N PEMBUATAN PERMINTAAN
PEMBUATAN
ROUTING PENAWARAN HARGA & WAKTU
WO PO
DARI VENDOR
PRE ORDER ENGINEERING
INFORMATION *) PEMBUATAN SCHEDULE
WO PO
PENJADWALAN
INDUK
PENCATATAN
PRODUKSI
PRE ORDER
SHOP FLOOR OUT SOURCING
SCHEDULE SCEDULE
JADWAL INDUK
PRODUKSI BOM
PEMBUATAN
ESTIMASI BIAYA DAN cost Cost
WAKTU
1. Engineering drawing
2. Model 2D atau 3D PEMBUATAN
3. Skecth drawing PENAWARAN
4. Draft des ign HARGA DAN WAKTU
5. Sample Product
6. Deskripsi Product
*) ENGINEERING DOCUMENT
PENAWARAN
PENAWARAN 1. Engineering drawing
HARGA DAN
HARGA DAN WAKTU 2. CAD Model 2D at au 3D
WAKTU
3. Sketch drawing
4. Draft Design
5. NC Program
SOP : PEMBUATAN & PENCATATAN WO PO
PEMBUATAN
WO PO
(DURASI : 5 MINUTE)
WO PO
DATA PRE
ORDER
PENCATATAN
PRE ORDER
(DURASI : 5 MENIT)
KETERANGAN :
PEMBUATAN ESTIMASI
Data harga
BIAYA DAN WAKTU Material
(DURASI : LHT KETERANGAN)
BO M
ESTIMASI BIAYA
PENAWARAN
DAN WAKTU
HARGA & WAKTU
DARI VENDOR
ENGINEERING
DOCUMENT *)
PEMBUATAN
PENAWARAN
HARGA DAN WAKTU
(DURASI : 5 MENIT)
PENAWARAN
HARGA DAN
WAKTU
KETERANGAN :
1. Estimasi Biaya dan Waktu : D: CSM 07/PRE ORDER 2007/P 7001-7050/P-7001/CTE P 7001.xls
2. Penawaran Harga & Waktu D: CSM 07/PRE ORDER 2007/P-7001-7050/P 7001/QUOTATION P 7001.xls
PRE ORDER
WO PO INFORMATION
WO PO WO PO WO PO
S
I
G
WO PO PRE ORDER
N
INFORMATION
MELAKUKAN KOORDINASI
DGN MASING-MASING
KEPALA BAGIAN
DI MFG DEPT
(DURASI : LHT KETERANGAN)
SOP : PENJADWALAN INDUK PRODUKSI
PENJADWALAN
INDUK
PRODUKSI
(DURASI : 10 MNT)
KETERANGAN :
Dokumentasi Soft Copy
1. Master Schedule D: CSM 07/SCHEDULE/Master Schedule.mpp
MTL ENG
PRE ORDER WO PO
INFORMATION
PENJADWALAN
MELAKUKAN KOORDINASI ENGINEERING
DGN MASING-MASING KEPALA
(DURASI : 10 MENIT)
BAGIAN
DI MFG DEPT
KETERANGAN
Dokumentasi Soft Copy
1. Engineering Schedule D: CSM 07/SCHEDULE/Engineering Schedule.mpp
ENGINEERING
PROCESS
(DURASI : LHT
KETERANGAN)
PEMBUATAN
PERMINTAAN
BO M PENAWARAN HARGA
& WAKTU DARI
VENDOR
ENGINEERING
PEMBUATAN
DOCUMENT *)
ROUTING
KETERANGAN
WO PO
PEMBUATAN
ENGINEERING
DOCUMENT *) ROUTING
(DURASI : LHT
KETERANGAN)
PEMBUATAN
PENJADWALAN PERMINTAAN
INDUK ROUTING
PENAWARAN
PRODUKSI HARGA & WAKTU
DARI VENDOR
PEMBUATAN
ESTIMASI BIAYA DAN
WAKTU PENJADWALAN
SHOP FLOOR
SOP : PENANGANAN PRE ORDER
MTL SF
ROUTING
PENJADWALAN
INDUK
PENJADWALAN
PRODUKSI
SHOP FLOOR
(DURASI : 10 MINUTE)
SHOP FLOOR
SCHEDULE
KETERANGAN
Dokumentasi Soft Copy
PENAWARAN
HARGA &
WO PO WAKTU
BOM
PEMBUATAN
PERMINTAAN
ENGINEERING PENAWARAN HARGA ENGINEERING
DOCUMENT *) DOCUMENT *)
& WAKTU DARI
VENDOR
(DURASI : LHT
KETERANGAN)
ROUTING
PENJADWALAN
INDUK
PRODUKSI
PEMBUATAN
ESTIMASI BIAYA DAN
WAKTU
PENJADWALAN
OUT SOURCING
SOP : PENJADWALAN OUT SOURCING
MTL OS
PENJADWALAN
INDUK
PRODUKSI
PENJADWALAN OUT
SOURCING
(DURASI : 10 MINUTE)
OUT SOURCING
SCEDULE