SNI Ukuran Talang Hujan

Pipa Pipa datar pembuangan air hujan Talang atap datar terbuka
Ukuran pipa
Tegak Kemiringan Kemiringan
mm inci (m2) 1% 2% 4% 1% 2%
50 2 63
65 2 120
80 3 200 75 105 150 20 30
100 4 425 170 245 345 45 65
125 5 800 310 435 620 80 115
150 6 1290 490 700 990 125 175
200 8 2690 1065 1510 2135 260 365
250 10 1920 2710 3845 470 665
300 12 3090 4365 6185
Sumber: Badan Standardisasi Nasional, 2005

Talang Tegak Talang Datar 2%


Ukuran Luas Catchment Ukuran Luas Catchment
50 50
65 65
80 80
100 100
125 125
150 150
200 200
250 250
300 300
atap datar terbuka
Kemiringan
4%

40
90
160
250
520
945
Diameter Spinkler
Sistem Jalur Jumlah Panjang Pipa Diameter

BASEMENT
Shaft 1
1 A-B 3 4.00 32
B-C 5 4.56 32
C-D 7 8.00 32
D-E 9 8.56 32
E-F 11 12.00 32
F-G 14 12.56 32
G-H 16 15.14 40
H-I 18 16.00 40
I-J 21 19.89 40
J-K 23 21.17 40
K-L 26 23.75 40
L-M 27 25.17 40
M-N 30 28.00 50
N-O 33 28.56 50
O-P 35 32.00 50
P-Q 38 33.36 50
Q-R 39 36.00 50
R-S 42 36.56 50
S-Shaft 1 44 48.81 50
BASEMENT
Shaft 2
1 A-B 4 3.44 25
B-C 6 4.00 32
C-D 8 7.44 32
D-E 10 8.00 32
E-F 13 11.44 32
F-G 15 12.00 32
G-H 18 15.44 40
H-I 20 16.00 40
I-J 23 19.44 40
J-K 25 20.00 40
K-L 28 23.44 40
L-M 30 24.00 40
M-N 33 28.00 50
N-O 36 28.47 50
O-P 38 31.44 50
P-Q 40 32.00 50
Q-R 43 38.56 50
R-S 44 41.03 50
S-Shaft 2 45 44.09 50

Sistem Jalur Jumlah Panjang Pipa Diameter

LANTAI 1
Shaft 1
1 A-B 3 4.00 32
B-C 5 4.74 32
C-D 7 7.54 32
D-E 9 8.00 32
E-F 11 12.00 32
F-G 14 12.43 32
G-H 16 15.67 40
H-I 18 16.00 40
I-J 21 19.49 40
J-K 23 20.00 40
K-L 26 22.79 40
L-M 28 24.46 40
M-N 31 28.00 50
N-O 33 28.96 50
O-P 36 32.05 50
P-Q 39 32.55 50
Q-R 40 35.19 50
R-S 43 36.00 50
S-Shaft 1 45 48.25 50
LANTAI 1
Shaft 2
1 A-B 4 4.00 32
B-C 6 5.00 32
C-D 8 7.61 32
D-E 11 8.52 32
E-F 13 10.97 32
F-G 16 12.00 32
G-H 18 15.13 40
H-I 21 16.00 40
I-J 23 19.40 40
J-K 26 19.91 40
K-L 28 22.88 40
L-M 31 23.39 40
M-N 33 26.16 40
N-O 35 27.05 40
O-P 38 29.85 50
P-Q 40 31.08 50
1-2 41 2.56 25
2-3 42 5.41 32
3-4 43 9.71 32
4-Q 44 11.50 32
Q-R 44 39.09 50
R-S 45 41.58 50
S-Shaft 2 46 44.64 50

Sistem Jalur Jumlah Panjang Pipa Diameter

LANTAI 2 DAN 3
Shaft 1
1 A-B 3 3.37 25
B-C 5 4.83 32
C-D 6 5.79 32
D-E 8 9.30 32
E-F 9 10.23 32
F-G 11 13.79 40
1-2 12 3.17 25
2-3 13 7.39 32
3-4 14 9.79 32
4-G 15 10.62 32
G-H 15 14.20 40
H-I 19 17.09 40
I-J 21 17.79 40
1-2 22 3.17 25
2-3 23 7.39 32
3-4 24 9.79 32
4-J 25 10.62 32
J-K 25 20.64 40
K-L 27 20.95 40
1-2 28 3.17 25
2-3 29 7.39 32
3-4 30 9.79 32
4-L 31 10.62 32
L-M 31 23.80 40
M-N 34 24.41 40
N-O 36 27.35 40
O-P 39 28.92 50
P-Q 41 29.79 50
1-2 42 3.17 25
2-3 43 7.39 32
3-4 44 9.79 32
4-Q 45 10.62 32
Q-R 45 32.58 50
R-S 46 33.79 50
1-2 47 3.17 25
2-3 48 7.39 32
3-4 49 9.79 32
4-S 50 10.62 32
S-T 50 36.82 50
T-U 52 37.79 50
1-2 53 3.17 25
2-3 54 7.39 32
3-4 55 9.79 32
4-U 56 10.62 32
U-Shaft 1 56 50.02 50
LANTAI 2 DAN 3
Shaft 2
1 A-B 3 4.00 32
B-C 5 4.94 32
C-D 6 8.00 32
D-E 8 8.66 32
1-2 9 3.17 25
2-3 10 7.39 32
3-4 11 9.79 32
4-E 12 10.62 32
E-F 12 12.00 32
F-G 14 12.66 32
1-2 15 3.17 25
2-3 16 7.39 32
3-4 17 9.79 32
4-G 18 10.62 32
G-H 18 16.00 40
H-I 20 16.66 40
1-2 21 3.17 25
2-3 22 7.39 32
3-4 23 9.79 32
4-I 24 10.62 32
I-J 24 19.20 40
J-K 27 20.00 40
K-L 29 22.35 40
L-M 32 24.00 40
M-N 34 24.66 40
1-2 35 3.17 25
2-3 36 7.39 32
3-4 37 9.79 32
4-N 38 10.62 32
N-O 38 28.35 50
O-P 40 28.66 50
1-2 41 3.17 25
2-3 42 7.39 32
3-4 43 9.79 32
4-P 44 10.62 32
P-Q 44 30.92 50
Q-R 46 32.66 50
1-2 47 3.17 25
2-3 48 7.39 32
3-4 49 9.79 32
4-R 50 10.62 32
R-S 50 39.11 50
S-T 51 41.60 50
T-Shaft 2 52 44.66 50

Sistem Jalur Jumlah Panjang Pipa Diameter

LANTAI 4
Shaft 1
1 A-B 3 4.54 32
B-C 5 7.53 32
C-D 7 8.54 32
D-E 9 11.53 32
E-F 11 12.54 32
1-2 12 4.06 32
2-3 13 7.68 32
3-4 14 10.09 32
4-F 15 11.01 32
F-G 15 15.53 40
G-H 17 16.54 40
1-2 18 4.06 32
2-3 19 7.68 32
3-4 20 10.09 32
4-H 21 11.01 32
H-I 21 19.53 40
I-J 23 19.71 40
1-2 24 4.06 32
2-3 25 7.68 32
3-4 26 10.09 32
4-J 27 11.01 32
J-K 27 22.71 40
1-2 28 4.06 32
2-3 29 7.68 32
3-4 30 10.09 32
4-K 31 11.01 32
K-L 31 23.53 40
L-M 33 24.54 40
M-N 36 27.53 40
N-O 38 28.54 50
1-2 39 4.06 32
2-3 40 7.68 32
3-4 41 10.09 32
4-O 42 11.01 32
O-P 42 30.49 50
P-Q 44 32.54 50
1-2 45 4.06 32
2-3 46 7.68 32
3-4 47 10.09 32
4-Q 48 11.01 32
Q-R 48 34.47 50
R-S 50 36.54 50
1-2 51 4.06 32
2-3 52 7.68 32
3-4 53 10.09 32
4-S 54 11.01 32
S-Shaft 1 54 48.42 50
LANTAI 4
Shaft 2
1 A-B 4 2.99 25
B-C 6 4.00 32
C-D 8 6.99 32
1-2 9 4.06 32
2-3 10 7.68 32
3-4 11 10.09 32
4-D 12 11.01 32
D-E 12 8.00 32
E-F 14 10.99 32
1-2 15 4.06 32
2-3 16 7.68 32
3-4 17 10.09 32
4-F 18 11.01 32
F-G 18 12.00 32
G-H 20 14.99 40
1-2 21 4.06 32
2-3 22 7.68 32
3-4 23 10.09 32
4-H 24 11.01 32
H-I 24 16.00 40
I-J 27 18.99 40
1-2 28 4.06 32
2-3 29 7.68 32
3-4 30 10.09 32
4-J 31 11.01 32
J-K 31 19.34 40
K-L 34 22.99 40
1-2 35 4.06 32
2-3 36 7.68 32
3-4 37 10.09 32
4-L 38 11.01 32
L-M 38 23.76 40
M-N 41 26.24 40
1-2 42 4.06 32
2-3 43 7.68 32
3-4 44 10.09 32
4-N 45 11.01 32
N-O 45 28.01 50
O-P 48 30.24 50
1-2 49 4.06 32
2-3 50 7.68 32
3-4 51 10.09 32
4-P 52 11.01 32
P-Q 52 32.01 50
Q-R 55 38.46 50
R-S 56 40.95 50
S-Shaft 2 57 44.01 50
Diameter Spinkler
Kehilangan Tekan per Panjang Pipa Kehilangan Tekan Ket

BASEMENT
Shaft 1
0.05 0.20 OK
0.05 0.23 OK
0.05 0.41 OK
0.05 0.44 OK
0.05 0.61 OK
0.05 0.64 OK
0.03 0.38 OK
0.03 0.40 OK
0.03 0.50 OK
0.03 0.53 OK
0.03 0.59 OK
0.03 0.63 OK
0.01 0.22 OK
0.01 0.22 OK
0.01 0.25 OK
0.01 0.26 OK
0.01 0.28 OK
0.01 0.29 OK
0.01 0.38 OK
BASEMENT
Shaft 2
0.20 0.69 OK
0.05 0.20 OK
0.05 0.38 OK
0.05 0.41 OK
0.05 0.58 OK
0.05 0.61 OK
0.03 0.39 OK
0.03 0.40 OK
0.03 0.49 OK
0.03 0.50 OK
0.03 0.59 OK
0.03 0.60 OK
0.01 0.22 OK
0.01 0.22 OK
0.01 0.25 OK
0.01 0.25 OK
0.01 0.30 OK
0.01 0.32 OK
0.01 0.34 OK

Kehilangan Tekan per Panjang Pipa Kehilangan Tekan Ket

LANTAI 1
Shaft 1
0.05 0.20 OK
0.05 0.24 OK
0.05 0.38 OK
0.05 0.41 OK
0.05 0.61 OK
0.05 0.63 OK
0.03 0.39 OK
0.03 0.40 OK
0.03 0.49 OK
0.03 0.50 OK
0.03 0.57 OK
0.03 0.61 OK
0.01 0.22 OK
0.01 0.23 OK
0.01 0.25 OK
0.01 0.25 OK
0.01 0.27 OK
0.01 0.28 OK
0.01 0.38 OK
LANTAI 1
Shaft 2
0.05 0.20 OK
0.05 0.26 OK
0.05 0.39 OK
0.05 0.43 OK
0.05 0.56 OK
0.05 0.61 OK
0.03 0.38 OK
0.03 0.40 OK
0.03 0.49 OK
0.03 0.50 OK
0.03 0.57 OK
0.03 0.58 OK
0.03 0.65 OK
0.03 0.68 OK
0.01 0.23 OK
0.01 0.24 OK
0.20 0.51 OK
0.05 0.28 OK
0.05 0.50 OK
0.05 0.59 OK
0.01 0.30 OK
0.01 0.32 OK
0.01 0.35 OK

Kehilangan Tekan per Panjang Pipa Kehilangan Tekan Ket

LANTAI 2 DAN 3
Shaft 1
0.20 0.67 OK
0.05 0.25 OK
0.05 0.30 OK
0.05 0.47 OK
0.05 0.52 OK
0.03 0.34 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.03 0.36 OK
0.03 0.43 OK
0.03 0.44 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.03 0.52 OK
0.03 0.52 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.03 0.60 OK
0.03 0.61 OK
0.03 0.68 OK
0.01 0.23 OK
0.01 0.23 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.25 OK
0.01 0.26 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.29 OK
0.01 0.29 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.39 OK
LANTAI 2 DAN 3
Shaft 2
0.05 0.20 OK
0.05 0.25 OK
0.05 0.41 OK
0.05 0.44 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.05 0.61 OK
0.05 0.65 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.03 0.40 OK
0.03 0.42 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.03 0.48 OK
0.03 0.50 OK
0.03 0.56 OK
0.03 0.60 OK
0.03 0.62 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.22 OK
0.01 0.22 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.24 OK
0.01 0.25 OK
0.20 0.63 OK
0.05 0.38 OK
0.05 0.50 OK
0.05 0.54 OK
0.01 0.31 OK
0.01 0.32 OK
0.01 0.35 OK

Kehilangan Tekan per Panjang Pipa Kehilangan Tekan Ket

LANTAI 4
Shaft 1
0.05 0.23 OK
0.05 0.38 OK
0.05 0.44 OK
0.05 0.59 OK
0.05 0.64 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.39 OK
0.03 0.41 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.49 OK
0.03 0.49 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.57 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.59 OK
0.03 0.61 OK
0.03 0.69 OK
0.01 0.22 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.01 0.24 OK
0.01 0.25 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.01 0.27 OK
0.01 0.29 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.01 0.38 OK
LANTAI 4
Shaft 2
0.20 0.60 OK
0.05 0.20 OK
0.05 0.36 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.05 0.41 OK
0.05 0.56 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.05 0.61 OK
0.03 0.37 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.40 OK
0.03 0.47 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.48 OK
0.03 0.57 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.03 0.59 OK
0.03 0.66 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.01 0.22 OK
0.01 0.24 OK
0.05 0.21 OK
0.05 0.39 OK
0.05 0.51 OK
0.05 0.56 OK
0.01 0.25 OK
0.01 0.30 OK
0.01 0.32 OK
0.01 0.34 OK
Jumlah Hidran Kebakaran Tiap Lantai
Lantai Luas Lantai (m2) Jumlah Hidran

Basement 1568 4
1 1568 4
2 1568 4
3 1568 4
4 1568 4
Ukuran Pipa Talang Tegak Ukuran Pipa
Sistem LuasAtap yang Dilayani (m2) Ukuran Pipa (mm) Sistem

Pipa 1 283 100 Talang 1


Pipa 2 182 100 Talang 2
Pipa 3 333 125 Talang 3
Pipa 4 147 100 Talang 4
Pipa 5 147 100 Talang 5
Pipa 6 333 125 Talang 6
Pipa 7 182 100 Talang 7
Pipa 8 283 100 Talang 8
Asumsi Curah Hujan 115 mm/jam Asumsi Curah Hujan 115 mm/jam

konversi CR 115 mm/jam


283.3333333333 100 76.6666666667 125
533.3333333333 125 116.6666666667 150
133.3333333333 80 243.3333333333 200
443.3333333333 250
Ukuran Pipa Talang Datar Terbuka
Kemirinngan Luas Atap yang Dilayani (m2) Ukuran Talang
ganti aja ini :)
2% 283 250 283
2% 182 200 182
2% 333 250 333
2% 147 200 147
2% 147 200 147
2% 333 250 333
2% 182 200 182
2% 283 250 283
Curah Hujan 115 mm/jam
Tabel 4.26 Perhitungan Aliran Air Dingin dengan Metode Unit Alat Plambing

No Jenis Jumlah Unit Beban Masing2

1 Kloset Jumlah Alat plambing (unit) 3


2 Lavatory 0 1
3 Urinal 108 3
4 Fauchet 127 0.5
5 Sink 12 4
Jumlah
Unit Alat Plambing

Jumlah Beban Unit

#VALUE!
0
324
63.5
48
1086

Anda mungkin juga menyukai