NO URAIAN SAT. JML.
1 GARDU BETON
2 GARDU DENGAN TIANG BETON
3 RENCANA GARDU 100 kVA
4 TIANG BETON 12/300
5 RENC.TIANG BETON 11/200
6 TIANG BETON 9/200
7 RENC.TIANG BETON 9/200
8 SUTM AAAC 3 x 70 mm²
9 RENC. SUTM AAAC 3 x 70 mm²
Kebutuhan Material : 10 LVTC 3 x 35 + 25 mm²
1. Tiang Beton 12/300daN = 11 Btg GARDU 11 RENC. LVTC 3x35+25 mm²
2. A3CS 150 mm = 1575 Mtr
3. Trafo distribusi 100kVA = 1 Set
K0847
- Konstruksi TM-1 = 6 set 12 RENC. SCHOER TM
- Konstruksi TM-3 = 2 set
- Konstruksi TM-10 = 1 set 13 RENC. SCHOER TR
4. Manset Portal = 1 set
14 RENC. GROUNDING
15 PELANGGAN
RENC. GARSIP
100KVA
PT PLN (Persero) DISTRIBUSI LAMPUNG
UP3 KOTABUMI
ULP BUMI ABUNG
JUDUL :
PERBAIKAN TEGANGAN DROP DENGAN GARDU
SISIPAN
LOKASI : GARDU K0847 Tanjung Harapan
AKTIVITAS TANGGAL NAMA PARAF
Disurvey 14 November 2024 Putra Fikrianda
Digambar 14 November 2024 Putra Fikrianda
Diperiksa 14 November 2024 Nugroho Setiajib
Disetujui 14 November 2024 Henri Sinaga
UKURAN : NO. GAMBAR :
A4 01