Anda di halaman 1dari 5

50 100 50

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm

6∅ 10
∅ 10 - 20 6∅ 10 ∅ 10 - 20

50

Ps. batu kali ad.1:4


Urugan Pasir t=5 cm

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm

Ps. batu kali ad.1:4


+Beton bertulang 1:2:3

EKAMITRA ENGINEERING
Engineering & Management Consultant

DIPERIKSA OLEH

NAMA :

50 100 50 DETAIL PONDASI AERATOR

TANGGAL : KODE LEMBAR NO. LEMBAR JML. LEMBAR

SKALA :

NAMA FILE : DET1-80L.DWG


HANDHOLE (H1) 300 HANDHOLE (H1) 300 HANDHOLE (H1) 300
SDD 1/2" SDD 1/2" SDD 1/2"

HEAD (10t) SS.41 HEAD (10t) SS.41 HEAD (10t) SS.41

150 150 150

200 200 200

2" 150# RF WN N2 2" 150# RF WN N2 2" 150# RF WN N2


FLANGE SCH 40 A105 FLANGE SCH 40 A105 FLANGE SCH 40 A105

PLAT LANTAI BETON BERTULANG 20 CM


LEBAR 150 cm PANJANG 400 cm
LANTAI KERJA 10 CM

URUGAN PASIR 7 CM

PASANGAN BATU KOSONG 20 CM


50 470 50

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm
6∅ 10 6∅ 10
∅ 10 - 20 ∅ 10 - 20

25 cm 50

25

Ps. batu kali ad.1:4


Urugan Pasir t=5 cm

50 470 50

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm

Ps. batu kali ad.1:4


+Beton bertulang 1:2:3
EKAMITRA ENGINEERING
Engineering & Management Consultant

DIPERIKSA OLEH

NAMA :

DETAIL PONDASI SPL

TANGGAL : KODE LEMBAR NO. LEMBAR JML. LEMBAR

SKALA :

NAMA FILE : DET1-80L.DWG


∅14-15

∅14-15

∅14-15
∅14-15
80

150

LANTAI KERJA 10 CM

URUGAN PASIR 7 CM

PASANGAN BATU KOSONG 20 CM

PLAT LANTAI BETON BERTULANG 20 CM


50 350 50

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm

6∅ 10
∅ 10 - 20 6∅ 10 ∅ 10 - 20

50

Ps. batu kali ad.1:4


Urugan Pasir t=5 cm

Urugan Pasir t=75 cm


Dipadatkan setiap 25 cm

Ps. batu kali ad.1:4


+Beton bertulang 1:2:3

EKAMITRA ENGINEERING
Engineering & Management Consultant

DIPERIKSA OLEH

NAMA :

50 350 50 DETAIL PONDASI RESERVOIR

TANGGAL : KODE LEMBAR NO. LEMBAR JML. LEMBAR

SKALA :

NAMA FILE : DET1-80L.DWG

Anda mungkin juga menyukai