RENCANA ANGGARAN BIAYA

KEGIATAN : PENGEMBANGAN REHAB GEDUNG YAYASAN


NAMA LEMBAGA : YAYASAN MIFTAHUL ULUM
LOKASI : KP. CIKUPA DESA CIRANGKONG CIJAMBE SUBANG
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME TOTAL HARGA
(RP)
I PEKERJAAN PLESTERAN DAN LANTAI
1 Pek. Lantai keramik 40x40 (Lt.1+Lt.2) m2 64.0 120,000 7,680,000
2 Plesteran m2 64.0 42,000 2,688,000
3 Acian plesteran m2 64.0 23,000 1,472,000
SUB TOTAL (I) PEKERJAAN PLESTERAN DAN LANTAI 11,840,000
II PEKERJAAN KAYU DAN ALUMINIUM
1 Listplank kayu klas II m' 17.0 60,000 1,020,000
3 Daun jendela kaca m2 2.0 332,000 664,000
4 Daun pintu panil m2 3.0 466,000 1,398,000
5 Pek. Ventilasi krepyek m2 2.0 268,000 536,000
6 Kaca polos 3 mm m2 4.0 138,000 552,000
SUB TOTAL (II) PEKERJAAN KAYU DAN ALUMINIUM 4,170,000
III PEKERJAAN BESI
1 Kunci pintu 2 slang besar bh 2.0 161,000 322,000
2 Engsel pintu bh 6.0 39,000 234,000
3 Engsel jendela bh 20.0 25,000 500,000
4 Hak angin kecil bh 20.0 27,500 550,000
5 Grendel kecil bh 44.0 21,500 946,000
SUB TOTAL (III) PEKEJAAN BESI 2,552,000
IV PEKERJAAN INSTALASI LISTRIK
1 Titik lampu + instalasi bh 8.0 173,500 1,388,000
2 Lampu SL 18 watt bh 8.0 35,000 280,000
3 Saklar dobell bh 2.0 55,000 110,000
4 Saklar tunggal bh 4.0 55,000 220,000
5 Stop kontak bh 3.0 56,000 168,000
SUB TOTAL (IV) PEKERJAAN INSTALASI LISTRIK 2,166,000
V PEKERJAAN PENGECATAN
1 Cat tembok m2 92.0 20,000 1,840,000
2 Cat plapond m2 73.0 20,000 1,460,000
3 Cat kayu m2 36.0 27,000 972,000
SUB TOTAL (V) PEKERJAAN PENGECATAN 4,272,000
JUMLAH TOTAL 25,000,000

YAYASAN
MIFTAHUL ULUM
Ketua Bendahara

ANWAR NAWAWI Ustz. NANI SUMARNI


RENCANA ANGGARAN BIAYA
KEGIATAN : PENGEMBANGAN REHAB GEDUNG YAYASAN
NAMA LEMBAGA : YAYASAN MIFTAHUL ULUM
LOKASI : KP. CIKUPA DESA CIRANGKONG CIJAMBE SUBANG
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME TOTAL HARGA
(RP)
I PEKERJAAN PLESTERAN DAN LANTAI
1 Pek. Lantai keramik 40x40 (Lt.1+Lt.2) m2 64.0 120,000 7,680,000
2 Plesteran m2 64.0 42,000 2,688,000
3 Acian plesteran m2 64.0 23,000 1,472,000
II PEKERJAAN KAYU DAN ALUMINIUM
1 Listplank kayu klas II m' 17.0 60,000 1,020,000
3 Daun jendela kaca m2 2.0 332,000 664,000
4 Daun pintu panil m2 3.0 466,000 1,398,000
5 Pek. Ventilasi krepyek m2 2.0 268,000 536,000
6 Kaca polos 3 mm m2 4.0 138,000 552,000
III PEKERJAAN BESI
1 Kunci pintu 2 slang besar bh 2.0 161,000 322,000
2 Engsel pintu bh 6.0 39,000 234,000
3 Engsel jendela bh 20.0 25,000 500,000
4 Hak angin kecil bh 20.0 27,500 550,000
5 Grendel kecil bh 44.0 21,500 946,000
IV PEKERJAAN INSTALASI LISTRIK
1 Titik lampu + instalasi bh 8.0 173,500 1,388,000
2 Lampu SL 18 watt bh 8.0 35,000 280,000
3 Saklar dobell bh 2.0 55,000 110,000
4 Saklar tunggal bh 4.0 55,000 220,000
5 Stop kontak bh 3.0 56,000 168,000
V PEKERJAAN PENGECATAN
1 Cat tembok m2 92.0 20,000 1,840,000
2 Cat plapond m2 73.0 20,000 1,460,000
3 Cat kayu m2 36.0 27,000 972,000
JUMLAH TOTAL 25,000,000