REKAPITULASI

BILL OF QUANTITY (BQ)


ORGANISASI : KOTA ADMINISTRASI JAKARTA UTARA
PROGRAM : PROGRAM PENUNJANG URUSAN PEMERINTAHAN DAERAHPROVINSI
KEGIATAN : REHAB TOTAL KANTOR KECAMATAN KOJA
LOKASI : KECAMATAN KOJA
WILAYAH : KOTA ADMINISTRASI JAKARTA UTARA
TAHUN ANGGARAN : 2022

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

I. PEKERJAAN PENDAHULUAN
I.A Pekerjaan Persiapan
I.B Biaya K3
II. PEKERJAAN TANAH DAN PONDASI
III. PEKERJAAN STRUKTUR K.350 ( READY MIX )
A. PEKERJAAN BETON KOLOM, BALOK DAN PLAT
B. PEKERJAAN BETON TANGGA DARURAT
IV. PEKERJAAN ARSITEKTUR
V. PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
A. PEKERJAAN ELEKTRIKAL
B. PEKERJAAN PEMADAM KEBAKARAN
C. PEKERJAAN PLUMBING
D. PEKERJAAN PANEL SURYA
VI. PEKERJAAN DI LUAR GEDUNG

JUMLAH Rp.
PPN 11 % Rp.
VII. PENAMBAHAN DAYA LISTRIK 164 kVA
164,000.00 VA 1,300.00
JUMLAH TOTAL Rp.
DIBULATKAN Rp. 30,446,727,000.00
Terbilang : Tiga Puluh Milyar Empat Ratus Empat Puluh Enam Juta Tujuh Ratus Dua Puluh Tujuh Ribu Rupiah.

Jakarta, 2022

-1-
SUB REKAPITULASI
BILL OF QUANTITY (BQ)

ORGANISASI : KOTA ADMINISTRASI JAKARTA UTARA


PROGRAM : PROGRAM PENUNJANG URUSAN PEMERINTAHAN DAERAHPROVINSI
KEGIATAN : REHAB TOTAL KANTOR KECAMATAN KOJA
LOKASI : KECAMATAN KOJA
WILAYAH : KOTA ADMINISTRASI JAKARTA UTARA
TAHUN ANGGARAN : 2022

JUMLAH HARGA TOTAL JUMLAH


NO. URAIAN PEKERJAAN

( Rp. ) ( Rp. )

I. PEKERJAAN PENDAHULUAN
I.A Pekerjaan Persiapan
I.B Biaya K3

II. PEKERJAAN TANAH DAN PONDASI

III. PEKERJAAN STRUKTUR K.350 ( READY MIX )


III.A PEKERJAAN BETON KOLOM, BALOK DAN PLAT
a Lantai Satu
b Lantai Dua
c Lantai Tiga
d Lantai Empat
e Lantai Lima
f Lantai Dak atap

III.B PEKERJAAN BETON TANGGA DARURAT


a Lantai Satu ke Lantai Dua
b Lantai Dua ke Lantai Tiga
c Lantai Tiga ke Lantai Empat
d Lantai Empat ke Lantai Lima
e Lantai Lima ke Lantai Dak atap

IV. PEKERJAAN ARSITEKTUR


A. PEKERJAAN LANTAI, DINDING, PLESTERAN DAN KOLOM PRAKTIS
B. PEKERJAAN TANGGA
C. PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI LANTAI DASAR S/D ATAP
D. PEKERJAAN PLAFOND DAN RANGKA ATAP LANTAI DASAR S/D LANTAI ATAP
E. PEKERJAAN PENGECATAN LANTAI SATU S/D DAK ATAP

V. PEKERJAAN MEKANIKAL ELEKTRIKAL


1. PEKERJAAN ELEKTRIKAL
A. PEKERJAAN PANEL
B. PEKERJAAN KABEL
C. PEKERJAAN ARMATUR & LAMPU
D. PEKERJAAN SAKLAR, STOP KONTAK & RAK KABEL
E. PEKERJAAN INSTALASI KABEL LAMPU & STOP KONTAK
F. PEKERJAAN INSTALASI DATA
G. PEKERJAAN INSTALASI PENANGKAL PETIR
H. PEKERJAAN GENERATOR SET
I. PEKERJAAN INSTALASI AC
J. PEKERJAAN INSTALASI VENTILASI
K. PEKERJAAN RAK KABEL
L. PEKERJAAN INSTALASI FIRE ALRAM
M. PEKERJAAN INSTALSI TELEPON
N. PEKERJAAN INSTALASI TATA SUARA
O. PEKERJAAN INSTALASI CCTV
P. PEKERJAAN INSTALASI LIFT

2. PEKERJAAN PEMADAM KEBAKARAN


A. RUANG POMPA
B. PEKERJAAN HYDRANT DAN SPRINKLER

3. PEKERJAAN PLUMBING
A. PEKERJAAN INSTALASI POMPA
B. PEKERJAAN TANGKI ATAS & PEMIPAAN SHAFF
C. PEKERJAAN INSTALASI AIR BERSIH, BEKAS & KOTOR
D. PEKERJAAN FLOOR DRAIN & CLEAN OUT
E. PEKERJAAN SANITAIR
F. PEKERJAAN INSTALASI PEMIPAAN AIR HUJAN
G. PEKERJAAN STP

4. PEKERJAAN PANEL SURYA

VI. PEKERJAAN DILUAR GEDUNG

JUMLAH -

-2-
BILL OF QUANTITY (BQ)

ORGANISASI : KOTA ADMINISTRASI JAKARTA UTARA


PROGRAM : PROGRAM PENUNJANG URUSAN PEMERINTAHAN DAERAHPROVINSI
KEGIATAN : REHAB TOTAL KANTOR KECAMATAN KOJA
LOKASI : KECAMATAN KOJA
WILAYAH : KOTA ADMINISTRASI JAKARTA UTARA
TAHUN ANGGARAN : 2022

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

I. PEKERJAAN PENDAHULUAN
A. Pekerjaan Persiapan
1. Pasang papan nama proyek dari kaso,triplek,Digital Printing dan umpak beton 1.00 bh
2. Administrasi Proyek, Foto Dokumentasi, Shop Drawing dan As Build Drawing 1.00 ls
3. Pengukuran dan pasang bouwplank 118.00 m'
4. Pagar sementara seng gelombang tebal 020 mm 355.00 m'
t= 1.80 m pondasi 40 x 40 x 40 ad. 1pc : 3 ps : 5 kr -
5. Direksi keet dengan uk. 4x6 m 24.00 m2
6. Pemakaian listrik kerja 7.00 bln
7. Biaya Pemakaian air untuk adukan menggunakan air pam 7.00 bln
8. Pembuatan bedeng buruh dan gudang 48.00 m2
9. Pekerjaan tebang pohon Ø 60 cm s/d 100 cm -
- Tebang pohon Ø 60 cm s/d 100 cm 5.00 btg
- Pembuangan pohon yang telah ditebang keluar lokasi proyek jarak 10 km 2.00 mobil
10. Alat bantu kerja menggunakan mobilc crane kapasitas 10 ton 5.00 bln

Jumlah I.A
B. Biaya K3
A. Penyiapan RK3K terdiri atas:
a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan 1.00 Set
b Pembuatan Kartu Identitas Pekerja(KIP); 40.00 Org
B. Sosialisasi dan Promosi K3 terdiri atas: -
a Induksi K3 (Safety Induction ); khusus untuk pekerja baru 40.00 Org
b Spanduk (banner) ; 5.00 Lb
c Poster; 5.00 Lb
d Papan Informasi K3. 1.00 Bh
C. Alat Pelindung Kerja terdiri atas -
a Jaring Pengaman (Safety Net); 1.00 Ls
b Tali Keselamatan (Life Line); 1.00 Ls
c Penahan Jatuh (Safety Deck); 1.00 Ls
d Pagar Pengaman (Guard Railling); 1.00 Ls
e Pembatas Area (Restricted Area ). 1.00 Ls
D. Alat Pelindung Diri terdiri atas: -
a Topi Pelindung (Safety Helmet) ; 40.00 Bh
b Pelindung Mata (Goggles, Spectacles); 10.00 Psg
c Tameng Muka (Face Shield); 5.00 Bh
d Pelindung Pernafasan Dan Mulut (Masker Plastik); 40.00 Bh
e Sarung Tangan (Safety Gloves); 40.00 Psg
f Sepatu Keselamatan (Safety Shoes); untuk Staf 10.00 Psg
g Sepatu Keselamatan (Rubber Safety Shoes_andtoe cap) 40.00 Psg
h Penunjang Seluruh Tubuh (Full Body Harness); 10.00 Bh
h Rompi Keselamatan (Safety Vest); 40.00 Bh
i Celemek (Apron/Coveralls); 5.00 Bh
j Pelindung Jatuh (Fall Arrester); 10.00 Bh
E. Asuransi Dan Perijinan terdiri atas : -
BPJS Ketenagakerjaan Dan Kesehatan Kerja; (BERDASARKAN KEPMENAKER NOMOR : KEP-196/MEN/1999,
a 1.00 Ls
untuk Tenaga harian Proyek)
b Surat Ijin Kelaikan Alat berat; 1.00 Alat
F. Fasilitas sarana kesehatan -
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll); 1.00 Ls
c Peralatan Pengasapan (Fogging) ; 1.00 Bh
d Obat Pengasapan. 30.00 Kali
G. Rambu- Rambu terdiri atas : -
a Rambu-Rambu Petunjuk; 20.00 Bh
b Rambu Larangan; 8.00 Bh
c Rambu Peringatan; 8.00 Bh
d Rambu Kewajiban; 8.00 Bh
e Rambu Informasi; 3.00 Bh
f Rambu Pekerjaan Sementara; 10.00 Bh
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick) ; 4.00 Bh
j Kerucut Lalu Lintas (Traffic Cone) ; 5.00 Bh
i Lampu Putar (Rotary Lamp ); 2.00 Bh
H. Lain- Lain Terkait Pengendalian Risiko K3 -
a Alat Pemadam Api Ringan (APAR); 10Kg 2.00 Bh
b Sirine; 1.00 Bh
c Bendera K3; 2.00 Bh
d Jalur Evakuasi (Escape Route ); 1.00 Ls
e Lampu Darurat (Emergency Lamp ); 2.00 Bh
f Program Inspeksi, Pelaporan Dan Audit Internal; 1.00 Ls

Jumlah I.B
II. PEKERJAAN TANAH DAN PONDASI
1. Galian tanah pondasi dan pour sedalam 1 m' 197.06 m3

-3-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

2. Tiang pancang uk. 25x25 cm L = 24 m' 2,619.00 m'


3. Biaya pemancangan /m' menggunakan hidrolik 2,619.00 m'
4. Penyabungan tiang pancang ( 3 x sambungan ) 388.00 ttk
5. Bobok kepala tiang pancang uk. 25x25 cm 97.00 ttk
6. Mobilisasi dan Demobilisasi 1.00 ls
7. Loading tes PDA 2.00 lot
8. Urugan pasir tebal 10 cm dibawah sloof dan poer 77.10 m3
9. Beton lt. kerja 1pc:3ps:5 split dibawah sloof dan poer 38.55 m3
10. Pekerjaan Poor P2 -
- Beton K.400 ready mix 8.50 m3
- Besi beton 1,130.50 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 22.68 m2
11. Pekerjaan Poor P3 -
- Beton K.400 ready mix 7.12 m3
- Besi beton 818.80 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 14.69 m2
12. Pekerjaan Poor P4 -
- Beton K.400 ready mix 16.20 m3
- Besi beton 1,506.60 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 34.20 m2
13. Pekerjaan Poor P5 -
- Beton K.400 ready mix 13.50 m3
- Besi beton 1,255.50 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 28.50 m2
14. Pekerjaan Poor P6 -
- Beton K.400 ready mix 3.60 m3
- Besi beton 306.00 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 6.60 m2
15. Pekerjaan Poor P8 -
- Beton K.400 ready mix 7.20 m3
- Besi beton 612.00 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 13.20 m2
16. Balok S1 uk. (45/70 cm ) -
- Beton K.400 ready mix 5.97 m3
- Besi beton 1,588.02 kg
- Bekisting 21.96 m2
17. Balok S2 uk. (45/75 cm ) -
- Beton K.400 ready mix 14.11 m3
- Besi beton 2,060.06 kg
- Bekisting 51.92 m2
18. Balok S3 uk. (45/75 cm ) -
- Beton K.400 ready mix 22.43 m3
- Besi beton 3,633.66 kg
- Bekisting 82.54 m2
19. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 46.55 m3
- Besi beton 8,658.30 kg
- Bekisting 310.48 m2
20. Balok B6 uk. (20/30 cm ) -
- Beton K.400 ready mix 7.18 m3
- Besi beton 1,349.84 kg
- Bekisting 71.80 m2
21. Balok B7 uk. (15/25 cm ) -
- Beton K.400 ready mix 0.45 m3
- Besi beton 102.15 kg
- Bekisting 4.50 m2
21. Kolom K1 uk. 50 x50 cm Elv. - 1,70 s/d +0.00 m -
- Beton K.400 ready mix 8.92 m3
- Besi 2,372.72 kg
- Bekisting 71.36 m2
22. Kolom K2 uk. (20/40 cm) Elv. -170 s/d 0,00 m -
- Beton K.400 ready mix 0.27 m3
- Besi beton 106.11 kg
- Bekisting 4.05 m2
23. Kolom K3 uk. (30/30 cm) expose -
- Beton K.400 ready mix 0.15 m3
- Besi beton 45.30 kg
- Bekisting 2.25 m2
24. Kolom K4 uk. (40/40 cm ) -
- Beton K.400 ready mix 0.27 m3
- Besi beton 78.03 kg
- Bekisting 2.70 m2
25. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.20 m3
- Besi beton 84.00 kg
- Bekisting 2.00 m2
26. Beton bawah nol tebal 12 cm -
- Beton K.400 ready mix 60.11 m3
- Besi beton 7,453.64 kg
27. Dinding beton pit lift tebal 20 cm -
- Beton K.400 ready mix 2.26 m3
- Besi beton 474.60 kg
- Begesting 22.60 m2
28. Lantai beton pit lift tebal 20 cm -

-4-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Beton K.400 ready mix 1.44 m3


- Besi beton 162.72 kg
29. Pasang batu kosong ( anstaping ) tebal 20 cm 17.40 m3
30. Pasang pondasi batu kali ad. 1pc: 5ps 43.51 m3
31. Plesteran pondasi batu bagian arah jalan kali t 15 ad 1pc : 4ps 47.15 m2
32. Acian plesteran turap 47.15 m2
33. Pengurukan tanah bekas galian 28.91 m3
34. Peninggian pail dalam bangunan dengan tanah merah padatkan per 20 cm 602.34 m3
35. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 226.43 m3

Jumlah II.
III. PEKERJAAN STRUKTUR K.350 ( READY MIX )

III.A PEKERJAAN BETON KOLOM, BALOK DAN PLAT


a. Lantai Satu +El. 0,05 - 3,91
1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 20.79 m3
- Besi beton 3,305.61 kg
- Bekisting 166.32 m2
2. Kolom K2 uk. (20/40 cm) expose -
- Beton K.400 ready mix 0.63 m3
- Besi beton 151.83 kg
- Bekisting 9.45 m2
3. Kolom K3 uk. (30/30 cm) expose -
- Beton K.400 ready mix 1.42 m3
- Besi beton 262.70 kg
- Bekisting 21.30 m2
4. Kolom K4 uk. (40/40 cm ) -
- Beton K.400 ready mix 0.63 m3
- Besi beton 110.88 kg
- Bekisting 6.30 m2
5. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.47 m3
- Besi beton 150.40 kg
- Bekisting 4.70 m2
6. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 17.72 m3
- Besi beton 2,675.72 kg
- Bekisting 110.57 m2
7. Balok B2 uk. (35/60 cm ) -
- Beton K.400 ready mix 22.17 m3
- Besi beton 4,345.32 kg
- Bekisting 138.34 m2
8. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 28.65 m3
- Besi beton 5,328.90 kg
- Bekisting 203.70 m2
9. Balok B6 uk. (20/30 cm ) -
- Beton K.400 ready mix 1.63 m3
- Besi beton 306.44 kg
- Bekisting 15.20 m2
10. Beton janggutan uk. (15/36 cm ) -
- Beton K.400 ready mix 0.33 m3
- Besi beton 45.54 kg
- Bekisting 4.40 m2
11. Beton janggutan uk. (12/55 cm ) -
- Beton K.400 ready mix 1.33 m3
- Besi beton 256.69 kg
- Bekisting 22.16 m2
12. Balok BL uk. (20/35 cm ) -
- Beton K.400 ready mix 0.56 m3
- Besi beton 106.96 kg
- Bekisting 7.20 m2
13. Balok uk. (15/20 cm ) -
- Beton K.400 ready mix 0.50 m3
- Besi beton 88.50 kg
- Bekisting 5.16 m2
14. Plat lantai beton tebal 12 cm =el. 3,91 -
- Beton K.400 ready mix 53.45 m3
- Besi beton 8,391.65 kg
- Bekisting 445.41 m2
15. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 150.28 m3

Jumlah III.A.a
b. Lantai Dua el. +3,91 -7.87
1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 20.79 m3
- Besi beton 3,305.61 kg
- Bekisting 166.32 m2
2. Kolom K2 uk. (20/40 cm) expose -
- Beton K.400 ready mix 0.63 m3
- Besi beton 151.83 kg
- Bekisting 9.45 m2
3. Kolom K4 uk. (40/40 cm ) -

-5-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Beton K.400 ready mix 0.63 m3


- Besi beton 110.88 kg
- Bekisting 6.30 m2
4. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.47 m3
- Besi beton 150.40 kg
- Bekisting 4.70 m2
5. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 18.87 m3
- Besi beton 2,849.37 kg
- Bekisting 117.74 m2
6. Balok B2 uk. (35/60 cm ) -
- Beton K.400 ready mix 21.02 m3
- Besi beton 4,119.92 kg
- Bekisting 131.16 m2
7. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 28.91 m3
- Besi beton 5,377.26 kg
- Bekisting 205.55 m2
8. Beton jenggutan uk. (15/36 cm ) -
- Beton K.400 ready mix 0.33 m3
- Besi beton 45.54 kg
- Bekisting 4.40 m2
9. Beton jenggutan uk. (12/55 cm ) -
- Beton K.400 ready mix 1.33 m3
- Besi beton 256.69 kg
- Bekisting 22.16 m2
10. Balok BL uk. (20/35 cm ) -
- Beton K.400 ready mix 0.56 m3
- Besi beton 106.96 kg
- Bekisting 7.20 m2
11. Balok uk. (15/20 cm ) -
- Beton K.400 ready mix 0.50 m3
- Besi beton 88.50 kg
- Bekisting 5.16 m2
12. Plat lantai beton tebal 12 cm =el. 7,87 -
- Beton K.400 ready mix 42.71 m3
- Besi beton 6,705.47 kg
- Bekisting 355.91 m2
13. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 382.56 m3

Jumlah III.A.b

c. Lantai Tiga + el. 7.87 - 11,83


1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 20.79 m3
- Besi beton 3,305.61 kg
- Bekisting 166.32 m2
2. Kolom K2 uk. (20/40 cm) expose -
- Beton K.400 ready mix 0.63 m3
- Besi beton 151.83 kg
- Bekisting 9.45 m2
3. Kolom K4 uk. (40/40 cm ) -
- Beton K.400 ready mix 0.63 m3
- Besi beton 110.88 kg
- Bekisting 6.30 m2
4. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.47 m3
- Besi beton 150.40 kg
- Bekisting 4.70 m2
5. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 17.72 m3
- Besi beton 2,675.72 kg
- Bekisting 110.57 m2
6. Balok B2 uk. (35/60 cm ) -
- Beton K.400 ready mix 21.02 m3
- Besi beton 4,119.92 kg
- Bekisting 131.16 m2
7. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 28.91 m3
- Besi beton 5,377.26 kg
- Bekisting 205.55 m2
8. Beton pot uk. (15/52 cm ) -
- Beton K.400 ready mix 0.44 m3
- Besi beton 58.08 kg
- Bekisting 5.86 m2
9. Beton jenggutan uk. (10/56 cm ) -
- Beton K.400 ready mix 0.32 m3
- Besi beton 36.48 kg
- Bekisting 6.40 m2
10. Beton jenggutan uk. (15/36 cm ) -
- Beton K.400 ready mix 0.33 m3
- Besi beton 45.54 kg
- Bekisting 4.40 m2

-6-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

11. Beton jenggutan uk. (12/55 cm ) -


- Beton K.400 ready mix 1.33 m3
- Besi beton 256.69 kg
- Bekisting 22.16 m2
12. Balok BL uk. (20/35 cm ) -
- Beton K.400 ready mix 0.56 m3
- Besi beton 106.96 kg
- Bekisting 7.20 m2
13. Balok uk. (15/20 cm ) -
- Beton K.400 ready mix 0.50 m3
- Besi beton 88.50 kg
- Bekisting 5.16 m2
14. Plat lantai beton tebal 12 cm =el. 11.83 -
- Beton K.400 ready mix 42.02 m3
- Besi beton 6,597.14 kg
- Bekisting 350.16 m2
15. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 135.67 m3

Jumlah III.A.c
d. Lantai Empat + el. 11.83 - 15,79
1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 20.79 m3
- Besi beton 3,305.61 kg
- Bekisting 166.32 m2
2. Kolom K2 uk. (20/40 cm) expose -
- Beton K.400 ready mix 0.63 m3
- Besi beton 151.83 kg
- Bekisting 9.45 m2
3. Kolom K4 uk. (40/40 cm ) -
- Beton K.400 ready mix 0.63 m3
- Besi beton 110.88 kg
- Bekisting 6.30 m2
4. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.47 m3
- Besi beton 150.40 kg
- Bekisting 4.70 m2
5. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 17.72 m3
- Besi beton 2,675.72 kg
- Bekisting 110.57 m2
6. Balok B2 uk. (35/60 cm ) -
- Beton K.400 ready mix 21.02 m3
- Besi beton 4,119.92 kg
- Bekisting 131.16 m2
7. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 28.91 m3
- Besi beton 5,377.26 kg
- Bekisting 205.55 m2
8. Beton pot uk. (15/52 cm ) -
- Beton K.400 ready mix 0.44 m3
- Besi beton 58.08 kg
- Bekisting 5.86 m2
9. Beton jenggutan uk. (10/56 cm ) -
- Beton K.400 ready mix 0.32 m3
- Besi beton 36.48 kg
- Bekisting 6.40 m2
10. Beton jenggutan uk. (15/36 cm ) -
- Beton K.400 ready mix 0.33 m3
- Besi beton 45.54 kg
- Bekisting 4.40 m2
11. Beton jenggutan uk. (12/55 cm ) -
- Beton K.400 ready mix 1.33 m3
- Besi beton 256.69 kg
- Bekisting 22.16 m2
8. Balok BL uk. (20/35 cm ) -
- Beton K.400 ready mix 1.12 m3
- Besi beton 213.92 kg
- Bekisting 14.40 m2
9. Balok uk. (15/20 cm ) -
- Beton K.400 ready mix 0.50 m3
- Besi beton 88.50 kg
- Bekisting 5.16 m2
9. Plat lantai beton tebal 12 cm =el. 15.79 -
- Beton K.400 ready mix 42.02 m3
- Besi beton 6,597.14 kg
- Bekisting 350.16 m2
10. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 136.23 m3

Jumlah III.A.d
e. Lantai Lima + el. 15.79 - 20.47
1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 17.82 m3
- Besi beton 2,833.38 kg
- Bekisting 142.56 m2
2. Kolom K2 uk. (20/40 cm) expose -

-7-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Beton K.400 ready mix 0.63 m3


- Besi beton 151.83 kg
- Bekisting 9.45 m2
3. Kolom K4 uk. (40/40 cm ) -
- Beton K.400 ready mix 0.63 m3
- Besi beton 110.88 kg
- Bekisting 6.30 m2
4. Kolom KL uk. (20/40/40 cm ) -
- Beton K.400 ready mix 0.47 m3
- Besi beton 150.40 kg
- Bekisting 4.70 m2
5. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 12.10 m3
- Besi beton 1,827.10 kg
- Bekisting 75.50 m2
6. Balok B2 uk. (35/60 cm ) -
- Beton K.400 ready mix 18.11 m3
- Besi beton 3,549.56 kg
- Bekisting 113.00 m2
7. Balok B3 uk. (45/70 cm ) -
- Beton K.400 ready mix 3.30 m3
- Besi beton 561.00 kg
- Bekisting 16.86 m2
8. Balok B4 uk. (45/70 cm ) -
- Beton K.400 ready mix 17.13 m3
- Besi beton 2,363.94 kg
- Bekisting 87.53 m2
9. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 10.00 m3
- Besi beton 1,860.00 kg
- Bekisting 71.10 m2
10. Beton pot uk. (15/52 cm ) -
- Beton K.400 ready mix 0.44 m3
- Besi beton 58.08 kg
- Bekisting 5.86 m2
11. Beton jenggutan uk. (10/56 cm ) -
- Beton K.400 ready mix 0.32 m3
- Besi beton 36.48 kg
- Bekisting 6.40 m2
12. Beton jenggutan uk. (15/36 cm ) -
- Beton K.400 ready mix 0.33 m3
- Besi beton 45.54 kg
- Bekisting 4.40 m2
13. Beton jenggutan uk. (12/55 cm ) -
- Beton K.400 ready mix 1.33 m3
- Besi beton 256.69 kg
- Bekisting 22.16 m2
14. Balok BL uk. (20/35 cm ) -
- Beton K.400 ready mix 0.56 m3
- Besi beton 106.96 kg
- Bekisting 7.20 m2
15. Plat lantai beton tebal 12 cm =el. 20.47 -
- Beton K.400 ready mix 22.96 m3
- Besi beton 3,604.72 kg
- Bekisting 191.33 m2
16. Dinding parapet dari beton tebal 20 cm =el. 20.47 -
- Beton K.400 ready mix 16.64 m3
- Besi beton 2,312.96 kg
- Bekisting 166.40 m2
17. Beton tanggul tinggi 40 cm tebal 10 cm =el. 20.47 -
- Beton K.400 ready mix 2.25 m3
- Besi beton 337.50 kg
- Bekisting 22.50 m2
18. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 106.13 m3

Jumlah III.A.e
f. Lantai Dak atap + el. 20.47 - 23.07
1. Kolom K1 uk. (50/50 cm) expose
- Beton K.400 ready mix 3.90 m3
- Besi beton 620.10 kg
- Bekisting 31.20 m2
2. Kolom pedestal uk. (405/40 cm ) -
- Beton K.400 ready mix 1.56 m3
- Besi beton 499.20 kg
- Bekisting 21.38 m2
3. Balok B1 uk. (35/60 cm ) -
- Beton K.400 ready mix 7.72 m3
- Besi beton 1,165.72 kg
- Bekisting 48.17 m2
4. Balok B5 uk. (30/45 cm ) -
- Beton K.400 ready mix 4.91 m3
- Besi beton 913.26 kg
- Bekisting 30.63 m2
5. Balok B6 uk. (20/30 cm ) -
- Beton K.400 ready mix 0.29 m3
- Besi beton 54.52 kg

-8-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Bekisting 2.70 m2
6. Plat lantai beton tebal 12 cm =el. 23,07 -
- Beton K.400 ready mix 10.14 m3
- Besi beton 1,591.98 kg
- Bekisting 67.60 m2
7. Concrete pump ( pompa )15 - 45 m3 sewa / 8 jam 1.00 kali

Jumlah III.A.f

Jumlah III.A.
III.B PEKERJAAN BETON TANGGA DARURAT
a. Lantai Satu ke Lantai Dua
1. Beton plat tangga K.300
- Beton K.400 ready mix 4.81 m3
- Besi beton 724.81 kg
- Bekisting 32.06 m2
2. Beton trap tangga -
- Beton K.400 ready mix 1.57 m3
- Besi beton 252.81 kg
- Begesting 10.47 m2
3. Balok Bordes B6 uk. (20/40 ) -
- Beton K.400 ready mix 0.38 m3
- Besi 59.82 kg
- Bekisting 3.61 m2

Jumlah III.C.a
b. Lantai Dua ke Lantai Tiga
1. Beton plat tangga K.300
- Beton K.400 ready mix 4.96 m3
- Besi beton 747.42 kg
- Bekisting 33.06 m2
2. Beton trap tangga -
- Beton K.400 ready mix 1.57 m3
- Besi beton 252.81 kg
- Bekisting 10.47 m2
3. Balok Bordes B6 uk. (20/40 ) -
- Beton K.400 ready mix 0.38 m3
- Besi 59.82 kg
- Bekisting 3.61 m2

Jumlah III.C.b
c. Lantai Tiga ke Lantai Empat
1. Beton plat tangga K.300
- Beton K.400 ready mix 4.96 m3
- Besi beton 747.42 kg
- Bekisting 33.06 m2
2. Beton trap tangga -
- Beton K.400 ready mix 1.57 m3
- Besi beton 252.81 kg
- Bekisting 10.47 m2
3. Balok Bordes B6 uk. (20/40 ) -
- Beton K.400 ready mix 0.38 m3
- Besi 59.82 kg
- Bekisting 3.61 m2

Jumlah III.C.c
d. Lantai Empat ke Lantai Lima
1. Beton plat tangga K.300
- Beton K.400 ready mix 4.96 m3
- Besi beton 747.42 kg
- Bekisting 33.06 m2
2. Beton trap tangga -
- Beton K.400 ready mix 1.57 m3
- Besi beton 252.81 kg
- Bekisting 10.47 m2
3. Balok Bordes B6 uk. (20/40 ) -
- Beton K.400 ready mix 0.38 m3
- Besi 59.82 kg
- Bekisting 3.61 m2

Jumlah III.C.d
e. Lantai Lima ke Dak atap
1. Beton plat tangga K.300
- Beton K.400 ready mix 4.96 m3
- Besi beton 747.42 kg
- Bekisting 33.06 m2
2. Beton trap tangga -
- Beton K.400 ready mix 1.57 m3
- Besi beton 252.81 kg
- Bekisting 10.47 m2
3. Balok Bordes B6 uk. (20/40 ) -
- Beton K.400 ready mix 0.38 m3
- Besi 59.82 kg
- Bekisting 3.61 m2

Jumlah III.C.e

Jumlah III.C.

-9-
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Jumlah III.
IV. PEKERJAAN ARSITEKTUR

A. PEKERJAAN LANTAI, DINDING, PLESTERAN DAN KOLOM PRAKTIS

a. Lantai Dasar
1. Pas. bata ringan tebal 10 cm 512.49 m2
2. Plesteran dinding Hebel, tebal 10 mm 943.14 m2
3. Acian plesteran dinding dengan semen mortar 943.14 m2
4. Acian kolom & tangga dengan semen mortar 142.13 m2
5. Pasang keramik lantai uk. 60x60 cm homogeneous tile 332.36 m2
6. Pasang keramik lantai ruang & teras uk. 60x60 cm homogeneous unpolished 142.03 m2
7. Pasang keramik trap tangga dari 0,00 ke halaman uk. 20x60 cm unpolished 9.63 m2
8. Pasang keramik step nosing uk.10x60 cm granit 5.53 m'
9. Pasang keramik lantai toilet uk. 30x30 cm roman unpolished 35.00 m2
10. Pasang keramik dinding toilet uk. 30x60 cm roman 81.84 m'
11. Pasang keramik plint uk. 10x60 cm homogeneous polished 137.83 m'
12. Pasang batu alam uk. 30x30 cm 22.80 m2
13. Pasang lantai screed 70.43 m2
14. Pasang roeter beton uk.20x20 cm 30.72 m2
15. Meja wastafel toilet wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
16. Meja wastafel toilet pria terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
17. Meja wastafel toilet paud terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
18. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 2.06 m3
- Besi beton 339.90 kg
- Bekisting 17.86 m2
19. Beton ring balok praktis atas kusen uk.13x18 K.175 -
- Beton K.175 1.41 m3
- Besi beton 238.29 kg
- Bekisting 12.22 m2
20. Pasang Backdrop PTSP lengkap disesuaikan dengan gambar 1.00 unit
21. Pasang meja backdrop PTSP lengkap sesuai gambar 1.00 unit
22. Pas. dinding partisi GRC t= 6 mm rangka hollow galvanis uk.40x40x0,4 mm pembungkus kolom 12.74 m2
23. Pas. dinding partisi Type rangka CS Stud Gypsum 12 mm double 71.63 m2
24. Pasang plin alumunium 48.36 m'
25. Railing pipa stainless M 304 Ø 2" di dinding toilet cacat 50.40 m'
26. Pasang Con wood motif kayu rangka besi hollow 40x40x1,2 mm dari Lt. 1 s/d 5 217.46 m2

Jumlah IV.A.a
b. Lantai Dua
1. Pas. bata ringan tebal 10 cm 422.54 m2
2. Plesteran dinding Hebel, tebal 10 mm 773.76 m2
3. Acian plesteran dinding dengan semen mortar 773.76 m2
4. Acian kolom & tangga dengan semen mortar 111.63 m2
5. Pasang keramik lantai uk. 60x60 cm homogeneous tile polished 338.46 m2
6. Pasang keramik lantai ruang & teras uk. 60x60 cm homogeneous unpolished 61.97 m2
7. Pasang keramik lantai toilet + janitor uk. 30x30 cm roman unpolished 23.46 m2
8. Pasang keramik dinding toilet + janitor uk. 30x60 cm roman 71.32 m2
9. Pasang keramik plint uk. 10x60 cm homogeneous polished 112.10 m'
10. Meja wastafel toilet wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
11. Meja wastafel toilet pria terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
12. Meja wastafel toilet camat terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
13. Pasang roeter beton uk.20x20 cm 11.52 m2
14. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 2.40 m3
- Besi beton 396.00 kg
- Bekisting 20.80 m2
15. Beton ring balok praktis atas kusen uk.13x18 cm K.175 -
- Beton K.175 1.41 m3
- Besi beton 238.29 kg
- Bekisting 12.22 m2
16. Water proofing coating toilet + dak outdoor AC 60.05 m2
17. Pas. LOGO DKI dari stainless steel tebal plat 1 mm 1.00 unit
18. Pas. huruf KANTOR CAMAT KOJA tinggi 30 cm 15.00 bh
19. Pasand sirip dari GRC t= 9 mm rangka hollow galvanis uk.40x40x0,7 mm 130.86 m2
20. Pas. dinding partisi GRC t= 6 mm rangka hollow galvanis uk.40x40x0,4 mm pembungkus kolom 15.25 m2
21. Pas. dinding partisi Type rangka CS Stud Gypsum 12 mm double 62.93 m2
22. Pasang wall paper dinding partisi 125.86 m2
23. Pasang plin alumunium 90.56 m'
24. Pasang pasang papan 2 x 10 cm finishing melamik 22.00 m'
24. Pasang Con wood motif kayu rangka besi hollow 40x40x1,2 mm dari Lt. 2 s/d 5 48.02 m2
24. Railing void dari stainless stell SS 304 hollow uk. 60x40 mm + kaca tempered tebal 8 mm sesuai gambar 1.00 unit

Jumlah IV.A.b
c. Lantai Tiga
1. Pas. bata ringan tebal 10 cm 403.72 m2
2. Plesteran dinding Hebel, tebal 10 mm 749.35 m2
3. Acian plesteran dinding dengan semen mortar 749.35 m2
4. Acian kolom & tangga dengan semen mortar 117.46 m2
5. Pasang keramik lantai uk. 60x60 cm setara homogeneous tile polished 351.77 m2
6. Pasang keramik lantai ruang & teras uk. 60x60 cm homogeneous unpolished 61.97 m2
7. Pasang keramik lantai toilet uk. 30x30 cm roman unpolished 23.46 m2

- 10 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

8. Pasang keramik dinding toilet uk. 30x60 cm roman 58.09 m2


9. Pasang keramik plint uk. 10x60 cm homogeneous polished 91.25 m'
10. Meja wastafel toilet wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
11. Meja wastafel pria wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
12. Pasang roeter beton uk.20x20 cm 11.52 m2
13. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 2.25 m3
- Besi beton 371.25 kg
- Bekisting 19.50 m2
14. Beton ring balok praktis atas kusen uk.13x18 K.175 -
- Beton K.175 1.39 m3
- Besi beton 234.91 kg
- Bekisting 12.05 m2
15. Water proofing coating toilet + dak outdoor AC 55.37 m2
16. Pasand sirip dari GRC t= 9 mm rangka hollow galvanis uk.40x40x0,7 mm 130.86 m2
17. Pas. dinding partisi GRC t= 6 mm rangka hollow galvanis uk.40x40x0,4 mm pembungkus kolom 13.91 m2
18. Pas. dinding partisi Type rangka CS Stud Gypsum 12 mm double 89.27 m2
19. Pasang pasang papan 2 x 10 cm finishing melamik 41.40 m'
20. Pasang plin alumunium 108.04 m'
21. Pasang dinding partisi dari kaca clear tebal 10 mm rangka kusen alumunium 4" dan sanblast 35.25 m2
22. Pasang sanblast partisi kaca 15.47 m2
23. Pasang GRC motif betawi nempel didinding tebal 10 mm dari Lantai 3 s/d 5 50.05 m2

Jumlah IV.A.c
d. Lantai Empat
1. Pas. bata ringan tebal 10 cm 393.42 m2
2. Plesteran dinding Hebel, tebal 10 mm 728.75 m2
3. Acian plesteran dinding dengan semen mortar 728.75 m2
4. Acian kolom & tangga dengan semen mortar 117.46 m2
5. Pasang keramik lantai uk. 60x60 setara homogeneous tile polished 351.77 m2
6. Pasang keramik lantai ruang & teras uk. 60x60 cm homogeneous unpolished 61.97 m2
7. Pasang keramik lantai toilet uk. 30x30 cm roman unpolished 23.46 m2
8. Pasang keramik dinding toilet uk. 30x60 cm roman 58.09 m2
9. Pasang keramik plint uk.10x60 cm setara homogeneous polished 99.75 m'
10. Meja wastafel toilet wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
11. Meja wastafel pria wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
12. Pasang roeter beton uk.20x20 cm 11.52 m2
13. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 2.25 m3
- Besi beton 371.25 kg
- Bekisting 19.50 m2
14. Beton ring balok praktis atas kusen uk.13x18 K.175 -
- Beton K.175 1.24 m3
- Besi beton 209.56 kg
- Bekisting 10.75 m2
15. Water proofing coating toilet + dak outdoor AC 55.37 m2
16. Pasand sirip dari GRC t= 9 mm rangka hollow galvanis uk.40x40x0,7 mm 130.86 m2
17. Pas. dinding partisi GRC t= 6 mm rangka hollow galvanis uk.40x40x0,4 mm pembungkus kolom 13.91 m2
18. Pasang dinding partisi dari kaca clear tebal 10 mm rangka kusen alumunium 4" dan sanblast 140.76 m2
19. Pasang sanblast partisi kaca 61.79 m2

Jumlah IV.A.d

e. Lantai Lima
1. Pas. bata ringan tebal 10 cm 504.35 m2
2. Plesteran dinding Hebel, tebal 10 mm 950.61 m2
3. Acian plesteran dinding dengan semen mortar 950.61 m2
4. Acian kolom & tangga dengan semen mortar 117.46 m2
5. Pasang keramik lantai uk. 60x60 cm homogeneous tile polished 351.77 m2
6. Pasang keramik lantai ruang & teras uk. 60x60 cm homogeneous unpolished 61.97 m2
7. Pasang keramik lantai toilet uk. 30x30 cm roman unpolished 23.46 m2
8. Pasang keramik dinding toilet uk. 30x60 cm roman 58.09 m2
9. Pasang keramik plint uk.10x60 cm homogeneous polished 146.75 m'
10. Meja wastafel toilet wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
11. Meja wastafel pria wanita terdiri dari beton,keramik uk. 60x60 cm 1.00 unit
12. Pasang roeter beton uk.20x20 cm 11.52 m2
13. Kolom K5 uk. (15/30 cm ) -
- Beton K.175 9.43 m3
- Besi beton 2,008.59 kg
- Bekisting 141.45 m2
14. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 2.32 m3
- Besi beton 382.80 kg
- Bekisting 20.11 m2
15. Beton ring balok praktis atas kusen uk.13x18 K.175 -
- Beton K.175 1.42 m3
- Besi beton 239.98 kg
- Bekisting 12.31 m2
16. Water proofing coating toilet + dak outdoor AC 55.37 m2
17. Pas. dinding partisi GRC t= 6 mm rangka hollow galvanis uk.40x40x0,4 mm pembungkus kolom 13.91 m2
18. Pas. Backdrop aula serbaguna lengkap sesuai gambar 1.00 unit

Jumlah IV.A.e
g. Lantai Dak atap

- 11 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

1. Pas. bata ringan tebal 10 cm 68.09 m2


2. Plesteran dinding Hebel, tebal 10 mm 136.18 m2
3. Acian plesteran dinding dengan semen mortar 136.18 m2
4. Acian kolom & tangga dengan semen mortar 14.82 m2
5. Pasang keramik lantai ruang uk. 60x60 cm homogeneous unpolished 34.56 m2
6. Pasang lantai screed 311.79 m2
7. Pasang keramik plint uk.10x60 cm homogeneous polished 18.90 m'
8. Pasang roeter beton uk.20x20 cm 2.88 m2
9. Kolom praktis uk.12x12 cm K. 175 -
- Beton K.175 0.34 m3
- Besi beton 56.10 kg
- Bekisting 2.94 m2
10. Waterproofing Membran 2 lapis + granule dak beton 250.05 m2
11. Waterproofing Membran 2 lapis + granule dak beton ruang mesin 95.21 m2

Jumlah IV.A.g

Jumlah IV.A.
B. PEKERJAAN TANGGA

a. Lantai satu ke dua


1. Pasang keramik uk. 20x60 setara homogeneous 24.95 m2
2. Pasang keramik nosing uk.10x60 setara homogeneous 71.30 m'
3. Pasang keramik lantai uk. 60x60 setara homogeneous tile polished 7.66 m2
4. Railing tangga dari pipa stainless M 304 Ø 2,5" & Ø 1" t=1,5 mm + cincin dop 35.85 m'
- Jumlah IV.B.a
b. Lantai dua ke tiga -
1. Pasang keramik uk. 20x60 setara homogeneous 24.95 m2
2. Pasang keramik step nosing uk.10x60 setara granite 71.30 m'
3. Pasang keramik lantai uk. 60x60 setara homogeneous tile polished 7.66 m2
4. Railing tangga dari pipa stainless M 304 Ø 2,5" & Ø 1" t=1,5 mm + cincin dop 35.50 m'
- Jumlah IV.B.b
c. Lantai tiga ke empat -
1. Pasang keramik uk. 20x60 setara homogeneous 24.95 m2
2. Pasang keramik step nosing uk.10x60 setara granite 71.30 m'
3. Pasang keramik lantai uk. 60x60 setara homogeneous polished 7.66 m2
4. Railing tangga dari pipa stainless M 304 Ø 2,5" & Ø 1" t=1,5 mm + cincin dop 35.50 m'
- Jumlah IV.B.c
d. Lantai empat ke lima -
1. Pasang keramik uk. 20x60 setara homogeneous 24.95 m2
2. Pasang keramik step nosing uk.10x60 setara granite 71.30 m'
3. Pasang keramik lantai uk. 60x60 setara homogeneous polished 7.66 m2
4. Railing tangga dari pipa stainless M 304 Ø 2,5" & Ø 1" t=1,5 mm + cincin dop 35.50 m'

Jumlah IV.B.d
e. Lantai Lima ke dak atap
1. Pasang keramik uk. 20x60 setara homogeneous 13.28 m2
2. Pasang keramik step nosing uk.10x60 setara granite 37.95 m'
3. Pasang keramik lantai uk. 60x60 setara homogeneous polished 4.14 m2
4. Railing tangga dari pipa stainless M 304 Ø 2,5" & Ø 1" t=1,5 mm + cincin dop 19.95 m'
Jumlah IV.B.e

Jumlah IV.B.
C. PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI LANTAI DASAR S/D ATAP

a. Lantai Satu
1. Pintu P1 lengkap dengan asesories 4.00 unit
2. Pintu P2 lengkap dengan asesories 3.00 unit
3. Pintu P4 lengkap dengan asesories 1.00 unit
4. Pintu P5 lengkap dengan asesories 1.00 unit
5. Pintu PD lengkap dengan asesories 1.00 unit
6. Pintu PF lengkap dengan asesories 6.00 unit
7. Pintu PT lengkap dengan asesories 1.00 unit
8. Pintu PT2 lengkap dengan asesories 1.00 unit
9. Pintu PS1 lengkap dengan asesories 1.00 unit
10. Pintu PS2 lengkap dengan asesories 1.00 unit
11. Pintu PB1 lengkap dengan asesories 5.00 unit
12. Pintu PB2 lengkap dengan asesories 1.00 unit
13. Pintu PB4 lengkap dengan asesories 2.00 unit
14. Pintu PJ1 lengkap dengan asesories 1.00 unit
15. Pintu PJ2 lengkap dengan asesories 1.00 unit
16. Pintu PJ3 lengkap dengan asesories 1.00 unit
17. Pintu PJ4 lengkap dengan asesories 1.00 unit
18. Pintu PJ6 lengkap dengan asesories 1.00 unit
19. Jendela J1 lengkap dengan asesories 1.00 unit
20. Jendela J3 lengkap dengan asesories 3.00 unit
21. Jendela J4 lengkap dengan asesories 2.00 unit
22. Jendela J4' lengkap dengan asesories 1.00 unit
23. Jendela JU lengkap dengan asesories 1.00 unit
24. Jendela JS lengkap dengan asesories 2.00 unit
25. Bouvenlich BV1 lengkap asesories 1.00 unit
26. Bouvenlich BV2 lengkap asesories 2.00 unit

Jumlah IV.C.a

- 12 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

b. Lantai Dua
1. Pintu P1 lengkap dengan asesories 7.00 unit
2. Pintu P2 lengkap dengan asesories 2.00 unit
3. Pintu PF lengkap dengan asesories 5.00 unit
4. Pintu PF2 lengkap dengan asesories 2.00 unit
5. Pintu PF3 lengkap dengan asesories 2.00 unit
6. Pintu PT lengkap dengan asesories 1.00 unit
7. Pintu PT2 lengkap dengan asesories 1.00 unit
8. Pintu PS1 lengkap dengan asesories 1.00 unit
9. Pintu PS2 lengkap dengan asesories 1.00 unit
10. Pintu PB1 lengkap dengan asesories 3.00 unit
11. Pintu PB2 lengkap dengan asesories 1.00 unit
12. Jendela J1' lengkap dengan asesories 2.00 unit
13. Jendela J2 lengkap dengan asesories 1.00 unit
14. Jendela J4 lengkap dengan asesories 2.00 unit
15. Jendela J5 lengkap dengan asesories 1.00 unit
16. Jendela J6 lengkap dengan asesories 2.00 unit
17. Jendela J7 lengkap dengan asesories 8.00 unit
18. Jendela J10 lengkap dengan asesories 1.00 unit
19. Jendela JU' lengkap dengan asesories 1.00 unit
20. Jendela JS lengkap dengan asesories 4.00 unit
21. Bouvenlich BV2 lengkap asesories 2.00 unit

Jumlah IV.C.b

c. Lantai Tiga
1. Pintu P1 lengkap dengan asesories 4.00 unit
2. Pintu P2 lengkap dengan asesories 2.00 unit
3. Pintu PF lengkap dengan asesories 3.00 unit
4. Pintu PF2 lengkap dengan asesories 1.00 unit
5. Pintu PT lengkap dengan asesories 1.00 unit
6. Pintu PT2 lengkap dengan asesories 1.00 unit
7. Pintu PS1 lengkap dengan asesories 1.00 unit
8. Pintu PS2 lengkap dengan asesories 1.00 unit
9. Pintu PB1 lengkap dengan asesories 3.00 unit
10. Pintu PB2 lengkap dengan asesories 1.00 unit
11. Pintu PJ5 lengkap dengan asesories 1.00 unit
12. Jendela J1' lengkap dengan asesories 2.00 unit
13. Jendela J2 lengkap dengan asesories 1.00 unit
14. Jendela J4 lengkap dengan asesories 2.00 unit
15. Jendela J6 lengkap dengan asesories 2.00 unit
16. Jendela J7 lengkap dengan asesories 8.00 unit
17. Jendela J10 lengkap dengan asesories 1.00 unit
18. Jendela JU' lengkap dengan asesories 1.00 unit
19. Jendela JS lengkap dengan asesories 4.00 unit
20. Bouvenlich BV2 lengkap asesories 2.00 unit

Jumlah IV.C.c
d. Lantai Empat
1. Pintu P1 lengkap dengan asesories 3.00 unit
2. Pintu P2 lengkap dengan asesories 2.00 unit
3. Pintu PF lengkap dengan asesories 7.00 unit
4. Pintu PF2 lengkap dengan asesories 2.00 unit
5. Pintu PT lengkap dengan asesories 1.00 unit
6. Pintu PT2 lengkap dengan asesories 1.00 unit
7. Pintu PS1 lengkap dengan asesories 1.00 unit
8. Pintu PS2 lengkap dengan asesories 1.00 unit
9. Pintu PB1 lengkap dengan asesories 3.00 unit
10. Pintu PB2 lengkap dengan asesories 1.00 unit
11. Jendela J1' lengkap dengan asesories 2.00 unit
12. Jendela J2 lengkap dengan asesories 1.00 unit
13. Jendela J4 lengkap dengan asesories 2.00 unit
14. Jendela J5' lengkap dengan asesories 1.00 unit
15. Jendela J6 lengkap dengan asesories 2.00 unit
16. Jendela J7 lengkap dengan asesories 8.00 unit
17. Jendela J10 lengkap dengan asesories 1.00 unit
18. Jendela JU' lengkap dengan asesories 1.00 unit
19. Jendela JS lengkap dengan asesories 4.00 unit
20. Bouvenlich BV2 lengkap asesories 2.00 unit

Jumlah IV.C.d

e. Lantai Lima
1. Pintu P1 lengkap dengan asesories 4.00 unit
2. Pintu P2 lengkap dengan asesories 2.00 unit
3. Pintu P3 lengkap dengan asesories 1.00 unit
4. Pintu PF2 lengkap dengan asesories 3.00 unit
5. Pintu PT lengkap dengan asesories 1.00 unit
6. Pintu PT2 lengkap dengan asesories 1.00 unit
7. Pintu PS1 lengkap dengan asesories 1.00 unit
8. Pintu PS2 lengkap dengan asesories 1.00 unit
9. Pintu PB1 lengkap dengan asesories 3.00 unit
10. Pintu PB2 lengkap dengan asesories 1.00 unit

- 13 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

11. Jendela J6 lengkap dengan asesories 2.00 unit


12. Jendela J7 lengkap dengan asesories 8.00 unit
13. Jendela J8 lengkap dengan asesories 1.00 unit
14. Jendela J9 lengkap dengan asesories 28.00 unit
15. Jendela JU' lengkap dengan asesories 1.00 unit
16. Jendela JS lengkap dengan asesories 4.00 unit
17. Bouvenlich BV2 lengkap asesories 2.00 unit

Jumlah IV.C.e

f. Lantai Dak atap


1. Pintu PB1 lengkap dengan asesories 1.00 unit
2. Pintu PB3 lengkap dengan asesories 1.00 unit
Jumlah IV.C.f

Jumlah IV.C.
D. PEKERJAAN PLAFOND DAN RANGKA ATAP LANTAI DASAR S/D LANTAI ATAP

a. Lantai Satu
1. Besi WF 200x100x5,5x8mm 104.51 kg
2. Besi Ex WF 200x100x5,5x8mm 21.33 kg
3. Gording kanal C 200 x 75 x 20 x 3.2 177.98 kg
4. Pasang baut angkur M 16 24.00 bh
5. Pasang baut M 12 24.00 bh
6. End plat t= 16 mm 27.99 kg
7. Pasang besi plat t= 10 mm 21.48 kg
8. Plat stif dan plat dudukan gording t= 6 mm 13.60 kg
9. Besi trextang O 12 mm 12.96 kg
10. Pipa baja dia 3" SCH 40 meni + cat 3.60 m'
11. Pasang ACP canopy setara seven rangka besi hollow 40x40x1,2 mm (struktur) 63.06 m2
12. Plafond gypsum uk. 120 x 240 tebal 9 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 363.05 m2
13. Plafond GRC uk. 120 x 240 tebal 6 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 31.96 m2
14. Pas. list profil kayu uk. 3x5 ditoilet 51.00 m'

Jumlah IV.D.a
b. Lantai Dua
1. Plafond gypsum uk. 120 x 240 tebal 9 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 334.94 m2
2. Plafond GRC uk. 120 x 240 tebal 6 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 32.63 m2
3. Pas. list profil kayu uk. 3x5 ditoilet 48.26 m'
-
- Jumlah IV.D.b
c. Lantai Tiga -
1. Plafond gypsum uk. 120 x 240 tebal 9 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 340.91 m2
2. Plafond GRC uk. 120 x 240 tebal 6 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 29.68 m2
3. Pas. list profil kayu uk. 3x5 ditoilet 41.34 m'
-
- Jumlah IV.D.c
d. Lantai Empat -
1. Plafond gypsum uk. 120 x 240 tebal 9 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 340.91 m2
2. Plafond GRC uk. 120 x 240 tebal 6 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 29.68 m2
3. Pas. list profil kayu uk. 3x5 ditoilet 41.34 m'
-
- Jumlah IV.D.d
e. Lantai Lima -
1. Plafond gypsum uk. 120 x 240 tebal 9 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 324.84 m2
2. Plafond GRC uk. 120 x 240 tebal 6 mm rangka hollow 20 x 40 & 40 x 40 mm (60 x 120) + penggantung 59.37 m2
3. Pas. list profil kayu uk. 3x5 ditoilet 69.94 m'
-
- Jumlah IV.D.e
-
f. Lantai Dak atap -
1. Tiang Baja WF 175x90x5x8 mm 347.52 kg
2. Kaki kuda-kuda Baja WF 175x90x5x8 mm 1,933.80 kg
3. Penghubung WF 100x50x5x7 mm 597.49 kg
4. Baja WF EX WF 175x90x5x8 mm 204.71 kg
5. Pasang baut angkur Ø 16 mm 64.00 bh
6. Base plat t= 12 mm 248.83 kg
7. Besi plat t= 8 mm 149.49 kg
8. Gording kanal C 150 x 50 x20 x 2.3 1,553.72 kg
9. Plat t= 6 mm dudukan gording 80.01 kg
10. Pasang baut m 12 214.00 bh
11. Besi trextang O 12 mm 175.82 kg
12. Besi beton bracing atap Ø 16 mm 41.02 kg
13. Trekstang (sparator ) 4.00 bh
14. Pasang Rangka atap kaso + reng baja ringan setara still truss 279.52 m2
15. Atap bitumen selulose Bergelombang Monolayer 3 mm 279.52 m2
16. Listplank GRC tebal 12 mm 70.84 m'
17. Pasang karpusan bitumen 31.78 m'
18. Penutup dinding dengan GRC rangka besi hollow 40x40x1.2 mm 58.68 m2

Jumlah IV.D.f

Jumlah IV.D.
E. PEKERJAAN PENGECATAN LANTAI SATU S/D DAK ATAP

- 14 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

a. Lantai Dasar
1. Cat dinding dan kolom exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 369.35 m2
2. Cat interior dinding, kolom & tangga 3 lapis dengan pelamir setara Dulux 704.23 m2
3. Cat dak beton dan balok 3 lapis tampa pelamir setara Dulux 105.44 m2
4. Cat plafond gypsum dan GRC 3 lapis tampa pelamir setara Dulux 395.01 m2
5. Cat Balok exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 95.26 m2
6. Cat interior dindingpartisi 3 lapis dengan pelamir setara Dulux 143.26 m2
7. Cat balok bagian luar exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 76.26 m2

Jumlah IV.E.a
b. Lantai Dua
1. Cat dinding dan kolom exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 323.63 m2
2. Cat interior dinding, kolom & tangga 3 lapis dengan pelamir setara Dulux 627.16 m2
3. Cat plafond gypsum dan GRC 3 lapis tampa pelamir setara Dulux 367.57 m2
4. Cat balok dan plat 3 lapis tampa pelamir setara Dulux 114.31 m2
5. Cat Balok exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 95.26 m2
6. Cat balok bagian luar exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 76.26 m2

Jumlah IV.E.b
c. Lantai Tiga
1. Cat dinding dan kolom exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 455.21 m2
2. Cat interior dinding, kolom & tangga 3 lapis dengan pelamir setara Dulux 559.73 m2
3. Cat plafond gypsum dan GRC 3 lapis tampa pelamir setara Dulux 370.59 m2
4. Cat balok dan plat 3 lapis tampa pelamir setara Dulux 114.31 m2
5. Cat Balok exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 95.26 m2
6. Cat interior dinding partisi 3 lapis dengan pelamir setara Dulux 178.54 m2
7. Cat balok bagian luar exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 76.26 m2

Jumlah IV.E.c
d. Lantai Empat
1. Cat dinding dan kolom exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 470.54 m2
2. Cat interior dinding, kolom & tangga 3 lapis dengan pelamir setara Dulux 807.90 m2
3. Cat plafond gypsum dan GRC 3 lapis tampa pelamir setara Dulux 370.59 m2
4. Cat balok dan plat 3 lapis tampa pelamir setara Dulux 114.31 m2
5. Cat Balok exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 95.26 m2
6. Cat balok bagian luar exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 76.26 m2

Jumlah IV.E.d

e. Lantai Lima
1. Cat dinding dan kolom exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 335.59 m2
2. Cat interior dinding, kolom & tangga 3 lapis dengan pelamir setara Dulux 796.03 m2
3. Cat plafond gypsum dan GRC 3 lapis tampa pelamir setara Dulux 384.21 m2
4. Cat balok dan plat 3 lapis tampa pelamir setara Dulux 114.31 m2
5. Cat Balok exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 95.26 m2
6. Cat balok bagian luar exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 75.12 m2

Jumlah IV.E.e

f. Lantai Dak atap


1. Cat dinding exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 360.27 m2
2. Cat interior dinding 3 lapis dengan pelamir setara Dulux 77.19 m2
3. Cat listplank exterior ( weathershield ) 3 lapis dengan pelamir setara Dulux 28.33 m2
4. Cat balok dan plat 3 lapis tampa pelamir setara Dulux 126.58 m2
5. Cat besi kolom WF dengan cat minyak 1 lapis meni + 2lapis cat penutup 124.50 m2

Jumlah IV.E.f

Jumlah IV.E

Jumlah IV.
V. PEKERJAAN MEKANIKAL ELEKTRIKAL

1. PEKERJAAN ELEKTRIKAL
A. PEKERJAAN PANEL
1. PANEL SDP / PUTR 1.00 unit
Box panel 1900 x 700 x 700 mm type floor standing 1.00
MCCB 250 A, 3P, 65 kA 2.00
MCCB 200 A, 3P, 65 kA 1.00
MCCB 50 A, 3P, 36 kA 4.00
MCCB 40 A, 3P, 36 kA 1.00
MCCB 32 A, 3P, 36 kA 3.00
MCCB 25 A, 3P, 36 kA 3.00
MCCB 16 A, 3P, 36 kA 1.00
MCCB 10 A, 3P, 25 kA 2.00
Indicator Lamp 3.00
Fuse Lamp 2A 3.00
Ampere meter 3.00
Volt meter 1.00
VSS 7 posisi 1.00
Current Transformer (CT) 2000 / 5A 1.00
Motorized 2.00
Bus Bar sistem 1000A 1.00

- 15 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Control wiring and accessories 1.00


Surge arrester 1.00
Over Voltage Release 380/415V (1.35 - 1.7 Un) 1.00
Grounding Cable BCC 50 mm2 1.00

2. PANEL LANTAI - 1 (LP - 1) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 32A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 5
MCB 6 A/ 1P / 8 kA 11
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1
Grounding Cable BCC 6 mm2 :1

3. PANEL LANTAI - 2 (LP - 2) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 25A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 6
MCB 6 A/ 1P / 8 kA 7
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1
Grounding Cable BCC 6 mm2 :1

4. PANEL LANTAI - 3 (LP - 3) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 40A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 6
MCB 6 A/ 1P / 8 kA 7
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1.0000
Grounding Cable BCC 6 mm2 :1

5. PANEL LANTAI - 4 (LP - 4) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 25A / 3P / 10kA :1
MCB 10 A/ 1P / 6 kA 10
MCB 6 A/ 1P / 6 kA 8
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1
Grounding Cable BCC 6 mm2 :1

6. PANEL LANTAI - 5 (LP - 5) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 16A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 4
MCB 6 A/ 1P / 8 kA 6
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1
Grounding Cable BCC 6 mm2 :1

7 PANEL AC LANTAI - 1 (PP- AC.1) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 32A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 15.0000
MCB 6 A/ 1P / 8 kA 2.0000
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1

- 16 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Control wiring and accessories 1.0000


Grounding Cable BCC 6 mm2 :1

8 PANEL AC LANTAI - 2 (PP- AC.2) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 32A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 12.0000
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1.0000
Grounding Cable BCC 6 mm2 :1

9 PANEL AC LANTAI - 3 (PP- AC.3) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 50A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 15.0000
MCB 6 A/ 1P / 8 kA 2.0000
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1.0000
Grounding Cable BCC 6 mm2 :1

10 PANEL AC LANTAI - 4 (PP- AC.4) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 50A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 14.0000
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1.0000
Grounding Cable BCC 6 mm2 :1

11 PANEL AC LANTAI - 5 (PP- AC.5) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted :1
MCCB 50A / 3P / 10kA :1
MCB 10 A/ 1P / 8 kA 13.0000
Indicator Lamp :3
Fuse Lamp 2A :3
Ampere meter 3
Volt meter 0-500 V 1
VSS 7 posisi 1
Bus Bar system Cu 5x(20x5mm) :1
Control wiring and accessories 1.0000
Grounding Cable BCC 6 mm2 :1

12 PANEL ATAP ( PP - ATAP ) 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted 1
MCB 63A / 3P / 10kA 1
MCB 16A/ 3P / 10kA 1
MCB 10 A/ 3P / 8 kA 3
Bus Bar system Cu 5x(20x5mm) 1
Control wiring and accessories 1
Grounding Cable BCC 4 mm2 1

13 PP - HYDRANT 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted 1
MCB 200A / 3P / 10kA 2
MCB 16A/ 3P / 10kA 2
MCB 10 A/ 3P / 8 kA 1
Bus Bar system Cu 5x(20x5mm) 1
Control wiring and accessories 1
Grounding Cable BCC 4 mm2 1

14 PP - POMPA AIR BERSIH 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted 1
MCB 32A / 3P / 10kA 1
MCB 16A/ 3P / 10kA 3
Bus Bar system Cu 5x(20x5mm) 1
Control wiring and accessories 1
Grounding Cable BCC 4 mm2 1

15 PP - ELEKTRONIK 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted 1
MCB 10A / 3P / 10kA 1
MCB 6A/ 3P / 10kA 6

- 17 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Bus Bar system Cu 5x(20x5mm) 1


Control wiring and accessories 1
Grounding Cable BCC 4 mm2 1

16 LP - PL SITE PLAN 1.00 unit


Box panel uk (500 x 400 x 200) type wall mounted 1
MCB 10A/ 3P / 10kA 1
MCB 6A/ 3P / 10kA 3
Time switch 1
Contactoe 3P 220 V / 380 V 1
Bus Bar system Cu 5x(20x5mm) 1
Control wiring and accessories 1
Grounding Cable BCC 4 mm2 1

Jumlah A

B. PEKERJAAN KABEL
1. Kabel dari KWH-M ke Panel Utama lt-1, NYY 4 x 95 mm² 31.00 m'
1. Kabel dari Panel Kontrol Genset ke Panel Utama lt-1, NYY 4 x 95 mm² 10.00 m'
2. Kabel dari P-Utama ke LP-1 (lt-1), NYY 4 x 6 mm² + BC 10 mm 10.00 m'
3. Kabel dari P-Utama ke LP-2 (lt-2), NYY 4 x 6 mm² + BC 6 mm 7.00 m'
4. Kabel dari P-Utama ke LP-3 (lt-3), NYY 4 x 10 mm² + BC 10 mm 11.00 m'
5. Kabel dari P-Utama ke LP-4 (lt-4), NYY 4 x 6 mm² + BC 6 mm 15.00 m'
6. Kabel dari P-Utama ke LP-5 (lt-5), NYY 4 x 6 mm² + BC 10 mm 19.00 m'
7. Kabel dari P-Utama ke PP-AC.1 (lt-1), NYY 4 x 6 mm² + BC 6 mm 4.00 m'
8. Kabel dari P-Utama ke PP-AC.2 (lt-2), NYY 4 x 6 mm² + BC 6 mm 8.00 m'
9. Kabel dari P-Utama ke PP-AC.3 (lt-3), NYY 4 x 16 mm² + BC 10 mm 12.00 m'
10. Kabel dari P-Utama ke PP-AC.4 (lt-4), NYY 4 x 16 mm² + BC 16 mm 16.00 m'
11. Kabel dari P-Utama ke PP-AC.5 (lt-5), NYY 4 x 16 mm² + BC 10 mm 20.00 m'
12. Kabel dari P-Utama ke PP-ATAP, FRC 4 x 16 mm² + BC 10 mm 25.00 m'
13. Kabel dari P-Utama ke PP-Hydrant, FRC 4 x 95 mm² + BC 95 mm 12.00 m'
14. Kabel dari P-Utama ke P-PAB, FRC 4 x 10 mm² + BC 10 mm 10.00 m'
15. Kabel dari P-Utama ke LP-ELEKTRONIK, FRC 4 x 6 mm² + BC 10 mm 22.00 m'
16. Kabel dari P-Utama ke LP-PL, NYFGBY 4 x 6 mm² 8.00 m'

Jumlah B
C. PEKERJAAN ARMATUR & LAMPU
1. Lantai - 1
a. Lampu type RM LED 1 x 18 W 5.00 bh
b. Lampu type RM LED 2 x 18 W 20.00 bh
c. Lampu type RM LED 3 x 18 W 8.00 bh
d. Lampu Down Light LED 12 W 81.00 bh
e Lampu Baret 12 W 17.00 bh

2. Lantai - 2
a. Lampu type RM LED 1 x 18 W 2.00 bh
b. Lampu type RM LED 2 x 18 W 29.00 bh
c. Lampu Down Light LED 12 W 46.00 bh
d. Lampu Baret 12 W 5.00 bh

3. Lantai - 3
a. Lampu type RM LED 1 x 18 W 2.00 bh
b. Lampu type RM LED 2 x 18 W 42.00 bh
c. Lampu Down Light LED 12 W 30.00 bh
d. Lampu Baret 12 W 5.00 bh

4. Lantai - 4
a. Lampu type RM LED 1 x 18 W 2.00 bh
b. Lampu type RM LED 2 x 18 W 21.00 bh
c. Lampu type RM LED 3 x 18 W 5.00 bh
d. Lampu Down Light LED 12 W 27.00 bh
e. Lampu Baret 12 W 5.00 bh

5. Lantai - 5
a. Lampu type RM LED 1 x 18 W 2.00 bh
b. Lampu type RM LED 2 x 18 W 18.00 bh
c. Lampu type RM LED 3 x 18 W 10.00 bh
d. Lampu Down Light LED 12 W 66.00 bh
e. Lampu Baret 12 W 2.00 bh

6. Lantai Dak atap


a. Lampu type RM LED 1 x 18 W 3.00 bh
b. Lampu Baret 12 W 1.00 bh

7. Site
a. Lampu Taman LED 18 W (GL E27 BG 12) + tiang BSP dia. 2 1/2" 10.00 bh
tinggi 2,5 mtr, pengadaan lampu lengkap dgn pondasi dan bok terminal.
b. Instalasi Lampu Taman Kabel NYFGBY 3 x 4 mm 150.00 m1
c. Saklar Ganda 1.00 unit
d. Stop Kontak, 220 V biasa 1 lubang 1.00 unit

Jumlah C
D. PEKERJAAN SAKLAR, STOP KONTAK & RAK KABEL
1. Lantai - 1
a. Saklar Tunggal 18.00 unit

- 18 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

b. Saklar Ganda 14.00 unit


c. Stop Kontak, 220 V biasa 1 lubang 91.00 unit
-
2. Lantai - 2 -
a. Saklar Tunggal 5.00 unit
b. Saklar Ganda 13.00 unit
c. Stop Kontak, 220 V biasa 1 lubang 66.00 unit
-
3. Lantai - 3 -
a. Saklar Tunggal 5.00 unit
b. Saklar Ganda 17.00 unit
c. Stop Kontak, 220 V biasa 1 lubang 97.00 unit
-
4. Lantai - 4 -
a. Saklar Tunggal 5.00 unit
b. Saklar Ganda 9.00 unit
c. Stop Kontak, 220 V biasa 1 lubang 40.00 unit
-
5. Lantai - 5 -
a. Saklar Tunggal 7.00 unit
b. Saklar Ganda 11.00 unit
c. Stop Kontak, 220 V biasa 1 lubang 24.00 unit
-
6. Lantai Dak atap -
a. Saklar Tunggal 3.00 unit
b. Saklar Ganda 1.00 unit
c. Stop Kontak, 220 V biasa 1 lubang 14.00 unit

Jumlah D
E. PEKERJAAN INSTALASI KABEL LAMPU & STOP KONTAK
1. Lantai - 1
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 121.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 91.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 8.00 titik
d. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak Lantai, dalam pipa Pvc konduit High Impact(HI) 20 mm 39.00 titik
-
2. Lantai - 2 -
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 71.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 66.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 17.00 titik
d. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak Lantai, dalam pipa Pvc konduit High Impact(HI) 20 mm 22.00 titik
-
3. Lantai - 3 -
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 76.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 97.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 12.00 titik
d. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak Lantai, dalam pipa Pvc konduit High Impact(HI) 20 mm 48.00 titik
-
4. Lantai - 4 -
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 45.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 40.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 14.00 titik
d. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak Lantai, dalam pipa Pvc konduit High Impact(HI) 20 mm 19.00 titik
-
5. Lantai - 5 -
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 87.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 24.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 1.00 titik
-
6. Lantai Dak atap -
a. Instalasi Kabel NYM 3 x 2,5 mm² Lampu, dalam pipa PVCkonduit High impact (HI)20 mm 14.00 titik
b. Instalasi Kabel NYM 3 x 2,5 mm² Stop Kontak, dalam pipa PV konduit High Impact (HI) 20 mm 2.00 titik
c. Instalasi Kabel NYM 3 x 2,5 mm² AC Split, dalam pipa PVCkonduit High Impact (HI) 20 mm 1.00 titik
-
F TESTING & COMMISSIONING -
Pekerjaan ini meliputi peengetesan instalasi , test fungsi , dan 1.00 ls
pengujian system dan peralatan yang terinstall -
Ijin Penggunaan Penangkal Petir (DINAS TENAGA KERJA) -
pengujian fungsi system dan peralatan yang terinstall. -
Ijin Penggunaan Instalasi Listrik (DINAS TENAGA KERJA) 1.00 ls
pengujian fungsi system dan peralatan yang terinstall.

Jumlah E

F. PEKERJAAN INSTALASI DATA


a. Lantai 1
1. Instalasi Data 35.00 ttk
2. Out let Data 35.00 m'
-
b. Lantai 2 -
1. Instalasi Data 23.00 ttk
2. Out let Data 23.00 m'
-
c. Lantai 3 -

- 19 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

1. Instalasi Data 45.00 ttk


2. Out let Data 45.00 m'
-
d. Lantai 4 -
1. Instalasi Data 12.00 ttk
2. Out let Data 12.00 m'
-
e. Lantai 5 -
1. Instalasi Data 1.00 ttk
2. Out let Data 1.00 m'
-
f. Peralatan utama -
Switch 16 port 1.00 unit
Patch Panel 1.00 unit
Rack Server 1.00 unit
-
g. TESTING & COMMISSIONING -
Pengetesan dan penyetelan instalasi sampai berfungsi dengan baik. 1.00 ls

Jumlah F
G. PEKERJAAN INSTALASI PENANGKAL PETIR
a. Terminal penerima type Non Radioaktif radius min 50 meter 1.00 bh
b. Pipa GIP Ø 2" 4.50 m'
c. Kabel Tegangan Tinggi N2XSY 1 X 70 mm2 37.50 m'
d. Klem kabel jarak 60 cm 1.00 bh
e. Connecting sleeve 2.00 bh
g. Pipa PVC AW dia. 32 mm2 1.00 m'
h. Pentanahan Penangkal petir lengkap dengan bak kontrol (400x600x600)mm 1.00 set
dgn kedalaman elektrode rod 12 m.Tahanan Pentanahan maks. 3 ohm -
i. Alat bantu 1.00 lt
-
F TESTING & COMMISSIONING -
Pekerjaan ini meliputi peengetesan instalasi , test fungsi , dan 1.00 ls
pengujian system dan peralatan yang terinstall -
Ijin Penggunaan Penangkal Petir (DINAS TENAGA KERJA) 1.00 ls
pengujian fungsi system dan peralatan yang terinstall. -
Ijin Penggunaan Instalasi Listrik (DINAS TENAGA KERJA) 1.00 ls
pengujian fungsi system dan peralatan yang terinstall.

Jumlah G

H. PEKERJAAN GENERATOR SET


1 Pekerjaan Pemasangan Genset Lengkap Panel Genset dan pengkabelan Tanki harian solar 1.00 unit
lengkap dengan kaki tanki type Silent Perkins-Stamford 100 KVA.
2 Test & commissioning 1.00 ls

Jumlah H

I. PEKERJAAN INSTALASI AC
Lantai - 1
1. AC Multi - S 2 Conection 2.00 bh
2. AC Multi - S 3 Conection 3.00 bh
3. AC dinding 2 PK type single Split Wall Mounted lengkap dgn kompresor 4.00 ttk
4. AC type cassete 4 PK ceilling mounted 1.00 ttk
5. Instalasi Pipa Refrigerant lengkap isolasi Sesuai Gambar 10.00 ttk
6. Instalasi Pipa Drain PVC/AW dia, 1/2 " Sesuai Gambar 10.00 ttk
7. Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2 10.00 ttk
-
Lantai - 2 -
1. AC Multi - S 2 Conection 3.00 bh
2. AC Multi - S 3 Conection 1.00 bh
3. AC type cassete 4 PK ceilling mounted 3.00 bh
4. AC dinding 2 PK type single Split Wall Mounted lengkap dgn kompresor 1.00 bh
5. Instalasi Pipa Refrigerant lengkap isolasi Sesuai Gambar 16.00 bh
6. Instalasi Pipa Drain PVC/AW dia, 1/2 " Sesuai Gambar 16.00 ttk
7. Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2 16.00 ttk
-
Lantai - 3 -
1. AC dinding 2 PK type single Split Wall Mounted lengkap dgn kompresor 9.00 bh
2. AC dinding 1 PK type single Split Wall Mounted lengkap dgn kompresor 1.00 bh
3. AC type cassete 4 PK ceilling mounted 2.00 bh
4. Instalasi Pipa Refrigerant lengkap isolasi Sesuai Gambar 16.00 ttk
5. Instalasi Pipa Drain PVC/AW dia, 1/2 " Sesuai Gambar 16.00 ttk
6. Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2 16.00 ttk
-
Lantai - 4 -
1. AC Multi - S 2 Conection 1.00 bh
2. AC dinding 2 PK type single Split Wall Mounted lengkap dgn kompresor 5.00 bh
3. AC type cassete 4 PK ceilling mounted 2.00 bh
4. AC type cassete 2 PK ceilling mounted 2.00 bh
5. Instalasi Pipa Refrigerant lengkap isolasi Sesuai Gambar 9.00 ttk
6. Instalasi Pipa Drain PVC/AW dia, 1/2 " Sesuai Gambar 9.00 ttk
7. Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2 9.00 ttk
-

- 20 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Lantai - 5 -
1. AC dinding 1 PK type single Split Wall Mounted lengkap dgn kompresor 1.00 bh
2. AC type cassete 5 PK ceilling mounted 6.00 bh
3. Instalasi Pipa Refrigerant lengkap isolasi Sesuai Gambar 5.00 ttk
4. Instalasi Pipa Drain PVC/AW dia, 1/2 " Sesuai Gambar 5.00 ttk
5. Instalasi kabel dari CU ke FCU NYM 3x2,5 mm2 5.00 ttk

Jumlah I
J. PEKERJAAN INSTALASI VENTILASI
Pengadaan dan Pemasangan Fan lengkap dengan gantungan/hanger/support
dan aksesories lainnya :
Lantai 1
1 EAF-1.1 dan EAF-1.2 2.00 unit
- Type : Industrial wall -
- Kapasitas : 100 CFM -
- Lokasi : Rumah pompa -
2 EAF-1.3 -
- Type : Axial duct 1.00 unit
- Kapasitas : 750 CFM -
- Lokasi : Toilet -
-
Lantai 2 -
1 EAF-2.2 1.00 unit
- Type : Axial duct -
- Kapasitas : 600 CFM -
- Lokasi : Toilet -
-
Lantai 3 -
1 EAF-3.1 1.00 unit
- Type : Axial duct -
- Kapasitas : 600 CFM -
- Lokasi : Toilet -
-
Lantai 4 -
1 EAF-4.1 1.00 unit
- Type : Axial duct -
- Kapasitas : 600 CFM -
- Lokasi : Toilet -
-
Lantai 5 -
1 EAF-5.1 1.00 unit
- Type : Axial duct -
- Kapasitas : 600 CFM -
- Lokasi : Toilet -
1 EAF-5.2 1.00 unit
- Type : Industrial wall -
- Kapasitas : 100 CFM -
- Lokasi : Gudang -
-
Test & commissioning 1.00 ls

Jumlah J

K. PEKERJAAN RAK KABEL


Lantai-1
1 Rak kabel elektrikal uk. 300 x 100 x 2 mm lengkap Hanger Rod,besi siku, Dyna bolt alat bantu dll 15.00 m'
-
Lantai-2 -
1 Rak kabel elektrikal uk. 300 x 100 x 2 mm lengkap Hanger Rod,besi siku, Dyna bolt alat bantu dll 27.00 m'
-
Lantai-3 -
1 Rak kabel elektrikal uk. 300 x 100 x 2 mm lengkap Hanger Rod,besi siku, Dyna bolt alat bantu dll 21.00 m'
-
Lantai-4 -
1 Rak kabel elektrikal uk. 300 x 100 x 2 mm lengkap Hanger Rod,besi siku, Dyna bolt alat bantu dll 18.00 m'
-
Lantai-5 -
1 Rak kabel elektrikal uk. 300 x 100 x 2 mm lengkap Hanger Rod,besi siku, Dyna bolt alat bantu dll 19.00 m'

Jumlah K

L. PEKERJAAN INSTALASI FIRE ALRAM


I. INSTALASI
I. INSTALASI
1.1Peralatan Utama
a. Fire alarm control panel (MCFA) kap. 16 zone lengkap dengan 1.00 unit
battery charger dan battery untuk 20 jam operasi -
b. Annuciator Ruang Kontrol Pos Jaga 1.00 unit
c. Grounding Elektronik 1.00 titk
d. MDF Master Control Fire Alarm 10 zone 1.00 unit
1.2Instalasi Detektor, Horn dan Lamp -
a. Lantai Dasar -
- ROR & fixed temperature detector 25.00 bh
- Manual call point / MCP 1.00 bh

- 21 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Alarm bell 1.00 bh


- Alarm lamp 1.00 bh
- Terminal box 1.00 bh
- Instalasi detektor dan MCP 25.00 titik
- Fire exthinguisher FE - 3 / 3 kg 2.00 bh
- Instalasi Sistem Alarm Bell 1.00 titik
- Instalasi Sistem Alarm Lamp 1.00 titik
- Instalasi Sistem Push Button 1.00 titik
-
c. Lantai - 2 -
- ROR & fixed temperature detector 20.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell 2.00 bh
- Alarm lamp 2.00 bh
- Terminal box 1.00 bh
- Instalasi detektor dan MCP 20.00 titik
- Fire exthinguisher FE - 3 / 3 kg 2.00 bh
- Instalasi Sistem Alarm Bell 2.00 titik
- Instalasi Sistem Alarm Lamp 2.00 titik
- Instalasi Sistem Push Button 2.00 titik
-
d. Lantai - 3 -
- ROR & fixed temperature detector 18.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell 2.00 bh
- Alarm lamp 2.00 bh
- Terminal box 1.00 bh
- Instalasi detektor dan MCP 18.00 titik
- Fire exthinguisher FE - 3 / 3 kg 2.00 bh
- Instalasi Sistem Alarm Bell 2.00 titik
- Instalasi Sistem Alarm Lamp 2.00 titik
- Instalasi Sistem Push Button 2.00 titik
-
e. Lantai - 4 -
- ROR & fixed temperature detector 18.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell 2.00 bh
- Alarm lamp 2.00 bh
- Terminal box 1.00 bh
- Instalasi detektor dan MCP 18.00 titik
- Fire exthinguisher FE - 3 / 3 kg 2.00 bh
- Instalasi Alarm Bell 2.00 titik
- Instalasi Alarm Lamp 2.00 titik
- Instalasi Push Button 2.00 titik
-
f. Lantai - 5 -
- ROR & fixed temperature detector 13.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 bh
- Instalasi detektor dan MCP 13.00 titik
- Fire exthinguisher FE - 3 / 3 kg 2.00 bh
- Instalasi Sistem Alarm Bell 1.00 titik
- Instalasi Sistem Alarm Lamp 1.00 titik
- Instalasi Sistem Push Button 1.00 titik
-
g. Lantai - dak -
- ROR & fixed temperature detector 2.00 bh
- Instalasi detektor dan MCP 2.00 titik
-
1.3 Instalasi Kabel Penghubung -
- Kabel dari MCFA ke MDF, Twisted AWG 18 15.00 m'
- Kabel dari MDF ke TBFA (loope), Twisted AWG 18 89.50 m'
- Kabel dari MDF ke Jack telephone (IHB-1) dalam pipa PVC Konduit High Impac (HI) 20 mm 15.00 m'
- Kabel dari MDF ke Jack telephone (IHB-2) dalam pipa PVG Konduit High Impact (HI) 29 mm 25.00 m'
- Kabel dari MDF ke Jack telephone (IHB-3) dalam pipa PVG konduit High Impact (HI) 20 mm 35.00 m'
- Kabel dari MDF ke Jack telephone (IHB-4) dalam pipa PVC konduit High Impact (HI) 20 mm 45.00 m'
- Kabel dari MDF ke Jack telephone (IHB-5) dalam pipa PVC konduit High Impact (HI) 20 mm 50.00 m'
-
TESTING & COMMISSIONING -
1 Pekerjaan ini meliputi peengetesan instalasi , test fungsi , dan 1.00 ls
pengujian system dan peralatan yang terinstall -
2 Ijin Rekomendasi Penggunaan Pemadam Kebakaran (DINAS PEMADAM) 1.00 ls
Pengujian fungsi Penggunaan system dan peralatan yang terinstall.

Jumlah L
M. PEKERJAAN INSTALSI TELEPON
a. Lantai-1
1. Instalasi Pengabelan ITC 2 x 2 x 0,6 mm2 9.00 ttk
2. Out let telepon 9.00 bh
3. Box Terminal cabang IDF 10 pair 1.00 bh
4. Box Terminal Induk MDF 40 pair 1.00 bh
5. Box Perumtel 1.00 bh

- 22 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

6. Kabel Telepon ITC 10 (2 x 2 x 0,6 mm2) 28.00 m'


7. Kabel Telepon ITC 6(2 x 2 x 0,6 mm2) 16.00 m'
8. Alat bantu 1.00 ls
9. Testing com,missioning System telepon 1.00 lt
-
b. Lantai-2 -
1. Instalasi Pengabelan ITC 2 x 2 x 0,6 mm2 10.00 ttk
2. Out let telepon 10.00 bh
3. Box Terminal cabang IDF 10 pair 1.00 bh
4. Kabel Telepon ITC 5 (2 x 2 x 0,6 mm2) 16.00 m'
-
c. Lantai-3 -
1. Instalasi Pengabelan ITC 2 x 2 x 0,6 mm2 13.00 ttk
2. Out let telepon 13.00 bh
3. Box Terminal cabang IDF 10 pair 1.00 bh
4. Kabel Telepon ITC 5 (2 x 2 x 0,6 mm2) 20.00 m
-
d. Lantai-4 -
1. Instalasi Pengabelan ITC 2 x 2 x 0,6 mm2 5.00 ttk
2. Out let telepon 5.00 bh
3. Box Terminal cabang IDF 10 pair 1.00 bh
4. Kabel Telepon ITC 6 (2 x 2 x 0,6 mm2) 24.00 m'
-
e. Lantai-5 -
1. Instalasi Pengabelan ITC 2 x 2 x 0,6 mm2 1.00 ttk
2. Out let telepon 1.00 bh
3. Box Terminal cabang IDF 10 pair 1.00 bh
4. Kabel Telepon ITC 6 (2 x 2 x 0,6 mm2) 24.00 m'

Jumlah M
N. PEKERJAAN INSTALASI TATA SUARA
Peralatan Utama (ruang kontrol audio)
1. 240W System Amplifier w/Chime & 5Ch. Selector, type VM-2240 1.00 unit
2. Microphone Remote w/Keypad Zone Selector 1.00 unit
3. Graphic Equalizer, type SR-231 1.00 unit
4. Mixer Pre Amplifir 1.00 unit
5. CD/MP3/DVD Player 1.00 unit
6. Cabinet Rack w/Acc. Type CR-232P 1.00 unit
7. Terminal box 12 pair 1.00 unit
8. Kabel NYMHY 3x2,5mm2 dari MDF ke TB-TS 570.00 m
9. Grounding eletronik 1.00 titk
-
a. Peralatan Tata Suara Lantai 1 -
1 Ceiling Speaker 3 Watt 18.00 unit
2 Box Speaker 3 Watt 3.00 unit
3 Attenuator 6-30W (Volume Control) 5.00 unit
4 Instalasi Ceiling Speaker kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact (UI) 20mm 21.00 ttk
lengkap dengan klem, sekrup, fisher, flexible pipe dll -
5 Instalasi Attenuator kabel NYMHY 3x1,5mm2 dalam pipa konduit PVC High Impact (HI) 20 mm 5.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
-
b. Peralatan Tata Suara Lantai 2 -
1 Ceiling Speaker 3 Watt 15.00 unit
2 Box Speaker 3 Watt 3.00 unit
3 Attenuator 6-30W (Volume Control) 9.00 unit
4 Instalasi Ceiling Speaker kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact (HI) 20 mm 18.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
5 Instalasi Attenuator kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Imoact (HI) 20 mm 9.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
-
c. Peralatan Tata Suara Lantai 3 -
1 Ceiling Speaker 3 Watt 15.00 unit
2 Box Speaker 3 Watt 2.00 unit
3 Attenuator 6-30W (Volume Control) 5.00 unit
4 Instalasi Ceiling Speaker kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact (HI) 20 mm 17.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
5 Instalasi Attenuator kabel NYMHY 3x1,5mm2 dalam pipa PVC Konduit High Impact (HI) 20 mm 5.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
-
d. Peralatan Tata Suara Lantai 4 -
1 Ceiling Speaker 3 Watt 14.00 unit
2 Box Speaker 3 Watt 3.00 unit
3 Attenuator 6-30W (Volume Control) 8.00 unit
4 Instalasi Ceiling Speaker kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact (HI) 20 mm 17.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
5 Instalasi Attenuator kabel NYMHY 3x1,5mm2 dala pipa PVC konduit High Impact (HI) 20 mm 8.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
-
e. Peralatan Tata Suara Lantai 5 -
1 Ceiling Speaker 3 Wat 10.00 unit
2 Box Speaker 3 Watt 4.00 unit
3 Attenuator 6-30W (Volume Control) 2.00 unit
4 Instalasi Ceiling Speaker kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact 20 mm 14.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -

- 23 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

5 Instalasi Attenuator kabel NYMHY 3x1,5mm2 dalam pipa PVC konduit High Impact (HI) 20 mm 2.00 ttk
lengkap dengan klem, sekrup, pipa conduit, fisher, flexible pipe dll -
-
f TESTING & COMMISSIONING -
Pengetesan dan penyetelan instalasi sampai berfungsi dengan baik. 1.00 ls

Jumlah N

O. PEKERJAAN INSTALASI CCTV


Peralatan Utama dan Kabel Utama
1 Instalasi pengkabelan peralatan utama 1.00 lot
Pekerjaan Instalasi CCTV pada Bangunan -
a. Lantai 1 -
1 Instalasi CCTV dengan coaxial cable RG-59 U dalam pipa PVC konduit High Impact (HI) 20mm 10.00 ttk
2 Dome fixed camera 10.00 ttk
b. Lantai 2 -
1 Instalasi CCTV dengan coaxial cable RG-59 U dalam pipa PVC konduit High Impact (HI) 20mm 4.00 ttk
2 Dome fixed camera 4.00 ttk
c. Lantai 3 -
1 Instalasi CCTV dengan coaxial cable RG-59 U dalam pipa PVC konduit High Impact (HI) 20mm 3.00 ttk
2 Dome fixed camera 3.00 ttk
d. Lantai 4 -
1 Instalasi CCTV dengan coaxial cable RG-59 U dalam pipa PVC konduit High Impact (HI) 20mm 3.00 ttk
2 dome fixed camera 3.00 ttk
e. Lantai 5 -
1 Instalasi CCTV dengan coaxial cable RG-59 U dalam pipa PVC konduit High Impact (HI) 20mm 6.00 ttk
2 Dome fixed camera 6.00 ttk
f TESTING & COMMISSIONING -
Pengetesan dan penyetelan instalasi sampai berfungsi dengan baik. 1.00 ls

Jumlah O
P. PEKERJAAN INSTALASI LIFT
Peralatan Utama
1. Pengadaan Lift Passenger dengan data teknis sebagai berikut: 1.00 unit
Kapasitas : 1000 kg
Ukuran : 2500 x 1500
Kecepatan : 90 mpm
Jumlah Stop : 5 Stop
Type : Simplex
Pintu : stainless steel hairline finishing
Interior : stainless steel hairline finishing
Lantai : Homogenius tile
Lengkap termasuk peralatan bantu dan assesories serta ARD
Sistem Darurat Petugas Kebakaran

2 Test & commissioning lift 1.00 ls

Jumlah P

TOTAL PEKERJAAN ELEKTRIKAL

2. PEKERJAAN PEMADAM KEBAKARAN

A. RUANG POMPA
1 Jockey pump 1.00 unit
- Tipe : Multi stage - Centrifugal Pump
- Kapasitas : 40 USGPM / Head : 60 M / 1450 RPM
- Power : 6 Kw / 380 V / 3 Ph / 50 Hz
- Termasuk panel & kabel kontrol, dudukan, dan spring mounting
- Kabel Fedeer dari pompa jockey ke panel hidrant FRC 4x6 mm2 + BC 4 mm2 10.00 m'

2 Electric pump 1.00 unit


- Tipe : Single stage horisontal - Centrifugal Pump
- Kapasitas : 750 USGPM / Head : 80 M / 2900 RPM
- Power : 90 Kw / 380 V / 3 Ph / 50 Hz
- Termasuk panel & kabel kontrol, dudukan, dan spring mounting
- Kabel Fedeer dari pompa elektrik ke panel hidrant FRC 4x95 mm2 + BC 95 mm2 10.00 m'

3 Diesel pump 1.00 unit


- Tipe : Single stage horisontal - Centrifugal Pump
- Kapasitas : 750 USGPM / Head : 80 M / 2900 RPM
- Power : 90 Kw / 380 V / 3 Ph / 50 Hz
- Radiator cooled, fuel tank & battery
- Kabel Fedeer dari pompa diesel ke panel hidrant FRC 4x6 mm2 + BC 4 mm2 9.00 m'

4 Instalasi pipa hydrant, black steel sch. 40, lengkap fitting :


- Pipa dia 150 mm 43.50 m'
- Pipa dia 100 mm 19.00 m'
- Pipa dia 65 mm 16.50 m'
5 Pipa header dia. 200 mm, lengkap support, flange dll 4.00 m'
- Gate valve :
- dia 150 mm 3.00 bh
- dia 100 mm 1.00 bh
- dia 65 mm 1.00 bh

- 24 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

6 Check valve :
- dia 150 mm 1.00 bh
- dia 65 mm 1.00 bh
7 Strainer :
- dia 150 mm 1.00 bh
- dia 65 mm 1.00 bh
8 Flexible joint :
- dia 150 mm 2.00 bh
9 Safety valve dia. 1" 1.00 bh
10 Foot valve dia. 150 mm 2.00 bh
Foot valve dia. 65 mm 1.00 bh
11 Pressure gauge L/D Gate Valve 2.00 bh

Jumlah A

B. PEKERJAAN HYDRANT DAN SPRINKLER


Pemipaan dan fitting menggunakan GIP medium dicat warna merah standard ASTM A53A
a. Pipa tegak dalam shaft
1 Pipa Ø 150 mm 58.00 m'
2 Pipa Ø 80 mm 20.00 m'

b. Lantai 1
1. Red Bulb Pendant Sprinkler Head Ø 15 mm 33.00 bh
2. Pipa Giv Ø 80 mm 17.50 m'
3. Pipa Giv Ø 65 mm 6.50 m'
4. Pipa Giv Ø 50 mm 32.50 m'
5. Pipa Giv Ø 40 mm 31.00 m'
6. Pipa Giv Ø 32 mm 13.00 m'
7. Pipa Giv Ø 25 mm 31.50 m'
8. Gate Valve Ø 80 mm 1.00 bh
9. Gate Valve Ø 25 mm 1.00 bh
10. Flow Switch Ø 80 mm 1.00 bh
11. Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m nozzle hydrant valve 1,5", hose rack 1.00 bh
12. Material bantu (mur-baut, flange, socket dll) 1.00 ls

c. Lantai 2
1. Red Bulb Pendant Sprinkler Head Ø 15 mm 27.00 bh
2. Pipa Giv Ø 80 mm 10.00 m'
3. Pipa Giv Ø 65 mm 9.00 m'
4. Pipa Giv Ø 50 mm 6.00 m'
5. Pipa Giv Ø 40 mm 9.00 m'
6. Pipa Giv Ø 32 mm 18.00 m'
7. Pipa Giv Ø 25 mm 40.00 m'
8. Gate Valve Ø 80 mm 1.00 bh
9. Gate Valve Ø 25 mm 1.00 bh
10. Flow Switch Ø 80 mm 1.00 bh
11. Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m nozzle hydrant valve 1,5", hose rack 1.00 bh
12. Material bantu (mur-baut, flange, socket dll) 1.00 ls
-
d. Lantai 3 -
1. Red Bulb Pendant Sprinkler Head Ø 15 mm 29.00 bh
2. Pipa Giv Ø 80 mm 16.00 m'
3. Pipa Giv Ø 65 mm 15.00 m'
4. Pipa Giv Ø 50 mm 14.00 m'
5. Pipa Giv Ø 40 mm 22.50 m'
6. Pipa Giv Ø 32 mm 12.00 m'
7. Pipa Giv Ø 25 mm 35.00 m'
8. Gate Valve Ø 80 mm 1.00 bh
9. Gate Valve Ø 25 mm 1.00 bh
10. Flow Switch Ø 80 mm 1.00 bh
11. Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m nozzle hydrant valve 1,5", hose rack 1.00 bh
12. Material bantu (mur-baut, flange, socket dll) 1.00 ls
-
e. Lantai 4 -
1. Red Bulb Pendant Sprinkler Head Ø 15 mm 29.00 bh
2. Pipa Giv Ø 80 mm 16.00 m'
3. Pipa Giv Ø 65 mm 14.00 m'
4. Pipa Giv Ø 50 mm 27.00 m'
5. Pipa Giv Ø 40 mm 18.00 m'
6. Pipa Giv Ø 32 mm 16.00 m'
7. Pipa Giv Ø 25 mm 26.00 m'
8. Gate Valve Ø 80 mm 1.00 bh
9. Gate Valve Ø 25 mm 1.00 bh
10. Flow Switch Ø 80 mm 1.00 bh
11. Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m nozzle hydrant valve 1,5", hose rack 1.00 bh
12. Material bantu (mur-baut, flange, socket dll) 1.00 ls
-
f. Lantai 5 -
1. Red Bulb Pendant Sprinkler Head Ø 15 mm 22.00 bh
2. Pipa Giv Ø 80 mm 16.00 m'
3. Pipa Giv Ø 65 mm 14.00 m'
4. Pipa Giv Ø 50 mm 25.00 m'
5. Pipa Giv Ø 40 mm 21.00 m'
6. Pipa Giv Ø 32 mm 15.00 m'

- 25 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

7. Pipa Giv Ø 25 mm 28.00 m'


8. Gate Valve Ø 80 mm 1.00 bh
9. Gate Valve Ø 25 mm 1.00 bh
10. Flow Switch Ø 80 mm 1.00 bh
11. Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m nozzle hydrant valve 1,5", hose rack 1.00 bh
12. Material bantu (mur-baut, flange, socket dll) 1.00 ls
-
g. PEKERJAAN DILUAR GEDUNG INSTALASI HYDRANT dan perlengkapan lainnya -
1. Pipa black steel sch 40 dia 150 72.00 m'
2. Pipa black steel sch 40 dia 100 8.00 m'
3. Hydrant Pilar 4.00 bh
4. Ooutdoor Hydran Box (OHB) Type C, termasuk fire hose 2,5"x30 m c/w coupling machino jet nozzel 2,5" 4.00 unit
5. Siamese 1.00 bh
6. Bahan Bantu ( Fitting,Karung goni,cat,Residu KaawatLas dll) 1.00 ls
-
h. TESTING & COMMISSIONING -
Pekerjaan ini meliputi peengetesan instalasi , test fungsi , dan pengujian system dan 1.00 ls
peralatan yang terinstall -
-
i. PERIZINAN -
Ijin Rekomendasi dan Penggunaan Pemadam Kebakaran (DINAS PEMADAM) 1.00 ls
Pengujian fungsi Penggunaan system dan peralatan yang terinstall. -
-
h. PEKERJAAN DILUAR GEDUNG CIVIL DAN ARSITEK -
1. Pasang Sumur Resapan (Buis Beton Dia, 600 mm) 3.00 bh
2. Pasang Saluran Pipa PVC Dia, 6" 35.00 m'
3. Tutup Buis Beton 4 3.00 bh
4. Perlengkapan GWT 1.00 ls
5. Pekerjaan GWT Fiberglass Biovive Kapasitas 72 x 2 = 144 m3 1.00 set

TOTAL PEKERJAAN ELEKTRIKAL Jumlah B


3. PEKERJAAN PLUMBING

A. PEKERJAAN INSTALASI POMPA


1. Pompa 400 watt Jet pump, Sanyo termasuk WLC 1.00 bh
2. Pompa transfer 250 watt, Sanyo termasuk WLC 2.00 bh
3. Dudukan pompa 2.00 bh
4. Pantekan sumur pompa lengkap 1.00 set
5. Pipa suction PVC dia. 32 mm2 32.00 m'
6. Foot valve dia. 32 mm2 2.00 bh
7. gate valve Ø 32 mm 2.00 bh
8. Check valve Ø 40 mm 2.00 bh
9. Alat sambung + bantu 1.00 lt

Jumlah A

B. PEKERJAAN TANGKI ATAS & PEMIPAAN SHAFF


1. Resorvoir atas vol - 1000 liter, lengkap dengan radar 2.00 bh
2. Pompa Booster dorong 100 l/m 2.00 unit
3. Gate Valve 80 mm 4.00 bh
4. Gate Valve 65 mm 2.00 bh
5. Gate Valve 50 mm 6.00 bh
6. Check valve dia 50 mm 2.00 bh
7. Pipa PVC dia, 65 mm2 116.40 m'
8. Pipa PVC dia, 50 mm2 127.20 m'
9. Pipa PVC dia, 100 mm2 (header) 4.00 m'
10. Alat bantu + sambung 1.00 lt

Jumlah B

C. PEKERJAAN INSTALASI AIR BERSIH, BEKAS & KOTOR


a. Lantai - 1
Pekerjaan Pemipaan Air Bersih (Pipa PVC AW)
1. Titik air bersih 23.00 ttk
2. Pipa PVC dia. 25 mm 18.00 m'
3. Pipa PVC dia. 20 mm 26.00 m'
4. Pipa PVC dia. 15 mm 80.50 m'
5. Alat sambung + bantu instalasi pemipaan 1.00 bh
-
Pekerjaan Pemipaan Air Bekas (Pipa PVC clas AW) -
1. Titik Air Bekas 23.00 ttk
2. Pipa PVC dia. 80 mm 60.00 m'
3. Pipa Instalasi Vent Toilet dia. 50 mm 21.00 m'
4. Pipa Instalasi Vent Toilet dia. 40 mm 18.00 m'
-
Pekerjaan Pemipaan Air Kotor (Pipa PVC clas AW) -
1. Titik Air Kotor 6.00 ttk
2. Pipa PVC dia. 100 mm 36.00 m'
-
b. Lantai - 2 -
Pekerjaan Pemipaan Air Bersih (Pipa PVC AW) -
1. Titik air bersih 20.00 ttk
2. Pipa PVC dia. 25 mm 36.00 m'
3. Pipa PVC dia. 20 mm 36.00 m'

- 26 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

4. Pipa PVC dia. 15 mm 70.00 m'


5. Alat sambung + bantu instalasi pemipaan 1.00 bh
-
Pekerjaan Pemipaan Air Bekas (Pipa PVC clas AW) -
1. Titik Air Bekas 10.00 ttk
2. Pipa PVC dia. 80 mm 30.00 m'
3. Pipa PVC dia. 50 mm 12.00 m'
4. Pipa Instalasi Vent Toilet dia. 50 mm 28.00 m'
5. Pipa Instalasi Vent Toilet dia. 40 mm 28.00 m'
-
Pekerjaan Pemipaan Air Kotor (Pipa PVC clas AW) -
1. Titik Air Kotor 5.00 ttk
2. Pipa PVC dia. 100 mm 26.00 m'
-
c. Lantai - 3 -
Pekerjaan Pemipaan Air Bersih (Pipa PVC AW) -
1. Titik air bersih 16.00 ttk
2. Pipa PVC dia. 25 mm 8.00 m'
3. Pipa PVC dia. 20 mm 16.00 m'
4. Pipa PVC dia. 15 mm 56.00 m'
5. Alat sambung + bantu instalasi pemipaan lantai 1 1.00 bh
-
Pekerjaan Pemipaan Air Bekas (Pipa PVC clas AW) -
1. Titik Air Bekas 8.00 ttk
2. Pipa PVC dia. 80 mm 32.00 m'
3. Pipa PVC dia. 50 mm 12.00 m'
4. Pipa Instalasi Vent Toilet dia. 50 mm 26.00 m'
5. Pipa Instalasi Vent Toilet dia. 40 mm 7.00 m'
-
Pekerjaan Pemipaan Air Kotor (Pipa PVC clas AW) -
1. Titik Air Kotor 4.00 ttk
2. Pipa PVC dia. 100 mm 36.00 m'
-
d. Lantai - 4 -
Pekerjaan Pemipaan Air Bersih (Pipa PVC AW) -
2. Titik air bersih 16.00 ttk
3. Pipa PVC dia. 25 mm 8.00 m'
4. Pipa PVC dia. 20 mm 16.00 m'
5. Pipa PVC dia. 15 mm 56.00 m'
6. Alat sambung + bantu instalasi pemipaan 1.00 bh
-
Pekerjaan Pemipaan Air Bekas (Pipa PVC clas AW) -
1. Titik Air Bekas 8.00 ttk
2. Pipa PVC dia. 80 mm 32.00 m'
3. Pipa PVC dia. 50 mm 12.00 m'
4. Pipa Instalasi Vent Toilet dia. 50 mm 26.00 m'
5. Pipa Instalasi Vent Toilet dia. 40 mm 7.00 m'
-
Pekerjaan Pemipaan Air Kotor (Pipa PVC clas AW) -
1. Titik Air Kotor 4.00 ttk
2. Pipa PVC dia. 100 mm 36.00 m'
-
e. Lantai - 5 -
Pekerjaan Pemipaan Air Bersih (Pipa PVC AW) -
1. Titik air bersih 16.00 ttk
2. Pipa PVC dia. 25 mm 8.00 m'
3. Pipa PVC dia. 20 mm 16.00 m'
4. Pipa PVC dia. 15 mm 56.00 m'
5. Alat sambung + bantu instalasi pemipaan 1.00 bh
-
Pekerjaan Pemipaan Air Bekas (Pipa PVC clas AW) -
1. Titik Air Bekas 8.00 ttk
2. Pipa PVC dia. 80 mm 32.00 m'
3. Pipa PVC dia. 50 mm 12.00 m'
4. Pipa Instalasi Vent Toilet dia. 50 mm 26.00 m'
5. Pipa Instalasi Vent Toilet dia. 40 mm 7.00 m'
-
Pekerjaan Pemipaan Air Kotor (Pipa PVC clas AW) -
1. Titik Air Kotor 4.00 ttk
2. Pipa PVC dia. 100 mm 36.00 m'

Jumlah C
D. PEKERJAAN FLOOR DRAIN & CLEAN OUT
a. Lantai - 1
1. Floor Drain dia. 50 mm2 7.00 bh
2. Closet clean out dia. 100 mm2 2.00 bh
-
b. Lantai - 2 -
1. Floor Drain dia. 50 mm2 8.00 bh
2. Closet clean out dia. 100 mm2 2.00 bh
-
c. Lantai - 3 -
1. Floor Drain dia. 50 mm2 7.00 bh
2. Closet clean out dia. 100 mm2 2.00 bh
-
d. Lantai - 4 -
1. Floor Drain dia. 50 mm2 7.00 bh

- 27 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

2. Closet clean out dia. 100 mm2 2.00 bh


-
e. Lantai - 5 -
1. Floor Drain dia. 50 mm2 7.00 bh
2. Closet clean out dia. 100 mm2 2.00 bh
-
TESTING & COMMISSIONING -
Pengetesan dan penyetelan instalasi sampai berfungsi dengan baik. 1.00 ls
-
PERIJINAN -
Perijinan ke dinas terkait 1.00 ls

Jumlah D
E. PEKERJAAN SANITAIR

a. Lantai - 1
1. Kloset Duduk Ex TOTO CW631J/SW631JP lengkap aksesoris dan jet shower 4.00 unit
2. Kloset Duduk Siphon Ex TOTO CW705ENJ/TV150NSV7J lengkap aksesoris & jet shower difabel 1.00 bh
3. Washtafel lengkap aksesoris & kaca cermin Toilet 4.00 unit
4. Washtafel lengkap aksesoris & kaca cermin toilet difable 1.00 unit
5. Pegangan stainless steal untuk difabel 1.00 unit
6. Urinoir standar muslim lengkap aksesoris 3.00 bh
7. Kran Dinding ex TOTO TX130L 3.00 bh
8. Floor Drain 7.00 bh
-
b. Lantai - 2 -
1. Kloset Duduk Ex TOTO CW631J/SW631JP lengkap aksesoris dan jet shower 5.00 unit
2. Washtafel lengkap aksesoris & kaca cermin Toilet 4.00 unit
3. Washtafel lengkap aksesoris & kaca cermin toilet Camat 1.00 unit
4. Urinoir standar muslim lengkap aksesoris 3.00 bh
5. Kran Dinding ex TOTO TX130L 1.00 bh
6. kitchenzink stainless 1.00 bh
7. Kran Kitchen Zink 1.00 bh
8. Floor Drain 8.00 bh
-
c. Lantai - 3 -
1. Kloset Duduk Ex TOTO CW631J/SW631JP lengkap aksesoris dan jet shower 4.00 unit
2. Washtafel lengkap aksesoris & kaca cermin Toilet 4.00 unit
3. Urinoir standar muslim lengkap aksesoris 3.00 bh
4. Kran Dinding ex TOTO TX130L 1.00 bh
5. kitchenzink stainless 1.00 bh
6. Kran Kitchen Zink 1.00 bh
7. Floor Drain 7.00 bh
-
d. Lantai - 4 -
1. Kloset Duduk Ex TOTO CW631J/SW631JP lengkap aksesoris dan jet shower 4.00 unit
2. Washtafel lengkap aksesoris & kaca cermin Toilet 4.00 unit
3. Urinoir standar muslim lengkap aksesoris 3.00 bh
4. Kran Dinding ex TOTO TX130L 5.00 bh
5. kitchenzink stainless 1.00 bh
6. Kran Kitchen Zink 1.00 bh
7. Floor Drain 7.00 bh
-
e. Lantai - 5 -
1. Kloset Duduk Ex TOTO CW631J/SW631JP lengkap aksesoris dan jet shower 4.00 unit
2. Washtafel lengkap aksesoris & kaca cermin Toilet 4.00 unit
3. Urinoir standar muslim lengkap aksesoris 3.00 bh
4. Kran Dinding ex TOTO TX130L 1.00 bh
5. kitchenzink stainless 1.00 bh
6. Kran Kitchen Zink 1.00 bh
7. Floor Drain 7.00 bh

Jumlah E
F. PEKERJAAN INSTALASI PEMIPAAN AIR HUJAN
Pengadaan dan pemasangan instalasi pipa air hujan termasuk
support, clamb dan accessories lain yang diperlukan sesuai dengan
Spesifikasi Teknis & Gambar.
1. Fitting dan Accessories 1.00 lot
2. Roof drain san ei H01 4" 3.00 bh
3. Pipa PVC Type AW Dia. 80 mm 96.00 m'
4. Pipa PVC Type AW Dia. 100 mm 97.80 m'
5. Pipa PVC Type AW Dia. 150 mm 21.74 m'
6. Bahan bantu ( lem,klem,fisher dll) 1.00 lls

Jumlah F
G. PEKERJAAN STP
1. STP kapasitas 24 m³ type 2 X BCR 200 2.00 Unit
System anaerobe & aerobe
Material & peralatan
Tank dimension : 1,6 (Dia) X 1,8 (T) 6 tank
Material : Fiberglass Reinforced Plastics
Model : Cylinder tank
Aeration : Disc Fine bubble 10" ex, Taiwan 1 ls
Airlift pump : PVC ex, AHS 1 ls

- 28 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

Media Filter : Enviroball, Japanese Model 1 ls


Air Blower : Type : HK - 120 1 unit
power : 120 watt - 220 Volt - 50 Hz
Pipe & Fitting's : PVC ½", 2", & 4" 1 ls

2. Grease Trap kap, 1 m3 1.00 Unit


Sistem penyaringan 3 tahap
Material & peralatan
: Fiberglass Reinforced Plastics
Tangki : Silinder
Pipe & Fitting's : PVC ½", 2", & 4" 1 ls

Jumlah G

TOTAL PEKERJAAN PLUMBING

4. PEKERJAAN PANEL SURYA


a. Main Equipment
1 ondusolar pro hc 540wp 48.00 Unit
2 pv inverter 25 kw 1.00 Unit
3 pv mounting 48.00 set
4 panel ac plts 1.00 set
5 cable and accessories 1.00 ls
b. Service -
1 biaya pengiriman 1.00 ls
2 biaya instalasi 1.00 ls
e. Lampu PJU TS 200wp led 40W max lithium 6.00 bh
Tiang Pju Galvanis 7m, batery 50ah

Jumlah 4

VI. PEKERJAAN DILUAR GEDUNG


1. Pengurugan halaman dengan tanah merah + pemadatan 1,528.58 m3
2. Pasang saluran terbuka U Ditch uk.30x30 cm + galian 137.00 m'
3. Pasang saluran terbuka U Ditch uk.40x40 cm + galian 242.00 m'
4. Pasang tutup saluran U Ditch uk.40x60 cm dari beton deck cover tebal 12 cm lebar 40 cm 19.00 m'
5. Pasang tutup saluran U Ditch uk.50x60 cm dari beton deck cover tebal 12 cm lebar 50 cm 19.00 m'
6. Pasang saluran box culvert uk. 40 x 40 x 100 cm + galian 50.50 m'
7. Pasang bak kontrol dari bata + beton penutup 10.00 unit
8. Pas. Paving full pave halaman K. 400 t= 8 cm + pasir 5 sirtu 9 cm 792.37 m2
9. Urugan sirtu tebal 20 cm padat 176.82 m3
10. Pas. Paving grass block halaman t= 8 cm + pasir 5 sirtu 9 cm 304.50 m2
11. Plesteran pondasi batu bagian arah jalan kali t 15 ad 1pc : 4ps 202.50 m2
12. Acian plesteran turap 202.50 m2
13. Beton hard standing & rump jalan -
- Beton K.400 44.80 m3
- Besi wiremest M 8 1,464.19 kg
- Urugan pasir dibawah plat lantai t : 10 cm 13.43 m3
- Beton lt. kerja 1pc:3ps:5 split dibawah beton hard standing 6.71 m3
14. Pasang Tiang bendera lengkap lengkap sesuai gambar 1.00 unit
15. Pasang kanstin beton lurus 20.30.60 DKI K. 400 tnp. Tulang 438.62 m'
16. Tanam rumput gajah lempeng, mini 2 cm 550.43 m2
17. Pembersihan akhir 1.00 Ls
18. Pekerjaan bak sampah dari bata, plesteran, besi plat, 1.00 unit
engsel dan kunci uk. 2 X 2 lengkap sesuai gambar -
19. Pasang guiding block uk.30 x 30 cm 19.18 m2
20. Cat Epoxy warna biru & putih untuk penanda 18.00 m2
21. Pagar halaman keliling halaman -
- Boring trouspal dalam 3 m' 240.00 m'
- Beton trouspal besi 90 kg/m3 ad.1pc :2ps: 3split -
- Beton K.175 16.95 m3
- Beton K.225 Ready mix 1,524.68 kg
- Galian tanah lobang pondasi 125.30 m3
- Pasang pasir urug tebal 5 cm 11.58 m3
- Pasang batu kosong ( anstaping ) tebal 20 cm 46.33 m3
- Pasang pondasi batu kali ad.1pc : 4ps 350.67 m3
- Kolom beton uk. 25/45 cm -
- Beton K.225 Ready mix 42.17 m3
- Besi beton 6,494.18 kg
- Bekisting 365.61 m2
- Sloof praktis uk. 20/25 -
- Beton K.225 Ready mix 6.51 m3
- Besi beton 1,100.19 kg
- Bekisting 56.44 m2
- Plesteran pondasi batu kali t= 15 cm ad 1 : 4 289.89 m2
- Acian plesteran batu kali 289.89 m2
- Pasang suling-suling dari pipa PVC AW Ø 1,5 " atas dan bawah jarak 3 m' ujung dalam ditutup injuk 132.00 bh
- Pas. Dinding bata ad. 1pc : 4ps 101.91 m2
- Plesteran t 15 ad 1 : 4 674.70 m2
- Acian plesteran dinding 674.70 m2
- Pengecatan dinding, kolom pagar setara ICI 555.36 m2
- Pasang teralis pagar p= 3,08 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 2.00 unit
- Pasang teralis pagar p= 2,97 m' dari besi hollow Galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 1.00 unit
- Pasang teralis pagar p= 2,78 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 1.00 unit
- Pasang teralis pagar p= 2,5 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 46.00 unit

- 29 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Pasang teralis pagar p= 1,8 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 3.00 unit
- Pasang teralis pagar p= 1,65 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 2.00 unit
- Pasang teralis pagar p= 1,36 m' dari besi hollow galvanis 40x40 dan 40x20 tebal 1,3 mm + cat 7.00 unit
- Tali air kolom uk,2 x 2 cm 240.00 m'
- Membuat kepala kolom 56.00 bh
-
22. PEKERJAAN TANGGA DARI HALAMAN KE RUMAH DINAS -
- Pasang trap tangga dari batu kali ad.1pc : 4ps 4.68 m3
- Plesteran pondasi batu kali t= 15 cm ad 1 : 4 26.28 m2
- Acian plesteran batu kali 26.28 m2
-
23. PEKERJAAN POS JAGA -
- Galian tanah pondasi plat setempat 1s/d 2 m' 4.60 m3
- Plat pondasi setempat K.175 -
- Beton K.175 0.51 m3
- Besi beton 56.10 kg
- Sloof praktis uk. 15/20 K.175 -
- Beton K.175 0.25 m3
- Besi beton 42.25 kg
- Bekisting 2.16 m2
- Kolom uk. 15x20 cm K.175 -
- Beton K.175 0.49 m3
- Besi beton 82.81 kg
- Bekisting 4.24 m2
- Ring balok atas kaca uk.15/30 K.175 -
- Beton K.175 0.37 m3
- Besi beton 60.31 kg
- Bekisting 3.20 m2
- Beton plat dak K.175 besi 135 kg/m3 -
- Beton K.175 1.62 m3
- Besi beton 254.34 kg
- Bekisting 13.49 m2
- Water profing coating dak beton 13.55 m2
- Pas. bata ringan tebal 10 cm 18.55 m2
- Plesteran dinding Hebel, tebal 10 mm 48.15 m2
- Acian plesteran dinding dengan semen mortar 48.15 m2
- Pengecatan balok dak beton dan dinding 3 lapis setara ICI 54.35 m2
- Pasang keramik lantai uk. 60x60 setara homogeneous polished 3.20 m2
- Pasang keramik lantai teras uk. 30x30 setara roman 1.20 m2
- Pasang batu alam andesit uk. 30x60 setara roman 3.60 m2
- Pasang hurup KANTOR CAMAT KOJA t= 10 cm 15.00 unit
- Roof drain Ø 3" 2.00 bh
- Talang tegak PVC klas AW Ø 3" 8.00 m'
- Pintu P1 kusen dan rangka pintu panel lengkap asesoris 1.00 unit
- Kusen alumunium 4" natural -
- Daun pintu panel -
- Sealent -
- Engsel pintu stainless -
- Kunci setara dekson -

- 30 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- Finishing cat -
- Jendela J1 kusen alumunium kaca 5 mm lengkap asesoris 2.00 unit
- Kusen alumunium 4" natural -
- Rangka kaca jendela -
- Kaca polos t= 5 mm -
- Karet -
- Sealent -
- Engsel jendela -
- Grendel jedela -
- Kaitan angin jendela -
- Instalasi titik nyala lampu Kabel NYM 3 x 2,5 mm² dalam konduit PVC 20 mm2 2.00 titik
- Lampu Baret 22 watt 2.00 bh
- Instalasi stop kontak Kabel NYM 3 x 2,5 mm² dalam konduit PVC 20 mm2 1.00 titik
- Stop Kontak 1.00 unit
- Saklar seri 1.00 unit
- MCB Box - 1ph 1.00 bh
- MCB 1pas 6A 2.00 bh
-
24. Pintu gerbang dari besi pipa galvanis, hollow 40x40 dan 40x20 mm galvanis ,rel,gembok + cat lengkap 2.00 unit
-
25. PEKERJAAN BETON GWT -
- Galian tanah 1 s/d 3 m' 485.21 m3
- Pasang pasir urug tebal 10 cm 13.11 m3
- Beton lantai kerja t= 5 cm 6.55 m3
- Pondasi plat setempat beton K.400 2.60 m3
- Besi beton 847.60 kg
- Beton lantai tebal 30 cm K. 400 26.33 m3
- Besi beton 5,713.61 kg
- Balok B5 uk. 30/45 cm K. 400 9.82 m3
- Besi beton 1,826.52 kg
- Pasangan batako uk.9x19x39 cmad. 1pc :4ps 21.80 m2
- Dinding beton tebal 30 cm K. 400 47.51 m3
- Besi beton 7,696.62 kg
- Begesting 316.73 m2
- Beton plat tebal 20 cm K. 400 21.81 m3
- Besi beton 5,038.11 kg
- Begesting 109.05 m2
- Balok B6 uk. 20/30 cm K. 400 1.77 m3
- Besi beton 332.76 kg
- Begesting 16.51 m2
- Pengurugan kembali dan perataan tanah sisa galian 485.21 m3
-
26. PEKERJAAN PONDASI STP -
- Galian tanah BCR s/d 2m' 119.01 m3
- Pasang pasir urug tebal 10 cm 3.37 m3
- Beton lantai kerja t= 5 cm ad. 1pc : 3ps 5split 1.68 m3
- Beton tumbuk K. 400 6.75 m3
- Besi beton 972.00 kg
- Kolom uk, 30x 30 cm K. 400 1.72 m3
- Besi beton 273.48 kg
- Begesting 22.92 m2
- Pasang bata merah ad. 1pc : 4ps 62.08 m2
- Plesteran dinding bata dan kolom tebal 15 mm 147.20 m2
- Acian plesteran dinding 147.20 m2
- Beton plat tebal 20 cm K. 400 4.41 m3
- Besi beton 1,018.71 kg
- Begesting 22.05 m2
- Balok B6 uk. 20/30 cm K. 400 1.41 m3
- Besi beton 265.08 kg
- Begesting 13.15 m2
- Pengurugan kembali dan perataan tanah sisa galian 119.01 m3
-
27. PEKERJAAN VEGETASI -
- Pohon palm ekor tupai t= 300 cm 20.00 btg
- Pohon ketapang t= 200 cm 19.00 btg

Jumlah V.
JUMLAH Rp.
PPN 11 % Rp.
PENAMBAHAN DAYA LISTRIK 164 kVA
164000 VA 1,300.00 1,300.00
JUMLAH TOTAL Rp.
DIBULATKAN Rp.

Jakarta, 2022

- 31 -
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)

- 32 -