LAPAN HOLDINGS SDN BHD (K-0303897)

1ST FLOOR NEW TOWNSHIP PHASE 3 SL/02/2060F

BETONG, SARAWAK.

Kepada:
SIMON ANAK DOMINIC
Lot 17, Jalan Ulu Layar,
95700 Betong, Sarawak. 03/01/2019
Tuan,
SEBUTHARGA BAGI KERJA-KERJA MEMBINA RUMAH SEMI-D SATU
TINGKAT BERKELUASAN 111.48m² DI ATAS LOT 17, JALAN ULU LAYAR, 95700
BETONG, SARAWAK
BIL. ITEM UNIT KUANTITI HARGA TOTAL
(RM) (RM)
1 KERJA-KERJA AWALAN
a) INSURANS 1
b) HORDING m² 1
c) SIGNBOARD Nos 1
d) SERAHAN
i. WATERBOARD 1
ii. SEB 1
e) SITE VISIT
KERJA-KERJA PEMBERSIHAN
TAPAK
a) KOS PENGANGKUTAN
b) COMPACTER
c) LAIN-LAIN BARANG
KERJA-KERJA MEMBEKAL DAN L/S 97009.20
MEMBINA TAPAK LANTAI
a) FORMWORK
 PAPAN 1x4x12 Nos
 PAPAN 1x2x12 Nos
 PAPAN 2x2x12 Nos
 PLASTIC 1 ROLL Nos
 PAKU
Nos
 BENANG
b) LANTAI
 BMC A6 Nos
 CONCRETE G20 m³
 PASIR Ton
 BATU Ton
KERJA-KERJA MEMBEKAL DAN
MEMASANG WALL PANEL
BERKELUASAN 239.94 ㎡
a) KOS BAHAN Nos
b) KOS PENGANGKUTAN
c) KOS PASANG IBS
d) KOS MESIN
e) KOS Y12 Nos
f) SIMEN SIKAGROUT Nos
g) SIMEN BIASA Nos
2 KERJA STRUKTUR
KERJA-KERJA MEMBEKAL DAN
MEMASANG BUMBUNG
a) ATAP METAL DECK Nos
b) C-CHANNEL 2"X4" Nos
c) C-CHANNEL 1"x2" Nos
d) PERALATAN
 SCREW 2½ Nos L/S 60732
KERJA-KERJA MEMBEKAL DAN
MEMASANG PINTU DAN TINGKAP
 PINTU KAYU Nos
 PINTU PLYWOOD Nos
 PINTU TANDAS PLASTIK Nos
 FRAME ALUMINIUM Nos
 FRAME ALUMINIUM Nos
 FRAME ALUMINIUM Nos
 TINGKAP + FRAME 4'x4' Nos
3 KERJA KEMASAN
KERJA-KERJA MEMBEKAL DAN
MEMASANG JUBIN
Nos
 JUBIN 2'x2'
 SIMEN Nos
KERJA-KERJA MEMBEKAL DAN
MEMASANG SANITARI/PEMBETUNGAN
 TOILET BOWL Nos
 ALUMINIUM SINK Nos
 PILI AIR Nos
 SANITARY PIPE (3½) Nos
 SINK Nos
 PERALATAN
KERJA-KERJA PENDAWAIAN L/S 56858.20
(ELEKTRIKAL)
 DEPOSIT SESCO
 BULB Nos
 POWER POINT Nos
 KIPAS Nos
 PLUG Nos
 METER
KERJA-KERJA PERPARITAN
 U-DRAIN (TANAH LIAT) Nos
70''x50''
 SIMEN Nos
 PASIR Ton
KERJA-KERJA MENGECAT &
PLASTER SILING Nos
 SCHEME COAT (18L) Nos
 UNDER COAT (18L) Nos
 CAT AIR (18L) Nos
 WALL SEALER (18L) Nos
 WEATHERBOARD (5L) Nos
 PERALATAN MENGECAT
 PLASTER BOARD 4'x8' Nos
4 KERJA AKHIR L/S 1400.00
KERJA-KERJA PEMBERSIHAN
(AKHIR)
JUMLAH 216000.00