DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2022


Triwulan I Tahun 2022

B. DAFTAR UPAH KERJA HARIAN

NO. JENIS BAHAN UKURAN SAT. KODE

1 2 3 4 5

1 MANDOR 7 jam/hari Org/hr L.04


2 KEPALA TK. BATU 7 jam/hari Org/hr L.03
3 KEPALA TK. KAYU 7 jam/hari Org/hr L.03
4 KEPALA TK. BESI 7 jam/hari Org/hr L.03
5 KEPALA TK. CAT 7 jam/hari Org/hr L.03
6 KEPALA TK. LISTRIK 7 jam/hari Org/hr L.03
7 KEPALA TK. PIPA 7 jam/hari Org/hr L.03
8 TUKANG BATU 7 jam/hari Org/hr L.02
9 TUKANG KAYU 7 jam/hari Org/hr L.02
10 TUKANG BESI 7 jam/hari Org/hr L.02
11 TUKANG CAT 7 jam/hari Org/hr L.02
12 TUKANG PLITUR 7 jam/hari Org/hr L.02
13 TUKANG ASPAL 7 jam/hari Org/hr L.02
14 TUKANG PIPA 7 jam/hari Org/hr L.02
15 TUKANG LISTRIK 7 jam/hari Org/hr L.02
16 TUKANG GALI TANAH 7 jam/hari Org/hr L.02
17 PENJAGA MALAM/ PENJAGA 7 jam/hari Org/hr
18 MASINIS 7 jam/hari Org/hr
19 PEMBANTU MASINIS 7 jam/hari Org/hr
20 MEKANIK 7 jam/hari Org/hr
21 PEMBANTU MEKANIK 7 jam/hari Org/hr
22 OPERATOR (TERAMPIL) 7 jam/hari Org/hr
23 PENGEMUDI/SOPIR 7 jam/hari Org/hr
24 PENJAGA API/PENJAGA 7 jam/hari Org/hr
25 PEMBANTU TUKANG / PEKERJA/BURUH TERAMPIL 7 jam/hari Org/hr L.01
26 PEKERJA TIDAK TERLATIH/BURUH TAK TERAMPIL 7 jam/hari Org/hr
27 PEMBANTU SOPIR 7 jam/hari Org/hr
28 PEKERJA PENGISI BATU 7 jam/hari Org/hr
29 OPERATOR SEMI TERAMPIL/PEMBANTU OPERATOR 7 jam/hari Org/hr
HARGA
STANDAR

(Rp)
5

102,500.00
97,500.00
97,500.00
97,500.00
97,500.00
97,500.00
97,500.00
92,500.00
92,500.00
92,500.00
92,500.00
92,500.00
92,500.00
92,500.00
92,500.00
92,500.00
81,600.00
92,500.00
81,600.00
92,500.00
81,600.00
92,500.00
92,500.00
81,600.00
81,600.00
81,600.00
81,600.00
81,600.00
81,600.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2022
DRAFT TRIWULAN I TAHUN 2022

A. DAFTAR HARGA RATA-RATA BAHAN BANGUNAN (HARGA BELUM TERMASUK PPN 10%,OVERHEAD DAN PROFIT

NO. JENIS BAHAN UKURAN SATUAN

1 2 3 4

I BAHAN PASANGAN DAN CAMPURAN BETON


1 Batu kali belah 10/ 15, 15/20 m³
2 Batu kali pecah 5/7 m³
3 Batu kali pecah 4/6 m³
4 Batu kali pecah 3/5 m³
5 Batu kali pecah 2/3 m³
6 Batu kali pecah Crusher 1/2 m³
7 Batu kali pecah Crusher. M 025 1/1 m³
8 Batu kali pecah Crusher. K 017/ M026 0,5/1 m³
9 Krikil batu alor (ampyang) - kg
10 Pasir beton/cor - m³
11 Pasir pasang - m³
12 Pasir urug - m³
13 Sirtu - m³
14 Tanah urug biasa - m³
15 Tanah urug pilihan (campur pupuk utk taman) - m³
16 Tanah katelan jalan - m³
17 Batako (home industri) (30x15x10) cm bh
18 Batu merah - bh
19 Roster beton 10 x 30 bh
22 Batu tempel hijau 10 x 20 m²
23 Semen Gresik (PC Gresik) 50 kg zak
24 Semen Gresik (PC Gresik) 40 kg zak
25 Semen Tiga Roda 50 kg zak
26 Semen Tiga Roda 40 kg zak
27 Semen dynamix 40 kg zak
27 Semen Merah Putih 40 kg zak
28 Semen putih (Tiga roda) 40 kg zak
29 PC super nut - kg
30 Ijuk - kg
31 Glass block bening 20 x 20 bh
32 Glass block buram 20 x 20 bh
33 Batu muka segi enam bh
34 Bata Ringan HB 7.5 7.5x20x60 cm m³
35 Bata Ringan HB 10 10x20x60 cm m³
II BAHAN KUZEN KAYU DAN KERANGKA ATAP
1 Kayu kamper, balok (mutu kayu klas II) 6/12, 6/15, 8/12 m³
2 Kayu kamper, papan (mutu kayu klas II) 2/20, 3/20, 3/25 m³
3 Kayu kamper, usuk (mutu kayu klas II) 3/5,4/6,5/7 m³
4 Kayu kamper, reng (mutu kayu klas II) 2/3 m³
5 Kayu meranti, balok (mutu kayu klas III) 6/12, 6/15, 8/12 m³
6 Kayu meranti, papan (mutu kayu klas III) 2/20, 3/20, 3/25 m³
7 Kayu meranti, usuk (mutu kayu klas III) 3/5,4/6,5/7 m³
8 Kayu meranti, reng (mutu kayu klas III) 2/3 m³
9 Kayu bekisting, papan randu (mutu kayu klas IV) 2/20-200 m³
10 Kayu bekisting, usuk sengon (mutu kayu klas IV) 4/6-200 m³
11
12
13
14 Kayu kruing, balok (mutu kayu klas II) 6/12, 6/15, 8/12 m³
15 Kayu kruing, papan (mutu kayu klas II) 2/20, 3/20, 3/25 m³
16 Kayu kruing, usuk (mutu kayu klas II) 3/5,4/6,5/7 m³
17 Kayu kruing, reng (mutu kayu klas II) 2/3 m³
18 Kayu balau, balok (mutu kayu klas II) 6/12, 6/15, 8/12 m³
19 Kayu balau, papan (mutu kayu klas II) 2/20, 3/20, 3/25 m³
20 Kayu balau, usuk (mutu kayu klas II) 3/5, 4/6, 5/7 m³
21 Kayu balau, reng (mutu kayu klas II) 2/3 m³
22 Kayu Albasiah (mutu kayu klas IV) - m³
23 Kayu jawa / lokal, balok (mutu kayu klas II) 6/12, 6/15, 8/12 m³
24 Kayu jawa / lokal, papan 2/20, 3/20, 3/25 m³
25 Kayu jawa / lokal, usuk 3/5,4/6,5/7 m³
26 Kayu jawa / lokal, reng 2/3 m³
27 List kayu tahun 1/4 m
28 List kayu profil 4/4 m
29 List kayu profil 5/5 m
32 Bambu apus Ø6-10 x 600 cm btg

III BAHAN PENUTUP ATAP DAN PLAFON


1 Asbes gelombang besar tebal 5 mm (Djabesmen) 1,05 X 3,00 lbr
2 Asbes gelombang kecil tebal 3 mm (Djabesmen) 0.8 X 3,00 lbr
3 Asbes gelombang kecil tebal 3 mm (Djabesmen) 0.8 X 2.40 lbr
4 Asbes gelombang kecil tebal 3 mm (Djabesmen) 0.8 X 2.10 lbr
5 Asbes gelombang kecil tebal 4 mm (Djabesmen) 1.05x3.00 lbr
6 Asbes gelombang kecil tebal 4 mm (Djabesmen) 1.05x2.40 lbr
7 Asbes bubung gelombang besar tebal 5 mm - m¹
8 Asbes bubung gelombang kecil tebal 4 mm - m¹
9 Woodplek tebal 9 mm 30x400 lbr
10 Woodplek tebal 9 mm 20x300 lbr
11 Eternit (lokal) - lbr
12 Gypsum tebal 9 mm 122 x 244 lbr
14 List Gypsum 15 x 200 cm btg
15 List Gypsum 10 x200 cm btg
16 Genteng flam press Jawa/lokal - bh
20 Genteng bubung Jawa/lokal - bh
22x30 cm(per-m2 isi
21 Genteng prentul Trenggalek bh
25 pcs)
22 Genteng bubung prentul Trenggalek 22x35 cm (per-m isi 4) bh
23x33 cm(per-m2 isi
23 Genteng Mantili Trenggalek bh
25 pcs)
24 Genteng bubung Mantili Trenggalek 22x35 cm (per-m isi 4) bh
33x42 cm (per-m2 isi
25 Genteng Beton (Monier) bh
9.7 pcs)
26 Genteng bubung Beton (Monier) 21x29.5 cm bh
31.7x32 cm(per-m2
27 Genteng Kanmuri Glasur (Milenio) bh
isi13.7
31.4x32pcs)
cm(per-m2
28 Genteng Kanmuri Glasur (Espanika)
isi14.5 pcs)
21x29.5 cm(per-m isi
29 Genteng Kanmuri bubung Glasur bh
3.8 pcs) cm(per-m2
31.4x32
30 Genteng KIA Glasur bh
isi14.5
21x29.5pcs)
cm(per-m isi
31 Genteng KIA bubung Glasur bh
3.8 pcs) cm(per-m2
31.4x32
32 Genteng M class bh
isi14.5
21x29.5pcs)
cm(per-m isi
33 Genteng bubung M class bh
3.8 pcs)
34 Seng Talang L=0.90 m,t=0.25 mm m¹
35 Seng Talang L=0.60 m,t=0.25 mm m¹
36 Seng Gelombang 80 x 210 cm lbr
37 Seng Gelombang 80 x 240 cm lbr
38 Tripleks tebal 3 mm (120 x 240) cm lbr
39 Tripleks tebal 4 mm (120 x 240) cm lbr
40 Tripleks tebal 6 mm (120 x 240) cm lbr
41 Tripleks tebal 8 mm (120 x 240) cm lbr
42 Tripleks tebal 9 mm (120 x 240) cm lbr
43 Kalsiboard (120 x 240) cm lbr
47 Talang Galvalum L=0.60 m,t=0.25 mm m¹
48 Jala/jaring paranet L=3 M m¹

IV BAHAN BESI/LOGAM
1 Besi begel/baut - kg
2 Besi beton polos - kg
3 Besi beton ulir - kg
4 Pipa besi galvanis medium B (tebal 2,4 mm) Ø1/2" - 6 m btg
5 Pipa besi galvanis medium B (tebal 3 mm) Ø1" - 6 m btg
6 Pipa besi galvanis medium B (tebal 3 mm) Ø1,5" - 6 m btg
7 Pipa besi galvanis medium B (tebal 3,3 mm) Ø2" - 6 m btg
8 Pipa besi galvanis medium B (tebal 3,3 mm) Ø2,5" - 6 m btg
9 Besi plat tebal 2 mm 4' x 8' lbr
10 Besi plat tebal 3 mm 4' x 8' lbr
11 Besi plat tebal 4 mm 4' x 8' lbr
12 Besi plat bordes tebal 6 mm 4' x 8' lbr
13 Besi plat strip panjang tebal 2 mm 5x2x6m ljr
14 Baja struktur - kg
15 Kawat harmonika - m²
16 Kawat ikat beton (bendrat) - kg
17 Bondex (galvalum) 0.75X1.00 m²
18 Pintu Alumunium (kualitas II) 70 x 200 cm lbr
19 Pintu PVC (kualitas baik) 70 x 210 cm lbr
20 Kawat kasa alumunium - m²
21 Pagar besi ulir komplit dg mainan - m²
22 Pintu pagar besi ulir komplit dg mainan - m²
23 Pintu rolling door - m²
24 Pintu plat harmonika t=1.2 mm m²
25 Atap twin lite rangka pipa stainless steel terpasang m²
26 Atap twin lite rangka pipa besi / hollow terpasang m²
27 Teralis besi - m²
28 Teralis aluminium - m²
29 Railling stainless steel Ø2" m²
30 Seng galvalum t=0.30 mm m²
t=0.75 mm jarak
31 Pasang rangka galvalum (terpasang) m²
kuda2=mm
t=0.75 1.20 m
jarak
32 Pasang rangka galvalum (terpasang) m²
kuda2= 1.00
t=0.75 mm jarak m
33 Pasang rangka galvalum (terpasang) m²
kuda2=mm
t=1.00 0.80 m
jarak
34 Pasang rangka galvalum (terpasang) m²
kuda2= 1.20
t=1.00 mm jarak m
35 Pasang rangka galvalum (terpasang) m²
kuda2= 1.00 m
36 Pasang rangka galvalum (terpasang) t=1.00 mm jarak kuda2= 0.80 m m²
37 Baut drilling sds 12x20 bh
38 Baut drilling sds 8x1/2 bh
39 Dinabolt 8x65 bh
40 Kusen Pintu&jendela Aluminium Silver "HC" 4" m¹
41 Kusen Pintu&jendela Aluminium Silver "ALEXINDO" 4" m¹
42 Kusen Pintu&jendela Aluminium silver "YKK" 4" m¹
43 Kusen Pintu&jendela Aluminium Coklat "HC" 4" m¹
44 Kusen Pintu&jendela Aluminium Coklat "ALEXINDO" 4" m¹
45 Kusen Pintu&jendela Aluminium Coklat "ALEXINDO" 3" m¹
46 Kusen Pintu&jendela Aluminium Coklat "YKK" 4" m¹
Kusen Pintu&jendela Aluminium Putih/super white
47 4" m¹
"ALEXINDO"
48 Sealent - tube

V BAHAN LANTAI
1 Paving stone 3 berlian warna, cetak basah 10.5 x 21 x 6 (cm) m²
2 Paving stone 3 berlian netral, cetak basah 10.5 x 21 x 6 (cm) m²
3 Paving stone segi 6 warna, cetak basah 10.5 x 21 x 6 (cm) m²
4 Paving stone segi 6 netal, cetak basah 10.5 x 21 x 6 (cm) m²
5 Paving stone persegi warna,cetak basah 10.5 x 21 x 6 (cm) m²
6 Paving stone per segi abu-abu, cetak basah 10.5 x 21 x 8 (cm) m²
7 Paving stone 3 berlian warna, cetak basah 10.5 x 21 x 8 (cm) m²
8 Paving stone 3 berlian netral, cetak basah 10.5 x 21 x 8 (cm) m²
9 Paving stone segi 6 warna, cetak basah 10.5 x 21 x 8 (cm) m²
10 Paving stone segi 6 netal, cetak basah 10.5 x 21 x 8 (cm) m²
11 Paving stone persegi netral, cetak basah 10.5 x 21 x 8 (cm) m²
12 Paving stone persegi warna, cetak basah 10.5 x 21 x 8 (cm) m²
13 Paving 3 Dimensi ,cetak basah t=6 (cm) m²
18 Paving Kotak netral,cetak basah 21x21x8 (cm) m²
19 Paving Kotak warna,cetak basah 21x21x8 (cm) m²
20 Kanstin 15x25x40 bh
21 Kanstin 15x30x50 bh
22 Kanstin 20x30x50 bh
23 Topi uskup t=6 cm bh
24 Topi uskup t=8 cm bh
25 Keramik, Roman polos 40 x 40 m²
26 Keramik, Roman polos 50 x50 m²
27 Keramik, Roman warna 40 x 40 m²
28 Keramik, Roman Type Alur 33 x 33 m²
29 Keramik, KIA polos 20 x 20 m²
30 Keramik, KIA polos 20 x 25 m²
39 Keramik, KIA warna 20 x 25 m²
40 Tegel keramik, KIA warna 30 x 30 m²
41 Tegel keramik, KIA warna 40 x 40 m²
42 Tegel keramik, KIA kasar 30 x 30 m²
40 Keramik, KIA warna 30 x 30 m²
41 Keramik, KIA warna 40 x 40 m²
42 Keramik, Platinum polos 40 x 40 m²
43 Keramik, Platinum polos 50 x 50 m²
44 Keramik, Platinum warna 30 x 30 m²
45 Keramik, Platinum warna 40 x 40 m²
46 Keramik, Platinum warna 50 x 50 m²
47 Keramik, Platinum warna 25 x 40 m²
48 Keramik, Platinum warna 60 x 60 m²
50 Keramik, Arwana Putih 20 x 25 m²
51 Keramik, Arwana Putih 30 x 30 m²
52 Keramik, Arwana Putih 40 x 40 m²
53 Keramik, Arwana Warna 20 x 25 m²
54 Keramik, Arwana Warna 30 x 30 m²
55 Keramik, Arwana Warna 40 x 40 m²
56 Keramik, Arwana Kasar 30 x 30 m²
57 Keramik, Asia Putih 30 x 30 m²
58 Keramik, Asia Putih 40 x 40 m²
59 Keramik, Asia Warna 20 x 25 m²
60 Keramik, Asia Warna 30 x 30 m²
61 Keramik, Asia Warna 40 x 40 m²
62 Keramik, Asia Kasar 30 x 30 m²
63 Tegel keramik, Essenza polos 30 x 30 m²
64 Tegel keramik, Essenza polos 40 x 40 m²
65 Tegel keramik, Essenza polos 60 x 60 m²
66 Tegel keramik, Essenza warna 30 x 30 m²
67 Tegel keramik, Essenza warna 40 x 40 m²
68 Keramik, Asia Kasar 40 x 40 m²
69 Tegel plint keramik warna 10 x 30 m¹
70 Marmer ex. Tulungagung 40 x 60 m²
71 Keramik motif Granit, Granito polos 40 x 40 m²
72 Keramik motif Granit, Granito polos 60 x 60 m²
73 Keramik motif Granit, Granito warna 40 x 40 m²
74 Keramik motif, Granito warna 60 x 60 m²
75 Step nosing 8x 40 bh
76 Step nosing 7 x 30 bh
77 Keramik motif granit ex china 60 x 60 m²
78 Keramik, Asia (Oscar Red) 30x30 m²
79 Keramik motif Granit,Dakara polos 60x60 dos
80 Keramik motif Granit,Niro kasar 60x60 dos
81 Keramik motif Granit,Roman polos 60x60 dos
82 Keramik motif Granit,Garuda polos 60x60 dos
83 Plint granit polos 10x60 bh
84 Plint granit motif 10x60 bh
85 Granit difable 30x30 m²
86 Tegel difable 30x30 m²

VI BAHAN PENGECATAN
1 Cat besi Emco - kg
2 Cat kayu Emco - kg
3 Meni besi/kayu, cap Pedang - kg
4 Thinner A spesial "Bintang" - ltr
5 Thinner B spesial - ltr
6 Cat tembok Vinilex (Interior) - kg
7 Cat tembok Vinilex ( exterior) - kg
8 Cat tembok Decolith - kg
9 Cat tembok Dulux (Interior) - Ltr
10 Cat tembok Dulux (exterior) Ltr
11 Cat tembok Paragon - kg
12 Cat genteng Sanlex - kg
13 Cat genteng Matex - kg
14 Wallsealer/cat tembok dasar Vinilex - ltr
15 Wallsealer/cat tembok dasar Dulux - ltr
16 No Drop - kg
17 Aqua proof - kg
18 Serlak kripik "India" - kg
19 Wood Filler "Impra" - ltr
20 Wood Stain 'Impra" - ltr
21 Sanding Sealer "Impra" - ltr
22 Kertas gosok - lbr
23 Plamur tembok - kg
24 Plamur kayu - kg
25 Spiritus - ltr
26 Lem Rajawali untuk kayu (kuning) - kg
27 Lem Rajawali untuk tembok - kg
28 Soda Api - kg
29 Kuas Eterna 3" bh
30 Kuas Eterna 4" bh
31 Kuas Eterna 5" bh
32 Kalsium - kg
33 Coating batu alam ex-propan - ltr

VII BAHAN PENGGANTUNG DAN PENGUNCI


1 Engsel pintu "ELT" 4" bh
2 Engsel jendela "ELT" 3" bh
3 Grendel - bh
4 Grendel biasa (besar) (Vintage) 8" bh
5 Grendel biasa (kecil) (Aomori) 3" bh
6 Kunci silinder "SES" - bh
7 Kunci silinder "SOLID" - bh
8 Kunci slot merk "ELT" (dengan handel) - bh
9 Kunci slot merk "SOLID'" (dengan handel) - bh
10 Hak angin biasa 8" set
11 Hak angin (sikutan) "DEKSON" - set
12 Pegangan pintu (model standar)ELT p = 30 cm bh
13 Pegangan pintu (model standar)ELT p = 40 cm bh
14 Spring knip (SOLID) - bh
15 Spring knip (vintage) - bh
16 Door closer ( dekson) - bh
17 Rel pintu dorong, J4 777 SOLID P= 2 m btg

VIII BAHAN SANITASI


1 Kloset duduk porselin (INA) - bh
2 Kloset duduk porselin (KIA) - bh
3 Kloset duduk porselin (TOTO) - bh
4 Kloset jongkok porselin (INA) - bh
5 Kloset jongkok porselin (TOTO) - bh
6 Kran air stainless steel Ø 1/2" bh
7 Kran air stainless steel Ø 3/4" bh
8 Kran air kuningan Ø 1/2" bh
9 Wastafel warna muda "TOTO" - bh
10 Wastafel warna tua "TOTO" - bh
11 Rol TBA (seal tape) - rol
12 Siphon Washer, kelas sedang plastik - set
13 Bak mandi fiberglass 0,5 m3 bh
14 Bak cuci piring stainless steel, besar (double) - bh
15 Tempat sabun keramik "Trisensa" - bh
16 Urinoir "INA" (komplit) - set

Urinoir "AMERICAN STANDARD" model Maybrook II


17 - set
Top Spud Urinal
18 Tandon air Biasa "Profil" 550 ltr bh
19 Tandon air stainless steel "Profil" 550 ltr bh
20 Tandon air stainless steel "Profil" 1100 ltr bh
21 Pompa air "Shimizu 125 W" - bh
22 Pompa air "Shimizu 250 W" - bh
23 Pompa air "Shimizu 150 W" - bh
24 Shower Spray -

25 Shower Set -
26 Floordrain -
27 Tempat Sabun -
28 Kran zink -
29 Kitchenzink -
30 Kran dinding -
31 Pelampung otomatis bh
32 Roof drain steinless 3" bh

IX BAHAN JENIS KACA


1 Kaca polos t = 3 mm m²
2 Kaca polos t = 5 mm m²
3 Kaca polos t = 8 mm m²
4 Kaca polos t = 10 mm m²
5 Kaca polos t = 12 mm m²
6 Kaca rayban t = 5 mm m²
7 Kaca rayban t = 8 mm m²
8 Kaca es/ buram t = 5 mm m²
9 Kaca cermin t = 3 mm m²

X BAHAN BETON CETAKAN


1 Buis beton (p = 100 cm) Ø 15 cm bh
2 Buis beton (p = 100 cm) Ø 20 cm bh
3 Buis beton (p = 100 cm) Ø 30 cm bh
4 Buis beton (p = 100 cm) Ø 40 cm bh
5 Buis beton (p = 50 cm) Ø 50 cm bh
6 Buis beton (p = 50 cm) Ø 60 cm bh
7 Buis beton (p = 50 cm) Ø 80 cm bh
8 Buis beton (p = 50 cm) Ø 100 cm bh
9 Buis Beton U (p = 100 cm) Ø 15 cm bh
10 Buis Beton U (p = 100 cm) Ø 20 cm bh
11 Buis Beton U (p = 100 cm) Ø 30 cm bh

XI BAHAN PIPA PVC


1 Pipa PVC tipe AW "Maspion" Ø 1/2" - 400 btg
2 Pipa PVC tipe AW "Maspion" Ø 3/4" - 400 btg
3 Pipa PVC tipe AW "Maspion" Ø 1" - 400 btg
4 Pipa PVC tipe AW "Maspion" Ø 1.5" - 400 btg
5 Pipa PVC tipe AW "Maspion" Ø 2" - 400 btg
6 Pipa PVC tipe AW "Maspion" Ø 2,5" - 400 btg
7 Pipa PVC tipe AW "Maspion" Ø 3" - 400 btg
8 Pipa PVC tipe AW "Maspion" Ø 4" - 400 btg
9 Pipa PVC tipe AW "Maspion" Ø 5" - 400 btg
10 Pipa PVC tipe AW "Maspion" Ø 6" - 400 btg
11 Pipa PVC tipe D "Maspion" Ø 2" - 400 btg
12 Pipa PVC tipe D "Maspion" Ø 2,5" - 400 btg
13 Pipa PVC tipe D "Maspion" Ø 3" - 400 btg
14 Pipa PVC tipe D "Maspion" Ø 4" - 400 btg
15 Pipa PVC tipe D "Maspion" Ø 5" - 400 btg
16 Pipa PVC tipe D "Maspion" Ø 6" - 400 btg
17 Stop kran dia 1" - bh
18 Klep diameter 3/4" - bh
19 Lem PVC - tube
Pipa
RRJ
S10-
XII
12.5 BAHAN JENIS PAKU
1 Paku kayu 1" kg
2 Paku kayu 1,5" - 2" kg
3 Paku kayu 2,5" - 3" kg
4 Paku kayu 4" kg
5 Paku payung (paku seng gelombang) - kg
6 Paku sekrup 1" dos
7 Paku triplek/eternit - kg
7 Paku kalsiboard - kg

XIII BAHAN PERALATAN LISTRIK


1 Fiting plafon - bh
2 T doos PVC - bh
3 Isolator kecil - bh
4 Stop kontak (Broco) - bh
5 Skakelar tunggal (Broco) - bh
6 Skakelar ganda (Broco) - bh
7 Panel box 40x60x20 bh
8 MCB 6 A (broco) - bh
9 MCB 10 A (broco) - bh
10 MCB 16 A (broco) - bh
11 Lampu LED (philips) 14.5 W - bh
12 Lampu sorot taman 30 W (Luxuri LED) - bh
13 Lampu sorot taman 30 W (Power LED) - bh
14 Lampu sorot taman 20 W (Luxuri LED) - bh
15 Fitting downlight 4" (Masko) - bh
16 Fitting downlight 2.5" (Masko) - bh
17 Fitting downlight 2.5" (Fillips) - bh
18 Box panel pVC isi 2 MCB (Broco) - bh
19 Box panel pVC isi 4 MCB (Broco) - bh
20 Outlet TV - bh
21 Outlet Telepon - bh
22 Kabel telepon 4x0.5 mm m¹
23 Kabel NYM. 2 x 2,5 - m¹
24 Kabel NYY. 3 x 2,5 - m¹

XIV BAHAN BBM


1 Pertalite - ltr
2 Solar - ltr
3 Bensin industri - ltr
4 Solar Industri - ltr
5 Minyak tanah non subsidi - ltr
6 Oli mesin Mesran - ltr
7 Minyak pelumas - ltr
8 Grease (gemuk pelumas) - kg
9 Aspal panas curah - kg
10 Aspal panas drum - kg
11 Aspal cold mix - ton
AD DAN PROFIT

HARGA DRAFT
TRIWULAN I 2022 KETERANGAN
(Rp)
5 6

169,700.00 Ex.Sungai Bladak


188,400.00 Ex.Sungai Bladak
192,500.00 Ex.Sungai Bladak
203,400.00 Ex.Sungai Bladak
207,500.00 Ex.Sungai Bladak
207,500.00 Ex.Sungai Bladak
218,800.00 Ex.Sungai Bladak
218,800.00 Ex.Sungai Bladak
3,500.00
145,000.00 Ex.Sungai Bladak
133,800.00 Ex.Sungai Bladak
90,000.00 Ex.Sungai Bladak
90,000.00 Ex.Sungai Bladak
90,000.00
90,000.00
89,000.00
2,100.00 Home industri
700.00 Home industri
17,000.00
80,000.00
75,250.00
60,200.00 Gresik
65,000.00
52,000.00 Tiga roda
52,000.00 dynamix
44,500.00 Merah putih
98,800.00 Tiga roda
22,000.00
26,300.00
22,500.00
22,500.00
750.00
750,000.00 BRICON
775,000.00 BRICON
8,900,000.00
9,900,000.00
8,200,000.00
7,900,000.00
5,600,000.00
6,200,000.00
5,200,000.00
4,900,000.00
1,375,000.00
3,125,000.00

7,000,000.00
7,300,000.00
6,500,000.00
6,000,000.00
10,500,000.00
11,200,000.00
9,300,000.00
7,800,000.00
2,292,000.00
4,160,000.00
3,750,000.00
3,645,000.00
3,330,000.00
5,500.00
8,000.00
15,000.00
20,000.00

126,800.00 Djabesmen
53,100.00 Djabesmen
37,400.00 Djabesmen
32,700.00 Djabesmen
75,500.00 Djabesmen
58,000.00 Djabesmen
63,350.00
21,500.00
95,000.00
65,000.00
17,000.00
56,000.00 APLUS
41,000.00
18,000.00
1,850.00
7,000.00
2,000.00
6,500.00
2,500.00
6,500.00
8,500.00 Monier
15,000.00 Monier
11,000.00 Milenio
10,000.00 Espanika
22,500.00 Kanmuri
9,500.00 KIA
20,000.00 KIA
10,500.00 M class
22,500.00 M class
27,000.00
25,000.00
59,000.00
70,000.00
57,000.00
70,000.00
82,000.00
110,000.00
125,000.00
45,000.00 APLUS
36,000.00
15,000.00

20,000.00
12,500.00 SNI
13,300.00 SNI
96,000.00
176,500.00
288,800.00
396,000.00
495,000.00
545,000.00
781,000.00
965,000.00
1,850,000.00
66,000.00
17,000.00
30,000.00
21,400.00
165,000.00 Kencana
1,550,000.00
440,000.00
45,000.00
675,000.00
775,000.00
575,000.00
1,200,000.00
700,000.00
575,000.00
475,000.00
525,000.00
950,000.00
39,000.00 Kencana
140,000.00 Kencana
150,000.00 Kencana
165,000.00 Kencana
155,000.00 Kencana
170,000.00 Kencana
185,000.00 Kencana
300.00 SEC
170.00 SEC
2,000.00 SEC
92,000.00 HC
117,500.00 ALEXINDO
375,000.00 YKK
105,000.00 HC
125,000.00 ALEXINDO
95,000.00 ALEXINDO
375,000.00 YKK
145,000.00 ALEXINDO
35,000.00

69,000.00 Home Industri


64,000.00 Home Industri
79,000.00 Home Industri
69,000.00 Home Industri
86,000.00 Home Industri
69,000.00 Home Industri
79,000.00 Home Industri
74,000.00 Home Industri
89,000.00 Home Industri
79,000.00 Home Industri
69,000.00 Home Industri
86,000.00 Home Industri
81,000.00 Home Industri
68,000.00 Home Industri
86,000.00 Home Industri
25,000.00 Home Industri
35,000.00 Home Industri
45,000.00 Home Industri
4,000.00 Home Industri
5,000.00 Home Industri
70,000.00 Roman
120,000.00 Roman
80,000.00 Roman
90,000.00 Roman
60,000.00 KIA
57,500.00 KIA
60,000.00 KIA
55,900.00 KIA
109,000.00 KIA
51,500.00 KIA
65,000.00 KIA
75,000.00 KIA
49,500.00 Platinum
77,000.00 Platinum
55,000.00 Platinum
58,000.00 Platinum
75,000.00 Platinum
75,000.00 Platinum
100,000.00 Platinum
48,000.00 Arwana
41,000.00 Arwana
43,000.00 Arwana
49,000.00 Arwana
50,000.00 Arwana
43,000.00 Arwana
46,000.00 Arwana
40,000.00 Asia
45,000.00 Asia
50,500.00 Asia
40,000.00 Asia
47,500.00 Asia
50,000.00 Asia
32,200.00 Essenza
36,800.00 Essenza
41,400.00 Essenza
11,500.00 Essenza
20,700.00 Essenza
57,500.00 Asia
37,000.00
247,500.00
200,000.00 Granito
260,000.00 Granito
174,000.00 Granito
249,000.00 Granito
14,000.00
11,000.00
100,000.00
55,000.00 Asia
164,000.00 Dakara
198,200.00 Niro
270,000.00 Roman
123,000.00 Garuda
17,500.00
35,000.00
Black Granite
672,000.00
Guiding Tactile blocks
165,000.00 Home Industri

62,000.00 Emco
62,000.00 Emco
30,600.00 Pedang
38,200.00
25,900.00
32,000.00 Vinilex
32,000.00 Vinilex
24,600.00 Decolith
72,000.00 Dulux
126,000.00 Dulux
23,000.00 Paragon
36,700.00 Sanlex
32,800.00 Matex
49,000.00 Vinilex
55,400.00 Dulux
53,000.00
48,000.00
268,800.00
41,800.00
74,600.00
74,600.00
4,000.00
29,000.00
25,500.00
10,000.00
47,500.00
17,800.00
22,600.00
12,300.00
20,300.00
31,300.00
2,500.00
76,500.00 Propam

98,800.00 ELT
50,300.00 ELT
7,500.00
34,500.00 Vintage
8,000.00 Aomori
85,000.00 SES
112,500.00 SOLID
450,000.00 ELT
206,000.00 SOLID
63,500.00
118,000.00 DEKSON
330,000.00 ELT
499,000.00 ELT
25,000.00 SOLID
22,000.00 Vintage
284,000.00 DEKSON
198,000.00 SOLID

1,750,000.00 INA
1,500,000.00 KIA
2,600,000.00 TOTO Type 633
225,000.00 INA
400,000.00 TOTO
72,100.00 MOVE
79,600.00 MOVE
30,000.00
534,100.00 TOTO Type 247
633,300.00 TOTO Type 247
5,000.00
38,000.00
383,500.00
565,500.00 Type PMJ
29,000.00
INA Type U114N
2,250,000.00
URINAL

2,112,500.00
899,000.00
2,698,000.00
3,510,000.00
402,000.00
2,558,500.00
1,445,000.00 Shimizu Ps 150 Bit
type THX 20 NBPIV ex.
221,900.00
Toto

506,000.00 type TX 423 SZ ex. Toto


368,500.00 TX 1B ex. Toto
34,500.00 S 11 N EX. Toto
251,200.00 T30ARBV7N ex.Toto
Stainlessteell doubel
559,000.00
/PMJ
231,000.00 T23 B13 ex.Toto
90,000.00
138,000.00 Os-15003

75,000.00
110,000.00
185,000.00
250,000.00
300,000.00
112,500.00
180,000.00
120,000.00
110,000.00

35,000.00 Home industri


45,000.00 Home industri
65,000.00 Home industri
80,000.00 Home industri
65,000.00 Home industri
75,000.00 Home industri
110,000.00 Home industri
175,000.00 Home industri
17,500.00 Home industri
22,500.00 Home industri
32,500.00 Home industri

35,000.00 Maspion
43,000.00 Maspion
54,000.00 Maspion
99,000.00 Maspion
147,000.00 Maspion
189,000.00 Maspion
269,000.00 Maspion
391,000.00 Maspion
616,000.00 Maspion
814,000.00 Maspion
70,000.00 Maspion
104,000.00 Maspion
151,000.00 Maspion
212,000.00 Maspion
345,000.00 Maspion
419,000.00 Maspion
133,000.00 Move
5,000.00 Royal
11,000.00 Glue

21,000.00
21,000.00
21,000.00
21,000.00
30,000.00
65,000.00
21,000.00
20,000.00

11,300.00
3,000.00
6,500.00
14,300.00 Broco
13,500.00 Broco
19,400.00 Broco
399,300.00
34,500.00 Broco
34,500.00 Broco
34,500.00 Broco
65,000.00 Philips
367,000.00 Luxuri
278,000.00 Power
245,000.00 Luxuri
45,000.00 Masco
24,000.00 Masco
42,800.00 Philips
10,600.00 Broco
43,000.00 Broco
59,900.00 Broco
76,400.00 Broco
13,750.00 Kitani
12,000.00
15,500.00

7,650.00 Pertamina
5,150.00 Pertamina
9,000.00 Pertamina
11,150.00 Pertamina
11,220.00 Pertamina
46,000.00 Pertamina
42,000.00 Pertamina
42,600.00 Pertamina
7,800.00 Pertamina
9,700.00 Pertamina
2,200,000.00 PT TRIASINDOMIX
Tabel 2. Perhitungan Analisa Harga Satuan Pekerjaan Kota Blitar Tahun 2022
Harga Satuan Upah Bahan Jumlah Harga
NO Uraian Pekerjaan
(Rp) (Rp) (Rp) (Rp)
a b c d e f
I Pekerjaan Persiapan
1.1 1m^2 Pembersihan lahan
Upah
0.1 OH Pekerja 81,600.00 8,160.00
0.05 OH Mandor 102,500.00 5,125.00
Sub Jumlah 13,285.00 0.00 13,285.00
1.2 Pekerjaan pembuatan 1 m2
Bahankeliling
pagar
0.00
0.00
0.070 m3 Kayu 5/7 616.27 43.14
0.060 Kg Paku 16.64 1.00
Upah
0.400 OH Pekerja 3.059.617 1.223.846
0.200 OH Tukang Kayu 149.35 29.87
0.020 OH Mandor 165.83 3.32
Sub Jumlah 33.19 44.14 77.32
1.3 Pekerjaan Gudang
Bahan

1.1 Kg Besi strip 25.81 28.39


0.18 m3 Kayu 5/7 Balok 616.27 886.825,8
Biasa
0.08 Kg Paku 16.64 1.33
35 Kg Semen Portland 53.39 1,868.55
0.15 m3 Pasir Pasang 183.65 27.55
0.1 m3 Pasir Beton 278.10 27.81
Upah
0.1 OH Pekerja 3,059,617.00 305,961.70
0.2 OH Tukang Kayu 149.35 29.87
0.05 OH Mandor 16,583.00 829.15
Sub Jumlah 306,820.72 1.33 830.48
a b c d e f
1.4 Pekerjaan bouwplank
Bahan
0.012 m3 Papan Kayu 5/7 616.27 113.534,232

0.02 Kg Paku 16.64 0.33


Upah
0.1 OH Pekerja 3,059,617.00 305,961.70
0.2 OH Tukang Kayu 149.35 29.87
0.01 OH Kepala Tukang 157.35 1.57

0.05 OH Mandor 1,658,300.00 82,915.00


Sub Jumlah 388,908.14 0.33 388,908.48
1.5 Pekerjaan air kerja
Sub Jumlah LS LS LS
1.6 Pekerjaan listrik kerja
Sub Jumlah LS LS LS
II Pekerjaan Galian Tanah
2.1.1 Galian pondasi tipe A dan B
Upah
0.75 OH Pekerja 3,059,617.00 2,294,712.75
0.025 OH Mandor 1,658,300.00 41,457.50
Sub Jumlah 2,336,170.25 0.00 2,336,170.25
2.1.2 Galian pondasi tipe C dan D
Upah
0.75 OH Pekerja 3,059,617.00 2,294,712.75
0.025 OH Mandor 1,658,300.00 41,457.50
Sub Jumlah 2,336,170.25 0.00 2,336,170.25
2.1.3 Galian pondasi footplat
Upah
0.9 OH Pekerja 3,059,617.00 2,753,655.30
0.045 OH Mandor 1,658,300.00 74,623.50
Sub Jumlah 2,828,278.80 0.00 2,828,278.80
2.2.1 Urugan tanah kembali footplat
Upah
0.5 OH Pekerja 3,059,617.00 1,529,808.50
a b c d e f
0.05 OH Mandor 1,658,300.00 82,915.00
Sub Jumlah 1,612,723.50 0.00 1,612,723.50
2.2.2 Urugan tanah kembali pondasi
Upahkali
batu
0.5 OH Pekerja 3,059,617.00 1,529,808.50
0.05 OH Mandor 1,658,300.00 82,915.00
Sub Jumlah 1,612,723.50 0.00 1,612,723.50
2.2.3 Urugan tanah peninggi elevasi
Upah rumah
lantai
0.5 OH Pekerja 3,059,617.00 1,529,808.50
0.05 OH Mandor 1,658,300.00 82,915.00
Sub Jumlah 1,612,723.50 0.00 1,612,723.50
2.2.4 Urugan tanah peninggi elevasi
Upah
teras
0.5 OH Pekerja 3,059,617.00 1,529,808.50
0.05 OH Mandor 1,658,300.00 82,915.00
Sub Jumlah 1,612,723.50 0.00 1,612,723.50
2.3.2 Urugan pasir bawah footplat
Bahan
1.2 m3 Pasir urug 138.90 166.68
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 934,468.10 166.68 934,634.78
2.3.3 Urugan pasir bawah
Bahan
aanstamping pondasi A dan B
1.2 m3 Pasir urug 138.90 166.68
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 934,468.10 166.68 934,634.78
2.3.4 Urugan pasir bawah
Bahan
aanstamping pondasi C
1.2 m3 Pasir urug 138.90 166.68
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
a b c d e f
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 934,468.10 166.68 934,634.78
2.3.5 Urugan pasir bawah lantai
Bahan
1.2 m3 Pasir urug 138.90 166.68
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 934,468.10 166.68 934,634.78
2.4.1 Aanstamping pondasi batu kali
Bahan
tipe A dan B
1.2 m3 Batu kali / belah 211.30 253.56

Upah
0.78 OH Pekerja 329,400.00 917,885.10
0.39 OH Tukang Batu 149.35 58.25
0.039 OH Kepala Tukang 3.939.750 153.650,25

0.039 OH Mandor 1,658,300.00 64,673.70


Sub Jumlah 982,617.05 253.56 982,870.61
2.4.2 Aanstamping pondasi batu kali
Bahan
tipe C
1.2 m3 Batu kali / belah 207.20 248.64

Upah
0.78 OH Pekerja 329,400.00 917,885.10
0.39 OH Tukang Batu 149.35 58.25
0.039 OH Kepala Tukang 3.939.750 153.650,25

0.039 OH Mandor 1,658,300.00 64,673.70


Sub Jumlah 982,617.05 248.64 982,865.69
2.4.3 Pasangan pondasi batu kali
Bahan
tipe A dan B
1.2 m3 Batu kali / belah 207.20 248.64

202 Kg Semen / PC 6.15 1,241.29


0.485 m3 Pasir Pasang 183.65 89.07
a b c d e f
Upah
1.5 OH Pekerja 329,400.00 917,885.10
0.75 OH Tukang Batu 149.35 112.01
0.075 OH Kepala Tukang 3.939.750 153.650,25

0.075 OH Mandor 1,658,300.00 124,372.50


Sub Jumlah 1,042,369.61 1,579.00 1,043,948.61
Pasangan pondasi batu kali
Bahan
tipe C
1.2 m3 Batu kali / belah 207.20 248.64

202 Kg Semen / PC 6.15 1,241.29


0.485 m3 Pasir Pasang 183.65 89.07
Upah
1.5 OH Pekerja 329,400.00 917,885.10
0.75 OH Tukang Batu 149.35 112.01
0.075 OH Kepala Tukang 3.939.750 153.650,25

0.075 OH Mandor 1,658,300.00 124,372.50


Sub Jumlah 1,042,369.61 1,579.00 1,043,948.61
III Pekerjaan Beton
3.1 Membuat 1 m3 lantai kerja
beton mutu f'c=7,4 MPa
Bahan
200.000 Ltr Air 150.00 30,000.00
0.800 m3 Koral beton 183.65 146.92
230.000 Kg Semen / PC 6.15 1,413.35
0.525 m3 Pasir 252.12 132.36
Upah
1.200 OH Pekerja 3,059,617.00 917,885.10
0.020 OH Kepala Tukang 3.939.750 153.650,25
0.200 OH Tukang Batu 149.35 29.87
0.075 OH Mandor 1,658,300.00 124,372.50
Sub Jumlah 1,042,287.47 31,692.63 1,073,980.10
3.2 Pembuatan 1 m3 beton mutu
f'c = 19,3 MPa (K 225) slump
Bahan
3.2
a b c d e f
215.000 Ltr Air 150.00 32,250.00
0.870 m3 Koral beton 183.65 159.78
50.000 Kg Semen / PC 6.15 307.25
0.411 m3 Pasir 252.12 103.62
Upah
1.650 OH Pekerja 3,059,617.00 917,885.10
0.028 OH Kepala Tukang 3.939.750 153.650,25
0.275 OH Tukang Batu 149.35 41.07
0.083 OH Mandor 1,658,300.00 137,638.90
Sub Jumlah 1,055,565.07 32,820.65 1,088,385.72
3.3 1 kg Pembesian dengan
tulangan ulir
Bahan
10.500 Kg Baja tulangan 17,000.00
ulir 178,500.00
0.150 m3 Kawat beton 22,400.00 3,360.00
Upah
0.070 OH Pekerja 3,059,617.00 917,885.10
0.007 OH Kepala Tukang 3.939.750 153.650,25
0.070 OH Tukang Besi 149.35 10.45
0.004 OH Mandor 1,658,300.00 6,633.20
Sub Jumlah 924,528.75 181,860.00 110,638.88
3.4 1 kg Pembesian dengan
tulangan polos
Bahan
10.500 Kg Baja tulangan 10,350.00
polos 108,675.00
0.150 m3 Kawat beton 22,400.00 3,360.00
Upah
0.070 OH Pekerja 3,059,617.00 917,885.10
0.007 OH Kepala Tukang 3.939.750 153,650.10
0.070 OH Tukang Besi 149.35 10.45
0.004 OH Mandor 1,658,300.00 6,633.20
Sub Jumlah 1,078,178.85 112,035.00 119,021.39
3.5 Pemasangan 1 m2 bekisting
untuk pondasi
Bahan
3.5
a b c d e f
0.040 m3 Kayu papan 181.63
bekisiting 7.27
0.300 Kg Paku 16.64 4.99
0.100 Ltr Minyak 4,749.00
bekisting 474.90
Upah
0.520 OH Pekerja 3,059,617.00 917,885.10
0.026 OH Kepala Tukang 3.939.750 153,650.10
0.260 OH Tukang Kayu 149.35 38.83
0.026 OH Mandor 1,658,300.00 43,115.80
Sub Jumlah 1,114,689.83 487.16 1,115,176.99
3.6 Pemasangan 1 m2 bekisting
untuk sloof
Bahan
0.045 m3 Kayu papan 181.63
bekisiting 8.17
0.300 Kg Paku 16.64 4.99
0.100 Ltr Minyak 4,749.00
bekisting 474.90
Upah
0.520 OH Pekerja 3,059,617.00 917,885.10
0.026 OH Kepala Tukang 3.939.750 153,650.10
0.260 OH Tukang Kayu 149.35 38.83
0.026 OH Mandor 1,658,300.00 43,115.80
Sub Jumlah 1,114,689.83 488.07 1,115,177.90
3.7 Pemasangan 1 m2 bekisting
untuk kolom
Bahan
0.040 m3 Kayu papan 1,375,000.00
bekisiting 55,000.00
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak
bekisting 3.41
17.035
0.015 m3 Kayu bekisting 4,749.00 71.24
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
a b c d e f

Upah
0.660 OH Pekerja 3,059,617.00 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 55,087.26 1,181,395.65
3.8 Pemasangan 1 m2 bekisting
untuk balok
Bahan
0.040 m3 Kayu papan 1,375,000.00
bekisiting 55,000.00
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak 17.04
bekisting 3.41
0.018 m3 Kayu bekisting 4,749.00 85.48
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96

Upah
0.660 OH Pekerja 3,059,617.00 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 55,101.51 1,181,409.89
3.9 Pemasangan 1 m2 bekisting
untuk plat lantai
Bahan
0.040 m3 Kayu papan 1,375,000.00
bekisiting 55,000.00
0.400 Kg Paku 16.64 6.66
0.200 Ltr Minyak 17.04
bekisting 3.41
0.015 m3 Kayu bekisting 4,749.00 71.24
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96
a b c d e f

Upah
0.660 OH Pekerja 3,059,617.00 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 55,087.26 1,181,395.65
3.10 Pemasangan 1 m2 bekisting
untuk tangga
Bahan
0.030 m3 Kayu papan 1,375,000.00
bekisiting 41,250.00
0.400 Kg Paku 16.64 6.66
0.150 Ltr Minyak 17.04
bekisting 2.56
0.015 m3 Kayu bekisting 4,749.00 71.24
0.350 Lbr Multiplek tebal 17.04
0,9 cm 5.96

Upah
0.660 OH Pekerja 3,059,617.00 917,885.10
0.033 OH Kepala Tukang 3.939.750 153,650.10
0.330 OH Tukang Kayu 149.35 49.29
0.033 OH Mandor 1,658,300.00 54,723.90
Sub Jumlah 1,126,308.39 41,336.41 1,167,644.79
IV Pekerjaan Pasangan
4.1 Pekerjaan Trasram (1:3)
Bahan
7 Kg Semen / PC 6.15 43.02
70 Buah Bata Merah 275.99 19,319.37
0.038 m3 Pasir Pasang 183.65 6.98
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
a b c d e f
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 19,369.36 1,115,794.00
4.2 Pekerjaan Pasangan Dinding Lantai 1
Bahan
8.32 Kg Semen / PC 6.15 51.13
70 Buah Bata Merah 539.44 37,760.45
0.049 m3 Pasir Pasang 183.65 9.00
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 37,820.58 1,134,245.21
4.3 Pekerjaan Pasangan Dinding Lantai 2
Bahan
8.32 Kg Semen / PC 6.15 51.13
70 Buah Bata Merah 539.44 37,760.45
0.049 m3 Pasir Pasang 183.65 9.00
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 37,820.58 1,134,245.21
4.4 Pekerjaan Pasangan Dinding Kamar Mandi Lantai 1
Bahan
6.24 Kg Semen / PC 6.15 38.34
72 Buah Bata Merah 539.44 38,839.32
0.043 m3 Pasir Pasang 183.65 7.90
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
a b c d e f
Sub Jumlah 1,096,424.64 38,885.56 1,135,310.20
4.5 Pekerjaan Pasangan Dinding Kamar Mandi Lantai 2
Bahan
6.24 Kg Semen / PC 6.15 38.34
72 Buah Bata Merah 539.44 38,839.32
0.043 m3 Pasir Pasang 183.65 7.90
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,424.64 38,885.56 1,135,310.20
4.6 Pekerjaan Plesteran Dinding Rumah
Bahan
4.416 Kg Semen / PC 6.15 27.14
0.027 m3 Pasir Pasang 183.65 4.96
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,432.10 32.09 1,096,464.20
4.7 Pekerjaan Plesteran Dinding Kamar Mandi
Bahan
6.24 Kg Semen / PC 6.15 38.34
0.024 m3 Pasir Pasang 183.65 4.41
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,432.10 42.75 1,096,474.85
4.8 Pekerjaan Plesteran Dinding Dalam Kamar Mandi
Bahan
a b c d e f
6.24 Kg Semen / PC 6.15 38.34
0.024 m3 Pasir Pasang 183.65 4.41
Upah
0.3 OH Pekerja 3,059,617.00 917,885.10
0.15 OH Tukang Batu 149.35 22.40
0.015 OH Kepala Tukang 3.939.750 153,650.10
0.015 OH Mandor 1,658,300.00 24,874.50
Sub Jumlah 1,096,432.10 42.75 1,096,474.85
4.9 Pekerjaan Acian
Bahan
3.25 Kg Semen / PC 6.15 19.97
Upah
0.2 OH Pekerja 3,059,617.00 611,923.40
0.1 OH Tukang Batu 149.35 14.94
0.01 OH Kepala Tukang 3.939.750 39,397.50
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 667,918.84 19.97 667,938.81
4.10 Pekerjaan Benangan Dalam
Bahan
0.1 Kg Semen /PC 6.15 0.61
Upah
0.05 OH Pekerja 3,059,617.00 196,987.50
0.0033 OH Mandor 1,658,300.00 5,538.72
Sub Jumlah 202,526.22 0.61 202,526.84
4.11 Pekerjaan Benangan Luar
Bahan
0.1 Kg Semen /PC 6.15 0.61
Upah
0.05 OH Pekerja 3,059,617.00 196,987.50
0.0033 OH Mandor 1,658,300.00 5,538.72
Sub Jumlah 202,526.22 0.61 202,526.84
4.12 Pekerjaan Tali Air Kusen
Bahan
0.1 Kg Semen / PC 6.15 0.61
a b c d e f
Upah
0.05 OH Pekerja 3,059,617.00 196,987.50
0.034 OH Mandor 1,658,300.00 56,382.20
Sub Jumlah 253,369.70 0.61 253,370.31
4.13 Pekerjaan Tali Air Ban Keramik
Bahan
0.1 Kg Semen / PC 6.15 0.61
Upah
0.05 OH Pekerja 3,059,617.00 196,987.50
0.034 OH Mandor 1,658,300.00 56,382.20
Sub Jumlah 253,369.70 0.61 253,370.31
V Pekerjaan Atap
5.1 Pekerjaan Rangka Kuda-Kuda
Bahan
1.1 m3 Balok Kayu 8/12 6,500,000.00 7,150,000.00
0.15 Kg Besi Strip 12,350.00 1,852.50
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3,059,617.00 183,577.02
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 23,638.50
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 212,199.38 7,162,352.50 7,374,551.88
5.2 Pekerjaan Balok Rangkai
Bahan
1.1 m3 Balok Kayu 8/12 6,500,000.00 7,150,000.00
0.15 Kg Besi Strip 12,350.00 1,852.50
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3,059,617.00 183,577.02
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 23,638.50
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 212,199.38 7,162,352.50 7,374,551.88
a b c d e f
5.3 Pekerjaan Usuk 5/7
Bahan
0.6 m Usuk 5/7 5,200,000.00 3,120,000.00
0.5 Kg Paku 21,000.00 10,500.00
Upah
0.06 OH Pekerja 3,059,617.00 183,577.02
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 23,638.50
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 212,199.38 3,130,500.00 3,342,699.38
5.4 Pekerjaan Reng 2/3
Bahan
0.012 m Reng 2/3 4,900,000.00 58,800.00
0.15 Kg Paku 21,000.00 3,150.00
Upah
0.06 OH Pekerja 3,059,617.00 183,577.02
0.06 OH Tukang Kayu 149.35 8.96
0.006 OH Kepala Tukang 3.939.750 23,638.50
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 212,199.38 61,950.00 274,149.38
VI Pekerjaan Penutup Atap
6.1 Pekerjaan Genteng
Bahan
30 buah Genteng M class 10,500.00 315,000.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
0.075 OH Tukang Kayu 149.35 11.20
0.008 OH Kepala Tukang 3.939.750 31,518.00
0.008 OH Mandor 1,658,300.00 13,266.40
Sub Jumlah 503,738.15 315,000.00 818,738.15
6.2 Pekerjaan Wuwung
Bahan
5 buah Genteng Wuwung 22,500.00 112,500.00
8 Kg Semen / PC 60,200.00 481,600.00
a b c d e f
0.032 m3 Pasir urug 90,000.00 2,880.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
0.075 OH Tukang Kayu 149.35 11.20
0.008 OH Kepala Tukang 3.939.750 31,518.00
0.008 OH Mandor 1,658,300.00 13,266.40
Sub Jumlah 503,738.15 596,980.00 1,100,718.15
VII Pekerjaan Lisplank dan Plafond
7.1 Pekerjaan Lisplank
Bahan
0.011 m3 Kayu Balok 5,600,000.00 61,600.00
0.05 Kg Paku 21,000.00 1,050.00
Upah
0.1 OH Pekerja 3,059,617.00 305,961.70
0.2 OH Tukang Kayu 149.35 29.87
0.02 OH Kepala Tukang 3.939.750 #VALUE!
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah 393,078.07 62,650.00 455,728.07
7.2 Pekerjaan Rangka Plafond Lantai 1
Bahan
0.0154 m3 Kayu Balok 5,600,000.00 86,240.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah 589,617.11 90,440.00 680,057.11
7.3 Pekerjaan Rangka Plafond Lantai 2
Bahan
0.0154 m3 Kayu Balok 5,600,000.00 86,240.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
a b c d e f
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah 589,617.11 90,440.00 680,057.11
7.4 Pekerjaan Plafond Lantai 1
Bahan
0.364 lbr gypsum 9 mm 56,000.00 20,384.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah 589,617.11 24,584.00 614,201.11
7.5 Pekerjaan Plafond Lantai 2
Bahan
0.364 lbr gypsum 9 mm 56,000.00 20,384.00
0.2 Kg Paku 21,000.00 4,200.00
Upah
0.15 OH Pekerja 3,059,617.00 458,942.55
0.3 OH Tukang Kayu 149.35 44.81
0.03 OH Kepala Tukang 3.939.750 #VALUE!
0.0075 OH Mandor 1,658,300.00 12,437.25
Sub Jumlah 589,617.11 24,584.00 614,201.11
VIII Pekerjaan Kusen Pintu dan Jendela
8.1 Pekerjaan Kusen Pintu dan Jendela Kayu
Bahan
1.2 m2 Kayu Balok 102,500.00 123,000.00
1.25 Kg Paku 21,000.00 26,250.00
1 Kg Lem Kayu 47,500.00 47,500.00
Upah
0.8 OH Pekerja 92,500.00 74,000.00
2.4 OH Tukang Kayu 149.35 358.44
0.24 OH Kepala Tukang 23,400.00 5,616.00
a b c d e f
0.04 OH Mandor 1,658,300.00 66,332.00
Sub Jumlah 146,306.44 196,750.00 343,056.44
8.2 Pekerjaan Satu Set Pintu Kayu
Bahan
1 Set Pintu Kayu 82,500.00 82,500.00
Upah
0.085 OH Pekerja 92,500.00 7,862.50
0.085 OH Tukang Kayu 149.35 12.69
0.0085 OH Kepala Tukang 23,400.00 198.90
0.0042 OH Mandor 1,658,300.00 6,964.86
Sub Jumlah 15,038.95 82,500.00 97,538.95
8.3 Pekerjaan 1 m2 Pintu / Jendela + Kaca
Bahan
0.024 m2 Papan Kayu 8,900,000.00 213,600.00
1.1 Kg Kaca 8 mm 185,000.00 203,500.00
0.3 Kg Lem Kayu 47,500.00 14,250.00
Upah
0.8 OH Pekerja 92,500.00 74,000.00
2.4 OH Tukang Kayu 149.35 358.44
0.24 OH Kepala Tukang 23,400.00 5,616.00
0.04 OH Mandor 1,658,300.00 66,332.00
Sub Jumlah 146,306.44 431,350.00 577,656.44
8.4 Pekerjaan Satu Set Boven
Bahan
1 Set Bovenlis kayu 15,000.00 15,000.00
Upah
0.085 OH Pekerja 92,500.00 7,862.50
0.085 OH Tukang Kayu 149.35 12.69
0.0085 OH Kepala Tukang 23,400.00 198.90
0.0042 OH Mandor 1,658,300.00 6,964.86
Sub Jumlah 15,038.95 15,000.00 30,038.95
IX Pekerjaan Tegel Lantai
9.1 Pekerjaan Tegel Lantai 1 (Granit 40 x 40)
Bahan
a b c d e f
1.075 KarduGranit 40 x 40 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 92,500.00 22,200.00
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 23,400.00 280.80
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah 42,398.32 907,191.00 949,589.32
9.2 Pekerjaan Tegel Lantai 2 (Granit 40 x 40)
Bahan
1.075 KarduGranit 40 x 40 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 92,500.00 22,200.00
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 23,400.00 280.80
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah 42,398.32 907,191.00 949,589.32
9.3 Pekerjaan tegel granit carport (30 x 30)
Bahan
1.075 KarduGranit 30 x 30 270,000.00 290,250.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.24 OH Pekerja 92,500.00 22,200.00
0.12 OH Tukang Batu 149.35 17.92
0.012 OH Kepala Tukang 23,400.00 280.80
0.012 OH Mandor 1,658,300.00 19,899.60
Sub Jumlah 42,398.32 907,191.00 949,589.32
a b c d e f
9.4 Pekerjaan Tegel Lantai 1 (keramik 40 x 40)
Bahan
1.03 Kardukeramik 40 x 40 36,800.00 37,904.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.7 OH Pekerja 92,500.00 64,750.00
0.35 OH Tukang Batu 149.35 52.27
0.035 OH Kepala Tukang 23,400.00 819.00
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 123,661.77 654,845.00 778,506.77
9.5 Pekerjaan Tegel Lantai 2 (keramik 40 x 40)
Bahan
1.03 Kardukeramik 40 x 40 36,800.00 37,904.00
9.6 Kg Semen / PC 60,200.00 577,920.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
1.5 Kg Semen Warna 22,000.00 33,000.00
Upah
0.7 OH Pekerja 92,500.00 64,750.00
0.35 OH Tukang Batu 149.35 52.27
0.035 OH Kepala Tukang 23,400.00 819.00
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 123,661.77 654,845.00 778,506.77
9.6 Pekerjaan Keramik Dinding KM Lt 1 (20 x 20)
Bahan
1.05 KarduKeramik Dinding 60,000.00 63,000.00
10 Kg Semen / PC 60,200.00 602,000.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
0.5 Kg Semen Warna 22,000.00 11,000.00
Upah
0.7 OH Pekerja 92,500.00 64,750.00
0.35 OH Tukang Batu 149.35 52.27
0.0035 OH Kepala Tukang 23,400.00 81.90
a b c d e f
0.0035 OH Mandor 1,658,300.00 5,804.05
Sub Jumlah 70,688.22 682,021.00 752,709.22
9.7 Pekerjaan Keramik Dinding KM Lt 2 (40 x 40)
Bahan
1.05 KarduKeramik Dinding 36,800.00 38,640.00
10 Kg Semen / PC 60,200.00 602,000.00
0.045 m3 Pasir Pasang 133,800.00 6,021.00
0.5 Kg Semen Warna 22,000.00 11,000.00
Upah
0.7 OH Pekerja 92,500.00 64,750.00
0.35 OH Tukang Batu 149.35 52.27
0.0035 OH Kepala Tukang 23,400.00 81.90
0.0035 OH Mandor 1,658,300.00 5,804.05
Sub Jumlah 70,688.22 657,661.00 728,349.22
9.8 Pekerjaan Keramik List KM
Bahan
3.53 Buah Keramik List 14,000.00 49,420.00
1.14 Kg Semen / PC 60,200.00 68,628.00
0.003 m3 Pasir Pasang 133,800.00 401.40
0.1 Kg Semen Warna 22,000.00 2,200.00
Upah
0.09 OH Pekerja 92,500.00 8,325.00
0.09 OH Tukang Batu 149.35 13.44
0.009 OH Kepala Tukang 23,400.00 210.60
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah 16,840.54 120,649.40 137,489.94
9.9 Pekerjaan Keramik Ban
Bahan
4.05 Buah Keramik Ban 2,700.00 10,935.00
1.14 Kg Semen / PC 60,200.00 68,628.00
0.003 m3 Pasir Pasang 133,800.00 401.40
0.1 Kg Semen Warna 22,000.00 2,200.00
Upah
0.09 OH Pekerja 92,500.00 8,325.00
a b c d e f
0.09 OH Tukang Batu 149.35 13.44
0.009 OH Kepala Tukang 23,400.00 210.60
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah 16,840.54 82164.4 99,004.94
9.10 Pemasangan 1 m2 keramik
Bahan tangga 20 x 100 cm
dinding
1.000 buah Keramik dinding 65,000.00
tangga 20 x100 65,000.00

0.100 Kg Semen warna 22,000.00 2,200.00


1.140 Kg Semen Portland 60,200.00 68,628.00
0.003 m3 Pasir 133,800.00 401.40
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.009 OH Kepala Tukang 23,400.00 210.60
0.090 OH Tukang Batu 149.35 13.44
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah 16,840.54 136,229.40 153,069.94
9.11 Pemasangan 1 m2 stepnoising
Bahan 30 x 100 cm
tangga
1.000 buah Stepnoising 115,790.00
tangga 30 x 100 115,790.00
0.100 Kg Semen warna 22,000.00 2,200.00
1.140 Kg Semen Portland 60,200.00 68,628.00
0.003 m3 Pasir 133,800.00 401.40
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.009 OH Kepala Tukang 23,400.00 210.60
0.090 OH Tukang Batu 149.35 13.44
0.005 OH Mandor 1,658,300.00 8,291.50
Sub Jumlah 16,840.54 187,019.40 203,859.94
X Pekerjaan Instalasi Listrik
10.1 Pemasangan 1 m' kabel
a
10.1 b c d e f
Bahan
1.000 m Kabel 15,500.00 15,500.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 15,500.00 83,280.70
10.2 Pemasangan 1 buah lampu SI
Bahan
1.000 m Lampu SI 65,000.00 65,000.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 65,000.00 132,780.70
10.3 Pemasangan 1 buah lampu
Bahan
gantung
1.000 buah Lampu gantung 1,680,000.00 1,680,000.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 1,680,000.00 1,747,780.70
10.4 Pemasangan 1 buah lampu
Bahan
downlight
1.000 buah Lampu 45,000.00
downlight 45,000.00

Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
a b c d e f
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 45,000.00 112,780.70
10.5 Pemasangan 1 buah stop
Bahan
kontak
1.000 buah Stop kontak 14,300.00 14,300.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 14,300.00 82,080.70
10.6 Pemasangan 1 buah saklar
Bahan
tunggal
1.000 buah Saklar tunggal 13,500.00 13,500.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 13,500.00 81,280.70
10.7 Pemasangan 1 buah saklar
Bahan
ganda
1.000 buah Saklar ganda 19,400.00 19,400.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 19,400.00 87,180.70
10.8 Pemasangan 1 buah MCB
Bahan
1.000 buah MCB 34,500.00 34,500.00
Upah
0.090 OH Pekerja 92,500.00 8,325.00
0.060 OH Kepala Tukang 23,400.00 1,404.00
a b c d e f
0.075 OH Tukang Listrik 149.35 11.20
0.035 OH Mandor 1,658,300.00 58,040.50
Sub Jumlah 67,780.70 34,500.00 102,280.70
XI Pekerjaan Instalasi Air
11.1 Pemasangan 1 m Pipa PVC
Bahan
SNI Ø1/2"
0.250 m Pipa PVC SNI 35,000.00 8,750.00
Ø1/2"
Upah
0.060 OH Pekerja 92,500.00 5,550.00
0.020 OH Kepala Tukang 23,400.00 468.00
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah 55,796.87 8,750.00 64,546.87
11.2 Pemasangan 1 m Pipa PVC
Bahan
SNI Ø4"
0.250 m Pipa PVC SNI 391,000.00 97,750.00
Ø4"
Upah
0.060 OH Pekerja 92,500.00 5,550.00
0.020 OH Kepala Tukang 23,400.00 468.00
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah 55,796.87 97,750.00 153,546.87
11.3 Pemasangan 1 buah meteran
Bahan
air
1.000 buah Meteran air 450,000.00 450,000.00
Upah
0.060 OH Pekerja 92,500.00 5,550.00
0.020 OH Kepala Tukang 23,400.00 468.00
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah 55,796.87 450,000.00 505,796.87
11.4 Pemasangan 1 buah pompa air
Bahan
1.000 buah Pompa air 1,445,000.00 1,445,000.00
11.4

a b c d e f
Upah
0.060 OH Pekerja 92,500.00 5,550.00
0.020 OH Kepala Tukang 23,400.00 468.00
0.200 OH Tukang Batu 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
Sub Jumlah 55,796.87 1,445,000.00 1,500,796.87
11.5 Pemasangan 1 buah kloset
Bahan
duduk
6% kloset Ls Perlengkapan 105,000.00 105,000.00
1.000 buah Kloset duduk 1,750,000.00 1,750,000.00
Upah
3.300 OH Pekerja 92,500.00 305,250.00
0.010 OH Kepala Tukang 23,400.00 234.00

1.100 OHTukang Batu 149.35 164.29


0.160 OHMandor 1,658,300.00 265,328.00
Sub Jumlah 570,976.28 1,855,000.00 2,425,976.29
11.6 Pemasangan 1 buah wastafel
Bahan
1.000 buah Wastafel 633,300.00 633,300.00
12% wastafel
Ls Perlengkapan 2,114,518.00 75,996.00
Upah
1.200 OH Pekerja 92,500.00 111,000.00
0.150 OH Kepala Tukang 23,400.00 3,510.00
1.450 OH Tukang Batu 149.35 216.56
0.060 OH Mandor 1,658,300.00 99,498.00
Sub Jumlah 214,224.56 709,296.00 923,520.56
11.7 Pemasangan 1 set shower
Bahan
1.000 buah Shower 1 set 506,000.00 506,000.00
Upah
0.060 OH Pekerja 92,500.00 5,550.00
0.020 OH Kepala Tukang 23,400.00 468.00
0.200 OH Tukang Pipa 149.35 29.87
0.030 OH Mandor 1,658,300.00 49,749.00
a b c d e f
Sub Jumlah 55,796.87 506,000.00 561,796.87
11.8 Pemasangan 1 buah kran air
Bahan
1.000 buah Kran air 72,100.00 72,100.00
0.025 buah Sealtape 5,000.00 125.00
Upah
0.050 OH Pekerja 92,500.00 4,625.00
0.009 OH Kepala Tukang 23,400.00 210.60
0.080 OH Tukang Pipa 149.35 11.95
0.002 OH Mandor 1,658,300.00 3,316.60
Sub Jumlah 8,164.15 72,100.00 80,264.15
XII Pekerjaan Finishing
12.1 Pengecatan 1 m2 bidang kayu
Bahan
baru
0.200 Kg Meni kayu 30,600.00 6,120.00
0.150 Kg Plamir kayu 25,500.00 3,825.00
0.170 Kg Cat kayu 62,000.00 10,540.00
0.350 Kg Cat penutup 53,000.00 18,550.00
0.010 buah Kuas 3" 19,000.00 190.00
0.030 Kg Pengencer cat 38,200.00 1,146.00
0.200 Lbr Ampelas 4,000.00 800.00
Upah
0.070 OH Pekerja 92,500.00 6,475.00
0.004 OH Kepala Tukang 23,400.00 93.60
0.105 OH Tukang Cat 149.35 15.68
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 11,559.18 41,171.00 52,730.18
12.2 Pengecatan 1 m2 tembok baru
Bahan
eksterior
0.100 Kg Cat dasar 126,000.00 12,600.00
tembok
0.260 Kg Cat penutup 53,000.00 13,780.00
Upah
0.020 OH Pekerja 92,500.00 1,850.00
0.006 OH Kepala Tukang 23,400.00 147.42
a b c d e f
0.063 OH Tukang Cat 149.35 9.41
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 6,981.73 26,380.00 33,361.73
12.2 Pengecatan 1 m2 tembok baru
Bahan
interior
0.100 Kg Plamir tembok 29,000.00 2,900.00
0.100 Kg Cat dasar 72,000.00 7,200.00
tembok
0.260 Kg Cat penutup 53,000.00 13,780.00
Upah
0.020 OH Pekerja 92,500.00 1,850.00
0.006 OH Kepala Tukang 23,400.00 147.42
0.063 OH Tukang Cat 149.35 9.41
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 6,981.73 23,880.00 30,861.73
12.3 Pengecatan 1 m2 waterproof
Bahan
untuk lisplank
1.000 Kg Cat waterproof 53,000.00 53,000.00
0.040 buah Kuas 3" 12,300.00 492.00
0.200 Lbr Ampelas 4,000.00 800.00
Upah
0.070 OH Pekerja 92,500.00 6,475.00
0.004 OH Kepala Tukang 23,400.00 93.60
0.105 OH Tukang Cat 149.35 15.68
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 11,559.18 54,292.00 65,851.18
12.4 Pengecatan 1 m2 waterproof
Bahanatap
untuk
1.000 Kg Cat waterproof 53,000.00 53,000.00
0.040 buah Kuas 3" 12,300.00 492.00
0.200 Lbr Ampelas 4,000.00 800.00
Upah
0.070 OH Pekerja 92,500.00 6,475.00
a b c d e f
0.004 OH Kepala Tukang 23,400.00 93.60
0.105 OH Tukang Cat 149.35 15.68
0.003 OH Mandor 1,658,300.00 4,974.90
Sub Jumlah 11,559.18 54,292.00 65,851.18
XIII Pekerjaan Lain-Lain
13.1 1 m3 Galian Tanah Septic Tank
Upah
0.75 OH Pekerja 92,500.00 69,375.00
0.025 OH Mandor 1,658,300.00 41,457.50
Sub Jumlah 110,832.50 0.00 110,832.50
13.2 1m3 Urugan pasir bawah Septic Tank
Bahan
1.2 m3 Pasir urug 90,000.00 108,000.00
Upah
0.3 OH Pekerja 92,500.00 27,750.00
0.01 OH Mandor 1,658,300.00 16,583.00
Sub Jumlah 44,333.00 108,000.00 152,333.00
13.3 1m3 Balok Septic Tank
Bahan
382 Kg Semen PC 60,200.00 22,996,400.00
0.496 m3 Pasir Beton 145,000.00 71,920.00
0.579 m3 Batu kali / belah 169,700.00 98,256.30
215 ltr Air 150.00 32,250.00
1.05 Kg Besi Beton Ulir 13,300.00 13965
0.015 Kg Bendrat 21,400.00 321
0.006 m3 Balok Kayu 5,600,000.00 33600
0.25 Kg Paku 3" (5-10 cm) 21,000.00 5250
0.128 lbr Plywood 120/240 70,000.00 8960
Upah
1.663 OH Pekerja 92,500.00 153,827.50
0.275 OH Tukang Batu 92,500.00 25,437.50
0.0007 OH Tukang Besi 92,500.00 64.75
0.11 OH Tukang Kayu 92,500.00 10,175.00
0.0397 OH Kepala Tukang 97,500.00 3,870.75
0.1054 OH Mandor 102,500.00 10,803.50
a b c d e f
Sub Jumlah 204,179.00 23,260,922.30 23,465,101.30
13.4 1m3 Plat penutup Septic Tank
Bahan
382 Kg Semen PC 60,200.00 22,996,400.00
0.496 m3 Pasir Beton 145,000.00 71,920.00
0.579 m3 Batu kali / belah 169,700.00 98,256.30
215 ltr Air 150.00 32,250.00
1.05 Kg Besi Beton Ulir 13,300.00 13965
0.015 Kg Bendrat 21,400.00 321
0.005 m3 Balok Kayu 5,600,000.00 28000
0.22 Kg Paku 3" (5-10 cm) 21,000.00 4620
0.12 Lbr Plywood 120/240 70,000.00 8400
Upah
1.857 OH Pekerja 92,500.00 171,772.50
0.275 OH Tukang Batu 92,500.00 25,437.50
0.007 OH Tukang Besi 92,500.00 647.50
0.1 OH Tukang Kayu 92,500.00 9,250.00
0.0387 OH Kepala Tukang 97,500.00 3,773.25
0.1034 OH Mandor 102,500.00 10,598.50
Sub Jumlah 221,479.25 23,254,132.30 23,475,611.55
13.5 1m2 Trasram Septic Tank
Bahan
18.95 Kg Semen / PC 60,200.00 1,140,790.00
70 Buah Bata Merah 700.00 49,000.00
0.038 m3 Pasir Pasang 168,000.00 6,384.00
Upah
0.3 OH Pekerja 92,500.00 27,750.00
0.1 OH Tukang Batu 92,500.00 9,250.00
0.01 OH Kepala Tukang 97,500.00 975.00
0.015 OH Mandor 102,500.00 1,537.50
Sub Jumlah 39,512.50 1,196,174.00 1,235,686.50
13.6 1 m3 Galian Tanah Sumur Resapan
Upah
0.75 OH Pekerja 92,500.00 69,375.00
a b c d e f
0.025 OH Mandor 102,500.00 2,562.50
Sub Jumlah 71,937.50 0.00 71,937.50
13.7 1m3 Plat penutup Sumur Resapan
Bahan
382 Kg Semen PC 60,200.00 22,996,400.00
0.496 m3 Pasir Beton 145,000.00 71,920.00
0.579 m3 Batu kali / belah 169,700.00 98,256.30
215 ltr Air 150.00 32,250.00
1.05 Kg Besi Beton Ulir 13,300.00 13965
0.015 Kg Bendrat 21,400.00 321
0.005 m3 Balok Kayu 5,600,000.00 28000
0.22 Kg Paku 3" (5-10 cm) 21,000.00 4620
0.12 Lbr Plywood 120/240 70,000.00 8400
Upah
1.857 OH Pekerja 92,500.00 171,772.50
0.275 OH Tukang Batu 92,500.00 25,437.50
0.007 OH Tukang Besi 92,500.00 647.50
0.1 OH Tukang Kayu 92,500.00 9,250.00
0.0387 OH Kepala Tukang 97,500.00 3,773.25
0.1034 OH Mandor 102,500.00 10,598.50
Sub Jumlah 221,479.25 23,254,132.30 23,475,611.55
13.8 1 m3 Galian Tanah Bak Kontrol
Upah
0.75 OH Pekerja 92,500.00 69,375.00
0.025 OH Mandor 102,500.00 2,562.50
Sub Jumlah 71,937.50 0.00 71,937.50
13.9 1 m3 Galian Tanah Pipa Saluran
Upah
0.75 OH Pekerja 92,500.00 69,375.00
0.025 OH Mandor 102,500.00 2,562.50
Sub Jumlah 71,937.50 0.00 71,937.50
13.10 Urugan tanah kembali pipa
Upah
0.5 OH Pekerja 92,500.00 46,250.00
0.05 OH Mandor 102,500.00 5,125.00
a b c d e f
Sub Jumlah 51,375.00 0.00 51,375.00
13.11 Pembuatan 1 m railing tangga
Bahan
dan void
0.070 Kg Besi hollow 94,385.00 6,606.95
1.000 cm Las listrik 64,369.00 64,369.00
Upah
0.080 OH Pekerja 92,500.00 7,400.00
0.008 OH Kepala Tukang 97,500.00 780.00
0.080 OH Tukang Besi 92,500.00 7,400.00
0.004 OH Mandor 102,500.00 410.00
Sub Jumlah 15,990.00 70,975.95 86,965.95
13.12 Pemasangan 1 buah grendel
Bahan
1.000 buah Grendel 34,500.00 34,500.00
Upah
0.020 OH Pekerja 92,500.00 1,850.00
0.020 OH Kepala Tukang 97,500.00 1,950.00
0.200 OH Tukang Kayu 92,500.00 18,500.00
0.001 OH Mandor 102,500.00 102.50
Sub Jumlah 22,402.50 34,500.00 56,902.50
13.13 Pemasangan 1 buah engsel
Bahan
1.000 buah Engsel 98,800.00 98,800.00
Upah
0.015 OH Pekerja 92,500.00 1,387.50
0.015 OH Kepala Tukang 97,500.00 1,462.50
0.150 OH Tukang Kayu 92,500.00 13,875.00
0.008 OH Mandor 102,500.00 820.00
Sub Jumlah 17,545.00 98,800.00 116,345.00
13.14 Pemasangan 1 set handle dan
Bahankunci
body
1.000 set handle dan body 330,000.00 330,000.00
kunci
Upah
0.025 OH Pekerja 92,500.00 2,312.50
0.025 OH Kepala Tukang 97,500.00 2,437.50
a b c d e f
0.250 OH Tukang Kayu 92,500.00 23,125.00
0.001 OH Mandor 102,500.00 133.25
Sub Jumlah 28,008.25 330,000.00 358,008.25
13.15 Pemasangan 1 hak angin
Bahan
1.000 buah hak angin 41,465.00 41,465.00
Upah
0.015 OH Pekerja 92,500.00 1,387.50
0.015 OH Kepala Tukang 97,500.00 1,462.50
0.150 OH Tukang Kayu 92,500.00 13,875.00
0.008 OH Mandor 102,500.00 820.00
Sub Jumlah 17,545.00 41,465.00 59,010.00
13.16 Pemasangan 1 buah penangkal
Bahan
petir
1.000 set Penangkal petir 5,500,000.00 5,500,000.00
1.000 buah Pemasangan 1,464,000.00 1,464,000.00
grounding
Upah
0.070 OH Pekerja 92,500.00 6,475.00
0.070 OH Kepala Tukang 97,500.00 6,825.00
0.700 OH Tukang listrik 92,500.00 64,750.00
0.008 OH Mandor 102,500.00 820.00
Sub Jumlah 78,870.00 6,964,000.00 7,042,870.00
13.17 Pemasangan 1 buah parabola
Bahan
1.000 buah Parabola TV 450,000.00 450,000.00
6% harga alat
Ls Perlengkapan 450,000.00 27,000.00
Upah
0.300 OH Pekerja 92,500.00 27,750.00
0.045 OH Kepala Tukang 97,500.00 4,387.50
0.450 OH Tukang listrik 92,500.00 41,625.00
0.015 OH Mandor 102,500.00 1,537.50
Sub Jumlah 75,300.00 477,000.00 552,300.00
13.18 Pemasangan 1 buah tandon air
Bahanliter
1050
13.18
a b c d e f
1.000 buah Tandon Air PVC 899,000.00
899,000.00

12% bak Ls Perlengkapan 899,000.00 107,880.00


Upah
0.300 OH Pekerja 92,500.00 27,750.00
0.045 OH Kepala Tukang 97,500.00 4,387.50
0.450 OH Tukang Batu 92,500.00 41,625.00
0.015 OH Mandor 102,500.00 1,537.50
Sub Jumlah 75,300.00 1,006,880.00 1,082,180.00
TABEL 1. PERHITUNGAN VOLUME PEKERJAAN
No Jenis Pekerjaan Perhitungan Volume Jumlah
a b c d
I PEKERJAAN PERSIAPAN
1.1 Pembersihan Lokasi Panjang = 17625 mm 278.65 m2
= 17.63 m
Lebar = 15810 mm
= 15.81 m
Volume = pxl
15.8

= 17.6 x 15.8
= 278.65 m2

17.6

1.2 Pemasangan Bowplank Panjang = 17.63 + (2 x 1) 74.87 m'


= 19.63 m
Lebar = 15.81 + (2 x 1)
= 17.81 m
P.Bowplank = 2 (p + l)
15.8

= 2 (19.6 + 17.8)
= 74.87 m'

17.6

1.3 Pembuatan Bedeng Panjang = 3000 mm 15.00 m2


= 3.00 m
Lebar = 5000 mm
= 5.00 m
Volume = pxl
5.0

= 3x5
= 15.00 m2
3.0

II PEKERJAAN TANAH DAN PONDASI


2.1 Galian tanah
A jml.Footplat = 25.00 bj 37.50 m3
Galian tanah pondasi footplat
P.Galian = 1.00 m
-0.30 L.Galian = 1.00 m
Tinggi Galian = 1.50 m
Volume = jml (p x l x t)
= 37.50 m3

-1.30

-2.00
-2.00

1.00
B Galian tanah pondasi Batu Kali
(A) P.Galian = 87.97 m 114.36 m3
-0.3 L.Galian = 1.00 m
Tinggi Galian = 1.30 m
Volume = (p x l x t)
= 114.36 m3
-1.30

1
C
Galian tanah pondasi Batu Kali (B)
P.Galian = 51.06 m 66.38 m3
-0.3 L.Galian = 1.00 m
Tinggi Galian = 1.30 m
Volume = (p x l x t)
= 66.38 m3
-1.30

1
2.2 Urugan Tanah
A Galian footplat = 37.50 m3 37.08 m3
Urugan tanah kembali footplat
Total Vol.Footplat = 4.80 m
Total Vol.Kolom pendek = 1.80 m
Volume = {37.5-(5.57+2.09)}x 1.2
= 37.08 m3

B
Urugan tanah kembali Batu kali
Vol. Total galian = 180.74 m 109.41 m3
Vol. Total pondasi = 89.56 m
Volume = (180.74-89.16)x1.2
= 109.41 m3

C Urugan tanah peninggi elevasi


Lantai rumah Luas lt. 1 = 181.07 m 65.18 m3
Tinggi/Tebal = 0.30 m
Volume = (181.07 x 0.3)x 1.2
= 65.18 m3

D
Urugan tanah peninggi elevasi
lantai teras, KM, dan gudang Luas lt. teras = 10.54 m 2.53 m3
Tinggi/Tebal = 0.20 m
Volume = (10.54x0.2) x 1.2
= 2.53 m3

2.3 Urugan Pasir


A jmlh footplat = 25.00 bj 2.50 m3
Urugan pasir bawah footplat
Panjang = 1.00 m
Lebar = 1.00 m
Tinggi/Tebal = 0.10 m
Volume = 25 x (1x1x0.1)
= 2.50 m3

B
Urugan pasir bawah anstamping
Batu Kali A dan B Lebar = 1.00 m 13.90 m3
Tinggi/Tebal = 0.10 m
Panjang Pondasi = 139.03 m
Volume = (1 x 0.1 x 139.03)
= 13.90 m3

C Urugan pasir bawah lantai


Luas Lt.1 = 191.61 m 19.16 m3
Tinggi/Tebal = 0.10 m
Volume = (191.61 x 0.1)
= 19.16 m3

2.4 Pasangan Batu Kali


A Lebar = 1.00 m 20.85 m3
Anstamping Pondasi A dan B
Tinggi/Tebal = 0.15 m
Panjang = 139.03 m
Volume = (1 x 0.15 x 139.03)
= 20.85 m3

B LGB = 0.80 m 35.55 m3


Pasangan Pondasi Bt. Kali A
LGA = 0.30 m
Tinggi/Tebal = 0.75 m
Panjang = 87.97 m
Volume kolom pendek = 1.80 m3
Volume
= {1/2 x (0.8+0.3) x 0.75} x 87.97 - 1.8
= 35.55 m3

C LGB = 0.80 m 19.26 m3


Pasangan Pondasi Bt. Kali B
LGA = 0.30 m
Tinggi/Tebal = 0.75 m
Panjang = 51.06 m
Volume kolom pendek = 1.80
Volume
= {1/2 x (0.8+0.3) x 0.75} x 51.06 - 2.09
= 19.26 m3

III PEKERJAAN BETON


3.1 Pek. beton non-struktur
A Lantai kerja Footplat Jmlah Footplat = 25.00 bh 0.80 m3
Panjang = 0.80 m'
Lebar = 0.80 m'
Tinggi/Tebal = 0.05 m'
Volume = 25 (0.8 x 0.8 x 0.05)
= 0.80 m3

B Rabatan Tidak ada

3.2 Pek. Beton bertulang


A Pondasi Footplat Jmlah footplat = 25.00 bh 1.50 m3
LGB = 0.80 m
LGA = 0.30 m
Tinggi/Tebal = 0.25 m
- Volume footplat = 25 (0.8 x 0.3 x 0.25)
= 1.50 m3

- Volume Bekisting
Jmlah footplat = 25.00 bh 24.00 m2
Panjang = 0.80 m
Tinggi/ Tebal = 0.30 m
Volume = 4 (0.8 x 0.3) x 25
= 24.00 m2

B Kolom Pendek
Jmlah Footplat = 25.00 bh 1.80 m3
Panjang kolom = 0.15 m'
Lebar kolom = 0.30 m'
Tinggi/Tebal = 1.60 m'
Volume = 25 (1.6 x 0.3 x 0.15)
= 1.80 m3

- Volume Bekisting = 4 (1.6 x 0.3)x29 24.00 m2


= 24.00 m2

C
Balok Sloof Batu Kali A dan B
Lebar = 0.15 m 5.91 m2
Tinggi/Tebal = 0.30 m
Panjang sloof = 131.44 m
Volume = 131.44 (0.3 x 0.15)
= 5.91 m2

- Volume Bekisting
Panjang sloof = 131.44 m 78.86 m2
Tinggi/Tebal = 0.30 m
Volume = 2 (131.44 x 0.3)
= 78.86 m2

D Kolom Induk Lt. 1


Jmlh Kolom = 25.00 bh 4.50 m3
Panjang = 0.30 m'
Lebar = 0.15 m'
Tinggi = 4.00 m'
Volume = 25 (0.15 x 0.3 x 4)
= 4.50 m3

- Volume Bekisting
Jlmh Kolom induk = 25.00 bh 30.00 m2
Tinggi = 4.00 m'
Lebar = 0.15 m'
Volume = 2 x (4 x 0.3) x 28
= 30.00 m2

E Kolom praktis Lt. 1


Jmlh Kolom = 14.00 bh 1.26 m3
Panjang = 0.15 m'
Lebar = 0.15 m'
Tinggi = 4.00 m'
Volume = 14 (0.15 x 0.15 x 4)
= 1.26 m3

- Volume Bekisting
Jlmh Kolom induk = 14.00 bh 16.80 m2
Tinggi = 4.00 m'
Lebar = 0.15 m'
Volume = 2 x (4 x 0.15) x 14
= 16.80 m2

F Balok Induk Lt. 1


Jmlh kolom induk = 25.00 bh 3.88 m3
Panjang Balok = 147.43 m'
Lebar Balok = 0.15 m'
Tinggi Balok = 0.30 m'
Lebar kolom induk = 0.15 m'
Tebal Plat = 0.12 m'
Volume
- Volume Kolom tertabrak
= 25 (0.15 x (0.3 - 0.12) x 0.15)
= 0.10 m3
- Volume balok induk
= 147.43 x 0.15 (0.3 - 0.12)
= 3.98 m3
- Volume Total = (3.98 - 0.10)
= 3.88 m3
- Volume Bekisting
Jlmh bekisting = 2.00 bh 132.68 m2
Panjang Balok = 147.43
Tinggi = 0.30 m'
Lebar = 0.15 m'
Volume = 3 (147.43 x 0.3)
= 132.68 m2

G Balok anak Lt. 1


Jmlh kolom induk = 25.00 bh 0.23 m3
Panjang Balok = 54.08 m'
Lebar Balok = 0.15 m'
Tinggi Balok = 0.15 m'
Lebar kolom praktis = 0.15 m'
Tebal Plat = 0.12 m'
Volume
- Volume Kolom tertabrak
= 25 (0.15 x (0.15 - 0.12) x 0.15)
= 0.02 m3
- Volume balok induk
= 54.08 x 0.15 (0.15 - 0.12)
= 0.24 m3
- Volume Total = (0.24 - 0.01)
= 0.23 m3

- Volume Bekisting
Jlmh bekisting = 2.00 bh 24.34 m2
Panjang Balok = 54.08
Tinggi = 0.15 m'
Lebar = 0.15 m'
Volume = 3 (54.08 x 0.15)
= 24.34 m2
H Plat Tangga
Tebal plat tangga = 0.18 m' 2.25 m3
Panjang Sisi samping = 2.40 m'
Sudut tangga bawah A = 34 derajat
Pnjng plat tangga bawah = 2.4/cos 34
= 2.89 m'
Panjang sisi samping B = 4.895 m'
Pnjng plat tangga tengah = 4.895/cos 34
= 5.90 m'
Panjang sisi samping C = 1.95 m'
Panjang plat tangga atas = 1.95/cos 34
= 2.35 m'
Lebar tangga = 0.95 m'
Lebar bordes = 1.00 m'
Volume
- Plat tangga bawah = (2.89 x 0.95 x 0.18)
= 0.50 m3
- Plat tangga tengah = (5.90 x 0.95 x 0.18)
= 1.01 m3
- Plat tangga atas = (2.35 x 0.95 x 0.18)
= 0.40 m3
- Plat Bordes = 2x (0.18 x(0.95 x 1))
= 0.34 m3
Volume total = 2.25 m3

Volume Bekisting
Volume plat 15.34 m2
Bawah = 3.73 m2
Tengah = 7.62 m2
Atas = 3.03 m2
Jumlah = 14.39 m2
Volume bordes = 0.95 m'
Volume = (31.91+0.95)
= 15.34 m2

I Anak tangga Jmlah anak tangga = 21 bh


Panjang = 0.95 m 0.57 m3
Lebar = 0.30 m
Tinggi = 0.19 m
Volume = 21x(1/2x0.95x0.3x0.19)
= 0.57 m3

Volume bekisting
Jumlah = 21 bh 3.79 m2
Tinggi = 0.19 m
Panjang = 0.95 m
Volume bekisting = (21 x 0.19 x 0.95)
= 3.79 m2
J Plat Lantai 2 Volume Plat lantai
Panjang = 15.81 m' 1.47 m3
Lebar = 13.095 m'
Tebal = 0.12 m'
Volume Lubang tangga = 23.38 m3
Volume = (15.81x13.095x0.12)-23.38
= 1.47 m3

Volume bekisting = 2{(15.81x0.12)+(13.095x0.12)


= 5.37 m2 5.37 m2

K Kolom Induk Lantai 2 Panjang = 0.15 m' 4.52 m3


Lebar = 0.30 m'
Tinggi = 4.18 m'
Jumlah = 24 bh
Volume = 24x(0.15x0.3x4.182)
= 4.52 m3

Volume bekisting = {2x(4.182x0.3)}x24 60.22 m2


= 60.22 m2

L Kolom Praktis Lantai 2 Panjang = 0.15 m' 0.85 m3


Lebar = 0.15 m'
Tinggi = 4.18 m'
Jumlah = 9 bh
Volume = 9x(0.15x0.15x4.182)
= 0.85 m3

Volume bekisting = {2x(4.182x0.15)}x9


= 11.29 m2 11.29 m2

M Balok Ring Volume Balok ring


Panjang = 143.40 m' 3.12 m3
Lebar = 0.15 m'
Tinggi = 0.15 m'
Jumlah = 33 bh
Lebar Kolom = 0.15 m'
- Volume kolom tertabrak = 33 x (0.15 x 0.15 x 0.15)
= 0.11 m3
- Volume balok ring = (143.40 x 0.15 x 0.15)
= 3.23 m3
- Volume total = 3.23-0.11
= 3.12 m3

Volume Bekisting
Jumlah = 2.00 bh 64.53 m2
Panjang = 143.40 m
Lebar = 0.15 m
Volume Bekisting = 3 x (143.40 x 0.15)
= 64.53 m2

IV PEKERJAAN PASANGAN DINDING


4.1 Trasram rumah (1:2) Panjang dinding = 32.41 m 4.36 m2
Panjang lubang kusen = 22.72 m
Lebar = 0.15 m
Tinggi = 3.00 m
Volume = (32.41-22.72) x 3 x 0.15
= 4.36 m2

4.2 Pasangan Dinding


A Panjang = 116.41 m 426.54 m2
Pasangan Dinding Lt.1 (1:6)
Tinggi = 4.00 m
Luas trasram = 4.36 m2
Luas lubang pintu jendela
dan ventilasi = 34.72 m2

Luas = (116.41 x 4)-(4.36 + 34.72)


= 426.54 m2

B Panjang = 133.71 m 500.31 m2


Pasangan Dinding Lt.2 (1:6)
Tinggi = 4.00 m
Luas trasram = 4.36 m2
Luas lubang pintu jendela = 30.17 m2
dan ventilasi
Luas = (133.71 x 4 )-(4.36 + 30.17)
= 500.31 m2

C Panjang = 12.80 m 1.44 m2


Dinding kamar mandi Lt.1 (1:4)
Tinggi = 1.00 m
Luas lubang pintu = 11.36 m2
Luas = (12.80 x 1) - 11.36
= 1.44 m2

D Panjang = 19.61 m 8.25 m2


Dinding kamar mandi Lt.2 (1:4)
Tinggi = 1.00 m
Luas lubang pintu = 11.36 m2
Luas = (19.61 x 1) - 11.36
= 8.25 m2

4.3 Pek. Plesteran dan Acian


A Luas dinding Lt.1 = 426.54 m2 1342.27 m2
Plesteran dinding rumah (1:6)
Luas dinding KM Lt. 1 = 1.44 m2
Luas dinding Lt.2 = 500.31 m2
Luas dinding KM Lt.2 = 8.25 m2
Luas Plesteran
=(2 [(426.54 - 1.44)+(500.31 - 8.25)]
= 1342.27 m2

B Luas dinding luar KM Lt.1 9.69 m2


Plesteran dinding luar KM (1:4)
= 1.44 m2
Luas dinding luar KM Lt.2
= 8.25 m2
Luas plesteran = 1.44 + 8.25
= 9.69 m2

C Panjang KM Lt.1 = 12.80 m 106.92 m2


Plesteran dinding dalam KM (1:4)
Tinggi KM Lt.1 = 4.00 m
Panjang KM Lt.2 = 19.61 m
Tinggi KM Lt.2 = 4.00 m
Luas lubang pintu Lt.1 = 11.36 m2
Luas lubang pintu Lt.2 = 11.36 m2
Luas
=[(12.8 x 4)-11.36]+[(19.61 x 4)-11.36]
= 106.92 m2

D Acian Luas plesteran dinding rumah 1458.88 m2


= 1342.27 m2
Luas plesteran dinding (luar) kamar mandi
= 9.69 m2
Luas plesteran dinding (dalam) kamar mandi
= 106.92 m2
Luas acian = 1149.79 + 9.69 + 106.92
= 1458.88 m2

E Benangan Dalam Benangan dalam Lt.1 = 192.00 m' 404.00 m'


Benangan dalam Lt.2 = 212.00 m'
Panjang = 192 + 212
= 404.00 m'

F Benangan Luar Benangan luar Lt.1 = 44.00 m' 72.00 m'


Benangan luar Lt.2 = 28.00 m'
Panjang = 44 + 28
= 72.00 m'

G Sopi-sopi Alas = 10.654 m 13.14 m2


Tinggi = 2.467 m
Luas = 1/2 x a x t
= 13.14 m2

V PEKERJAAN ATAP DAN PENUTUP ATAP


5.1 Pekerjaan Kuda-kuda
Panjang bentang = 10.654 m' 16.24 m2
Rangka Kuda-kuda Baja Ringan
Lebar bentang = 15.810 m'
Tinggi Rangka = 3.049 m'
Kemiringan = 30 Derajat
Total kuda-kuda = luas rangka x jumlah
= 259.87
Luas rangka kuda-kuda = 1/2 x a x t
= 16.24 m2

5.2 Kerangka penutup atap = Luas atap 1/kemirin 389.00 m2


= 194.50 m2
total luas kerangka penutu = luas atap x jumlah atap
= 389.00 m2

5.3 Penutup atap genting beton = Luas atap 1/kemirin 389.00 m2


= 194.50
total luas penutup atap = luas atap x jumlah atap
= 389.00 m2

VI PEKERJAAN LISPLANK DAN PLAFOND


6.1 Lisplank Panjang = 31.62 m2 0.28 m2
Uk. Papan Lisplank = 3/30 cm
Volume = 31.62 (0.3 x 0.03)
= 0.28 m2

6.2 Pekerjaan Plafond


A Rangka Plafond Lt. 1 Teras depan = 5.445 x 2.29 203.74 m2
= 12.47 m2
Carport = 8.47 x 3.688
= 31.24 m2
Ruang Tamu = 6.295 x 3.63
= 22.85 m2
Ruang makan = 5.465 x 6.65
= 36.34 m2
Ruang Tidur 1 = 3.63 x 4.355
= 15.81 m2
Ruang Tidur 2 = 3.025 x 4.275
= 12.93 m2
Ruang Tidur 3 = 3.025 x 3.33
= 10.07 m2
Ruang Tidur 4 = 1.775 x 2.95
= 5.24 m2
KM/WC 1 = 1.775 x 1.75
= 3.11 m2
KM/WC 2 = 1.56 x 1.625
= 2.54 m2
Gudang = 1.74 x 1.625
= 2.83 m2
Dapur = 3.69 x 5.049
= 18.63 m2
Teras Belakang = 10.345 x 2.87
= 29.69 m2
Luas Total = 203.74 m2

B Rangka Plafond Lt. 2 Ruang Tidur 1 = 6.061 x 4.65 172.56 m2


= 28.184 m2
Ruang Tidur 2 = 3.691 x 5.945
= 21.94 m2
Ruang Tidur 3 = 3.999 x 2.93
= 11.72 m2
Ruang Tidur 4 = 2.969 x 3.3
= 9.80 m2
KM/WC 1 = 2.0 x 3.38
= 6.76 m2
KM/WC 2 = 2.075 x 2.35
= 4.88 m2
Ruang Keluarga = 5.975 x 10.595
= 63.31 m2
Void = 4.37 x 5.945
= 25.98 m2
Luas Total = 172.56 m2

C Plafond Lt. 1 Teras depan = 5.445 x 2.29 203.74 m2


= 12.47 m2
Carport = 8.47 x 3.688
= 31.24 m2
Ruang Tamu = 6.295 x 3.63
= 22.85 m2
Ruang makan = 5.465 x 6.65
= 36.34 m2
Ruang Tidur 1 = 3.63 x 4.355
= 15.81 m2
Ruang Tidur 2 = 3.025 x 4.275
= 12.93 m2
Ruang Tidur 3 = 3.025 x 3.33
= 10.07 m2
Ruang Tidur 4 = 1.775 x 2.95
= 5.24 m2
KM/WC 1 = 1.775 x 1.75
= 3.11 m2
KM/WC 2 = 1.56 x 1.625
= 2.54 m2
Gudang = 1.74 x 1.625
= 2.83 m2
Dapur = 3.69 x 5.049
= 18.63 m2
Teras Belakang = 10.345 x 2.87
= 29.69 m2
Luas Total = 203.74 m2

D Plafond Lt. 2 Ruang Tidur 1 = 6.061 x 4.65 172.56 m2


= 28.184 m2
Ruang Tidur 2 = 3.691 x 5.945
= 21.94 m2
Ruang Tidur 3 = 3.999 x 2.93
= 11.72 m2
Ruang Tidur 4 = 2.969 x 3.3
= 9.80 m2
KM/WC 1 = 2.0 x 3.38
= 6.76 m2
KM/WC 2 = 2.075 x 2.35
= 4.88 m2
Ruang Keluarga = 5.975 x 10.595
= 63.31 m2
Void = 4.37 x 5.945
= 25.98 m2
Luas Total = 172.56 m2

VII PEKERJAAN KUSEN PINTU DAN JENDELA (ALUMUNIUM)


7.1 Kusen Pintu dan Jendela (PG 1) 1 Lebar = 0.15 m 10.28 m3
Unit Tinggi = 2.40 m
Panjang = 2.78 m
Volume = Jmlh x P x L x T
= 1.00 m3

7.2 Kusen Pintu dan Jendela (PJ 1) 1 Lebar = 0.15 m


Unit Tinggi = 2.40 m
Panjang = 2.18 m
Volume = Jmlh x P x L x T
= 0.78 m3

7.3 Kusen Pintu (P1) 1 Unit Lebar = 0.15 m


Tinggi = 2.40 m
Panjang = 1.68 m
Volume = Jmlh x P x L x T
= 0.60 m3

7.4 Kusen Pintu (P2) 12 Unit Lebar = 0.15 m


Tinggi = 2.40 m
Panjang = 0.88 m
Volume = Jmlh x P x L x T
= 3.80 m3

7.5 Kusen Pintu (P 3) 4 Unit Lebar = 0.15 m


Tinggi = 2.14 m
Panjang = 0.78 m
Volume = Jmlh x P x L x T
= 1.00 m3

7.6 Kusen Pintu (P4) 2 Unit Lebar = 0.15 m


Tinggi = 2.40 m
Panjang = 0.88 m
Volume = Jmlh x P x L x T
= 0.63 m3

7.7 Kusen Jendela (J1A) 1 Unit Lebar = 0.15 m


Tinggi = 2.40 m
Panjang = 1.48 m
Volume = Jmlh x P x L x T
= 0.53 m3

7.8 Kusen Jendela (J2) 8 Unit Lebar = 0.15 m


Tinggi = 1.78 m
Panjang = 0.78 m
Volume = Jmlh x P x L x T
= 1.67 m3

7.9 Kusen Jendela (J3) 2 Unit Lebar = 0.15 m


Tinggi = 0.53 m
Panjang = 1.42 m
Volume = Jmlh x P x L x T
= 0.23 m3

7.10 Kusen Jendela (J4) 1 Unit Lebar = 0.15 m


Tinggi = 0.30 m
Panjang = 0.70 m
Volume = Jmlh x P x L x T
= 0.03 m3

Total Volume Kusen Pintu dan Jendela


= 10.28 m3

VIII PEKERJAAN KERAMIK


8.1 Pekerjaan Tegel Lantai
A Lantai 1 Granit tile (60 x 60) Teras depan = 5.445 x 2.29 166.86 m2
= 12.47 m2
Ruang Tamu = 6.295 x 3.63
= 22.85 m2
Ruang makan = 5.465 x 6.65
= 36.34 m2
Ruang Tidur 1 = 3.63 x 4.355
= 15.81 m2
Ruang Tidur 2 = 3.025 x 4.275
= 12.93 m2
Ruang Tidur 3 = 3.025 x 3.33
= 10.07 m2
Ruang Tidur 4 = 1.775 x 2.95
= 5.24 m2
Gudang = 1.74 x 1.625
= 2.83 m2
Dapur = 3.69 x 5.049
= 18.63 m2
Teras Belakang = 10.345 x 2.87
= 29.69 m2
Total Luas Lantai Granit = 166.86 m2

B Lantai 2 Granit Tile (60 x 60) Ruang Tidur 1 = 6.061 x 4.65 242.02 m2
= 28.184 m2
Ruang Tidur 2 = 3.691 x 5.945
= 21.94 m2
Ruang Tidur 3 = 3.999 x 2.93
= 11.72 m2
Ruang Tidur 4 = 2.969 x 3.3
= 9.80 m2
Ruang Keluarga = 16.975 x 10.037
= 170.38 m2
Total Luas Lantai Granit = 242.02 m2

C Lantai 1 Keramik (40 x 40) KM/WC 1 = 1.775 x 1.75 5.64 m2


= 3.11 m2
KM/WC 2 = 1.56 x 1.625
= 2.54 m2
Total Luas Lantai Keramik = 5.64 m2

D Lantai 2 Keramik (40 x 40) KM/WC 1 = 2.0 x 3.38 51.16 m2


= 6.76 m2
KM/WC 2 = 2.075 x 2.35
= 4.88 m2
Teras Belakang = 2.50 x 15.81
= 39.53 m2
Total Luas Lantai Keramik = 51.16 m2
E Carport = 8.47 x 3.688 31.24 m2
Lantai 1 Keramik Kasar (40 x 40)
= 31.24 m2
Total Luas Lantai Keramik = 31.24 m2

8.2 Keramik Dinding


A Tinggi = 3.00 m2 28.90 m2
Keramik Dinding KM Lt.1 (25 x 40)
Luas lubang kusen = 5.68 m2
KM/WC 1 = 2 x (1.775 + 1.75)
= 7.05 m2
Volume = (7.05 x 3) - 5.68
= 15.47 m2
KM/WC 2 = 2 x (1.56 + 1.625)
= 6.37 m2
Volume = (6.37 x 3) - 5.68
= 13.43 m2
Volume Total = 15.47 + 13.43
= 28.90 m2

B Tinggi = 3.00 m2 47.47 m2


Keramik Dinding KM Lt.2 (25 x 40)
Luas lubang kusen = 5.68 m2
KM/WC 1 = 2 x (2.0 + 3.38)
= 10.76 m2
Volume = (10.76 x 3) - 5.68
= 26.60 m2
KM/WC 2 = 2 x (2.075 + 2.35)
= 8.85 m2
Volume = (8.85 x 3) - 5.68
= 20.87 m2
Volume Total = 26.6+20.87
= 47.47 m2

VIIII PEKERJAAN INSTALASI LISTRIK


9.1 Instalasi Listrik Lantai 1
Panjang kabel = 84.10 m
Panel MCB = 1 bh
Meteran Listrik = 1 bh
Saklar Tunggal = 5 bh
Saklar Ganda = 8 bh
Stop Kontak Tunggal = 22 bh
Stop Kontak Ganda = 1 bh
Lampu Gantung = 1 bh
Lampu SL = 36 bh

9.2 Instalasi Listrik Lantai 2


Panjang kabel = 93.13 m
Tv Kabel = 2 bh
Saklar Tunggal = 8 bh
Saklar Ganda = 5 bh
Stop Kontak Tunggal = 20 bh
Stop Kontak Ganda = 6 bh
Lampu Led strip plafond = 7.21 m
Lampu Led strip dipan = 7.00 m
Lampu SL = 33 bh

X PEKERJAAN INSTALASI AIR


10.1 Instalasi air Lantai 1
Pipa air bersih = 59.22 m
Pipa air bekas = 39.00 m
Pipa Pembuangan air AC = 20.53 m
Pipa air kotor = 12.49 m
Kloset duduk = 2 bh
Kran air = 2 bh
Shower = 1 bh
Floor Drain = 2 bh
Kitchen set = 1 unit
Wastafel = 1 bh
AC = 3 bh

10.2 Instalasi air Lantai 2


Pipa air bersih = 31.12 m
Pipa air bekas = 22.98 m
Pipa Pembuangan air AC = 29.19 m
Pipa air kotor = 20.00 m
Kloset duduk = 2 bh
Shower = 2 bh
Floor Drain = 2 bh
Wastafel = 2 bh
Pompa = 1 bh
Toren/Tandon Air = 1 bh
AC = 6 bh

XI PEKERJAAN FINISHING
11.1 Pekerjaan Pengecatan dinding
Luas dinding Lt.1 = 129.21 m2 461.56 m2
Luas dinding Lt.2 = 153.32 m2
Luas Sopi-sopi = 13.14 m2
Luas kusen = 64.89 m2
Luas Total
= (2 sisi x ((129.21 + 153.32 + 13.14) - 64.89))
= 461.56 m2

11.2 Pekerjaan Pengecatan Lisplank


Panjang = 31.62 m 18.97 m2
Lebar = 0.30 m
Volume = 2 sisi x (p x l)
= 18.97 m2

XII PEKERJAAN LAIN-LAIN


12.1 Pekerjaan Septictank
A Galian tanah Septictank Panjang galian I = 1.00 m 3.50 m3
Lebar galian I = 1.00 m
Dalam galian I = 2.00 m
Volume (I) = 1x1x2
= 2.00 m3
Panjang galian I = 1.00 m
Lebar galian I = 1.00 m
Dalam galian I = 1.50 m
Volume (I) = 1 x 1 x 1.5
= 1.50 m3

Total Volume = 2 + 1.5


= 3.50 m3

B Urugan pasir bawah septictank


Luas sisi septictank = 8.00 m2 0.80 m3
Ketebalan = 0.10 m2
Volume = 8x1
= 0.80 m3
C Balok septictank (15/15)
Jumlah = 2 unit 0.09 m3
Panjang = 2.00 m
Lebar = 0.15 m
Tebal = 0.15 m
Volume = 2 x (2 x x 0.15 x 0.15)
= 0.09 m3

D Plat penutup septictank


Jumlah unit = 2 unit 0.40 m3
Panjang = 2.00 m
Lebar = 1.00 m
Tebal = 0.10 m
Volume = 2 x (2 x 1 x 0.1)
= 0.40 m3

E Trasram septictank (1:2)


Luas sisi septictank = 12.00 m2 3.60 m3
Kedalaman trasram = 0.30 m
Volume = 12 x 0.3
= 3.60 m3

12.2 Pekerjaan Sumur Resapan


A Galian tanah sumur resapan
Diameter = 1.20 m 2.03 m3
Jari-jari = 0.60 m
Kedalaman = 1.80 m
Volume = 3.14 x 0.6 x 0.6 x 1.8
= 2.03 m3

B Plat penutup sumur resapan


Diameter = 1.00 m 0.08 m3
Jari-jari = 0.50 m
Tebal = 0.10 m
Volume = 3.14 x 0.5 x 0.5 x 0.1
= 0.08 m3
12.3 Pekerjaan bak kontrol
A Galian tanah bak kontrol
Jumlah bak kontrol = 2 unit 0.23 m3
Panjang = 0.50 m
Lebar = 0.50 m
Kedalaman = 0.45 m
Volume = 2 x (0.5 x 0.5 x 0.45)
= 0.23 m3

B Plat penutup bak kontrol


Jumlah = 2 unit 0.01 m3
Panjang = 0.30 m
Lebar = 0.30 m
Tebal = 0.05 m
Volume = 2 x (0.3 x 0.3 x 0.05)
= 0.01 m3

12.4 Pekerjaan pipa saluran


A Galian tanah pipa saluran limbah
padat 4" Panjang = 12.49 m 1.22 m3
Kemiringan = 0.03
Kedalaman = 12.49 x 2.5%
= 0.31 m
Volume = 0.3 x 0.3 x 12.49
= 1.22 m3

B Galian tanah pipa saluran limbah


cair 3" Panjang = 22.98 m 1.21 m3
Kemiringan = 0.01
Kedalaman = 22.98 x 1%
= 0.23 m
Volume = 0.2 x 0.2 x 22.98
= 1.21 m3

C Urugan tanah kembali pipa


limbah padat 4" Volume galian = 1.22 m3 1.06 m3
Diameter pipa = 0.114 m
Panjang galian = 12.49 m'
Volume
= [1.22 - (1/4 x 3.14 x 0.114 x 0.114 x 12.49)]
= 1.06 m3

D Urugan tanah kembali pipa


limbah cair 3" Volume galian = 1.21 m3 1.04 m3
Diameter pipa = 0.089 m
Panjang galian = 22.98 m'
Volume
= [1.21 - (1/4 x 3.14 x 0.089 x 0.089 x 22.98)]
= 1.04 m3

12.5 Railing tangga dan void


Panjang tangga = 7.42 m 16.21 m
Panjang void = 8.79 m
Total = 7.42+8.79
16.21 m

12.6 Tandon air atau toren


Jumlah = 1 Unit 1 Unit

12.7 Set Wifi


Jumlah = 1 bh 1 bh

12.8 Parabola
Jumlah = 1 bh 1 bh
ANALISA HARGA SATUAN PEKERJAAN

I. HARGA SATUAN PEKERJAAN PERSIAPAN


1 Pembersihan 1 m2 lapangan dan perataan
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.1 105,000.00 10,500.00
2 Mandor OH 0.05 130,000.00 6,500.00
JUMLAH HARGA TENAGA KERJA 17,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,000.00
E Overhead & Profit 10% x D 1,700.00
F Harga Satuan Pekerjaan (D+E) 18,700.00
2 Pengukuran dan pemasangan 1 m' Bouwplank
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.1 105,000.00 10,500.00
2 Tukang Kayu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.005 130,000.00 650
JUMLAH HARGA TENAGA KERJA 25,550.00
B BAHAN
Kayu balok utk bowplank,pagar dan
1 m3 0.012 59,890.80 718.690
kantor sementara
2 Paku kg 0.02 17,050.00 341.000
3 Kayu kamper (papan) m³ 0.007 12,150,000.00 85,050.00
JUMLAH HARGA BAHAN 113,591.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 139,141.00
E Overhead & Profit 10% x D 13,914.10
F Harga Satuan Pekerjaan (D+E) 153,055.00
3 Pembuatan Bedeng
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.1 105,000.00 10,500.00
2 Tukang Kayu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 24,900.00
B BAHAN
1 Kaso 5/7 m3 0.012 2,350,000.00 28,200.00
2 Paku kg 0.02 17,050.00 341
3 Kayu kamper (papan) m³ 0.007 12,150,000.00 85,050.00
4 Asbes m³ 0.045 45,500.00 85,050.00
JUMLAH HARGA BAHAN 198,641.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 223,541.00
E Overhead & Profit 10% x D 22,354.10
F Harga Satuan Pekerjaan (D+E) 245,895.10

II. HARGA SATUAN PEKERJAAN TANAH


1. Pengurugan kembali 1 m3 hasil galian tanah
Pengurugan hasil galian dihitung dari 1/3 kali dari koefisien pek. galian
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.5 105,000.00 52,500.00
2 Mandor OH 0.05 130,000.00 6,500.00
JUMLAH HARGA TENAGA KERJA 59,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,000.00
E Overhead & Profit 10% x D 5,900.00
F Harga Satuan Pekerjaan (D+E) 64,900.00
2. Pemadatan tanah 1 m3 tanah ( per 20 cm)
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.5 105,000.00 52,500.00
2 Mandor OH 0.05 130,000.00 6,500.00
JUMLAH HARGA TENAGA KERJA 59,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,000.00
E Overhead & Profit 10% x D 5,900.00
F Harga Satuan Pekerjaan (D+E) 64,900.00
3. Pengurugan 1 m3 dengan Pasir urug
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.3 105,000.00 31,500.00
2 Mandor OH 0.01 130,000.00 1,300.00
JUMLAH HARGA TENAGA KERJA 32,800.00
B BAHAN
1 Pasir urug (quarry - lokasi pekerjaan) m³ 1.2 250,100.00 300,120.00
JUMLAH HARGA BAHAN 300,120.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 332,920.00
E Overhead & Profit 10% x D 33,292.00
F Harga Satuan Pekerjaan (D+E) 366,212.00

III. HARGA SATUAN PEKERJAAN PONDASI


1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 1.8 105,000.00 189,000.00
2 Tukang Batu OH 0.9 130,000.00 117,000.00
4 Mandor OH 0.18 130,000.00 23,400.00
JUMLAH HARGA TENAGA KERJA 329,400.00
B BAHAN
Batu belah (quarry - lokasi
1 m3 1.2 300,200.00 360,240.00
pekerjaan)
2 Portland cement kg 202 1,500.00 303,000.00
Pasir muntilan (quarry - lokasi
3 m³ 0.485 388,900.00 188,616.50
pekerjaan)
JUMLAH HARGA BAHAN 851,856.50
C PERALATAN
1 Concrete mixer 350 ℓ jam 0.689 98,500.00 67,817.25
2 Water tanker truck 3000-4000 ℓ jam 0.057 384,900.00 22,016.28
3 Alat bantu set 0.1 50,000.00 5,000.00
JUMLAH HARGA ALAT 94,833.53
D Jumlah (A+B+C) 1,276,090.03
E Overhead & Profit 10% x D 127,609.00
F Harga Satuan Pekerjaan (D+E) 1,403,699.00
2. Pemasangan 1 m3 batu kosong (anstamping)
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.78 105,000.00 81,900.00
2 Tukang Batu OH 0.39 130,000.00 50,700.00
3 Kepala Tukang OH 0.039 140,000.00 5,460.00
4 Mandor OH 0.039 130,000.00 5,070.00
JUMLAH HARGA TENAGA KERJA 143,130.00
B BAHAN
Batu belah (quarry - lokasi
1 m3 1.2 300,200.00 360,240.00
pekerjaan)

2 Pasir urug (quarry - lokasi pekerjaan) m³ 0.432 250,100.00 108,043.20


JUMLAH HARGA BAHAN 468,283.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 611,413.20
E Overhead & Profit 10% x D 61,141.32
F Harga Satuan Pekerjaan (D+E) 672,554.00
HARGA SATUAN PEKERJAAN BETON
IV.
1. Membuat 1 m3 beton mutu f'c = 12,2 MPa (K 150) slump (12± 2) cm w/c = 0,72
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 1.65 105,000.00 173,250.00
2 Tukang Batu OH 0.275 130,000.00 35,750.00
3 Kepala Tukang OH 0.028 140,000.00 3,920.00
4 Mandor OH 0.083 130,000.00 10,790.00
JUMLAH HARGA TENAGA KERJA 223,710.00
B BAHAN
1 Portland cement kg 299 1,700.00 508,300.00
Pasir muntilan (quarry - lokasi
2 m³ 0.47 388,900.00 182,783.00
pekerjaan)
3 Batu pecah kg 1017 210 213,570.00
4 Air, liter 215 200 43,000.00
JUMLAH HARGA BAHAN 947,653.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,171,363.00
E Overhead & Profit 10% x D 117,136.30
F Harga Satuan Pekerjaan (D+E) 1,288,499.30
2. Pembesian dengan besi tulangan polos
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.07 105,000.00 7,350.00
2 Tukang Besi OH 0.07 130,000.00 9,100.00
3 Kepala Tukang OH 0.007 140,000.00 980
4 Mandor OH 0.004 130,000.00 520
JUMLAH HARGA TENAGA KERJA 17,950.00
B BAHAN
1 Baja tulangan polos U-24 kg 10.5 13,150.00 138,075.00
2 Kawat beton kg 0.15 18,160.00 2,724.00
JUMLAH HARGA BAHAN 140,799.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) Harga per 10 kg 158,749.00
E Harga per 1 kg 15,874.90
F Overhead & Profit 10% x E 1,587.49
G Harga Satuan Pekerjaan (E+F) 17,462.00
3. Pembesian dengan besi tulangan ulir
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.07 105,000.00 7,350.00
2 Tukang Besi OH 0.07 130,000.00 9,100.00
3 Kepala Tukang OH 0.007 140,000.00 980
4 Mandor OH 0.004 130,000.00 520
JUMLAH HARGA TENAGA KERJA 17,950.00
B BAHAN
1 Baja tulangan ulir U-32 kg 10.5 13,530.00 142,065.00
2 Kawat beton kg 0.15 18,160.00 2,724.00
JUMLAH HARGA BAHAN 144,789.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) Harga per 10 kg 158,749.00
E Harga per 1 kg 15,874.90
F Overhead & Profit 10% x E 1,587.49
G Harga Satuan Pekerjaan (E+F) 17,462.00
4. Pemasangan 1 m2 bekisting untuk pondasi
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.52 105,000.00 54,600.00
2 Tukang Kayu OH 0.26 130,000.00 33,800.00
3 Kepala Tukang OH 0.026 140,000.00 3,640.00
4 Mandor OH 0.026 130,000.00 3,380.00
JUMLAH HARGA TENAGA KERJA 95,420.00
B BAHAN
1 Kayu Sengon (papan) m3 0.04 3,782,400.00 151,296.00
2 Paku kg 0.3 17,050.00 5,115.00
3 Minyak bekisting liter 0.1 16,800.00 1,680.00
JUMLAH HARGA BAHAN 158,091.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 253,511.00
E Overhead & Profit 10% x D 25,351.10
F Harga Satuan Pekerjaan (D+E) 278,862.00
5. Pemasangan 1 m2 bekisting untuk sloof
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.52 105,000.00 54,600.00
2 Tukang Kayu OH 0.26 130,000.00 33,800.00
3 Kepala Tukang OH 0.026 140,000.00 3,640.00
4 Mandor OH 0.026 130,000.00 3,380.00
JUMLAH HARGA TENAGA KERJA 95,420.00
B BAHAN
1 Kayu Sengon (papan) m3 0.045 3,782,400.00 170,208.00
2 Paku kg 0.3 17,050.00 5,115.00
3 Minyak bekisting liter 0.1 16,800.00 1,680.00
JUMLAH HARGA BAHAN 177,003.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 272,423.00
E Overhead & Profit 10% x D 27,242.30
F Harga Satuan Pekerjaan (D+E) 299,665.00
6. Pemasangan 1 m2 bekisting untuk kolom
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.66 105,000.00 69,300.00
2 Tukang Kayu OH 0.33 130,000.00 42,900.00
3 Kepala Tukang OH 0.033 140,000.00 4,620.00
4 Mandor OH 0.033 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 121,110.00
B BAHAN
1 Kayu Sengon (papan) m3 0.04 3,782,400.00 151,296.00
2 Paku kg 0.4 17,050.00 6,820.00
3 Minyak bekisting liter 0.2 16,800.00 3,360.00
4 Kayu kelapa m³ 0.015 4,600,000.00 69,000.00
5 Multiplek tebal 0,9 cm lembar 0.35 116,000.00 40,600.00
Bambu cerucuk Ø 15 cm panjang
6 batang 2 22,600.00 45,200.00
600 cm
JUMLAH HARGA BAHAN 316,276.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 437,386.00
E Overhead & Profit 10% x D 43,738.60
F Harga Satuan Pekerjaan (D+E) 481,124.00
7. Pemasangan 1 m2 bekisting untuk balok
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.66 105,000.00 69,300.00
2 Tukang Kayu OH 0.33 130,000.00 42,900.00
3 Kepala Tukang OH 0.033 140,000.00 4,620.00
4 Mandor OH 0.033 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 121,110.00
B BAHAN
1 Kayu Sengon (papan) m3 0.04 3,782,400.00 151,296.00
2 Paku kg 0.4 17,050.00 6,820.00
3 Minyak bekisting liter 0.2 16,800.00 3,360.00
4 Kayu kelapa m³ 0.018 4,600,000.00 82,800.00
5 Multiplek tebal 0,9 cm lembar 0.35 116,000.00 40,600.00
Bambu cerucuk Ø 15 cm panjang
6 batang 2 22,600.00 45,200.00
600 cm
JUMLAH HARGA BAHAN 330,076.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 451,186.00
E Overhead & Profit 10% x D 45,118.60
F Harga Satuan Pekerjaan (D+E) 496,304.00
8. Pemasangan 1 m2 bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.66 105,000.00 69,300.00
2 Tukang Kayu OH 0.33 130,000.00 42,900.00
3 Kepala Tukang OH 0.033 140,000.00 4,620.00
4 Mandor OH 0.033 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 121,110.00
B BAHAN
1 Kayu Sengon (papan) m3 0.04 3,782,400.00 151,296.00
2 Paku kg 0.4 17,050.00 6,820.00
3 Minyak bekisting liter 0.2 16,800.00 3,360.00
4 Kayu kelapa m³ 0.015 4,600,000.00 69,000.00
5 Multiplek tebal 0,9 cm lembar 0.35 116,000.00 40,600.00
Bambu cerucuk Ø 15 cm panjang
6 batang 6 22,600.00 135,600.00
600 cm
JUMLAH HARGA BAHAN 406,676.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 527,786.00
E Overhead & Profit 10% x D 52,778.60
F Harga Satuan Pekerjaan (D+E) 580,564.00
9. Pemasangan 1 m2 bekisting untuk dinding
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.66 105,000.00 69,300.00
2 Tukang Kayu OH 0.33 130,000.00 42,900.00
3 Kepala Tukang OH 0.033 140,000.00 4,620.00
4 Mandor OH 0.033 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 121,110.00
B BAHAN
1 Kayu Sengon (papan) m3 0.03 3,782,400.00 113,472.00
2 Paku kg 0.4 17,050.00 6,820.00
3 Minyak bekisting liter 0.2 16,800.00 3,360.00
4 Kayu kelapa m³ 0.02 4,600,000.00 92,000.00
5 Multiplek tebal 0,9 cm lembar 0.35 116,000.00 40,600.00
Bambu cerucuk Ø 15 cm panjang
6 batang 3 22,600.00 67,800.00
600 cm
Formtie/penjaga jarak
7 buah 4 7,000.00 28,000.00
bekesting/spacer
JUMLAH HARGA BAHAN 352,052.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 473,162.00
E Overhead & Profit 10% x D 47,316.20
F Harga Satuan Pekerjaan (D+E) 520,478.00
10. Pemasangan 1 m2 bekisting untuk tangga
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.66 105,000.00 69,300.00
2 Tukang Kayu OH 0.33 130,000.00 42,900.00
3 Kepala Tukang OH 0.033 140,000.00 4,620.00
4 Mandor OH 0.033 130,000.00 4,290.00
JUMLAH HARGA TENAGA KERJA 121,110.00
B BAHAN
1 Kayu Sengon (papan) m3 0.03 3,782,400.00 113,472.00
2 Paku kg 0.4 17,050.00 6,820.00
3 Minyak bekisting liter 0.15 16,800.00 2,520.00
4 Kayu kelapa m³ 0.015 4,600,000.00 69,000.00
5 Multiplek tebal 0,9 cm lembar 0.35 116,000.00 40,600.00
Bambu cerucuk Ø 15 cm panjang
6 batang 2 22,600.00 45,200.00
600 cm
JUMLAH HARGA BAHAN 277,612.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 398,722.00
E Overhead & Profit 10% x D 39,872.20
F Harga Satuan Pekerjaan (D+E) 438,594.00
11. Membuat Ring Balk Beton Bertulang (10x15) cm (m')
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.297 105,000.00 31,185.00
2 Tukang Batu OH 0.033 130,000.00 4,290.00
3 Tukang Kayu OH 0.033 130,000.00 4,290.00
4 Tukang Besi OH 0.033 130,000.00 4,290.00
5 Kepala Tukang OH 0.01 140,000.00 1,400.00
6 Mandor OH 0.015 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 47,405.00
B BAHAN
1 Kayu Meranti (balok) m3 0.003 6,600,000.00 19,800.00
2 Paku kg 0.02 17,050.00 341
3 Baja tulangan polos U-24 kg 3.6 13,150.00 47,340.00
4 Kawat beton kg 0.05 18,160.00 908
5 Portland cement kg 5.5 1,500.00 8,250.00
Pasir muntilan (quarry - lokasi
6 m³ 0.009 388,900.00 3,500.10
pekerjaan)
7 Batu pecah 1/2 m³ 0.015 388,700.00 5,830.50
JUMLAH HARGA BAHAN 85,969.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,374.60
E Overhead & Profit 10% x D 13,337.46
F Harga Satuan Pekerjaan (D+E) 146,712.00
12. Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.18 105,000.00 18,900.00
2 Tukang Batu OH 0.02 130,000.00 2,600.00
3 Tukang Kayu OH 0.02 130,000.00 2,600.00
4 Tukang Besi OH 0.02 130,000.00 2,600.00
5 Kepala Tukang OH 0.006 140,000.00 840
6 Mandor OH 0.009 130,000.00 1,170.00
JUMLAH HARGA TENAGA KERJA 28,710.00
B BAHAN
1 Kayu Sengon (papan) m3 0.002 3,782,400.00 7,564.80
2 Paku kg 0.01 17,050.00 170.5
3 Minyak bekisting liter 0.01 16,800.00 168
4 Baja tulangan polos U-24 kg 3 13,150.00 39,450.00
5 Kawat beton kg 0.45 18,160.00 8,172.00
6 Portland cement kg 4 1,500.00 6,000.00
Pasir muntilan (quarry - lokasi
7 m³ 0.006 388,900.00 2,333.40
pekerjaan)
8 Batu pecah 1/2 m³ 0.009 388,700.00 3,498.30
JUMLAH HARGA BAHAN 67,357.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,067.00
E Overhead & Profit 10% x D 9,606.70
F Harga Satuan Pekerjaan (D+E) 105,673.00

V. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1. Pemasangan 1 kg besi profil
1. Pemasangan 1 m' talang datar/ jurai seng bjls 28 lebar 90 cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.2 105,000.00 21,000.00
2 Tukang batu OH 0.2 130,000.00 26,000.00
3 Kepala Tukang OH 0.02 140,000.00 2,800.00
4 Mandor OH 0.001 130,000.00 130
JUMLAH HARGA TENAGA KERJA 49,930.00
B BAHAN
1 Seng plat bjls 30 m¹ 1.05 74,400.00 78,120.00
2 Paku kg 0.015 17,050.00 255.75
3 Kayu kamper (papan) m³ 0.019 12,150,000.00 230,850.00
JUMLAH HARGA BAHAN 309,225.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 359,155.75
E Overhead & Profit 10% x D 35,915.58
F Harga Satuan Pekerjaan (D+E) 395,071.00
2. Pemasangan 1m2 Rangka Besi Hollow 1 x 40.40.2 mm; Modul 60x60 cm dinding
plafond
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.35 105,000.00 36,750.00
2 Tukang Besi OH 0.35 130,000.00 45,500.00
3 Kepala Tukang OH 0.035 140,000.00 4,900.00
4 Mandor OH 0.018 130,000.00 2,340.00
JUMLAH HARGA TENAGA KERJA 89,490.00
B BAHAN
1 Rangka metal hollow 40.40.2 mm m 4 15,800.00 63,200.00
2 Assesoris (perkuatan las dll) Ls 0.1 63,200.00 31,600.00
JUMLAH HARGA BAHAN 94,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 184,290.00
E Overhead & Profit 10% x D 18,429.00
F Harga Satuan Pekerjaan (D+E) 202,719.00
3. Pemasangan Kusen Pintu dan Jendela Aluminium (m')
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.085 105,000.00 8,925.00
2 Tukang Alumunium OH 0.085 130,000.00 11,050.00
3 Kepala Tukang OH 0.009 140,000.00 1190
4 Mandor OH 0.004 130,000.00 546
JUMLAH HARGA TENAGA KERJA 21,711.00
B BAHAN
1 Profil Aluminium m¹ 4.4 117,400.00 516,560.00
2 Alumunium strip m' 15 41,600.00 607,360.00
JUMLAH HARGA BAHAN 1,123,920.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,145,631.00
E Overhead & Profit 10% x D 114,563.10
F Harga Satuan Pekerjaan (D+E) 1,260,194.10

VI. HARGA SATUAN PEKERJAAN DINDING PASANGAN


1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
3PP
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.3 105,000.00 31,500.00
2 Tukang Batu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.015 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 47,850.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm buah 70 610 42,700.00
2 Portland cement kg 10.37 1,500.00 15,555.00
Pasir muntilan (quarry - lokasi
3 m³ 0.04 388,900.00 15,556.00
pekerjaan)
JUMLAH HARGA BAHAN 73,811.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 121,661.00
E Overhead & Profit 10% x D 12,166.10
F Harga Satuan Pekerjaan (D+E) 133,827.10

HARGA SATUAN PEKERJAAN PLESTERAN


VII.
1. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.26 105,000.00 27,300.00
2 Tukang Batu OH 0.2 130,000.00 26,000.00
3 Kepala Tukang OH 0.02 140,000.00 2,800.00
4 Mandor OH 0.013 130,000.00 1,690.00
JUMLAH HARGA TENAGA KERJA 57,790.00
B BAHAN
1 Portland cement kg 10.368 1,500.00 15,552.00
Pasir muntilan (quarry - lokasi
2 m³ 0.031 388,900.00 12,055.90
pekerjaan)
JUMLAH HARGA BAHAN 27,607.90
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,397.90
E Overhead & Profit 10% x D 8,539.79
F Harga Satuan Pekerjaan (D+E) 93,937.00
2. Pemasangan 1 m2 acian.
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.2 105,000.00 21,000.00
2 Tukang Batu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.01 130,000.00 1,300.00
JUMLAH HARGA TENAGA KERJA 36,700.00
B BAHAN
1 Portland cement kg 3.25 1,500.00 4,875.00
JUMLAH HARGA BAHAN 4,875.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,575.00
E Overhead & Profit 10% x D 4,157.50
F Harga Satuan Pekerjaan (D+E) 45,732.00
VIII. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan 1m2 lantai ubin granit ukuran 60cm x 60cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.25 105,000.00 26,250.00
2 Tukang Batu OH 0.125 130,000.00 16,250.00
3 Kepala Tukang OH 0.013 140,000.00 1,820.00
4 Mandor OH 0.013 130,000.00 1,690.00
JUMLAH HARGA TENAGA KERJA 46,010.00
B BAHAN
Granit tile 60 x 60 cm( double
1 buah 2.917 92,800.00 270,697.60
loading )
2 Portland cement kg 9.8 1,500.00 14,700.00
3 Semen warna kg 1.3 12,300.00 15,990.00
4 Pasir muntilan (quarry - lokasi pekerja m³ 0.045 388,900.00 17,500.50
JUMLAH HARGA BAHAN 318,888.10
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 364,898.10
E Overhead & Profit 10% x D 36,489.81
F Harga Satuan Pekerjaan (D+E) 401,387.00
2. Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.7 105,000.00 73,500.00
2 Tukang Batu OH 0.35 130,000.00 45,500.00
3 Kepala Tukang OH 0.035 140,000.00 4,900.00
4 Mandor OH 0.035 130,000.00 4,550.00
JUMLAH HARGA TENAGA KERJA 128,450.00
B BAHAN
1 Keramik 40 x 40 cm buah 6.63 8,100.00 53,703.00
2 Portland cement kg 10 1,500.00 15,000.00
Pasir muntilan (quarry - lokasi
3 m³ 0.045 388,900.00 17,500.50
pekerjaan)
4 Semen warna kg 1.5 12,300.00 18,450.00
JUMLAH HARGA BAHAN 104,653.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 233,103.50
E Overhead & Profit 10% x D 23,310.35
F Harga Satuan Pekerjaan (D+E) 256,413.00
3. Pemasangan 1 m2 dinding keramik 25cm x 40cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.9 105,000.00 94,500.00
2 Tukang Batu OH 0.45 130,000.00 58,500.00
3 Kepala Tukang OH 0.045 140,000.00 6,300.00
4 Mandor OH 0.045 130,000.00 5,850.00
JUMLAH HARGA TENAGA KERJA 165,150.00
B BAHAN
1 Keramik 25 x 40 cm buah 5.889 12,500.00 73,611.11
2 Portland cement kg 9.3 1,500.00 13,950.00
Pasir muntilan (quarry - lokasi
3 m³ 0.018 388,900.00 7,000.20
pekerjaan)
4 Semen warna kg 1.94 12,300.00 23,862.00
JUMLAH HARGA BAHAN 118,423.31
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 283,573.31
E Overhead & Profit 10% x D 28,357.33
F Harga Satuan Pekerjaan (D+E) 311,930.00

IX. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm tebal 9 mm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.1 105,000.00 10,500.00
2 Tukang Kayu OH 0.05 130,000.00 6,500.00
3 Kepala Tukang OH 0.005 140,000.00 700
4 Mandor OH 0.005 130,000.00 650
JUMLAH HARGA TENAGA KERJA 18,350.00
B BAHAN
1 Gypsum Board (120 cm x 240 cm x 9 lembar 0.364 62,000.00 22,568.00
2 Paku sekrup kg 0.11 30,090.00 3,309.90
JUMLAH HARGA BAHAN 25,877.90
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,227.90
E Overhead & Profit 10% x D 4,422.79
F Harga Satuan Pekerjaan (D+E) 48,650.00

X. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1. Pemasangan 1 m2 atap genteng palentong kecil
1. Pemasangan 1 m2 Kuda-kuda baja Ringan
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.2 105,000.00 21,000.00
2 Tukang Kayu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.001 130,000.00 130
JUMLAH HARGA TENAGA KERJA 35,530.00
B BAHAN
1 Rangka Baja Ringan bh 1.02 242,400.00 44,472.00
2 Paku kg 0.2 17,050.00 3,410.00
JUMLAH HARGA BAHAN 47,882.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,412.00
E Overhead & Profit 10% x D 8,341.20
F Harga Satuan Pekerjaan (D+E) 83,412.00
2. Pemasangan 1 m2 genteng metal
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.2 105,000.00 21,000.00
2 Tukang Kayu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.001 130,000.00 130
JUMLAH HARGA TENAGA KERJA 35,530.00
B BAHAN
1 Genteng metal lembar 1.02 43,600.00 44,472.00
2 Paku kg 0.2 17,050.00 3,410.00
JUMLAH HARGA BAHAN 47,882.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,412.00
E Overhead & Profit 10% x D 8,341.20
F Harga Satuan Pekerjaan (D+E) 91,753.00
3. Pemasangan 1 m' lisplank ukuran (3 x 30) cm kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.1 105,000.00 10,500.00
2 Tukang Kayu OH 0.2 130,000.00 26,000.00
3 Kepala Tukang OH 0.02 140,000.00 2,800.00
4 Mandor OH 0.005 130,000.00 650
JUMLAH HARGA TENAGA KERJA 39,950.00
B BAHAN
1 Kayu kamper (papan) m³ 0.011 12,150,000.00 133,650.00
2 Paku kg 0.05 17,050.00 852.5
JUMLAH HARGA BAHAN 134,502.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 174,452.50

XII HARGA SATUAN PEKERJAAN SANITASI GEDUNG


1 Pemasangan 1 buah closet duduk / monoblock
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 3.3 105,000.00 346,500.00
2 Tukang Batu OH 1.1 130,000.00 143,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.16 130,000.00 20,800.00
JUMLAH HARGA TENAGA KERJA 511,700.00
B BAHAN
1 Kloset duduk/monoblok buah 1 1,735,100.00 1,735,100.00
2 Perlengkapan Ls 6% x closet 104,106.00
JUMLAH HARGA BAHAN 1,839,206.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,350,906.00
E Overhead & Profit 10% x D 235,090.60
F Harga Satuan Pekerjaan (D+E) 2,585,996.00
2. Pemasangan 1 buah wastafel
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 1.2 105,000.00 126,000.00
2 Tukang Batu OH 1.45 130,000.00 188,500.00
3 Kepala Tukang OH 0.15 140,000.00 21,000.00
4 Mandor OH 0.06 130,000.00 7,800.00
JUMLAH HARGA TENAGA KERJA 343,300.00
B BAHAN
1 Wastavel buah 1.2 382,400.00 458,880.00
2 Portland cement kg 6 1,500.00 9,000.00
Pasir muntilan (quarry - lokasi
3 m³ 0.01 388,900.00 3,889.00
pekerjaan)
12% x
4 Perlengkapan 55,065.60
wastavel
JUMLAH HARGA BAHAN 526,834.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 870,134.60
E Overhead & Profit 10% x D 87,013.46
F Harga Satuan Pekerjaan (D+E) 957,148.00
3. Pemasangan 1 buah tandon air fibreglass vol 1200 liter
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.3 105,000.00 31,500.00
2 Tukang Batu OH 0.45 130,000.00 58,500.00
3 Kepala Tukang OH 0.045 140,000.00 6,300.00
4 Mandor OH 0.015 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 98,250.00
B BAHAN
Bak reservoir fibreglass (kapasitas
1 buah 1 1,650,000.00 1,650,000.00
1200 liter)
2 Perlengkapan 12% x bak 198,000.00
JUMLAH HARGA BAHAN 1,848,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,946,250.00
E Overhead & Profit 10% x D 194,625.00
F Harga Satuan Pekerjaan (D+E) 2,140,875.00
4. Pemasangan 1 buah bak cuci piring stainlessteel
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.03 105,000.00 3,150.00
2 Tukang Batu OH 0.3 130,000.00 39,000.00
3 Kepala Tukang OH 0.03 140,000.00 4,200.00
4 Mandor OH 0.015 130,000.00 1,950.00
JUMLAH HARGA TENAGA KERJA 48,300.00
B BAHAN
1 Wastavel buah 1 382,400.00 382,400.00
2 Water drain + asesories set 1 321,200.00 321,200.00
JUMLAH HARGA BAHAN 703,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 751,900.00
E Overhead & Profit 10% x D 75,190.00
F Harga Satuan Pekerjaan (D+E) 827,090.00
5. Pemasangan 1 buah floor drain stainless steel
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.01 105,000.00 1,050.00
2 Tukang Batu OH 0.1 130,000.00 13,000.00
3 Kepala Tukang OH 0.01 140,000.00 1,400.00
4 Mandor OH 0.005 130,000.00 650
JUMLAH HARGA TENAGA KERJA 16,100.00
B BAHAN
1 Floor drain stainles steel buah 1 48,600.00 48,600.00
JUMLAH HARGA BAHAN 48,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,700.00
E Overhead & Profit 10% x D 6,470.00
F Harga Satuan Pekerjaan (D+E) 71,170.00
6. Pemasangan 1 buah bak kontrol pasangan bata 50cm x50cm tinggi 45 cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 3.2 105,000.00 336,000.00
2 Tukang Batu OH 1.15 130,000.00 149,500.00
3 Kepala Tukang OH 0.011 140,000.00 1,540.00
4 Mandor OH 0.016 130,000.00 2,080.00
JUMLAH HARGA TENAGA KERJA 489,120.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm buah 70 610 42,700.00
2 Portland cement kg 77 1,500.00 115,500.00
Pasir muntilan (quarry - lokasi
3 m³ 0.13 388,900.00 50,557.00
pekerjaan)
4 Batu pecah 1/2 m³ 0.02 388,700.00 7,774.00
5 Baja tulangan polos U-24 kg 2.6 13,150.00 34,190.00
JUMLAH HARGA BAHAN 250,721.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 739,841.00
E Overhead & Profit 10% x D 73,984.10
F Harga Satuan Pekerjaan (D+E) 813,825.00
7. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.081 105,000.00 8,505.00
2 Tukang Batu OH 0.135 130,000.00 17,550.00
3 Kepala Tukang OH 0.0135 140,000.00 1,890.00
4 Mandor OH 0.004 130,000.00 520
JUMLAH HARGA TENAGA KERJA 28,465.00
B BAHAN
1 Pipa PVC tipe AW Ø 3" panjang 4 m batang 0.3 185,700.00 55,710.00
2 Perlengkapan 35% x pipa 19,498.50
JUMLAH HARGA BAHAN 75,208.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,673.50
E Overhead & Profit 10% x D 10,367.35
F Harga Satuan Pekerjaan (D+E) 114,040.00
8. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.081 105,000.00 8,505.00
2 Tukang Batu OH 0.135 130,000.00 17,550.00
3 Kepala Tukang OH 0.0135 140,000.00 1,890.00
4 Mandor OH 0.004 130,000.00 520
JUMLAH HARGA TENAGA KERJA 28,465.00
B BAHAN
1 Pipa PVC tipe AW Ø 4" panjang 4 m batang 0.3 277,300.00 83,190.00
2 Perlengkapan 35% x pipa 29,116.50
JUMLAH HARGA BAHAN 112,306.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 140,771.50
E Overhead & Profit 10% x D 14,077.15
F Harga Satuan Pekerjaan (D+E) 154,848.00

XII PEKERJAAN FINISHING


1 Upah meletakkan bahan tiap berat 1 kg
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.0050 105,000.00 525
2 Mandor OH 0.0003 130,000.00 32.5
JUMLAH HARGA TENAGA KERJA 687.5
B BAHAN
1 Cat Dinding bh 1 69,000.00 69000.00
2 Pelapis cat bh 1 26,180.00 26180.00
JUMLAH HARGA BAHAN 95180.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95867.50
E Overhead & Profit 10% x D 9586.75
F Harga Satuan Pekerjaan (D+E) 105454.25

XIII PEKERJAAN LAIN-LAIN


1 Upah meletakkan bahan tiap berat 1 kg
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.005 105,000.00 525
2 Tukang Batu OH 0.001 130,000.00 130
3 Mandor OH 0.00025 130,000.00 32.5
JUMLAH HARGA TENAGA KERJA 687.5
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 687.5
E Overhead & Profit 10% x D 68.75
F Harga Satuan Pekerjaan (D+E) 756.00
2. 1 Unit Membuat bak kontrol 45/45 cm2
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
JUMLAH HARGA TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C SUB PEKERJAAN
1 Mengurug pasir M3 0.03 332,920.00 9,987.60
2 Menggali tanah M3 0.32 131,850.00 42,192.00
3 Pasangan bata 1 : 6 M3 0.18 1,017,384.17 183,129.15
4 Plester 1 : 3 M2 1.12 75,658.70 84,737.74
JUMLAH HARGA ALAT 320,046.49
D Jumlah (A+B+C) 320,046.49
E Overhead & Profit 10% x D 32,004.65
F Harga Satuan Pekerjaan (D+E) 352,051.00
3. 1 M¹ Pagar beton Pracetak ( 240 x 40 x 5 ) cm K.225
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja OH 0.375 105,000.00 39,375.00
2 Tukang Batu OH 0.125 130,000.00 16,250.00
3 Kepala Tukang OH 0.012 140,000.00 1,680.00
4 Mandor OH 0.019 130,000.00 2,470.00
JUMLAH HARGA TENAGA KERJA 59,775.00
B BAHAN
1 Panel Beton Pracetak 240x40x5 lbr 0.986 137,000.00 135,082.00
2 Kolom Beton Pracetak 225x17x8 btg 0.525 285,750.00 150,018.75
3 Pasir muntilan (quarry - lokasi pekerja m³ 0.074 388,900.00 28,778.60
4 Batu pecah 2/3 m³ 0.146 362,600.00 52,939.60
5 Portland cement kg 45 1,500.00 67,500.00
JUMLAH HARGA BAHAN 434,318.95
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 494,093.95
E Overhead & Profit 10% x D 49,409.40
F Harga Satuan Pekerjaan (D+E) 543,503.00
Tabel 3.Rencana Anggaran Biaya (RAB)

Harga Satuan
No Jenis Pekerjaan Volume Jumlah (Rp)
(Rp)
1 2 3 4 5
I PEKERJAAN PERSIAPAN

1.1 Pembersihan Lokasi 180.00 m2 Rp 13,285.0 Rp 2,391,300.0

1.2 Pagar Keliling 64.00 m Rp 77.3 Rp 4,948.7

1.3 Pemasangan Bowplank 64.00 m Rp 388,908.5 Rp 24,890,142.5

1.4 Pembuatan gudang 18.00 m2 Rp 830.5 Rp 14,948.7

1.5 Pekerjaan Listrik Kerja 1 ILS Rp1,500,000 Rp 1,500,000.0

1.6 Pekerjaan Air Kerja 1 ILS Rp1,500,000 Rp 1,500,000.0

SUB JUMLAH Rp 30,301,339.9

II PEKERJAAN TANAH DAN PONDASI

2.1 Galian tanah

A Galian tanah pondasi footplat 1 6.72 m3 Rp 78,052.5 Rp 524,512.8

B Galian tanah pondasi footplat 2 5.76 m3 Rp 78,052.5 Rp 449,582.4

C Galian tanah pondasi footplat 3 1.92 m3 Rp 78,052.5 Rp 149,860.8

D Galian tanah pondasi footplat 4 1.73 m3 Rp 78,052.5 Rp 135,030.8


E Galian tanah pondasi Bt. Kali (A) 41.00 m3 Rp 63,762.5 Rp 2,614,262.5

F Galian tanah pondasi Batu Kali (B) 20.65 m3 Rp 63,762.5 Rp 1,316,695.6

G Galian tanah pondasi Batu Kali (C) 4.42 m3 Rp 63,762.5 Rp 281,830.3

H Galian tanah pondasi Batu Kali (D) 0.04 m3 Rp 63,762.5 Rp 2,805.5

2.2 Urugan Tanah

A Urugan tanah kembali footplat 13.60 m3 Rp 45,925.0 Rp 624,580.0

B Urugan tanah kembali Batu kali 34.90 m3 Rp 45,925.0 Rp 1,602,782.5

C Urugan tanah peninggi elevasi Lt. rumah 11.52 m3 Rp 45,925.0 Rp 529,056.0

D Urugan tanah peninggi elevasi lt. teras, KM 1.57 m3 Rp 45,925.0 Rp 72,102.3

E Urugan tanah peninggi elevasi Taman Belakang 0.08 m3 Rp 45,925.0 Rp 3,674.0

F Urugan tanah peninggi elevasi Taman Depan, Taman Samping 1.82 m3 Rp 45,925.0 Rp 83,583.5

G Urugan tanah peninggi elevasi carport 5.80 m3 Rp 45,925.0 Rp 266,365.0

2.3 Urugan Pasir

A Urugan pasir bawah footplat 1 0.28 m3 Rp 133,505.0 Rp 37,381.4

B Urugan pasir bawah footplat 2 dan 3 0.32 m3 Rp 133,505.0 Rp 42,721.6

C Urugan pasir bawah footplat 4 0.07 m3 Rp 133,505.0 Rp 9,211.8

B Urugan pasir bawah anstamping 1.60 m3 Rp 133,505.0 Rp 915,530.0


Bt.Kali A

Bt.Kali B 0.80 m3 Rp 133,505.0 Rp 106,804.0

Bt.Kali C 0.36 m3 Rp 133,505.0 Rp 48,061.8

Bt.Kali D 0.75 m3 Rp 133,505.0 Rp 100,128.8

C Urugan pasir bawah lantai 16.08 m3 Rp 133,505.0 Rp 2,146,760.4

2.4 Pasangan Batu Kali

A Astamping Pondasi A 4.8 m3 Rp 3,228,259.2


Rp 672,554.0

B Anstamping Pondasi B 2.42 m3 Rp 672,554.0 Rp 1,627,580.7

C Pasangan Pondasi Bt. Kali A 2.42 m3 Rp 1,403,699.0 Rp 3,396,951.6

D Pasangan Pondasi Bt. Kali B 13.43 m3 Rp 1,403,699.0 Rp 18,851,677.6

E Pasangan Pondasi Bt. Kali C 7.78 m3 Rp 1,403,699.0 Rp 10,920,778.2

F Pasangan Pondasi Bt. Kali D 1.80 m3 Rp 1,403,699.0 Rp 2,526,658.2

SUB JUMLAH Rp 52,615,229.2

III PEKERJAAN BETON

3.1 Pek. beton non-struktur

A Lantai kerja Footplat 1 0.22 m3 Rp 7,325,792.9 Rp 1,611,674.4

B Lantai kerja Footplat 2 dan 3 0.25 m3 Rp 7,325,792.9 Rp 1,831,448.2


C Lantai kerja Footplat 4 0.06 m3 Rp 7,325,792.9 Rp 439,547.6

3.2 Pek. Beton bertulang

A Pondasi Footplat 1 2.72 m3 Rp 5,202,892.2 Rp 14,151,866.7

B Pondasi Footplat 2 dan 3 3.09 m3 Rp 5,202,892.2 Rp 16,076,936.8

C Pondasi Footplat 4 0.35 m3 Rp 5,202,892.2 Rp 1,821,012.3

D Kolom Pendek (FP 1) 0.42 m3 Rp 5,739,853.5 Rp 2,410,738.5

E Kolom Pendek (FP 2) 0.36 m3 Rp 5,739,853.5 Rp 2,066,347.3

F Kolom Pendek (FP 3) 0.12 m3 Rp 5,739,853.5 Rp 688,782.4

G Kolom Pendek (FP 4) 1 0.05 m3 Rp 5,739,853.5 Rp 258,293.4

H Kolom Pendek (FP 4) 2 0.07 m3 Rp 5,739,853.5 Rp 413,269.5

I Balok Sloof Batu Kali A,B,C,D 3 m3 Rp 5,220,453.8 Rp 15,661,361.3

J Kolom Induk Lt. 1 (1K1) 3.84 m3 Rp 5,961,131.3 Rp 22,890,744.0

K Kolom Induk Lt. 1 (1K2) m3 Rp 5,961,131.3 Rp 894,169.7


0.15

L Kolom praktis Lt. 1 1.71 m3 Rp 5,961,131.3 Rp 10,193,534.4

M Balok Induk Lt. 1 (B1) 1.8 m3 Rp 5,659,063.7 Rp 10,186,314.7

N Balok Induk Lt. 1 (B2) 0.12 m3 Rp 5,659,063.7 Rp 667,769.5

O Balok BL Lt. 1 0.22 m3 Rp 5,659,063.7 Rp 1,244,994.0


P Balok BP Lt. 1 0.10 m3 Rp 5,659,063.7 Rp 565,906.4

Q Plat Tangga 1.26 m3 Rp 5,848,569.5 Rp 7,369,197.6

R Anak tangga 1.03 m3 Rp 5,848,569.5 Rp 6,018,178.1

T Plat Lantai 2 13.05 m3 Rp 6,131,200.0 Rp 80,012,160.2

U Kolom Praktis Lantai 2 3.38 m3 Rp 5,961,131.3 Rp 20,148,623.6

V Balok Ring 1.97 m3 Rp 5,292,335.7 Rp 10,425,901.4

SUB JUMLAH Rp 228,048,772.1

IV PEKERJAAN PASANGAN DINDING

4.1 Trasram rumah (1:3) 3.57 m2 Rp 1,115,794.0 Rp 3,983,384.6

4.2 Pasangan Dinding

A Pasangan Dinding Lt.1 164.90 m2 Rp 133,827.1 Rp 22,068,088.8

B Pasangan Dinding Lt.2 145.50 m2 Rp 133,827.1 Rp 19,471,843.1

C Dinding kamar mandi Lt.1 19.38 m2 Rp 133,827.1 Rp 2,593,569.2

D Dinding kamar mandi Lt.2 25.72 m2 Rp 133,827.1 Rp 3,442,033.0

4.3 Pek. Plesteran dan Acian

A Plesteran dinding rumah 278.78 m2 Rp 93,937.0 Rp 26,187,756.9

B Plesteran dinding luar KM 45.10 m2 Rp 93,937.0 Rp 4,236,558.7


C Plesteran dinding dalam KM 33.90 m2 Rp 93,937.0 Rp 3,184,464.3

D Acian 357.00 m2 Rp 45,732.0 Rp 16,326,324.0

E Benangan Dalam 297.00 m Rp 21,950.0 Rp 6,519,150.0

F Benangan Luar 266.80 m Rp 25,700.0 Rp 6,856,760.0

G Tali air kusen 267.00 m Rp 253,370.3 Rp 67,649,874.0

H Tali air ban keramik 86.70 m2 Rp 253,370.3 Rp 21,967,206.3

SUB JUMLAH Rp 204,487,012.7

V PEKERJAAN ATAP

5.1 Pekerjaan Kuda-kuda

A Rangka Kuda-kuda Kayu 1.70 m3 Rp 7,374,551.9 Rp 12,536,738.2

5.2 Balok rangakai

A Balok rangkai kuda-kuda kayu 9.74 m3 Rp 7,374,551.9 Rp 71,828,135.3

B Usuk 0.205 m3 Rp 3,342,699.4 Rp 685,253.4

C Reng 0.158 m3 Rp 274,149.4 Rp 43,315.6

SUB JUMLAH Rp 85,093,442.5

VI PEKERJAAN PENUTUP ATAP

6.1 Luas atap 116.50 m2 Rp 175,165.0 Rp 20,406,722.5


6.2 Kebutuhan genteng Karangpilang 3060.00 bh Rp 10,500.0 Rp 32,130,000.0

6.3 Kebutuhan genteng penutup wuwung 110.00 bh Rp 22,500.0 Rp 2,475,000.0

SUB JUMLAH Rp 55,011,722.5

VII PEKERJAAN LISPLANK DAN PLAFOND

7.1 Lisplank 0.20 m2 Rp 174,452.5 Rp 34,890.5

7.2 Pekerjaan Plafond

A Rangka Plafond Lt. 1 94.41 m2 Rp 202,719.0 Rp 19,138,700.8

B Rangka Plafond Lt. 2 237.22 m2 Rp 202,719.0 Rp 48,089,001.2

SUB JUMLAH Rp 67,262,592.5

VIII PEKERJAAN KUSEN PINTU DAN JENDELA

8.1 Pekerjaan kusen pintu dan jendela -

A Kusen Pintu (P1) 3.78 m3 Rp 343,056.4 Rp 1,296,753.3

B Kusen Pintu (P2) 20.28 m3 Rp 343,056.4 Rp 6,957,184.6

C Kusen Pintu (P 3) 16.40 m3 Rp 343,056.4 Rp 5,626,125.6

D Kusen Pintu (P4) 9.54 m3 Rp 343,056.4 Rp 3,272,758.4

E Kusen Pintu (P 5) 3.28 m3 Rp 343,056.4 Rp 1,125,225.1

F Kusen Jendela (J1) 106.40 m3 Rp 343,056.4 Rp 36,501,205.2


G Kusen Jendela (J2) 74.43 m3 Rp 343,056.4 Rp 25,533,690.8

H Kusen Bouvenlist 4.80 m3 Rp 30,039.0 Rp 144,187.0

8.2 Pekerjaan daun pintu dan jendela

A Daun Pintu 1 (P1) 2.86 m2 Rp 97,539.0 Rp 278,961.4

B Daun Pintu 2 (P2) 11.88 m2 Rp 97,539.0 Rp 1,158,762.8

C Daun Pintu 3 (P3) 8.80 m2 Rp 97,539.0 Rp 858,342.8

D Daun Pintu 4 (P4) 4.62 m2 Rp 97,539.0 Rp 450,630.0

E Daun Pintu 5 (P5) 1.76 m2 Rp 97,539.0 Rp 171,668.6

F Daun Jendela 1 (J1) 19.74 m2 Rp 97,539.0 Rp 1,925,419.0

G Daun Jendela 2 (J2) 19.53 m2 Rp 97,539.0 Rp 1,904,935.8

H Bouvenlist
0.3 m2 Rp 30,039.0 Rp 9,011.7

SUB JUMLAH Rp 87,214,862.1

IX PEKERJAAN KERAMIK

9.1 Pekerjaan Tegel Lantai

A Lantai 1 Keramik (40 x 40) 73.35 m2 Rp 256,413.0 Rp 18,807,893.5

B Lantai 1 Keramik (30 x 30) 26.85 m2 Rp 256,413.0 Rp 6,884,689.1

C Lantai 2 Keramik (40 x 40) 87.99 m2 Rp 256,413.0 Rp 22,561,779.9


D Lantai kamar mandi lantai 1 keramik (20 x 20) 1.90 m2 Rp 256,413.0 Rp 487,184.7

E Lantai kamar mandi lantai 2 keramik (40 x 40) 3.28 m2 Rp 256,413.0 Rp 841,034.6

9.2 Keramik Dinding

A Keramik Dinding KM Lt.1 (30 x 30) 4.35 m2 Rp 311,930.0 Rp 1,356,895.5

B Keramik Dinding KM Lt.2 (30 x 30) 9.69 m2 Rp 311,930.0 Rp 3,022,601.7

C keramik list KM (7.5 x 30) 10.89 m2 Rp 137,489.9 Rp 1,497,265.5

D Keramik ban 6.47 m2 Rp 99,004.9 Rp 640,562.0

E Granit dinding tangga 5.14 m2 Rp 153,069.9 Rp 1,047,840.1

F Stepnoising tangga keramik 5.14 m2 Rp 203,859.9 Rp 1,047,840.1

SUB JUMLAH Rp 58,195,586.6

X PEKERJAAN INSTALASI LISTRIK

10.1 Instalasi Listrik Lantai 1

Panjang kabel 25.57 m Rp 314,300.0 Rp 8,036,651.0

Panel MCB 1 bh Rp 50,000.0 Rp 50,000.0

Meteran Listrik 1 bh Rp 500,000.0 Rp 500,000.0

Saklar Tunggal 2 bh Rp 20,000.0 Rp 40,000.0

Saklar Ganda 3 bh Rp 15,000.0 Rp 45,000.0


Stop Kontak Tunggal 6 bh Rp 285,780.0 Rp 1,714,680.0

Lampu Led 4 watt 4 bh Rp 200,000.0 Rp 800,000.0

Lampu Led 6 watt 6 bh Rp 200,000.0 Rp 1,200,000.0

10.2 Instalasi Listrik Lantai 2

Panjang kabel 26.91 m Rp 314,300.0 Rp 8,457,813.0

Saklar Tunggal 5 bh Rp 20,000.0 Rp 100,000.0

Saklar Ganda 2 bh Rp 15,000.0 Rp 30,000.0

Stop Kontak Tunggal 6 bh Rp 285,780.0 Rp 1,714,680.0

Lampu Led 4 watt 7.00 bh Rp 200,000.0 Rp 1,400,000.0

Lampu Led 6 watt 4.00 bh Rp 200,000.0 Rp 800,000.0

SUB JUMLAH Rp 24,888,824.0

XI PEKERJAAN INSTALASI AIR

11.1 Instalasi air Lantai 1

Pipa air bersih 17.31 m Rp 114,040.0 Rp 1,974,032.4

Pipa air kotor 18.50 m Rp 154,848.0 Rp 2,864,688.0

Kloset duduk 1 bh Rp 2,585,996.0 Rp 2,585,996.0

Kran air 2 bh Rp 138,000.0 Rp 276,000.0


Shower 1 bh Rp 225,000.0 Rp 225,000.0

Floor Drain 1 bh Rp 71,170.0 Rp 71,170.0

Kitchen set 1 unit Rp 827,090.0 Rp 827,090.0

Sink 1 bh Rp 526,834.6 Rp 526,834.6

11.2 Instalasi air Lantai 2

Pipa air bersih 17.57 m Rp 114,040.0 Rp 2,003,682.8

Pipa air kotor 9.82 m Rp 154,848.0 Rp 1,520,607.4

Kloset duduk 2 bh Rp 2,585,996.0 Rp 5,171,992.0

Shower 2 bh Rp 225,000.0 Rp 450,000.0

Floor Drain 2 bh Rp 71,170.0 Rp 142,340.0

Pompa 1 bh Rp 900,000.0 Rp 900,000.0

Toren/Tandon Air 1 bh Rp 2,140,875.0 Rp 2,140,875.0

SUB JUMLAH Rp 21,680,308.2

XII PEKERJAAN FINISHING

A Pekerjaan Pengecatan dinding eksterior 184.49 m2 Rp 65,851.2 Rp 12,148,884.5

B Pengecatan dinding interior Lt.1 94.60 m2 Rp 33,361.7 Rp 3,156,019.6

C Pengecatan dinding interior Lt.2 89.89 m2 Rp 33,361.7 Rp 2,998,885.8


D Pengecatan Kusen 20.94 m2 Rp 52,730.2 Rp 1,104,170.0

E Pengecatan karangpilang 124.95 m2 Rp 52,730.2 Rp 6,588,636.2

F Pekerjaan Pengecatan Lisplank 18.97 m2 Rp 26,180.0 Rp 496,687.0

SUB JUMLAH Rp 26,493,283.1

XIII PEKERJAAN LAIN-LAIN

A Pekerjaan Septictank

Galian tanah septictank 2.44 m3 Rp 110,833 Rp 270,431.3

Urugan pasir bawah saptictank 0.2 m3 Rp 152,333 Rp 30,466.6

Plat penutup septictank 0.09 m3 Rp 23,475,612 Rp 2,112,805.0

trasram septictank 0.87 m3 Rp 1,235,687 Rp 1,075,047.3

B Pekerjaan Sumur Resapan

Galian tanah sumur resapan 1.17 m3 Rp 71,938 Rp 84,166.9

plat penutup sumur resapan 0.087 m3 Rp 23,475,612 Rp 2,042,378.2

C Pekerjaan bak kontrol 4.5 m3 Rp 71,937.5 Rp 323,718.8

D Pekerjaan pipa saluran

Galian tanah pipa saluran 0.81 m3 Rp 71,937.5 Rp 58,269.4

Urugan tanah kembali pipa 0.55 m3 Rp 51,375.0 Rp 28,256.3


G Railing tangga dan void 0.67 m Rp 86,966.0 Rp 58,267.2

H Pagar balkon 1 Unit Rp 543,503.0 Rp 543,503.0

I Grendel 15 Bh Rp 56,902.5 Rp 853,537.5

J Handle pintu 16 Bh Rp 358,008.3 Rp 5,728,132.0

K Body kunci 16 Bh Rp 358,008.3 Rp 5,728,132.0

L Hak angin 30 Bh Rp 59,010.0 Rp 1,770,300.0

M Engsel 78 Bh Rp 116,345.0 Rp 9,074,910.0

N Penangkal petir 1 Bh Rp 7,042,870.0 Rp 7,042,870.0

O Parabola 1 Bh Rp 552,300.0 Rp 552,300.0

P Tandon air 1 Bh Rp 1,082,180.0 Rp 1,082,180.0

SUB JUMLAH Rp 38,459,671.3

GRAND TOTAL Rp 979,752,646.7

Dibulatkan Rp 979,752,000.0

Terbilang :
Satu Milyar Lima Ratus Tujuh Puluh Empat Juta Tiga Ratus Tujuh Puluh Tujuh Ribu Rupiah
Tabel 4. Rekapitulasi Dana

Pekerjaan : Pembangunan Rumah 2 Lantai


Lokasi : JL.Kemantren 3, Kota Malang, Jawa Timur
No Jenis Pekerjaan Jumlah
I Pekerjaan Persiapan Rp 30,301,339.89
II Pekerjaan Tanah dan Pondasi Rp 52,615,229.25
III Pekerjaan Beton Rp 228,048,772.06
IV Pekerjaan Pasangan Dinding Rp 204,487,012.72
V Pekerjaan Atap Rp 85,093,442.49
VI Pekerjaan Penutup Atap Rp 55,011,722.50
VII Pekerjaan Lisplank dan Plafond Rp 67,262,592.47
VIII Pekerjaan Kusen Pintu dan Jendela Rp 87,214,862.12
IX Pekerjaan Keramik Rp 58,195,586.64
X Pekerjaan Instalasi Listrik Rp 24,888,824.00
XI Pekerjaan Instalasi Air Rp 21,680,308.16
XII Pekerjaan Finishing Rp 26,493,283.09
XIII Pekerjaan Lain-lain Rp 38,459,671.34
Jumlah Rp 979,752,646.73
Dibulatkan Rp 979,752,000.00
Terbilang : Satu Milyar Tujuh Belas Juta Dua Ratus Tujuh Puluh Tujuh Ribu Rupiah
PLOTTING

No Jenis Pekerjaan Deskripsi


1 2 3
I PEKERJAAN PERSIAPAN
1.1 Pembersihan Lokasi I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.1 satuan pekerjaan
Mandor OH 0.05 = 180.00 x 0.10 = 18 Pekerja
1
Volume 180.0 m2 II. Ploting
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 18.000 x 1 = 4.5 ~ 5 pekerja
4
III. TS = Ploting hari = 4 = 0.7 minggu
hari dlm seminggu 6
1.2 Pemasangan Bowplank I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.1 kayu satuan pekerjaan
Tukang Kayu OH 0.1 = 64.00 x 0.10 = 6.4 Tukang Kayu
Kepala Tukang OH 0.01 1
Mandor OH 0.005 Jml pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 64.00 m 64.00 x 0.10 = 6.4 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 6.4 x 1 = 2 Tukang Kayu
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 6.4 x 1 = 2.1333 ~ 2 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
1.3 Pembuatan Bedeng I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.1 kayu satuan pekerjaan
Tukang Kayu OH 0.1 = 18.00 x 0.10 = 1.8 Tukang Kayu
Kepala Tukang OH 0.01 1
Jml pekerja = volume pekerjaan x koefisien pekerja
Volume 18.00 m2 satuan pekerjaan
1 2 3
18.00 x 0.10 = 1.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.8 x 1 = 1.8 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.8 x 1 = 1.8 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
II PEKERJAAN TANAH DAN PONDASI
2.1 Galian tanah
A Galian tanah pondasi footplat I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 1.73 x 0.50 = 0.9 Pekerja
1
Volume 1.73 m3 II. Ploting
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.9 x 1 = 0.4 ~ 0 pekerja
2
III. TS = Ploting hari = 2 = 0.3 minggu
hari dlm seminggu 6
B Galian tanah pondasi Bt. Kali I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 61.65 x 0.50 = 30.8 Pekerja
1
Volume 61.7 m3 II. Ploting
Waktu 8 hari = Jumlah hari x pekerja
Plotting hari
= 30.8 x 1 = 3.9 ~ 4 pekerja
8
III. TS = Ploting hari = 8 = 1.3 minggu
hari dlm seminggu 6
2.2 Urugan Tanah
A Urugan tanah kembali footplatI. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
1 2 3
Mandor OH 0.05 = 13.60 x 0.50 = 6.8 Pekerja
1
Volume 13.60 m3 II. Ploting
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 6.8 x 1 = 3.4 ~ 3 pekerja
2
III. TS = Ploting hari = 2 = 0.3 minggu
hari dlm seminggu 6
B Urugan tanah kembali Batu kaI. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 34.90 x 0.50 = 17.5 Pekerja
1
Volume 34.9 m3 II. Ploting
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 17.5 x 1 = 4.4 ~ 4 pekerja
4
III. TS = Ploting hari = 4 = 0.7 minggu
hari dlm seminggu 6
C Urugan tanah peninggi elevasiI. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 11.52 x 0.50 = 5.8 Pekerja
1
Volume 11.52 m3 II. Ploting
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 5.8 x 1 = 1.9 ~ 2 pekerja
3
III. TS = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
D Urugan tanah elevasi teras,K I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 1.57 x 0.50 = 0.8 Pekerja
1
Volume 1.57 m3 II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.8 x 1 = 0.8 ~ 1 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
1 2 3
2.3 Urugan Pasir
A Urugan pasir bawah footplat I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 0.28 x 0.50 = 0.1 Pekerja
1
Volume 0.28 m3 II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.1 x 1 = 0.1 ~ 0 pekerja

III. TS = Ploting hari = 1 = 0.2 minggu


hari dlm seminggu 6
B Urugan pasir bawah
I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
anstamping Bt.Kali
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 1.60 x 0.50 = 0.8 Pekerja
1
Volume 1.60 m3 II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.8 x 1 = 0.8 ~ 1 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
C Urugan pasir bawah lantai I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.5 satuan pekerjaan
Mandor OH 0.05 = 16.08 x 0.50 = 8.0 Pekerja
1
Volume 16.08 ### II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 8.0 x 1 = 8.0 ~ 8 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
2.4 Pasangan Batu Kali
A Anstamping Pondasi A & B I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.78 batu satuan pekerjaan
Tukang Batu OH 0.39 = 2.42 x 0.39 = 0.9 Tukang Batu
Kepala Tukang OH 0.039 1
Mandor OH 0.039 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
1 2 3
Volume 2.42 m3 2.42 x 0.78 = 1.9 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.9 x 1 = 0.4719 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 1.9 x 1 = 0.9438 ~ 1 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
B Pasangan Pondasi Bt. Kali A dI. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 1.8 batu satuan pekerjaan
Tukang Batu OH 0.9 = 4.22 x 0.90 = 3.8 Tukang Batu
Mandor OH 0.18 1
Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 4.22 m3 4.22 x 1.80 = 7.6 Pekerja
1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
= 3.8 x 1 = 0.633 ~ 1 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 7.6 x 1 = 1.266 ~ 1 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
III PEKERJAAN BETON
3.1 Pekerjaan beton non-struktur
A Lantai kerja Footplat I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 1.650 satuan pekerjaan
Mandor OH 0.083 = 0.22 x 1.65 = 0.4 Pekerja
1
1 2 3
Volume 0.22 m3 II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari

= 0.4 x 1 = 0.4 ~ 0 pekerja

1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
3.2 Pekerjaan Beton bertulang
A Pondasi Footplat dan Kolom
Pendek I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
batu
A.1 Beton satuan pekerjaan
Pekerja OH 1.650 = 3.45 x 0.28 = 0.9 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
3.45 x 1.65 = 5.7 Pekerja
Volume 3.45 m3 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 0.9 x 1 = 0.3163 ~ 0 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 5.7 x 1 = 1.8975 ~ 2 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
A.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.520 kayu satuan pekerjaan
Tukang Kayu OH 0.260 = 0.42 x 0.26 = 0.1 Tukang Kayu
Kepala Tukang OH 0.026 1
Mandor OH 0.026 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.42 m3 0.42 x 0.52 = 0.2 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari

1 2 3
= 0.1 x 1 = 0.0366 ~ 0 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.0731 ~ 0 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
B Balok Sloof Bt. Kali A & B I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
B.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = #NAME? x 0.28 = ### Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
#NAME? x 1.65 = ### Pekerja
Volume ### m3 1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
B.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.520 kayu satuan pekerjaan
Tukang Kayu OH 0.260 = #NAME? x 0.26 = ### Tukang Kayu
Kepala Tukang OH 0.026 1
Mandor OH 0.026 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### ### #NAME? x 0.52 = ### Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
C Kolom Induk Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
C.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 3.84 x 0.28 = 1.1 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
3.84 x 1.65 = 6.3 Pekerja
Volume 3.84 m3 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 1.1 x 1 = 0.352 ~ 0 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 6.3 x 1 = 2.112 ~ 2 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
C.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
D Kolom praktis Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
D.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 1.71 x 0.28 = 0.5 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
1.71 x 1.65 = 2.8 Pekerja
Volume 1.71 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.4703 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.8 x 1 = 2.8215 ~ 3 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
D.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
E Balok Induk Lt. 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
E.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 0.12 x 0.28 = 0.0 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
0.12 x 1.65 = 0.2 Pekerja
Volume 0.12 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0.0162 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.0973 ~ 0 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
E.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
F Balok Anak Lt.1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
F.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 0.10 x 0.28 = 0.0 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
0.10 x 1.65 = 0.2 Pekerja
Volume 0.10 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0.0138 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.0825 ~ 0 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
F.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
G Plat Tangga I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
G.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 1.26 x 0.28 = 0.3 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
1.26 x 1.65 = 2.1 Pekerja
Volume 1.26 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.3 x 1 = 0.3465 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.1 x 1 = 2.079 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
H Anak tangga I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
H.1 Beton batu satuan pekerjaan
Pekerja OH 1.650 = 1.03 x 0.28 = 0.3 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
1.03 x 1.65 = 1.7 Pekerja
Volume 1.03 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.3 x 1 = 0.283 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.7 x 1 = 1.6978 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
I Plat Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
I.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = 13.05 x 0.28 = 3.6 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
13.05 x 1.65 = 21.5 Pekerja
Volume 13.05 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 3.6 x 1 = 1.7944 ~ 2 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 21.5 x 1 = 10.766 ~ 11 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
1.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
J Kolom Induk Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
J.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = #NAME? x 0.28 = ### Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
#NAME? x 1.65 = ### Pekerja
Volume ### m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
J.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
K Kolom Praktis Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
K.1 Beton batu satuan pekerjaan
Pekerja OH 1.65 = 3.38 x 0.28 = 0.9 Tukang Batu
Tukang Batu OH 0.275 1
Kepala Tukang OH 0.028 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.083 satuan pekerjaan
3.38 x 1.65 = 5.6 Pekerja
Volume 3.38 m3 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.9 x 1 = 0.9295 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 5.6 x 1 = 5.577 ~ 6 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
K.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
L Ring Balok I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
L.1 Beton batu satuan pekerjaan
Pekerja OH 0.30 = 1.97 x 0.03 = 0.033 Tukang Batu
Tukang Batu OH 0.033 1
Kepala Tukang OH 0.010 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.015 satuan pekerjaan
1.97 x 0.30 = 0.3 Pekerja
Volume 1.97 m3 1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0.0165 ~ 0 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 0.3 x 1 = 0.1485 ~ 0 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
L.2 Bekisting I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.66 kayu satuan pekerjaan
Tukang Kayu OH 0.33 = #NAME? x 0.33 = ### Tukang Kayu
Kepala Tukang OH 0.033 1
Mandor OH 0.033 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.66 = ### Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
1 2 3
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
IV PEKERJAAN PASANGAN DINDING
4.1 Trasram rumah (1:2) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 3.57 x 0.10 = 0.4 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.57 m2 3.57 x 0.30 = 1.1 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.4 x 1 = 0.714 ~ 1 tukang
0.5
Waktu 0.5 hari = Jumlah hari x pekerja
Plotting hari
= 1.1 x 1 = 2.142 ~ 2 pekerja
0.5
III. TS Tukang = Ploting hari = 0.5 = 0.083 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 0.5 = 0.083 minggu
hari dlm seminggu 6
4.2 Pasangan Dinding
A Pasangan Dinding Lt.1 (1:6) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 164.90 x 0.10 = 16.5 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 164.90 m2 164.90 x 0.30 = 49.5 Pekerja
1

1 2 3
II. Ploting
Waktu 9 hari = Jumlah hari x tukang
Plotting hari
= 16.5 x 1 = 1.8322 ~ 2 tukang
9
Waktu 9 hari = Jumlah hari x pekerja
Plotting hari
= 49.5 x 1 = 5.4967 ~ 5 pekerja
9
III. TS Tukang = Ploting hari = 9 = 1.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 9.0 = 1.5 minggu
hari dlm seminggu 6
B Pasangan Dinding Lt.2 (1:6) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 145.50 x 0.10 = 14.6 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 145.50 m2 145.50 x 0.30 = 43.7 Pekerja
1
II. Ploting
Waktu 10 hari = Jumlah hari x tukang
Plotting hari
= 14.6 x 1 = 1.455 ~ 1 tukang
10
Waktu 10 hari = Jumlah hari x pekerja
Plotting hari
= 43.7 x 1 = 4.365 ~ 4 pekerja
10
III. TS Tukang = Ploting hari = 10 = 1.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 10.0 = 1.667 minggu
hari dlm seminggu 6
C Dinding kamar mandi (1:4) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.3 batu satuan pekerjaan
Tukang Batu OH 0.1 = 45.10 x 0.10 = 4.5 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 45.10 m2 45.10 x 0.30 = 13.5 Pekerja
1
1 2 3
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 4.5 x 1 = 2.255 ~ 2 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 13.5 x 1 = 6.765 ~ 7 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
4.3 Pekerjaan Plesteran & Acian I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Plesteran dinding rumah (1:6) batu satuan pekerjaan
Pekerja OH 0.26 = 278.78 x 0.20 = 55.8 Tukang Batu
Tukang Batu OH 0.2 1
Kepala Tukang OH 0.02 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.013 satuan pekerjaan
278.78 x 0.26 = 72.5 Pekerja
Volume 278.8 m2 1
II. Ploting
Waktu 23 hari = Jumlah hari x tukang
Plotting hari
= 55.8 x 1 = 2.4242 ~ 2 tukang
23
Waktu 23 hari = Jumlah hari x pekerja
Plotting hari
= 72.5 x 1 = 3.1514 ~ 3 pekerja
23
III. TS Tukang = Ploting hari = 23 = 3.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 23.0 = 3.833 minggu
hari dlm seminggu 6
B Plesteran dinding luar KM(1:4I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.26 batu satuan pekerjaan
Tukang Batu OH 0.2 = 45.10 x 0.20 = 9.0 Tukang Batu
Kepala Tukang OH 0.02 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 45.1 m2 45.10 x 0.26 = 11.7 Pekerja
1
1 2 3
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 9.0 x 1 = 4.51 ~ 5 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 11.7 x 1 = 5.863 ~ 6 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
C Plesteran dinding dalam KM(1I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.26 batu satuan pekerjaan
Tukang Batu OH 0.2 = 33.90 x 0.20 = 6.8 Tukang Batu
Kepala Tukang OH 0.02 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 33.9 m2 33.90 x 0.26 = 8.8 Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= 6.8 x 1 = 3.39 ~ 3 tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= 8.8 x 1 = 4.407 ~ 4 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
D Acian I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 357.00 x 0.10 = 35.7 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 357.0 m2 357.00 x 0.20 = 71.4 Pekerja
1
1 2 3
II. Ploting
Waktu 17 hari = Jumlah hari x tukang
Plotting hari
= 35.7 x 1 = 2.1 ~ 2 tukang
17
Waktu 17 hari = Jumlah hari x pekerja
Plotting hari
= 71.4 x 1 = 4.2 ~ 4 pekerja
17
III. TS Tukang = Ploting hari = 17 = 2.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 17.0 = 2.833 minggu
hari dlm seminggu 6
E Benangan Dalam dan Luar I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 563.80 x 0.10 = 56.4 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 563.8 m 563.80 x 0.20 = 112.8 Pekerja
1
II. Ploting
Waktu 7 hari = Jumlah hari x tukang
Plotting hari
= 56.4 x 1 = 8.0543 ~ 8 tukang
7
Waktu 7 hari = Jumlah hari x pekerja
Plotting hari
= 112.8 x 1 = 16.109 ~ 16 pekerja
7
III. TS Tukang = Ploting hari = 7 = 1.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 7.0 = 1.167 minggu
hari dlm seminggu 6
G Sopi-sopi I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.2 batu satuan pekerjaan
Tukang Batu OH 0.1 = 86.70 x 0.10 = 8.7 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.01 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 86.7 m2 86.70 x 0.20 = 17.3 Pekerja
1
1 2 3
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 8.7 x 1 = 8.67 ~ 9 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 17.3 x 1 = 17.34 ~ 17 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
V PEKERJAAN ATAP
5.1 Rangka Kuda-kuda BJ. Ringa = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.2 satuan pekerjaan
Tukang OH 0.1 = 118.20 x 0.10 = 11.8 Tukang
Kepala Tukang OH 0.01 1
Mandor OH 0.001 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 118.2 m2 118.20 x 0.20 = 23.6 Pekerja
1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
= 11.8 x 1 = 1.97 ~ 2 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 23.6 x 1 = 3.94 ~ 4 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6.0 = 1 minggu
hari dlm seminggu 6
VI PEKERJAAN PENUTUP ATAP
6.1 Borongan penutup atap gentin = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.2 satuan pekerjaan
Tukang OH 0.1 = 110.00 x 0.10 = 11.0 Tukang
Kepala Tukang OH 0.01 1
Mandor OH 0.001 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
1 2 3
110.00 x 0.20 = 22.0 Pekerja
Volume 110.0 m2 1
II. Ploting
Waktu 6 hari = Jumlah hari x tukang
Plotting hari
= 11.0 x 1 = 1.8333 ~ 2 tukang
6
Waktu 6 hari = Jumlah hari x pekerja
Plotting hari
= 22.0 x 1 = 3.6667 ~ 4 pekerja
6
III. TS Tukang = Ploting hari = 6 = 1 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 6.0 = 1 minggu
hari dlm seminggu 6
VII PEKERJAAN LISPLANK DAN PLAFOND
7.1 Lisplank = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.1 satuan pekerjaan
Tukang OH 0.2 = 0.20 x 0.20 = 0.0 Tukang
Kepala Tukang OH 0.02 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.20 m 0.20 x 0.10 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0.04 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.02 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
7.2 Pekerjaan Plafond I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Rangka Plafond Lt. 1 besi satuan pekerjaan
Pekerja OH 0.35 = 94.41 x 0.35 = 33.0 Tukang Besi
Tukang Besi OH 0.35 1
Kepala Tukang OH 0.035 Jumlah pekerja = volume pekerjaan x koefisien pekerja
1 2 3
Mandor OH 0.018 satuan pekerjaan
94.41 x 0.35 = 33.0 Pekerja
Volume 94.41 m2 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 33.0 x 1 = 6.6087 ~ 7 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 33.0 x 1 = 6.6087 ~ 7 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Rangka Plafond Lt. 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = 237.22 x 0.35 = 83.0 Tukang Besi
Kepala Tukang OH 0.035 1
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 237.22 m2 237.22 x 0.35 = 83.0 Pekerja
1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 83.0 x 1 = 16.605 ~ 17 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 83.0 x 1 = 16.605 ~ 17 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
C Plafond Lantai 1 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = #NAME? x 0.35 = ### Tukang Besi
Kepala Tukang OH 0.035 1

1 2 3
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.35 = ### Pekerja
1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
D Plafond Lantai 2 I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.35 besi satuan pekerjaan
Tukang Besi OH 0.35 = #NAME? x 0.35 = ### Tukang Besi
Kepala Tukang OH 0.035 1
Mandor OH 0.018 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.35 = ### Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
VIII PEKERJAAN KUSEN PINTU DAN JENDELA (ALUMUNIUM)
8.1 Kusen Pintu dan Jendela I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.043 besi satuan pekerjaan

1 2 3
Tukang Besi OH 0.043 = 238.91 x 0.04 = 10.3 Tukang Besi
Kepala Tukang OH 0.004 1
Mandor OH 0.002 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 238.91 m3 238.91 x 0.04 = 10.3 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 10.3 x 1 = 10.273 ~ 10 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 10.3 x 1 = 10.273 ~ 10 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
IX PEKERJAAN KERAMIK
9.1 Pekerjaan Tegel Lantai I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Lantai 1 Granit tile (60 x 60) batu satuan pekerjaan
Pekerja OH 0.25 = #NAME? x 0.13 = ### Tukang Batu
Tukang Batu OH 0.125 1
Kepala Tukang OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.013 satuan pekerjaan
#NAME? x 0.25 = ### Pekerja
Volume ### m2 1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6

1 2 3
B Lantai 2 Granit Tile (60 x 60) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = #NAME? x 0.13 = ### Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m2 #NAME? x 0.25 = ### Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
C Lantai 1 Keramik (40 x 40) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 73.35 x 0.13 = 9.2 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 73.35 m2 73.35 x 0.25 = 18.3 Pekerja
1
II. Ploting
Waktu 4 hari = Jumlah hari x tukang
Plotting hari
= 9.2 x 1 = 2.2922 ~ 2 tukang
4
Waktu 4 hari = Jumlah hari x pekerja
Plotting hari
= 18.3 x 1 = 4.5844 ~ 5 pekerja
4
III. TS Tukang = Ploting hari = 4 = 0.667 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 4.0 = 0.667 minggu
hari dlm seminggu 6
1 2 3
D Lantai 2 Keramik (40 x 40) I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 87.99 x 0.13 = 11.0 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 87.99 m2 87.99 x 0.25 = 22.0 Pekerja
1
II. Ploting
Waktu 2.0 hari = Jumlah hari x tukang
Plotting hari
= 11.0 x 1 = 5.4994 ~ 5 tukang
2
Waktu 2.0 hari = Jumlah hari x pekerja
Plotting hari
= 22.0 x 1 = 11 ~ 11 pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
E Lantai 1 Keramik Kasar (40 x I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.25 batu satuan pekerjaan
Tukang Batu OH 0.125 = 3.28 x 0.13 = 0.4 Tukang Batu
Kepala Tukang OH 0.013 1
Mandor OH 0.013 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.28 m2 3.28 x 0.25 = 0.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.4 x 1 = 0.41 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.8 x 1 = 0.82 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
1 2 3
9.2 Keramik Dinding I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
A Keramik Dinding KM Lt.1 (25batu satuan pekerjaan
Pekerja OH 0.9 = 4.35 x 0.45 = 2.0 Tukang Batu
Tukang Batu OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
4.35 x 0.90 = 3.9 Pekerja
Volume 4.35 m2 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.0 x 1 = 1.9575 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 3.9 x 1 = 3.915 ~ 4 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Keramik Dinding KM Lt.2 (25I. Jumlah tukang = volume pekerjaan x koefisien tukang kayu
Pekerja OH 0.9 batu satuan pekerjaan
Tukang Batu OH 0.45 = 9.69 x 0.45 = 4.4 Tukang Batu
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 9.69 m2 9.69 x 0.90 = 8.7 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 4.4 x 1 = 4.3605 ~ 4 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 8.7 x 1 = 8.721 ~ 9 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
1 2 3
X PEKERJAAN INSTALASI LISTRIK
10.1 Instalasi Listrik Lantai 1 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Panjang kabel satuan pekerjaan
Pekerja OH 0.9 = 25.57 x 0.45 = 11.5 Tukang
Tukang OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
25.57 x 0.90 = 23.0 Pekerja
Volume 25.57 m 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 11.5 x 1 = 2.3013 ~ 2 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 23.0 x 1 = 4.6026 ~ 5 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Panel MCB = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 1.00 x 0.45 = 0.5 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.90 = 0.9 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.45 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.9 x 1 = 0.9 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6

1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Saklar Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 2.00 x 0.45 = 0.9 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.90 = 1.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.9 x 1 = 0.9 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.8 x 1 = 1.8 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
D Saklar Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 3.00 x 0.45 = 1.4 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.00 bh 3.00 x 0.90 = 2.7 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.4 x 1 = 1.35 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 2.7 x 1 = 2.7 ~ 3 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Stop Kontak Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 6.00 x 0.03 = 0.2 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 6.00 bh 6.00 x 0.03 = 0.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.15 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.2 x 1 = 0.15 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Stop Kontak Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 3.00 x 0.03 = 0.1 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.00 bh 3.00 x 0.03 = 0.1 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.075 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.1 x 1 = 0.075 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G Lampu Gantung = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 4.00 x 0.45 = 1.8 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 4.00 bh 4.00 x 0.90 = 3.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.8 x 1 = 1.8 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 3.6 x 1 = 3.6 ~ 4 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Lampu SL = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 6.00 x 0.45 = 2.7 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 6.00 bh 6.00 x 0.90 = 5.4 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 2.7 x 1 = 0.9 ~ 1 tukang
3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 5.4 x 1 = 1.8 ~ 2 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6
10.2 Instalasi Listrik Lantai 2 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Panjang kabel satuan pekerjaan
Pekerja OH 0.9 = 26.91 x 0.45 = 12.1 Tukang
Tukang OH 0.45 1
Kepala Tukang OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.045 satuan pekerjaan
26.91 x 0.90 = 24.2 Pekerja
Volume 26.91 m 1
II. Ploting
Waktu 5 hari = Jumlah hari x tukang
Plotting hari
= 12.1 x 1 = 2.4219 ~ 2 tukang
5
Waktu 5 hari = Jumlah hari x pekerja
Plotting hari
= 24.2 x 1 = 4.8438 ~ 5 pekerja
5
III. TS Tukang = Ploting hari = 5 = 0.833 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 5.0 = 0.833 minggu
hari dlm seminggu 6
B Saklar Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 5.00 x 0.45 = 2.3 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 5.00 bh 5.00 x 0.90 = 4.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.3 x 1 = 2.25 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 4.5 x 1 = 4.5 ~ 5 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Saklar Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 2.00 x 0.45 = 0.9 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.90 = 1.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.9 x 1 = 0.9 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.8 x 1 = 1.8 ~ 2 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
D Stop Kontak Tunggal = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = 0.00 x 0.03 = 0.0 Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.00 bh 0.00 x 0.03 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.0 x 1 = 0 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Stop Kontak Ganda = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0250 satuan pekerjaan
Tukang OH 0.0250 = #NAME? x 0.03 = ### Tukang
Kepala Tukang OH 0.1000 1
Mandor OH 0.5000 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### bh #NAME? x 0.03 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Lampu Led strip Plafond & di = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = 11.00 x 0.45 = 5.0 Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 11.00 m 11.00 x 0.90 = 9.9 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 5.0 x 1 = 4.95 ~ 5 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 9.9 x 1 = 9.9 ~ 10 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
1 2 3
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
G Lampu SL = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.9 satuan pekerjaan
Tukang OH 0.45 = #NAME? x 0.45 = ### Tukang
Kepala Tukang OH 0.045 1
Mandor OH 0.045 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### bh #NAME? x 0.90 = ### Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
XI PEKERJAAN INSTALASI AIR
11.1 Instalasi air Lantai 1 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Pipa air bersih satuan pekerjaan
Pekerja OH 0.081 = 17.31 x 0.14 = 2.3 Tukang Batu
Tukang Batu OH 0.135 1
Kepala Tukang OH 0.0135 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.004 satuan pekerjaan
17.31 x 0.08 = 1.4 Pekerja
Volume 17.31 m 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.3 x 1 = 2.3369 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.4 x 1 = 1.4021 ~ 1 pekerja
1

1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Pipa air bekas dan AC = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = #NAME? x 0.14 = ### Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m #NAME? x 0.08 = ### Pekerja
1
II. Ploting
Waktu 2 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
2
Waktu 2 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
2
III. TS Tukang = Ploting hari = 2 = 0.333 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 2.0 = 0.333 minggu
hari dlm seminggu 6
C Pipa air kotor = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 18.50 x 0.14 = 2.5 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 18.50 m 18.50 x 0.08 = 1.5 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.5 x 1 = 2.4975 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.5 x 1 = 1.4985 ~ 1 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Kloset duduk = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 3.3 satuan pekerjaan
Tukang Batu OH 1.1 = 1.00 x 1.10 = 1.1 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.16 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 3.30 = 3.3 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.1 x 1 = 1.1 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 3.3 x 1 = 3.3 ~ 3 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Kran air dan shower = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0100 satuan pekerjaan
Tukang OH 0.4000 = 3.00 x 0.40 = 1.2 Tukang
Kepala tukang OH 0.0400 1
Mandor OH 0.0050 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 3.00 bh 3.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.2 x 1 = 1.2 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.015 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Floor Drain = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.01 satuan pekerjaan
Tukang Batu OH 0.1 = 1.00 x 0.10 = 0.1 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.1 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.01 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
I Kitchen set = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.03 satuan pekerjaan
Tukang Batu OH 0.3 = 1.00 x 0.30 = 0.3 Tukang Batu
Kepala Tukang OH 0.03 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 Unit 1.00 x 0.03 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.3 x 1 = 0.3 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.03 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
J Wastafel = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 1.2 satuan pekerjaan
Tukang Batu OH 1.45 = 1.00 x 1.45 = 1.5 Tukang Batu
Kepala Tukang OH 0.15 1
Mandor OH 0.06 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 1.20 = 1.2 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.5 x 1 = 1.45 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.2 x 1 = 1.2 ~ 1 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
11.2 Instalasi air Lantai 2 = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Pipa air bersih satuan pekerjaan
Pekerja OH 0.081 = 17.57 x 0.14 = 2.4 Tukang Batu
Tukang Batu OH 0.135 1
Kepala Tukang OH 0.0135 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.004 satuan pekerjaan
17.57 x 0.08 = 1.4 Pekerja
Volume 17.57 m 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.4 x 1 = 2.372 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 1.4 x 1 = 1.4232 ~ 1 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Pipa air bekas dan AC = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = #NAME? x 0.14 = ### Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### m #NAME? x 0.08 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
C Pipa air kotor = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 9.82 x 0.14 = 1.3 Tukang Batu
Kepala Tukang OH 0.0135 1
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 9.82 m 9.82 x 0.08 = 0.8 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 1.3 x 1 = 1.3257 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.8 x 1 = 0.7954 ~ 1 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
E Kloset duduk = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 3.3 satuan pekerjaan
Tukang Batu OH 1.1 = 2.00 x 1.10 = 2.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.16 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 3.30 = 6.6 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 2.2 x 1 = 2.2 ~ 2 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 6.6 x 1 = 6.6 ~ 7 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
F Shower = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0100 satuan pekerjaan
Tukang OH 0.4000 = 2.00 x 0.40 = 0.8 Tukang
Kepala tukang OH 0.0400 1
Mandor OH 0.0050 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.8 x 1 = 0.8 ~ 1 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.01 ~ 0 pekerja
1
1 2 3
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
H Floor Drain = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.01 satuan pekerjaan
Tukang Batu OH 0.1 = 2.00 x 0.10 = 0.2 Tukang Batu
Kepala Tukang OH 0.01 1
Mandor OH 0.005 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 2.00 bh 2.00 x 0.01 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.2 x 1 = 0.2 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.02 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
I Wastafel = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 1.2 satuan pekerjaan
Tukang Batu OH 1.45 = #NAME? x 1.45 = ### Tukang Batu
Kepala Tukang OH 0.15 1
Mandor OH 0.06 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume ### bh #NAME? x 1.20 = ### Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= #NAME? x 1 = ### ~ ### tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= #NAME? x 1 = ### ~ ### pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6

1 2 3
J Toren/Tandon Air = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.3 satuan pekerjaan
Tukang Batu OH 0.45 = 1.00 x 0.45 = 0.5 Tukang Batu
Kepala Tukang OH 0.045 1
Mandor OH 0.015 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 1.00 bh 1.00 x 0.30 = 0.3 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.5 x 1 = 0.45 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.3 x 1 = 0.3 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
XII PEKERJAAN FINISHING
12.1 Pekerjaan Pengecatan dinding = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0200 satuan pekerjaan
Tukang OH 0.0630 = 184.49 x 0.06 = 11.6 Tukang
Kepala tukang OH 0.0063 1
Mandor OH 0.0030 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 184.49 m2 184.49 x 0.02 = 3.7 Pekerja
1
II. Ploting
Waktu 9 hari = Jumlah hari x tukang
Plotting hari
= 11.6 x 1 = 1.2914 ~ 1 tukang
9
Waktu 9 hari = Jumlah hari x pekerja
Plotting hari
= 3.7 x 1 = 0.41 ~ 0 pekerja
9
III. TS Tukang = Ploting hari = 9 = 1.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 9.0 = 1.5 minggu
hari dlm seminggu 6
12.2 Pekerjaan Pengecatan lisplank = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.0200 satuan pekerjaan
Tukang OH 0.0630 = 184.49 x 0.06 = 11.6 Tukang
Kepala tukang OH 0.0063 1
Mandor OH 0.0030 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 184.49 m2 184.49 x 0.02 = 3.7 Pekerja
1
II. Ploting
Waktu 3 hari = Jumlah hari x tukang
Plotting hari
= 11.6 x 1 = 3.8743 ~ 4 tukang
3

1 2 3
Waktu 3 hari = Jumlah hari x pekerja
Plotting hari
= 3.7 x 1 = 1.2299 ~ 1 pekerja
3
III. TS Tukang = Ploting hari = 3 = 0.5 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 3.0 = 0.5 minggu
hari dlm seminggu 6

XIII PEKERJAAN LAIN-LAIN


13.1 Pekerjaan Septictank & ResapI. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.1 satuan pekerjaan
Mandor OH 0.05 = 0.00 x 0.10 = 0.0 Pekerja
1
Volume 0.0 Unit II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.000 x 1 = 0.0 ~ 0 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
13.2 Pekerjaan Bak Kontrol I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.1 satuan pekerjaan
Mandor OH 0.05 = 4.50 x 0.10 = 0.5 Pekerja
1
Volume 4.5 Unit II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.450 x 1 = 0.5 ~ 0 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
13.3 Pekerjaan pipa saluran = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
A Pemasangan Pipa PVC (AW 4" satuan pekerjaan
Pekerja OH 0.081 = 0.81 x 0.14 = 0.1 Tukang Batu
Tukang Batu OH 0.135 1
Kepala Tukang OH 0.0135 Jumlah pekerja = volume pekerjaan x koefisien pekerja
Mandor OH 0.004 satuan pekerjaan
0.81 x 0.08 = 0.1 Pekerja
Volume 0.8 m 1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.1094 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.1 x 1 = 0.0656 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
B Pemasangan Pipa PVC (AW 3" = volume pekerjaan x koefisien tukang kayu
I. Jumlah tukang
Pekerja OH 0.081 satuan pekerjaan
Tukang Batu OH 0.135 = 0.55 x 0.14 = 0.1 Tukang Batu
Kepala Tukang OH 0.0135 1
1 2 3
Mandor OH 0.004 Jumlah pekerja = volume pekerjaan x koefisien pekerja
satuan pekerjaan
Volume 0.6 m 0.55 x 0.08 = 0.0 Pekerja
1
II. Ploting
Waktu 1 hari = Jumlah hari x tukang
Plotting hari
= 0.1 x 1 = 0.0743 ~ 0 tukang
1
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.0 x 1 = 0.0446 ~ 0 pekerja
1
III. TS Tukang = Ploting hari = 1 = 0.167 minggu
hari dlm seminggu 6
Pekerja = Ploting hari = 1.0 = 0.167 minggu
hari dlm seminggu 6
13.4 Railing tangga dan void I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Pekerja OH 0.1 satuan pekerjaan
Mandor OH 0.05 = 0.67 x 0.10 = 0 Pekerja
1
Volume 0.7 m2 II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 0.067 x 1 = 0.1 ~ 0 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
Pagar beton, Set Wifi,
13.5 I. Jumlah pekerja = volume pekerjaan x koefisien pekerja
Parabola, dan AC
Pekerja OH 0.1 satuan pekerjaan
Mandor OH 0.05 = 94.00 x 0.10 = 9 Pekerja
1
Volume 94.0 bh II. Ploting
Waktu 1 hari = Jumlah hari x pekerja
Plotting hari
= 9.400 x 1 = 9.4 ~ 9 pekerja
1
III. TS = Ploting hari = 1 = 0.2 minggu
hari dlm seminggu 6
PLOTTING HARIAN

Minggu 2
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN 3.09
1.1 Pembersihan Lokasi 0.7
1.2 Pemasangan Bowplank 0.50
1.3 Pembuatan Bedeng 0.2
Plotting/Bobot 3.09 3.09
minggu 2 = 1.33 x 3.09 / 1.33 = 3.09 Minggu ini 1.33
akumulasi 1.33

Minggu 3 Minggu 4 Minggu 5


No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
II PEKERJAAN TANAH DAN PONDASI 5.37
2.1 Galian tanah
A Galian tanah pondasi footplat 0.3
B Galian tanah pondasi Bt. Kali (A) dan (B) 0.8 0.5
2.2 Urugan Tanah
A Urugan tanah kembali footplat 0.3
B Urugan tanah kembali Batu kali 0.2 0.5
C Urugan tanah peninggi elevasi Lt. rumah 0.5
D Urugan tanah peninggi elevasi lt. teras,KM,gudang 0.2
2.3 Urugan Pasir
A Urugan pasir bawah footplat 0.2
B Urugan pasir bawah anstamping Bt. Kali A dan B 0.2
C Urugan pasir bawah lantai 0.2
2.4 Pasangan Batu Kali
A Anstamping Pondasi A dan B 0.3
B Pasangan Pondasi Bt. Kali A dan B 0.3 0.7
Plotting/Bobot 5.37 2.08 1.39 1.91
minggu 3 = 2.00 x 5.37 / 5.17 = 2.08 Minggu ini 2.00 1.33 1.83
minggu 4 = 1.33 x 5.37 / 5.17 = 1.39 akumulasi 2.00 3.33 5.17
minggu 5 = 1.83 x 5.37 / 5.17 = 1.91
Minggu 4 Minggu 6 Minggu 7
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
III PEKERJAAN BETON 23.28
3.1 Pek. beton non-struktur
A Lantai kerja Footplat 0.2
3.2 Pek. Beton bertulang
A Pondasi Footplat & Kolom Pendek
Beton 0.5
Bekisting 0.5
B Balok Sloof Batu Kali A dan B
Beton 0.7
Bekisting 0.5
C Kolom Induk Lt. 1
Beton 0.5
Bekisting 0.5
D Kolom praktis Lt. 1
Beton 0.2
Bekisting 0.2
E Balok Induk Lt. 1
Beton
Bekisting 0.2
F Balok anak Lt. 1
Beton
Bekisting
G Plat Tangga
Beton
Bekisting
H Anak tangga
Beton
Bekisting
I Plat Lantai 2
Beton
Bekisting
J Kolom Induk Lantai 2
Beton
Bekisting
K Kolom Praktis Lantai 2
Beton
Bekisting
L Balok Ring
Beton
Bekisting
Plotting/Bobot 23.28 2.96 2.96 3.81
minggu 4 = 1.17 x 23.28 / 9.17 = 2.96 Minggu ini 1.17 1.17 1.50
minggu 6 = 1.17 x 23.28 / 9.17 = 2.96 akumulasi 1.17 2.33 3.83
minggu 7 = 1.50 x 23.28 / 9.17 = 3.81
minggu 8 = 1.50 x 23.28 / 9.17 = 3.81
minggu 9 = 0.33 x 23.28 / 9.17 = 0.85
minggu 810 = 1.00 x 23.28 / 9.17 = 2.54
minggu 11 = 1.00 x 23.28 / 9.17 = 2.54
minggu 13 = 0.67 x 23.28 / 9.17 = 1.69
minggu 14 = 0.83 x 23.28 / 9.17 = 2.12
Minggu 7 Minggu 8 Minggu 9
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
IV PEKERJAAN PASANGAN DINDING 20.87
4.1 Trasram rumah (1:2) 0.1
4.2 Pasangan Dinding
A Pasangan Dinding Lt.1 (1:6) 0.8 0.7
B Pasangan Dinding Lt.2 (1:6)
C Dinding kamar mandi Lt.1 (1:4) 0.3
D Dinding kamar mandi Lt.2 (1:4)
4.3 Pek. Plesteran dan Acian
A Plesteran dinding rumah Lt.1 (1:6) 0.5 1.0
B Plesteran dinding rumah Lt.2 (1:6)
C Plesteran dinding luar KM (1:4) 0.2
D Plesteran dinding dalam KM (1:4) 0.3
E Acian Lt. 1 0.7
F Acian Lt. 2
G Benangan Dalam dan luar 0.5
H Sopi-sopi 0.2
Plotting/Bobot 20.87 1.54 2.80 4.48
minggu 7 = 0.92 x 20.87 / 12.42 = 1.54 Minggu ini 0.92 1.67 2.67
minggu 8 = 1.67 x 20.87 / 12.42 = 2.80 akumulasi 0.92 2.58 5.25
minggu 9 = 2.67 x 20.87 / 12.42 = 4.48
minggu 11 = 1.83 x 20.87 / 12.42 = 3.08
minggu 12 = 0.33 x 20.87 / 12.42 = 0.56
minggu 13 = 1.17 x 20.87 / 12.42 = 1.96
minggu 14 = 2.67 x 20.87 / 12.42 = 4.48
minggu 15 = 1.17 x 20.87 / 12.42 = 1.96
Minggu 14
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
V PEKERJAAN ATAP 8.69
5.1 Pekerjaan Kuda-kuda 1
A Rangka Kuda-kuda Baja Ringan
Plotting/Bobot 8.69 8.69
minggu 14 = 1.00 x 8.69 / 1.00 = 8.69 Minggu ini 1.00
akumulasi 1.00

Minggu 15
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
VI PEKERJAAN PENUTUP ATAP 5.61
6.1 Pekerjaan penutup atap
A Borongan kerangka dan penutup atap 1
Plotting/Bobot 5.61 5.61
minggu 15 = 1.00 x 5.61 / 1.00 = 5.61 Minggu ini 1.00
akumulasi 1.00

Minggu 17 Minggu 18 Minggu 19


No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
VII PEKERJAAN LISPLANK DAN PLAFOND 6.87
7.1 Lisplank 0.2
7.2 Pekerjaan Plafond
A Rangka Plafond Lt. 1 0.7 0.2
B Rangka Plafond Lt. 2 0.7 0.2
C Plafond Lt. 1 0.3 0.5
D Plafond Lt. 2 0.2 0.5
Plotting/Bobot 6.87 2.40 3.09 1.37
minggu 17 = 1.17 x 6.87 / 3.33 = 2.40 Minggu ini 1.17 1.50 0.67
minggu 18 = 1.50 x 6.87 / 3.33 = 3.09 akumulasi 1.17 2.67 3.33
minggu 19 = 0.67 x 6.87 / 3.33 = 1.37

Minggu 6
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
VIII PEKERJAAN KUSEN PINTU & JENDELA 8.90
8.1 Kusen Pintu dan Jendela (PG 1) 0.167
8.2 Kusen Pintu dan Jendela (PJ 1) 0.167
8.3 Kusen Pintu (P1) 0.167
8.4 Kusen Pintu (P2) 0.167
8.5 Kusen Pintu (P 3) 0.167
8.6 Kusen Pintu (P4) 0.167
8.7 Kusen Jendela (J1A) 0.167
8.8 Kusen Jendela (J2) 0.167
8.9 Kusen Jendela (J3) 0.167
8.10 Kusen Jendela (J4) 0.167
Plotting/Bobot 8.90 8.90
minggu 6 = 1.67 x 8.90 / 1.67 = 8.90 Minggu ini 1.67
akumulasi 1.67

Minggu 12 Minggu 13 Minggu 16


No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
IX PEKERJAAN KERAMIK 5.94
9.1 Pekerjaan Tegel Lantai
A Lantai 1 Granit tile (60 x 60) 0.5
B Lantai 2 Granit Tile (60 x 60) 0.3 0.3
C Lantai 1 Keramik (40 x 40) 0.3 0.3
D Lantai 2 Keramik (40 x 40) 0.3
E Lantai 1 Keramik Kasar (40 x 40) 0.2
9.2 Keramik Dinding
A Keramik Dinding KM Lt.1 (25 x 40) 0.2
B Keramik Dinding KM Lt.2 (25 x 40) 0.2
Plotting/Bobot 5.94 2.23 1.86 1.86
minggu 12 = 1.00 x 5.94 / 2.67 = 2.23 Minggu ini 1.00 0.83 0.83
minggu 13 = 0.83 x 5.94 / 2.67 = 1.86 akumulasi 1.00 1.83 2.67
minggu 16 = 0.83 x 5.94 / 2.67 = 1.86

Minggu 10 Minggu 11 Minggu 15


No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
X PEKERJAAN INSTALASI LISTRIK 2.54
10.1 Instalasi Listrik Lantai 1
Panjang kabel 0.8
Panel MCB 0.2
Meteran Listrik 0.2
Saklar Tunggal 0.2
Saklar Ganda 0.2
Stop Kontak Tunggal 0.2
Stop Kontak Ganda 0.2
Lampu Gantung 0.2
Lampu SL 0.5
10.2 Instalasi Listrik Lantai 2
Panjang kabel 0.2 0.7
Tv Kabel 0.2
Saklar Tunggal 0.2
Saklar Ganda 0.2
Stop Kontak Tunggal 0.2
Stop Kontak Ganda 0.2
Lampu Led strip plafond
Lampu Led strip dipan
Lampu SL
Plotting/Bobot 2.54 1.23 0.79 0.18
minggu 10 = 2.33 x 2.54 / 4.83 = 1.23 Minggu ini 2.33 1.50 0.33
minggu 11 = 1.50 x 2.54 / 4.83 = 0.79 akumulasi 2.33 3.83 4.17
minggu 15 = 0.33 x 2.54 / 4.83 = 0.18
minggu 17 = 0.33 x 2.54 / 4.83 = 0.18
minggu 22 = 0.33 x 2.54 / 4.83 = 0.18

Minggu 19 Minggu 20
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6
XI PEKERJAAN INSTALASI AIR 2.21
11.1 Instalasi air Lantai 1 0.2
Pipa air bersih 0.2
Pipa air bekas 0.2
Pipa Pembuangan air AC 0.2
Pipa air kotor 0.2
Kloset duduk 0.2
Kran air 0.2
Shower 0.2
Floor Drain 0.2
Kitchen set 0.2
Wastafel 0.2
AC 0.2
11.2 Instalasi air Lantai 2
Pipa air bersih 0.2
Pipa air bekas 0.2
Pipa Pembuangan air AC 0.2
Pipa air kotor 0.2
Kloset duduk 0.2
Shower 0.2
Floor Drain 0.2
Wastafel 0.2
Pompa 0.2
Toren/Tandon Air 0.2
AC 0.2
Plotting/Bobot 2.21 1.25 0.96
minggu 19 = 2.17 x 2.21 / 3.83 = 1.25 Minggu ini 2.17 1.67
minggu 20 = 1.67 x 2.21 / 3.83 = 0.96 akumulasi 2.17 3.83

Minggu 21 Minggu 22
No Jenis Pekerjaan Bobot
1 2 3 4 5 6 1 2 3 4 5 6
XII PEKERJAAN FINISHING 2.70
12.1 Pekerjaan Pengecatan dinding 1 0.5
12.2 Pekerjaan Pengecatan Lisplank 0.5
Plotting/Bobot 2.70 2.03 0.68
minggu 20 = 1.50 x 2.70 / 2.00 = 2.03 Minggu ini 1.50 0.50
minggu 21 = 0.50 x 2.70 / 2.00 = 0.68 akumulasi 1.50 2.00

Minggu 22
No Jenis Pekerjaan Bobot
1 2 3 4 5 6
XIII PEKERJAAN LAIN-LAIN 3.93
13.1 Pekerjaan Septictank 0.2
13.2 Pekerjaan Sumur Resapan 0.2
13.3 Pekerjaan bak kontrol 0.2
13.4 Pekerjaan pipa saluran
A Pemasangan Pipa PVC (AW 4") 0.2
B Pemasangan Pipa PVC (AW 3") 0.2
13.5 Railing tangga dan void 0.2
13.6 Pagar beton 0.2
13.7 Set Wifi 0.2
13.8 Parabola 0.2
Plotting/Bobot 3.93 3.93
minggu 22 = 1.50 x 3.93 / 1.50 = 3.93 Minggu ini 1.50
akumulasi 1.50
Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 13 Minggu 14
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

0.3
0.8

0.3
0.3

0.2
0.2

0.2
0.2

0.3
0.3 0.2
0.3
0.5

0.2
0.2

0.3
0.5
3.81 0.85 2.54 2.54 1.69 2.12
1.50 0.33 1.00 1.00 0.67 0.83
5.33 5.67 6.67 7.67 8.33 9.17
Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

0.3 1.0 0.3

0.3

0.5
0.2 1.0 0.7

0.7
1 0.5
0.7

3.08 0.56 1.96 4.48 1.96


1.83 0.33 1.17 2.67 1.17
7.08 7.42 8.58 11.25 12.42
Minggu 17 Minggu 22
1 2 3 4 5 6 1 2 3 4 5 6

0.2
0.2
0.3
0.18 0.18
0.33 0.33
4.50 4.83
KURVA-S

Pekerjaan : Pembangunan Rumah 2 lantai


Lokasi : JL.Kemantren 3, Kota Malang, Jawa Timur

Bobot Mei Juni Juli Agustus


No Jenis Pekerjaan Jumlah
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
I Pek. Persiapan Rp 30,301,339.89 3.09 , 1,00 1,29
8
II Pek. Tanah dan Pondasi Rp 52,615,229.25 5.37 0,79 1,35 1,78 0,50 0,98

III Pek. Beton Rp 228,048,772.06 23.28 1,82 2,10 3,00 4,00 3,10 3,6 4,10 1,10

IV Pek. Pasangan Dinding Rp 204,487,012.72 20.87 1,80 0,30 2,90 8,00 3,70 2,32 1,10 0,95

V Pek. Atap Rp 85,093,442.49 8.69 0,40 3,20 2,80 2,29

VI Pek. Penutup Atap Rp 55,011,722.50 5.61 1,13 2,04 1,47 0,97

VII Pek. Lisplank & Plafond Rp 67,262,592.47 6.87 3,20 2,17 1,50

VIII Pek. Kusen Pintu & Jendela Rp 87,214,862.12 8.90 0,92 1,10 3,46 1,04 2,38

IX Pek. Keramik Rp 58,195,586.64 5.94 0,58 0,69 0.88 0,72 1,75

X Pek. Instalasi Listrik Rp 24,888,824.00 2.54 0,30 0,82 0,33

XI Pek. Instalasi Air Rp 21,680,308.16 2.21 0,20 0,26 0,52 0,44 0,42

XII Pek. Finishing Rp 26,493,283.09 2.70 0,33 0,80

XIII Pek. Lain-lain Rp 38,459,671.34 3.93 0,30 0,70

Jumlah Rp 979,752,646.7 100.00

Mingguan 0,8 2,56. 5,2 8,8 13,2 18,4 25,6 34,0 45,2 59,2 65,6 77,12 83,6 88,72 92,72
Rencana
Komulatif 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.88 0.00 0.00
Mingguan
Realisasi
Komulatif
Lebih Lambat (-)
Lbih Cepat (+)
Agustus
16 17 18
0.00 0.0 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1,32 0.88 0.88
0,36 0,60 0,13 0.00 0.00
0,24 0,13 0.00 0.00
0,40 0,56 0,61 0.00 0.00
1,20 0,60 1,13 0.00 0.00
100.00 0.88
96,0 98,0 100.00
0.00 0.00 0.00