Anda di halaman 1dari 69

LAPORAN LABORATORIUM KONSTRUKSI BETON

JURUSAN TEKNIK SIPIL


POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

BAB I
PERHITUNGAN PANJANG BENGKOKAN DAN BENTUK TULANGAN

AS bangunan Kelompok 15 adalah A-07 sampai C-10 (lantai 9).


I. Denah Pelat Lantai, kolom, dan balok

Gambar 1.1 Denah balok, kolom, dan pelat lantai


II. Perhitungan Kolom
2.1 Kolom K6
K6-T-01

Tulangan utama dihitung sampai ¼ tinggi kolom dibawahnya.


Diketahui :
 Tulangan 24D29
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton = 50 mm
 tinggi lantai 9 = 3000 mm ; tinggi balok 600 mm ; ¼ tinggi lantai 8 = 750 mm
 Banyak kolom K6 dilantai 9 = 4 kolom
Hitungan :
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = (0,5x72.5 + 29) = 65,25 mm
 12d = 12x29 = 348 mm
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 B = tinggi lantai 9+tinggi balok+1/4tinggi lantai 8-selimut beton-x
= 3000+600+750-50-65,25
= 4234,750 mm
 Panjang Total = 12d+A+B = 348+79,718+4234,750 = 4662,468 mm = 4,7 m
 Banyaknya kebutuhan batang=24, untuk 4 kolom membutuhkan 24x4=96
batang

2.2 Kolom K7
a. K7-T-02

Tulangan utama dihitung sampai ¼ tinggi kolom dibawahnya.


Diketahui :
 20D22
 db = 22 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton = 50 mm
 tinggi lantai 9 = 3000 mm ; tinggi balok 600 mm ; ¼ tinggi lantai 8 = 750 mm
 Banyak kolom K7 dilantai 9 = 2 kolom
Hitungan :
 D = db+dp = 72.5+22 ` = 94,5 mm
 x = (0,5dp+ db) = (0,5x72.5 + 22) = 58,25 mm
 6d = 6x22 = 132 mm
 A =¼𝜋D = ¼ 𝜋 94,5 = 74,220 mm
 B = tinggi lantai 9+tinggi balok+1/4tinggi lantai 8-selimut beton-x
= 3000+600+750-50-58,25
= 4241,750 mm
 Panjang Total = 12d+A+B = 132+74,220+4241,750 = 4447,97 mm = 4,5 m
 Banyaknya kebutuhan batang=20, untuk 2 kolom membutuhkan 20x2= 40
batang

III. Perhitungan Balok


3.1 Balok 9B1 As 7-10

a. Tulangan Atas
9B1-7-01

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) =( ½ 62.5+25) = 56,25 mm
 12d = 12x25 = 300 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 B = 12000-12d-A-x
= 12000-300-68,722-56,25
= 11575,028 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang :
1. Untuk As A = 2 batang
2. Untuk As C = 2 batang
Total 4 batang
9B1-A-2

Diketahui :
 db = 25 mm
 Panjang total = 12000 mm
 Banyaknya Kebutuhan Batang :
1. Untuk As A = 2 batang
2. Untuk As C = 2 batang
Total 4 batang
9B1-A-3

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton (sb) = 50 mm
 Panjang total tulangan atas = 24500 mm
Hitungan :
 D = db+dp = 62.5+25 = 87,5 mm
 x = (0,5dp+ db) = (½ 62.5+25) = 56,25 mm
 12d = 12x25 = 300 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 B = 24500 - 2sb - 2x – (panjang B tulangan 9B1-A-1) – ((panjang
tulangan 9B1-A-2)-40d) +40d
= 24500 – 100 – 112,5 – 11575,028 – 10000 + 1000
= 3712,472 mm
 Panjang Total = 12d+A+B = 300+68,722+3712,472 = 4081,194mm = 4,1 m
 Banyaknya Kebutuhan Batang :
1. Untuk As A = 2 batang
LAPORAN LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

2. Untuk As C = 2 batang
Total 4 batang
9B1-A-4

Diketahui :
 Dipasang untuk tumpuan lapis pertama
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) = ( ½ 62.5+25) = 56,25 mm
 12d = 12x25 = 300 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 B = ( ½ lebar balok-sb)+( ¼ 4000 )+15db
= (250-50)+(1000)+(375)
= 1575 mm
 Panjang Total = 12d+A+B = 300+68,722+1575 = 1943,722 mm = 1,9 m
 Banyaknya Kebutuhan Batang
1. Untuk As A = 4 batang tumpuan paling kiri dan 4 batang tumpuan paling
kanan
2. Untuk As C = 4 batang tumpuan paling kiri dan 4 batang tumpuan paling
kanan
Total = 16 batang
9B1-A-5

Diketahui :
 db = 25 mm
 Dipasang untuk lapangan lapisa pertama, tumpuan lapis pertama, tumpuan
lapis kedua
Hitungan :
 A= ( ½ 4000)+2(15d) = 2000+2(375) = 2750 mm = 2,8 m
 Banyaknya Kebutuhan Batang
1. As A :
- Untuk lapangan lapis pertama = 6 batang
- Untuk tumpuan lapis pertama = 5 batang
- Untuk tumpuan lapis kedua = 5 batang
2. Untuk As C
- Untuk lapangan lapis pertama = 6 batang
- Untuk tumpuan lapis pertama = 5 batang
- Untuk tumpuan lapis kedua = 5 batang
Total = 32 batang
9B1-A-6

Diketahui :
 Dipasang untuk tumpuan lapis kedua
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) = ( ½ 62.5+25) = 56,25 mm
 12d = 12x25 = 300 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 B = ( ½ lebar balok-sb-diameter tul)+( ¼ 4000 )+15db
= (250-50-25)+(1000)+(375)
= 1550 mm
 Panjang Total = 12d+A+B = 300+76,576+1550 = 1926,876 mm =1,9 m
 Banyaknya Kebutuhan Batang
1. Untuk As A = 2 batang tumpuan paling kiri dan 2 batang tumpuan paling
kanan
2. Untuk As C = 2 batang tumpuan paling kiri dan 2 batang tumpuan paling
kanan
Total = 8 batang
b. Tulangan Badan
9B1-BD-1
Diketahui :
 db = 16 mm
 dp = 2,5db mm = 40 mm
Hitungan :
 D = db+dp = 40+16 = 56 mm
 x = (0,5dp+ db) = ( ½ 40+16) = 36 mm
 12d = 12x16 = 192 mm
 A =¼𝜋D = ¼ 𝜋 56 = 43,982 mm
 B = 12000-12d-A-x
= 12000-192-43,982-36
= 11728,018 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 4 batang untuk As A dan 4 batang untuk As C
Total = 8 batang
9B1-BD-2

Diketahui :
 db = 25 mm
 Panjang total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 4 batang untuk As A dan 4 batang untuk As C
Total = 8 batang
9B1-BD-3

Diketahui :
 db = 16 mm
 dp = 2,5db mm = 40 mm
Hitungan :
 D = db+dp = 40+16 = 56 mm
 x = (0,5dp+ db) = ( ½ 40+16) = 36 mm
 12d = 12x16 = 192 mm
 A =¼𝜋D = ¼ 𝜋 56 = 43,982 mm
 B = panjang total-2x-(panjangB 9B1-BD-1)-((A 9B1-BD-2)-40db)+40db
= 24300-72-11728,018-11360+640
= 1779,92 mm
 Panjang Total = 12d+A+B = 192+43,982+1779,92 = 2015,902 mm = 2 m
 Banyaknya Kebutuhan Batang = 4 batang untuk As A dan 4 batang untuk As C
Total = 8 batang
c. Tulangan Bawah
9B1-B-1

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 = 87,5 mm
 x = (0,5dp+ db) = ( ½ 62.5+25) = 56,25 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 12d = 12x25 = 300 mm
 B = 12000-12d-A-x
= 12000-300-68,722 -56,25
= 11575,028 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang : 5 batang untuk As A dan 5 batang untuk As C
Total = 10 batang
9B1-B-2

Diketahui :
 db = 25 mm
 Panjang total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang : 5 batang untuk As A dan 5 batang untuk As C
Total = 10 batang
9B1-B-3

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) = ( ½ 62.5+25) = 56,25 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 mm
 12d = 12x25 = 300 mm
 B = 24500 - 2sb - 2x – (panjang B tulangan 9B1-B-1) – ((panjang
tulangan 9B1-B-2)-40d) +40d
= 24500 – 100 – 112,5 – 11575,028 – 10000 + 1000
= 3712,472 mm
 Panjang Total = 12d+A+B = 300+68,722 +3712,472 = 4081,194 mm = 4,1 m
 Banyaknya Kebutuhan Batang : 5 batang untuk As A dan 5 batang untuk As C
Total = 10 batang

3.2 Balok 9B2 As B

a. Tulangan Atas
9B2-B-01

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 72.5+29 = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 B = 12000-12d-A-x
= 12000-348-79,718-65,25
= 11507,032 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya kebutuhan batang = 3
9B2-A-2

Diketahui :
 db = 29 mm
 Panjang total = 12000 mm = 12 m
 Banyaknya kebutuhan batang = 3
9B2-A-3

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = 24500 - 2sb - 2x – (panjang B tulangan 9B2-A-1) – ((panjang
tulangan 9B2-A-2)-2(40d)) +40d
= 24500 – 100 – 130,5 – 11507,032 – 9680 + 1000
= 4082,468 mm
 Panjang Total = 12d+A+B = 348+79,718 +4082,468 = 4510,186 mm = 4,5 m
 Banyaknya kebutuhan batang = 3
9B2-A-4

Diketahui :
 Dipasang untuk tumpuan lapis pertama dan tupuan lapis kedua
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = ( ½ lebar balok-sb)+( ¼ 4000 )+15db
= (250-50)+(1000)+(435)
= 1635 mm
 Panjang total = 348+79,718+1635 = 2062,718 mm = 2,1 m
 Banyaknya kebutuhan batang : 4 batang tumpuan paling kiri dan 4 batang
tumpuan paling kanan
Total = 8 batang
9B1-A-5

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = ( ½ lebar balok-sb-diameter tul lap. pertama)+( ¼ 4000 )+15db
= (250-50-29)+(1000)+(435)
= 1606 mm
Panjang Total = 12d+A+B = 300+79,718 +1606 = 1985,718 mm = 2 m
 Banyaknya kebutuhan batang : 3 batang tumpuan paling kiri dan3 batang
tumpuan paling kanan
Total = 6 batang
9B2-A-6

Diketahui :
 db = 29 mm
 A= ( ½ 4000)+2(15d) = 2000+2(435) = 2870 mm = 2,9 m
 Banyaknya Kebutuhan Batang
- Untuk lapangan lapis pertama = 2x6 segmen = 12 batang
- Untuk tumpuan lapis pertama = 4x5 = 20 batang
- Untuk tumpuan lapis kedua = 3x5 = 15 batang
Total = 47 batang
b. Tulangan Badan
9B2-BD-1

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72,5 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = 12000-12d-A-x
= 12000-348-79,718-65,25
= 11510,032 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 6 batang
9B1-BD-2
Diketahui :
 db = 29 mm
 Panjang total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 6 batang
9B1-BD-3

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72,5 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = panjang total-2x-(panjangB 9B2-BD-1)-((A 9B2-BD-2)
2(40db))+40db
= 24300-130,5-11510,032 -9680+1160
= 4139,468 mm
 Panjang Total = 12d+A+B = 348+79,718 +4139,468 = 4567,186 mm = 4,7 m
 Banyaknya Kebutuhan Batang = 6 batang
c. Tulangan Bawah
9B2-B-01

Diketahui :
 db = 29mm
 dp = 2,5db mm = 72.5 mm
 selimut beton = 50 mm

Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = 12000-12d-A-x
= 12000-348-79,718-65,25
= 11507,032 mm
 Panjang Total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 7 batang
9B2-B-2

Diketahui :
 db = 29 mm
 Panjang total = 12000 mm = 12 m
 Banyaknya Kebutuhan Batang = 7 batang
9B2-B-3

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72.5 mm
 selimut beton (sb) = 50 mm
Hitungan :
 A =¼𝜋D = ¼ 𝜋 101,5 = 79,718 mm
 D = db+dp = 72.5+29 ` = 101,5 mm
 x = (0,5dp+ db) = ( ½ 72.5+29) = 65,25 mm
 12d = 12x29 = 348 mm
 B = 24500 - 2sb - 2x – (panjang B tulangan 9B2-B-1) – ((panjang
tulangan 9B2-B-2)-2(40d)) +40d
= 24500 – 100 – 130,5 – 11507,032 – 9680 + 1160
= 4242,468 mm
 Panjang Total = 12d+A+B = 348+79,718 +4242,468 = 4670,186 mm= 4,7 m
 Banyaknya Kebutuhan Batang = 7 batang
3.3 Balok 9B1 As 07 ( Lebar bentang = 6000 mm )

a. Tulangan Atas
9B1-07-01

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) =( ½ 62.5+25) = 56,25 x 2 = 112.5 mm
 12d = 12x25 = 300 x 2 = 600 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 x 2 = 137.444 mm
 B = 5900-A-x
= 5900-137.444-112.5
= 5650.1 mm
 Panjang Total = 6500 mm = 6.5 m
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 2 batang
Total = 2 x 2 = 4 batang
9B1-07-02

Diketahui :
 db = 25 mm
 15 D = 15 x 25 = 375 mm
 Panjang total = ¼. 5950 + 375 = 1862.5 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 8 batang
Total = 8x2= 16 batang

9B1-07-03

Diketahui :
 db = 25 mm
 15 D = 15 x 25 = 375 x 2 = 750 mm
 Panjang total = ½ . 5900 + 750 = 3700 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 1 batang
Total 1x2 = 2 batang

b. Tulangan Badan
9B1-07-04 (Tulangan Susut)

Diketahui :
 db = 16 mm
 Panjang total = 5900 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 4 batang
Total =4x2 = 8 batang
c. Tulangan Bawah
9B1-07-05

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) =( ½ 62.5+25) = 56,25 x 2 = 112.5 mm
 12d = 12x25 = 300 x 2 = 600 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 x 2 = 137.444 mm
 B = 5900-A-x
= 5900-137.444-112.5
= 5650.1 mm
 Panjang Total = 6500 mm = 6.5 m
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 2 batang
Total 2x2 = 4 batang

9B1-07-06

Diketahui :
 db = 25 mm
 Panjang total = 5900 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 3 batang
Total 3x2= 6 batang
3.4 Balok 9B1 As 08 ( Lebar bentang = 10900 mm )

a. Tulangan Atas
9B1-08-01

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) =( ½ 62.5+25) = 56,25 x 2 = 112.5 mm
 12d = 12x25 = 300 x 2 = 600 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 x 2 = 137.444 mm
 B = 10800-A-x
= 10800-137.444-112.5
= 10550.056 mm
 Panjang Total = 11400 mm = 11.4 m
 Banyaknya Kebutuhan Batang
: Untuk As 8= 2 batang
Total =2x5 = 10 batang
9B1-08-2

Diketahui :
 db = 25 mm
 15 D = 15 x 25 = 375 mm
 Panjang total = ¼. 10850 + 375 = 11275 mm
 Banyaknya Kebutuhan Batang
: Untuk As 8 = 6 batang
Total = 6x5= 30 batang

9B1-08-3

Diketahui :
 db = 25 mm
 15 D = 15 x 25 = 375 x 2 = 750 mm
 Panjang total = ½ . 10800 + 750 = 6150 mm
 Banyaknya Kebutuhan Batang
: Untuk As 8 = 1 batang
Total =1x5= 5 batang

b. Tulangan Badan
9B1-08-4 (Tulangan Susut)

Diketahui :
 db = 16 mm
 Panjang total = 10800 mm
 Banyaknya Kebutuhan Batang
: Untuk As 8 = 4 batang
Total =4x5 = 20 batang
c. Tulangan Bawah
9B1-08-05

Diketahui :
 db = 25 mm
 dp = 2,5db mm = 62.5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 62.5+25 ` = 87,5 mm
 x = (0,5dp+ db) =( ½ 62.5+25) = 56,25 x 2 = 112.5 mm
 12d = 12x25 = 300 x 2 = 600 mm
 A =¼𝜋D = ¼ 𝜋 87,5 = 68,722 x 2 = 137.444 mm
 B = 10800-A-x
= 10800-137.444-112.5
= 10550.056 mm
 Panjang Total = 11400 mm = 11.4 m
 Banyaknya Kebutuhan Batang
: Untuk As 8 = 2 batang
Total =2x5 = 10 batang

9B1-08-06

Diketahui :
 db = 25 mm
 Panjang total = 10800 mm
 Banyaknya Kebutuhan Batang
: Untuk As 8 = 3 batang
Total =3x5= 15 batang
3.5 Balok 9B2 As 07 ( Lebar bentang = 4900 mm )

d. Tulangan Atas
9B2-07-01

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72,5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 72,5+29 ` = 101.5 mm
 x = (0,5dp+ db) =( ½ 72,5+29) = 65,25 x 2 = 130,5 mm
 12d = 12x29 = 348 x 2 = 696 mm
 A =¼𝜋D = ¼ 𝜋 101.5 = 79,718 x 2 = 159,436 mm
 B = 4800-A-x
= 4800-159,436-130,5
= 4510,064 mm
 Panjang Total = 5496 mm = 5,496 m
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 2 batang
Total =2x2= 4 batang
9B2-07-2

Diketahui :
 db = 29 mm
 15 D = 15 x 29 = 435 mm
 Panjang total = ¼. 4850+ 435 = 1647.5 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 10 batang
Total =10x2 = 10 batang

9B2-07-3

Diketahui :
 db = 29 mm
 15 D = 15 x 29 = 435 x 2 = 870 mm
 Panjang total = ½ . 4800 + 870 = 3270 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 3 batang
Total =3x2= 6 batang

d. Tulangan Badan
9B2-07-4 (Tulangan Susut)

Diketahui :
 db = 29 mm
 Panjang total = 4800 mm
 Banyaknya Kebutuhan Batang :
Untuk As 7 = 6 batang
Total =6x2= 12 batang
e. Tulangan Bawah
9B2-07-05

Diketahui :
 db = 29 mm
 dp = 2,5db mm = 72,5 mm
 selimut beton = 50 mm
Hitungan :
 D = db+dp = 72,5+29 ` = 101.5 mm
 x = (0,5dp+ db) =( ½ 72,5+29) = 65,25 x 2 = 130,5 mm
 12d = 12x29 = 348 x 2 = 696 mm
 A =¼𝜋D = ¼ 𝜋 101.5 = 79,718 x 2 = 159,436 mm
 B = 4800-A-x
= 4800-159,436-130,5
= 4510,064 mm
 Panjang Total = 5496 mm = 5,496 m
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 2 batang
Total =2x2 = 4 batang

9B2-07-06

Diketahui :
 db = 25 mm
 Panjang total = 4800 mm
 Banyaknya Kebutuhan Batang
: Untuk As 7 = 5 batang
Total =5x2 = 10 batang
III. Perhitungan Plat

Detail Plat Lantai S4

Gambar Kode Untuk Penulangan Plat Lantai


3.1 Tulangan Atas
Tulangan Atas Lapis Kedua
Kode 5

Diketahui :
 D10-200
 dp = 10
 L = 6000 mm
 1 𝐿= 1500 mm
4
Hitungan :
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4x10 = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 1500-x = 1500-15 = 1485 mm
 Panjang Total = a+b+c = 1548,56 mm = 1,6 m
 Bayak Kebutuhan Tulangan = ((8000x3)/200)+1= 41 batang
Kode 3

Diketahui :
 D10-200
 dp = 10
 L = 6000 mm dan 4900 mm
 L yang dipakai = ( ¼ 6000)+( ¼ 49000) = 2725
Hitungan
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4(10) = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 2725-2x = 2725-15 = 2710 mm
 Panjang Total = 2a+2b+c = 2837,12 mm = 2,8 m
 Bayak Kebutuhan Tulangan = ((8000x3)/200)+1= 41 batang
Kode 4

Diketahui :
 D10-200
 Dp = 10
 L = 4900 mm
 1 𝐿 = 1225 mm
4
Hitungan :
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4x10 = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 1225-x = 1225-15 = 1210 mm
 Panjang Total = a+b+c = 1273,56 mm = 1,3 m
 Bayak Kebutuhan Tulangan = ((8000x3)/200)+1= 41 batang
Tulangan Atas Lapis Kedua
Kode 2

Diketahui :
 D10-150
 Dp = 10
 L = 4000 mm
 1 𝐿 = 1000 mm
4

Hitungan :
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4x10 = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 1000-x = 1000-15 = 985 mm
 Panjang Total = a+b+c = 1048,56 mm = 1,1 m
 Bayak Kebutuhan Tulangan = ((6000+4900)/150)+1= 74 batang
As 7 = As 10, maka kebutuhan batang dikali dua menjadi 148 batang.
Kode 1

Diketahui :
 D10-150
 dp = 10
 L = 8000
 1 𝐿 = 2000 mm
4

Hitungan

 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4(10) = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 2000-2x = 2000-15 = 1970 mm
 Panjang Total = 2a+2b+c = 2097,12 mm = 2,1 m
 Bayak Kebutuhan Tulangan = ((6000+4900)/150)+1= 74 batang
Total yang dibutuhkan = 74x 5 baris = 370 batang
3.2 Tulangan Bawah
Tulangan Bawah Lapis Pertama
Kode 9

Diketahui :
 D10-200
 dp = 10
 L = 10900
 Selimut beton = 30 mm
Hitungan
 L = 10900- (2 x 30)= 10840 mm
 D = dp+db = 10+10 = 20
LAPORAN LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4(10) = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 10840-2x = 10840-30 = 10810 mm
 Panjang Total = 2a+2b+c = 10937,12 mm = 11 m
 Bayak Kebutuhan Tulangan = (24000/200)+1= 121 batang
Kode 6 dan 7

Diketahui :
 D10-150
 dp = 10
Hitungan
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4(10) = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 12000-2a-2b = 11872,88 mm
 Panjang Total = 12 m
 Bayak Kebutuhan Tulangan = ((6000+4900)/150)+1= 74 batang
Total = 74 x 2 = 148 batang
Kode 8

Diketahui :
 D10-150
 dp = 10
 Ltotal= 24000- (2 x 30)= 23940 mm
Hitungan
 D = dp+db = 10+10 = 20
 x = 1dp+db= 110+10= 15 mm
2 2
 a = 4D = 4(10) = 40 mm
 b = 3 𝜋 D = 3 𝜋 20= 23,56 mm
8 8
 c = 23940-c kode 6- c kode 7 – 2x = 164,24 mm
 Panjang Total = 2a+2b+c = 291,36 mm = 0,3 m
 Bayak Kebutuhan Tulangan = ((6000+4900)/150)+1= 74 batang
III. Perhitungan Sengkang
a. Sengkang Kolom
K6-S-01

Diketahui :
 D13-100 untuk tumpuan dan D13-300 untuk lapangan
 db = 13 mm
 dp = 29 mm
 selimut beton = 50 mm
 Banyak kolom K6 dilantai 9 = 4 kolom
 tinggi lantai 9 = 3000 mm ; ¼ tinggi lantai 8 = 750 mm
Hitungan :
 D = db+dp = 13+29 = 42 mm
 x = (0,5dp+ db) = (0,5x29 + 13) = 27,5 mm
 6d = 6(13) = 78 mm
 A = 600-100 = 500 mm
 A’ = A-2X = 500–2(27.5) = 445 mm
 3𝜋42 = 49,480 mm
B = 3 = 8
𝜋
𝐷
8
 C = ¼ 𝜋 D = ¼ 𝜋 42 = 32,987 mm
 Panjang Total = 2(6d)+2B+4A’+3C
= 2(78)+2(49,480)+4(445)+3(32,987)
= 2133,921 mm
= 2,1 m
 Kebutuhan batang untuk satu kolom :
1. Tumpuan : 3((750/100)+1) = 24 batang
2. Lapangan : 1500/300 = 5 btg
Kebutuhan batang untuk empat kolom :
1. Tumpuan : 24x4 = 96 btg
2. Lapangan : 5x4 = 20 btg
Total = 116 batang
LAPORAN LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

K7-S-02

Diketahui :
 D13-100 untuk tumpuan dan D13-300 untuk lapangan
 db = 13 mm
 dp = 22 mm
 selimut beton = 50 mm
 Banyak kolom K7 dilantai 9 = 2 kolom
 tinggi lantai 9 = 3000 mm ; ¼ tinggi lantai 8 = 750 mm
Hitungan :
 D = db+dp = 13+22 = 35 mm
 x = (0,5dp+ db) = (0,5x22 + 13) = 24 mm
 6d = 6(13) = 78 mm
 A = 500-100 = 400 mm
 A’ = A-2X= 400–2(24) = 352 mm
 3𝜋35 = 41,233 mm
B = 3 = 8
𝜋
𝐷
8
 C = ¼ 𝜋 D = ¼ 𝜋 35 = 27,489 mm
 Panjang Total = 2(6d)+2B+4A’+3C
= 2(78)+2(41,233)+4(352)+3(27,489)
= 1728,933 mm
= 1,7 m
 Kebutuhan batang untuk satu kolom :
3. Tumpuan : 3((750/100)+1) = 24 batang
4. Lapangan : 1500/300 = 5 btg
Kebutuhan batang untuk dua kolom :
3. Tumpuan : 24x2 = 28 btg
4. Lapangan : 5x2 = 10 btg
Total = 38 batang
b. Sengkang Balok

Balok 9B1
9B1-S-1

Diketahui :
 db = 13 mm
 dp = 25 mm
 D = 13+25= 38 mm
 x = (0,5 dp+ db) = (0,5x25 + 13) = 25,5 mm
 selimut beton = 50 mm
Hitungan :
 A = 500-100 = 400 mm
 A’ = A-2x = 400-(2x25,5) = 349 mm
 D = 600-100 = 500 mm
 D’ = D-2x = 500-(2x25,5) = 449 mm
 6db = 6db = 6x13 = 78 mm
 C = ¼ 𝜋D = ¼ 𝜋(38) = 29,845 mm
 B = 3/8𝜋D =3/8𝜋(38) = 44,768 mm
 Panjang total = 2(6db)+2A’ + 2D’ + 3C+2B
= 2(78)+2(349)+2(449)+3(29,845)+2(44,768)
= 1931,071 mm
=2m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (8000-500-100)/100 + 1 = 75 x 6 segmen = 450 batang
Bentang 10.9 m = (10900-500-100)/100 + 1 = 104 x 5 segmen = 520 batang
Bentang 6 m = (6000-500-100)/100 + 1 = 55 x 2 segmen = 110 batang
Total = 1080 batang
9B1-S-2

Diketahui :
 db = 13 mm
 dp = 25 mm
 D = 13+25= 38 mm
 x = (0,5 dp+ db) = (0,5x25 + 13) = 25,5 mm
Hitungan :
 A’ = 3(75) = 225 mm
 D = 600-100 = 500 mm
 D’ = D-2x = 500-(2x25,5) = 449 mm
 6db = 6db = 6x13 = 78 mm
 C = ¼ 𝜋D = ¼ 𝜋(38) = 29,845 mm
 B = 3/8𝜋D =3/8𝜋(38) = 44,768 mm
 Panjang total = 2(6db)+2A’+2D’+3C+2B
= 2(78)+2(225)+2(449)+3(29,845)+2(44,768)
= 1683,071 mm = 1,7 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (8000-500-100)/100 + 1 = 75 x 6 segmen = 450 batang
Bentang 10.9 m = (10900-500-100)/100 + 1 = 104 x 5 segmen = 520 batang
Bentang 6 m = (6000-500-100)/100 + 1 = 55 x 2 segmen = 110 batang
Total = 1080 batang
9B1-S-3

Diketahui :
 db = 13 mm
 dp = 25 mm
 D = 13+25= 38 mm
 x = (0,5 dp+ db) = (0,5x25 + 13) = 25,5 mm
Hitungan :
 A = 500-100= 400 mm
 A’ = A-2x = 400-(2x25,5) = 349 mm
 6db = 6db = 6x13 = 78 mm
 C = ¼ 𝜋D = ¼ 𝜋(38) = 29,845 mm
 Panjang total = 2(6db)+A’+2C = 2(78)+349+2(29,845)
= 564,63 mm = 0,56 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (4000-500-100)/100 + 1 = 35 x 6 segmen = 210 batang
Bentang 10.9 m = (5450-500-100)/100 + 1 = 50 x 5 segmen = 250 batang
Bentang 6 m = (3000-500-100)/100 + 1 = 25 x 2 segmen = 50 batang
Total = 510 batang
Balok 9B2
9B2-S-1

Diketahui :
 db = 16 mm
 dp = 29 mm
 D = 16+29= 45 mm
 x = (0,5 dp+ db) = (0,5x29 + 16) = 30,5 mm
 selimut beton = 50 mm
Hitungan :
 A = 800-100 = 700 mm
 A’ = A-2x = 700-(2x30,5) = 639 mm
 D = 600-100 = 500 mm
 D’ = D-2x = 500-(2x30,5) = 439 mm
 6db = 6db = 6x16 = 96 mm
 C = ¼ 𝜋D = ¼ 𝜋(45) = 35,34 mm
 B = 3/8𝜋D =3/8𝜋(45) = 53,01 mm
 Panjang total = 2(6db)+2A’ + 2D’ + 3C+2B
= 2(96)+2(639)+2(439)+3(35,34)+2(53,01)
= 2560,04 mm
= 2,56004 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (8000-500-100)/125 + 1 = 61 x 3 segmen = 183 batang
Bentang 4.9 m = (4900-500-100)/125 + 1 = 36 x 2 segmen = 72 batang
Total = 255 batang

9B2-S-2

Diketahui :
 db = 16 mm
 dp = 29 mm
 D = 16+29= 45 mm
 x = (0,5 dp+ db) = (0,5x29 + 16) = 30,5 mm
 selimut beton = 50 mm
Hitungan :
 A’ = 111+2x = 111+2(30,5) = 172 mm
 D = 600-100 = 500 mm
 D’ = D-2x = 500-(2x30,5) = 439 mm
 6db = 6db = 6x16 = 96 mm
 C = ¼ 𝜋D = ¼ 𝜋(45) = 35,34 mm
 B = 3/8𝜋D =3/8𝜋(45) = 53,01 mm
 Panjang total = 2(6db)+2A’ + 2D’ + 3C+2B
= 2(96)+2(172)+2(439)+3(35,34)+2(53,01)
= 1626,04 mm
=1,62604 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (8000-500-100)/125 + 1 = 61 x 3 segmen = 183 batang
Bentang 4.9 m = (4900-500-100)/125 + 1 = 36 x 2 segmen = 72 batang
Total = 255 batang

9B2-S-3

Diketahui :
 db = 16 mm
 dp = 29 mm
 D = 16+29= 45 mm
 x = (0,5 dp+ db) = (0,5x29 + 16) = 30,5 mm
 selimut beton = 50 mm
Hitungan :
 A’ = 333+2x = 333+2(30,5) = 394 mm
 D = 600-100 = 500 mm
 D’ = D-2x = 500-(2x30,5) = 439 mm
 6db = 6db = 6x16 = 96 mm
 C = ¼ 𝜋D = ¼ 𝜋(45) = 35,34 mm
 B = 3/8𝜋D =3/8𝜋(45) = 53,01 mm
 Panjang total = 2(6db)+2A’ + 2D’ + 3C+2B
= 2(96)+2(394)+2(439)+3(35,34)+2(53,01)
= 2070,04 mm
=2,07004 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = (8000-500-100)/125 + 1 = 61 x 3 segmen = 183 batang
Bentang 4.9 m = (4900-500-100)/125 + 1 = 36 x 2 segmen = 72 batang
Total = 255 batang
9B2-S-4

Diketahui :
 db = 16 mm
 dp = 29 mm
 D = 16+29= 45 mm
 x = (0,5 dp+ db) = (0,5x29 + 16) = 30,5 mm
 selimut beton = 50 mm
Hitungan :
 A = 800-100= 700 mm
 A’ = A-2x = 700-(2x30,5) = 639 mm
 6db = 6db = 6x16 = 96 mm
 C = ¼ 𝜋D = ¼ 𝜋(45) = 35,343 mm
 Panjang total = 2(6db)+A’+2C = 2(96)+700+2(35,343)
= 1598,69 mm = 1,5987 m

 Banyaknya Kebutuhan Batang


Bentang 8 m = ((8000/4)-500-100))/125 + 1 = 13 x 2 x 3 segmen = 78 batang

Bentang 4.9 m =((4900/4)-500-100))/125 + 1 = 6 x 2 x 2 segmen = 24 batang

Total = 102 batang


BAB II
PERHITUNGAN KEBUTUHAN BATANG TULANGAN

Diketahui 1 lente = 12 m

2.1 Kolom
K6-T-01
 Diameter 29
 Panjang perbatang = 4,7 m
 Total kebutuhan : 96 batang
 Banyaknya kebutuhan perlente = 12 m / 4,7 m = 2,5 batang
 1 lente bisa untuk 2 batang, maka untuk 96 batang = 96/2 = 48 lente.
 Sisa = 12m-(2x4,7) = 2,6 m setiap lente
K7-T-02
 Diameter 22
 Panjang perbatang = 4,5 m
 Total kebutuhan : 40 batang
 Banyaknya kebutuhan = 12 m / 4,5 m = 2,7 btg
 1 lente bisa untuk 2 batang, maka untuk 40 batang = 40/2 = 20 lente
 Sisa = 12m-(2x4,5) = 3 m setiap lente
2.2 Balok
9B1-A-01
 Diameter 25
 Panjang perbatang = 12 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 12 batang = 12/1 = 12 lente
 Sisa = 0 setiap lente
9B1-A-02
 Diameter 25
 Panjang perbatang = 12 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 12 batang = 12/1 = 12 lente
 Sisa = 0 setiap lente
9B1-A-03
 Diameter 25
 Panjang perbatang = 4,1 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/4,1 m = 2,9 batang
 1 lente bisa untuk 2 batang, maka untuk 4 batang = 4/2 = 2 lente
 Sisa = 12m-(2x4,1) = 3,8 m setiap lente
9B1-A-04
 Diameter 25
 Panjang perbatang = 1,9 m
 Total kebutuhan : 16 batang
 Banyaknya kebutuhan perlente = 12 m/1,9 m = 6,3 batang
 1 lente bisa untuk 6 batang, maka untuk 16 batang = 16/6 = 2,7 lente = 3 lente
 Sisa = 12m-(6x1,9) = 0,6 m untuk dua lente
Sisa = 12m-(4x1,9) = 4,4 m untuk satu lente
9B1-A-05
 Diameter 25
 Panjang perbatang = 2,8 m
 Total kebutuhan : 32 batang
 Banyaknya kebutuhan perlente = 12 m/2,8 m = 4,3 batang
 1 lente bisa untuk 4 batang, maka untuk 32 batang = 32/4 = 8 lente
 Sisa = 12m-(4x2,8) = 0,8 m untuk setiap lente
9B1-A-06
 Diameter 25
 Panjang perbatang = 1,9 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/1,9 m = 6,3 batang
 1 lente bisa untuk 6 batang, maka untuk 8 batang = 8/6 = 1,3 lente = 2 lente
 Sisa = 12m-(6x1,9) = 0,6 m untuk satu lente
Sisa = 12m-(2x1,9) = 8,2 m untuk satu lente
9B1-BD-1
 Diameter 16
 Panjang perbatang = 12 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 8 batang = 8/1 = 8 lente
 Sisa = 0
9B1-BD-2
 Diameter 16
 Panjang perbatang = 12 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 8 batang = 8/1 = 8 lente
 Sisa = 0
9B1-BD-3
 Diameter 16
 Panjang perbatang = 2 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/2 m = 6 batang
 1 lente bisa untuk 6 batang, maka untuk 8 batang = 8/6 = 1,3 lente = 2 lente
 Sisa = 12m-(2x2) = 8 m untuk satu lente
9B1-B-1
 Diameter 25
 Panjang perbatang = 12 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 10 batang = 10/1 = 10 lente
 Sisa = 0
9B1-B-2
 Diameter 25
 Panjang perbatang = 12 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 10 batang = 10/1 = 10 lente
 Sisa = 0
9B1-B-3
 Diameter 25
 Panjang perbatang = 4,1 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/4,1m = 2,9 batang
 1 lente bisa untuk 2 batang, maka untuk 10 batang = 10/2 = 5 lente
 Sisa = 12m-(2x4,1) = 3,8 m untuk satu lente
9B2-B-01
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 3 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 3 batang = 3/1 = 3 lente
 Sisa = 0
9B2-A-2
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 3 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 3 batang = 3/1 = 3 lente
 Sisa = 0
9B2-A-3
 Diameter 29
 Panjang perbatang = 4,5 m
 Total kebutuhan : 3 batang
 Banyaknya kebutuhan perlente = 12 m/4,5m = 2,7 batang
 1 lente bisa untuk 2 batang, maka untuk 3 batang = 3/2 = 1,5 lente
 Sisa = 12m-(2x4,5) = 3 m untuk satu lente
Sisa = 12m-(1x4,5) = 7,5 m untuk satu lente
9B2-A-4
 Diameter 29
 Panjang perbatang = 2,1 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/2,1m = 5,7 batang
 1 lente bisa untuk 5 batang, maka untuk 8 batang = 8/5 = 1,6 lente
 Sisa = 12m-(5x2,1) = 1,5 m untuk satu lente
Sisa = 12m-(3x2,1) = 5,7 m untuk satu lente
9B1-A-5
 Diameter 29
 Panjang perbatang = 2 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/2m = 6 batang
 1 lente bisa untuk 6 batang
 Sisa = 0
9B2-A-6
 Diameter 29
 Panjang perbatang = 2,9 m
 Total kebutuhan : 47 batang
 Banyaknya kebutuhan perlente = 12 m/2,9m = 4,2 batang
 1 lente bisa untuk 4 batang, maka untuk 47 batang = 47/4 = 11,75 lente =12 lente
 Sisa = 12m-(4x2,9) = 0,4 m untuk masing masing 11 lente
Sisa = 12m-(3x2,9) = 3,3 m untuk satu lente
9B2-BD-1
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 6 batang = 6/1 = 6 lente
 Sisa = 0
9B1-BD-2
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 6 batang = 6/1 = 6 lente
 Sisa = 0
9B1-BD-3
 Diameter 29
 Panjang perbatang = 4,7 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/4,7m = 2,6 batang
 1 lente bisa untuk 2 batang, maka untuk 6 batang = 6/2 = 3 lente
 Sisa = 12m-(2x4,7) = 2,6 m untuk satu lente
9B2-B-01
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 7 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 7 batang = 7/1 = 7 lente
 Sisa = 0
9B2-B-2
 Diameter 29
 Panjang perbatang = 12 m
 Total kebutuhan : 7 batang
 Banyaknya kebutuhan perlente = 12 m/12m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 7 batang = 7/1 = 7 lente
 Sisa = 0
9B2-B-3
 Diameter 29
 Panjang perbatang = 4,7 m
 Total kebutuhan : 7 batang
 Banyaknya kebutuhan perlente = 12 m/4,7m = 2,6 batang
 1 lente bisa untuk 2 batang, maka untuk 7 batang = 7/2 = 3,5 lente
 Sisa = 12m-(2x4,7) = 2,6 m untuk masing masing 3 lente
Sisa = 12m-(1x4,7) = 7,3 m untuk satu lente
9B1-07-01
 Diameter 25
 Panjang perbatang = 6,5 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/6,5 m = 1,85 batang
 1 lente bisa untuk 1 batang, maka untuk 4 batang = 4/1 = 4 lente
 Sisa = 12m-(1x6,5) = 5,5 m untuk masing masing 4 lente

9B1-07-02
 Diameter 25
 Panjang perbatang = 1,863 m
 Total kebutuhan : 16 batang
 Banyaknya kebutuhan perlente = 12 m/1,863 m = 6,44 batang
 1 lente bisa untuk 6 batang, maka untuk 16 batang = 16/6 = 2,67 lente = 3 lente
 Sisa = 12m-(6x1,863) = 0,82 m untuk masing masing 2 lente
Sisa = 12m-(4x1,863) = 4,54 m untuk satu lente

9B1-07-03
 Diameter 25
 Panjang perbatang = 3,7 m
 Total kebutuhan : 2 batang
 Banyaknya kebutuhan perlente = 12 m/3,7 m = 3,24 batang
 1 lente bisa untuk 3 batang, maka untuk 2 batang = 2/3 = 0,667 lente = 1 lente
 Sisa = 12m-(2x3,7) = 4,6 m untuk satu lente

9B1-07-04
 Diameter 16
 Panjang perbatang = 5,9 m
 Total kebutuhan : 8 batang
 Banyaknya kebutuhan perlente = 12 m/5,9 m = 2,03 batang
 1 lente bisa untuk 2 batang, maka untuk 8 batang = 8/2 = 4 lente
 Sisa = 12m-(2x5,9) = 0,2 m untuk masing masing 4 lente

9B1-07-05
 Diameter 25
 Panjang perbatang = 6,5 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/6,5 m = 1,85 batang
 1 lente bisa untuk 1 batang, maka untuk 4 batang = 4/1 = 4 lente
 Sisa = 12m-(1x6,5) 5,5 m untuk masing masing 4 lente
9B1-07-06
 Diameter 25
 Panjang perbatang = 5,9 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/5,9 m = 2,03 batang
 1 lente bisa untuk 2 batang, maka untuk 6 batang = 6/2 = 3 lente
 Sisa = 12m-(2x5,9) = 0,2 m untuk masing masing 3 lente

9B1-08-01
 Diameter 25
 Panjang perbatang = 11,4 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/11,4 m = 1,05 batang
 1 lente bisa untuk 1 batang, maka untuk 10 batang = 10/1 = 10 lente
 Sisa = 12m-(1x11,4) = 0,6 m untuk masing masing 10 lente

9B1-08-02
 Diameter 25
 Panjang perbatang = 11,28 m
 Total kebutuhan : 30 batang
 Banyaknya kebutuhan perlente = 12 m/11,28 m = 1,06 batang
 1 lente bisa untuk 1 batang, maka untuk 30 batang = 30/1 = 30 lente
 Sisa = 12m-(1x11,28) = 0,72 m untuk masing masing 30 lente

9B1-08-03
 Diameter 25
 Panjang perbatang = 6,15 m
 Total kebutuhan : 5 batang
 Banyaknya kebutuhan perlente = 12 m/6,15 m = 1,95 batang
 1 lente bisa untuk 1 batang, maka untuk 5 batang = 5/1 = 5 lente
 Sisa = 12m-(1x6,15) = 5,85 m untuk masing masing 5 lente

9B1-08-04
 Diameter 16
 Panjang perbatang = 10,8 m
 Total kebutuhan : 20 batang
 Banyaknya kebutuhan perlente = 12 m/10,8 m = 1,1 batang
 1 lente bisa untuk 1 batang, maka untuk 20 batang = 20/1 = 20 lente
 Sisa = 12m-(1x10,8) = 1,2 m untuk masing masing 20 lente
9B1-08-05
 Diameter 25
 Panjang perbatang = 11,4 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/11,4 m = 1,05 batang
 1 lente bisa untuk 1 batang, maka untuk 10 batang = 10/1 = 10 lente
 Sisa = 12m-(1x11,4) = 0,6 m untuk masing masing 10 lente

9B1-08-06
 Diameter 25
 Panjang perbatang = 10,8 m
 Total kebutuhan : 15 batang
 Banyaknya kebutuhan perlente = 12 m/10,8 m = 1,1 batang
 1 lente bisa untuk 1 batang, maka untuk 15 batang = 15/1 = 15 lente
 Sisa = 12m-(1x10,8) = 1,2 m untuk masing masing 15 lente

9B2-07-01
 Diameter 29
 Panjang perbatang = 5,5 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/5,5 m = 2,18 batang
 1 lente bisa untuk 2 batang, maka untuk 4 batang = 4/2 = 2 lente
 Sisa = 12m-(2x5,5) = 1 m untuk masing masing 2 lente

9B2-07-02
 Diameter 29
 Panjang perbatang = 1,65 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/1,65 m = 7,27 batang
 1 lente bisa untuk 7 batang, maka untuk 10 batang = 10/7 = 1.43 lente = 2 lente
 Sisa = 12m-(7x1,65) = 0,45 m untuk 1 lente
Sisa = 12m-(3x1,65) = 7,05 m untuk 1 lente berikutnya

9B2-07-03
 Diameter 29
 Panjang perbatang = 3,27 m
 Total kebutuhan : 6 batang
 Banyaknya kebutuhan perlente = 12 m/3,27 m = 3,67 batang
 1 lente bisa untuk 3 batang, maka untuk 6 batang = 6/3 = 2 lente
 Sisa = 12m-(3x3,27) = 2,19 m untuk 2 lente
9B2-07-04
 Diameter 29
 Panjang perbatang = 4,8 m
 Total kebutuhan : 12 batang
 Banyaknya kebutuhan perlente = 12 m/4,8 m = 2,5 batang
 1 lente bisa untuk 2 batang, maka untuk 12 batang = 12/2 = 6 lente
 Sisa = 12m-(2x4,8) = 2,4 m untuk masing-masing 6 lente

9B2-07-05
 Diameter 29
 Panjang perbatang = 5,5 m
 Total kebutuhan : 4 batang
 Banyaknya kebutuhan perlente = 12 m/5,5 m = 2,18 batang
 1 lente bisa untuk 2 batang, maka untuk 4 batang = 4/2 = 2 lente
 Sisa = 12m-(2x5,5) = 1 m untuk masing-masing 2 lente

9B2-07-06
 Diameter 25
 Panjang perbatang = 4,8 m
 Total kebutuhan : 10 batang
 Banyaknya kebutuhan perlente = 12 m/4,8 m = 2,5 batang
 1 lente bisa untuk 2 batang, maka untuk 10 batang = 10/2 = 5 lente
 Sisa = 12m-(2x4,8) = 2,4 m untuk masing-masing 5 lente

2.3 Plat Lantai


Kode 5
 Diameter 10
 Panjang perbatang = 1,6 m
 Total kebutuhan : 41 batang
 Banyaknya kebutuhan perlente = 12 m/1,6m = 7,5 batang
 1 lente bisa untuk 7 batang, maka untuk 41 batang = 41/7 = 5,9 lente = 6 lente
 Sisa = 12m-(7x1,6) = 0,8 m untuk masing masing 5 lente
Sisa = 12m-(6x1,6) = 2,4 m untuk satu lente
Kode 3
 Diameter 10
 Panjang perbatang = 2,8 m
 Total kebutuhan : 41 batang
 Banyaknya kebutuhan perlente = 12 m/2,8m = 4,3 batang
 1 lente bisa untuk 4 batang, maka untuk 41 batang = 41/4 = 10,25 lente = 11 lente
 Sisa = 12m-(4x2,8) = 0,8 m untuk masing masing 10 lente
Sisa = 12m-(1x1,6) = 10,4 m untuk satu lente
Kode 4
 Diameter 10
 Panjang perbatang = 1,3 m
 Total kebutuhan : 41 batang
 Banyaknya kebutuhan perlente = 12 m/1,3 m = 9,2 batang
 1 lente bisa untuk 9 batang, maka untuk 41 batang = 41/9 = 4,6 lente = 5 lente
 Sisa = 12m-(9x1,3) = 0,3 m untuk masing masing 4 lente
Sisa = 12m-(5x1,3) = 5,5 m untuk satu lente
Kode 2
 Diameter 10
 Panjang perbatang = 1,1 m
 Total kebutuhan : 148 batang
 Banyaknya kebutuhan perlente = 12 m/1,1 m = 10,9 batang
 1 lente bisa untuk 10 batang, maka untuk 148 batang = 148/10 = 14,8 lente = 15 lente
 Sisa = 12m-(10x1,1) = 1 m untuk masing masing 14 lente
Sisa = 12m-(8x1,1) = 3,2 m untuk satu lente
Kode 1
 Diameter 10
 Panjang perbatang = 2,1 m
 Total kebutuhan : 370 batang
 Banyaknya kebutuhan perlente = 12 m/2,1 m = 5,7 batang
 1 lente bisa untuk 5 batang, maka untuk 370 batang = 370/5 = 74 lente
 Sisa = 12m-(5x2,1) = 1,5 m untuk masing masing 74 lente
Kode 9
 Diameter 10
 Panjang perbatang = 11 m
 Total kebutuhan : 121 batang
 Banyaknya kebutuhan perlente = 12 m/11 m = 1,1 batang
 1 lente bisa untuk 1 batang, maka untuk 121 batang = 121/1 = 121 lente
 Sisa = 12m-(1x11) = 1 m untuk masing masing 121 lente
Kode 6 dan 7
 Diameter 10
 Panjang perbatang = 12 m
 Total kebutuhan : 148 batang
 Banyaknya kebutuhan perlente = 12 m/12 m = 1 batang
 1 lente bisa untuk 1 batang, maka untuk 148 batang = 148/1 = 148 lente
 Sisa = 0
Kode 8
 Diameter 10
 Panjang perbatang = 0,3 m
 Total kebutuhan : 74 batang
 Banyaknya kebutuhan perlente = 12 m/0,3 m = 40 batang
 1 lente bisa untuk 40 batang, maka untuk 74 batang = 74/40 = 1,85 lente = 2 lente
 Sisa = 12m-(37x0,3) = 0,9 m untuk masing masing satu lente

2.4 Sengkang

Sengkang Kolom

K6-S-01
 Diameter 13-100
 Panjang perbatang = 2,1 m
 Total kebutuhan : 116 batang
 Banyaknya kebutuhan perlente = 12 m/2,1 m = 5,71 batang
 1 lente bisa untuk 5 batang, maka untuk 116 batang = 116/5 = 23,2 lente = 24 lente
 Sisa = 12m-(5x2,1) = 1,5 m untuk 23 lente
 Sisa = 12m-(1x2,1)= 9,9 m untuk satu lente

K6-S-02
 Diameter 13-100
 Panjang perbatang = 1,7 m
 Total kebutuhan : 38 batang
 Banyaknya kebutuhan perlente = 12 m/1,7 m = 7,06 batang
 1 lente bisa untuk 7 batang, maka untuk 38 batang = 38/7 = 5,43 lente = 6 lente
 Sisa = 12m-(7x1,7) = 0,1 m untuk 5 lente
 Sisa = 12m-(3x1,7) = 6,9 m untuk satu lente

Sengkang Balok

9B1-S-1
 Diameter 13-100
 Panjang perbatang = 2 m
 Total kebutuhan : 1080 batang
 Banyaknya kebutuhan perlente = 12 m/2m = 6 batang
 1 lente bisa untuk 6 batang, maka untuk 1080 batang = 1080/6 = 180 lente
 Sisa = 12m-(6x2) = 0 m untuk 180 lente
9B1-S-2
 Diameter 13-100
 Panjang perbatang = 1,7 m
 Total kebutuhan : 1080 batang
 Banyaknya kebutuhan perlente = 12 m/1,7m = 7,06 batang
 1 lente bisa untuk 7 batang, maka untuk 1080 batang = 1080/7 = 154,3lente =155 lente
 Sisa = 12m-(7x1,7) = 0.1 m untuk 154 lente
Sisa = 12m-(2x1,7) = 8.6 m untuk satu lente

9B1-S-3
 Diameter 13-100
 Panjang perbatang = 0,56 m
 Total kebutuhan : 510 batang
 Banyaknya kebutuhan perlente = 12 m/0,56 m = 21,43 batang
 1 lente bisa untuk 21 batang, maka untuk 510 batang =510/21= 24,3 lente =25 lente
 Sisa = 12m-(21x0,56) = 0,24 m untuk 24 lente
Sisa = 12m-(6x0,56) = 8,64 m untuk satu lente

9B2-S-1
 Diameter 16-125
 Panjang perbatang = 2,6 m
 Total kebutuhan : 255 batang
 Banyaknya kebutuhan perlente = 12 m/2,6 m = 4,62 batang
 1 lente bisa untuk 4 batang, maka untuk 255 batang =255/4= 63,75 lente = 64 lente
 Sisa = 12m-(4x2,6) = 1,6 m untuk 63 lente
Sisa = 12m-(3x2,6) = 4,2 m untuk satu lente

9B2-S-2
 Diameter 16-125
 Panjang perbatang = 1,63 m
 Total kebutuhan : 255 batang
 Banyaknya kebutuhan perlente = 12 m/1,63 m = 7,36 batang
 1 lente bisa untuk 7 batang, maka untuk 255 batang =255/7= 36,43 lente = 37 lente
 Sisa = 12m-(7x1,63) = 0,59 m untuk 36 lente
Sisa = 12m-(3x1,63) = 7,11 m untuk satu lente

9B2-S-3
 Diameter 16-125
 Panjang perbatang = 2,1 m
 Total kebutuhan : 255 batang
 Banyaknya kebutuhan perlente = 12 m/2,1 m = 5,7 batang
 1 lente bisa untuk 5 batang, maka untuk 255 batang =255/5 = 51 lente
 Sisa = 12m-(5x2,1) = 1,5 m untuk 51 lente

9B2-S-4
 Diameter 16-125
 Panjang perbatang = 1,6 m
 Total kebutuhan : 102 batang
 Banyaknya kebutuhan perlente = 12 m/1,6 m = 7,5 batang
 1 lente bisa untuk 7 batang, maka untuk 102 batang =102/7 = 14,57 lente = 15 lente
 Sisa = 12m-(7x1,6) = 0,8 m untuk 14 lente
Sisa = 12m-(4x1,6) = 5,6 m untuk satu lente
LAPORAN LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

BAB III
PERHITUNGAN SISA TULANGAN

Banya Sisa Diberikan kepada


Panjang Banyak
Diameter k Diberikan Sisa
Kode Per Batang Batang Panjang Banyak Panjang Banyak Ket.
(mm) Batang kepada (m)
(m) (lente) (m) (lente) (m) (lente)
(m)
Kode 5 0,8 5
41 1,6 6 6,4
2,4 1
Kode 3 0,8 10
41 2,8 11 18,4
10,4 1
Kode 4 0,3 4 Tidak membeli
41 1,3 5 -
5,5 1 tulangan baru
Kode 2 1 14
148 1,1 15 17,2
3,2 1
Kode 1 10 370 2,1 74 1,5 74 Kode 4 1,3 41 57,7
Kode 9
121 11 121 1 121 Kode 8 0,3 3 98,8
Kode 6
dan 7 148 12 148 0 0 - - - -

Kode 8 Tidak membeli


74 0,3 2 0,9 2 - - - -
tulangan baru
K6-S- 1,5 23
01 13 116 2,1 24 44,4
1
9,9
K6-S- 0,1 5
02 38 1,7 6 7,4
6,9 1

9B1-S-
1080 2 180 0 0 0
1

9B1-S- 0,1 154


2 1080 1,7 155 24
8,6 1
9B1-S- 0,24 24
3 510 0,56 25 14.4
8,64 1
Dikurangi 1
lente karena
9B2-S- mendapat
1 255 2,6 64 1,6 63 100,8 tambahan dari
9B2-S-2
dan 9B2-S-4

9B2-S- 16 0,59 36
9B2-S-1
2 255 1,63 37 5,2 1 23,15
7,11 1

9B2-S-
255 2,1 51 1,5 51 76,5
3

9B2-S- 102 1,6 15 0,8 14 9B2-S-1 2,6 1 14,2


4
5,6 1
9B1-
08-04 20 10,8 20 1,2 20 24

9B1-
07-04 8 5,9 4 0,2 4 0,96

9B1-
BD-1 8 12 8 0 0 0

9B1-
BD-2 8 12 8 0 0 0

9B1-
BD-3 8 2 2 8 1 8

K6-T-
02 22 40 2,8 20 3 20 60

9B1-
9B1-07-02
07-01 4 6,5 4 5,5 4 7,6 2 14,4

25 Dikurangi 1
9B1- lente karena
0,82 2
07-02 16 1,9 3 1,64 mendapat
tambahan dari
9B1-07-01
9B1-
07-03 2 3,7 1 4,6 1 4,6

9B1-
07-05 4 6,5 4 5,5 4 22

9B1-
07-06 6 5,9 4 0,2 3 0,6

9B1-
08-01 10 11,4 10 0,6 10 6

9B1-
08-02 30 11,28 30 0,72 30 21,6

9B1-
08-03 5 6,15 5 5,85 5 29,25

9B1-
08-05 10 11,4 10 0,6 10 6

9B1-
08-06 15 10,8 15 1,2 15 18

9B1-B- 10 12 10 0 0 0
1

9B1-B- 10 12 10 0 0 0
2

9B1-B- 10 4,1 5 3,8 1 3,8


3

9B1-A-
01 4 12 12 0 0 0

9B1-A-
02 4 12 12 0 0 0

9B1-A-
03 4 4,1 2 3,8 2 7,6

9B1-A- 0,6 2
04 16 1,9 3 5,6
4,4 1
9B1-A-
05 32 2,8 8 0,8 8 6,4

9B1-A- 0,6 1
06 8 1,9 2 8,8
8,2 1

9B2-
29 4 5,5 2 1 2 2
07-01
9B2- 0,45 1
9B2-07-01
07-02 10 1,65 2 5,5 1 2,5
7,05 1
9B2-
07-03 6 3,27 2 2,19 2 4,38

9B2-
07-04 12 4,8 6 2,4 6 14,4

9B2-
4 5,5 2 1 2 2
07-05

9B2-
07-06 10 4,8 5 2,4 5 12

9B2-
BD-1 6 12 6 0 0 0

9B2-
BD-2 6 12 6 0 0 0

9B2-
BD-3 6 4,7 3 2,6 1 2,6

9B2-B-
01 7 12 7 0 0 0
9B2-B-
02 7 12 7 0 0 0

9B2-B- 2,6 3
9B2-07-01
03 7 4,7 4 5,5 1 9,6
7,3 1

Hanya membeli 1
lente karena
mendapat
9B2-
4 5,5 2 1 2 6,5 tambahan dari
07-01
9B2-07-02, 9B2-
B-03, dan 9B2-A-
4
0,45 1 Tidak membeli
tulangan karena
9B2- mendapat
29
07-02 10 1,7 2 tambahan dari
7,05 1
9B2-07-03, 9B2-
07-04, dan 9B2-
07-06
9B2- 9B2-
07-03 6 3,3 2 2,19 2 07-02 1,7 2 0,98

9B2- 9B2-
07-04 12 4,8 6 2,4 6 07-02 1,7 6 4,2
9B2-
4 5,5 2 1 2 2
07-05

9B2- 9B2-
07-06 10 4,8 5 2,4 5 07-02 1,7 5 3,5

9B2-
BD-1 6 12 6 0 0 0

9B2-
BD-2 6 12 6 0 0 0

Dikurangi 1 lente
9B2- karena mendapat
BD-3 6 4,7 3 2,6 1 0 tambahan dari
9B2-B-03
Dan 9B2-A-3
9B2-B-
01 7 12 7 0 0 0

9B2-B-
02 7 12 7 0 0 0

9B2-B- 2,6 3 9B2-


03 7 4,7 4 BD-3 4,7 1 10,4
7,3 1
9B2-B- 29 3 12 3 0 0 0
01

9B2-B-
02 3 12 3 0 0 0

9B2-A- 3 1 9B2-
3 3 4,5 2 BD-3 4,7 1 5,8
7,5 1
9B2-A- 1,5 1 9B2-
4 8 5,7 2 07-01 5,5 1 2,2
5,7 1
9B2-A-
6 2 6 0 0 0
5
9B2-A- 0,4 11
47 2,9 12 7,7
6 3,3 1
K6-T- 96 4,7 48 2,6 48
124,8
01
LAPORAN LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext.266 Bandung

BAB IV
KESIMPULAN

1. Diameter 10
Kebutuhan = 382 lente = 4584 m
Sisa = 198,5 m
198,5
𝑥100% = 4,3% < 10% → 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
4584
2. Diameter 13
Kebutuhan= 390 lente = 4680 m
Sisa = 90,2 m
90,2
𝑥100% = 1,9 % < 10% → 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
4680
3. Diameter 16
Kebutuhan= 208 lente = 2496 m
Sisa = 247,61 m
2508
𝑥100% = 9,9% < 10% → 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
259,61
4. Diameter 22
Kebutuhan= 20 lente = 240 m
Sisa = 60 m
60
𝑥100% = 25% < 10% → 𝑇𝑖𝑑𝑎𝑘 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
240
Diameter ini tidak ekonomis dikarenakan sisa dari batang tersebut tidak dapat dipakai
untuk bentuk lain.
5. Diameter 25
Kebutuhan= 149 lente = 1788 m
Sisa = 156,29 m
156,29
𝑥100% = 8,7 % < 10% → 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
1788
6. Diameter 29
Kebutuhan= 179 lente = 2148 m
Sisa = 217,56 m
217,56
𝑥100% = 10,1% < 10% → 𝐾𝑢𝑟𝑎𝑛𝑔 𝐸𝑘𝑜𝑛𝑜𝑚𝑖𝑠
2148
Bentuk Besi : Catatan :
No. Daftar : Dia. 13 mm = 1,040 Kg per m
No. Gambar : Dia. 16 mm = 1,578 Kg per m
Digambar Diperiksa Tanggal Dia. 25 mm = 3,853 Kg per m
Dia. 29 mm = 5,185 Kg per m
Nomor Banyak Panjang Bentuk (ukuran luar) ujung kait Ket.
Posisi Dia. Batang Per Total menurut standar Indonesia
Batang (m) Dalam cm
(m)
1 10 41 1,6 65,6

2 10 41 2,8 114,8

3 10 41 1,3 53,3

4 10 148 1,1 162,8

5 10 370 2,1 777

6 10 121 11 1331

7 10 148 12 1776

8 10 74 0.3 22,2

9 13 116 2,1 243,6


10 13 38 1,7 64,6

11 13 1080 2 2160

12 13 1080 1,7 1836

13 13 510 0,56 285,6

14 16 255 2 510

15 16 255 1,6 408

16 16 255 2,1 535,5

17 16 102 1,6 163,2


18 22 40 4,3 172

19 24 96 4,2 403,2

20 25 4 12 48

21 25 4 12 48

22 25 4 4,1 16,4

23 25 16 1,9 30,4

24 25 32 2,8 89,6

25 25 8 1,6 12,8

26 16 8 12 96

27 16 8 12 96

28 16 8 1,8 14,4
29 25 10 12 120

30 25 10 12 120

31 25 10 4,1 41

32 29 3 12 36

33 29 3 12 36

34 29 3 4,5 13,5

35 29 8 2,1 16,8

36 29 6 2 12

37 29 47 2,9 136,3

38 29 12 6 72

39 29 12 6 72

40 29 6 4,7 28,2

41 29 12 7 84
42 29 12 7 84

43 29 7 4,7 32,9

44 25 4 6,5 26

45 25 16 1,9 30,4

46 25 2 3,7 7,4

47 25 8 5,9 47,2

48 25 4 6,5 26

49 25 6 5,9 35,4

50 25 10 11,4 114

51 25 30 11,2 336

52 25 5 6,1 30,5

53 16 20 10,8 216

54 25 10 11,4 114

55 25 15 10,8 162

56 29 4 5,5 22

57 29 10 1,6 16

58 29 6 3,3 19,8
59 29 12 4,8 57,6

60 29 4 5,5 22

61 25 10 4,8 48