Anda di halaman 1dari 10

LAPORAN

HASIL PEKERJAAN DI STASIUN SOLO


BALAPAN
LINGKUP PEKERJAAN :
1. Jalur Stabling 1 Emplasemen Stasiun Solo Balapan
2. Dari No. Pole 69A s/d No. Pole 87A
LINGKUP PEKERJAAN
PEMASANGAN / INSTALASI PERALATAN :

1. Wiring Messeger Wire = 445,3 m


2. Wiring Contact Wire = 445,3 m
3. Hanger Bar = 89 Set
4. Steadying Equipment, Single Trolley = 10 Set
5. Pull Off Equipment, Pulley Type = 1 Set
6. Insulator Insertion = 1 Set
7. Suspension for Messenger Wire = 11 Set
8. Feeding Branch = 2 Set
9. Automatic Tensioning Device, Pulley Type = 2 Set
10. Anchoring Fixed Type = 2 Set
11. Adjusting OHC = 445,3 m
12. Wiring Feeder Wire = 493,3 m
13. Suspension Insulator for Feeder Wire = 12 Set
14. Wiring Ground Wire = 433,3 m
KONDISI DI LAPANGAN SAAT INI :

1. Pekerjaan Jaringan LAA di Stabling 1 dan Stabling 2


KONDISI DILAPANGAN SAAT INI :
KONDISI DILAPANGAN SAAT INI :