3 Panjang sungai dari bagian hilir ke titik berat Lc 6.7 km 0 0.000 0.000 0.000
4 Koefisien n 0.200 1 0.228 0.234 0.701
5 Koefisien Ct 1.600 2 0.457 0.698 2.090
6 Koefisien Cp 1.200 3 0.685 0.923 2.763
4 0.914 0.995 2.981
4.38 1.000 1.000 2.995
Parameter bentuk hidrograf 5 1.142 0.990 2.965
Menghitung waktu dari titik berat hujan ke debit puncak (tp) 6 1.371 0.946 2.832
tp = Ct * ((L * Lc)n = 3.877 jam 7 1.599 0.882 2.642
8 1.828 0.812 2.430
Menghitung curah hujan efektif (te) 9 2.056 0.739 2.213
te = tp / 5,5 = 0.705 jam 10 2.285 0.669 2.002
11 2.513 0.602 1.803
Menghitung waktu untuk mencapai puncak (Tp) 12 2.742 0.540 1.617
tr = 1 jam, 13 2.970 0.483 1.446
Jika te > tr 14 3.199 0.431 1.290
tp' = tp + 0,25(te-tr) = 3.803 jam 15 3.427 0.384 1.149
Tp = tp' + 0,5 = 4.303 jam 16 3.656 0.341 1.022
17 3.884 0.303 0.908
Jika te < tr 18 4.112 0.269 0.806
Tp = tp + 0,5tr = 4.377 jam 19 4.341 0.239 0.715
20 4.569 0.212 0.633
Jika te = tr 21 4.798 0.187 0.561
Tp = tp = 3.877 jam 22 5.026 0.166 0.497
23 5.255 0.147 0.439
Menghitung debit maksimum hidrograf satuan (Qp) 24 5.483 0.130 0.389
qp = 0,278 (Cp/tp) = 0.076 m3/dt/km2 25 5.712 0.115 0.344
Qp = qp . A = 2.995 m3/dt 26 5.940 0.101 0.304
27 6.169 0.090 0.268
Perhitungan absis (nilai x) 28 6.397 0.079 0.237
x = t / tp = lihat tabel 29 6.626 0.070 0.209
30 6.854 0.062 0.185
Penghitungan koefisien l dan a 31 7.083 0.054 0.163
l = Qp.Tp/(A.h) = 0.334 32 7.311 0.048 0.144
a = 1,32I2 + 0,15I + 0,045 = 0.242 33 7.540 0.042 0.127
34 7.768 0.037 0.112
Perhitungan besarnya ordinat y 35 7.997 0.033 0.099
y = 10-α(1-x)^2/x) = lihat tabel 36 8.225 0.029 0.087
37 8.453 0.026 0.077
Perhitungan besarnya Qt 38 8.682 0.023 0.068
Qt = Qp . Y = lihat tabel 39 8.910 0.020 0.060
40 9.139 0.018 0.053
41 9.367 0.016 0.047
Tb = 85.131 jam 42 9.596 0.014 0.041
43 9.824 0.012 0.036
44 10.053 0.011 0.032
45 10.281 0.009 0.028
46 10.510 0.008 0.025
47 10.738 0.007 0.022
48 10.967 0.006 0.019
49 11.195 0.006 0.017
50 11.424 0.005 0.015
51 11.652 0.004 0.013
52 11.881 0.004 0.012
53 12.109 0.003 0.010
3.500
HSS SNYDER 54 12.337 0.003 0.009
Q(m3/dt/mm)
0.000
0 9 18 27 36 45 54 63 72 81 90 99
Waktu t (jam)
2.000
1.500
1.000
Qtotal (m3/dt)
0.300
8.687
27.472
41.363
50.306
55.022
56.355
55.077
52.357
48.889
44.993
41.005
37.120
33.441
30.019
26.875
24.012
21.419
19.083
16.985
15.107
13.430
11.934
10.603
9.419
8.368
Perhitungan Debit Banjir Rancangan Metode Snyder
R5th = 80.735 mm
Refektif = 33.673 mm
Q max = 87.177 (m3/dt)
Qtotal (m3/dt)
0.300
13.298
42.413
63.943
77.802
85.111
87.177
85.196
80.981
75.606
69.569
63.388
57.366
51.663
46.360
41.488
37.050
33.031
29.411
26.160
23.249
20.650
18.332
16.268
14.433
12.804
Perhitungan Debit Banjir Rancangan Metode Snyder
R10th = 95.16 mm
Refektif = 46.13 mm
Q max = 119.30 (m3/dt)
Tabel 9.9 Perhitungan Debit Banjir Rancangan Tr 100 tahun Metode Snyder
Qt R1 R2 R3 R4
t 57.52 14.95 10.49 8.35 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 40.348 0.000 0.300 40.648
2 2.090 120.233 10.487 0.000 0.300 131.021
3 2.763 158.943 31.251 7.357 0.000 0.300 197.851
4 2.981 171.479 41.313 21.922 5.857 0.300 240.870
4.38 2.995 172.256 44.571 28.980 17.452 0.300 263.559
5 2.965 170.562 44.773 31.266 23.071 0.300 269.971
6 2.832 162.894 44.333 31.407 24.890 0.300 263.824
7 2.642 151.999 42.339 31.098 25.003 0.300 250.740
8 2.430 139.789 39.508 29.700 24.757 0.300 234.054
9 2.213 127.322 36.334 27.714 23.644 0.300 215.314
10 2.002 115.184 33.094 25.488 22.063 0.300 196.129
11 1.803 103.692 29.939 23.214 20.291 0.300 177.436
12 1.617 93.001 26.952 21.001 18.481 0.300 159.736
13 1.446 83.177 24.173 18.906 16.719 0.300 143.275
14 1.290 74.224 21.619 16.957 15.051 0.300 128.151
15 1.149 66.116 19.292 15.165 13.499 0.300 114.373
16 1.022 58.809 17.185 13.533 12.073 0.300 101.900
17 0.908 52.247 15.286 12.055 10.774 0.300 90.661
18 0.806 46.371 13.580 10.723 9.597 0.300 80.570
19 0.715 41.121 12.053 9.526 8.536 0.300 71.536
20 0.633 36.440 10.688 8.455 7.584 0.300 63.466
21 0.561 32.271 9.471 7.498 6.731 0.300 56.271
22 0.497 28.565 8.388 6.644 5.969 0.300 49.866
23 0.439 25.273 7.425 5.884 5.289 0.300 44.171
24 0.389 22.351 6.569 5.208 4.684 0.300 39.112
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 186.97 mm
Refektif = 128.91 mm
Q max = 332.90 (m3/dt)
Tabel 9.9 Perhitungan Debit Banjir Rancangan Tr 100 tahun Metode Snyder
Qt R1 R2 R3 R4
t 70.94 18.44 12.94 10.30 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 49.763 0.000 0.300 50.063
2 2.090 148.288 12.934 0.000 0.300 161.523
3 2.763 196.030 38.543 9.073 0.000 0.300 243.947
4 2.981 211.492 50.952 27.037 7.223 0.300 297.004
4.38 2.995 212.450 54.971 35.742 21.524 0.300 324.987
5 2.965 210.360 55.220 38.561 28.454 0.300 332.896
6 2.832 200.903 54.677 38.736 30.698 0.300 325.314
7 2.642 187.466 52.219 38.355 30.837 0.300 309.177
8 2.430 172.407 48.726 36.630 30.534 0.300 288.598
9 2.213 157.031 44.812 34.180 29.161 0.300 265.485
10 2.002 142.061 40.816 31.435 27.211 0.300 241.823
11 1.803 127.887 36.925 28.631 25.025 0.300 218.768
12 1.617 114.702 33.240 25.902 22.793 0.300 196.938
13 1.446 102.585 29.814 23.317 20.620 0.300 176.636
14 1.290 91.543 26.664 20.913 18.563 0.300 157.983
15 1.149 81.544 23.794 18.704 16.649 0.300 140.991
16 1.022 72.531 21.195 16.691 14.890 0.300 125.608
17 0.908 64.438 18.852 14.868 13.288 0.300 111.746
18 0.806 57.191 16.749 13.225 11.836 0.300 99.300
19 0.715 50.716 14.865 11.749 10.528 0.300 88.158
20 0.633 44.942 13.182 10.428 9.353 0.300 78.205
21 0.561 39.802 11.681 9.247 8.301 0.300 69.331
22 0.497 35.230 10.345 8.194 7.362 0.300 61.431
23 0.439 31.170 9.157 7.257 6.523 0.300 54.407
24 0.389 27.566 8.102 6.423 5.777 0.300 48.168
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 229.37 mm
Refektif = 168.27 mm
Q max = 434.43 (m3/dt)
Tabel 9.10 Perhitungan Debit Banjir Rancangan Tr 1000 tahun Metode Snyder
Qt R1 R2 R3 R4
t 92.60 24.07 16.88 13.44 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 64.955 0.000 0.300 65.255
2 2.090 193.560 16.883 0.000 0.300 210.743
3 2.763 255.877 50.310 11.843 0.000 0.300 318.331
4 2.981 276.059 66.508 35.292 9.428 0.300 387.586
4.38 2.995 277.309 71.753 46.654 28.096 0.300 424.112
5 2.965 274.582 72.079 50.333 37.141 0.300 434.435
6 2.832 262.237 71.370 50.561 40.070 0.300 424.538
7 2.642 244.698 68.161 50.064 40.252 0.300 403.475
8 2.430 225.042 63.602 47.813 39.856 0.300 376.614
9 2.213 204.972 58.493 44.615 38.064 0.300 346.445
10 2.002 185.432 53.277 41.032 35.518 0.300 315.558
11 1.803 166.930 48.198 37.372 32.665 0.300 285.465
12 1.617 149.720 43.389 33.809 29.752 0.300 256.970
13 1.446 133.903 38.915 30.436 26.916 0.300 230.470
14 1.290 119.490 34.804 27.298 24.230 0.300 206.123
15 1.149 106.439 31.058 24.414 21.732 0.300 183.943
16 1.022 94.675 27.666 21.787 19.436 0.300 163.863
17 0.908 84.111 24.608 19.407 17.344 0.300 145.770
18 0.806 74.651 21.862 17.262 15.450 0.300 129.525
19 0.715 66.199 19.403 15.336 13.742 0.300 114.981
20 0.633 58.663 17.207 13.611 12.209 0.300 101.989
21 0.561 51.953 15.248 12.070 10.836 0.300 90.406
22 0.497 45.986 13.504 10.696 9.609 0.300 80.094
23 0.439 40.686 11.953 9.472 8.515 0.300 70.926
24 0.389 35.982 10.575 8.385 7.541 0.300 62.782
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.30
13.298 18.105 25.044 25.044 32.553 40.648 50.063 65.255 0.30
42.413 57.985 80.468 80.468 104.794 131.021 161.523 210.743 0.30
63.943 87.476 121.453 121.453 158.216 197.851 243.947 318.331 0.30 Hidro
500.000
77.802 106.460 147.835 147.835 192.605 240.870 297.004 387.586 0.30
85.111 116.472 161.750 161.750 210.742 263.559 324.987 424.112 0.30
Q (m3/dt)
87.177 119.302 165.682 165.682 215.867 269.971 332.896 434.435 0.30 400.000
85.196 116.589 161.912 161.912 210.953 263.824 325.314 424.538 0.30
80.981 110.815 153.888 153.888 200.494 250.740 309.177 403.475 0.30
75.606 103.452 143.655 143.655 187.157 234.054 288.598 376.614 0.30 300.000
69.569 95.183 132.163 132.163 172.176 215.314 265.485 346.445 0.30
63.388 86.716 120.397 120.397 156.840 196.129 241.823 315.558 0.30
200.000
57.366 78.467 108.933 108.933 141.897 177.436 218.768 285.465 0.30
51.663 70.656 98.078 98.078 127.748 159.736 196.938 256.970 0.30
46.360 63.393 87.983 87.983 114.590 143.275 176.636 230.470 0.30 100.000
41.488 56.719 78.708 78.708 102.500 128.151 157.983 206.123 0.30
37.050 50.639 70.258 70.258 91.487 114.373 140.991 183.943 0.30
33.031 45.135 62.609 62.609 81.516 101.900 125.608 163.863 0.30 0.000
-8 2 1
29.411 40.175 55.716 55.716 72.532 90.661 111.746 145.770 0.30
26.160 35.722 49.528 49.528 64.466 80.570 99.300 129.525 0.30
23.249 31.735 43.987 43.987 57.244 71.536 88.158 114.981 0.30
20.650 28.174 39.038 39.038 50.793 63.466 78.205 101.989 0.30
18.332 24.999 34.626 34.626 45.042 56.271 69.331 90.406 0.30
16.268 22.173 30.697 30.697 39.921 49.866 61.431 80.094 0.30
14.433 19.659 27.205 27.205 35.369 44.171 54.407 70.926 0.30
12.804 17.427 24.102 24.102 31.325 39.112 48.168 62.782 0.30
11.358 15.446 21.350 21.350 27.737 34.623 42.632 55.556 0.30
10.075 13.690 18.909 18.909 24.555 30.643 37.723 49.148 0.30
8.939 12.134 16.746 16.746 21.736 27.116 33.373 43.470 0.30
7.933 10.755 14.830 14.830 19.239 23.993 29.521 38.442 0.30
Hidrograf Banjir Rancangan Metode Snyder
500.000
Q (m3/dt)
400.000
Qt 5th
Qt 10 th
300.000
Qt 20th
Qt 50th
200.000 Bas e
Flow
Q 100 th
Q 1000
100.000 th
0.000
-8 2 12 22 32 42 52 62 72 82 92
Waktu t (jam)
Hidrograf Banjir Rancangan Metode Snyder
500.000
400.000
Qt 5th Qt 10 th
Qt 20th Qt 50th
Q (m3/dt)
200.000
100.000
0.000
-8 2 12 22 32 Waktu 42
t (jam) 52 62 72 82 92
Qt 5th Qt 10 th
Qt 20th Qt 50th
Base Flow Q 100 th
Q 1000 th Qt 2 th
Qt 25 th Qt 200 th
92