REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKY


DIREKTORAT JENDERAL BINA MARGA

SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DAR


PEJABAT PEMBUAT KOMITMEN

FINAL QUANTITY
NAMA PEKERJAAN

NOMOR KONTRAK

TANGGAL KONTRAK

NILAI KONTRAK

Rp

PENYEDIA JASA

0
0

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS


BTS. KOTA PEMATANG SIANTAR - PARAPAT KM. 153 + 300,
+ 000, KM.162 + 100 (LINK. 065)

TAHUN ANGGARAN 2015

UBLIK INDONESIA

AN UMUM DAN PERUMAHAN RAKYAT

T JENDERAL BINA MARGA

AN MENDESAK DAN TANGGAP DARURAT


PEMBUAT KOMITMEN

L QUANTITY

ANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN


. KOTA PEMATANG SIANTAR - PARAPAT KM. 153 + 300, KM.154
00, KM.162 + 100 (LINK. 065)

HUN ANGGARAN 2015

REKAPITULASI DAFTAR KUANTITAS DAN HAR


No. Paket
Nama Pekerjaan

:
:

NO. DIVISI
1
2
3
4
5
6
7
8
9
10

0
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. K
PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
URAIAN PEKERJAAN

UMUM
PEKERJAAN DRAINASE
PEKERJAAN TANAH
PELEBARAN PERKERASAN DAN BAHU JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
STRUKTUR
PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
PEKERJAAN HARIAN
PEKERJAAN PEMELIHARAAN RUTIN

Total Harga Konstruksi


Pajak Pertambahan Nilai (PPN)
Total Harga + PPN
Dibulatkan

Terbilang :

PPN 10 %
A+B

Satu Milyar Enam Puluh Tiga Juta Lima Ratus Enam Puluh Enam Ribu Rupiah

Diajukan Oleh,
PT. LAMPATAR

0
0

I DAFTAR KUANTITAS DAN HARGA

ERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR 3 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
JUMLAH HARGA
(Rp.)
32,904,500.00
19,671,213.19
914,302,474.17
-

966,878,187.36
96,687,818.74
1,063,566,006.10
1,063,566,000.00

uta Lima Ratus Enam Puluh Enam Ribu Rupiah

Medan,

2015

Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0

0
0

DAFTAR KUANTITAS DAN HARGA


No. Paket
Nama Pekerjaan
Lokasi

Mata
Pembayara
n

:
:
:

10/KTR-APBN/Br.S2/PPK-06/2015
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR-PARAPAT KM. 153+300, KM. 154+000, KM. 162+100 (LINK 065)
Provinsi Sumatera Utara/Kabupaten Humbang Hasundutan
Kontrak Awal
Uraian

Satuan

Harga Satuan
(Rp.)

DIVISI 1. UMUM
1.2
Mobilisasi
Ls
1.8 (1)
Manajemen dan Keselamatan Lalu Lintas
Ls
1.20 (2) Sondir termasuk Laporan
M
DIVISI 2. PEKERJAAN DRAINASE
2.1 (1)
Galian Untuk Selokan Drainase dan Saluran Air
M3
DIVISI 3. PEKERJAAN TANAH
3.1 (3)
Galian Struktur dengan kedalaman 0 - 2 meter
M3
3.2 (2)
Timbunan Pilihan
M3
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
DIVISI 5. PERKERASAN BERBUTIR
DIVISI 6. PERKERASAN ASPAL
DIVISI 7. STRUKTUR
7.1 (7)
Beton Mutu Sedang fc' = 20 Mpa (K - 250)
M3
7.1 (9)
Beton Siklop fc' = 15 Mpa (K - 175)
M3
7.1 (10) Beton Mutu Rendah fc' = 10 Mpa (K - 125)
M3
7.3 (1)
Baja Tulangan U 24 Polos
Kg
7.3 (3)
Baja Tulangan U 32 Ulir
Kg
7.6 (1)
Pondasi Cerucuk, Penyediaan dan Pemancangan
M
7.6 (19).b Tiang Bor Beton Diameter 400 mm
M
7.7 (1)
Dinding Sumuran Silinder terpasang, Diameter 80 Cm
M
7.16 (3) a Pipa Drainase PVC diameter 50 mm
M
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
DIVISI 9. PEKERJAAN HARIAN
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
JUMLAH HARGA
PPN (10 %) x JUMLAH HARGA
TOTAL
PEMBULATAN

Perkiraan
Kuantitas

24,250,000.00
2,500,000.00
153,862.50

1.00
1.00
40.00

38,746.94
70,772.06
114,970.62

1,693,162.90
877,718.09
1,013,829.89
16,619.04
18,074.81
72,335.71
1,357,783.35
2,225,765.48
123,326.54

Adendum I

Jumlah Harga

Bobot

(Rp.)

(%)

Perkiraan
Kuantitas

24,250,000.00
2,500,000.00
6,154,500.00

0.84
0.09
0.21

1.00
1.00
40.00

23.38

905,903.46

0.03

29.78
380.51

2,107,591.95
43,747,470.62

0.07
1.51

513.73
23.76
86.41
1,799.75
62,124.42
176.00
420.00
42.00
77.60

869,828,576.62
20,854,581.82
87,605,040.79
29,910,117.24
1,122,887,087.86
12,731,084.96
570,269,007.00
93,482,150.16
9,570,139.39

30.03
0.72
3.02
1.03
38.76
0.44
19.69
3.23
0.33

2,896,803,251.87
289,680,325.19
3,186,483,577.06
3,186,483,500.00

100.00

Tambah

Jumlah Harga

Bobot

(Rp.)

(%)

24,250,000.00
2,500,000.00
6,154,500.00

0.84
0.09
0.21

12.67

490,923.73

0.02

54.17
333.69

3,833,722.49
38,364,675.52

0.13
1.32

553.65
26.16
81.47
1,727.23
60,009.48
176.00
420.00
34.00
50.20

937,419,639.59
22,961,105.23
82,596,721.14
28,704,904.46
1,084,659,949.20
12,731,084.96
570,269,007.00
75,676,026.32
6,190,992.23

32.36
0.79
2.85
0.99
37.44
0.44
19.69
2.61
0.21

2,896,803,251.87
289,680,325.19
3,186,483,577.06
3,186,483,500.00

100.00

Kurang

Jumlah Harga

Perkiraan
Kuantitas

(Rp.)

(12.67)

(490,923.73)
-

(328.62)
(53.91)
(37,874.03)
(176.00)
(420.00)
(31.00)

(556,407,192.20)
(54,655,569.37)
(684,565,896.18)
(12,731,084.96)
(570,269,007.00)
(3,823,122.69)

(1,882,942,796.14)

Final Quantity

Jumlah Harga

Perkiraan
Kuantitas

Perkiraan
Kuantitas

(Rp.)

1.00
1.00
40.00

Jumlah Harga

Bobot

(Rp.)

(%)

24,250,000.00
2,500,000.00
6,154,500.00

12.67

490,923.73

1.53
195.00

108,281.25
22,418,903.57

52.64
138.69

3,725,441.24
15,945,771.95

0.13
0.55

24,455,083.55
12,731,084.96
570,269,007.00
3,823,122.69

225.03
26.16
27.56
255.72
22,135.45
34.00
19.20

381,012,447.39
22,961,105.23
27,941,151.77
4,249,820.91
400,094,053.01
75,676,026.32
2,367,869.54

13.15
0.79
0.96
0.15
13.81
2.61
0.08

966,878,187.36
96,687,818.74
1,063,566,006.10
1,063,566,000.00

33.38

1,471.51
176.00
420.00
31.00

634,296,406.76

Diajukan Oleh,

Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0

0
0

0
0

0.84
0.09
0.21
-

REKAPITULASI VOLUME TIAP LOKASI


No. Paket
Nama Pekerjaan

Lokasi

No. Mata
Pembayara
n

1.2
1.8 (1)
1.20 (2)
2.1 (1)
3.1 (3)
3.2 (2)
7.1 (7)
7.1 (9)
7.1 (10)
7.3 (1)
7.3 (3)
7.6 (1)
7.6 (19).b
7.7 (1)
7.16 (3) a

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR - PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
Provinsi Sumatera Utara/Kabupaten Humbang Hasundutan
Vol Tiap Lokasi
Uraian Pekerjaan

DIVISI 1.
Mobilisasi
Manajemen dan Keselamatan Lalu Lintas
Sondir termasuk Laporan
DIVISI 2.
Galian Untuk Selokan Drainase dan Saluran Air
DIVISI 3.
Galian Struktur dengan kedalaman 0 - 2 meter
Timbunan Pilihan
DIVISI 7.
Beton Mutu Sedang fc' = 20 Mpa (K - 250)
Beton Siklop fc' = 15 Mpa (K - 175)
Beton Mutu Rendah fc' = 10 Mpa (K - 125)
Baja Tulangan U 24 Polos
Baja Tulangan U 32 Ulir
Pondasi Cerucuk, Penyediaan dan Pemancangan
Tiang Bor Beton Diameter 400 mm
Dinding Sumuran Silinder terpasang, Diameter 80 Cm
Pipa Drainase PVC diameter 50 mm
DIVISI 8.
DIVISI 9.
DIVISI 10.

Diajukan Oleh,
PT. LAMPATAR

Sat

Kontrak Awal

Adendum I

Final Quantity

KM. 153 +
300

Ls
Ls
M

1.00
1.00
40.00

1.00
1.00
40.00

1.00
1.00
40.00

1.00
1.00
40.00

M3

23.38

12.67

M3
M3

29.78
380.51

54.17
333.69

52.64
138.69

52.64
138.69

M3
M3
M3
Kg
Kg
M
M
M
M

513.73
23.76
86.41
1,799.75
62,124.42
176.00
420.00
42.00
77.60

553.65
26.16
81.47
1,727.23
60,009.48
176.00
420.00
34.00
50.20

225.03
26.16
27.56
255.72
22,135.45
34.00
19.20

225.03
26.17
27.57
255.72
22,135.45

34.00
19.20

Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0

0
0

0
0

NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300

FINAL QUANTIT

40
100

50
30 20

50

52.64 M3

80

SUMURAN ATAS
=
1.00
=
7.00
=
0.95 M
=
2.00 M
=
9.93
M3

150

Timbunan Pilihan
LEBAR ATAS
LEBAR BAWAH
TINGGI
PANJANG
VOLUME TIMBUNAN

=
=
=
=
=
=

225

225

150

400

50

150

DENAHPONDASI (LOKASI KM153+300)


Scala1:25
40
200

Bahu Jalan Beton Cor K-250


Bahu Jalan Tanah

CL

i = 3

i = 5

28.53 M3
Dinding Beton Cor K250

Timbunan Pilihan

100

138.69 M3
5.00 M
0.50 M
4.00 M
12.61 M
138.69 M3

Pondasi Sumuran Dia. 80 cm


Jarak As - As = 225 cm

Lantai Kerja t = 10 cm

80

30

Lantai Kerja t = 10 cm

80

80
300

POTONGANA-A
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
:

455

Lantai Kerja t=10 cm

90

Pondasi Sumuran Dia. 80 cm


Jarak As - As = 225 cm

PEKERJAAN

150

90

3.2 (2)

225

1200

i = 3

Galian Struktur dengan kedalaman 2-4 meter


A. GALIAN UNTUK TAPAK BAWAH
PANJANG
=
12.10 M
LEBAR
=
3.10 M
TINGGI GALIAN
=
0.76 M
VOLUME GALIAN
=
28.53
M3

225

325

B. GALIAN UNTUK PONDASI


JUMLAH BARIS
JUMLAH KOLOM
DIAMETER GALIAN
TINGGI GALIAN
VOLUME GALIAN

170

3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter


A. GALIAN UNTUK PONDASI SUMURAN BAWAH
JUMLAH BARIS
=
2.00
JUMLAH KOLOM
=
5.00
DIAMETER GALIAN
=
0.95 M
TINGGI GALIAN
=
2.00 M
VOLUME GALIAN
=
14.18
M3

40

1430

CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................

Scala1:100

..............................................
:
NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300


225.03 M3

12.00
3.00
0.90
32.40

M
M
M
M3

0.72
1.00
3.24
13.15
36.64

M
M
M
M
M3

1.80
2.00
0.90
14.30
24.45

M
M
M
M
M3

0.40
0.80
4.55
21.30
58.15

M
M
M
M
M3

38.20
0.40
0.40
6.11

M
M
M
M3

F.

BADAN JALAN
PANJANG
LEBAR
TINGGI
VOLUME PENGECORAN

=
=
=
=

21.30
2.85
0.20
10.90

M
M
M
M3

G. BAHU JALAN
PANJANG
LEBAR
TINGGI
VOLUME PENGECORAN

=
=
=
=

100.65
1.50
0.20
30.20

M
M
M
M3

H. PENGISI SUMURAN
A. PENGISI SUMURAN BAWAH
DIAMETER DALAM SUMURAN
TINGGI
JUMLAH SUMURAN
VOLUME PENGECORAN
A. PENGISI SUMURAN ATAS
DIAMETER DALAM SUMURAN
TINGGI
JUMLAH SUMURAN
VOLUME PENGECORAN

BahuJal n2

B a hu J al n 2

TEMBOK PENGARAH

BahuJal n1

Beton Cor

Beton Silko

=
=
=
=

0.70
0.50
17.00
13.09

M
M
BUAH
M3

=
=
=
=

0.70
0.50
17.00
13.09

M
M
BUAH
M3

290

50 0

CATATAN
:
..............................................
..............................................
..............................................
..............................................

Dinding Su
Silinder

Beton Cor

70
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN

40

1
5
0

FINAL QUANTIT

2
8
5

Beton Mutu Sedang fc' = 20 Mpa (K - 250)


A. TAPAK PONDASI BAWAH
PANJANG
=
LEBAR
=
TINGGI
=
VOLUME PENGECORAN
=
B. DINDING PENAHAN BAWAH
LEBAR ATAS
=
LEBAR BAWAH
=
TINGGI
=
PANJANG
=
VOLUME PENGECORAN
=
C. TAPAK PONDASI ATAS
LEBAR ATAS
=
LEBAR BAWAH
=
TINGGI
=
PANJANG
=
VOLUME PENGECORAN
=
D. DINDING PENAHAN ATAS
LEBAR ATAS
=
LEBAR BAWAH
=
TINGGI
=
PANJANG
=
VOLUME PENGECORAN
=
E. BALOK 40 x 60 CM
PANJANG
=
LEBAR
=
TINGGI
=
VOLUME PENGECORAN
=

4
3
0

7.1 (7)

TANGGAL :

35 15

120

DENAHRENCANLONGSOR(LOKASIKM153+30)
Scal 1:0

15 35

70

..............................................
..............................................
..............................................
:

NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300


=
=
=
=
=

26.17 M3
0.70
1.00
17.00
26.17

Beton Mutu Rendah fc' = 10 Mpa (K - 125)


=
A. SUMURAN
DIAMETER SUMURAN
=
0.80
TINGGI
=
0.10
JUMLAH SUMURAN
=
17.00
VOLUME PENGECORAN
=
3.42
B. TAPAK PONDASI BAWAH
PANJANG
=
12.00 M
LEBAR
=
3.00 M
TEBAL
=
0.10 M
VOLUME PENGECORAN
=
3.60 M3
C. BAHU JALAN
PANJANG
=
21.30 M
LEBAR
=
2.85 M
TEBAL
=
0.10 M
VOLUME PENGECORAN
=
5.45 M3
D. BAHU JALAN
PANJANG
=
100.65 M
LEBAR
=
1.50 M
TEBAL
=
0.10 M
VOLUME PENGECORAN
=
15.10 M3

M
M
BUAH
M3
27.57 M3
M
M
BUAH
M3

150

FINAL QUANTIT

400

50

150

40

200

Bahu Jalan Beton Cor K-250


Bahu Jalan Tanah

i = 3

CL

i = 3

i = 5

Lantai Kerja t=10 cm

Dinding Beton Cor K250

Timbunan Pilihan

100

Beton

Pondasi Sumuran Dia. 80 cm


Jarak As - As = 225 cm

Lantai Kerja t = 10 cm

80

30

90

7.1 (10)

Beton Siklop fc' = 15 Mpa (K - 175)


A. PENGISI SUMURAN
DIAMETER DALAM SUMURAN
TINGGI
JUMLAH SUMURAN
VOLUME PENGECORAN

90

7.1 (9)

TANGGAL :

Beton S

Dindin
Silind

Beton
Pondasi Sumuran Dia. 80 cm
Jarak As - As = 225 cm

Lantai Kerja t = 10 cm

80

80
300

POTONGANA-A
Scala1:100

REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA

455

325

PEKERJAAN

CATATAN
:
..............................................
..............................................

SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT


PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

..............................................
..............................................
..............................................
..............................................
..............................................
:

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300


=

20.00 M

Dinding Sumuran Silinder terpasang, Diameter 80 cm


JUMLAH BARIS
=
1.00
JUMLAH KOLOM
=
7.00
TINGGI SUMURAN
=
2.00 M
VOLUME SUMURAN
=
14.00 M

14.00 M

FINAL QUANTIT

4
0

Dinding Sumuran Silinder terpasang, Diameter 80 Cm


JUMLAH BARIS
=
2.00
JUMLAH KOLOM
=
5.00
TINGGI SUMURAN
=
2.00 M
VOLUME SUMURAN
=
20.00 M

1
0
0

3
0

5
0

2
0

5
0

7.7 (1)

TANGGAL :

4
0

NAMA PEKERJAAN

19.20 M
2.00
6.00
0.80 M
9.60 M

80

1
7
0

7.16 (3) a Pipa Drainase PVC diameter 50 mm


A. DINDING BAWAH
JUMLAH BARIS
=
JUMLAH KOLOM
=
PANJANG
=
VOLUME SUMURAN
=
B. DINDING ATAS
JUMLAH BARIS
=
JUMLAH KOLOM
=
PANJANG
=
VOLUME SUMURAN
=

2.00
6.00
0.80 M
9.60 M
150

225

225

225

1200

DENAHPONDASI(LOKASIKM153+30)
REPUBLIK INDONESIA

CATATAN

Scala1:25

225

150

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................

:
NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300

400

50

150

40

FINAL QUANTIT

200

10-125 (p1)

40

150

TANGGAL :

D16 - 150 (n1)

D13 - 150 (o1 - o11)

i = 5

40

455

i = 3

D19 - 150 (i1)


D16 - 150 (k1 & k2)

Detail PenulanganTem
bokPengarahdanBahuJ
Scala1:25

D16 - 150 (j1 & j2)

180

D19 - 150 (g1 - g3)

D16 - 150 (h1 & h2)

D16 - 150 (e1 & e2)


Pondasi Sumuran Dia. 80 cm
Jarak As - As = 225 cm

D19 - 150 (d1)

325

CL

D13 - 150 (o1 - o11) D16 - 150 (n1)

D16 - 150 (f1 & f2)


Lantai Kerja t = 10 cm

D16 - 150 (b1 & b3)

30
D19 - 150 (a1 & a2)

90

i = 3

20

Bahu Jalan Tanah

150

Detail Bahu Jala


Skala 1:25

Pondasi Sumuran Dia. 80 cm


Jarak As - As = 225 cm

Lantai Kerja t = 10 cm

80

80

POTONGANA-A
Scala1:100

Lantai Kerja t = 10 cm

80

80

POTONGANA-A
Scala1:100

REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................

:
NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300

7.3 (3)

KODE
1

Baja Tulangan U 32 Ulir

DIA
(mm)
2

a
(m)
3

Tapak Pondasi Bawah


a1
19
0.13
a2
19
0.13
b1
16
0.10
b3
16
0.10
c1
16
0.10
c2
16
0.10
Dinding Penahan Bawah
20 d1
19
0.13
e1
16
0.10
e2
16
0.10
f1
16
0.10
f2
16
0.10
Tapak Pondasi Atas
20 g1
19
0.13
20 g2
19
0.13
20 g3
19
0.13
h1
16
0.10
h2
16
0.10
Dinding Penahan Atas
20
i1
19
0.13
j1
16
0.10
j2
16
0.10
k1
16
0.10
20
20

b
(m)
4

22,135.45

c
(m)
5

DIMENSI
d
(m)
6

TANGGAL :

FINAL QUANTIT

Kg

e
(m)
7

f
(m)
8

g
(m)
9

PANJANG /
POTONG

JARAK
PASANG

DIPASANG
SEPJ.

JUMLAH /
GROUP

(M)
10=3+4+5+6
+7+8+9

(M)
11

(M)
12

(Ptg)
13 =
(12:11)+1

JUMLAH
GROUP
14

PANJANG TOTAL

BERAT T

(M)
15 =10x13x14

(Kg
16 = 0,0061

0.80
2.90
11.80
11.80
2.90
0.80

2.90
0.13
0.10
0.10
0.10
0.10

0.80

0.13

4.76
3.16
12.00
12.00
3.10
1.00

0.150
0.150
0.150
0.150
0.150
1.000

11.80
11.80
4.50
2.90
0.80
11.80

80
80
31
21
6
12

1
1
1
1
2
1

380.80
252.80
372.00
252.00
37.20
12.00

4.88
11.80
1.75
0.72
0.72

0.60
0.10
0.10
0.10
0.10

4.04

0.13

9.78
12.00
1.95
0.92
0.92

0.150
0.150
0.150
0.150
1.000

12.95
8.92
8.92
3.20
12.95

88
61
61
23
11

1
1
1
2
2

860.64
732.00
118.95
42.32
20.24

1.70
1.85
1.78
11.80
2.90

0.80
0.80
0.13
0.10
0.10

0.13
0.13

2.76
2.91
2.04
12.00
3.10

0.150
0.150
0.150
0.150
0.150

14.10
14.10
0.80
3.00
3.00

95
95
7
21
21

1
1
2
1
1

262.20
276.45
28.49
252.00
65.10

5.45
11.80
6.40
0.60

5.30
0.10
0.10
0.10

0.70

11.71
12.00
6.60
0.80

0.150
0.150
0.150
0.150

17.60
10.75
10.75
4.10

119
73
73
29

1
1
1
2

1,393.49
876.00
481.80
46.40

0.13

k2

16

0.10

0.60

0.10

0.80

REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

1.000

15.90

14

:
NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300

KODE
1

20
20
20
20

Baja Tulangan U 32 Ulir


DIA
(mm)
2

Tembok Pengarah
l1
19
l1
19
l1
19
l2
19
m1
16
m1
16
m1
16
m2
16
Bahu Jalan
n1
16
o1
13
o2
13
o3
13
o4
13
o5
13
o6
13
o7
13
o8
13
o9
13
o11
13
Badan Jalan
n1
16

a
(m)
3

b
(m)
4

33.60

CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................

7.3 (3)

TANGGAL :

FINAL QUANTIT

(lanjutan)

c
(m)
5

DIMENSI
d
(m)
6

e
(m)
7

f
(m)
8

g
(m)
9

PANJANG /
POTONG

JARAK
PASANG

DIPASANG
SEPJ.

JUMLAH /
GROUP

(M)
10=3+4+5+6
+7+8+9

(M)
11

(M)
12

(Ptg)
13 =
(12:11)+1

0.13
0.13
0.13
0.13
0.10
0.10
0.10
0.10

11.74
11.74
11.74
4.58
11.80
11.80
11.80
4.40

0.13
0.13
0.13
0.13
0.10
0.10
0.10
0.10

12.00
12.00
12.00
4.84
12.00
12.00
12.00
4.60

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1.40
11.80
11.80
11.80
11.80
11.80
11.80
11.80
11.80
5.40
6.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.10

1.40

0.10

0.10

3.20
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
5.60
7.20

0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150

0.10

1.90

0.10

1.90

0.10

0.10

4.20

0.150

JUMLAH
GROUP
14

PANJANG TOTAL

BERAT T

(M)
15 =10x13x14

(Kg
16 = 0,0061

4
4
4
4
8
8
8
8

1
1
1
1
1
1
1
1

48.00
48.00
48.00
19.36
96.00
96.00
96.00
36.80

99.80
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

667
11
11
11
11
11
11
11
11
11
11

1
2
2
2
2
2
2
2
2
2
2

2,134.40
264.00
264.00
264.00
264.00
264.00
264.00
264.00
264.00
123.20
158.40

20.80

140

588.00

o1
o2

13
13

0.10
0.10

11.80
9.60

0.10
0.10

12.00
9.80

0.150
0.150

1.90
1.90

14
14

2
2

336.00
274.40

TOTAL BERAT BAJA TULANGAN BJ 32 ULIR


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................

:
NAMA PEKERJAAN

PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)

STA

KM. 153 + 300

7.3 (1)

KODE
1

Baja Tulangan U 24 Polos


DIA
(mm)
2

Balok 40 x 40 Cm
p1
10

a
(m)
3

0.08

b
(m)
4

0.30

TANGGAL :

FINAL QUANTIT

255.72 Kg

c
(m)
5

0.30

DIMENSI
d
(m)
6

0.30

e
(m)
7

0.30

f
(m)
8

0.08

g
(m)
9

PANJANG /
POTONG

JARAK
PASANG

DIPASANG
SEPJ.

JUMLAH /
GROUP

(M)
10=3+4+5+6
+7+8+9

(M)
11

(M)
12

(Ptg)
13 =
(12:11)+1

1.36

TOTAL BERAT BAJA TULANGAN BJ 32 ULIR

0.125

38.00

305

JUMLAH
GROUP
14

PANJANG TOTAL

BERAT T

(M)
15 =10x13x14

(Kg
16 = 0,0061

414.80

REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN

CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:

TANGGAL :

FINAL QUANTITY
1430

80

150

225

225

225

1200

DENAHPONDASI (LOKASI KM153+300)


Scala1:25

225

150

TANGGAL :

50

FINAL QUANTITY

Beton Cor K-250

100

Beton Silkop K175

50

Dinding Sumuran
Silinder 80 cm
Beton Cor K-250

80

Detail Pondasi Sum


uran
Scala1:25

TANGGAL :

50

FINAL QUANTITY

Beton Cor K-250

100

Beton Silkop K175

50

Dinding Sumuran
Silinder 80 cm
Beton Cor K-250

80

Detail Pondasi Sum


uran
Scala1:25

TANGGAL :

FINAL QUANTITY

TANGGAL :

FINAL QUANTITY
2 D19 (l1 & l2)

3 D16 (m1 & m2)

40

10-125 (p1)

5 D16 (m1 & m2)

D13 - 150 (o1 - o11)

20

D16 - 150 (n1)

2 D19

40

Detail PenulanganTem
bokPengarahdanBahuJalan
Scala1:25

D13 - 150 (o1 - o11) D16 - 150 (n1)

150

Detail Bahu Jalan 1


Skala 1:25

TANGGAL :

FINAL QUANTITY

BERAT TOTAL
(Kg.)
16 = 0,006165x15x22

939.05
623.40
587.11
397.72
58.71
18.94
2,122.34
1,155.27
187.73
66.79
31.94
646.59
681.73
70.26
397.72
102.74
3,436.35
1,382.54
760.40
73.23

53.03

TANGGAL :

FINAL QUANTITY

BERAT TOTAL
(Kg.)
16 = 0,006165x15x22

118.37
118.37
118.37
47.74
151.51
151.51
151.51
58.08
3,368.60
275.06
275.06
275.06
275.06
275.06
275.06
275.06
275.06
128.36
165.03
928.01

350.07
285.89
22,135.45

TANGGAL :

FINAL QUANTITY

BERAT TOTAL
(Kg.)
16 = 0,006165x15x22

255.72
255.72

TANGGAL :