I PEKERJAAN PERSIAPAN 1.7064 28 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061
II PEKERJAAN 1 TWIN BLOK
2.1. PEKERJAAN STRUKTUR
A. PEKERJAAN LANTAI DASAR 12.7200 8 1.500 1.600 1.700 1.700 1.700 1.600 1.500
A.1. PONDASI, PILE CAP & TIE BEAM 8.08044
B. PEKERJAAN LANTAI 2 ELV. + 3.15 M 40,57 6.3589 6 1.000 1.200 1.200 1.200
C. PEKERJAAN LANTAI 3 ELV. + 5.95 M 6.1608 6 0.500 1.000
D. PEKERJAAN LANTAI 4 ELV. + 8.75 M 6.1608 6
E. PEKERJAAN LANTAI 5 ELV. + 11.55 M 5.9582 6
F. PEKERJAAN LANTAI ATAP ELV. + 14.27 M 3.2511 5
G. PEKERJAAN RANGKA ATAP BAJA RINGAN 0.8857 3
H. PEKERJAAN GROUND TANK DAN RUMAH POMPA 2.2284 6
I. PEKERJAAN SEPTIC TANK BIOTECH 2 BUAH 0.2526 2
J. PEKERJAAN SUMUR RESAPAN 2 BUAH 0.0816 2 3.5 BULAN = 14 MING
2.2. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DAN PLESTERAN 14.3209 20 0.500
B. PEKERJAAN LANTAI 7.8367 16
C. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES 8.7576 16
D. PEKERJAAN PENUTUP ATAP 0.7933 2
E. PEKERJAAN SANITAIR 1.5108 4
F. PEKERJAAN PLAFOND 0.5319 8
G. PEKERJAAN PENGECATAN 2.4962 10
H. PEKERJAAN CEROBONG SAMPAH 0.6108 10
I. PEKERJAAN ENTRANCE 0.2489 6
J. PEK. PERKERASAN DI DALAM & KELILING BAGIAN LUAR BANG. 0.5490 8
K. PEKERJAAN DRAINASE DI DALAM & KELILING BAGIAN LUAR BANG. (*) 0.7113 8
L. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN 0.9130 5
2.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A. INSTALASI PLAMBING 4.2065 17 1
C. PEKERJAAN PEMADAM KEBAKARAN 0.3062 17
D. PEKERJAAN INSTALASI ELEKTRIKAL 4.0909 18 14.127
PROGRES RENCANA MINGGUAN 0.061 1.561 1.661 1.761 2.761 2.961 3.361 4.261
PROGRES KOMULATIF RENCANA MINGGUAN 0 0.061 1.622 3.283 5.044 7.805 10.766 14.127 18.388
27/01/14 03/02/14 10/02/14 17/02/14 24/02/14 03/03/14 10/03/14 17/03/14 24/03/14 31/03/14 07/04/14 14/04/14 21/04/14 28/04/14 05/05/14 12/05/14 19/05/14
02/02/14 09/02/14 16/02/14 23/02/14 02/03/14 09/03/14 16/03/14 23/03/14 30/03/14 06/04/14 13/04/14 20/04/14 27/04/14 04/05/14 11/05/14 18/05/14 25/05/14
57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061
1.420
8
85.659
1.000 0.759
1.200 1.200 1.200 1.061 81.438
0.500 1.200 1.200 1.200 1.061 1.000
0.500 1.200 1.200 1.058 1.000 1.000 77.437
57.016
0.500 0.500 0.750 0.750 0.750 0.750 0.750 0.750 1.000 1.000 0.821 0.750 0.750 0.750 0.750 0.750 0.750
0.300 0.300 0.400 0.40053.096 0.500 0.500 0.600 0.600 0.700 0.700 0.600 0.600 0.537
0.200 0.300 0.400 0.400 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700 0.700
48.825
0.397 0.397
44.816
40.049
35.189
30.499
26.788
23.068
18.388 0.200 0.200 0.200 0.200 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.206 0.200
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
127 0.200 0.200 0.200 0.200 0.300 0.300 0.300 0.300 0.300 0.200 0.200 0.200 0.200 0.200
0.020 0.030 0.030 0.030 0.030 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040
0.200 0.200 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
4.681 3.720 3.711 4.690 4.860 4.767 4.009 4.270 3.920 3.988 3.909 3.838 4.189 4.497 4.000 4.221 4.151
23.068 26.788 30.499 35.189 40.049 44.816 48.825 53.096 57.016 61.004 64.913 68.751 72.940 77.437 81.438 85.659 89.810
25 % 50 % 75 %
(STRUKTU, ARSITEKTUR, ME)
MEI JUNI
SKALA
26/05/14 02/06/14 09/06/14 16/06/14 23/06/14
01/06/14 08/06/14 15/06/14 22/06/14 29/06/14
26 27 28 29 30
0.061 0.061 0.061 100
99.441 100.000
98.463
96.341
93.204
89.810
85.659
81.438
77.437
75
72.940
68.751
64.913
0.500 0.500
0.400 0.400 0.300
0.558 0.300 0.300 50
0.378 0.378
0.066 0.066 0.066 0.066
0.250 0.250 0.250 0.250 0.250
FINISHING
R E KAP ITU LAS I
RENCANA ANGGARAN BIAYA (RAB)
JUMLAH HARGA
No. JENIS PEKERJAAN
( Rp. )
DIBULATKAN : Rp 12,279,040,000.00
PPN 10 % : Rp 1,227,904,000.00
TOTAL : Rp 13,506,944,000.00
DI BULATKAN : Rp 13,506,944,000.00
Terbilang : Tiga Belas Milyar Lima Ratus Enam Juta Sembilan Ratus E
1.71 Rp 209,531,720.10 Rp -
-
1.71 Rp 209,531,720.10 Rp -
-
97.54 Rp 10,897,464,491.17 Rp 1,079,547,837.24
-
44.06 Rp 4,417,689,006.39 Rp 992,201,183.35
12.72
8.08 Rp 992,201,183.35
4.64 Rp 569,687,680.86
6.36 Rp 780,809,808.86
6.16 Rp 756,485,073.28
6.16 Rp 756,485,073.28
5.96 Rp 731,608,217.21
3.25 Rp 399,201,472.95
0.89 Rp 108,751,500.00
2.23 Rp 273,625,600.21 Rp -
0.25 Rp 31,012,878.38
0.08 Rp 10,021,701.38
-
39.28 Rp 4,735,901,251.38 Rp 87,346,653.89
14.32 Rp 1,758,474,382.37
7.84 Rp 962,267,650.37
8.76 Rp 1,075,350,765.78
0.79 Rp 97,403,967.07
1.51 Rp 185,508,922.34
0.53 Rp 65,308,777.23
2.50 Rp 306,511,999.41
0.61 Rp 75,000,000.00
0.25 Rp 30,556,863.46
0.55 Rp 67,409,070.85
0.71 Rp 87,346,653.89
0.91 Rp 112,108,852.50
REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 10/12
ITEM PEKERJAAN DENGAN ITEM PEKERJAAN DENGAN
KONTRAK LUMPSUM KONTRAK UNIT PRICES
-
14.20 Rp 1,743,874,233.40 Rp -
4.21 Rp 516,512,361.50
0.31 Rp 37,592,900.00
4.09 Rp 502,321,467.90
0.63 Rp 76,772,729.00
4.97 Rp 610,674,775.00
-
0.75 Rp 92,497,977.75
Rp 11,106,996,211.27 Rp 1,172,045,814.98
Rp 11,106,990,000.00 Rp 1,172,040,000.00
Rp 1,110,699,000.00 Rp 117,204,000.00
Rp 12,217,689,000.00 Rp 1,289,244,000.00
Rp 12,217,689,000.00 Rp 1,289,244,000.00