ENGINEERING DESIGN
MULAI
SPECIAL FACILITIS
MEMBUAT SURAT
REVIEW DRAWING OLEH
PERMOHONAN REVIEW
BAGIAN PERENCANAAN PLN SUBMIT DRAWING DESIGN DRAWING KE PLN
UIP KALBAGBAR
UIP KALBAGBAR
DRAWING
OK
MENERIMA
MENERIMA APPROVAL MENERIMA APPROVAL
APPROVAL KONFIRMASI DRAWING DRAWING
DRAWING
1. WP GARDU INDUK
2. WP PEKERJAAN TOWER
3. REQUEST FOR INSPECTION
APPROVAL
DOKUMEN
TIDAK OK
MENERIMA APPROVAL
OK DOKUMEN PERINTAH KERJA KONSTRUKSI
1.FORM RFI
2.FORM CHECK LIST INSPECTION
OK
JOINT INSPECTION
APPROVAL JOINT
INSPECTION REPAIR
OK
SELESAI