1.

Kuda kuda
1.a. Balok 10/10 l1 0.1 m Btg 3m 34.00 bh
l2 0.1 m V 1.02 m3
A 0.01 m2

horison miring vertikal skoor skoor skoor skoor


6.1 4.9 1.3 0.38 0.71 0.65 1.08
4.9 0.38 0.71 0.65 1.08
Jumlah 22.84 m
Overhead 10% 2.284 m
Jumlah 1 Kuda kuda 25.124 m
n 4 bh
Jumlah 4 Kuda kuda 100.496 m
L 1 batang 3 m
33.50 btg
34.00 btg
A 0.01 m2
V 1.02 m3

1.b. Balok Gapit 6/12


l1 0.06 m Btg 3m 8.00 bh
l2 0.12 m V 0.1728 m3
A 0.0072 m2

1 kk 2 bh
n kk 4 bh
8 bh
p 3m
jumlah 24 m
A 0.0072 m2
V 0.1728 m3

1.c Gording 10/10 Btg 3m 40.00 bh


l1 0.1 m V 0.4 m3
l2 0.1 m
A 0.01 m2

p 12 m
n 10 bh
jumlah 120 m
40 btg

A 0.01 m2
V 0.4 m3

1.d Balok Angin 6/12 Btg 3,5m 6.00 bh


l1 0.06 m V 0.126 m3
l2 0.1 m
A 0.006 m2

p1 3.5 m
n 6 btg
A 0.006 m2
V 0.126 m3

1.e Papan 3/20 Btg 2m 18.00 bh


l1 0.03 m V 0.216 m3
l2 0.2 m
A 0.006 m2

L p1 papan bh
Papan Nok 12 2 6 bh
Papan Lisplank 24 2 12 bh
Jumlah 36 m 18 bh
A 0.006 m2
V 0.216 m3

1.f Atap Asbes 240*105 V 120 m2


p 2.4 m n 47.62 lbr 10% 4.761905 lbr
l 1.05 m N 52.38 lbr
A 2.52 m2

Sisi 1 5 12 60 m2
Sisi 2 5 12 60 m2
Jumlah 120 m2

1.g Nok/Bubungan 105 V 12 m


N 12 lbr

2 Balok Tiang 10/10


l1 0.1 m
l2 0.1 m
A 0.01 m2

2.a. Tiang 1,5 m 0.18 m3

l 1.5 m
n 12 bh
V 0.18 m3

2.b. Tiang 3 m 0.12 m3


l 3m
n 4 bh
V 0.12 m3

2.c. Balok Sekat n 18.00 btg


V 2.16 m3

kiri kanan jumlah


p 3.5 3.5
p 3.5 3.5
p 6 6
jumlah 13 13
tingkat 2 2
26 26 52 m
3m
17.33 btg
18.00 btg
2.16 m3

3. Pasangan Bata 1m 26 m

4. Floor Lantai (Peninggian 20 cm) 54 m2

p 9 m
l 6 m
A 54 m2
A.028 Rabat beton tebal 2,5 cm m2 65,635
Pekerja oh 0.12 80,000 9,600
Tukang batu oh 0.06 80,000 4,800
Kepala tukang oh 0.01 80,000 960
Mandor oh 0.01 80,000 400
Semen kg 12.00 1,500 18,000
Pasir beton m3 0.03 250,000 6,875
Seplit 1x2 m3 0.04 250,000 10,000
Air ltr 100.00 150 15,000
RENCANA ANGGARAN BIAYA
Project : Villa Pildun
Tahun : 2018

No
1 Galian Pondasi (Bata Rollag) <m3> 30,000
Bahan Upah
Borongan 1 m3

2 Pasangan Pondasi Bata Rollag <m1> 64,250


Bahan Upah
Batu bata 35 bh 700 24,500 Borongan 1 m
Semen 0.25 Sak 55,000 13,750
Pasir 0.03 m3 200,000 6,000
Jumlah Bahan 44,250 Jumlah Upah

3 Pasangan Bata Setinggi 1 m <m2> 109,900


Bahan Upah
Batu bata 70 bh 700 49,000 Borongan 1 m2
Semen 0.5 Sak 55,000 27,500
Pasir 0.067 m3 200,000 13,400
Jumlah Bahan 89,900 Jumlah Upah

4 Floor Lantai / Rabat 5 cm <m2> 25,375


Bahan Upah
Semen 0.125 sak 55,000 6,875 Borongan 1 m2
Pasir 0.025 m3 180,000 4,500
Split 1,2 0.05 m3 180,000 9,000
Jumlah Bahan 20,375 Jumlah Upah

5 Rangka Tiang & Sekat Balok 10/10 <m2> 98,750


Bahan Upah
Balok 10/10 0.05 m3 1,800,000 90,000 Borongan 1 m2
Paku 0.05 kg 15,000 750
Jumlah Bahan 90,750 Jumlah Upah

6 Rangka Atap (Kuda kuda, Gording) <m2> 92,770


Bahan Upah
Balok 10/10 0.03 m3 1,800,000 54,000 Borongan 1 m2
Kayu 6/12 0.01 m3 1,800,000 18,000
Papan Nok 3/20 0.0014 m3 1,800,000 2,520
Paku 0.05 kg 15,000 750
Plat, Pengunci 1 ls 1,500 1,500
76,770
7 Lisplank 3/20 <m1> 16,700
Bahan Upah
Papan 0.006 m3 1,800,000 10,800 Borongan 1 m
Paku 0.06 kg 15,000 900
11,700

8 Atap Asbes Gelombang 240*105 <m2> 27,900


Bahan Upah
Asbes 240*105 0.42 lbr 55,000 23,100 Borongan 1 m
Paku Asbes 0.04 kg 20,000 800
23,900

9 Nok / Bubungan Asbes 105 <m1> 30,000


Bahan Upah
Nok Asbes 1 lbr 25,000 25,000 Borongan 1 m
Paku Asbes 0.05 kg 20,000 1,000
26,000

10 Plester Dinding 1:4 + Aci <m2> 29,600


Bahan Upah
Semen 0.2 sak 55,000 11,000 Borongan 1 m2
Pasir 0.02 m3 180,000 3,600
14,600

11 Titik Lampu & Saklar 92,500


Bahan Upah
Kabel 6 m 7,500 45,000 Borongan 1 titik
Fitting Plafon 1 bh 10,000 10,000
Saklar 1 bh 12,500 12,500
67,500
Harga Bahan

Harsat
Galian Pondasi (Bata Rollag) 26 m 6.5 m3
Bahan + Upah
30,000 30,000 30,000

Pasangan Pondasi Rollag 26 m 44,250


Bahan + Upah
20,000 20,000

20,000 64,250

Pasangan Bata Setinggi 1 m 26 m 89,900


Bahan + Upah
25,000 20,000

20,000 109,900

Floor Lantai / Rabat 5 cm 54 m2 20,375


Bahan + Upah
5,000 5,000

5,000 25,375

Rangka Tiang & Sekat Balok 10/10 54 m2 90,750


Bahan + Upah
8,000 8,000

8,000 98,750

Rangka Atap (Kuda kuda, Gording) 54 m2 76,770


Bahan + Upah
16,000 16,000

16,000 92,770
Lisplank 3/20 22 m 11,700
Bahan + Upah
4,000 5,000

5,000 16,700

Bahan + Upah Atap Asbes Gelombang 240*105 60 m2 23,900


4,000 4,000

4,000 27,900

Nok / Bubungan Asbes 105 12 m 26,000


Bahan + Upah
4,000 4,000

4,000 30,000

Plester Dinding 1:4 26 m2 14,600


Bahan + Upah
15,000 15,000

15,000 29,600

Titik Lampu & Saklar 3 Titik 67,500


Bahan + Upah
25,000 25,000

25,000 92,500
Harga Bahan Harga Upah Jumlah Harga

Jumlah Harsat Jumlah Bahan & Upah


30,000 195,000 195,000

1,150,500 20,000 520,000 1,670,500

2,337,400 20,000 520,000 2,857,400

1,100,250 5,000 270,000 1,370,250

4,900,500 8,000 432,000 5,332,500

4,145,580 16,000 864,000 5,009,580


257,400 5,000 110,000 367,400

1,434,000 4,000 240,000 1,674,000

312,000 4,000 48,000 360,000

379,600 15,000 390,000 769,600

202,500 25,000 75,000 277,500

16,219,730 3,469,000 19,883,730


RENCANA ANGGARAN BIAYA
Project : Villa Pildun Lokasi : Bandung
Tahun : 2018 Luas : 54 m2
HARGA BAHAN HARGA UPAH
NO ITEM PEKERJAAN QTY
Harsat Jumlah Harsat
(Rp) (Rp) (Rp)
1 Galian Pondasi (Bata Rollag) 26 m 6.5 m3 30,000
2 Pasangan Pondasi Rollag 26 m 44,250 1,150,500 20,000
3 Pasangan Bata Setinggi 1 m 26 m 89,900 2,337,400 20,000
4 Plester Dinding 1:4 & Aci 26 m2 14,600 379,600 15,000
5 Rangka Tiang & Sekat Balok 10/10 54 m2 90,750 4,900,500 8,000
6 Rangka Atap (Kuda kuda, Gording) 54 m2 76,770 4,145,580 16,000
7 Atap Asbes Gelombang 240*105 60 m2 23,900 1,434,000 4,000
8 Nok / Bubungan Asbes 105 12 m 26,000 312,000 4,000
9 Lisplank 3/20 22 m 11,700 257,400 5,000
10 Floor Lantai / Rabat 5 cm 54 m2 20,375 1,100,250 5,000
11 Titik Lampu & Saklar 3 Titik 67,500 202,500 25,000
JUMLAH REAL COST ....................................................... 16,219,730
81.57%
HARGA UPAH JUMLAH HARGA BOBOT
Jumlah Bahan & Upah
(Rp) (Rp) (%)
195,000 195,000 0.98%
520,000 1,670,500 8.40%
520,000 2,857,400 14.37%
390,000 769,600 3.87%
432,000 5,332,500 26.82%
864,000 5,009,580 25.19%
240,000 1,674,000 8.42%
48,000 360,000 1.81%
110,000 367,400 1.85%
270,000 1,370,250 6.89%
75,000 277,500 1.40%
3,664,000 19,883,730 100%
18.43% 100%

Tasikmalaya, 24 Agustus 2018