BAB I
PERHITUNGAN PANJANG TULANGAN YANG DIBENGKOK
A. DENAH
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
B. KOLOM
- db = 22 mm
- Selimut beton = 50 mm
- Panjang total as ke as = 3100 mm
- 40 d = 880 mm
C. BALOK
a. BALOK BP1B as H-K
Diketahui
1. Untuk diameter 22
- db = 22 mm
- dp = 2,5 db = 55 mm
- Selimut beton = 50 mm
- D = db + dp = 77 mm
- Panjang total as ke as = 20000 mm
- x = 0,5dp + db = 49,5 mm
- 12 d = 264 mm
- 15 d = 330 mm
- 20 d = 440 mm
- 40 d = 880 mm
- A =¼πD = 60,48 mm
2. Untuk diameter 10
- db = 10 mm
- dp = 2,5 db = 25 mm
- Selimut beton = 50 mm
- D = db + dp = 35 mm
- Panjang total as ke as = 20000 mm
- x = 0,5dp + db = 22,5 mm
- 12 d = 120 mm
- 40 d = 400 mm
- A =¼πD = 27,49 mm
A-03 22 A = 60,48
B = (6000/4) + 400 – X – SB – 22
+ 15d= 2108,5 mm
C= 12 d =264 mm
Kebutuhan = A + B + C = 2432,98
mm
P-01 10 A= 27,49
B= 12000 – A – 12d = 11852,51
mm
C= 12d = 120 mm
Kebutuhan =A + B + C = 12000
mm
B-01 22 A= 60,48
B= 12000 – A – 12d = 11675,52
mm
C= 12d = 264 mm
Kebutuhan =A + B + C = 12000
mm
Diketahui
1. Untuk diameter 22
- db = 22 mm
- dp = 2,5 db = 55 mm
- Selimut beton = 50 mm
- D = db + dp = 77 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
A-02 22 B = 12000 mm
Kebutuhan = 12000 mm
A-04 22 A = 60,48
B = (8000/4) + 250 – X – SB – 22
+ 15d= 2458,5 mm
C= 12 d =264 mm
Kebutuhan = A + B + C = 2782,98
mm
P-01 10 A= 27,49
B= 12000 – A – 12d = 11852,51
mm
C= 12d = 120 mm
Kebutuhan =A + B + C = 12000
mm
P-02 10 B = 12000 mm
Kebutuhan = 12000
B-01 22 A= 60,48
B= 12000 – A – 12d = 11675,52
mm
C= 12d = 264 mm
Kebutuhan =A + B + C = 12000
mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
B-02 22 B = 12000 mm
Kebutuhan = 12000 mm
Diketahui
1. Untuk diameter 19
- db = 19 mm
- dp = 2,5 db = 47,5 mm
- Selimut beton = 50 mm
- D = db + dp = 66,5 mm
- Panjang total as ke as = 24000 mm
- x = 0,5dp + db = 42,75 mm
- 12 d = 228 mm
- 15 d = 285 mm
- 20 d = 380 mm
- 40 d = 760 mm
- A =¼πD = 52,23 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
2. Untuk diameter 10
- db = 10 mm
- dp = 2,5 db = 25 mm
- Selimut beton = 50 mm
- D = db + dp = 35 mm
- Panjang total as ke as = 24000 mm
- x = 0,5dp + db = 22,5 mm
- 12 d = 120 mm
- 40 d = 400 mm
- A =¼πD = 27,49 mm
KODE D Gambar Perhitungan
A-01 19 A= 52,23 mm
B= 12000 – A – 12d = 11719,77
mm
C= 12d = 228 mm
Kebutuhan =A + B + C = 12000
mm
A-02 19 B = 12000 mm
Kebutuhan = 12000 mm
A-04 19 A = 52,23 mm
B = (8000/4) + 175 – X – SB – 22
+ 15d= 2348,25 mm
C= 12 d =228 mm
Kebutuhan = A + B + C = 2628,48
mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
P-01 10 A= 27,49
B= 12000 – A – 12d = 11852,51
mm
C= 12d = 120 mm
Kebutuhan =A + B + C = 12000
mm
P-02 10 B = 12000 mm
Kebutuhan = 12000
B-01 19 A= 52,23 mm
B= 12000 – A – 12d = 11719,77
mm
C= 12d = 228 mm
Kebutuhan =A + B + C = 12000
mm
B-02 19 B = 12000 mm
Kebutuhan = 12000 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
Diketahui
1. Untuk diameter 19
- db = 19 mm
- dp = 2,5 db = 47,5 mm
- Selimut beton = 50 mm
- D = db + dp = 66,5 mm
- Panjang total as ke as = 7000 mm
- x = 0,5dp + db = 42,75 mm
- 12 d = 228 mm
- 15 d = 285 mm
- 20 d = 380 mm
- 40 d = 760 mm
- A =¼πD = 52,23 mm
2. Untuk diameter 10
- db = 10 mm
- dp = 2,5 db = 25 mm
- Selimut beton = 50 mm
- D = db + dp = 35 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
A-02 19 A = 52,23 mm
B = (7000/4) + 175 – X – SB +
15d= 2117,25 mm
C= 12 d =228 mm
Kebutuhan = A + B + C = 2397,48
mm
P-01 10 A = 52,23 mm
B = 7000 – (7000/4) + 40d – SB –
X +175= 9592,25 mm
C= 228 mm
Kebutuhan = 9872,48 mm
B-01 22 A = 27,49 mm
B = 7000 – (7000/4) + 40d – SB –
X +175= 9592,25 mm
C= 120 mm
Kebutuhan = 9872,48 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
D. SENGKANG
a. Sengkang Kolom
Diketahui
Diameter 10 mm
- db = 10 mm
- dp = 25 mm
- D = 35 mm
- X = 22,5 mm
- SB = 50 mm
- 6d = 60 mm
Diameter 13 m
- db = 13 mm
- dp = 32,5 mm
- D = 45,5 mm
- X = 29,25 mm
- SB = 50 mm
- 6d = 78 mm
b. Sengkang Balok
Diketahui
- db = 10 mm
- dp = 25 mm
- D = 35 mm
- X = 22,5 mm
- SB = 50 mm
- 6d = 60 mm
KODE D GAMBAR PERHITUNGAN
BP1C S- 10 A = 250 mm
01 A’ = A – 2X = 205 mm
B = 3/8 π D = 41,23 mm
C = ¼ π D = 27,49 mm
D = 600 mm
D’ = D – 2 X = 555 mm
Kebutuhan = ( 2 x 6d) + ( 2 x
A’) + ( 2 x B ) + ( 3 x C ) +
( 2 x D’ ) = 1804,94 mm
BP1B S- 10 A = 250 mm
01 A’ = A – 2X = 205 mm
B = 3/8 π D = 41,23 mm
C = ¼ π D = 27,49 mm
D = 600 mm
D’ = D – 2 X = 555 mm
Kebutuhan = ( 2 x 6d) + ( 2 x
A’) + ( 2 x B ) + ( 3 x C ) +
( 2 x D’ ) = 1804,94 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
E. PLAT LANTAI
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Fax. (022) 2016150 Ext. 266 Bandung
Diketahui
Db = 10 mm
Selimut beton = 50 mm
15Db = 150 mm