Anda di halaman 1dari 8

DANA DESA 2017

KEC BATULAYAR
cm 30
PROVINSI
NTB
KABUPATEN
LOMBOK BARAT
KECAMATAN
BATULAYAR
badan talud
DESA
cm 2,60
BENGKAUNG
JENIS PRASARANA
TALUD PENAHAN TANAH
LOKASI
DUSUN BUNIAN
JUDUL GAMBAR
SKETSA DASAR
pondasi talud 40
cm Dibuat Oleh :
Ketua TPK

cm 40
SYAHRUL NAJMI
Diverifikasi
Ketua PTPKD

SAIFUL NAZAR S.I P


Disetujui
Kepala Desa

H. AHMAD JUNAEDY
FOTO KONDISI EKSISTING

Nama Ruas : (-) ..........................

Lembar ke- : 1

STA. 0+000

T/R

4,0

STA. 0+50

T/R

4,5
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

Kabupaten : Lombok Barat


Kecamatan : Batulayar
Desa : Bengkaung

DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

Harga
No. Uraian Satuan Keterangan
(Rp)

I UPAH
1 Pekerja HOK 84,000
2 Tukang Batu HOK 100,000

II BAHAN
1 Pasir Pasang/galian M3 168,000
2 Pasir Beton M3 187,000
3 Pasir Uruq M3 149,000
4 Kerikil M3 348,000
5 Batu Pasang M3 189,200
6 Semen Portland Zak 68,000
7 Tanah Urug M3 110,000

III ALAT
1 Concrete Mixer / Molen Jam 75,000
2 Mob dan Demob LS 450,000
3 Ember Bh 12,500
4 Benang Bh 5,000
360000
Kabupaten : Lombok Barat Jenis Prasarana : Pas.Talud
Kecamatan :
Desa/Kelurahan:
Batulayar
Bengkaung
Take Off Sheet Lokasi
Volume
: Dusun Pelolat
: 9 M3

Sketsa Kasar Perhitungan Volume Vol. Sat Analisa Kebutuhan SAT

1. Pekerjaan Pas. Talud


I Penampang Taud I 50 M a. Perhitungan Volume Galian Tanah Talud
P = 50 m L= - m T= 0 m 0 m3 1 Upah
Pas. Batu = 1 pc : 5 psr =P x L x T a. Pekerja = 0.0 x 0.750 = - HOK
= 50 x 0 x 0.0
30 =0 m3
cm

0.4 b. Perhitungan Volume Pasangan Batu Talud. 9 m3 1 Bahan


a. Batu Pasang = 8.75 x 1.20 = 11 M3
40cm 1. Perhitungan Volume Pasangan Pondasi b. Pasir pasang = 8.75 x 0.544 = 5 M3
P= P m L= - m T = 0.4 m c. Semen = 8.75 x 2.72 = 24 ZAK
cm 40 =P x L x T
= 50 x 0.0 x 0.4
=0 m3 2 Upah
a. Pekerja = 8.75 x 1.50 = 13 HOK
2. Perhitungan Badan Talud b. Tukang = 8.75 x 0.75 = 7 HOK
P = 50 m L= 0.35 m T = 0.5 m c. Mandor = 8.75 x 0.08 = HOK
= P x L x T
= 50 x 0.35 x 0.5
= 9 m3

Total = 8.8 m3

c. Perhitungan Volume Pelesteran 40 M2 Pelesteran dan Siar


P = 50 m L = 0.80 m 1 Bahan
= P x L a. Semen = 40.00 x 0.09 = 4 ZAK
= 50 x 0.8 b. Pasir pasang = 40.00 x 0.016 = 1 M3
= 40 m2
2 Upah
a. Pekerja = 40.00 x 0.15 = 6 HOK
b. Tukang = 40.00 x 0.07 = 3 HOK
c. Mandor = 40.00 x 0.01 = HOK

d. Perhitungan Volume Urugan 6 M2 Urugan Tanah


P = 50 m L= 0.25 m T = 0.5 m 1 Bahan
=P x L x T a. Tanah Urug = 6.25 x 1.20 = 8 M3
= 50 x 0.3 x 0.5 b. Air Kerja = 28.00 x 80.000 = 2,240
=6 m3
2 Upah
a. Pekerja = 6.25 x 0.30 = 2 HOK

4 Pekerja Lansiran Material


a. Semen = x 0.23 = 0.00 HOK
- b. Pasir Pasang = x 1.00 = 0.00 HOK
- c. Batu pasang = x 0.90 = 0.00 HOK
d. Tanah Urug = x 1.32 = 0.00 HOK
e Air Kerja = x 80 = -
RENCANA ANGGARAN BIAYA ( RAB ) TALUD DUSUN PELOLAT

Provinsi : Nusa Tenggara Barat No. RAB : 02


Kabupaten : Lombok Barat Bidang : Sarana Prasarana
Kecamatan : Batulayar Kegiatan : Pas.Talud
Desa : Bengkaung Volume : 8.75

No. Uraian Volume Satuan Harga Satuan (Rp.) Jumlah (Rp)

I. UPAH
a. Pekerja 21.00 HOK 84,000 1,764,000
b. Tukang 10.00 HOK 100,000 1,000,000
Sub Total 1 2,764,000

II. BAHAN
a. Pasir Pasang 6.00 M3 168,000 1,008,000
b. Batu Pasang 11.00 M3 189,200 2,081,200
c. Semen 28.00 Zak 68,000 1,904,000
d. Tanah Urug 8.00 M3 110,000 880,000
e. Air Kerja 2,240 liter 150 336,000
Sub Total 2 151.00 6,209,200

III. ALAT

a. Ember Bh 12,500 -
b. Benang Bh 5,000 -

Sub Total 3 0
JUMLAH BIAYA ( I + II + III ) 8,973,200
SUMBER : DANA DESA 8,973,200