Anda di halaman 1dari 21

PT.

Nusareka Prima Engineering


Contruction & Mantenace Service for Industrial and Power Plant

HSE PLAN
Annual Shutdown February, 2022
Site DATANG DSSP Power Indonesia
Bayung Lencir – South Sumatera

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

COMPANY CERTFICATION

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

KEBIJAKAN K3L, KOMITMEN K3L & KEBIJAKAN ALKOHOL DAN


OBAT OBATAN TERLARANG

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

ORGANIZATION CHART

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

PROJECT HSE WORK OBJECTIVES AND PROGRAM


Tujuan K3L PT Nusareka Prima Engineering adalah bebas Insiden dan Cedera
 PT. NPE menyatakan komitmennya untuk menerapkan manajemen HSE, selain itu akan melakukan
tindakan pencegahan terhadap segala kemungkinan yang dapat membahayakan manusia, merusak
properti, alat/peralatan kerja dan lingkungan.
 Untuk memenuhi komitmen tersebut,PT. NPE harus menyediakan dan memelihara lingkungan
kerjanya dan selalu menerapkan praktik kerja yang aman, kondisi kerja yang aman dan selalu
berusaha semaksimal mungkin untuk meminimalkan potensi bahaya, dengan menetapkan target
pencapaian sebagai berikut:
A. Tidak ada kecelakaan kerja yang fatal = 0 (“nihil fatality”).
B. Tingkat Frekuensi Cedera = 0 (0 Kasus per 1 Juta Jam Kerja)
C. Tingkat Keparahan Cedera = 0 (0 Hari yang hilang per 1 Juta Jam Kerja)
D. Tingkat Frekuensi nyaris celaka = 0(0 Kasus per 1 Juta Jam Kerja)
E. Lingkungan = 0 (nihil kasus)

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

HSE WORK PROGRAM DURING


ASD FEBRUARY 2022

Tujuan Program Kerja K3L :


 Mengurangi atau mencegah aspek dan dampak dari bahaya dan resiko yang
akan timbul dalam setiap pekerjaan di tempat kerja.
 Menjamin setiap sumber produksi dapat digunakan secara aman dan
efisisensi.
 Untuk mencapai Sasaran, Tujuan dan Target K3L yaitu ZERO ACCIDENT
di tempat kerja.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

SITE HSE ACTIVITY PLAN


1. Covid -19 Preventive & Covid-19 Screening
Memastikan semua personil/pekerja yang dikirim ke site PT.DSSP Power Indonesia
telah:
 Menerima Vaksin Covid-19 minimal Dosis 2 dibuktikan dengan Sertifikat Vaksin
Covid-19.
 Melakukan Test Antigen Covid-19 dan dinyatakan negative.

2. Job / Project Layout


Tim Proyek termasuk HSE, menetapkan layout / tata letak proyek dengan berkordinasi
dengan Klien, meliputi:
 Area Kerja
 Fasilitas Pendukung (utility)
3. Identifikasi Bahaya, Penilaian Resiko dan Pengendalian Resiko
Memastikan identifikasi bahaya serta penetapan dan pengendalian resiko dalam
kaitan Keselamatan dan Kesehatan Kerja diseluruh area kegiatan telah dilakukan
secara menyeluruh dan disetujui oleh Klien. Dalam hal ini bisa menggunakan JSA /
HIRADC.
HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5
PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

4.Orientasi HSE / Safety Induction


/ HSE Training
HSE NPE bersama dengan HSE Klien
PT.DSSP akan melakukan orientasi/induksi
HSE terhadap karyawan dan setiap personil
menandatangani pernyataan kesepahaman dan
komitmen K3L.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

5. HSE Meeting
 General Safety Talk
 HSE Morning Talk / Tool Box
Meeting
 Staff Coordination Meeting
 External (Client HSE Meeting),
disesuaikan dengan permintaan klien.

6. HSE Inspection
A. General Inspection
 Daily Safety Patrol (untuk
memastikan SMK3L
dilaksanakan)
 Joint Safety Patrol dengan Klien

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

B.I. CETV-M (Construction, Equipment,


Tool, Vehicle, and Machinery) Inspection

 Inspeksi Alat-alat berat (Crane,


Lifting & Hauling dll) jika ada.
 Inspeksi Kendaraan berat(Trailer,
Truck, Forklift dll), jika ada
 Inspeksi Kendaraan ringan (Jeep,
Pick-up, dll), jika ada
 Inspeksi Power tools (grinding,
drilling machine,dll).

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

B.II. CETV-M (Construction, Equipment, Tool, Vehicle,


and Machinery) Inspection
 Inspeksi Lifting devices peralatan pendukung
(sling, shackle, chain / lever / pulley blocks
dll).
 Inspeksi Alat Pemadam Api Ringan (APAR).
 Inspeksi Perancah (Scafolding)
 Inspeksi Machinery (generator-set, welding
machine, dll).

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

C. Safety Equipment Inspection


 Inspeksi APD (Alat Pelindung
Diri)

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

7. Waste Management Plan


A. Limbah Cair Non B3
• Ditampung dalam jerigen atau drum khusus yang disediakan
untuk selanjutnya dikirim ke bagian penanganan limbah B3;
B. Limbah Cair B3
• Ditempatkan ke dalam jerigen/drum khusus yang telah diberi
label jenis limbah dan ditutup rapat;
• Penanganan limbah akan diserahkan kepada pihak yang
mendapat ijin dari Pemerintah.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

C. Limbah Padat B3
• Limbah padat B3 berupa ceceran Hg, kemasan bekas B3 dan
limbah padat terkontaminasi B3 (majun, sarung tangan, masker,
dll) dikumpulkan dan dikemas dalam drum khusus yang diberi
label dan disimpan di Gudang Limbah Bahan Kimia untuk
selanjutnya diserahkan kepada pihak yang mendapat ijin dari
Pemerintah.
D. Limbah Padat Non B3
• Limbah padat organik (limbah kantin, kardus kertas, daun dan
kayu) dibuang ketempat penampungan sementara organik.
Limbah padat organik selanjutnya diserahkan ke Klien untuk
dibakar di tungku pembakar.
• Limbah padat non-organik (plastik, karet, gelas/kaca, majun,
sarung tangan, APD bekas) dibuang ke tempat penampungan
sementara non-organik untuk didaur ulang.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

E. Collection and Cleanliness.


 Semua limbah padat harus dikelola dan dikemas dan
dibuang dengan benar.
 Area camp (mess) dan lokasi kerja harus dalam
kondisi rapi, bersih dan aman.
 Satu regu dipekerjakan untuk: pengumpulan dan
pembuangan sampah, pembersihan jalan, tempat
tinggal (camp) dan fasilitas sanitasi.
 Tempat pengambilan sampah dapat diakses oleh
petugas truk sampah
 Sampah diambil dalam kantong plastik atau
dalam drum dengan tutup rapat.
 Penggunaan tempat sampah dalam jumlah yang
cukup untuk semua tempat makan, area camp,
dan lokasi kerja untuk menjaga kebersihan.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

FLOW CHART EMERGENCY RESPON PLAN

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

FLOW CHART PCR TEST PROCESS

PCR Test Di RS

Hasil PCR (Negatif) &


Sertifikat Vaksin Covid-19 ke
2
No Work Positive Negative
?

Karantina Di RS/ PCRT Test Personil tiba di


Start to Work A
Positive Dipulangan ketempat asal. Site DSSP

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

ORGANIZATION CHART P2K3 AND TASK FORCE COVID-19


Pembentukan
Tim/Unit
Tanggap
Darurat ini
untuk
menanggulangi
keadaaan
darurat dalam
lingkungan
kerja dan untuk
melindungi para
pekerja dari hal-
hal yang tidak
diinginkan yang
berdampak
terhadap
kesehatan,
keselamatan
para pekerja
dan aset
perusahaan
serta lingkungan
hidup.

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

EMERGENCY PREPAREDNESS ACCIDENT

Safety Dept Ambulance Clinic

Site Manager PT. DSSP Power

Supervisor, Rumah Sakit


Safety Officer
Kantor Polisi

Saksi / Pelapor Fire Station

Accident

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

SAFETY CAMPAIGN

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5


PT.Nusareka Prima Engineering
Contruction & Mantenace Service for Industrial and Power Plant

KESELAMATAN ADALAH TANGGUNG


JAWAB KITA SEMUA
PLAN..
DO..
CHECK..
ACTION..

HSE PT. NPE Site DSSP Power Indonesia-Sumsel 5