BERJAYA BINA CONSTRUCTION (K-0303897)

1ST FLOOR NEW TOWNSHIP PHASE 3 SL/02/2060F

BETONG, SARAWAK.

Kepada:
ABU BIN DHABI
Lot 17, Jalan Setia Raja,
95700 Betong, Sarawak. 03/01/2019

Tuan,
SEBUTHARGA BAGI KERJA-KERJA MEMBINA RUMAH BANGLO DUA
TINGKAT BERKELUASAN 1500KPS DI ATAS LOT 17, JALAN SETIA RAJA, 95700
BETONG, SARAWAK
BIL. ITEM UNIT KUANTITI HARGA TOTAL
(RM) (RM)
1 KERJA-KERJA AWALAN
a) INSURANS 1
b) HORDING m² 1
c) SIGNBOARD Nos 1
d) SERAHAN
i. WATERBOARD 1
ii. SEB 1
e) SITE VISIT
KERJA-KERJA PEMBERSIHAN
TAPAK
a) KOS PENGANGKUTAN
b) COMPACTER
c) BACKHOE
d) LAIN-LAIN BARANG L/S 255,167.07
KERJA-KERJA MEMACANG
TANDA(SETTING OUT)
a) FOOTING(300x300x400)
 BESI Y12 Nos 36
 BOLD & NUT Set 15

b) BEAM BAWAH
Nos 36
 BESI Y12
Nos 60
 BESI R6
m³ 6
 SIMEN G25
 DAWAI kg 1
c) LANTAI BAWAH
Nos 15
 BMC A6
m³ 14.5
 SIMEN G25
d) LANTAI ATAS
 BESI HOLLOW Nos 6
 TAPPING SCREW Nos 1
 WALL PANEL SOLID (2’x10’x4”) Nos 74
e) TIANG
 BESI HOLLOW (4”x4”x6m) Nos 15
 PLAT BESI (1’x1”x12mm) Nos 15

KERJA-KERJA PEMASANGAN IBS


BERKELUASAN 457.2 ㎡
a) KOS BAHAN Nos
b) KOS PENGANGKUTAN
c) KOS PASANG IBS

2 KERJA STRUKTUR
KERJA-KERJA MEMBEKAL DAN
MEMASANG ATAP/BUMBUNG
a) ATAP SPANDEX
 G28-24’ Nos 16
 G28-21’ Nos 32
b) KEKUDA (2”x4”) Nos 56
c) PERALATAN L/S 50,094
 SKRU 2½ Nos 2
d) BATTEN 20’ Nos 42
e) PERABUNG Nos 15
KERJA-KERJA MEMBEKAL DAN
MEMASANG PINTU DAN TINGKAP
 PINTU KAYU Nos 4
 PINTU PLYWOOD Nos 6
 PINTU TANDAS PLASTIK Nos 2
 FRAME ALUMINIUM Nos 4
 FRAME ALUMINIUM Nos 6
 FRAME ALUMINIUM Nos 2
 TINGKAP + FRAME 4'x8' Nos 18
 TINGKAP + FRAME 2’x2’ Nos 4
KERJA-KERJA MEMBINA TANGGA
 4’(L)x12’(P)
3 KERJA KEMASAN
KERJA-KERJA MEMBEKAL DAN
MEMASANG JUBIN
Nos 740
 JUBIN 2'x2'
Nos 40
 SIMEN
KERJA-KERJA MEMBEKAL DAN
MEMASANG SANITARI/PEMBETUNGAN
 TOILET BOWL Nos 2
Nos 2
 ALUMINIUM SINK Nos 12
 PILI AIR Nos
 SANITARY PIPE (3½) Nos 2
 SINK
KERJA-KERJA PENDAWAIAN L/S 93,942
(ELEKTRIKAL)
 DEPOSIT SESCO
 BULB Nos 24
 POWER POINT Nos 24
 KIPAS Nos 11
 PLUG Nos 33
KERJA-KERJA PERPARITAN
 LONGKANG KONKRIT
184’(P)x9’(L)x12’(T)
 PRECAST Nos 92
 SIMEN m³ 2
 BRC (66A) Nos 1

KERJA-KERJA MENGECAT &


PLASTER SILING
 SCHEME COAT (18L) Nos 2
 UNDER COAT (18L) Nos 10
 CAT WARNA (18L) Nos 10
 WALL SEALER (18L) Nos 2
 PERALATAN MENGECAT
 SUPERFLEX 4x4 Nos 185
 PAKU KAYU 2 ½ Kg 5
 PAKU SILING 1 Kg 1
 PAKU SIMEN 2 ½ Nos 1
 SIMEN PUTTY kg 2
4 KERJA AKHIR L/S 5,400
KERJA-KERJA PEMBERSIHAN
(AKHIR)
JUMLAH 404,603.07