Perhitungan Unit Hidrograf Metode Snyder

Parameter HSS Snyder Tabel 9.4 Ordinat HSS Metode S


1 Luas DAS A 39.29 km2 t Qt
x y
2 Panjang sungai utama L 12.44 km (jam) (m /dt/mm)
3

3 Panjang sungai dari bagian hilir ke titik berat Lc 6.7 km 0 0.000 0.000 0.000
4 Koefisien n 0.200 1 0.228 0.234 0.701
5 Koefisien Ct 1.600 2 0.457 0.698 2.090
6 Koefisien Cp 1.200 3 0.685 0.923 2.763
4 0.914 0.995 2.981
4.38 1.000 1.000 2.995
Parameter bentuk hidrograf 5 1.142 0.990 2.965
Menghitung waktu dari titik berat hujan ke debit puncak (tp) 6 1.371 0.946 2.832
tp = Ct * ((L * Lc)n = 3.877 jam 7 1.599 0.882 2.642
8 1.828 0.812 2.430
Menghitung curah hujan efektif (te) 9 2.056 0.739 2.213
te = tp / 5,5 = 0.705 jam 10 2.285 0.669 2.002
11 2.513 0.602 1.803
Menghitung waktu untuk mencapai puncak (Tp) 12 2.742 0.540 1.617
tr = 1 jam, 13 2.970 0.483 1.446
Jika te > tr 14 3.199 0.431 1.290
tp' = tp + 0,25(te-tr) = 3.803 jam 15 3.427 0.384 1.149
Tp = tp' + 0,5 = 4.303 jam 16 3.656 0.341 1.022
17 3.884 0.303 0.908
Jika te < tr 18 4.112 0.269 0.806
Tp = tp + 0,5tr = 4.377 jam 19 4.341 0.239 0.715
20 4.569 0.212 0.633
Jika te = tr 21 4.798 0.187 0.561
Tp = tp = 3.877 jam 22 5.026 0.166 0.497
23 5.255 0.147 0.439
Menghitung debit maksimum hidrograf satuan (Qp) 24 5.483 0.130 0.389
qp = 0,278 (Cp/tp) = 0.076 m3/dt/km2 25 5.712 0.115 0.344
Qp = qp . A = 2.995 m3/dt 26 5.940 0.101 0.304
27 6.169 0.090 0.268
Perhitungan absis (nilai x) 28 6.397 0.079 0.237
x = t / tp = lihat tabel 29 6.626 0.070 0.209
30 6.854 0.062 0.185
Penghitungan koefisien l dan a 31 7.083 0.054 0.163
l = Qp.Tp/(A.h) = 0.334 32 7.311 0.048 0.144
a = 1,32I2 + 0,15I + 0,045 = 0.242 33 7.540 0.042 0.127
34 7.768 0.037 0.112
Perhitungan besarnya ordinat y 35 7.997 0.033 0.099
y = 10-α(1-x)^2/x) = lihat tabel 36 8.225 0.029 0.087
37 8.453 0.026 0.077
Perhitungan besarnya Qt 38 8.682 0.023 0.068
Qt = Qp . Y = lihat tabel 39 8.910 0.020 0.060
40 9.139 0.018 0.053
41 9.367 0.016 0.047
Tb = 85.131 jam 42 9.596 0.014 0.041
43 9.824 0.012 0.036
44 10.053 0.011 0.032
45 10.281 0.009 0.028
46 10.510 0.008 0.025
47 10.738 0.007 0.022
48 10.967 0.006 0.019
49 11.195 0.006 0.017
50 11.424 0.005 0.015
51 11.652 0.004 0.013
52 11.881 0.004 0.012
53 12.109 0.003 0.010
3.500
HSS SNYDER 54 12.337 0.003 0.009
Q(m3/dt/mm)

55 12.566 0.003 0.008


3.000 56 12.794 0.002 0.007
57 13.023 0.002 0.006
58 13.251 0.002 0.005
2.500
59 13.480 0.002 0.005
60 13.708 0.001 0.004
2.000
61 13.937 0.001 0.004
62 14.165 0.001 0.003
1.500 63 14.394 0.001 0.003
64 14.622 0.001 0.003
1.000 65 14.851 0.001 0.002
66 15.079 0.001 0.002
0.500

0.000
0 9 18 27 36 45 54 63 72 81 90 99
Waktu t (jam)
2.000

1.500

1.000

0.500 67 15.308 0.001 0.002


68 15.536 0.001 0.002
0.000 69 15.765 0.000 0.001
0 9 18 27 36 45 54 63 72 81 90 99 70 15.993 0.000 0.001
Waktu t (jam)
71 16.221 0.000 0.001
72 16.450 0.000 0.001
73 16.678 0.000 0.001
Grafik 9.10 unit hidrograf metode snyder 74 16.907 0.000 0.001
75 17.135 0.000 0.001
76 17.364 0.000 0.001
77 17.592 0.000 0.000
78 17.821 0.000 0.000
79 18.049 0.000 0.000
80 18.278 0.000 0.000
81 18.506 0.000 0.000
82 18.735 0.000 0.000
83 18.963 0.000 0.000
84 19.192 0.000 0.000
85 19.420 0.000 0.000
86 19.649 0.000 0.000
87 19.877 0.000 0.000
88 20.106 0.000 0.000
89 20.334 0.000 0.000
90 20.562 0.000 0.000
91 20.791 0.000 0.000
92 21.019 0.000 0.000
Tabel 9.4 Ordinat HSS Metode Snyder
akibat hujan
Qtotal (m3/dt)
21.73 33.67 46.13
0.000 - - 0.000 1.830386 4.270807
15.240 0.000 - 15.240
45.414 23.620 0.000 69.033
60.035 70.385 32.354 162.773
64.770 93.045 96.411 254.226
65.063 100.384 127.451 292.898
64.423 100.839 137.503 302.765
61.527 99.847 138.126 299.500
57.412 95.358 136.768 289.538
52.800 88.980 130.619 272.399
48.091 81.833 121.883 251.807
43.506 74.534 112.092 230.133
39.166 67.429 102.096 208.690
35.128 60.701 92.363 188.192
31.417 54.443 83.147 169.007
28.035 48.692 74.575 151.302
24.973 43.451 66.697 135.120
22.213 38.704 59.518 120.435
19.734 34.427 53.017 107.178
17.515 30.585 47.157 95.257
15.532 27.145 41.895 84.572
13.764 24.072 37.183 75.019
12.189 21.332 32.974 66.495
10.789 18.892 29.220 58.901
9.546 16.722 25.877 52.145
8.442 14.795 22.905 46.142
7.463 13.084 20.265 40.813
6.596 11.567 17.922 36.086
5.828 10.223 15.845 31.896
5.148 9.033 14.003 28.184
4.546 7.979 12.373 24.898
4.014 7.046 10.929 21.990
3.544 6.222 9.652 19.418
3.128 5.493 8.522 17.143
2.761 4.848 7.524 15.132
2.436 4.278 6.641 13.355
2.149 3.775 5.861 11.785
1.896 3.331 5.171 10.398
1.672 2.939 4.563 9.174
1.475 2.592 4.025 8.092
1.301 2.286 3.551 7.138
1.147 2.016 3.132 6.295
1.012 1.778 2.762 5.552
0.892 1.568 2.436 4.896
0.786 1.383 2.148 4.317
0.693 1.219 1.894 3.806
0.611 1.075 1.670 3.356
0.539 0.947 1.472 2.958
0.475 0.835 1.298 2.608
0.419 0.736 1.144 2.299
0.369 0.649 1.008 2.026
0.325 0.572 0.889 1.786
0.287 0.504 0.783 1.574
0.253 0.444 0.690 1.387
0.223 0.392 0.609 1.223
0.196 0.345 0.536 1.078
0.173 0.304 0.473 0.950
0.152 0.268 0.416 0.837
0.134 0.236 0.367 0.737
0.118 0.208 0.323 0.650
0.104 0.183 0.285 0.573
0.092 0.162 0.251 0.504
0.081 0.142 0.221 0.444
0.071 0.125 0.195 0.392
0.063 0.110 0.172 0.345
0.055 0.097 0.151 0.304
0.049 0.086 0.133 0.268
0.043 0.076 0.117 0.236
0.038 0.067 0.103 0.208
0.033 0.059 0.091 0.183
0.029 0.052 0.080 0.161
0.026 0.046 0.071 0.142
0.023 0.040 0.062 0.125
0.020 0.035 0.055 0.110
0.018 0.031 0.048 0.097
0.016 0.027 0.043 0.086
0.014 0.024 0.038 0.075
0.012 0.021 0.033 0.066
0.011 0.019 0.029 0.059
0.009 0.016 0.026 0.052
0.008 0.015 0.023 0.045
0.007 0.013 0.020 0.040
0.006 0.011 0.018 0.035
0.006 0.010 0.015 0.031
0.005 0.009 0.014 0.027
0.004 0.008 0.012 0.024
0.004 0.007 0.011 0.021
0.003 0.006 0.009 0.019
0.003 0.005 0.008 0.016
0.003 0.005 0.007 0.014
0.002 0.004 0.006 0.013
0.002 0.004 0.006 0.011
0.002 0.003 0.005 0.010
0.002 0.003 0.004 0.009
Perhitungan Debit Banjir Rancangan Metode Snyder
R5th = 66.573 mm
Refektif = 21.727 mm
Q max = 56.355 (m3/dt)

Tabel 9.5 perhitungan Debit banjir rancangan Tr 2tahun Metode Snyder


Qt R1 R2 R3 R4
t 11.96 3.11 2.18 1.74 Base Flow (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 - - - 0.30
1 0.701 8.387 0.000 - - 0.30
2 2.090 24.992 2.180 0.000 - 0.30
3 2.763 33.038 6.496 1.529 0.000 0.30
4 2.981 35.644 8.587 4.557 1.217 0.30
4.38 2.995 35.806 9.265 6.024 3.628 0.30
5 2.965 35.453 9.307 6.499 4.796 0.30
6 2.832 33.859 9.215 6.528 5.174 0.30
7 2.642 31.595 8.801 6.464 5.197 0.30
8 2.430 29.057 8.212 6.174 5.146 0.30
9 2.213 26.466 7.553 5.761 4.915 0.30
10 2.002 23.943 6.879 5.298 4.586 0.30
11 1.803 21.554 6.223 4.825 4.218 0.30
12 1.617 19.332 5.602 4.365 3.842 0.30
13 1.446 17.289 5.025 3.930 3.475 0.30
14 1.290 15.428 4.494 3.525 3.129 0.30
15 1.149 13.743 4.010 3.152 2.806 0.30
16 1.022 12.224 3.572 2.813 2.510 0.30
17 0.908 10.860 3.177 2.506 2.239 0.30
18 0.806 9.639 2.823 2.229 1.995 0.30
19 0.715 8.548 2.505 1.980 1.774 0.30
20 0.633 7.574 2.222 1.757 1.576 0.30
21 0.561 6.708 1.969 1.558 1.399 0.30
22 0.497 5.938 1.744 1.381 1.241 0.30
23 0.439 5.253 1.543 1.223 1.099 0.30
24 0.389 4.646 1.365 1.083 0.974 0.30
5 perhitungan Debit banjir rancangan Tr 2tahun Metode Snyder

Qtotal (m3/dt)

0.300
8.687
27.472
41.363
50.306
55.022
56.355
55.077
52.357
48.889
44.993
41.005
37.120
33.441
30.019
26.875
24.012
21.419
19.083
16.985
15.107
13.430
11.934
10.603
9.419
8.368
Perhitungan Debit Banjir Rancangan Metode Snyder
R5th = 80.735 mm
Refektif = 33.673 mm
Q max = 87.177 (m3/dt)

Tabel 9.5 perhitungan Debit banjir rancangan Tr 5tahun Metode Snyder


Qt R1 R2 R3 R4
t 18.53 4.82 3.38 2.69 Base Flow (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 - - - 0.30
1 0.701 12.998 0.000 - - 0.30
2 2.090 38.734 3.379 0.000 - 0.30
3 2.763 51.205 10.068 2.370 0.000 0.30
4 2.981 55.243 13.309 7.062 1.887 0.30
4.38 2.995 55.494 14.359 9.336 5.622 0.30
5 2.965 54.948 14.424 10.072 7.432 0.30
6 2.832 52.477 14.282 10.118 8.019 0.30
7 2.642 48.968 13.640 10.019 8.055 0.30
8 2.430 45.034 12.728 9.568 7.976 0.30
9 2.213 41.018 11.705 8.928 7.617 0.30
10 2.002 37.108 10.661 8.211 7.108 0.30
11 1.803 33.405 9.645 7.479 6.537 0.30
12 1.617 29.961 8.683 6.766 5.954 0.30
13 1.446 26.796 7.788 6.091 5.386 0.30
14 1.290 23.912 6.965 5.463 4.849 0.30
15 1.149 21.300 6.215 4.886 4.349 0.30
16 1.022 18.946 5.536 4.360 3.889 0.30
17 0.908 16.832 4.924 3.884 3.471 0.30
18 0.806 14.939 4.375 3.454 3.092 0.30
19 0.715 13.247 3.883 3.069 2.750 0.30
20 0.633 11.739 3.443 2.724 2.443 0.30
21 0.561 10.397 3.051 2.415 2.168 0.30
22 0.497 9.202 2.702 2.140 1.923 0.30
23 0.439 8.142 2.392 1.896 1.704 0.30
24 0.389 7.200 2.116 1.678 1.509 0.30
5 perhitungan Debit banjir rancangan Tr 5tahun Metode Snyder

Qtotal (m3/dt)

0.300
13.298
42.413
63.943
77.802
85.111
87.177
85.196
80.981
75.606
69.569
63.388
57.366
51.663
46.360
41.488
37.050
33.031
29.411
26.160
23.249
20.650
18.332
16.268
14.433
12.804
Perhitungan Debit Banjir Rancangan Metode Snyder
R10th = 95.16 mm
Refektif = 46.13 mm
Q max = 119.30 (m3/dt)

Tabel 9.6 Perhitungan Debit Banjir Rancangan Tr 10 tahun Metode snyder


Qt R1 R2 R3 R4
t 25.38 6.60 4.63 3.68 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 - - - 0.300 0.300
1 0.701 17.805 0.000 - - 0.300 18.105
2 2.090 53.057 4.628 0.000 - 0.300 57.985
3 2.763 70.139 13.791 3.246 0.000 0.300 87.476
4 2.981 75.671 18.231 9.674 2.584 0.300 106.460
4.38 2.995 76.014 19.669 12.788 7.701 0.300 116.472
5 2.965 75.266 19.758 13.797 10.181 0.300 119.302
6 2.832 71.882 19.563 13.860 10.984 0.300 116.589
7 2.642 67.075 18.684 13.723 11.034 0.300 110.815
8 2.430 61.687 17.434 13.106 10.925 0.300 103.452
9 2.213 56.185 16.034 12.230 10.434 0.300 95.183
10 2.002 50.829 14.604 11.247 9.736 0.300 86.716
11 1.803 45.758 13.212 10.244 8.954 0.300 78.467
12 1.617 41.040 11.893 9.268 8.155 0.300 70.656
13 1.446 36.705 10.667 8.343 7.378 0.300 63.393
14 1.290 32.754 9.540 7.483 6.642 0.300 56.719
15 1.149 29.176 8.513 6.692 5.957 0.300 50.639
16 1.022 25.952 7.583 5.972 5.328 0.300 45.135
17 0.908 23.056 6.745 5.320 4.754 0.300 40.175
18 0.806 20.463 5.993 4.732 4.235 0.300 35.722
19 0.715 18.146 5.319 4.204 3.767 0.300 31.735
20 0.633 16.080 4.717 3.731 3.347 0.300 28.174
21 0.561 14.241 4.180 3.309 2.970 0.300 24.999
22 0.497 12.605 3.702 2.932 2.634 0.300 22.173
23 0.439 11.152 3.276 2.597 2.334 0.300 19.659
24 0.389 9.863 2.899 2.298 2.067 0.300 17.427
Perhitungan Debit Banjir Rancangan Metode Snyder
R20th = 111.67 mm
Refektif = 60.63 mm
Q max = 156.73 (m3/dt)

Tabel 9.7 Perhitungan Debit Banjir rancangan Tr 20 tahun Metode Snyder


Qt R1 R2 R3 R4
t 33.37 8.67 6.08 4.84 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 - - - 0.300 0.300
1 0.701 23.405 0.000 - - 0.300 23.705
2 2.090 69.743 6.083 0.000 - 0.300 76.127
3 2.763 92.197 18.128 4.267 0.000 0.300 114.892
4 2.981 99.469 23.964 12.716 3.397 0.300 139.847
4.38 2.995 99.920 25.854 16.810 10.123 0.300 153.007
5 2.965 98.937 25.971 18.136 13.383 0.300 156.727
6 2.832 94.489 25.716 18.218 14.438 0.300 153.161
7 2.642 88.169 24.560 18.039 14.504 0.300 145.572
8 2.430 81.087 22.917 17.228 14.361 0.300 135.893
9 2.213 73.855 21.076 16.076 13.715 0.300 125.023
10 2.002 66.815 19.197 14.784 12.798 0.300 113.894
11 1.803 60.148 17.367 13.466 11.770 0.300 103.050
12 1.617 53.947 15.634 12.182 10.720 0.300 92.783
13 1.446 48.248 14.022 10.967 9.698 0.300 83.235
14 1.290 43.055 12.541 9.836 8.731 0.300 74.462
15 1.149 38.352 11.191 8.797 7.830 0.300 66.470
16 1.022 34.113 9.968 7.850 7.003 0.300 59.235
17 0.908 30.307 8.867 6.993 6.249 0.300 52.715
18 0.806 26.898 7.877 6.220 5.567 0.300 46.862
19 0.715 23.853 6.991 5.526 4.952 0.300 41.622
20 0.633 21.137 6.200 4.904 4.399 0.300 36.941
21 0.561 18.720 5.494 4.349 3.904 0.300 32.767
22 0.497 16.570 4.866 3.854 3.462 0.300 29.051
23 0.439 14.660 4.307 3.413 3.068 0.300 25.748
24 0.389 12.965 3.810 3.021 2.717 0.300 22.814
Perhitungan Debit Banjir Rancangan Metode Snyder
R20th = 115.58 mm
Refektif = 64.10 mm
Q max = 165.68 (m3/dt)

Tabel 9.7 Perhitungan Debit Banjir rancangan Tr 20 tahun Metode Snyder


Qt R1 R2 R3 R4
t 35.28 9.17 6.43 5.12 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 - - - 0.300 0.300
1 0.701 24.744 0.000 - - 0.300 25.044
2 2.090 73.736 6.432 0.000 - 0.300 80.468
3 2.763 97.476 19.166 4.512 0.000 0.300 121.453
4 2.981 105.164 25.336 13.444 3.592 0.300 147.835
4.38 2.995 105.640 27.334 17.773 10.703 0.300 161.750
5 2.965 104.601 27.458 19.174 14.149 0.300 165.682
6 2.832 99.898 27.188 19.261 15.265 0.300 161.912
7 2.642 93.217 25.966 19.072 15.334 0.300 153.888
8 2.430 85.729 24.229 18.214 15.183 0.300 143.655
9 2.213 78.083 22.283 16.996 14.500 0.300 132.163
10 2.002 70.640 20.296 15.631 13.531 0.300 120.397
11 1.803 63.591 18.361 14.237 12.444 0.300 108.933
12 1.617 57.035 16.529 12.880 11.334 0.300 98.078
13 1.446 51.010 14.825 11.595 10.253 0.300 87.983
14 1.290 45.519 13.259 10.399 9.230 0.300 78.708
15 1.149 40.547 11.831 9.301 8.279 0.300 70.258
16 1.022 36.066 10.539 8.299 7.404 0.300 62.609
17 0.908 32.042 9.374 7.393 6.607 0.300 55.716
18 0.806 28.438 8.328 6.576 5.886 0.300 49.528
19 0.715 25.218 7.392 5.842 5.235 0.300 43.987
20 0.633 22.347 6.555 5.185 4.651 0.300 39.038
21 0.561 19.791 5.809 4.598 4.128 0.300 34.626
22 0.497 17.518 5.144 4.075 3.660 0.300 30.697
23 0.439 15.499 4.553 3.609 3.244 0.300 27.205
24 0.389 13.707 4.029 3.194 2.873 0.300 24.102
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 137.30 mm
Refektif = 83.55 mm
Q max = 215.87 (m3/dt)

Tabel 9.8 Perhitungan Debit Banjir Rancangan Tr 50 tahun Metode Snyder


Qt R1 R2 R3 R4
t 45.98 11.95 8.38 6.67 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 32.253 0.000 0.300 32.553
2 2.090 96.111 8.383 0.000 0.300 104.794
3 2.763 127.054 24.981 5.881 0.000 0.300 158.216
4 2.981 137.075 33.024 17.524 4.682 0.300 192.605
4.38 2.995 137.696 35.629 23.166 13.951 0.300 210.742
5 2.965 136.342 35.790 24.993 18.442 0.300 215.867
6 2.832 130.212 35.438 25.106 19.897 0.300 210.953
7 2.642 121.504 33.845 24.859 19.987 0.300 200.494
8 2.430 111.743 31.581 23.741 19.790 0.300 187.157
9 2.213 101.778 29.044 22.154 18.901 0.300 172.176
10 2.002 92.075 26.454 20.374 17.636 0.300 156.840
11 1.803 82.888 23.932 18.557 16.220 0.300 141.897
12 1.617 74.343 21.544 16.788 14.773 0.300 127.748
13 1.446 66.489 19.323 15.113 13.365 0.300 114.590
14 1.290 59.332 17.282 13.555 12.031 0.300 102.500
15 1.149 52.852 15.422 12.123 10.791 0.300 91.487
16 1.022 47.010 13.737 10.818 9.651 0.300 81.516
17 0.908 41.765 12.219 9.636 8.612 0.300 72.532
18 0.806 37.067 10.856 8.571 7.671 0.300 64.466
19 0.715 32.871 9.635 7.615 6.824 0.300 57.244
20 0.633 29.129 8.544 6.758 6.062 0.300 50.793
21 0.561 25.797 7.571 5.993 5.380 0.300 45.042
22 0.497 22.834 6.705 5.311 4.771 0.300 39.921
23 0.439 20.202 5.935 4.704 4.228 0.300 35.369
24 0.389 17.867 5.251 4.163 3.744 0.300 31.325
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 160.40 mm
Refektif = 104.52 mm
Q max = 269.97 (m3/dt)

Tabel 9.9 Perhitungan Debit Banjir Rancangan Tr 100 tahun Metode Snyder
Qt R1 R2 R3 R4
t 57.52 14.95 10.49 8.35 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 40.348 0.000 0.300 40.648
2 2.090 120.233 10.487 0.000 0.300 131.021
3 2.763 158.943 31.251 7.357 0.000 0.300 197.851
4 2.981 171.479 41.313 21.922 5.857 0.300 240.870
4.38 2.995 172.256 44.571 28.980 17.452 0.300 263.559
5 2.965 170.562 44.773 31.266 23.071 0.300 269.971
6 2.832 162.894 44.333 31.407 24.890 0.300 263.824
7 2.642 151.999 42.339 31.098 25.003 0.300 250.740
8 2.430 139.789 39.508 29.700 24.757 0.300 234.054
9 2.213 127.322 36.334 27.714 23.644 0.300 215.314
10 2.002 115.184 33.094 25.488 22.063 0.300 196.129
11 1.803 103.692 29.939 23.214 20.291 0.300 177.436
12 1.617 93.001 26.952 21.001 18.481 0.300 159.736
13 1.446 83.177 24.173 18.906 16.719 0.300 143.275
14 1.290 74.224 21.619 16.957 15.051 0.300 128.151
15 1.149 66.116 19.292 15.165 13.499 0.300 114.373
16 1.022 58.809 17.185 13.533 12.073 0.300 101.900
17 0.908 52.247 15.286 12.055 10.774 0.300 90.661
18 0.806 46.371 13.580 10.723 9.597 0.300 80.570
19 0.715 41.121 12.053 9.526 8.536 0.300 71.536
20 0.633 36.440 10.688 8.455 7.584 0.300 63.466
21 0.561 32.271 9.471 7.498 6.731 0.300 56.271
22 0.497 28.565 8.388 6.644 5.969 0.300 49.866
23 0.439 25.273 7.425 5.884 5.289 0.300 44.171
24 0.389 22.351 6.569 5.208 4.684 0.300 39.112
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 186.97 mm
Refektif = 128.91 mm
Q max = 332.90 (m3/dt)

Tabel 9.9 Perhitungan Debit Banjir Rancangan Tr 100 tahun Metode Snyder
Qt R1 R2 R3 R4
t 70.94 18.44 12.94 10.30 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 49.763 0.000 0.300 50.063
2 2.090 148.288 12.934 0.000 0.300 161.523
3 2.763 196.030 38.543 9.073 0.000 0.300 243.947
4 2.981 211.492 50.952 27.037 7.223 0.300 297.004
4.38 2.995 212.450 54.971 35.742 21.524 0.300 324.987
5 2.965 210.360 55.220 38.561 28.454 0.300 332.896
6 2.832 200.903 54.677 38.736 30.698 0.300 325.314
7 2.642 187.466 52.219 38.355 30.837 0.300 309.177
8 2.430 172.407 48.726 36.630 30.534 0.300 288.598
9 2.213 157.031 44.812 34.180 29.161 0.300 265.485
10 2.002 142.061 40.816 31.435 27.211 0.300 241.823
11 1.803 127.887 36.925 28.631 25.025 0.300 218.768
12 1.617 114.702 33.240 25.902 22.793 0.300 196.938
13 1.446 102.585 29.814 23.317 20.620 0.300 176.636
14 1.290 91.543 26.664 20.913 18.563 0.300 157.983
15 1.149 81.544 23.794 18.704 16.649 0.300 140.991
16 1.022 72.531 21.195 16.691 14.890 0.300 125.608
17 0.908 64.438 18.852 14.868 13.288 0.300 111.746
18 0.806 57.191 16.749 13.225 11.836 0.300 99.300
19 0.715 50.716 14.865 11.749 10.528 0.300 88.158
20 0.633 44.942 13.182 10.428 9.353 0.300 78.205
21 0.561 39.802 11.681 9.247 8.301 0.300 69.331
22 0.497 35.230 10.345 8.194 7.362 0.300 61.431
23 0.439 31.170 9.157 7.257 6.523 0.300 54.407
24 0.389 27.566 8.102 6.423 5.777 0.300 48.168
Perhitungan Debit Banjir Rancangan Metode Snyder
R50th = 229.37 mm
Refektif = 168.27 mm
Q max = 434.43 (m3/dt)

Tabel 9.10 Perhitungan Debit Banjir Rancangan Tr 1000 tahun Metode Snyder
Qt R1 R2 R3 R4
t 92.60 24.07 16.88 13.44 Base Flow (m3/dt) Qtotal (m3/dt)
(m3/dt/mm)
(mm) (mm) (mm) (mm)
0 0.000 0.000 0.300 0.300
1 0.701 64.955 0.000 0.300 65.255
2 2.090 193.560 16.883 0.000 0.300 210.743
3 2.763 255.877 50.310 11.843 0.000 0.300 318.331
4 2.981 276.059 66.508 35.292 9.428 0.300 387.586
4.38 2.995 277.309 71.753 46.654 28.096 0.300 424.112
5 2.965 274.582 72.079 50.333 37.141 0.300 434.435
6 2.832 262.237 71.370 50.561 40.070 0.300 424.538
7 2.642 244.698 68.161 50.064 40.252 0.300 403.475
8 2.430 225.042 63.602 47.813 39.856 0.300 376.614
9 2.213 204.972 58.493 44.615 38.064 0.300 346.445
10 2.002 185.432 53.277 41.032 35.518 0.300 315.558
11 1.803 166.930 48.198 37.372 32.665 0.300 285.465
12 1.617 149.720 43.389 33.809 29.752 0.300 256.970
13 1.446 133.903 38.915 30.436 26.916 0.300 230.470
14 1.290 119.490 34.804 27.298 24.230 0.300 206.123
15 1.149 106.439 31.058 24.414 21.732 0.300 183.943
16 1.022 94.675 27.666 21.787 19.436 0.300 163.863
17 0.908 84.111 24.608 19.407 17.344 0.300 145.770
18 0.806 74.651 21.862 17.262 15.450 0.300 129.525
19 0.715 66.199 19.403 15.336 13.742 0.300 114.981
20 0.633 58.663 17.207 13.611 12.209 0.300 101.989
21 0.561 51.953 15.248 12.070 10.836 0.300 90.406
22 0.497 45.986 13.504 10.696 9.609 0.300 80.094
23 0.439 40.686 11.953 9.472 8.515 0.300 70.926
24 0.389 35.982 10.575 8.385 7.541 0.300 62.782
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.30
13.298 18.105 25.044 25.044 32.553 40.648 50.063 65.255 0.30
42.413 57.985 80.468 80.468 104.794 131.021 161.523 210.743 0.30
63.943 87.476 121.453 121.453 158.216 197.851 243.947 318.331 0.30 Hidro
500.000
77.802 106.460 147.835 147.835 192.605 240.870 297.004 387.586 0.30
85.111 116.472 161.750 161.750 210.742 263.559 324.987 424.112 0.30

Q (m3/dt)
87.177 119.302 165.682 165.682 215.867 269.971 332.896 434.435 0.30 400.000
85.196 116.589 161.912 161.912 210.953 263.824 325.314 424.538 0.30
80.981 110.815 153.888 153.888 200.494 250.740 309.177 403.475 0.30
75.606 103.452 143.655 143.655 187.157 234.054 288.598 376.614 0.30 300.000
69.569 95.183 132.163 132.163 172.176 215.314 265.485 346.445 0.30
63.388 86.716 120.397 120.397 156.840 196.129 241.823 315.558 0.30
200.000
57.366 78.467 108.933 108.933 141.897 177.436 218.768 285.465 0.30
51.663 70.656 98.078 98.078 127.748 159.736 196.938 256.970 0.30
46.360 63.393 87.983 87.983 114.590 143.275 176.636 230.470 0.30 100.000
41.488 56.719 78.708 78.708 102.500 128.151 157.983 206.123 0.30
37.050 50.639 70.258 70.258 91.487 114.373 140.991 183.943 0.30
33.031 45.135 62.609 62.609 81.516 101.900 125.608 163.863 0.30 0.000
-8 2 1
29.411 40.175 55.716 55.716 72.532 90.661 111.746 145.770 0.30
26.160 35.722 49.528 49.528 64.466 80.570 99.300 129.525 0.30
23.249 31.735 43.987 43.987 57.244 71.536 88.158 114.981 0.30
20.650 28.174 39.038 39.038 50.793 63.466 78.205 101.989 0.30
18.332 24.999 34.626 34.626 45.042 56.271 69.331 90.406 0.30
16.268 22.173 30.697 30.697 39.921 49.866 61.431 80.094 0.30
14.433 19.659 27.205 27.205 35.369 44.171 54.407 70.926 0.30
12.804 17.427 24.102 24.102 31.325 39.112 48.168 62.782 0.30
11.358 15.446 21.350 21.350 27.737 34.623 42.632 55.556 0.30
10.075 13.690 18.909 18.909 24.555 30.643 37.723 49.148 0.30
8.939 12.134 16.746 16.746 21.736 27.116 33.373 43.470 0.30
7.933 10.755 14.830 14.830 19.239 23.993 29.521 38.442 0.30
Hidrograf Banjir Rancangan Metode Snyder
500.000
Q (m3/dt)

400.000
Qt 5th
Qt 10 th
300.000
Qt 20th
Qt 50th
200.000 Bas e
Flow
Q 100 th
Q 1000
100.000 th

0.000
-8 2 12 22 32 42 52 62 72 82 92
Waktu t (jam)
Hidrograf Banjir Rancangan Metode Snyder
500.000

400.000
Qt 5th Qt 10 th
Qt 20th Qt 50th
Q (m3/dt)

Base Flow Q 100 th


300.000 Q 1000 th Qt 2 th
Qt 25 th Qt 200 th

200.000

100.000

0.000
-8 2 12 22 32 Waktu 42
t (jam) 52 62 72 82 92
Qt 5th Qt 10 th
Qt 20th Qt 50th
Base Flow Q 100 th
Q 1000 th Qt 2 th
Qt 25 th Qt 200 th

92

Anda mungkin juga menyukai