TAHAP I

LENGKUNG DEBIT

Bentuk penampang sungai : Persegi


Material dasar sungai : Kerikil
Lebar dasar sungai : 11,5 m
Kemiringan dasar sungai : 0,013
Kemiringan tebing sungai : 1:1
Koefisien kekasaran : Manning
Debit 100 tahun : 250 m3/s

Tabel 1.1 Nilai Koefisien Kekasaran Manning

Tugas Bangunan Air | 1


Tabel 1.2 Hasil Perhitungan Debit Sebelum Ada Bendung
v Q
No. h (m) b (m) A (m2) P (m) R (m) I n
(m/s) (m3/s)
1 0 11.5 0 11.5 0 0.013 0.022 0 0
2 0.5 11.5 5.75 12.5 0.460 0.013 0.022 3.088 17.758
3 1 11.5 11.5 13.5 0.852 0.013 0.022 4.657 53.558
4 1.5 11.5 17.25 14.5 1.190 0.013 0.022 5.819 100.373
5 2 11.5 23 15.5 1.484 0.013 0.022 6.742 155.075
6 2.5 11.5 28.75 16.5 1.742 0.013 0.022 7.504 215.753
7 2.765 11.5 31.798 17.03 1.867 0.013 0.022 7.858 249.878
8 3 11.5 34.5 17.5 1.971 0.013 0.022 8.148 281.118
9 3.5 11.5 40.25 18.5 2.176 0.013 0.022 8.702 350.250

Lengkung Debit
4

3.5

2.5
h (m)

1.5

0.5

0
0 50 100 150 200 250 300 350 400
Q (m3/s)

Gambar 1.1 Grafik Lengkung Debit Sebelum Ada Bendung

Tugas Bangunan Air | 2


Contoh Perhitungan:
Diketahui: b = 11,5 m I = 0,013
h = 2,765 m n = 0,022 (kerikil)

1. Luas Penampang
A=b×h
A = 11,5 × 2,765 = 31,798 m2
2. Keliling Basah
P = b + 2h
P = 11,5 + 2 . (2,765) = 17,03 m
3. Jari-jari hidrolis
𝐴
R=
𝑃
31,798
R= = 1,867 m
17,03

4. Kecepatan aliran (manning)


1 2 1
v= × 𝑅3 × 𝐼2
𝑛
1 2 1
v= × 1,8673 × 0,0132 = 7,858 m/s
0,022

5. Debit
Q=A×v
Q = 31,74 × 7,852 = 249,878 m3/s

Tugas Bangunan Air | 3


TAHAP II
HIDRAULIK BENDUNG

Data jaringan irigasi:


Elevasi muka air pada bangunan bagi I = + 128
Jarak bangunan bagi × kemiringan dasar saluran primer I = 0,165
Kehilangan energi pada alat ukur debit = 0,22
Kehilangan energi akibat bangunan bilas = 0,17
Kehilangan energi pada bangunan pengambil = 0,15
Faktor keamanan = 0,1
Elevasi mercu = + 128,805
1. Tinggi Pembendungan (P)
P = Elevasi mercu bendung – Elevasi dasar sungai di udik bendung
= 128,805 – 125
= 3,805 m
2. Lebar Normal (Bn)
Karena penampang berbentuk persegi maka:
Bn = 11,5 m
3. Lebar Bruto (Bb)
Syarat: Bn < Bb < 1,2 Bn
11,5 m < Bb < 13,8 m
Bb = 13,5 m
4. Lebar Pintu Pembilas dan Lebar Pilar
Lebar rencana pembilas
1 1
Syarat: Bb < B < Bb
10 6
1,35 m < B < 2,25 m
B = 2,25 m
Dengan ketentuan: 1 buah pintu dengan lebar 1,25 m
1 buah pilar dengan lebar 1 m

Tugas Bangunan Air | 4


Tabel 2.1 Nilai-nilai Koefisien Kontraksi

5. Lebar Efektif Mercu (Be)

Bnetto = Bb – (n × lebar pilar)

= 13,5 – (1 × 1)
= 12,5 m
Beff = Bnetto – 2 × (n . Kp + Ka) × H1
= 12,5 – 2 × (1 . 0,01 + 0) × H1
= 12,5 – 0,02 H1 ……(1)

Mercu 2 radius: Cd = 2,0 – 2,2


Asumsi Cd awal = 2,0
Q100 = 250 m3/dt
Substitusi persamaan (1) ke persamaan (2)
2 2
Q = Cd × 3 × √3 . 𝑔 × Beff × 𝐻1,5 ……..(2)

2 2
250 = 2 × 3 × √3 . 9,81 × (12,5 – 0,02H) × 𝐻1,5

Didapat H1 = 3,264 m

Tugas Bangunan Air | 5


Dari persamaan (1) didapat:
Beff = 12,5 – 0,02 H1
Beff = 12,5 – 0,02 (3,264) = 12,435 m
Bahan pasangan beton (0,1 < r < 0,7) H1
Diambil r = 0,5 H1
= 0,5 × 3,264 = 1,632 m
𝐻1 3,264
Co = = = 2 dari grafik didapat 1,33
𝑟 1,632
P 3,805
C1 = = = 1,166 dari grafik didapat 0,98
𝐻1 3,264

C2 = 1 (mercu bendung tegak)


Cd = Co × C1 × C2
= 1,33 × 0,98 × 1 = 1,3034
Cd tidak sama dengan asumsi awal, maka Cd dicari kembali sampai Cd awal dan Cd akhir
memiliki nilai yang sama.
Cd awal H1 r H1/r P/H1 Co C1 C2 Cd akhir
2 3.264 1.632 2 1.166 1.33 0.98 1 1.3034
1.3034 4.347 2.174 2 0.875 1.33 0.96 1 1.2768
1.2768 4.407 2.204 2 0.863 1.33 0.96 1 1.2768

Tugas Bangunan Air | 6


6. Lengkung Debit Setelah Ada Bendung

2 2
Q = Cd × 3 × √3 . 𝑔 × Beff × 𝐻1,5 Cd = 1,2768

H1 Cd g Beff Q
0 1.2768 9.81 12.500 0.000
0.25 1.2768 9.81 12.495 3.400
0.5 1.2768 9.81 12.490 9.613
0.75 1.2768 9.81 12.485 17.652
1 1.2768 9.81 12.480 27.167
1.25 1.2768 9.81 12.475 37.951
1.5 1.2768 9.81 12.470 49.868
1.75 1.2768 9.81 12.465 62.816
2 1.2768 9.81 12.460 76.716
2.25 1.2768 9.81 12.455 91.504
2.5 1.2768 9.81 12.450 107.127
2.75 1.2768 9.81 12.445 123.542
3 1.2768 9.81 12.440 140.709
3.25 1.2768 9.81 12.435 158.596
3.5 1.2768 9.81 12.430 177.171
3.75 1.2768 9.81 12.425 196.410
4 1.2768 9.81 12.420 216.288
4.407 1.2768 9.81 12.412 249.961
4.75 1.2768 9.81 12.405 279.549

Tugas Bangunan Air | 7


Lengkung Debit setelah ada bendung
5
4.5
4
3.5
3
H (m)

2.5
2
1.5
1
0.5
0
0 50 100 150 200 250 300
Q (m3/det)

7. Mencari Hd (tinggi energi rencana di atas mercu)


H = 4,407 m
𝑄2
H - Hd = 2
((ℎ𝑑 +𝑃) . 𝐵𝑒𝑓𝑓 ) × 2𝑔

𝑄2
H = Hd + 2
((ℎ𝑑 +𝑃) . 𝐵𝑒𝑓𝑓 ) × 2𝑔

2502
4,407 = Hd +
((ℎ𝑑 +3,805) . 12,412)2 × 2 .9.81

Hd = 4,074 m < 4,407 m


8. Pengaruh Tinggi Pengempangan di Udik Bendung
𝑄
v =
(𝐻𝑑 + 𝑃) . 𝐵𝑒𝑓𝑓

250
v =
(4,074 + 3,805) × 12,412

v = 2,453 m/s
𝑣2
h = Hd +
2𝑔

2,5562
h = 4,074 +
2 × 9,81

h = 4,407 m

Tugas Bangunan Air | 8


9. Elevasi Muka Air di Udik Bendung
= Elevasi mercu + Hd
= 128,805 + 4,074
= 132,879 m
10. Elevasi Muka Air di Hilir Bendung
hMAH = Elevasi dasar sungai terdalam 300m hilir bendung + Hb
= 122 + 2,765 = 124,765 m
11. Elevasi Garis Energi
𝑣2
= Elevasi muka air di udik bendung +
2𝑔

2,5562
= 132,879 +
2 × 9,81

= 133,212 m
12. Elevasi Tembok Pangkal Udik
= Elevasi dasar udik + tinggi diatas mercu (Hd) + tinggi jagaan + P
= 125 + 4,074 + 1,5 + 3,805
= 134,379 m
13. Elevasi Tembok Pangkal Hilir
= Elevasi hilir + tinggi sungai awal (Hb) + tinggi jagaan
= 122 + 2,765 + 1,5
= 126,265 m
14. Pengaruh Tinggi Penampang di Udik Bendung
2×∆ℎ
L=
𝑆
2×5,447
L= = 838 m
0,013

Dimana: L = panjang pengaruh pengempangan ke arah udik dari suatu bendung


S = kemiringan dasar sungai
∆ℎ = tinggi kenaikan muka air akibat pengempangan
= P + H1 – Hb
= 3,805 + 4,407 – 2,765 = 5,447 m

Tugas Bangunan Air | 9


TAHAP III
MERCU BENDUNG

Mercu Bulat 2 Radius


Bahan pasangan beton (0,1 < r < 0,7 H1)
Diambil r = 0,5
H1 = 4,407 m
R2 = 0,5 × H1
= 0,5 × 4,407
= 2,2 m
R1 = 0,5 × R2
= 0,5 × 2,2
= 1,1 m

Tugas Bangunan Air | 10


TAHAP IV
KOLAM OLAK PEREDAM ENERGI

Peredam Energi Tipe Shocklitsch


Q = 250 m3/s
Elevasi Mercu = +128,805 m
Elevasi dasar sungai di hilir bendung = +124,765 m
Beff = 12,412 m
P = 0,15
𝛼 = 0,5 dengan syarat (0,5 < 𝛼 < 1)
ɛ = 0,05 dengan syarat (0,03 < ɛ < 0,08)
𝛽 = 0,35 (dari grafik halaman 69)
𝑄
q =
𝐵𝑒𝑓𝑓
250
= = 20,142 m3/s/m
12,412

3 𝑞2
Hg =√
𝐵𝑒𝑓𝑓

3 20,4122
=√ = 3,197 m
12,412

Z = 1,0 m (degradasi)
W = 1,4 𝑍 + 2,4 𝐻𝑔
= 1,4 × 1,0 + 2,4 × 3,197 = 9,073 m
r3 = 0,15 𝑊
= 0,15 × 9,073 = 1,36 m
𝐼 > 0,075 × 𝑊
= 0,075 × 9,073 = 0,68 diambil 0,7 dengan syarat I > 0,075 W
𝑟
EW = 𝐼 − ( 3⁄2)

Tugas Bangunan Air | 11


= 0,7 − (1,36⁄2) = 0,02 m
1⁄
1⁄
× (𝑊⁄𝑔)
4
𝑆′ =𝑞 2

1⁄
× (9,073⁄9,81)
1⁄ 4
= 20,412 2 = 4,43 m
1⁄
1⁄
× (𝑊⁄𝑔)
4
S =𝛽×𝑞 2

= 𝛽 × 𝑆′
= 0,35 × 4,43 = 1,55 m
L =𝛼×𝑊
= 0,5 × 9,073 = 4,536 m

Tugas Bangunan Air | 12


TAHAP V
PINTU PENGAMBIL, PINTU PEMBILAS, KANTONG LUMPUR

5.1 Pintu Pengambil

Kondisi hidraulik aliran pada pintu pengambil: Aliran tidak tenggelam


d : 0,15 – 0,25 m Diambil d = 0,2 m
p : 0,5 – 1,5 m Diambil p = 0,8 m
z : 0,15 – 0,3 m Diambil z = 0,2 m
μ : 0,8 – 0,9 m Diambil μ = 0,85 m
t : 0,1 m Diambil t = 0,1 m
Debit kebutuhan di intake = 10 m3/s
1. Elevasi muka air normal (MAN)
Elevasi MAN = elevasi mercu – faktor keamanan
= 128,805 – 0,1
= 128,705 m
2. Elevasi ambang pada bangunan pengambil
El. Ambang bangunan pengambil = El. Dasar sungai udik + p (ambang)
= 125 + 0,8
= 125,8 m

Tugas Bangunan Air | 13


3. Tinggi muka air diatas ambang
H = Elevasi MAN – El. Ambang bangunan pengambil
= 128,705 – 125,8
= 2,905 m
𝐻
Dimana z <
3
2,905
0,2 <
3
0,2 m < 0,97 m (Ok)
4. Tinggi bukaan pintu pengambil
a = (El. MAN – z + t) – El. Ambang bangunan pengambil
= (128,705 – 0,2 + 0,1) – 125,8
= 2,805 m
5. Lebar pintu pengambil
Qintake = 10 m3/s

Qintake = μ × b × a × (2√𝑧 × g × t)
10 = 0,85 × b × 2,805 × (2√0,3 × 9,81 × 0,1)
b = 3,9 m diambil 4 m
Maka direncanakan:
2 pintu dengan lebar 1 m
2 pilar dengan lebar 1 m
6. Cek aliran tenggelam
𝑄𝑖𝑛𝑡𝑎𝑘𝑒 2 1
Z=( ) × 2𝑔
μ×b×a

10 2 1
Z=( ) × 2×9,81
0,9 × 4 × 2,705

Z = 0,054 m < 0,3 m (Ok)

Tugas Bangunan Air | 14


5.2 Bangunan Pembilas Tipe Undersluice
1. Variabel yang diketahui dan digunakan
Diameter butir endapan lempung (d) = 0,05 m
Koefisien bentuk endapan (Cb) =3–4 Diambil Cb = 4
Tinggi bukaan (y) = 0,5 – 1,5 Diambil y = 1,5
Tinggi pembendungan (P) = 3,805 m
Lebar pintu pembilas (b) = n pintu × b pintu
=2×1=2m
2. Pemeriksaan pintu pembilas:
Vc = 1,5 Cb × √𝑑
= 1,5 (4) × √0,05
= 1,342 m/s
3. Pengecekan saat pintu dibuka setengah (μ = 0,6)
𝑦
A =b×
2
1,5
=2×
2
= 1,5 m2
𝑦 𝑦
Q =μ×b× × √2𝑔 × (P − 2
)
2

1,5 1,5
= 0,6 × 2 × × √2. 9,81 × (3,805 − 2
)
2

= 6,968 m3/s
𝑄
Vp =
𝐴
6,968
= = 4,645 m/s
1,5

Vp > Vc
4,645 m/s > 1,342 m/s (Ok)
4. Pengecekan saat pintu dibuka penuh (μ = 0,8)
A =b×y
= 2 × 1,5 = 3 m2

Tugas Bangunan Air | 15


Q = μ × b × y × √2𝑔 × (P − y)
= 0,8 × 2 × 1,5 × √2. 9,81 × (3,805 – 1,5)
= 16,14 m3/s
𝑄
Vp =
𝐴
16,14
= = 5,38 m/s
3
Vp > Vc
5,38 m/s > 1,342 m/s (Ok)

5.3 Kantong Lumpur


Perencanaan kantong lumpur
1. Menghitung waktu bilas lumpur (t)
Waktu bilas lumpur = 6 hari
t = 6 × 24 × 3600
t = 518400 detik
2. Debit intake di bangunan pengambil
Qn = Qintake × 1,2

Qn = 10 × 1,2

Qn = 12 m3/s

3. Volume kantong lumpur (Vkl)

Vkl = 0,0005 × Qs × t

Vkl = 0,0005 × 12 × 518400

Vkl = 3110,4 m3

4. Luas rata-rata kantong lumpur (Akl)


do = 0,07 (material sungai kerikil)
T = 30°C (suhu air normal di Indonesia)
Berdasarkan grafik diperoleh nilai w = 5 mm/s = 0,005 m/s
Q 12
L×B = = = 2400 m2
W 0,005

Tugas Bangunan Air | 16


L
Syarat : Panjang bidang endapan B > 8, maka
2400
> 8 diperoleh B = 17,32 m
B2
2400
L= = 138,56 m
17,32

Q𝑛
An = Asumsi Vn = 0,4 m/s sehingga :
Vn
12
An = = 30 mm2
0,4

𝐴𝑛 30
hn = = = 1,732 m
B 17,32

Pn = B + 2 hn
= 17,32 + 2 . (1,732) = 20,784 m

𝐴𝑛 30
Rn = = = 1,443 m
Pn 20,784

Vn 2
In = 2 1
(R n 3 × )2
n
0,42
In = 2 = 0,000047
1
(1,4433 × 0,022)2

5. Pembilasan Kantong Lumpur


Asumsi :
Vs = 1,5 𝑚/𝑠
Q s = 1,2 × Q n
m3
= 1,2 × 12 = 14,4
dt
Diperoleh :
Q s 14,4
As = = = 9,6 m2
s 1,5
A s = B × hs
9,6 = 17,32 × hs
hs = 0,554 m

Tugas Bangunan Air | 17


Ps = B + 2hs
Ps = 17,32 + 2 × (0,554) = 18,428 m

As 9,6
Rs = = = 0,521 m
Ps 18,428

Vs 2
Is = 2 1
(R s 3 × n)2

1,52
Is = 2 = 0,0026
1
(0,5213 × 0,022)2

Vs
Fr =
√g × hs
1,5
Fr = = 0,643 < 1 …..(Ok)
√9,81×0,554
6. Panjang Kantong Lumpur
Vkl = (0,5 × B × L) + (0,5 × (Is − In ) × L2 × B)
3110,4 = (0,5 × 17,32 × L) + (0,5 × (0,0026 − 0,000047) × L2 × 17,32)
L = 227,28 m
Jadi L = 227,28 m dan B = 17,32 m

Tugas Bangunan Air | 18


TAHAP VI
PONDASI DAN LANTAI MUKA

Koefisien Bligh = 7,0


Koefisien Lane = 4,0
Elevasi Muka Air Normal = elevasi dasar sungai di hilir bendung + Hb
= 122 + 2,765 = 124,765 m
∆HN = elevasi mercu bendung – elevasi muka air normal
= 128,805 – 124,765 = 4,04 m
Elevasi Muka Air Banjir = elevasi mercu bendung + Hd
= 128,805 + 4,074 = 132,879 m
∆HB = elevasi muka air banjir – elevasi dasar sungai di hilir
= 132,879 – 122 = 10,879 m

Gradien hidrolis sebelum ada lantai muka


∆H Bligh ∆H Lane (Lv
Segmen Lv Lh 1/3 Lh
(Lv + Lh) + 1/3 Lh)

A-B 5 0 0.000 5 5.000


B-C 0 4.5 1.500 4.5 1.500
C-D 2 0 0.000 2 2.000
D-E 0 4.54 1.513 4.54 1.513
E-F 2 0 0.000 2 2.000
F-G 0 2.51 0.837 2.51 0.837
G-H 1.86 0 0.000 1.86 1.860
H-I 0 2 0.667 2 0.667
I-J 2 0 0.000 2 2.000
J-K 0 2 0.667 2 0.667
K-L 2 0 0.000 2 2.000
L-M 0 2.5 0.833 2.5 0.833
M-N 2 0 0.000 2 2.000

Tugas Bangunan Air | 19


N-O 0 2.5 0.833 2.5 0.833
O-P 4 0 0.000 4 4.000
∑ 20.860 20.550 6.850 41.410 27.710

Penentuan Lantai Muka


Muka Air Normal
 Metode Bligh

∑ 𝐿𝑣 + ∑ 𝐿ℎ ≥ 𝐶𝐵𝑙𝑖𝑔ℎ × ∆𝐻 × 1,5

20,86 + 20,55 ≥ 7 × 4,04 × 1,5


41,41 m ≥ 42,42 m
Perlu muka lantai sejauh = 42,42 – 37,41 = 1,01 m
 Metode Lane
1
∑ 𝐿𝑣 + ∑ 𝐿ℎ ≥ 𝐶𝐿𝑎𝑛𝑒 × ∆𝐻
3
20,86 + 6,85 ≥ 4,0 × 4,04
27,71 m ≥ 16,16 m
Tidak perlu muka lantai

Muka Air Banjir


 Metode Bligh

∑ 𝐿𝑣 + ∑ 𝐿ℎ ≥ 𝐶𝐵𝑙𝑖𝑔ℎ × ∆𝐻 × 1,5

20,86 + 20,55 ≥ 7 × 10,879 × 1,5


41,41 m ≥ 114,23 m
Perlu muka lantai sejauh = 114,23 – 41,41 = 72,82 m
 Metode Lane
1
∑ 𝐿𝑣 + ∑ 𝐿ℎ ≥ 𝐶𝐿𝑎𝑛𝑒 × ∆𝐻
3
20,86 + 6,85 ≥ 4,0 × 10,879
27,71 m ≥ 43,516 m
Perlu muka lantai sejauh = 43,516 – 27,71 = 15,806 m
Kesimpulan : Diperlukan lantai muka sepanjang 73 m

Tugas Bangunan Air | 20


Gradien hidrolis setelah ada lantai muka
∆H Bligh ∆H Lane (Lv
Segmen Lv Lh 1/3 Lh
(Lv + Lh) + 1/3 Lh)

A-B 5 0 0.000 5 5.000


B-C 0 4.5 1.500 4.5 1.500
C-D 2 0 0.000 2 2.000
D-E 0 4.54 1.513 4.54 1.513
E-F 2 0 0.000 2 2.000
F-G 0 2.51 0.837 2.51 0.837
G-H 1.86 0 0.000 1.86 1.860
H-I 0 2 0.667 2 0.667
I-J 2 0 0.000 2 2.000
J-K 0 2 0.667 2 0.667
K-L 2 0 0.000 2 2.000
L-M 0 2.5 0.833 2.5 0.833
M-N 2 0 0.000 2 2.000
N-O 0 2.5 0.833 2.5 0.833
O-P 4 0 0.000 4 4.000
P-Q 0 3 1.000 3 1.000
Q-R 2 0 0.000 2 2.000
R-S 0 3 1.000 3 1.000
S-T 2 0 0.000 2 2.000
T-U 0 3 1.000 3 1.000
U-V 2 0 0.000 2 2.000
V-W 0 3 1.000 3 1.000
W-X 2 0 0.000 2 2.000
X-Y 0 3 1.000 3 1.000
Y-Z 2 0 0.000 2 2.000
Z-A' 0 3 1.000 3 1.000
A'-B' 2 0 0.000 2 2.000
B'-C' 0 3 1.000 3 1.000

Tugas Bangunan Air | 21


C'-D' 2 0 0.000 2 2.000
D'-E' 0 3 1.000 3 1.000
E'-F' 2 0 0.000 2 2.000
F'-G' 0 3 1.000 3 1.000
G'-H' 2 0 0.000 2 2.000
H'-I 0 3 1.000 3 1.000
I'-J' 2 0 0.000 2 2.000
J'-K' 0 3 1.000 3 1.000
K'-L' 2 0 0.000 2 2.000
L'-M' 0 3 1.000 3 1.000
M'-N' 2 0 0.000 2 2.000
N'-O' 0 3 1.000 3 1.000
O'-P' 2 0 0.000 2 2.000
P'-Q' 0 3 1.000 3 1.000
Q'-R' 2 0 0.000 2 2.000
R'-S' 0 3 1.000 3 1.000
S'-T' 2 0 0.000 2 2.000
T'-U' 0 3 1.000 3 1.000
U'-V' 4.41 0 0.000 4.41 4.410
∑ 55.27 68.55 22.85 123.82 78.12

Tugas Bangunan Air | 22


TAHAP VII
STABILITAS BENDUNG

7.1 Perhitungan Stabilitas Bendung


Perhitungan stabilitas bendung yaitu perhitungan gaya-gaya yang bekerja dan control
stabilitas bendung.

7.1.1 Akibat Berat Sendiri


Menghitung gaya akibat berat sendiri dari konstruksi bending, peninjauan dilakukan
pada setiap satu meter sehingga gaya yang diperhitungkan adalah luas bidang
dikalikan dengan berat jenis pasangan beton (2,4 t/m3).

Berat Jenis Besar Gaya Lengan Momen


Bidang Luas
Beton Berat Momen terhadap B
A1 1.376 2.4 3.3024 19.45 64.232
A2 23.7 2.4 56.88 19.3 1097.784
A3 3.175 2.4 7.62 17.38 132.436
A4 12.35 2.4 29.64 16.8 497.952
A5 2.03 2.4 4.872 14.88 72.495
A6 9.82 2.4 23.568 14.55 342.914
A7 2.03 2.4 4.872 12.88 62.751
A8 9.76 2.4 23.424 12.55 293.971
A9 1.747 2.4 4.1928 10.91 45.743
A10 12.249 2.4 29.39712 10.29 302.496
A11 6.084 2.4 14.60064 7.9 115.345
A12 6.084 2.4 14.60064 5.64 82.348
A13 4.433 2.4 10.6392 2.95 31.386
A14 11.25 2.4 27 3.38 91.260
A15 2.002 2.4 4.8048 0.94 4.517
A16 11.25 2.4 27 1.13 30.510
∑ 286.4136 (-) 3268.140

Tugas Bangunan Air | 23


7.1.2 Akibat Gempa
Gaya yang diperhitungkan terjadi terhadap konstruksi bendung adalah gaya
horizontal, dengan menggunakan rumus:
K = E × Ng
E = ad / g
ad = n (ad × z)m
dimana : K = gaya gempa (ton)
E = koefisien gempa = 1,15
∑G = berat konstruksi (ton)
g = percepatan gravitasi = 9,81 m/dt2

Luas Berat Jenis Besar Gaya Koefisien Besar Gaya Lengan Momen
Bidang
2
(m ) Beton Berat Gempa Gempa Momen terhadap B
A1 1.376 2.4 3.302 1.15 3.798 13.65 51.839
A2 23.7 2.4 56.880 1.15 65.412 8.58 561.235
A3 3.175 2.4 7.620 1.15 8.763 11.48 100.599
A4 12.35 2.4 29.640 1.15 34.086 8.33 283.936
A5 2.03 2.4 4.872 1.15 5.603 9.45 52.946
A6 9.82 2.4 23.568 1.15 27.103 6.32 171.292
A7 2.03 2.4 4.872 1.15 5.603 7.42 41.573
A8 9.76 2.4 23.424 1.15 26.938 4.3 115.832
A9 1.747 2.4 4.193 1.15 4.822 5.49 26.471
A10 12.2488 2.4 29.397 1.15 33.807 2.44 82.488
A11 6.0836 2.4 14.601 1.15 16.791 3.34 56.081
A12 6.0836 2.4 14.601 1.15 16.791 3.34 56.081
A13 4.433 2.4 10.639 1.15 12.235 5.71 69.862
A14 11.25 2.4 27.000 1.15 31.050 2.5 77.625
A15 2.002 2.4 4.805 1.15 5.526 5.48 30.280
A16 11.25 2.4 27.000 1.15 31.050 2.5 77.625
∑ 329.376 (+) 1855.767

Tugas Bangunan Air | 24


7.1.3 Akibat Tekanan Lumpur
Endapan lumpur dianggap setinggi mercu bendung dengan sudut geser (∅) = 28o dan
berat jenis lumpur (γlumpur ) = 1,60 t/m3 dan perhitungan menggunakan rumus:

Ka = tan2 (45 − )
2
1
Ps = × γ × h2 × Ka
2
Dimana: Ka = koefisien tekanan tanah aktif
𝛾s = berat jenis lumpur efektif (t/m3)
h = kedalaman lumpur (m)
∅ = sudut geser dalam lumpur
Ps = gaya akibat tekanan lumpur (ton)

Perhitungan:

Ka = tan2 (45 − )
2
28
Ka = tan2 (45 − ) = 0,361
2
1
Ps = × γ𝑠 × h2 × Ka
2
1
Ps = × (1,60 − 1,00) × 3,8052 × 0,361 = 1,568 ton
2
Lengan momen = 11,54 m

Momen terhadap B = Ps × Lengan momen

= 1,568 × 11,27

= 18,095 ton meter (+)

7.1.4 Akibat Tekanan Tanah


Perhitungan tekanan tanah menggunakan rumus berikut ini

Ka = tan2 (45 − 2)

Kp = tan2 (45 + )
2

Tugas Bangunan Air | 25


1
Pa = × γ × h2 × Ka
2
1
Pp = × γ × h2 × Kp
2
Dimana: Pa = gaya akibat tekanan tanah aktif (ton)
Pp = gaya akibat tekanan tanah pasif (ton)
γ = berat jenis tanah (t/m3)
h = kadalaman tanah (m)
∅ = sudut geser dalam lumpur
Ka = koefisien tekanan tanah aktif
Kp = koefisien tekanan tanah pasif

Perhitungan:

 Tekanan Tanah Aktif



Ka = tan2 (45 − )
2
28
Ka = tan2 (45 − ) = 0,361
2
1
Pa = × γ × h2 × Ka
2
1
Pa = × (1,60 − 1) × 7,892 × 0,361 = 6,742 ton
2
Lengan momen = 2,6 m
Momen terhadap B = Pa × Lengan momen

= 6,742 × 2,6 = 17,529 ton meter (+)

 Tekanan Tanah Pasif



Kp = tan2 (45 + )
2
28
Kp = tan2 (45 + ) = 2,7698
2

Tugas Bangunan Air | 26


1
Pp = × γ × h2 × Kp
2
1
Pp = × (1,60 − 1) × 6,432 × 2,7698 = 34,355 ton
2
Lengan momen = 2,14 m
Momen terhadap B = Pp × Lengan momen

= 34,355 × 2,14 = 73,52 ton meter (-)

7.1.5 Akibat Gaya Hidrostatis


Perhitungan akibat gaya hidrostatis ditinjau terhadap waktu air normal dan air banjir
menggunakan rumus berikut ini
1
𝑃𝐻 = × 𝛾𝑤 × ℎ2
2
Dimana: PH = gaya akibat tekanan hidrostatis (ton)
h = tinggi air (m)
𝛾𝑤 = berat jenis air (1 t/m3)

Perhitungan:
1. Pada waktu air normal
1
𝑃𝐻 = × 𝛾𝑤 × ℎ2
2
1
𝑃𝐻 = 2 × 1 × 3,8052 = 7,239 ton

Lengan momen = 11,54 m


Momen terhadap B = 𝑃𝐻 × lengan momen
= 7,239 × 11,54 = 83,538 ton meter (+)
2. Pada waktu air banjir
1
𝑃𝐻 = × 𝛾𝑤 × ℎ2
2
1
𝑃𝐻 = 2 × 1 × 7,882 = 31,047 ton

Lengan momen = 12,9 m


Momen terhadap S = 𝑃𝐻 × lengan momen
= 31,047 × 12,9 = 400,51 m (+)

Tugas Bangunan Air | 27


Gaya pada A2 = Luas area A2 × 𝛾𝑤
= 57,634 × 1 = 57,634 ton
Lengan momen = 14,13 m
Momen terhadap B = 57,634 × 14,13
= 814,268 ton meter (-)
Gaya pada A3 = Luas area A3 × 𝛾𝑤
= 33,986 × 1 = 33,986 ton
Lengan momen = 4,93 m
Momen terhadap B = 33,986 × 4,93
= 167,551 ton meter (-)

7.1.6 Akibat Uplift Pressure


Perhitungan akibat gaya uplift pressure ditinjau terhadap waktu air normal dan air
banjir dengan menggunakan rumus berikut ini
𝐿𝑥 ∆𝐻
𝑈𝑥 = [𝐻𝑥 − ]𝛾
𝐿𝑡𝑜𝑡𝑎𝑙 𝑤
Dimana: Ux = gaya angkat pada x (t/m2)

Ltotal = panjang total bidang kontak bangunan dan tanah bawah (m)

Lx = jarak sepanjang bidang kontak dari hulu sampai x (m)

Hx = tinggi energi di hulu bendung (m)


ΔH = beda tinggi energi (m)

Tugas Bangunan Air | 28


Perhitungan Uplift Pressure Pada Muka Air Normal
Elevasi Muka Elevasi Di
Hx Lx Ltotal ΔH 𝛾𝑤 Ux
Titik Air Normal Titik x
(m) (m) (m) (m) (m) (m) (t/m3) (t/m2)
A 124.765 118.545 6.220 82.41 123.82 4.890 1.0 2.965
B 124.765 114.545 10.220 86.41 123.82 4.890 1.0 6.807
C 124.765 114.545 10.220 88.91 123.82 4.890 1.0 6.709
D 124.765 116.545 8.220 90.91 123.82 4.890 1.0 4.630
E 124.765 116.545 8.220 93.41 123.82 4.890 1.0 4.531
F 124.765 114.545 10.220 95.41 123.82 4.890 1.0 6.452
G 124.765 114.545 10.220 97.41 123.82 4.890 1.0 6.373
H 124.765 112.545 12.220 99.41 123.82 4.890 1.0 8.294
I 124.765 112.545 12.220 101.41 123.82 4.890 1.0 8.215
J 124.765 110.685 14.080 103.27 123.82 4.890 1.0 10.002
K 124.765 110.685 14.080 105.78 123.82 4.890 1.0 9.902
L 124.765 112.685 12.080 107.78 123.82 4.890 1.0 7.823
M 124.765 112.685 12.080 112.32 123.82 4.890 1.0 7.644
N 124.765 110.685 14.080 114.32 123.82 4.890 1.0 9.565
O 124.765 110.685 14.080 118.82 123.82 4.890 1.0 9.387
P 124.765 115.685 9.080 123.82 123.82 4.890 1.0 4.190

Perhitungan Gaya Uplift Horizontal Pada Muka Air Normal


Gaya Lengan Momen
Titik
uplift momen (m) terhadap O
A-B 19.546 5.53 108.087
C-D 11.338 4.82 54.651
E-F 10.983 4.82 52.938
G-H 14.667 2.79 40.921
I-J 16.941 0.87 14.739
K-L 17.726 0.93 16.485
M-N 17.209 0.93 16.005
O-P 33.944 2.22 75.355
142.354 379.181

Tugas Bangunan Air | 29


Perhitungan Gaya Uplift Vertikal Pada Muka Air Normal
Gaya Lengan Momen
Titik
uplift momen (m) terhadap O
B-C 16.895 19.31 326.245
D-E 11.451 16.81 192.489
F-G 12.825 14.55 186.604
H-I 16.509 12.55 207.189
J-K 24.980 10.3 257.289
L-M 35.112 6.79 238.407
N-O 42.643 2.27 96.801
160.415 1505.024

Perhitungan Uplift Pressure Pada Muka Air Banjir

Elevasi Muka Elevasi Di


Hx Lx Ltotal ΔH 𝛾𝑤 Ux
Titik Air Normal Titik x
(m) (m) (m) (m) (m) (m) (t/m3) (t/m2)
A 132.879 122.589 10.290 82.41 123.82 8.970 1.0 4.320
B 132.879 118.589 14.290 86.41 123.82 8.970 1.0 8.030
C 132.879 118.589 14.290 88.91 123.82 8.970 1.0 7.849
D 132.879 120.589 12.290 90.91 123.82 8.970 1.0 5.704
E 132.879 120.589 12.290 93.41 123.82 8.970 1.0 5.523
F 132.879 118.589 14.290 95.41 123.82 8.970 1.0 7.378
G 132.879 118.589 14.290 97.41 123.82 8.970 1.0 7.233
H 132.879 116.589 16.290 99.41 123.82 8.970 1.0 9.088
I 132.879 116.589 16.290 101.41 123.82 8.970 1.0 8.943
J 132.879 114.729 18.150 103.27 123.82 8.970 1.0 10.669
K 132.879 114.729 18.150 105.78 123.82 8.970 1.0 10.487
L 132.879 116.729 16.150 107.78 123.82 8.970 1.0 8.342
M 132.879 116.729 16.150 112.32 123.82 8.970 1.0 8.013
N 132.879 114.729 18.150 114.32 123.82 8.970 1.0 9.868
O 132.879 114.729 18.150 118.82 123.82 8.970 1.0 9.542
P 132.879 119.729 13.150 123.82 123.82 8.970 1.0 4.180

Tugas Bangunan Air | 30


Perhitungan Gaya Uplift Horizontal Pada Muka Air Banjir
Gaya Lengan Momen
Titik
uplift momen (m) terhadap O
A-B 24.700 5.53 136.591
C-D 13.553 4.82 65.326
E-F 12.901 4.82 62.184
G-H 16.322 2.79 45.537
I-J 18.239 0.87 15.868
K-L 18.829 0.93 17.511
M-N 17.881 0.93 16.630
O-P 34.306 2.22 76.158
156.731 435.805

Perhitungan Gaya Uplift Vertikal Pada Muka Air Banjir


Gaya Lengan Momen
Titik
uplift momen (m) terhadap O
B-C 19.849 19.3 383.084
D-E 14.034 16.8 235.770
F-G 14.611 14.55 212.595
H-I 18.032 12.55 226.299
J-K 26.550 10.3 273.468
L-M 37.126 6.78 251.715
N-O 43.673 2.26 98.702
173.876 1681.634

Tugas Bangunan Air | 31