SOP : PENANGANAN PRE ORDER

CUSTOMER MKT MTL ENG SF OS

WO PO
PRE ORDER WO PO WO PO
PERMINTAAN ORDER PRE ORDER INFORMATION
INFORMATION S
I
PENJADWALAN
G
ENGINEERING
N PEMBUATAN PERMINTAAN
PEMBUATAN
ROUTING PENAWARAN HARGA & WAKTU
WO PO
DARI VENDOR
PRE ORDER ENGINEERING
INFORMATION *) PEMBUATAN SCHEDULE
WO PO

PENAWARAN HARGA &


ENGINEERING LOG ROUTING WAKTU DARI VENDOR
PROCESS BOOK
WO PO MELAKUKAN KOORDINASI
DGN MASING-MASING
KEPALA BAGIAN
DI MFG DEPT

DATA PRE ENGINEERING


ORDER PENJADWALAN PENJADWALAN OUT
DOCUMENT *)
SHOP FLOOR SO URCING

PENJADWALAN
INDUK
PENCATATAN
PRODUKSI
PRE ORDER
SHOP FLOOR OUT SOURCING
SCHEDULE SCEDULE

JADWAL INDUK
PRODUKSI BOM

PEMBUATAN
ESTIMASI BIAYA DAN cost Cost
WAKTU

ESTIMASI BIAYA Data harga


DAN WAKTU Material

*) PRE ORDER INFORMATION

1. Engineering drawing
2. Model 2D atau 3D PEMBUATAN
3. Skecth drawing PENAWARAN
4. Draft des ign HARGA DAN WAKTU
5. Sample Product
6. Deskripsi Product

*) ENGINEERING DOCUMENT
PENAWARAN
PENAWARAN 1. Engineering drawing
HARGA DAN
HARGA DAN WAKTU 2. CAD Model 2D at au 3D
WAKTU
3. Sketch drawing
4. Draft Design
5. NC Program
SOP : PEMBUATAN & PENCATATAN WO PO

CUSTOMER MKT MTL

PRE ORDER PRE ORDER


INFORMATION WO PO
INFORMATION

PEMBUATAN
WO PO
(DURASI : 5 MINUTE)

WO PO
DATA PRE
ORDER

PENCATATAN
PRE ORDER
(DURASI : 5 MENIT)

KETERANGAN :

1. Dokumentasi Soft Copy


1. Preo Order Information D: CSM 07/PRE ORDER 2007/P 7001-7050/…………...
2. WO PO D: CSM 07/PRE ORDER 2007/P 7001-7050/WO PO P-7001.xls

2. Dokumentasi Hard Copy :


1. Pre Order Information P 7001-7050 (MTL)
2. Work Order Pro Order WO PO (MTL)
SOP : PEMBUATAN ESTIMASI & PENAWARAN HARGA & WAKTU

CUSTOMER MKT MTL ENG SF OS

JADWAL INDUK ROUTING


PENAWARAN
PRODUKSI
HARGA DAN WAKTU

PEMBUATAN ESTIMASI
Data harga
BIAYA DAN WAKTU Material
(DURASI : LHT KETERANGAN)

BO M

ESTIMASI BIAYA
PENAWARAN
DAN WAKTU
HARGA & WAKTU
DARI VENDOR
ENGINEERING
DOCUMENT *)

PEMBUATAN
PENAWARAN
HARGA DAN WAKTU
(DURASI : 5 MENIT)

PENAWARAN
HARGA DAN
WAKTU

KETERANGAN :

1. Durasi pembuatan Estimasi Biaya & Waktu :


1. Single Part Sederhana :
2. Single Part Sedang :
3. Single Part Sulit :
4. Assembly Sederhana :
5. Assembly Sedang :
6. Assembly Sulit :

2. Dokumentasi Soft Copy

1. Estimasi Biaya dan Waktu : D: CSM 07/PRE ORDER 2007/P 7001-7050/P-7001/CTE P 7001.xls
2. Penawaran Harga & Waktu D: CSM 07/PRE ORDER 2007/P-7001-7050/P 7001/QUOTATION P 7001.xls

3. Dokumentasi Hard Copy


1. Estimasi Biaya dan Waktu COST & TIME ESTIMATION (MKT)
2. Penawaran Harga & Waktu QUOTATION (MKT)
SOP : KOORDINASI MTL

MKT MTL ENG SF OS

PRE ORDER
WO PO INFORMATION
WO PO WO PO WO PO

S
I
G
WO PO PRE ORDER
N
INFORMATION

MELAKUKAN KOORDINASI
DGN MASING-MASING
KEPALA BAGIAN
DI MFG DEPT
(DURASI : LHT KETERANGAN)
SOP : PENJADWALAN INDUK PRODUKSI

MKT MTL ENG SF OS

JADWAL INDUK ENGINEERING SHOP FLOOR OUT


PRODUKSI SCHEDULE SCHEDULE SOURCING
SCHEDULE

PENJADWALAN
INDUK
PRODUKSI
(DURASI : 10 MNT)

ENGINEERING ROUTING PENAWARAN


DOCUMENT WAKTU DARI
VENDOR
MASTER
SCHEDULE

KETERANGAN :
Dokumentasi Soft Copy
1. Master Schedule D: CSM 07/SCHEDULE/Master Schedule.mpp

Dokumentasi Hard Copy Display on Board daily


SOP : PENJADWALAN ENGINEERING

MTL ENG

PRE ORDER WO PO
INFORMATION

PENJADWALAN
MELAKUKAN KOORDINASI ENGINEERING
DGN MASING-MASING KEPALA
(DURASI : 10 MENIT)
BAGIAN
DI MFG DEPT

PENJADWALAN ENGI NEERING


INDUK SCHEDULE
PRODUKSI

KETERANGAN
Dokumentasi Soft Copy
1. Engineering Schedule D: CSM 07/SCHEDULE/Engineering Schedule.mpp

Dokumentasi Hard Copy Display on Board Daily


SOP : ENGINEERING PROCESS

MKT MTL ENG SF OS

PEMBUATAN PRE ORDER ENGINEERING


ESTIMASI BIAYA DAN INFORMATION SCHEDULE
WAKTU

ENGINEERING
PROCESS
(DURASI : LHT
KETERANGAN)
PEMBUATAN
PERMINTAAN
BO M PENAWARAN HARGA
& WAKTU DARI
VENDOR

ENGINEERING
PEMBUATAN
DOCUMENT *)
ROUTING

KETERANGAN

1. Durasi Engineering Process


2. Dokumentasi Soft Copy
1. Engineering Document D: CSM07/PRE ORDER 07/P 7001-7050/P-7001/…..cad file (sldprt, dxf, dwg dll)
2. BOM D: CSM 07/PRE ORDER 07/P 7001-7050/P-7001/BOM P-7001.xls

3. Dokumentasi Hard Copy


1. Engineering Document P 7001-7050 (MTL)
2. BOM P 7001-7050 (MTL)
SOP : PEMBUATAN ROUTING

MKT MTL ENG SF OS

WO PO

PEMBUATAN
ENGINEERING
DOCUMENT *) ROUTING
(DURASI : LHT
KETERANGAN)

PEMBUATAN
PENJADWALAN PERMINTAAN
INDUK ROUTING
PENAWARAN
PRODUKSI HARGA & WAKTU
DARI VENDOR

PEMBUATAN
ESTIMASI BIAYA DAN
WAKTU PENJADWALAN
SHOP FLOOR
SOP : PENANGANAN PRE ORDER

MTL SF

ROUTING

PENJADWALAN
INDUK
PENJADWALAN
PRODUKSI
SHOP FLOOR
(DURASI : 10 MINUTE)

SHOP FLOOR
SCHEDULE

KETERANGAN
Dokumentasi Soft Copy

Dokumentasi Hard Copy


SOP : PEMBUATAN PERMINTAAN PENAWARAN HARGA & WAKTU DARI VENDOR

MKT MTL ENG SF OS VENDOR

PENAWARAN
HARGA &
WO PO WAKTU
BOM

PEMBUATAN
PERMINTAAN
ENGINEERING PENAWARAN HARGA ENGINEERING
DOCUMENT *) DOCUMENT *)
& WAKTU DARI
VENDOR
(DURASI : LHT
KETERANGAN)

ROUTING
PENJADWALAN
INDUK
PRODUKSI

PENAWARAN HARGA &


WAKTU DARI VENDOR

PEMBUATAN
ESTIMASI BIAYA DAN
WAKTU
PENJADWALAN
OUT SOURCING
SOP : PENJADWALAN OUT SOURCING

MTL OS

PENAWARAN HARGA &


WAKTU DARI VENDOR

PENJADWALAN
INDUK
PRODUKSI
PENJADWALAN OUT
SOURCING
(DURASI : 10 MINUTE)

OUT SOURCING
SCEDULE