PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. K
PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
URAIAN PEKERJAAN
UMUM
PEKERJAAN DRAINASE
PEKERJAAN TANAH
PELEBARAN PERKERASAN DAN BAHU JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
STRUKTUR
PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
PEKERJAAN HARIAN
PEKERJAAN PEMELIHARAAN RUTIN
Terbilang :
PPN 10 %
A+B
Satu Milyar Enam Puluh Tiga Juta Lima Ratus Enam Puluh Enam Ribu Rupiah
Diajukan Oleh,
PT. LAMPATAR
0
0
ERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR 3 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
JUMLAH HARGA
(Rp.)
32,904,500.00
19,671,213.19
914,302,474.17
-
966,878,187.36
96,687,818.74
1,063,566,006.10
1,063,566,000.00
Medan,
2015
Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0
0
0
Mata
Pembayara
n
:
:
:
10/KTR-APBN/Br.S2/PPK-06/2015
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR-PARAPAT KM. 153+300, KM. 154+000, KM. 162+100 (LINK 065)
Provinsi Sumatera Utara/Kabupaten Humbang Hasundutan
Kontrak Awal
Uraian
Satuan
Harga Satuan
(Rp.)
DIVISI 1. UMUM
1.2
Mobilisasi
Ls
1.8 (1)
Manajemen dan Keselamatan Lalu Lintas
Ls
1.20 (2) Sondir termasuk Laporan
M
DIVISI 2. PEKERJAAN DRAINASE
2.1 (1)
Galian Untuk Selokan Drainase dan Saluran Air
M3
DIVISI 3. PEKERJAAN TANAH
3.1 (3)
Galian Struktur dengan kedalaman 0 - 2 meter
M3
3.2 (2)
Timbunan Pilihan
M3
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
DIVISI 5. PERKERASAN BERBUTIR
DIVISI 6. PERKERASAN ASPAL
DIVISI 7. STRUKTUR
7.1 (7)
Beton Mutu Sedang fc' = 20 Mpa (K - 250)
M3
7.1 (9)
Beton Siklop fc' = 15 Mpa (K - 175)
M3
7.1 (10) Beton Mutu Rendah fc' = 10 Mpa (K - 125)
M3
7.3 (1)
Baja Tulangan U 24 Polos
Kg
7.3 (3)
Baja Tulangan U 32 Ulir
Kg
7.6 (1)
Pondasi Cerucuk, Penyediaan dan Pemancangan
M
7.6 (19).b Tiang Bor Beton Diameter 400 mm
M
7.7 (1)
Dinding Sumuran Silinder terpasang, Diameter 80 Cm
M
7.16 (3) a Pipa Drainase PVC diameter 50 mm
M
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
DIVISI 9. PEKERJAAN HARIAN
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
JUMLAH HARGA
PPN (10 %) x JUMLAH HARGA
TOTAL
PEMBULATAN
Perkiraan
Kuantitas
24,250,000.00
2,500,000.00
153,862.50
1.00
1.00
40.00
38,746.94
70,772.06
114,970.62
1,693,162.90
877,718.09
1,013,829.89
16,619.04
18,074.81
72,335.71
1,357,783.35
2,225,765.48
123,326.54
Adendum I
Jumlah Harga
Bobot
(Rp.)
(%)
Perkiraan
Kuantitas
24,250,000.00
2,500,000.00
6,154,500.00
0.84
0.09
0.21
1.00
1.00
40.00
23.38
905,903.46
0.03
29.78
380.51
2,107,591.95
43,747,470.62
0.07
1.51
513.73
23.76
86.41
1,799.75
62,124.42
176.00
420.00
42.00
77.60
869,828,576.62
20,854,581.82
87,605,040.79
29,910,117.24
1,122,887,087.86
12,731,084.96
570,269,007.00
93,482,150.16
9,570,139.39
30.03
0.72
3.02
1.03
38.76
0.44
19.69
3.23
0.33
2,896,803,251.87
289,680,325.19
3,186,483,577.06
3,186,483,500.00
100.00
Tambah
Jumlah Harga
Bobot
(Rp.)
(%)
24,250,000.00
2,500,000.00
6,154,500.00
0.84
0.09
0.21
12.67
490,923.73
0.02
54.17
333.69
3,833,722.49
38,364,675.52
0.13
1.32
553.65
26.16
81.47
1,727.23
60,009.48
176.00
420.00
34.00
50.20
937,419,639.59
22,961,105.23
82,596,721.14
28,704,904.46
1,084,659,949.20
12,731,084.96
570,269,007.00
75,676,026.32
6,190,992.23
32.36
0.79
2.85
0.99
37.44
0.44
19.69
2.61
0.21
2,896,803,251.87
289,680,325.19
3,186,483,577.06
3,186,483,500.00
100.00
Kurang
Jumlah Harga
Perkiraan
Kuantitas
(Rp.)
(12.67)
(490,923.73)
-
(328.62)
(53.91)
(37,874.03)
(176.00)
(420.00)
(31.00)
(556,407,192.20)
(54,655,569.37)
(684,565,896.18)
(12,731,084.96)
(570,269,007.00)
(3,823,122.69)
(1,882,942,796.14)
Final Quantity
Jumlah Harga
Perkiraan
Kuantitas
Perkiraan
Kuantitas
(Rp.)
1.00
1.00
40.00
Jumlah Harga
Bobot
(Rp.)
(%)
24,250,000.00
2,500,000.00
6,154,500.00
12.67
490,923.73
1.53
195.00
108,281.25
22,418,903.57
52.64
138.69
3,725,441.24
15,945,771.95
0.13
0.55
24,455,083.55
12,731,084.96
570,269,007.00
3,823,122.69
225.03
26.16
27.56
255.72
22,135.45
34.00
19.20
381,012,447.39
22,961,105.23
27,941,151.77
4,249,820.91
400,094,053.01
75,676,026.32
2,367,869.54
13.15
0.79
0.96
0.15
13.81
2.61
0.08
966,878,187.36
96,687,818.74
1,063,566,006.10
1,063,566,000.00
33.38
1,471.51
176.00
420.00
31.00
634,296,406.76
Diajukan Oleh,
Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0
0
0
0
0
0.84
0.09
0.21
-
Lokasi
No. Mata
Pembayara
n
1.2
1.8 (1)
1.20 (2)
2.1 (1)
3.1 (3)
3.2 (2)
7.1 (7)
7.1 (9)
7.1 (10)
7.3 (1)
7.3 (3)
7.6 (1)
7.6 (19).b
7.7 (1)
7.16 (3) a
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR - PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
Provinsi Sumatera Utara/Kabupaten Humbang Hasundutan
Vol Tiap Lokasi
Uraian Pekerjaan
DIVISI 1.
Mobilisasi
Manajemen dan Keselamatan Lalu Lintas
Sondir termasuk Laporan
DIVISI 2.
Galian Untuk Selokan Drainase dan Saluran Air
DIVISI 3.
Galian Struktur dengan kedalaman 0 - 2 meter
Timbunan Pilihan
DIVISI 7.
Beton Mutu Sedang fc' = 20 Mpa (K - 250)
Beton Siklop fc' = 15 Mpa (K - 175)
Beton Mutu Rendah fc' = 10 Mpa (K - 125)
Baja Tulangan U 24 Polos
Baja Tulangan U 32 Ulir
Pondasi Cerucuk, Penyediaan dan Pemancangan
Tiang Bor Beton Diameter 400 mm
Dinding Sumuran Silinder terpasang, Diameter 80 Cm
Pipa Drainase PVC diameter 50 mm
DIVISI 8.
DIVISI 9.
DIVISI 10.
Diajukan Oleh,
PT. LAMPATAR
Sat
Kontrak Awal
Adendum I
Final Quantity
KM. 153 +
300
Ls
Ls
M
1.00
1.00
40.00
1.00
1.00
40.00
1.00
1.00
40.00
1.00
1.00
40.00
M3
23.38
12.67
M3
M3
29.78
380.51
54.17
333.69
52.64
138.69
52.64
138.69
M3
M3
M3
Kg
Kg
M
M
M
M
513.73
23.76
86.41
1,799.75
62,124.42
176.00
420.00
42.00
77.60
553.65
26.16
81.47
1,727.23
60,009.48
176.00
420.00
34.00
50.20
225.03
26.16
27.56
255.72
22,135.45
34.00
19.20
225.03
26.17
27.57
255.72
22,135.45
34.00
19.20
Diperiksa Oleh,
KOORDINATOR DIREKSI LAPANGAN
0
0
0
0
0
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
FINAL QUANTIT
40
100
50
30 20
50
52.64 M3
80
SUMURAN ATAS
=
1.00
=
7.00
=
0.95 M
=
2.00 M
=
9.93
M3
150
Timbunan Pilihan
LEBAR ATAS
LEBAR BAWAH
TINGGI
PANJANG
VOLUME TIMBUNAN
=
=
=
=
=
=
225
225
150
400
50
150
CL
i = 3
i = 5
28.53 M3
Dinding Beton Cor K250
Timbunan Pilihan
100
138.69 M3
5.00 M
0.50 M
4.00 M
12.61 M
138.69 M3
Lantai Kerja t = 10 cm
80
30
Lantai Kerja t = 10 cm
80
80
300
POTONGANA-A
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
:
455
90
PEKERJAAN
150
90
3.2 (2)
225
1200
i = 3
225
325
170
40
1430
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
Scala1:100
..............................................
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
12.00
3.00
0.90
32.40
M
M
M
M3
0.72
1.00
3.24
13.15
36.64
M
M
M
M
M3
1.80
2.00
0.90
14.30
24.45
M
M
M
M
M3
0.40
0.80
4.55
21.30
58.15
M
M
M
M
M3
38.20
0.40
0.40
6.11
M
M
M
M3
F.
BADAN JALAN
PANJANG
LEBAR
TINGGI
VOLUME PENGECORAN
=
=
=
=
21.30
2.85
0.20
10.90
M
M
M
M3
G. BAHU JALAN
PANJANG
LEBAR
TINGGI
VOLUME PENGECORAN
=
=
=
=
100.65
1.50
0.20
30.20
M
M
M
M3
H. PENGISI SUMURAN
A. PENGISI SUMURAN BAWAH
DIAMETER DALAM SUMURAN
TINGGI
JUMLAH SUMURAN
VOLUME PENGECORAN
A. PENGISI SUMURAN ATAS
DIAMETER DALAM SUMURAN
TINGGI
JUMLAH SUMURAN
VOLUME PENGECORAN
BahuJal n2
B a hu J al n 2
TEMBOK PENGARAH
BahuJal n1
Beton Cor
Beton Silko
=
=
=
=
0.70
0.50
17.00
13.09
M
M
BUAH
M3
=
=
=
=
0.70
0.50
17.00
13.09
M
M
BUAH
M3
290
50 0
CATATAN
:
..............................................
..............................................
..............................................
..............................................
Dinding Su
Silinder
Beton Cor
70
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
40
1
5
0
FINAL QUANTIT
2
8
5
4
3
0
7.1 (7)
TANGGAL :
35 15
120
DENAHRENCANLONGSOR(LOKASIKM153+30)
Scal 1:0
15 35
70
..............................................
..............................................
..............................................
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
26.17 M3
0.70
1.00
17.00
26.17
M
M
BUAH
M3
27.57 M3
M
M
BUAH
M3
150
FINAL QUANTIT
400
50
150
40
200
i = 3
CL
i = 3
i = 5
Timbunan Pilihan
100
Beton
Lantai Kerja t = 10 cm
80
30
90
7.1 (10)
90
7.1 (9)
TANGGAL :
Beton S
Dindin
Silind
Beton
Pondasi Sumuran Dia. 80 cm
Jarak As - As = 225 cm
Lantai Kerja t = 10 cm
80
80
300
POTONGANA-A
Scala1:100
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
455
325
PEKERJAAN
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
20.00 M
14.00 M
FINAL QUANTIT
4
0
1
0
0
3
0
5
0
2
0
5
0
7.7 (1)
TANGGAL :
4
0
NAMA PEKERJAAN
19.20 M
2.00
6.00
0.80 M
9.60 M
80
1
7
0
2.00
6.00
0.80 M
9.60 M
150
225
225
225
1200
DENAHPONDASI(LOKASIKM153+30)
REPUBLIK INDONESIA
CATATAN
Scala1:25
225
150
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
400
50
150
40
FINAL QUANTIT
200
10-125 (p1)
40
150
TANGGAL :
i = 5
40
455
i = 3
Detail PenulanganTem
bokPengarahdanBahuJ
Scala1:25
180
325
CL
30
D19 - 150 (a1 & a2)
90
i = 3
20
150
Lantai Kerja t = 10 cm
80
80
POTONGANA-A
Scala1:100
Lantai Kerja t = 10 cm
80
80
POTONGANA-A
Scala1:100
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
7.3 (3)
KODE
1
DIA
(mm)
2
a
(m)
3
b
(m)
4
22,135.45
c
(m)
5
DIMENSI
d
(m)
6
TANGGAL :
FINAL QUANTIT
Kg
e
(m)
7
f
(m)
8
g
(m)
9
PANJANG /
POTONG
JARAK
PASANG
DIPASANG
SEPJ.
JUMLAH /
GROUP
(M)
10=3+4+5+6
+7+8+9
(M)
11
(M)
12
(Ptg)
13 =
(12:11)+1
JUMLAH
GROUP
14
PANJANG TOTAL
BERAT T
(M)
15 =10x13x14
(Kg
16 = 0,0061
0.80
2.90
11.80
11.80
2.90
0.80
2.90
0.13
0.10
0.10
0.10
0.10
0.80
0.13
4.76
3.16
12.00
12.00
3.10
1.00
0.150
0.150
0.150
0.150
0.150
1.000
11.80
11.80
4.50
2.90
0.80
11.80
80
80
31
21
6
12
1
1
1
1
2
1
380.80
252.80
372.00
252.00
37.20
12.00
4.88
11.80
1.75
0.72
0.72
0.60
0.10
0.10
0.10
0.10
4.04
0.13
9.78
12.00
1.95
0.92
0.92
0.150
0.150
0.150
0.150
1.000
12.95
8.92
8.92
3.20
12.95
88
61
61
23
11
1
1
1
2
2
860.64
732.00
118.95
42.32
20.24
1.70
1.85
1.78
11.80
2.90
0.80
0.80
0.13
0.10
0.10
0.13
0.13
2.76
2.91
2.04
12.00
3.10
0.150
0.150
0.150
0.150
0.150
14.10
14.10
0.80
3.00
3.00
95
95
7
21
21
1
1
2
1
1
262.20
276.45
28.49
252.00
65.10
5.45
11.80
6.40
0.60
5.30
0.10
0.10
0.10
0.70
11.71
12.00
6.60
0.80
0.150
0.150
0.150
0.150
17.60
10.75
10.75
4.10
119
73
73
29
1
1
1
2
1,393.49
876.00
481.80
46.40
0.13
k2
16
0.10
0.60
0.10
0.80
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN
1.000
15.90
14
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
KODE
1
20
20
20
20
Tembok Pengarah
l1
19
l1
19
l1
19
l2
19
m1
16
m1
16
m1
16
m2
16
Bahu Jalan
n1
16
o1
13
o2
13
o3
13
o4
13
o5
13
o6
13
o7
13
o8
13
o9
13
o11
13
Badan Jalan
n1
16
a
(m)
3
b
(m)
4
33.60
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
7.3 (3)
TANGGAL :
FINAL QUANTIT
(lanjutan)
c
(m)
5
DIMENSI
d
(m)
6
e
(m)
7
f
(m)
8
g
(m)
9
PANJANG /
POTONG
JARAK
PASANG
DIPASANG
SEPJ.
JUMLAH /
GROUP
(M)
10=3+4+5+6
+7+8+9
(M)
11
(M)
12
(Ptg)
13 =
(12:11)+1
0.13
0.13
0.13
0.13
0.10
0.10
0.10
0.10
11.74
11.74
11.74
4.58
11.80
11.80
11.80
4.40
0.13
0.13
0.13
0.13
0.10
0.10
0.10
0.10
12.00
12.00
12.00
4.84
12.00
12.00
12.00
4.60
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.40
11.80
11.80
11.80
11.80
11.80
11.80
11.80
11.80
5.40
6.00
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.10
1.40
0.10
0.10
3.20
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
5.60
7.20
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.10
1.90
0.10
1.90
0.10
0.10
4.20
0.150
JUMLAH
GROUP
14
PANJANG TOTAL
BERAT T
(M)
15 =10x13x14
(Kg
16 = 0,0061
4
4
4
4
8
8
8
8
1
1
1
1
1
1
1
1
48.00
48.00
48.00
19.36
96.00
96.00
96.00
36.80
99.80
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
667
11
11
11
11
11
11
11
11
11
11
1
2
2
2
2
2
2
2
2
2
2
2,134.40
264.00
264.00
264.00
264.00
264.00
264.00
264.00
264.00
123.20
158.40
20.80
140
588.00
o1
o2
13
13
0.10
0.10
11.80
9.60
0.10
0.10
12.00
9.80
0.150
0.150
1.90
1.90
14
14
2
2
336.00
274.40
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:
NAMA PEKERJAAN
PENANGANAN KERUSAKAN JALAN AKIBAT LONGSOR RUAS JALAN BTS. KOTA PEMATANG SIANTAR PARAPAT KM. 153 + 300, KM.154 + 000, KM.162 + 100 (LINK. 065)
STA
7.3 (1)
KODE
1
Balok 40 x 40 Cm
p1
10
a
(m)
3
0.08
b
(m)
4
0.30
TANGGAL :
FINAL QUANTIT
255.72 Kg
c
(m)
5
0.30
DIMENSI
d
(m)
6
0.30
e
(m)
7
0.30
f
(m)
8
0.08
g
(m)
9
PANJANG /
POTONG
JARAK
PASANG
DIPASANG
SEPJ.
JUMLAH /
GROUP
(M)
10=3+4+5+6
+7+8+9
(M)
11
(M)
12
(Ptg)
13 =
(12:11)+1
1.36
0.125
38.00
305
JUMLAH
GROUP
14
PANJANG TOTAL
BERAT T
(M)
15 =10x13x14
(Kg
16 = 0,0061
414.80
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PENANGANAN MENDESAK DAN TANGGAP DARURAT
PEJABAT PEMBUAT KOMITMEN
PEKERJAAN
CATATAN
:
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
..............................................
:
TANGGAL :
FINAL QUANTITY
1430
80
150
225
225
225
1200
225
150
TANGGAL :
50
FINAL QUANTITY
100
50
Dinding Sumuran
Silinder 80 cm
Beton Cor K-250
80
TANGGAL :
50
FINAL QUANTITY
100
50
Dinding Sumuran
Silinder 80 cm
Beton Cor K-250
80
TANGGAL :
FINAL QUANTITY
TANGGAL :
FINAL QUANTITY
2 D19 (l1 & l2)
40
10-125 (p1)
20
2 D19
40
Detail PenulanganTem
bokPengarahdanBahuJalan
Scala1:25
150
TANGGAL :
FINAL QUANTITY
BERAT TOTAL
(Kg.)
16 = 0,006165x15x22
939.05
623.40
587.11
397.72
58.71
18.94
2,122.34
1,155.27
187.73
66.79
31.94
646.59
681.73
70.26
397.72
102.74
3,436.35
1,382.54
760.40
73.23
53.03
TANGGAL :
FINAL QUANTITY
BERAT TOTAL
(Kg.)
16 = 0,006165x15x22
118.37
118.37
118.37
47.74
151.51
151.51
151.51
58.08
3,368.60
275.06
275.06
275.06
275.06
275.06
275.06
275.06
275.06
128.36
165.03
928.01
350.07
285.89
22,135.45
TANGGAL :
FINAL QUANTITY
BERAT TOTAL
(Kg.)
16 = 0,006165x15x22
255.72
255.72
TANGGAL :