INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 22 April 2013
PERENCANAAN PENGADAAN Revisi : 00
MDEP/MSCI Halaman : Hal 1 / 9
Isi Prosedur
INDONESIA POWER
INTEGRATED MANAGEMENT SYSTEM
INSTRUKSI KERJA
BOILER FORCE COOLING
UNIT 5, 6, DAN 7
5. Rincian Proses
PENANGGUNG JAWAB
ALIRAN AKTIVITAS
DAN REKAMAN
Start
- ssss
Start satu ID Fan
Tutup Damper Laluan gas Inlet dan Outlet Primary Air Heater
cat Cat. 3 R : Operator Control Room
- ssss
A : SP Operasi
C : SPS Operasi
I : HMB, MOPN, MHAR
Start Penthouse Fan
Buka Econ Recirc. V side A dan side B (AE.. SHV001A & AE..
SHV001B) disaat tdk ada feed water flow
cat Cat. 5
Finish
PT INDONESIA POWER No.Dokumen:
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 Sep 2020
BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 3 / 8
6. Catatan Tambahan :
Cat. 1 • Force cooling adalah kegiatan untuk mempercepat proses pendinginan di
boiler metal. Hal ini dilakukan dalam kondisi khusus pemeliharaan.
• Pastikan level drum dalam kondisi terisi. (normal level 340 mm) untuk
memastikan boiler risers tube terisi air.
• Perhatikan ΔT pada Drum metal temp top & bottom terjaga < 80 ˚C. (gambar
7.3)
• Lakukan pengisian feedwater ke drum dengan SU-BFP beroperasi disaat
temperatur drum > ±100 ˚C. Dan pengaturan valve (SJ..0018A dan
SJ..0018A) SU-BFP pembukaan ditrottling ±15 % untuk menghindari flow
yang besar.
• Pengisian feedwater ke drum dengan SU BFP dapat distop dan manuver
pengisian feedwater ke drum dengan Valve 25 dan Valve 26 dapat dilakukan
bila temperatur drum sudah < ±100 ˚C oleh operator lokal ground floor.
• Pastikan SDDC terisi air penuh.
Cat. 2 • Buka IDF Inlet Vane Station >15% s/d <40% (sesuaikan dengan set point
furnace pressure -12 mmwg) posisikan auto
• Buka FDF Inlet Vane Station >15% s/d <40% (sesuai dengan secondary total
air flow 5 s/d 30% atau sesuai permintaan pemeliharaan) posisikan manual.
(Gambar 7.1)
Cat. 3 • Tutup PAH A dan PAH B GAS INL ISLN DMP (GG.. ISV001A) dan
(GG.. ISV001B)
Cat. 4 • Buka Drum air vent (VTV 001A dan 001B)
• Buka PSH 2 A & B INL HDR VENT (AJ.. VTV001A & AJ.. VTV001B)
• Buka SSH INL HDR DRAIN V (AJ.. ISV0005 & ISV0006)
• Buka PSH 2 OUT HDR VENT(AJ.. VTV0002)
• Buka STM ENCL HDR DRN V (AJ.. VTV0003)
• Buka PSH 2 INL HDR DRN V (AJ.. VTV0004)
Cat. 5 • Econ Recirculating Valve side A dan side B akan menutup sendiri dari logic
sequence disaat ada feed water flow (SUBFP beroperasi)
PT INDONESIA POWER No.Dokumen:
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 Sep 2020
BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 4 / 8
7. Lampiran
Table 7.1
Force Draft Fan Load Performance Test
Table 7.2
Induced Draft Fan Load Performance Test
PT INDONESIA POWER No.Dokumen:
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 Sep 2020
BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 5 / 8
Gambar 7.1
Grafik Static Pressure Rise vs Flow Rate FDF Ned Condition VWO + OP avg. Coat
Gambar 7.2
Grafik Static Pressure Rise vs Flow Rate FDF Test Block Conditon
PT INDONESIA POWER No.Dokumen:
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 Sep 2020
BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 6 / 8
Gambar 7.3
Drum Protection Unit 5-7
PT INDONESIA POWER No.Dokumen:
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 Sep 2020
BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 7 / 8
8. Riwayat Perubahan
Yang dirubah Perubahan
No Tanggal
Hal Uraian Hal Uraian
1 5 Sep 0 Sampul • Logo Perusahaan • Logo Perusahaan
2020
Yusuf Septiawan
Angandrowa Bate’e Misiran Yunus Tohir
TS FAN MILL 5-7 SPS HAR BOILER 5-7 MHAR 5-7
PT. INDONESIA POWER UNIT PEMBANGKIT SURALAYA No. Form :
INDONESIA POWER INTEGRATED MANAGEMENT SYSTEM Tgl Terbit : 15 September2020
INSTRUKSI KERJA BOILER FORCE COOLING Revisi : 00
UNIT 5, 6, DAN 7 Halaman : Hal 8 / 8
PEMELIHARAAN
NO.DOKUMEN/ TANGGAL
NO NAMA DOKUMEN PENANGGUNG METODE RETENSI DAN
CATATAN TERBIT
JAWAB PENYIMPANAN PEMUSNAHAN
(1) (2) (3) (4) (5) (6) (7)
2 Operation Manual (OM) book 122-7715-OM-01 7 April 1997 Soft Copy Sesuai TLSK
3 Operation Manual (DM) book 122-7715-DM-08 10 Juli 1996 Soft Copy Sesuai TLSK
4 Operation Manual (DM) book 122-7715-DM-06.1 15 April 1997 Soft Copy Sesuai TLSK
MISIRAN