P A N I T I A P E N E L I T I K O N T R A K REPUBLIK INDONESIA

KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DIREKTORAT JENDRAL BINA MARGA

BALAI BESAR PELAKSANAAN JALAN NASIONAL XI

D O K U M E N
PENELITIAN DAN EVALUASI HASIL KAJIAN TEKNIS

P A K E T

PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN

K O N T R A K A D E N DU M 01

Rp3.209.606.000,00

S U M B E R D A N A

APBN
TAHUN ANGGARAN 2018

P E N Y E D I A J A S A

PT. RANTAU KAPUAS RAYA


KONSULTAN SUPERVISI

PT. DIANTAMA REKANUSA


PERUBAHAN DAFTAR KUANTITAS DAN HARGA ( REKAPITULASI KUANTITAS BERDASARKAN
KEBUTUHAN LAPANGAN DENGAN KONDISI DANA IDEAL )

NO. MATA PEMBA-


PERKIRAAN KUANTITAS
Tambah Kurang
JUMLAH HARGA (Rp) U R A I A N
SATUAN
HARGA SATUAN
(Rp)
YARAN
SEMULA PERUBAHAN TAMBAH / KURANG
PERSENTASE
AWAL + / ( - )
Nego / Tetap
PERSENTASE
PERUBAHAN SEMULA PERUBAHAN
TAMBAH / KURANG

DIV-1 UMUM
414.693.900,00 414.693.900,00
-

1,2 Mobilisasi
Ls 1,00 1,00
- 0,00% 299.845.900,00 Tetap
Tidak Nego 0,00% 299.845.900,00
299.845.900,00 -

1.20.(1) Pengeboran, termasuk SPT dan Laporan


M1 15,00 15,00
- 0,00% 950.000,00
Tetap Tidak Nego 0,00%
14.250.000,00 14.250.000,00
-

1,21 Manajemen Mutu


LS 1,00 1,00
- 0,00% 100.598.000,00 Tetap
Tidak Nego 0,00% 100.598.000,00
100.598.000,00 -

DIV-3 PEKERJAAN TANAH


52.870.340,00 505.749.077,59
452.878.737,59

3.1.(1a) Galian Biasa


(semula) M3 108,00
118,80 10,80 0,00%
95.894,00 Bertambah Tidak Nego 10,00%
10.356.552,00 11.392.207,20
1.035.655,20

(tambahan) M3
1.339,81 1.339,81 0,00%
95.894,00 Bertambah Nego
1140,57%
128.480.072,01 128.480.072,01

3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter


M3 218,24 254,94
36,70 0,00% 129.745,00 Bertambah
Tidak Nego 16,81% 28.315.548,80
33.076.658,35 4.761.109,55

3.2.(2a) Timbunan Pilihan dari sumber galian


(semula) M3 58,20
64,00 5,80 0,00%
243.956,00 Bertambah Tidak Nego 9,97%
14.198.239,20 15.613.184,00
1.414.944,80

(tambahan) M3
1.300,18 1.300,18 0,00%
243.956,00 Bertambah Nego
2133,99%
317.186.956,04 317.186.956,04

DIV-7

7.1 (7) a
S T R U K T U R

Beton mutu sedang fc’20 Mpa


2.185.002.955,59 2.382.871.875,76
197.868.920,17

M3 354,32 369,21
14,89 0,00% 2.630.456,00 Bertambah
Tidak Nego 4,20% 932.023.169,92
971.181.137,51 39.157.967,59

7.1 (9)
Beton Siklop fc’=15 Mpa untuk pondasi Sumuran
M3 113,04 128,96
15,92 0,00% 2.156.840,00 Bertambah
Tidak Nego 14,08% 243.809.193,60
278.145.655,03 34.336.461,43

7.1 (10)

7.3 (3)

7.5 (1)
Beton mutu rendah fc’10 Mpa

Baja Tulangan U 32 Ulir

Pemasangan jembatan Rangka Baja (Gantung)


M3 9,54 9,54
- 0,00% 1.845.680,00 Tetap
Tidak Nego 0,00% 17.607.787,20
17.607.787,20 -

Kg 6.555,03 7.473,96 918,93


0,00% 24.745,00 Bertambah
Tidak Nego 14,02% 162.204.217,35
184.943.031,32 22.738.813,97

Kg 50.000,00 51.584,00 1.584,00


0,00% 2.250,00 Bertambah
Tidak Nego 3,17% 112.500.000,00
116.064.000,00 3.564.000,00

7.5 (2)
Pengangkutan Bahan Jembatan
Kg 50.000,00 51.584,00 1.584,00
0,00% 11.584,00 Bertambah
Tidak Nego 3,17% 579.200.000,00
597.549.056,00 18.349.056,00

7.7.(1)

7.9.(1)
Dinding Sumuran Silinder terpasang, Diameter 250 cm

Pasangan Batu
M1 24,00 24,00
- 0,00% 2.184.560,00 Tetap
Tidak Nego 0,00% 52.429.440,00
52.429.440,00 -

M3 77,44 149,88
72,44 0,00% 1.100.583,00 Bertambah
Tidak Nego 93,54% 85.229.147,52
164.951.768,70 79.722.621,18

JUMLAH BIAYA DIVISI-1 SAMPAI DIVISI-7


2.652.567.195,59 3.303.314.853,35
650.747.657,76

PAJAK PERTAMBAHAN NILAI / PPN


( 10,0% )
265.256.719,56 330.331.485,33
65.074.765,78

JUMLAH BIAYA TERMASUK PAJAK


2.917.823.915,15 3.633.646.338,68
715.822.423,53

D I B U L A T K A N
2.917.823.000,00 3.633.646.000,00
715.822.000,00

PT. RANTAU KAPUAS RAYA


PANITIA PENELITI KONTRAK

1. Nursari Puji Lestari, S.T


( )

Ketua Merangkap Anggota

2. Akem, S.T
( )

RAKHMAD
Sekretaris Merangkap Anggota
Direktur

3. Ir. Leo Pessy, M.T


( )

Anggota

Satker Pelaksanaan Jalan Nasional Wilayah II

Provinsi Kalimantan Barat


4. Mahmud Yunus, S.T
( )

PPK 11 Tebelian - Sintang - Sp. Silat - Sp. Sejiram

SEPTERIAWURI ANGGIA DEWI, ST


Anggota

5. Hasbi, A.Md
( )

Anggota

NIP : 19760328200502201
PERUBAHAN DAFTAR KUANTITAS DAN HARGA ( REKAPITULASI KUANTITAS BERDASARKAN
KEBUTUHAN LAPANGAN DAN BALANCE BUDGED )
NO. MATA PEMBA- YARAN

U R A I A N
SATUAN
PERKIRAAN KUANTITAS

SEMULA PERUBAHAN TAMBAH /

PERSENTASE

HARGA SATUAN (Rp)


Tambah Kurang
JUMLAH HARGA (Rp)

PERSENTASE
KURANG
AWAL + / ( - )
Nego / Tetap
PERUBAHAN SEMULA PERUBAHAN
TAMBAH / KURANG

DIV-1 UMUM
414.693.900,00 414.693.900,00
-

1,2 Mobilisasi
Ls 1,00 1,00
- 0,00% 299.845.900,00 Tetap
Tidak Nego 0,00% 299.845.900,00
299.845.900,00 -

1.20.(1) Pengeboran, termasuk SPT dan Laporan


M1 15,00 15,00
- 0,00% 950.000,00
Tetap Tidak Nego 0,00%
14.250.000,00 14.250.000,00
-

1,21 Manajemen Mutu


LS 1,00 1,00
- 0,00% 100.598.000,00 Tetap
Tidak Nego 0,00% 100.598.000,00
100.598.000,00 -

DIV-3 PEKERJAAN TANAH


52.870.340,00 52.870.340,00
-

3.1.(1a) Galian Biasa


M3 108,00 108,00
- 0,00% 95.894,00
Tetap Tidak Nego 0,00%
10.356.552,00 10.356.552,00
-

3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter


M3 218,24 218,24
- 0,00% 129.745,00
Tetap Tidak Nego 0,00%
28.315.548,80 28.315.548,80
-

3.2.(2a) Timbunan Pilihan dari sumber galian


M3 58,20 58,20
- 0,00% 243.956,00
Tetap Tidak Nego 0,00%
14.198.239,20 14.198.239,20
-

DIV-7

7.1 (7) a

7.1 (9)

7.1 (10)

7.3 (3)

7.5 (1)

7.5 (2)

7.7.(1)

7.9.(1)
S T R U K T U R

Beton mutu sedang fc’20 Mpa

Beton Siklop fc’=15 Mpa untuk pondasi Sumuran


Beton mutu rendah fc’10 Mpa

Baja Tulangan U 32 Ulir

Pemasangan jembatan Rangka Baja (Gantung) Pengangkutan Bahan Jembatan


Dinding Sumuran Silinder terpasang, Diameter 250 cm

Pasangan Batu
2.185.002.955,59 2.185.002.955,59
- M3 354,32 354,32
- 0,00% 2.630.456,00 Tetap
Tidak Nego 0,00% 932.023.169,92
932.023.169,92 - M3
113,04 113,04 - 0,00%
2.156.840,00 Tetap Tidak Nego
0,00% 243.809.193,60
243.809.193,60 - M3
9,54 9,54 -
0,00% 1.845.680,00 Tetap
Tidak Nego 0,00% 17.607.787,20
17.607.787,20 - Kg
6.555,03 6.555,03 - 0,00%
24.745,00 Tetap Tidak Nego
0,00% 162.204.217,35
162.204.217,35 - Kg
50.000,00 50.000,00 - 0,00%
2.250,00 Tetap Tidak Nego
0,00% 112.500.000,00
112.500.000,00 - Kg
50.000,00 50.000,00 - 0,00%
11.584,00 Tetap Tidak Nego
0,00% 579.200.000,00
579.200.000,00 - M1
24,00 24,00 - 0,00%
2.184.560,00 Tetap Tidak Nego
0,00% 52.429.440,00
52.429.440,00 -
M3 77,44 77,44
- 0,00% 1.100.583,00 Tetap
Tidak Nego 0,00% 85.229.147,52
85.229.147,52 -

JUMLAH BIAYA DIVISI-1 SAMPAI DIVISI-7


2.652.567.195,59 2.652.567.195,59
- PAJAK PERTAMBAHAN NILAI / PPN
( 10,0% )
265.256.719,56 265.256.719,56
- JUMLAH BIAYA TERMASUK PAJAK
2.917.823.915,15 2.917.823.915,15
- D I B U L A T K A N
2.917.823.000,00 2.917.823.000,00
-
PT. RANTAU KAPUAS RAYA
PANITIA PENELITI KONTRAK

1. Nursari Puji Lestari, S.T


( )

Ketua Merangkap Anggota

2. Akem, S.T
( )

RAKHMAD
Sekretaris Merangkap Anggota

Direktur

3. Ir. Leo Pessy, M.T


( )

Anggota

Satker Pelaksanaan Jalan Nasional Wilayah II

Provinsi Kalimantan Barat


4. Mahmud Yunus, S.T
( )
PPK 11 Tebelian - Sintang - Sp. Silat - Sp. Sejiram

SEPTERIAWURI ANGGIA DEWI, ST


Anggota

5. Hasbi, A.Md
( )

Anggota

NIP : 19760328200502201
PERUBAHAN DAFTAR KUANTITAS DAN HARGA ( REKAPITULASI KUANTITAS BERDASARKAN
KEBUTUHAN LAPANGAN DAN TAMBAHAN DANA 10% USULAN PENYEDIA JASA )

NO. MATA PEMBA- YARAN

U R A I A N
SATUAN
PERKIRAAN KUANTITAS

SEMULA PERUBAHAN TAMBAH /

PERSENTASE

HARGA SATUAN (Rp)


Tambah Kurang
JUMLAH HARGA (Rp)

PERSENTASE
KURANG
AWAL + / ( - )
Nego / Tetap
PERUBAHAN SEMULA PERUBAHAN
TAMBAH / KURANG

DIV-1 UMUM
414.693.900,00 414.693.900,00
-

1,2 Mobilisasi
Ls 1,00 1,00
- 0,00% 299.845.900,00 Tetap
Tidak Nego 0,00% 299.845.900,00
299.845.900,00 -

1.20.(1) Pengeboran, termasuk SPT dan Laporan


M1 15,00 15,00
- 0,00% 950.000,00
Tetap Tidak Nego 0,00%
14.250.000,00 14.250.000,00
-

1,21 Manajemen Mutu


LS 1,00 1,00
- 0,00% 100.598.000,00 Tetap
Tidak Nego 0,00% 100.598.000,00
100.598.000,00 -

DIV-3 PEKERJAAN TANAH


52.870.340,00 120.258.139,39
67.387.799,39

3.1.(1a) Galian Biasa


(semula) M3 108,00
118,80 10,80 0,00%
95.894,00 Bertambah Tidak Nego 10,00%
10.356.552,00 11.392.207,20
1.035.655,20

(tambahan) M3
1.041,89 1.041,89 0,00%
57.185,77 Bertambah Nego
864,72%
59.581.481,50 59.581.481,50

3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter


M3 218,24 218,24
- 0,00% 129.745,00
Tetap Tidak Nego 0,00%
28.315.548,80 28.315.548,80
-
3.2.(2a) Timbunan Pilihan dari sumber galian
M3 58,20 85,95
27,75 0,00% 243.956,00 Bertambah
Tidak Nego 47,69% 14.198.239,20
20.968.901,88 6.770.662,68

DIV-7

7.1 (7) a
S T R U K T U R

Beton mutu sedang fc’20 Mpa


2.185.002.955,59 2.382.871.875,76
197.868.920,17

M3 354,32 369,21
14,89 0,00% 2.630.456,00 Bertambah
Tidak Nego 4,20% 932.023.169,92
971.181.137,51 39.157.967,59

7.1 (9)

7.1 (10)
Beton Siklop fc’=15 Mpa untuk pondasi Sumuran

Beton mutu rendah fc’10 Mpa


M3 113,04 128,96
15,92 0,00% 2.156.840,00 Bertambah
Tidak Nego 14,08% 243.809.193,60
278.145.655,03 34.336.461,43

M3 9,54 9,54
- 0,00% 1.845.680,00 Tetap
Tidak Nego 0,00% 17.607.787,20
17.607.787,20 -

7.3 (3)

7.5 (1)

7.5 (2)

7.7.(1)

7.9.(1)
Baja Tulangan U 32 Ulir

Pemasangan jembatan Rangka Baja (Gantung) Pengangkutan Bahan Jembatan


Dinding Sumuran Silinder terpasang, Diameter 250 cm

Pasangan Batu
Kg 6.555,03 7.473,96 918,93
0,00% 24.745,00 Bertambah
Tidak Nego 14,02% 162.204.217,35
184.943.031,32 22.738.813,97

Kg 50.000,00 51.584,00 1.584,00


0,00% 2.250,00 Bertambah
Tidak Nego 3,17% 112.500.000,00
116.064.000,00 3.564.000,00

Kg 50.000,00 51.584,00 1.584,00


0,00% 11.584,00 Bertambah
Tidak Nego 3,17% 579.200.000,00
597.549.056,00 18.349.056,00

M1 24,00 24,00
- 0,00% 2.184.560,00 Tetap
Tidak Nego 0,00% 52.429.440,00
52.429.440,00 -

M3 77,44 149,88
72,44 0,00% 1.100.583,00 Bertambah
Tidak Nego 93,54% 85.229.147,52
164.951.768,70 79.722.621,18

JUMLAH BIAYA DIVISI-1 SAMPAI DIVISI-7


2.652.567.195,59 2.917.823.915,15
265.256.719,56

PAJAK PERTAMBAHAN NILAI / PPN


( 10,0% )
265.256.719,56 291.782.391,51
26.525.671,96

JUMLAH BIAYA TERMASUK PAJAK


2.917.823.915,15 3.209.606.306,66
291.782.391,51

D I B U L A T K A N
2.917.823.000,00 3.209.606.000,00
291.782.000,00
PT. RANTAU KAPUAS RAYA
PANITIA PENELITI KONTRAK

1. Nursari Puji Lestari, S.T


( )

Ketua Merangkap Anggota

2. Akem, S.T
( )

RAKHMAD
Sekretaris Merangkap Anggota

Direktur

3. Ir. Leo Pessy, M.T


( )

Anggota

Satker Pelaksanaan Jalan Nasional Wilayah II

Provinsi Kalimantan Barat


4. Mahmud Yunus, S.T
( )

PPK 11 Tebelian - Sintang - Sp. Silat - Sp. Sejiram


SEPTERIAWURI ANGGIA DEWI, ST
Anggota

5. Hasbi, A.Md
( )

Anggota

NIP : 19760328200502201
Lampiran - 1 : BERITA ACARA PENELITIAN DAN EVALUASI KAJIAN TEKNIS
LAPANGAN
N o m o r : Tanggal :

PERUBAHAN DAFTAR KUANTITAS

Nama Paket : Pembangunan Jembatan


Gantung Bara Sinabun

Nomor & Tanggal Kontrak : HK.02.03-BM/PJNW.II/PPK.11/TBL-


SJM/14 ,30 Agustus 2018
Nama Kontraktor : PT. RANTAU KAPUAS RAYA Nama
Konsultan Pengawas : PT. DIANTAMA REKANUSA

MATA

U R A I A N SATUAN
ALTERNATIF I ( IDEAL LAPANGAN )
ALTERNATIF II ( Tetap )
ALTERNATIF III ( Penambahan 10% )
PEMBAYARAN
SEMULA

PERUBAHAN TAMBAH / KURANG

SEMULA PERUBAHAN
TAMBAH /
KURANG

SEMULA PERUBAHAN
TAMBAH /
KURANG

DIV-1 UMUM

1,2 Mobilisasi
Ls 1,00

1.20.(1) Pengeboran, termasuk SPT dan Laporan


M1 15,00
1,21 Manajemen Mutu
LS 1,00

1,00

15,00

1,00

- 1,00 1,00
- 1,00 1,00
-

- 15,00 15,00
- 15,00 15,00
-
- 1,00 1,00
- 1,00 1,00
-

DIV-3 PEKERJAAN TANAH

3.1.(1a) Galian Biasa


M3 108,00

3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter


M3 218,24
3.2.(2a) Timbunan Pilihan dari sumber galian
M3 58,20

1.458,61
254,94

1.364,18

1.350,61 108,00 108,00


- 108,00 1.160,69
1.052,69

36,70 218,24 218,24


- 218,24 218,24
-
1.305,98 58,20 58,20
- 58,20 85,95
27,75

DIV-7 S T R U K T U R

7.1 (7) a Beton mutu sedang fc’20 Mpa


M3 354,32
7.1 (9) Beton Siklop fc’=15 Mpa untuk pondasi Sumuran
M3 113,04

7.1 (10) Beton mutu rendah fc’10 Mpa


M3 9,54
7.3 (3) Baja Tulangan U 32 Ulir
Kg 6.555,03

7.5 (1) Pemasangan jembatan Rangka Baja (Gantung)


Kg 50.000,00

7.5 (2) Pengangkutan Bahan Jembatan


Kg 50.000,00

7.7.(1) Dinding Sumuran Silinder terpasang, Diameter 250 cm


M1 24,00

7.9.(1) Pasangan Batu


M3 77,44

369,21

128,96

9,54

7.473,96

51.584,00

51.584,00

24,00
149,88

14,89 354,32 354,32


- 354,32 369,21
14,89
15,92 113,04 113,04
- 113,04 128,96
15,92
- 9,54 9,54
- 9,54 9,54
-
918,93 6.555,03 6.555,03
- 6.555,03 7.473,96
918,93

1.584,00 50.000,00 50.000,00


- 50.000,00 51.584,00 1.584,00

1.584,00 50.000,00 50.000,00


- 50.000,00 51.584,00 1.584,00

- 24,00 24,00
- 24,00 24,00
-

72,44 77,44 77,44


- 77,44 149,88
72,44

S e t u j u
PANITIA PENELITI KONTRAK PT. RANTAU KAPUAS RAYA

1. Nursari Puji Lestari, S.T


( )
Ketua Merangkap Anggota

RAKHMAD Direktur

Mengetahui
Satker Pelaksanaan Jalan Nasional
Provinsi Kalimantan Barat
PPK 11 Tebelian - Sintang - Sp. Silat -

SEPTERIAWURI ANGGIA DEWI, ST NIP : 19760328200502201


2. Akem, S.T (
)
Sekretaris Merangkap Anggota

3. Ir. Leo Pessy, M.T


( )
Anggota
4. Mahmud Yunus, S.T (
)
Anggota

5. Hasbi, A.Md
( )
Anggota
PERUBAHAN JENIS DAN VOLUME PEKERJAAN

Berdasarkan rencana perubahan yang akan dilaksanakan, terjadi perubahan jenis dan
volume masing-masing pekerjaan adalah sebagai berikut :

MATA
RENCANA PERUBAHAN
PEMBA- YARAN
U R A I A N SAT
SEMULA
ALTERNATIF-I (IDEAL)
ALTERNATIF-II (TETAP)
ALTERNATIF-III
(PENAMBAHAN
10%)
1,20 Mobilisasi
Ls 1,00 1,00
0,00%
1.20.(1) Pengeboran, termasuk SPT dan Laporan
M1 15,00 15,00
0,00%
1,00

0,00%

0,00%
1,00

15,00

1,00

0,00%

0,00%
1,00

15,00
1,00
1,21 Manajemen Mutu
LS 1,00

0,00%

0,00%

0,00%

3.1.(1a) Galian Biasa


M3 108,00 1.458,61
1250,57%
108,00
0,00%
1.160,69
974,72%

3.1.(3)

Timbunan Pilihan dari sumber galian


M3 218,24 254,94
16,81%
218,24
0,00%
218,24
0,00%
3.2.(2a) Timbunan Pilihan dari sumber galian
M3 58,20 1.364,18
2243,95%

0,00%
58,20
85,95
47,69%

7.1 (7) a Beton mutu sedang fc’20 Mpa


M3 354,32 369,21
4,20%
7.1 (9) Beton Siklop fc’=15 Mpa untuk pondasi Sumuran
M3 113,04 128,96
14,08%
9,54
354,32
0,00%
113,04
0,00%
9,54
369,21
4,20%
128,96
14,08%
9,54
7.1 (10) Beton mutu rendah fc’10 Mpa
M3 9,54
0,00%

0,00%

0,00%

7.3 (3)

Baja Tulangan U 32 Ulir


Kg 6.555,03
7.473,96
14,02%
6.555,03
0,00%
7.473,96
14,02%

7.5 (1) Pemasangan jembatan Rangka Baja (Gantung)


Kg

50.000,00
51.584,00
3,17%
50.000,00
0,00%
51.584,00
3,17%

7.5 (2) Pengangkutan Bahan Jembatan


Kg 50.000,00
51.584,00
3,17%
50.000,00
0,00%
51.584,00
3,17%
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter 250 cm
M1 24,00 24,00
0,00%

0,00%
24,00

0,00%
24,00
7.9.(1) Pasangan Batu
M3 77,44 149,88
93,54%

0,00%
77,44
149,88
93,54%
a. Alternatif - I = Rencana penanganan dengan jenis dan volume
pekerjaan berdasarkan keperluan teknis lapangan dengan tidak memperhitungkan PAGU
yang ada ( Kondisi Ideal
)
b. Alternatif - II = Rencana penanganan dengan jenis dan volume
pekerjaan berdasarkan keperluan teknis lapangan dengan memperhitungkan dan sesuai
PAGU yang ada.

C. Alternatif - III = Rencana penanganan dengan jenis dan volume


pekerjaan berdasarkan keperluan teknis lapangan dengan memperhitungkan dan
PENAMBAHAN 10%.
REPUBLIK INDONESIA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DIREKTORAT
JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI

SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALIMANTAN BARAT

PEJABAT PEMBUAT KOMITMEN 11


TEBELIAN - SINTANG - SP. SILAT - SP. SEJIRAM

PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN

No Kontrak :

Tanggal Kontrak :
HK.02.03-BM/PJNW.II/PPK.11/TBL- SJM/14
30 AGUSTUS 2018
Nilai Kontrak : Rp. 2.917.823.000,00
Sumber Dana : APBN T.A 2018
Waktu Pelaksanaan : Waktu Pemeliharaan :
120 ( Seratus Dua Puluh ) Hari Kalender

365 ( Tiga Ratus Enam Puluh Lima ) Hari


Kalender

Konsultan Supervisi Penyedia Jasa


Konstruksi
BACK UP DATA
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN
NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN
SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 1,2


URAIAN : M O B I L I S A S I

No. URAIAN
Sat.

VOLUME
RENCANA

BOBOT BOBOT THD KONTRAK

HARGA SATUAN

JUMLAH HARGA

VOLUME
PERUBAHAN

BOBOT BOBOT THD KONTRAK

KETERANGAN
( % ) ( Rp )
( Rp ) ( % ) ( Rp )

A. Sewa Tanah
Ls 1,00 24,33 2,75
72.945.900,00 72.945.900,00 1,00 2,75
72.945.900,00

B. PERALATAN
Periksa lembar 1.2-2
LS 1,00 37,69 4,26
113.000.000,00 113.000.000,00 1,00 4,26
113.000.000,00

C. MOBILISASI FASILITAS KONTRAKTOR


1 Kantor Direksi Lapangan
Ls 1,00 5,00 0,57
15.000.000,00 15.000.000,00 1,00 0,57
15.000.000,00
2 Barak
Ls 1,00 3,34 0,38
10.000.000,00 10.000.000,00 1,00 0,38
10.000.000,00
3 Pagar Base Camp dan lain-lain
Ls 1,00 2,67 0,30
8.000.000,00 8.000.000,00 1,00 0,30
8.000.000,00

D. FASILITAS DIREKSI
1 Kendaraan Roda 2 (Sewa)
UB 12,00 4,00 0,45
1.000.000,00 12.000.000,00 12,00 0,45
12.000.000,00
2 Perahu Motor/Long Boat (Sewa)
UB 8,00 4,00 0,45
1.500.000,00 12.000.000,00 8,00 0,45
12.000.000,00

E. MOBILISASI FASILITAS LABORATORIUM


1 Ruang Laboratorium (sesuai Gambar) LS
1,00 5,00 0,57 15.000.000,00
15.000.000,00 1,00 0,57 15.000.000,00

2 Concrete Testing
a Slump Cone
LS 1,00 0,67 0,08
2.000.000,00 2.000.000,00 1,00 0,08
2.000.000,00 b Cylinder/Cube Mould for Compressive Strength
LS 1,00 0,67 0,08
2.000.000,00 2.000.000,00 1,00 0,08
2.000.000,00 c Beam Mould For Flexural Strength (RIGID)
LS 1,00 0,67 0,08
2.000.000,00 2.000.000,00 1,00 0,08
2.000.000,00

F. LAIN-LAIN
1 Komunikasi Lapangan Lengkap
LS 1,00 0,67 0,08
2.000.000,00 2.000.000,00 1,00 0,08
2.000.000,00

G. DEMOBILISASI
LS 1,00 11,31 1,28
33.900.000,00 33.900.000,00 1,00 1,28
33.900.000,00

JUMLAH
100,00 11,30
299.845.900,00 11,30 299.845.900,00

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-
11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA
KONSULTAN SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 1,2


URAIAN : M O B I L I S A S I
LEMBAR KE - 02

No. URAIAN
Sat.
RENCANA

BOBOT VOLUME

BOBOT THD KONTRAK

HARGA SATUAN JUMLAH HARGA

VOLUME
PERUBHAN

BOBOT

BOBOT THD KONTRAK

KETERANGAN

A PERALATAN
( % ) ( Rp )
( Rp ) ( % )
1 CONCRETE MIXER 0.3-0.6 M3
Unit 2,00 4,42 0,19
2.500.000,00 5.000.000,00 2,00
4,42 0,19
2 DUMP TRUCK 3.5 TON
Unit 2,00 8,85 0,38
5.000.000,00 10.000.000,00 2,00
8,85 0,38
3 EXCAVATOR 80-140 HP
Unit 1,00 30,97 1,32
35.000.000,00 35.000.000,00 1,00 30,97
1,32
4 GENERATOR SET
Unit 1,00 1,77 0,08
2.000.000,00 2.000.000,00 1,00
1,77 0,08
5 CONCRETE VIBRATOR
Unit 2,00 4,42 0,19
2.500.000,00 5.000.000,00 2,00
4,42 0,19
6 WATER PUMP 70-100 mm
Unit 1,00 2,21 0,09
2.500.000,00 2.500.000,00 1,00
2,21 0,09
7 TAMPER
Unit 2,00 3,54 0,15
2.000.000,00 4.000.000,00 2,00
3,54 0,15
8 CONCRETE PUMP
Unit 1,00 2,21 0,09
2.500.000,00 2.500.000,00 1,00
2,21 0,09
9 TRAILER 20 TON
Unit 1,00 22,12 0,94
25.000.000,00 25.000.000,00 1,00 22,12
0,94
10 CHAIN HOOK
Unit 2,00 17,70 0,75
10.000.000,00 20.000.000,00 2,00 17,70
0,75
11 WELDING SET
Unit 1,00 1,77 0,08
2.000.000,00 2.000.000,00 1,00
1,77 0,08

JUMLAH
100,00 4,26
113.000.000,00 100,00 4,26
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-
11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA
KONSULTAN SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 1.21


URAIAN : Manajemen Mutu

No. URAIAN
Sat.
RENCANA

BOBOT VOLUME

BOBOT THD KONTRAK

HARGA SATUAN JUMLAH HARGA

VOLUME
PERUBAHAN

BOBOT BOBOT THD KONTRAK

KETERANGAN

A. TENAGA / PERSONIL
( % ) ( Rp )
( Rp ) ( % )

Masa Pelaksanaan Pekerjaan


Bulan 4,00
1 Ahli Kendali Mutu
OB 4,00 39,76 1,51
10.000.000,00 40.000.000,00 4,00
1,51 1,51

2 Asisten Ahli Kendali Mutu


OB 4,00 31,81 1,21
8.000.000,00 32.000.000,00 4,00
1,21 1,21

3 Staff Pendukung (supporting Staff)


OB 4,00 23,86 0,90
6.000.000,00 24.000.000,00 4,00
0,90 0,90

4 Laporan Kendali Mutu


Bulan 4,00 4,57 0,17
1.149.500,00 4.598.000,00 4,00
0,17 0,17

JUMLAH
100,00 3,79
100.598.000,00 3,79
3,79

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-
11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA
KONSULTAN SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 1.20.(1)


URAIAN : Pengeboran, termasuk
SPT dan Laporan

No. URAIAN
Sat.
RENCANA

BOBOT VOLUME

BOBOT THD KONTRAK

HARGA SATUAN JUMLAH HARGA

VOLUME
PERUBAHAN

BOBOT BOBOT THD KONTRAK

KETERANGAN
( % ) ( Rp )
( Rp ) ( % )

A. PERALATAN DAN PELAKSANAAN PENGEBORAN


Estimasi kedalaman boring per titik
M 15,00
1 Peralatan Pengeboran lengkap
Unit 1,00 11,42 0,06
1.479.545,45 1.479.545,45 1,00 11,42
0,06
2 Mobilisasi dan Demobilisasi Peralatan Pengeboran lengkap Ls
1,00 11,58 0,06 1.500.000,00
1.500.000,00 1,00 11,58
0,06
2 Pelaksanaan Pekerjaan Pengeboran dilapangan
M 15,00 6,95 0,03
60.000,00 900.000,00 15,00 6,95
0,03
3 Pengambilan SPT interval 2 meter
Sampel 5,00 3,28 0,02
85.000,00 425.000,00 5,00
3,28 0,02
4 Pengambilan benda uji tanah interval 2 meter
Sampel 5,00 4,25 0,02
110.000,00 550.000,00 5,00
4,25 0,02
5 Pengujian Laboratorium untuk benda uji lengkap
Sampel 10,00 11,58 0,06
150.000,00 1.500.000,00 10,00 11,58
0,06
6 Laporan hasil pengeboran dan pengujian
Ls 1,00 4,63 0,02
600.000,00 600.000,00 1,00
4,63 0,02

B. TENAGA/PERSONIL
Estimasi kedalaman boring per titik
M 15,00
1 Tenaga Ahli Pengeboran
OH 1,00 15,44 0,08
2.000.000,00 2.000.000,00 1,00 15,44
0,08
2 Tenaga Pendukung
OH 2,00 15,44 0,08
1.000.000,00 2.000.000,00 2,00 15,44
0,08
3 Mobilisasi dan Demobilisasi Tenaga
Ls 1,00 15,44 0,08
2.000.000,00 2.000.000,00 1,00 15,44
0,08

JUMLAH
12.954.545,45
OVERHEAD & PROFIT
1.295.454,55
TOTAL HARGA PEKERJAAN
14.250.000,00
HARGA SATUAN PENGEBORAN DAN LAPORAN PER METER
100,00 0,54
950.000,00 100,00 0,54

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

GALIAN

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN


NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN
SUPERVISI : PT. DIANTAMA REKANUSA

NO.
Uraian

1 : Galian Biasa

2 : Galian Struktur dengan kedalaman 0 - 2 meter

S U B T O T A L

T O T A L
VOLUME (M3)
1.458,61

254,94

1.713,55

1.713,55

KETERANGAN
Disetujui Oleh,
Diperiksa Oleh, Dibuat
Oleh, KONSULTAN SUVERVISI PENYEDIA
JASA

KOKO ASFARUDIN MADJIDUDIN,


ST, M.MT AGUS FITRADI, ST PENGAWAS
LAPANGAN SITE ENGINEER
GENERAL SUPERINTENDENT

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR


KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 3.1.(1a) URAIAN


: Galian Biasa

long

X Y jarak KET

SABANG UTUNG
at point X= -119,20 Y= 27,20 Z= 0,00 -119,20
27,20 P13 at point X=
-110,21 Y= 22,99 Z= 0,00 -110,21 22,99
8,99 P12 at point X= -100,90 Y= 19,98 Z= 0,00
-100,90 19,98 9,31
P11 at point X= -91,50 Y= 16,55 Z= 0,00 -91,50
16,55 9,4 P10 at point X= -81,54
Y= 15,25 Z= 0,00 -81,54 15,25
9,96 P09 at point X= -71,55 Y= 14,86 Z= 0,00
-71,55 14,86 9,99
P08 at point X= -61,55 Y= 14,22 Z= 0,00 -61,55
14,22 10 P07 at point X= -61,13
Y= 14,00 Z= 0,00 -61,13 14,00
0,42 0

STA patok
CUT
X Y Σ X*Y Σ
Y*X
M² P M³
P9
0,000
at point X= -14,99 Y= 16,49 Z= 0,00 -14,99
16,49 -248,5342 -211,072 -352,5894
-301,9611 25,314 9,96 at point X= -12,80 Y=
16,58 Z= 0,00 -12,80 16,58
-209,664 -125,6764
at point X= -7,58 Y= 16,38 Z= 0,00 -7,58
16,38 -125,2974 0 at point X=
0,00 Y= 16,53 Z= 0,00 0,00 16,53
0 115,5447

P10
at point X= 6,99 Y= 16,72 Z= 0,00 6,99
16,72 111,0012 183,5856 at point X= 10,98 Y=
15,88 Z= 0,00 10,98 15,88
170,19 185,002 at point X= 11,65 Y= 15,50 Z= 0,00
11,65 15,50 180,575
-217
at point X= -14,00 Y= 15,50 Z= 0,00 -14,00
15,50 -230,86 -232,345
at point X= -14,99 Y= 16,49 Z= 0,00 -14,99
16,49

252,129

STA patok
CUT
X Y Σ X*Y Σ
Y*X
M² P M³
P10
25,314 9,96
at point X= -8,25 Y= 19,75 Z= 0,00 -8,25
19,75 -127,875 -79
56,892 -48,6355 52,764 9,40 at
point X= -4,00 Y= 15,50 Z= 0,00 -4,00
15,50 -62 62
at point X= 4,00 Y= 15,50 Z= 0,00 4,00
15,50 78,4 125,55

P11
at point X= 8,10 Y= 19,60 Z= 0,00 8,10
19,60 159,165 121,52 at point X=
6,20 Y= 19,65 Z= 0,00 6,20 19,65
123,752 0 at point X= 0,00 Y= 19,96 Z= 0,00
0,00 19,96 0
-115,768 at point X= -5,80 Y= 19,75 Z= 0,00 -5,80
19,75 -114,55 -162,9375
at point X= -8,25 Y= 19,75 Z= 0,00 -8,25
19,75
614,956

STA patok
CUT
X Y Σ X*Y Σ
Y*X
M² P M³
P11
52,764 9,40
at point X= -7,29 Y= 18,79 Z= 0,00 -7,29
18,79 -112,995 -75,16
138,4458 64,1357 37,155 9,31 at
point X= -4,00 Y= 15,50 Z= 0,00 -4,00
15,50 -62 62

P12
at point X= 4,00 Y= 15,50 Z= 0,00 4,00
15,50 73,96 108,345 at point X=
6,99 Y= 18,49 Z= 0,00 6,99 18,49
129,4548 107,242 at point X= 5,80 Y= 18,52 Z= 0,00
5,80 18,52 110,026
0 at point X= 0,00 Y= 18,97 Z= 0,00 0,00
18,97 0 -138,2913 at point X=
-7,29 Y= 18,79 Z= 0,00 -7,29 18,79

591,529

TOTAL GALIAN BIASA :


1.458,61 M³

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR


KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 3.1.(3)


URAIAN : Galian Struktur dengan kedalaman 0 -
2 meter

patok POSISI
CUT
X Y Σ X*Y Σ
Y*X
M² JARAK V KANAN M³ V KIRI M²
KANAN at point X= 3,53 Y= 13,92 Z=
0,00 3,53 13,92
48,1492 70,0176 228,0668 230,4068
1,170 at point X= 5,03 Y= 13,64 Z= 0,00 5,03
13,64 65,39 68,6092
at point X= 5,03 Y= 13,00 Z= 0,00 5,03
13,00 65,39 45,89 at point
X= 3,53 Y= 13,00 Z= 0,00 3,53
13,00 49,1376 45,89 at point X=
3,53 Y= 13,92 Z= 0,00 3,53 13,92

P3
0
KIRI at point X= -3,53 Y= 13,79 Z=
0,00 -3,53 13,79
-47,4785 -69,3637 -226,9372 -228,7972
0,930
at point X= -5,03 Y= 13,45 Z= 0,00 -5,03
13,45 -65,39 -67,6535 at point X=
-5,03 Y= 13,00 Z= 0,00 -5,03 13,00
-65,39 -45,89 at point X= -3,53 Y= 13,00 Z= 0,00
-3,53 13,00 -48,6787
-45,89 at point X= -3,53 Y= 13,79 Z= 0,00 -3,53
13,79

KANAN at point X= 3,48 Y= 14,24 Z= 0,00


3,48 14,24 45,762
49,5552 232,1094 229,2144 1,448 at point
X= 3,48 Y= 13,15 Z= 0,00 3,48
13,15 45,762 65,487
at point X= 4,98 Y= 13,15 Z= 0,00 4,98
13,15 69,6702 65,487 at point X=
4,98 Y= 13,99 Z= 0,00 4,98 13,99
70,9152 48,6852 at point X= 3,48 Y= 14,24 Z= 0,00
3,48 14,24

P4
9,7
KIRI at point X= -3,48 Y= 14,56 Z=
0,00 -3,48 14,56
-50,286 -72,5088 -231,9288 -235,9938
2,033
at point X= -4,98 Y= 14,45 Z= 0,00 -4,98
14,45 -65,487 -71,961 at point X=
-4,98 Y= 13,15 Z= 0,00 -4,98 13,15
-65,487 -45,762 at point X= -3,48 Y= 13,15 Z= 0,00
-3,48 13,15 -50,6688
-45,762 at point X= -3,48 Y= 14,56 Z= 0,00 -3,48
14,56
32,69 34,37

KANAN at point X= 3,48 Y= 14,17 Z= 0,00


3,48 14,17 45,762
49,3116 231,6114 228,8664 1,372 at point
X= 3,48 Y= 13,15 Z= 0,00 3,48
13,15 45,762 65,487
at point X= 4,98 Y= 13,15 Z= 0,00 4,98
13,15 69,5208 65,487 at point X=
4,98 Y= 13,96 Z= 0,00 4,98 13,96
70,5666 48,5808 at point X= 3,48 Y= 14,17 Z= 0,00
3,48 14,17

P5
10 34,1 42,99
KIRI at point X= -3,48 Y= 14,82 Z=
0,00 -3,48 14,82
-51,852 -73,8036 -234,3996 -239,5296
2,565
at point X= -4,98 Y= 14,90 Z= 0,00 -4,98
14,90 -65,487 -74,202 at point X=
-4,98 Y= 13,15 Z= 0,00 -4,98 13,15
-65,487 -45,762 at point X= -3,48 Y= 13,15 Z= 0,00
-3,48 13,15 -51,5736
-45,762 at point X= -3,48 Y= 14,82 Z= 0,00 -3,48
14,82
KANAN at point X= 3,53 Y= 13,70 Z= 0,00
3,53 13,70 45,89
48,361 287,3809 285,7021 0,839 at point
X= 3,53 Y= 13,00 Z= 0,00 3,53
13,00 45,89 65,39
at point X= 5,03 Y= 13,00 Z= 0,00 5,03
13,00 67,2511 65,39 at point X=
5,03 Y= 13,37 Z= 0,00 5,03 13,37
68,2068 58,6943 at point X= 4,39 Y= 13,56 Z= 0,00
4,39 13,56 60,143
47,8668
P6 at point
X= 3,53 Y= 13,70 Z= 0,00 3,53
13,70
KIRI at point X= -3,48 Y= 14,53 Z=
0,00 -3,48 14,53
-50,9472 -72,3594 -232,4856 -236,7906
2,153
at point X= -4,98 Y= 14,64 Z= 0,00 -4,98
14,64 -65,487 -72,9072 at point X=
-4,98 Y= 13,15 Z= 0,00 -4,98 13,15
-65,487 -45,762 at point X= -3,48 Y= 13,15 Z= 0,00
-3,48 13,15 -50,5644
-45,762 at point X= -3,48 Y= 14,53 Z= 0,00 -3,48
14,53

DEPAN at point X= 134,63 Y= 113,80 Z= 0,00


134,63 113,80 15289,9291
15209,37 76089,2431 76085,2085 2,017 at point
X= 133,65 Y= 113,57 Z= 0,00 133,65
113,57 15019,587 15178,6305
at point X= 133,65 Y= 112,38 Z= 0,00 133,65
112,38 15019,587 15188,157
at point X= 135,15 Y= 112,38 Z= 0,00 135,15
112,38 15380,07 15188,157 at point X=
135,15 Y= 113,80 Z= 0,00 135,15 113,80
15380,07 15320,894 at point X= 134,63 Y= 113,80 Z= 0,00
134,63 113,80

10 31,06 43,59

8 36,14

TOTAL GALIAN Struktur dengan kedalaman 0 - 2 meter :


254,94 M³

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR
KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 3.2.(2a)


URAIAN : Timbunan Pilihan dari sumber
galian

long

X Y jarak KET

baras nabun

patok
at point X= 0,00 Y= 10,00 Z= 0,00 0,00 10,00
P0 at point X= 9,98 Y= 10,62 Z= 0,00 9,98 10,62
9,98 P1 at point X= 19,86 Y= 12,25 Z= 0,00 19,86
12,25 9,88 P2 at point X= 29,52 Y= 14,58 Z= 0,00
29,52 14,58 9,66 P3 at point X= 34,63 Y= 14,55
Z= 0,00 34,63 14,55 5,11 A1 at
point X= 39,22 Y= 14,83 Z= 0,00 39,22 14,83
4,59 P4 at point X= 49,22 Y= 14,65 Z= 0,00 49,22
14,65 10 P5 at point X= 59,22 Y= 14,30 Z= 0,00
59,22 14,30 10 P6

FILL
X Y Σ X*Y Σ Y*X
M² P M³

BARAS
0
0 0
at point X= -4,00 Y= 15,50 Z= 0,00 -4,00 15,50
-62 62 51,56 65,76 7,100 9,88 at
point X= 4,00 Y= 15,50 Z= 0,00 4,00 15,50
55,32 62
at point X= 4,00 Y= 13,83 Z= 0,00 4,00 13,83
58,24 0

70,148
NABUN
P3

patok
at point X= 0,00 Y= 14,56 Z= 0,00 0,00 14,56
0 -58,24
at point X= -4,00 Y= 13,68 Z= 0,00 -4,00 13,68

FILL
X Y Σ X*Y Σ Y*X
M² P M³

BARAS
P3
7,100 9,88 at point X= -4,00 Y= 16,19 Z= 0,00 -4,00
16,19 -60,84 -64,76 -58,08 56,6
57,340 9,70 at point X= -4,00 Y= 15,21 Z= 0,00 -4,00
15,21 -62 0
at point X= 0,00 Y= 15,50 Z= 0,00 0,00 15,50
0 62

590,633
NABUN
P4

patok
at point X= 4,00 Y= 14,84 Z= 0,00 4,00 14,84
64,76 59,36
at point X= 4,00 Y= 16,19 Z= 0,00 4,00 16,19

FILL
X Y Σ X*Y Σ Y*X
M² P M³

BARAS
P4
57,340 9,70 at point X= -4,00 Y= 15,71 Z= 0,00 -4,00
15,71 -65,48 -62,84 -9,12 6,12
7,620 10,00 at point X= -4,00 Y= 16,37 Z= 0,00 -4,00
16,37 -65,48 65,48
at point X= 4,00 Y= 16,37 Z= 0,00 4,00 16,37
59,84 65,48

362,900
NABUN
P5
patok
at point X= 4,00 Y= 14,96 Z= 0,00 4,00 14,96
62 0
at point X= 0,00 Y= 15,50 Z= 0,00 0,00 15,50
0 -62 at point X= -4,00 Y= 15,71 Z= 0,00 -4,00
15,71

FILL
X Y Σ X*Y Σ Y*X
M² P M³

BARAS
P5
7,620 10,00 at point X= -4,00 Y= 16,72 Z= 0,00 -4,00
16,72 -66,88 66,88 54,48 71,76
8,640 10,00 at point X= 4,00 Y= 16,72 Z= 0,00 4,00
16,72 59,36 66,88
at point X= 4,00 Y= 14,84 Z= 0,00 4,00 14,84
62 0

124,500
NABUN
P6

patok
at point X= 0,00 Y= 15,50 Z= 0,00 0,00 15,50
0 -62
at point X= -4,00 Y= 15,79 Z= 0,00 -4,00 15,79

FILL
X Y Σ X*Y Σ Y*X
M² P M³
P6
8,640 10,00
0,000 50,00
BARAS
NABUN P7

216,000

TOTAL TIMBUNAN
1364,181 M³
REKAPITULASI BESI TULANGAN

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-
SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN
SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.3 (3)


URAIAN : Baja Tulangan U 32 Ulir

No.
JENIS PEKERJAAN
J U M L A H ( m3 )

I. ABUTMEN
139,39 M3

II. SUMURAN
212,47 M3

III. IKATAN ANGIN


17,34 M3

J U M L A H
369,21 M3
Disetujui Oleh,

KOKO ASFARUDIN PENGAWAS LAPANGAN


Diperiksa Oleh, KONSULTAN SUVERVISI

MADJIDUDIN, ST, M.MT SITE ENGINEER


Dibuat Oleh, PENYEDIA JASA

AGUS FITRADI, ST GENERAL SUPERINTENDENT


BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR


KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.1 (7) a


URAIAN : Beton mutu sedang fc’20 Mpa

BETON UNTUK ABUTMENT

No. G A M B A
R S K E T

a. Abutmen (pilon) 1,00 x


1,00 x 4,00 x 2 x 2
= 16,00 M3
0,74 x 2,40 x 4,00 x 2
= 14,11 M3

b. Abutmen (anchor block) 2,90 x 4,00


x 4,40 x 2
= 102,08 M3
0,60 x( 2,00 + 4,00 )x 1,00 x
2 x 2 = 7,20 M3
2
139,39 M3

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA
KOKO ASFARUDIN PENGAWAS LAPANGAN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN :
PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR KONTRAK
: HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30
AGUSTUS 2018
NILAI KONTRAK :
Rp. 2.917.823.000,00
NOMOR SPMK :
PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS
2018
PENYEDIA JASA :
PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.1 (7) a


URAIAN
: Beton mutu sedang fc’20 Mpa

BETON UNTUK SUMURAN

No. G A M B A
R S K E T

a. Sumuran (pilon)-atas 2 x
3,14 x( 1,50 + 1,15 )x 1,00 x
2 = 52,26 M3
2
Sumuran (pilon)-bawah 2 x 3,14 x(
1,50 + 1,33 )x 0,50 x 2
= 27,85 M3
2
2 x 3,14 x( 1,50 + 1,15 )x
0,50 x 2 = 26,13 M3
2
b. Sumuran (anchor block)-atas 2 x 3,14 x(
1,50 + 1,15 )x 1,00 x 2
= 52,26 M3
2
Sumuran (anchor block)-bawah 2 x 3,14
x( 1,50 + 1,33 )x 0,50 x
2 = 27,85 M3
2
2 x 3,14 x( 1,50 + 1,15 )x
0,50 x 2 = 26,13 M3
2
212,47 M3

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN PENGAWAS LAPANGAN


MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR


KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.1 (7) a


URAIAN : Beton mutu sedang fc’20 Mpa

BETON UNTUK IKATAN ANGIN

No. G A M B A
R S K E T

a. Ikatan Angin 1,70 x


1,70 x 1,50 x 2 x 2
= 17,34 M3
-

Disetujui Oleh,
Diperiksa Oleh,

KONSULTAN SUVERVISI
Dibuat Oleh,

PENYEDIA JASA

KOKO ASFARUDIN PENGAWAS LAPANGAN


MADJIDUDIN, ST, M.MT SITE ENGINEER
AGUS FITRADI, ST GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR


KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.1 (9)


URAIAN : Beton Siklop fc’=15 Mpa untuk
pondasi Sumuran

BETON ISIAN SIKLOP

No. G A M B A
R S K E T
a. Beton Isian SIKLOP 3,14 x 1,85
2 x 3,00 x 2 x 2
= 128,96 M3

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
REKAPITULASI BESI TULANGAN

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-
SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN
SUPERVISI : PT. DIANTAMA REKANUSA
MATA PEMBAYARAN : 7.3 (3)
URAIAN : Baja Tulangan U 32 Ulir

No.
JENIS PEKERJAAN
J U M L A H ( Kg )
f 22 f 19 f 16 f 13 f
12

I. ABUTMEN PADA PILON


2.067,37

II. ABUTMEN PADA ANCHOR BLOCK


3.688,92

III. IKATAN ANGIN


691,30 389,31 637,06

J U M L A H
691,30 6.145,60 637,06

JUMLAH BESI ULIR

JUMLAH BESI POLOS


7.473,96

Disetujui Oleh,

KOKO ASFARUDIN PENGAWAS LAPANGAN


Diperiksa Oleh, KONSULTAN SUVERVISI

MADJIDUDIN, ST, M.MT SITE ENGINEER


Dibuat Oleh, PENYEDIA JASA
AGUS FITRADI, ST GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN :
PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR KONTRAK
: HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30
AGUSTUS 2018
NILAI KONTRAK :
Rp. 2.917.823.000,00
NOMOR SPMK :
PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS
2018
PENYEDIA JASA :
PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.3 (3)


URAIAN
: Baja Tulangan U 32 Ulir

PEMBESIAN PADA ABUTMEN PILON

f (mm) PANJANG KEBUTUHAN

JUMLAH

No. G A M B A
R S K E T

Berat
(Kg/m)

POTONGAN
(M) Potong

PANJANG (M')

BERAT (Kg)

1
2
3 4
5 6 = 4 x 5 7 = 3 x 6

ABUTMEN PADA PILON


94
94 f16-200 5,03
21 x 2 = 42 211,26
333,791
8
26,50 26,50
8 1,580

246

8
8 f16-200 6,38 21
x 2 = 42 267,96 423,377
1,580
94
94

434

8 394
f16-200 4,10 23 x 2 =
46 188,60 297,988
8 1,580

8
8 f16-200 5,98 23
x 2 = 46 275,08 434,626
1,580
94
94

394

434
8 f16-200 8,44 4 x
2 = 8 67,52 106,682
394
1,580

8
8 434

434

394
8 f16-200 8,44 4
x 2 = 8 67,52 106,682
1,580

8 f16-200 8,44 4 x
2 = 8 67,52 106,682
394
1,580

8 434

394
8 f16-200 8,44 4
x 2 = 8 67,52 106,682
1,580

67,4
8 f16-200 4,77 5 x
2 = 10 47,74 75,429
394
1,580
8

8 67,4

394
8 f16-200 4,77 5
x 2 = 10 47,74 75,429
1,580

f16 2.067,367

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
GAMBAR KERJA ABUTMEN PILON
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN :
PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR KONTRAK
: HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30
AGUSTUS 2018
NILAI KONTRAK :
Rp. 2.917.823.000,00
NOMOR SPMK :
PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS
2018
PENYEDIA JASA :
PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.3 (3)


URAIAN
: Baja Tulangan U 32 Ulir

PEMBESIAN PADA ABUTMEN ANCHOR BLOCK

No. G A M B A
R S K E T
f (mm) PANJANG KEBUTUHAN
JUMLAH

Berat POTONGAN Potong


PANJANG BERAT
1
2
3 4
5 6 = 4 x 5 7 = 3 x 6

ABUTMEN PADA ANCHOR BLOCK

200
146
78

284
284

f16-200 10,08 21 x 2 =
42 423,36 668,909
1,580

8
8

8 tegak

434

394

434
224
f16-200 4,50 21 x 2 =
42 189,00 298,620
8 1,580

f16-200 4,10 64 x 2 =
128 524,80 829,184
8 1,580

f16-200 4,50 4 x 21 x 2 = 168


756,00 1.194,480
8 1,580

f16-200 2,40 4 x 23 x 2 = 184


441,60 697,728
8 1,580

f16 3.688,921

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
GAMBAR KERJA PADA ABUTMEN ANCHOR BLOCK
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN :
PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR KONTRAK
: HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30
AGUSTUS 2018
NILAI KONTRAK :
Rp. 2.917.823.000,00
NOMOR SPMK :
PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS
2018
PENYEDIA JASA :
PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.3 (3)


URAIAN
: Baja Tulangan U 32 Ulir

PEMBESIAN PADA IKATAN ANGIN f19

No. G A M B A
R S K E T
f(mm) PANJANG KEBUTUHAN
JUMLAH

Berat POTONGAN Potong


PANJANG BERAT
1
2
3 4
5 6 = 4 x 5
7 = 3 x 6

IKATAN ANGIN

0
f16-200 6,16 10 x 2 x 2
= 40 246,40 389,312
0 164
1,580

144 144

164

7
f13-200 6,30 8 x 4 x 2
= 64 403,20 637,056
7 144
1,580

164 164
144

ANGKUR

f19-200 3,10 25 x 2 x 2
= 100 310,00 691,300
20
2,230

270

20

f19 691,300 f16


389,312 f13
637,056

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
GAMBAR KERJA PADA IKATAN ANGIN
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-
11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA
KONSULTAN SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.5 (2)


URAIAN : Pengangkutan Bahan
Jembatan

No. URAIAN
Sat.
RENCANA
PERUBAHAN
HARGA SATUAN JUMLAH
HARGA SATUAN JUMLAH

KETERANGAN
VOLUME
HARGA
VOLUME
HARGA
( Rp ) ( Rp )
( Rp ) ( Rp )
Pemasangan jembatan Rangka Baja (Gantung)
Kg 50.000,00 11.584,00
579.200.000,00 51.584,00 11.584,00
597.549.056,00

JUMLAH
579.200.000,00
597.549.056,00

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA


SINABUN NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-
11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-
SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA
KONSULTAN SUPERVISI : PT. DIANTAMA REKANUSA
MATA PEMBAYARAN : 7.5 (1)
URAIAN : Pemasangan jembatan
Rangka Baja (Gantung)

RENCANA
PERUBAHAN

No. URAIAN
Sat.
HARGA SATUAN JUMLAH
HARGA SATUAN JUMLAH

KETERANGAN
VOLUME
HARGA
VOLUME
HARGA
( Rp ) ( Rp )
( Rp ) ( Rp )

Pemasangan jembatan Rangka Baja (Gantung)


Kg 50.000,00 2.250,00
112.500.000,00 51.584,00 2.250,00
116.064.000,00

JUMLAH
112.500.000,00
116.064.000,00

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh, KONSULTAN SUVERVISI
PENYEDIA JASA
KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
BACK UP DATA

PAKET PEKERJAAN :
PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN NOMOR KONTRAK
: HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30
AGUSTUS 2018
NILAI KONTRAK :
Rp. 2.917.823.000,00
NOMOR SPMK :
PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS
2018
PENYEDIA JASA :
PT. RANTAU KAPUAS RAYA KONSULTAN SUPERVISI
: PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.7.(1)


URAIAN
Dinding Sumuran Silinder terpasang, Diameter 250 cm

Dinding Sumuran Silinder terpasang, Diameter 250 cm

No.
Uraian
Kedalaman Posisi

1
2
3
4

1 Dinding Sumuran Silinder terpasang, Diameter 250 cm


Posisi

A- 1 : 6,00 Meter A - 1.1 : 6,00


Meter A - 2 : 6,00 Meter
A - 2.1 : 6,00 Meter

Angkur Blok
Pilon Angkur Blok Pilon
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
GAMBAR KERJA DINDING SUMURAN SILINDER TERPASANG, DIAMETER 250 CM
Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN
MADJIDUDIN, ST, M.MT
AGUS FITRADI, ST PENGAWAS LAPANGAN
SITE ENGINEER
GENERAL SUPERINTENDENT
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN GANTUNG BARA SINABUN
NOMOR KONTRAK : HK.02.03-BM/PJNW.II/PPK-11/TBL-SJM/14
TANGGAL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 2.917.823.000,00
NOMOR SPMK : PW.04.01-BM/PJNW.II/PPK.11/TBL-SJM/184
TANGGAL MULAI KERJA : 31 AGUSTUS 2018
PENYEDIA JASA : PT. RANTAU KAPUAS RAYA KONSULTAN
SUPERVISI : PT. DIANTAMA REKANUSA

MATA PEMBAYARAN : 7.9.(1) URAIAN


: Pasangan Batu

patok POSISI
CUT
X Y Σ X*Y Σ Y*X
M² JARAK V KANAN M V KIRI M²
KANAN at point X= 88,00 Y= 13,35 Z=
0,00 88,00 13,35 1174,8 1170,13 8564,24
8560,46 1,889 at point X= 87,65 Y= 13,35 Z= 0,00
87,65 13,35 1139,45 1170,13
at point X= 87,65 Y= 13,00 Z= 0,00 87,65 13,00
1139,45 1155,7
at point X= 88,90 Y= 13,00 Z= 0,00 88,90 13,00
1186,82 1155,7 at point X= 88,90 Y= 13,35 Z= 0,00
88,90 13,35 1377,95 1180,81 at point X= 88,45 Y= 15,50
Z= 0,00 88,45 15,50 1370,98 1364 at
point X= 88,00 Y= 15,50 Z= 0,00 88,00 15,50
1174,8 1364
P3 at point X=
88,00 Y= 13,35 Z= 0,00 88,00 13,35
KIRI at point X= 79,10 Y= 13,35 Z=
0,00 79,10 13,35 1226,05 1061,99 7740,16
7743,94 1,889
at point X= 79,55 Y= 15,50 Z= 0,00 79,55 15,50
1233,03 1240 at point X= 80,00 Y= 15,50 Z= 0,00
80,00 15,50 1068 1240 at point X= 80,00 Y=
13,35 Z= 0,00 80,00 13,35 1068 1072,67
at point X= 80,35 Y= 13,35 Z= 0,00 80,35 13,35
1044,55 1072,67 at point X= 80,35 Y= 13,00 Z= 0,00
80,35 13,00 1044,55 1028,3 at point X= 79,10 Y= 13,00
Z= 0,00 79,10 13,00 1055,99 1028,3 at point
X= 79,10 Y= 13,35 Z= 0,00 79,10 13,35
KANAN at point X= 4,00 Y= 47,50 Z= 0,00
4,00 47,50 182,8 190 1355,39 1352,34
1,528 at point X= 4,00 Y= 45,70 Z= 0,00 4,00
45,70 182,8 166,805
at point X= 3,65 Y= 45,70 Z= 0,00 3,65 45,70
165,528 166,805 at point X= 3,65 Y= 45,35 Z= 0,00
3,65 45,35 165,528 217,68 at point X= 4,80 Y= 45,35
Z= 0,00 4,80 45,35 219,36 217,68 at
point X= 4,80 Y= 45,70 Z= 0,00 4,80 45,70
228 203,365 at point X= 4,45 Y= 47,50 Z= 0,00 4,45
47,50 211,375 190
P4 at point X=
4,00 Y= 47,50 Z= 0,00 4,00 47,50
KIRI at point X= -4,45 Y= 47,50 Z=
0,00 -4,45 47,50 -211,375 -190 -1363,43
-1360,88 1,277
at point X= -4,00 Y= 47,50 Z= 0,00 -4,00 47,50
-184,4 -190 at point X= -4,00 Y= 46,10 Z= 0,00
-4,00 46,10 -184,4 -168,265 at point X= -3,65 Y=
46,10 Z= 0,00 -3,65 46,10 -166,988 -168,265 at
point X= -3,65 Y= 45,75 Z= 0,00 -3,65 45,75
-166,988 -219,6 at point X= -4,80 Y= 45,75 Z= 0,00
-4,80 45,75 -221,28 -219,6 at point X= -4,80 Y=
46,10 Z= 0,00 -4,80 46,10 -228
-205,145 at point X= -4,45 Y= 47,50 Z= 0,00 -4,45
47,50
KANAN at point X= 4,00 Y= 31,50 Z= 0,00
4,00 31,50 118,8 126 887,05 883,923
1,563 at point X= 4,00 Y= 29,70 Z= 0,00 4,00
29,70 118,8 108,405
at point X= 3,65 Y= 29,70 Z= 0,00 3,65 29,70
107,128 108,405 at point X= 3,65 Y= 29,35 Z= 0,00
3,65 29,35 107,128 140,88 at point X= 4,80 Y= 29,35
Z= 0,00 4,80 29,35 142,56 140,88 at
point X= 4,80 Y= 29,70 Z= 0,00 4,80 29,70
151,2 133,353 at point X= 4,49 Y= 31,50 Z= 0,00 4,49
31,50 141,435 126
at point X= 4,00 Y= 31,50 Z= 0,00 4,00 31,50

0
9,7

16,57 15,36
P5
P6

OPRIT

KIRI at point X= -4,45 Y= 31,50 Z=


0,00 -4,45 31,50 -140,175 -126
-903,88 -901,95 0,965 at point X= -4,00 Y= 31,50 Z= 0,00
-4,00 31,50 -122,4 -126
at point X= -4,00 Y= 30,60 Z= 0,00 -4,00 30,60
-122,4 -111,69 at point X= -3,65 Y= 30,60 Z= 0,00
-3,65 30,60 -110,413 -111,69 at point X= -3,65 Y=
30,25 Z= 0,00 -3,65 30,25 -110,413 -145,2
at point X= -4,80 Y= 30,25 Z= 0,00 -4,80 30,25
-146,88 -145,2 at point X= -4,80 Y= 30,60 Z= 0,00
-4,80 30,60 -151,2 -136,17 at point X= -4,45 Y=
31,50 Z= 0,00 -4,45 31,50
KANAN at point X= 4,90 Y= 13,35 Z= 0,00
4,90 13,35 75,95 59,4075 412,04 408,263
1,889 at point X= 4,45 Y= 15,50 Z= 0,00 4,45
15,50 68,975 62
at point X= 4,00 Y= 15,50 Z= 0,00 4,00 15,50
53,4 62 at point X= 4,00 Y= 13,35 Z= 0,00
4,00 13,35 53,4 48,7275 at point X= 3,65 Y=
13,35 Z= 0,00 3,65 13,35 47,45
48,7275 at point X= 3,65 Y= 13,00 Z= 0,00 3,65
13,00 47,45 63,7 at point X= 4,90 Y= 13,00 Z=
0,00 4,90 13,00 65,415 63,7 at point
X= 4,90 Y= 13,35 Z= 0,00 4,90 13,35
KIRI at point X= -4,45 Y= 15,50 Z=
0,00 -4,45 15,50 -68,975 -62
-426,24 -423,81 1,215 at point X= -4,00 Y= 15,50 Z= 0,00
-4,00 15,50 -56,8 -62
at point X= -4,00 Y= 14,20 Z= 0,00 -4,00 14,20
-56,8 -51,83 at point X= -3,65 Y= 14,20 Z= 0,00
-3,65 14,20 -50,5525 -51,83 at point X= -3,65 Y=
13,85 Z= 0,00 -3,65 13,85 -50,5525 -66,48
at point X= -4,80 Y= 13,85 Z= 0,00 -4,80 13,85
-68,16 -66,48 at point X= -4,80 Y= 14,20 Z= 0,00
-4,80 14,20 -74,4 -63,19 at point X= -4,45 Y=
15,50 Z= 0,00 -4,45 15,50
KANAN at point X= 4,90 Y= 61,88 Z=
0,00 4,90 61,88 306,397 275,366 1832,08
1830,32 0,876 at point X= 4,45 Y= 62,53 Z= 0,00
4,45 62,53 278,259 250,12
at point X= 4,00 Y= 62,53 Z= 0,00 4,00 62,53
247,52 250,12 at point X= 4,00 Y= 61,88 Z= 0,00
4,00 61,88 247,52 225,862 at point X= 3,65 Y=
61,88 Z= 0,00 3,65 61,88 224,585 225,862
at point X= 3,65 Y= 61,53 Z= 0,00 3,65 61,53
224,585 301,497 at point X= 4,90 Y= 61,53 Z= 0,00
4,90 61,53 303,212 301,497 at point X= 4,90 Y= 61,88
Z= 0,00 4,90 61,88
KIRI at point X= -4,45 Y= 62,53 Z=
0,00 -4,45 62,53 -278,259 -250,12 -1822,65
-1821,22 0,715 at point X= -4,00 Y= 62,53 Z= 0,00
-4,00 62,53 -248,12 -250,12
at point X= -4,00 Y= 62,03 Z= 0,00 -4,00 62,03
-248,12 -226,41 at point X= -3,65 Y= 62,03 Z= 0,00
-3,65 62,03 -225,132 -226,41 at point X= -3,65 Y=
61,68 Z= 0,00 -3,65 61,68 -225,132 -296,064 at
point X= -4,80 Y= 61,68 Z= 0,00 -4,80 61,68
-297,744 -296,064 at point X= -4,80 Y= 62,03 Z= 0,00
-4,80 62,03 -300,144 -276,034 at point X= -4,45 Y= 62,53
Z= 0,00 -4,45 62,53
10 15,455 11,21

10 17,26 10,90
15 20,74 28,67

DEPAN
KANAN at point X= 127,72 Y= 114,73 Z= 0,00
127,72 114,73 14653,3 14704,9 101408 101412
1,652 at point X= 128,17 Y= 114,73 Z= 0,00 128,17 114,73
14448,6 14704,9
at point X= 128,17 Y= 112,73 Z= 0,00 128,17 112,73
14448,6 14488,1 at point X= 128,52 Y= 112,73 Z= 0,00 128,52
112,73 14443,1 14488,1 at point X= 128,52 Y= 112,38 Z= 0,00
128,52 112,38 14443,1 14313,8 at point X= 127,37 Y= 112,38
Z= 0,00 127,37 112,38 14358,4 14313,8 at point X=
127,37 Y= 112,73 Z= 0,00 127,37 112,73 14613,2
14397,9 at point X= 127,72 Y= 114,73 Z= 0,00 127,72 114,73
KIRI

8,3 13,72
TOTAL PASANGAN BATU AREA BARAS NABUN
149,877 M³

Disetujui Oleh,
Diperiksa Oleh,
Dibuat Oleh,

KONSULTAN SUVERVISI
PENYEDIA JASA

KOKO ASFARUDIN PENGAWAS LAPANGAN


MADJIDUDIN, ST, M.MT SITE ENGINEER
AGUS FITRADI, ST GENERAL SUPERINTENDENT