) P.Galian = 87.97 m 114.36 m3
-0.3 L.Galian = 1.00 m
Tinggi Galian = 1.30 m
Volume = (p x l x t)
= 114.36 m3
-1.30
1
C
Galian tanah pondasi Batu Kali (B)
P.Galian = 51.06 m 66.38 m3
-0.3 L.Galian = 1.00 m
Tinggi Galian = 1.30 m
Volume = (p x l x t)
= 66.38 m3
-1.30
1
2.2 Urugan Tanah
A Galian footplat = 37.50 m3 37.08 m3
Urugan tanah kembali footplat
Total Vol.Footplat = 4.80 m
Total Vol.Kolom pendek = 1.80 m
Volume = {37.5-(5.57+2.09)}x 1.2
= 37.08 m3
B
Urugan tanah kembali Batu kali
Vol. Total galian = 180.74 m 109.41 m3
Vol. Total pondasi = 89.56 m
Volume = (180.74-89.16)x1.2
= 109.41 m3
D
Urugan tanah peninggi elevasi
lantai teras, KM, dan gudang Luas lt. teras = 10.54 m 2.53 m3
Urugan tanah peninggi elevasi
lantai teras, KM, dan gudang
Tinggi/Tebal = 0.20 m
Volume = (10.54x0.2) x 1.2
= 2.53 m3
B
Urugan pasir bawah anstamping
Batu Kali A dan B Lebar = 1.00 m 13.90 m3
Tinggi/Tebal = 0.10 m
Panjang Pondasi = 139.03 m
Volume = (1 x 0.1 x 139.03)
= 13.90 m3
- Volume Bekisting
Jmlah footplat = 25.00 bh 24.00 m2
Panjang = 0.80 m
Tinggi/ Tebal = 0.30 m
Volume = 4 (0.8 x 0.3) x 25
= 24.00 m2
B Kolom Pendek
Jmlah Footplat = 25.00 bh 1.80 m3
Panjang kolom = 0.15 m'
Lebar kolom = 0.30 m'
Tinggi/Tebal = 1.60 m'
Volume = 25 (1.6 x 0.3 x 0.15)
= 1.80 m3
C
Balok Sloof Batu Kali A dan B
Lebar = 0.15 m 5.91 m2
Tinggi/Tebal = 0.30 m
Panjang sloof = 131.44 m
Volume = 131.44 (0.3 x 0.15)
= 5.91 m2
- Volume Bekisting
Panjang sloof = 131.44 m 78.86 m2
Tinggi/Tebal = 0.30 m
Volume = 2 (131.44 x 0.3)
= 78.86 m2
- Volume Bekisting
Jlmh Kolom induk = 25.00 bh 30.00 m2
Tinggi = 4.00 m'
Lebar = 0.15 m'
Volume = 2 x (4 x 0.3) x 28
= 30.00 m2
- Volume Bekisting
Jlmh Kolom induk = 14.00 bh 16.80 m2
Tinggi = 4.00 m'
Lebar = 0.15 m'
Volume = 2 x (4 x 0.15) x 14
= 16.80 m2
- Volume Bekisting
Jlmh bekisting = 2.00 bh 132.68 m2
Panjang Balok = 147.43
Tinggi = 0.30 m'
Lebar = 0.15 m'
Volume = 3 (147.43 x 0.3)
= 132.68 m2
- Volume Bekisting
Jlmh bekisting = 2.00 bh 24.34 m2
Panjang Balok = 54.08
Tinggi = 0.15 m'
Lebar = 0.15 m'
Volume = 3 (54.08 x 0.15)
= 24.34 m2
H Plat Tangga
Tebal plat tangga = 0.18 m' 2.25 m3
Panjang Sisi samping = 2.40 m'
Sudut tangga bawah A = 34 derajat
Pnjng plat tangga bawah = 2.4/cos 34
= 2.89 m'
Panjang sisi samping B = 4.895 m'
Pnjng plat tangga tengah = 4.895/cos 34
= 5.90 m'
Panjang sisi samping C = 1.95 m'
Panjang plat tangga atas = 1.95/cos 34
= 2.35 m'
Lebar tangga = 0.95 m'
Lebar bordes = 1.00 m'
Volume
- Plat tangga bawah = (2.89 x 0.95 x 0.18)
= 0.50 m3
- Plat tangga tengah = (5.90 x 0.95 x 0.18)
= 1.01 m3
- Plat tangga atas = (2.35 x 0.95 x 0.18)
= 0.40 m3
- Plat Bordes = 2x (0.18 x(0.95 x 1))
= 0.34 m3
Volume total = 2.25 m3
Volume Bekisting
Volume plat 15.34 m2
Bawah = 3.73 m2
Tengah = 7.62 m2
Atas = 3.03 m2
Jumlah = 14.39 m2
Volume bordes = 0.95 m'
Volume = (31.91+0.95)
= 15.34 m2
Volume bekisting
Jumlah = 21 bh 3.79 m2
Tinggi = 0.19 m
Panjang = 0.95 m
Volume bekisting = (21 x 0.19 x 0.95)
= 3.79 m2
Volume Bekisting
Jumlah = 2.00 bh 64.53 m2
Panjang = 143.40 m
Lebar = 0.15 m
Volume Bekisting = 3 x (143.40 x 0.15)
= 64.53 m2
B Lantai 2 Granit Tile (60 x 60) Ruang Tidur 1 = 6.061 x 4.65 242.02 m2
= 28.184 m2
Ruang Tidur 2 = 3.691 x 5.945
= 21.94 m2
Ruang Tidur 3 = 3.999 x 2.93
= 11.72 m2
Ruang Tidur 4 = 2.969 x 3.3
= 9.80 m2
Ruang Keluarga = 16.975 x 10.037
= 170.38 m2
Total Luas Lantai Granit = 242.02 m2
XI PEKERJAAN FINISHING
11.1 Pekerjaan Pengecatan dinding
Luas dinding Lt.1 = 129.21 m2 461.56 m2
Luas dinding Lt.2 = 153.32 m2
Luas Sopi-sopi = 13.14 m2
Luas kusen = 64.89 m2
Luas Total
= (2 sisi x ((129.21 + 153.32 + 13.14) - 64.89))
= 461.56 m2
12.8 Parabola
Jumlah = 1 bh 1 bh
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Jenis Pekerjaan Volume Jumlah (Rp)
(Rp)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
B Rabatan 0.00 m3 -
A Pondasi Footplat
B Kolom Pendek
H Plat Tangga
I Anak tangga
J Plat Lantai 2
M Balok Ring
V PEKERJAAN ATAP
IX PEKERJAAN KERAMIK
AC 3 bh Rp 287,760.0 Rp 863,280.0
AC 6 bh Rp 287,760.0 Rp 1,726,560.0
Dibulatkan #VALUE!
Terbilang :
Satu Milyar Lima Ratus Tujuh Puluh Empat Juta Tiga Ratus Tujuh Puluh Tujuh Ribu Rupiah
Tabel 4. Rekapitulasi Dana
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
3.2 Pekerjaan Beton bertulang
A Pondasi Footplat dan Kolom
Pendek I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
batu
A.1 Beton satuan pekerjaan
Pekerja OH 1.650 = 25.80 x 0.28 = 7.1 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
25.80 x 1.65 = 42.6 Pekerja
Volume 25.80 m3 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 7.1 x 1 = 2.365 ~ 2 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 42.6 x 1 = 14.19 ~ 14 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
A.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.520 kayu satuan pekerjaan
Tukang Kayu OH 0.260 = 25.80 x 0.26 = 6.7 Tukang Kayu
Kepala Tukang OH 0.026 1
Mandor OH 0.026 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 25.80 m2 25.80 x 0.52 = 13.4 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 6.7 x 1 = 2.236 ~ 2 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 13.4 x 1 = 4.472 ~ 4 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
B Balok Sloof Bt. Kali A & B I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
B.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 5.91 x 0.28 = 1.6 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
5.91 x 1.65 = 9.8 Pekerja
Volume 5.91 m3 1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= 1.6 x 1 = 0.4066 ~ 0 tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 9.8 x 1 = 2.4399 ~ 2 pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
B.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.520 kayu satuan pekerjaan
Tukang Kayu OH 0.260 = 78.86 x 0.26 = 20.5 Tukang Kayu
Kepala Tukang OH 0.026 1
Mandor OH 0.026 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 78.86 m2 78.86 x 0.52 = 41.0 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 20.5 x 1 = 6.8349 ~ 7 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 41.0 x 1 = 13.67 ~ 14 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
C Kolom Induk Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
C.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 4.50 x 0.28 = 1.2 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
4.50 x 1.65 = 7.4 Pekerja
Volume 4.50 m3 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 1.2 x 1 = 0.4125 ~ 0 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 7.4 x 1 = 2.475 ~ 2 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
C.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 30.00 x 0.33 = 9.9 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 30.00 m2 30.00 x 0.66 = 19.8 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 9.9 x 1 = 3.3 ~ 3 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 19.8 x 1 = 6.6 ~ 7 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
D Kolom praktis Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
D.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 1.26 x 0.28 = 0.3 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
1.26 x 1.65 = 2.1 Pekerja
Volume 1.26 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.3 x 1 = 0.3465 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.1 x 1 = 2.079 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
D.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 16.80 x 0.33 = 5.5 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 16.80 m2 16.80 x 0.66 = 11.1 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 5.5 x 1 = 5.544 ~ 6 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 11.1 x 1 = 11.088 ~ 11 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
E Balok Induk Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
E.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 3.88 x 0.28 = 1.1 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
3.88 x 1.65 = 6.4 Pekerja
Volume 3.88 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 1.1 x 1 = 0.5334 ~ 1 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 6.4 x 1 = 3.2004 ~ 3 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
E.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
kayu
I. Jumlah tukang
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 132.68 x 0.33 = 43.8 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 132.7 m2 132.68 x 0.66 = 87.6 Pekerja
1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 43.8 x 1 = 7.2975 ~ 7 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 87.6 x 1 = 14.595 ~ 15 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
F Balok Anak Lt.1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
F.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 0.23 x 0.28 = 0.1 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
0.23 x 1.65 = 0.4 Pekerja
Volume 0.23 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.0311 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.4 x 1 = 0.1869 ~ 0 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
F.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 24.34 x 0.33 = 8.0 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 24.34 m2 24.34 x 0.66 = 16.1 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 8.0 x 1 = 4.0155 ~ 4 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 16.1 x 1 = 8.031 ~ 8 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
G Plat Tangga I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
G.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 2.25 x 0.28 = 0.6 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
2.25 x 1.65 = 3.7 Pekerja
Volume 2.25 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.6 x 1 = 0.6184 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 3.7 x 1 = 3.7107 ~ 4 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 15.34 x 0.33 = 5.1 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 15.34 m2 15.34 x 0.66 = 10.1 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 5.1 x 1 = 5.0607 ~ 5 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 10.1 x 1 = 10.121 ~ 10 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
H Anak tangga I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
H.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 0.57 x 0.28 = 0.2 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
0.57 x 1.65 = 0.9 Pekerja
Volume 0.57 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.1564 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.9 x 1 = 0.9381 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 3.79 x 0.33 = 1.3 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.79 m2 3.79 x 0.66 = 2.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 1.3 x 1 = 1.2509 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.5 x 1 = 2.5017 ~ 3 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
I Plat Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
I.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = 1.47 x 0.28 = 0.4 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
1.47 x 1.65 = 2.4 Pekerja
Volume 1.47 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.4 x 1 = 0.2015 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 2.4 x 1 = 1.2089 ~ 1 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
1.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 5.37 x 0.33 = 1.8 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 5.37 m2 5.37 x 0.66 = 3.5 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 1.8 x 1 = 0.5902 ~ 1 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 3.5 x 1 = 1.1805 ~ 1 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
J Kolom Induk Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
J.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = 4.52 x 0.28 = 1.2 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
4.52 x 1.65 = 7.5 Pekerja
Volume 4.52 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 1.2 x 1 = 0.621 ~ 1 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 7.5 x 1 = 3.7262 ~ 4 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
J.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 60.22 x 0.33 = 19.9 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 60.22 m2 60.22 x 0.66 = 39.7 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 19.9 x 1 = 6.6243 ~ 7 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 39.7 x 1 = 13.249 ~ 13 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
K Kolom Praktis Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
K.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = 0.85 x 0.28 = 0.2 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
0.85 x 1.65 = 1.4 Pekerja
Volume 0.85 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.2329 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.4 x 1 = 1.3973 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
K.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 11.29 x 0.33 = 3.7 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 11.29 m2 11.29 x 0.66 = 7.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 3.7 x 1 = 3.7262 ~ 4 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 7.5 x 1 = 7.4523 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
L Ring Balok I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
L.1 Beton batu satuan pekerjaan
Pekerja OH 0.30 = 3.12 x 0.03 = 0.033 Tukang Batu
Tukang Batu OH 0.033 1
Kepala Tukang OH 0.010 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.015 satuan pekerjaan
3.12 x 0.30 = 0.3 Pekerja
Volume 3.12 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0.0165 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.3 x 1 = 0.1485 ~ 0 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
L.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = 64.53 x 0.33 = 21.3 Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 64.53 m2 64.53 x 0.66 = 42.6 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= 21.3 x 1 = 7.0983 ~ 7 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 42.6 x 1 = 14.197 ~ 14 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
IV PEKERJAAN PASANGAN DINDING
4.1 Trasram rumah (1:2) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 4.36 x 0.10 = 0.4 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 4.36 m2 4.36 x 0.30 = 1.3 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.4 x 1 = 0.8721 ~ 1 tukang
0.5
Waktu 0.5 hari = Jumlah hari x pekerja
Plotting hari
= 1.3 x 1 = 2.6163 ~ 3 pekerja
0.5
III. TS Tukang = Ploting hari = 0.5 = 0.083 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 0.5 = 0.083 minggu
hari dlm seminggu 6
4.2 Pasangan Dinding
A Pasangan Dinding Lt.1 (1:6) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 426.54 x 0.10 = 42.7 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 426.54 m2 426.54 x 0.30 = 128.0 Pekerja
1
1 2 3
II. Ploting
Waktu 9 hari = Jumlah hari x tukang
Plotting hari
= 42.7 x 1 = 4.7394 ~ 5 tukang
9
Waktu 9 hari = Jumlah hari x pekerja
Plotting hari
= 128.0 x 1 = 14.218 ~ 14 pekerja
9
III. TS Tukang = Ploting hari = 9 = 1.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 9.0 = 1.5 minggu
hari dlm seminggu 6
B Pasangan Dinding Lt.2 (1:6) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 500.31 x 0.10 = 50.0 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 500.31 m2 500.31 x 0.30 = 150.1 Pekerja
1
II. Ploting
Waktu 10 hari = Jumlah hari x tukang
Plotting hari
= 50.0 x 1 = 5.0031 ~ 5 tukang
10
Waktu 10 hari = Jumlah hari x pekerja
Plotting hari
= 150.1 x 1 = 15.009 ~ 15 pekerja
10
III. TS Tukang = Ploting hari = 10 = 1.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 10.0 = 1.667 minggu
hari dlm seminggu 6
C Dinding kamar mandi (1:4) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 9.69 x 0.10 = 1.0 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 9.69 m2 9.69 x 0.30 = 2.9 Pekerja
1
1 2 3
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 1.0 x 1 = 0.4845 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 2.9 x 1 = 1.4535 ~ 1 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
4.3 Pekerjaan Plesteran & Acian I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Plesteran dinding rumah (1:6) batu satuan pekerjaan
Pekerja OH 0.26 = 1342.27 x 0.20 = 268.5 Tukang Batu
Tukang Batu OH 0.2 1
Kepala Tukang OH 0.02 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.013 satuan pekerjaan
1342.27 x 0.26 = 349.0 Pekerja
Volume 1342.3 m2 1
II. Ploting
Waktu 23 hari = Jumlah hari x tukang
Plotting hari
= 268.5 x 1 = 11.672 ~ 12 tukang
23
Waktu 23 hari = Jumlah hari x pekerja
Plotting hari
= 349.0 x 1 = 15.173 ~ 15 pekerja
23
III. TS Tukang = Ploting hari = 23 = 3.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 23.0 = 3.833 minggu
hari dlm seminggu 6
B Plesteran dinding luar KM(1:4I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.26 batu satuan pekerjaan
Tukang Batu OH 0.2 = 9.69 x 0.20 = 1.9 Tukang Batu
Kepala Tukang OH 0.02 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 9.7 m2 9.69 x 0.26 = 2.5 Pekerja
1
1 2 3
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 1.9 x 1 = 0.969 ~ 1 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 2.5 x 1 = 1.2597 ~ 1 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
C Plesteran dinding dalam KM(1I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.26 batu satuan pekerjaan
Tukang Batu OH 0.2 = 106.92 x 0.20 = 21.4 Tukang Batu
Kepala Tukang OH 0.02 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 106.9 m2 106.92 x 0.26 = 27.8 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 21.4 x 1 = 10.692 ~ 11 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 27.8 x 1 = 13.9 ~ 14 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
D Acian I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 1458.88 x 0.10 = 145.9 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1458.9 m2 1458.88 x 0.20 = 291.8 Pekerja
1
1 2 3
II. Ploting
Waktu 17 hari = Jumlah hari x tukang
Plotting hari
= 145.9 x 1 = 8.5816 ~ 9 tukang
17
Waktu 17 hari = Jumlah hari x pekerja
Plotting hari
= 291.8 x 1 = 17.163 ~ 17 pekerja
17
III. TS Tukang = Ploting hari = 17 = 2.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 17.0 = 2.833 minggu
hari dlm seminggu 6
E Benangan Dalam dan Luar I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 476.00 x 0.10 = 47.6 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 476.0 m 476.00 x 0.20 = 95.2 Pekerja
1
II. Ploting
Waktu 7 hari = Jumlah hari x tukang
Plotting hari
= 47.6 x 1 = 6.8 ~ 7 tukang
7
Waktu 7 hari = Jumlah hari x pekerja
Plotting hari
= 95.2 x 1 = 13.6 ~ 14 pekerja
7
III. TS Tukang = Ploting hari = 7 = 1.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 7.0 = 1.167 minggu
hari dlm seminggu 6
G Sopi-sopi I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 13.14 x 0.10 = 1.3 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 13.1 m2 13.14 x 0.20 = 2.6 Pekerja
1
1 2 3
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.3 x 1 = 1.3142 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.6 x 1 = 2.6283 ~ 3 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
V PEKERJAAN ATAP
5.1 Rangka Kuda-kuda BJ. Ringa = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.2 satuan pekerjaan
Tukang OH 0.1 = 405.24 x 0.10 = 40.5 Tukang
Kepala Tukang OH 0.01 1
Mandor OH 0.001 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 405.2 m2 405.24 x 0.20 = 81.0 Pekerja
1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
= 40.5 x 1 = 6.754 ~ 7 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 81.0 x 1 = 13.508 ~ 14 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6.0 = 1 minggu
hari dlm seminggu 6
VI PEKERJAAN PENUTUP ATAP
6.1 Borongan penutup atap gentin = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.2 satuan pekerjaan
Tukang OH 0.1 = 389.00 x 0.10 = 38.9 Tukang
Kepala Tukang OH 0.01 1
Mandor OH 0.001 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
1 2 3
389.00 x 0.20 = 77.8 Pekerja
Volume 389.0 m2 1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
= 38.9 x 1 = 6.4833 ~ 6 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 77.8 x 1 = 12.967 ~ 13 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6.0 = 1 minggu
hari dlm seminggu 6
VII PEKERJAAN LISPLANK DAN PLAFOND
7.1 Lisplank = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.1 satuan pekerjaan
Tukang OH 0.2 = 0.28 x 0.20 = 0.1 Tukang
Kepala Tukang OH 0.02 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.28 m 0.28 x 0.10 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.0569 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.0285 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
7.2 Pekerjaan Plafond I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Rangka Plafond Lt. 1 besi satuan pekerjaan
Pekerja OH 0.35 = 203.74 x 0.35 = 71.3 Tukang Besi
Tukang Besi OH 0.35 1
Kepala Tukang OH 0.035 Jumlah pekerja = volume pekerjaan x koefisien pekerja
1 2 3
Mandor OH 0.018 satuan pekerjaan
203.74 x 0.35 = 71.3 Pekerja
Volume 203.74 m2 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 71.3 x 1 = 14.262 ~ 14 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 71.3 x 1 = 14.262 ~ 14 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Rangka Plafond Lt. 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
besi
I. Jumlah tukang
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = 172.56 x 0.35 = 60.4 Tukang Besi
Kepala Tukang OH 0.035 1
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 172.56 m2 172.56 x 0.35 = 60.4 Pekerja
1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 60.4 x 1 = 12.079 ~ 12 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 60.4 x 1 = 12.079 ~ 12 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
C Plafond Lantai 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = 203.74 x 0.35 = 71.3 Tukang Besi
Kepala Tukang OH 0.035 1
1 2 3
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 203.74 m2 203.74 x 0.35 = 71.3 Pekerja
1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 71.3 x 1 = 14.262 ~ 14 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 71.3 x 1 = 14.262 ~ 14 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
D Plafond Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = 172.56 x 0.35 = 60.4 Tukang Besi
Kepala Tukang OH 0.035 1
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 172.56 m2 172.56 x 0.35 = 60.4 Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= 60.4 x 1 = 15.099 ~ 15 tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 60.4 x 1 = 15.099 ~ 15 pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
VIII PEKERJAAN KUSEN PINTU DAN JENDELA (ALUMUNIUM)
8.1 Kusen Pintu dan Jendela I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.043 besi satuan pekerjaan
1 2 3
Tukang Besi OH 0.043 = 10.28 x 0.04 = 0.4 Tukang Besi
Kepala Tukang OH 0.004 1
Mandor OH 0.002 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 10.28 m3 10.28 x 0.04 = 0.4 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.4 x 1 = 0.4422 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.4 x 1 = 0.4422 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
IX PEKERJAAN KERAMIK
9.1 Pekerjaan Tegel Lantai I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Lantai 1 Granit tile (60 x 60) batu satuan pekerjaan
Pekerja OH 0.25 = 166.86 x 0.13 = 20.9 Tukang Batu
Tukang Batu OH 0.125 1
Kepala Tukang OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.013 satuan pekerjaan
166.86 x 0.25 = 41.7 Pekerja
Volume 166.86 m2 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 20.9 x 1 = 6.9525 ~ 7 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 41.7 x 1 = 13.905 ~ 14 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6
1 2 3
B Lantai 2 Granit Tile (60 x 60) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 242.02 x 0.13 = 30.3 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 242.02 m2 242.02 x 0.25 = 60.5 Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= 30.3 x 1 = 7.5631 ~ 8 tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 60.5 x 1 = 15.126 ~ 15 pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
C Lantai 1 Keramik (40 x 40) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 242.02 x 0.13 = 30.3 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 242.02 m2 242.02 x 0.25 = 60.5 Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= 30.3 x 1 = 7.5631 ~ 8 tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 60.5 x 1 = 15.126 ~ 15 pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
1 2 3
D Lantai 2 Keramik (40 x 40) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 5.64 x 0.13 = 0.7 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 5.64 m2 5.64 x 0.25 = 1.4 Pekerja
1
II. Ploting
Waktu 2.0 hari = Jumlah hari x tukang
Plotting hari
= 0.7 x 1 = 0.3526 ~ 0 tukang
2
Waktu 2.0 hari = Jumlah hari x pekerja
Plotting hari
= 1.4 x 1 = 0.7052 ~ 1 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
E Lantai 1 Keramik Kasar (40 x I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 51.16 x 0.13 = 6.4 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 51.16 m2 51.16 x 0.25 = 12.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 6.4 x 1 = 6.3952 ~ 6 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 12.8 x 1 = 12.79 ~ 13 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
1 2 3
9.2 Keramik Dinding I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Keramik Dinding KM Lt.1 (25batu satuan pekerjaan
Pekerja OH 0.9 = 5.64 x 0.45 = 2.5 Tukang Batu
Tukang Batu OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
5.64 x 0.90 = 5.1 Pekerja
Volume 5.64 m2 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.5 x 1 = 2.5386 ~ 3 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 5.1 x 1 = 5.0771 ~ 5 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Keramik Dinding KM Lt.2 (25I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.9 batu satuan pekerjaan
Tukang Batu OH 0.45 = 51.16 x 0.45 = 23.0 Tukang Batu
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 51.16 m2 51.16 x 0.90 = 46.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 23.0 x 1 = 23.023 ~ 23 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 46.0 x 1 = 46.045 ~ 46 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
1 2 3
X PEKERJAAN INSTALASI LISTRIK
10.1 Instalasi Listrik Lantai 1 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Panjang kabel satuan pekerjaan
Pekerja OH 0.9 = 84.10 x 0.45 = 37.8 Tukang
Tukang OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
84.10 x 0.90 = 75.7 Pekerja
Volume 84.10 m 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 37.8 x 1 = 7.5691 ~ 8 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 75.7 x 1 = 15.138 ~ 15 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Panel MCB = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 1.00 x 0.45 = 0.5 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.90 = 0.9 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.45 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.9 x 1 = 0.9 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Saklar Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 5.00 x 0.45 = 2.3 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 5.00 bh 5.00 x 0.90 = 4.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.3 x 1 = 2.25 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 4.5 x 1 = 4.5 ~ 5 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
D Saklar Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 8.00 x 0.45 = 3.6 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 8.00 bh 8.00 x 0.90 = 7.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 3.6 x 1 = 3.6 ~ 4 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 7.2 x 1 = 7.2 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Stop Kontak Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 22.00 x 0.03 = 0.6 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 22.00 bh 22.00 x 0.03 = 0.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.6 x 1 = 0.55 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.6 x 1 = 0.55 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Stop Kontak Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 8.00 x 0.03 = 0.2 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 8.00 bh 8.00 x 0.03 = 0.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.2 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.2 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G Lampu Gantung = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 1.00 x 0.45 = 0.5 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.90 = 0.9 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.45 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.9 x 1 = 0.9 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Lampu SL = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 36.00 x 0.45 = 16.2 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 36.00 bh 36.00 x 0.90 = 32.4 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 16.2 x 1 = 5.4 ~ 5 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 32.4 x 1 = 10.8 ~ 11 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6
10.2 Instalasi Listrik Lantai 2 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Panjang kabel satuan pekerjaan
Pekerja OH 0.9 = 93.13 x 0.45 = 41.9 Tukang
Tukang OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
93.13 x 0.90 = 83.8 Pekerja
Volume 93.13 m 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 41.9 x 1 = 8.3817 ~ 8 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 83.8 x 1 = 16.763 ~ 17 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Saklar Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 8.00 x 0.45 = 3.6 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 8.00 bh 8.00 x 0.90 = 7.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 3.6 x 1 = 3.6 ~ 4 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 7.2 x 1 = 7.2 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Saklar Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 5.00 x 0.45 = 2.3 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 5.00 bh 5.00 x 0.90 = 4.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.3 x 1 = 2.25 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 4.5 x 1 = 4.5 ~ 5 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
D Stop Kontak Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 0.00 x 0.03 = 0.0 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.00 bh 0.00 x 0.03 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Stop Kontak Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 6.00 x 0.03 = 0.2 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 6.00 bh 6.00 x 0.03 = 0.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.15 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.15 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Lampu Led strip Plafond & di = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 14.21 x 0.45 = 6.4 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 14.21 m 14.21 x 0.90 = 12.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 6.4 x 1 = 6.3945 ~ 6 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 12.8 x 1 = 12.789 ~ 13 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G Lampu SL = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 33.00 x 0.45 = 14.9 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 33.00 bh 33.00 x 0.90 = 29.7 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 14.9 x 1 = 7.425 ~ 7 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 29.7 x 1 = 14.85 ~ 15 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
XI PEKERJAAN INSTALASI AIR
11.1 Instalasi air Lantai 1 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Pipa air bersih satuan pekerjaan
Pekerja OH 0.081 = 59.22 x 0.14 = 8.0 Tukang Batu
Tukang Batu OH 0.135 1
Kepala Tukang OH 0.0135 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.004 satuan pekerjaan
59.22 x 0.08 = 4.8 Pekerja
Volume 59.22 m 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 8.0 x 1 = 7.9943 ~ 8 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 4.8 x 1 = 4.7966 ~ 5 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Pipa air bekas dan AC = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 59.53 x 0.14 = 8.0 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 59.53 m 59.53 x 0.08 = 4.8 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 8.0 x 1 = 4.0183 ~ 4 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 4.8 x 1 = 2.411 ~ 2 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
C Pipa air kotor = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 12.49 x 0.14 = 1.7 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 12.49 m 12.49 x 0.08 = 1.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.7 x 1 = 1.6862 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.0 x 1 = 1.0117 ~ 1 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Kloset duduk = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 3.3 satuan pekerjaan
Tukang Batu OH 1.1 = 2.00 x 1.10 = 2.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.16 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 3.30 = 6.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.2 x 1 = 2.2 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 6.6 x 1 = 6.6 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Kran air dan shower = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0100 satuan pekerjaan
Tukang OH 0.4000 = 3.00 x 0.40 = 1.2 Tukang
Kepala tukang OH 0.0400 1
Mandor OH 0.0050 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.00 bh 3.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.2 x 1 = 1.2 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.015 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Floor Drain = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.01 satuan pekerjaan
Tukang Batu OH 0.1 = 2.00 x 0.10 = 0.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.2 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.02 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
I Kitchen set = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.03 satuan pekerjaan
Tukang Batu OH 0.3 = 1.00 x 0.30 = 0.3 Tukang Batu
Kepala Tukang OH 0.03 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 Unit 1.00 x 0.03 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.3 x 1 = 0.3 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.03 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
J Wastafel = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 1.2 satuan pekerjaan
Tukang Batu OH 1.45 = 1.00 x 1.45 = 1.5 Tukang Batu
Kepala Tukang OH 0.15 1
Mandor OH 0.06 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 1.20 = 1.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.5 x 1 = 1.45 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.2 x 1 = 1.2 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
11.2 Instalasi air Lantai 2 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Pipa air bersih satuan pekerjaan
Pekerja OH 0.081 = 31.12 x 0.14 = 4.2 Tukang Batu
Tukang Batu OH 0.135 1
Kepala Tukang OH 0.0135 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.004 satuan pekerjaan
31.12 x 0.08 = 2.5 Pekerja
Volume 31.12 m 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 4.2 x 1 = 4.2005 ~ 4 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.5 x 1 = 2.5203 ~ 3 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Pipa air bekas dan AC = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 52.18 x 0.14 = 7.0 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 52.18 m 52.18 x 0.08 = 4.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 7.0 x 1 = 7.044 ~ 7 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 4.2 x 1 = 4.2264 ~ 4 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Pipa air kotor = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 20.00 x 0.14 = 2.7 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 20.00 m 20.00 x 0.08 = 1.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.7 x 1 = 2.6993 ~ 3 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.6 x 1 = 1.6196 ~ 2 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Kloset duduk = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 3.3 satuan pekerjaan
Tukang Batu OH 1.1 = 2.00 x 1.10 = 2.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.16 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 3.30 = 6.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.2 x 1 = 2.2 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 6.6 x 1 = 6.6 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Shower = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0100 satuan pekerjaan
Tukang OH 0.4000 = 2.00 x 0.40 = 0.8 Tukang
Kepala tukang OH 0.0400 1
Mandor OH 0.0050 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.8 x 1 = 0.8 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.01 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Floor Drain = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.01 satuan pekerjaan
Tukang Batu OH 0.1 = 2.00 x 0.10 = 0.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.2 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.02 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
I Wastafel = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 1.2 satuan pekerjaan
Tukang Batu OH 1.45 = 2.00 x 1.45 = 2.9 Tukang Batu
Kepala Tukang OH 0.15 1
Mandor OH 0.06 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 1.20 = 2.4 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.9 x 1 = 2.9 ~ 3 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.4 x 1 = 2.4 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
1 2 3
J Toren/Tandon Air = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.3 satuan pekerjaan
Tukang Batu OH 0.45 = 1.00 x 0.45 = 0.5 Tukang Batu
Kepala Tukang OH 0.045 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.30 = 0.3 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.45 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.3 x 1 = 0.3 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
XII PEKERJAAN FINISHING
12.1 Pekerjaan Pengecatan dinding = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0200 satuan pekerjaan
Tukang OH 0.0630 = 461.56 x 0.06 = 29.1 Tukang
Kepala tukang OH 0.0063 1
Mandor OH 0.0030 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 461.56 m2 461.56 x 0.02 = 9.2 Pekerja
1
II. Ploting
Waktu 9 hari = Jumlah hari x tukang
Plotting hari
= 29.1 x 1 = 3.2309 ~ 3 tukang
9
Waktu 9 hari = Jumlah hari x pekerja
Plotting hari
= 9.2 x 1 = 1.0257 ~ 1 pekerja
9
III. TS Tukang = Ploting hari = 9 = 1.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 9.0 = 1.5 minggu
hari dlm seminggu 6
12.2 Pekerjaan Pengecatan lisplank = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0200 satuan pekerjaan
Tukang OH 0.0630 = 461.56 x 0.06 = 29.1 Tukang
Kepala tukang OH 0.0063 1
Mandor OH 0.0030 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 461.56 m2 461.56 x 0.02 = 9.2 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 29.1 x 1 = 9.6928 ~ 10 tukang
3
1 2 3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 9.2 x 1 = 3.0771 ~ 3 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6
Minggu 2
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN #VALUE!
1.1 Pembersihan Lokasi 0.7
1.2 Pemasangan Bowplank 0.50
1.3 Pembuatan Bedeng 0.2
Plotting/Bobot #VALUE! #VALUE!
minggu 2 = 1.33 x ### / 1.33 = #VALUE! Minggu ini 1.33
akumulasi 1.33
Minggu 15
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
VI PEKERJAAN PENUTUP ATAP #VALUE!
6.1 Pekerjaan penutup atap
A Borongan kerangka dan penutup atap 1
Plotting/Bobot #VALUE! #VALUE!
minggu 15 = 1.00 x ### / 1.00 = #VALUE! Minggu ini 1.00
akumulasi 1.00
Minggu 6
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
VIII PEKERJAAN KUSEN PINTU & JENDELA #VALUE!
8.1 Kusen Pintu dan Jendela (PG 1) 0.167
8.2 Kusen Pintu dan Jendela (PJ 1) 0.167
8.3 Kusen Pintu (P1) 0.167
8.4 Kusen Pintu (P2) 0.167
8.5 Kusen Pintu (P 3) 0.167
8.6 Kusen Pintu (P4) 0.167
8.7 Kusen Jendela (J1A) 0.167
8.8 Kusen Jendela (J2) 0.167
8.9 Kusen Jendela (J3) 0.167
8.10 Kusen Jendela (J4) 0.167
Plotting/Bobot #VALUE! #VALUE!
minggu 6 = 1.67 x ### / 1.67 = #VALUE! Minggu ini 1.67
akumulasi 1.67
Minggu 19 Minggu 20
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6
XI PEKERJAAN INSTALASI AIR #VALUE!
11.1 Instalasi air Lantai 1 0.2
Pipa air bersih 0.2
Pipa air bekas 0.2
Pipa Pembuangan air AC 0.2
Pipa air kotor 0.2
Kloset duduk 0.2
Kran air 0.2
Shower 0.2
Floor Drain 0.2
Kitchen set 0.2
Wastafel 0.2
AC 0.2
11.2 Instalasi air Lantai 2
Pipa air bersih 0.2
Pipa air bekas 0.2
Pipa Pembuangan air AC 0.2
Pipa air kotor 0.2
Kloset duduk 0.2
Shower 0.2
Floor Drain 0.2
Wastafel 0.2
Pompa 0.2
Toren/Tandon Air 0.2
AC 0.2
Plotting/Bobot #VALUE! #VALUE! #VALUE!
minggu 19 = 2.17 x ### / 3.83 = #VALUE! Minggu ini 2.17 1.67
minggu 20 = 1.67 x ### / 3.83 = #VALUE! akumulasi 2.17 3.83
Minggu 21 Minggu 22
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6
XII PEKERJAAN FINISHING #VALUE!
12.1 Pekerjaan Pengecatan dinding 1 0.5
12.2 Pekerjaan Pengecatan Lisplank 0.5
Plotting/Bobot #VALUE! #VALUE! #VALUE!
minggu 20 = 1.50 x ### / 2.00 = #VALUE! Minggu ini 1.50 0.50
minggu 21 = 0.50 x ### / 2.00 = #VALUE! akumulasi 1.50 2.00
Minggu 22
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
XIII PEKERJAAN LAIN-LAIN #VALUE!
13.1 Pekerjaan Septictank 0.2
13.2 Pekerjaan Sumur Resapan 0.2
13.3 Pekerjaan bak kontrol 0.2
13.4 Pekerjaan pipa saluran
A Pemasangan Pipa PVC (AW 4") 0.2
B Pemasangan Pipa PVC (AW 3") 0.2
13.5 Railing tangga dan void 0.2
13.6 Pagar beton 0.2
13.7 Set Wifi 0.2
13.8 Parabola 0.2
Plotting/Bobot #VALUE! #VALUE!
minggu 22 = 1.50 x ### / 1.50 = #VALUE! Minggu ini 1.50
akumulasi 1.50
Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 13 Minggu 14
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
0.3
0.8
0.3
0.3
0.2
0.2
0.2
0.2
0.3
0.3 0.2
0.3
0.5
0.2
0.2
0.3
0.5
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.50 0.33 1.00 1.00 0.67 0.83
5.33 5.67 6.67 7.67 8.33 9.17
Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
0.3
0.5
0.2 1.0 0.7
0.7
1 0.5
0.7
0.2
0.2
0.3
#VALUE! #VALUE!
0.33 0.33
4.50 4.83
KURVA-S
III Pek. Beton Rp 240,961,956.09 ### 3.03 3.30 3.00 3.25 3.25 3.20 2.50 2.50
IV Pek. Pasangan Dinding Rp 361,612,175.16 ### 2.80 3.50 3.70 3.60 3.40 3.30 2.50
VIII Pek. Kusen Pintu & Jendela #VALUE! ### 0.79 0.79
Mingguan
Realisasi
Komulatif
Lebih Lambat (-)
Lbih Cepat (+)
Agustus
16 17 18
4.12 4.12
### 8.03
24.03 24.03
22.80 22.80
0.35 0.35
4.33 4.33
2.00 2.00 6.01 6.01
1.58 1.58
16.42 16.42
1.35 1.25 6.05 6.05
1.01 3.03 3.03
1.05 2.07 2.07
0.60 1.20 1.20
### 100.02
2.00 3.35 3.91