Anda di halaman 1dari 3

BOQ

PEKERJAAN BAJA
AREA : BANGUNAN UTAMA

NO. ITEM PEKERJAAN VOLUME SATUAN


1. PEKERJAAN BAJA BANGUNAN UTAMA
A. UNP 100x50x7.5x5 (K2) 2,985.47 Kg
B. PROFIL BAJA T 200x200x8x13 (BALOK) 9,391.11 Kg
C. HOLLOW 100x100x3 (RENG) 9,044.47 Kg
D. PELAT BAJA (LISPLANK) 1,398.36 Kg
E. PELAT BAJA T=6 MM (BASE PLATE KOLOM) 159.46 Kg
F. PELAT BAJA T=12 MM (BASE PLATE BALOK) 165.79 Kg
G. PELAT BAJA T=10 MM (SAMBUNGAN) 183.63 Kg
H. GROUTING T=25 MM (KOLOM DAN BALOK) 96.00 Bh
I. ANCHOR Ø16, L=200 256.00 Bh
J. ANCHOR Ø16, L=450 128.00 Bh
K. IKATAN ANGIN Ø12 277.51 Kg
L. TREKSTANG Ø12 421.44 Kg
BOQ

PEKERJAAN BAJA
AREA : PASAR

NO. ITEM PEKERJAAN VOLUME SATUAN


1. PEKERJAAN BAJA PASAR
A. UNP 125x65x6x8 (K1) 3,085.75 Kg
B. WF 150x75x5x7 (KUDA-KUDA) 1,893.50 Kg
C. CNP 125x50x20x2.3 3,870.66 Kg
D. HOLLOW 40x40x2.3 4,160.98 Kg
E. TREKSTANG Ø10 353.72 Kg
F. IKATAN ANGIN Ø12 507.80 Kg
G. STIFFNER 201.60 Kg
H. PELAT BAJA T=6 MM (BASE PLATE KOLOM) 94.68 Kg
I. PELAT BAJA T=6 MM (WF) 70.66 Kg
J. GROUTING T=25 MM (KOLOM DAN BALOK) 38.00 Bh
K. ANCHOR dia.=12, L=200 152.00 Bh
L. SIKU 50x50x5 45.06 Kg
BOQ

PEKERJAAN BAJA
AREA : GEREJA

NO. ITEM PEKERJAAN VOLUME SATUAN


1. PEKERJAAN BAJA GEREJA
A. UNP 125x65x6x8 (K1) 520.99 Kg
B. WF 150x75x5x7 (KUDA-KUDA) 254.52 Kg
C. CNP 125x50x20x2.3 541.20 Kg
D. TREKSTANG Ø10 34.33 Kg
E. IKATAN ANGIN Ø12 46.16 Kg
F. STIFFNER 8.40 Kg
G. PELAT BAJA T=6 MM (BASE PLATE KOLOM) 14.95 Kg
H. PELAT BAJA T=6 MM (WF) 11.16 Kg
I. GROUTING T=25 MM (KOLOM DAN BALOK) 6.00 Bh
J. ANCHOR dia.=12, L=200 96.00 Bh
K. SIKU 50x50x5 6.71 Kg