DATA
Luas Daerah Pengaliran AREA = 2.12 km2
Hujan terpusat PBAR = 252 mm (lihat Peta Isohyet Lokasi)
Faktor Reduksi Area ARF = 1.15 untuk DAS 2.12 km2
Panjang Sungai MSL = 2.80 km
Elevasi Hulu = 433 m
Elevasi Hilir = 157 m
Luas Permukan Danau = 0.00 m2
GROWTH FACTOR
Periode Ulang Luas DAS (km2)
(tahun) < 180 300 600 900 1200 > 1500
2 1.07 1.06 1.03 1.01 0.98 0.96
5 1.28 1.27 1.24 1.22 1.19 1.17
10 1.56 1.57 1.48 1.44 1.41 1.37
20 1.88 1.88 1.75 1.70 1.64 1.59
25 1.97 1.96 1.84 1.78 1.72 1.66
50 2.35 2.30 2.18 2.12 2.03 1.95
100 2.78 2.72 2.57 2.47 2.37 2.27
200 3.27 3.20 3.01 2.89 2.78 2.66
500 4.01 3.92 3.70 3.56 3.41 3.27
1000 4.68 4.58 4.32 4.16 4.01 3.85
PERHITUNGAN
Beda Tinggi = 276 m
ARF = 1.15
Luas Permukaan Danau
PBAR = 252
AREA
APBAR = ARF x PBAR = 289.29
QT = GF (T.AREA) X MAF
DATA
A = 2.12 km2
L = 2.80 km CHECK
E1 = 433 m Qn = c . b . qn . A
E2 = 157 m
I ###
t 1
120 A t = 0.25 . L . Qn-0,125 . I-0,25
b = t9 (sama atau mendekati t asumsi)
120 A
Rn 67,65
qn =
240 t 1,45
4,1
c =1
β.q n 7
DESIGN FLOOD
Kala Ulang t assumed
tcheck QF
RT b qn c
(tahun) (jam) (jam) m /det
3
'file:///conversion/tmp/scratch/463901191.xlsx'#$Der Weduwen
Perhitungan Debit Banjir Metode Der Weduwen
Metode Hujan Gumbell
Sungai Prayungan
Rencana Jembatan Kalisari Kabupaten Blora
DATA
A = 2.61 km2
L = 6.60 km CHECK
E1 = 433 m Qn =c. b.q
E2 = 157 m
ii ###
t 1
120 A t = 0.25 . L . Qn-0,125 . i-0,25
mendekati t asumsi) b = t9 (sama atau mendekati t asum
120 A
R n 67,65
qn =
240 t 1,45
4,1
c =1
β.q n 7
DESIGN FLOOD
Kala Ulang t assumed
RT b qn c
(tahun) (jam)
= c . b . qn . A
tcheck QF
(jam) m /det
3
1.07 3.36
1.05 3.98
1.03 4.76
1.01 5.42
1.00 6.06
0.98 7.19
0.96 8.30
0.98 6.99
Perhitungan Hujan Rancangan Metode Iwai Kadoya
Perhitungan Waktu Distribusi Banjir
Sungai Lebak Menak
Rencana Penyusunan Rencana Teknis Embung Petir di Banjarnegara 1 2 3 4 5 6
T
0.5500 0.1400 0.1000 0.0800 0.0700 0.0600
No Urut Curah Hujan 5 23.533 5.990 4.279 3.423 2.995 2.567
log xi xi + b log (xi + b) {log (xi + b)}2
Regresi xi No xi xs xi.xs xi + xs xi.xs - x02 2x0 - (xi + xs) bi 10 27.820 7.081 5.058 4.046 3.541 3.035
1 53.00 1.72 46.85 1.67 2.791 1 53.00 21.00 1113.00 74.00 -51.54 -5.75 8.96 20 29.686 7.557 5.398 4.318 3.778 3.239
2 50.70 1.71 44.55 1.65 2.719 2 50.70 24.54 1244.10 75.24 79.56 -6.99 -11.39 50 33.508 8.529 6.092 4.874 4.265 3.655
3 49.65 1.70 43.49 1.64 2.684 3 49.65 25.77 1279.54 75.42 115.00 -7.17 -16.04 100 36.360 9.255 6.611 5.289 4.628 3.967
4 49.63 1.70 43.47 1.64 2.684 -18.46 200 39.206 9.980 7.128 5.703 4.990 4.277
5 44.17 1.65 38.01 1.58 2.496 log x0 = 1.53 b = -6.15 1000 42.986 10.942 7.816 6.253 5.471 4.689
6 41.00 1.61 34.85 1.54 2.378 x0 = 34.13
7 40.00 1.60 33.85 1.53 2.339 x02 = 1,164.54
8 39.00 1.59 32.85 1.52 2.300 T 1 2 3 4 5 6
9 38.80 1.59 32.65 1.51 2.292 5 15.061 3.834 2.738 2.191 1.917 1.643
10 32.75 1.52 26.60 1.42 2.030 1/T z (1/a) . z (1/a) . z + Xo x+b x 10 17.804 4.532 3.237 2.590 2.266 1.942
11 32.30 1.51 26.15 1.42 2.009 1/5 0.5951 0.121 1.564 36.63 42.79 mm 20 18.999 4.836 3.454 2.764 2.418 2.073
12 31.00 1.49 24.85 1.40 1.947 1/10 1.0062 0.205 1.648 44.43 50.58 mm 50 21.445 5.459 3.899 3.119 2.729 2.339
13 31.00 1.49 24.85 1.40 1.947 1/20 1.1631 0.237 1.680 47.82 53.98 mm 100 23.271 5.923 4.231 3.385 2.962 2.539
14 28.83 1.46 22.68 1.36 1.838 1/50 1.4522 0.296 1.739 54.77 60.92 mm 200 25.092 6.387 4.562 3.650 3.194 2.737
15 28.43 1.45 22.27 1.35 1.817 1/100 1.645 0.335 1.778 59.96 66.11 mm 1000 27.511 7.003 5.002 4.002 3.501 3.001
16 27.57 1.44 21.42 1.33 1.771 1/200 1.8214 0.371 1.814 65.13 71.28 mm
17 27.06 1.43 20.91 1.32 1.743 1/500 2.0352 0.415 1.857 72.00 78.16 mm
18 26.13 1.42 19.97 1.30 1.691
19 25.77 1.41 19.62 1.29 1.671
20 24.54 1.39 18.38 1.26 1.599
21 21.00 1.32 14.85 1.17 1.373
Jumlah 32.19 30.29 44.12
1/n 1.53 1.44 2.10
1/a = 0.204
No Urut Curah Hujan Probability
Regresi xi i/n
1 45.76 5.882%
2 45.35 11.765%
3 40.24 17.647%
4 37.96 23.529%
5 35.11 29.412%
6 32.45 35.294%
7 29.73 41.176%
8 29.30 47.059%
9 29.00 52.941%
10 26.57 58.824%
11 23.94 64.706%
12 23.76 70.588%
13 23.40 76.471%
14 22.89 82.353%
15 20.57 88.235%
16 19.28 94.118%
17 17.28 100.000%
Perhitungan Debit Banjir Metode Melchior
Sungai Lebak Menak
Pekerjaan Penyusunan Rencana Teknis Embung Petir di Banjarnegara
DATA
A = 2.61 km2 b1 = 1.4204
L sungai = 3.7 km b2 = 0.9127
E1 = 433.0 m b = 1.2964
E2 = 157.4 m ii = 0.0828
L1 elips = 10.6 km
L2 elips = 6.4 km
F = 52.865 km2
T Rn Q0 V t QF
q0 a qcheck
tahun mm m /det
3
m/det jam m3/det
5 35.735 2.37 8.7862 0.7467 0.52 1.38 9.35 2.9391972
10 41.330 2.84 10.529 0.7742 0.52 1.33 11.21 4.0764009
20 46.697 3.31 12.271 0.7983 0.52 1.29 13.06 5.3655799
50 53.643 3.94 14.607 0.8266 0.52 1.24 15.54 7.3317202
100 58.848 4.42 16.386 0.8458 0.52 1.22 17.44 9.0288728
200 64.035 4.91 18.203 0.8638 0.52 1.19 19.38 10.917611
500 70.877 5.58 20.686 0.8862 0.52 1.16 22.01 13.722063
1000 76.049 6.09 22.577 0.9018 0.52 1.14 24.03 16.076247
T Rn Q0 V t QF
q0 a qcheck
tahun mm m3/det m/det jam m3/det
5 33.828 2.21 8.193 0.7363 0.52 1.40 8.73 2.5972574
10 38.164 2.57 9.5276 0.7589 0.52 1.35 10.15 3.4071049
20 43.650 3.04 11.27 0.7848 0.52 1.31 12.00 4.6091006
50 47.761 3.4 12.605 0.8026 0.52 1.28 13.43 5.6432722
100 51.885 3.78 14.013 0.8198 0.52 1.25 14.90 6.8024158
200 56.071 4.16 15.422 0.8356 0.52 1.23 16.42 8.0979852
1000 66.138 5.11 18.944 0.8707 0.52 1.18 20.18 11.740043
Perhitungan Debit Banjir Metode Rasional Jepang
Metode Hujan Log Pearson type III
Data Dasar
Luas Daerah Aliran SungA = 2.12 km2
Panjang Sungai L = 2.80 km
Elevasi Hulu E1 = 433.00 m
Elevasi Hilir E2 = 157.44 m
Beda Tinggi H = 275.56 m
Kemiringan i = 0.0984
t RT iT Qt
(tahunan) (mm) (mm/jam) (m3/det)
2 80.75 40.894 12.041
5 106.58 53.975 15.893
10 126.12 63.870 18.806
20 145.66 73.766 21.720
50 171.49 86.846 25.571
100 191.03 96.742 28.485
200 210.57 106.637 31.399
1000 255.93 129.613 38.164
4A^0,5 2.912044
1,5 L 4.2
0,8 H^0,514.84749
0.4790064
0.1052008
R602 100.1997
Perhitungan Debit Banjir Metode Haspers Perhitungan Debit Banjir Metode Haspers
Metode Hujan Gumbell Metode Hujan Log Pearson type III
Period RT Rt q QT Period RT Rt q QT
t = 0,1 . L0,9 . i-0,3 5 th 35.735 30.75 2.41 9.58 t = 0,1 . L0,9 . i-0,3 2 th 100.200 83.73 6.57 26.07
= 3.541 jam 10 th 41.330 35.47 2.78 11.05 = 0.506 jam 5 th 125.507 103.70 8.14 32.29
20 th 46.697 39.98 3.14 12.45 10 th 144.678 118.54 9.30 36.91
Period RT Rt q QT Period RT Rt q QT
5 th 35.735 27.87 2.19 8.68 2 th 100.200 78.13 6.13 24.33
10 th 41.330 32.23 2.53 10.04 5 th 125.507 97.87 7.68 30.48
20 th 46.697 36.41 2.86 11.34 10 th 144.678 112.82 8.85 35.13
50 th 53.643 41.83 3.28 13.03 20 th 163.951 127.85 10.03 39.81
100 th 58.848 45.89 3.60 14.29 50 th 194.046 151.31 11.87 47.12
200 th 64.035 49.93 3.92 15.55 100 th 218.183 170.13 13.35 52.98
500 th 70.877 55.27 4.34 17.21 200 th 244.545 190.69 14.96 59.38
1000 th 76.049 59.30 4.65 18.47 1000 th 315.342 245.90 19.29 76.58
Period RT Rt q QT Period RT Rt q QT
5 th 35.735 26.26 2.06 8.18 2 th 100.200 71.84 5.64 22.37
10 th 41.330 30.22 2.37 9.41 5 th 125.507 89.73 7.04 27.94
20 th 46.697 34.01 2.67 10.59 10 th 144.678 103.29 8.10 32.16
50 th 53.643 38.93 3.05 12.12 20 th 163.951 116.91 9.17 36.41
100 th 58.848 42.61 3.34 13.27 50 th 194.046 138.19 10.84 43.03
200 th 64.035 46.27 3.63 14.41 100 th 218.183 155.26 12.18 48.35
500 th 70.877 51.11 4.01 15.92 200 th 244.545 173.89 13.64 54.15
1000 th 76.049 54.77 4.30 17.05 1000 th 315.342 223.95 17.57 69.74
SOMAWANGI
0 0 9
1 1.048 8
2 3.19
7
3 4.3426
3.96 7.965 6
0
0 1 2 3
3 3.96
Kala Ulang (th)
Metode
2 5 10 20 50 100 200
Rasional 12.04 15.89 18.81 21.72 25.57 28.49 31.40
FSR Jawa Sumatera 14.54 17.39 21.20 25.55 31.93 37.78 44.43
Haspers 26.14 33.77 38.01 41.14 45.82 48.69 51.37
der Weduwen 20.12 28.09 32.62 36.10 41.58 44.78 48.05
Nakayasu 22.25 29.15 33.06 35.99 40.44 43.20 45.81
Gama I 13.17 16.94 19.08 20.68 23.11 24.63 26.05
21.49
1000
38.16
63.59
57.07
54.91
51.45
29.14