BOBOT Minggu ke
No. URAIAN
(%) Hari Ke
100.000
Rencana Mingguan
Rencana Komulatif Mingguan -
ENCANA PEKERJAAN/WORK PLAN SCHEDULE
1 2 3 4 5 6 7
1-7 8-14 15-21 22-28 29-35 36-42 43-49
1.567
1.453 1.453 1.453 1.453
2.356
2.816
2.000 3.102 4.302 5.102 5.102
1.665
1.733
2.545
4.055 4.255 4.755 4.755
3.984 3.984
1.421
2.461 2.461
3.565 3.565 3.565
-
0.135 0.135 -
-
-
-
-
-
-
0.800 -
1.665 -
Minggu ke 9
2.233 1.233 -
hanya 4 hari
-
0.126 -
1.014 1.014 -
hanya 4 hari
-
1.200 -
-
1.421 -
-
-
0.998 -
0.171 -
-
9.592 2.553
97.447 100.000
BOQ (Bill Of Quantity)
130,959,882.00
26,593,465.64
34,289,626.00
127,189,178.00
51,572,741.00
61,633,084.00
446,630,881.00
72,899,640.00
113,767,455.00
2,746,743.00
44,393,265.00
55,690,240.00
416,318,129.00
174,372,724.00
62,197,099.00
107,725,303.00
234,060,856.00
21,846,052.00
3,750,000.00
2,188,636,363.64
218,863,636.36
2,407,500,000.00
2,407,500,000.00 2,500,000,000 HPS
96.300% 2,407,500,000
-
BILL OF QUANTITY (BOQ)
HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT
(Rp.)
1 PEKERJAAN PENDAHULUAN DAN MANAJEMEN
A PEKERJAAN PERSIAPAN
1 Pek. Pasang Papan Proyek 1.00 Bh 167,300.00
2 Pek. Pas. Pagar Pengaman Seng Gelombang T = 2 m 285.68 m' 384,000.00
3 Pek. Pembersihan dan Perataan 1,270.57 m² 16,600.00
Sub Jumlah A
B PEKERJAAN RUTIN
1 Pek. Pengadaan Listrik Kerja 1.00 Ls 2,400,000.00
2 Pek. Pengadaan Air Kerja 1.00 Ls 3,400,000.00
3 Kesehatan dan Keselamatan Kerja
a. Penyapaan RKK
- Cetak Buku Prosedur RKK 1.00 buku 1,000,000.00
b Sosialisasi, promosi dan pelatihan
- Sosialisasi K3 1.00 ls 300,000.00
c. APD (Alat Pelindung Diri) dan APK
- safety helmet 5.00 buah 30,000.00
- safety shoes 5.00 buah 250,000.00
- pagar lokasi proyek (APK) 1.00 Ls 1,000,000.00
d Asuransi dan perijinan
- Asuransi ketenaga Kerjaan 1.00 Ls 1,000,000.00
e. Personel Keselamatan Konstruksi
- Safety Officer 1.00 Ls 2,500,000.00
f. Alat Kesehatan
- Kotak P3k 1.00 set 1,000,000.00
- Tenda Kesehatan 1.00 set 1,200,000.00
g. rambu - rambu
- cetak banner dan spanduk peringatan K3 1.00 Ls 200,000.00
h. konsultasi dengan ahli K3
- pertemuan dengan ahli K3 (forum group discussion) 1.00 Ls 2,693,465.64
i. kegiatan dan peralatan K3
- Rambu petunjuk 1.00 unit 100,000.00
j. Protocol Covid 19 1.00 Ls 3,500,000.00
4 Foto Dokumentasi dan Pelaporan 1.00 Ls 1,900,000.00
5 Shop Drawing dan As Built Drawing 1.00 Ls 3,000,000.00
Sub Jumlah B
Jumlah 1
2 PEKERJAAN BONGKARAN DAN PAVING BLOCK
A PEKERJAAN BONGKARAN
1 Pek. Bongkaran Paving Block Eksisting 938.90 m² 18,300.00
2 Pek. Bongkaran Kios dan Auining Eksisting 1.00 Ls 8,000,000.00
3 Pek. Bongkaran Beton Eksisiting 6.35 m³ 678,400.00
4 Pek. Bongkaran Bata Eksisting 7.59 m³ 632,400.00
Sub Jumlah A
B PEKERJAAN PAVING BLOCK
1 Pek. Mengganti Paving Blok Hexagonal T = 8 cm K-300 381.17 m² 224,800.00
2 Pek. Pas. Kansteen 15 x 20 x 40 214.26 m' 193,700.00
Sub Jumlah B
Jumlah 2
3 PEKERJAAN PEDESTRIAN
A PEKERJAAN PEDESTRIAN 1 (POT BUNGA DAN TEMPAT DUDUK) = 2 UNIT
1 Pek. Galian Tanah Biasa < 1 m 7.68 m³ 76,700.00
2 Pek. Pondasi Rollag ad. 1:4 34.13 m² 263,200.00
3 Pek. Pas. Bata ad. 1:5 53.52 m² 126,000.00
4 Pek. Plesteran ad. 1:5 107.04 m² 64,700.00
5 Pek. Pas. Granite uk. 40 cm x 40 cm 41.14 m² 277,200.00
6 Pek. Pas. Batu Alam + Vernis Batu Alam 33.46 m² 372,100.00
7 Pek. Urugan Tanah Urug 31.07 m³ 144,100.00
Sub Jumlah A
B PEKERJAAN PEDESTRIAN 2 (POT BUNGA DAN TEMPAT DUDUK) = 5 UNIT
1 Pek. Galian Tanah Biasa < 1 m 10.98 m³ 76,700.00
2 Pek. Pondasi Rollag ad. 1:4 48.80 m² 263,200.00
3 Pek. Pas. Bata ad. 1:5 65.89 m² 126,000.00
4 Pek. Plesteran ad. 1:5 131.78 m² 64,700.00
5 Pek. Pas. Granite uk. 40 cm x 40 cm 31.46 m² 277,200.00
6 Pek. Pas. Batu Alam + Vernis Batu Alam 51.34 m² 372,100.00
7 Pek. Urugan Tanah Urug 22.86 m³ 144,100.00
Sub Jumlah B
C PEKERJAAN JALAN PEDESTRIAN
1 Pek. Rabat Beton ad. 1:2:3 T = 8 cm 69.73 m³ 896,700.00
2 Pek. Concrete Stamp 938.90 m² 409,100.00
Sub Jumlah C
Jumlah 3
4 PEKERJAAN TAMAN GANTUNG = 5 UNIT
1 Pek. Rangka Taman Gantung (Besi Hollow GI 2 cm x 4 cm x 1 135.30 m² 538,800.00
Jumlah 4
5 PEKERJAAN VEGETASI
1 Pek. Urugan Tanah Urug 40.75 m³ 144,100.00
2 Pek. Tanam Rumput Gajah Mini 400.62 m² 34,000.00
3 Pek. Pengadaan Pohon Palem Ekor Tupai T. 2,5 m L. 20 cm 4.00 Batang 430,000.00
4 Pek. Pengadaan Pohon Hias Heliconia 325.00 Batang 57,000.00
5 Pek. Pengadaan Pohon Hias Hanjuang Merah 350.00 Batang 27,000.00
6 Pek. Pengadaan Pohon Hias Bayam Merah 235.00 Batang 9,500.00
7 Pek. Pengadaan Pohon Hias Bromelia 283.00 Batang 23,000.00
8 Pek. Pengadaan Pohon Hias Brokoli Kuning 218.00 Batang 18,000.00
9 Pek. Pengadaan Pohon Hias Lili 205.00 Batang 14,000.00
10 Pek. Pengadaan Pohon Hias Sepatu Blek 220.00 Batang 27,000.00
11 Pek. Pengadaan Pohon Hias Agave Sirip Putih 257.00 Batang 46,000.00
12 Pek. Pengadaan Pohon Bougenvil T = 2 m 3.00 Batang 340,000.00
13 Pek. Pengadaan Tanaman Rambat Gantung Lee Kwan Yew 85.00 Batang 23,000.00
14 Jasa Penanaman Pohon + Pupuk Tanaman 2,117.00 Batang 5,400.00
15 Pek. Pas. Koral Lepas T = 10 cm 125.00 m² 135,000.00
Jumlah 5
6 PEKERJAAN LAMPU TAMAN = 7 UNIT
A STRUKTUR LAMPU TAMAN
1 Pek.Galian Tanah < 1 m 2.19 m³ 76,700.00
2 Pek. Lantai Kerja ad. 1:3:5 0.18 m³ 1,066,600.00
3 Pek. Foot Plate 50 cm x 50 cm
- Pek. Pembesian T. Ø 12 " 41.44 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 0.21 m³ 1,066,600.00
4 Pek. Pas. Kolom uk. 20 cm x 20 cm
- Pek. Pas. Bekisting 2 x Pakai 2.46 m² 245,000.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 42.55 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 0.25 m³ 1,066,600.00
Sub Jumlah A
B PEKERJAAN MECANIKAL ELECTRIK (ME) LAMPU TAMAN
1 Biaya Pemasangan dan Istalasi Listrik 10500 VA 1.00 Ls 17,700,000.00
2 Pek. Galian Tanah Biasa < 1 m (Jalur Kabel ) 20.15 m³ 76,700.00
3 Pek. Pengadaan Kabel NYY 3 x 2.5 mm 245.00 m' 14,300.00
4 MCB 4 Amper 2.00 Buah 78,000.00
5 Kristin (Terminal Kabel) 2.00 Buah 23,000.00
6 Konektor 4.00 Buah 20,000.00
7 Box Panel Out Door + Topi uk. 70 x 50 x 20 cm 2.00 Unit 1,250,000.00
8 Isolasi 10.00 Buah 20,000.00
9 Kontraktor SN 95 2.00 Buah 1,660,000.00
10 Biaya Upah Pemasangan Kabel 329.40 m' 7,900.00
11 Pek. Pengadaan dan Pemasangan Lampu Taman Antik T = 2.7 7.00 Unit 1,820,000.00
Sub Jumlah B
Jumlah 6
7 PEKERJAAN SELFIE CORNER
1 Pek. Galian Tanah Biasa < 1 m 6.53 m³ 76,700.00
2 Pek. Pondasi Pas. Batu ad. 1:5 5.28 m³ 1,030,500.00
3 Pek. Pas. Sloof
- Pek. Pas. Bekisting 2 x Pakai 3.96 m² 155,800.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 166.60 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 0.40 m³ 1,066,600.00
4 Pek. Pas. Kolom
- Pek. Pas. Bekisting 2 x Pakai 2.16 m² 245,000.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 46.89 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 0.11 m³ 1,066,600.00
5 Pek. Pas. Bata 25.09 m² 126,000.00
6 Pek. Plesteran + Acian 21.85 m² 103,000.00
7 Pek. Pas. Batu Alam + Cat Vernis Batu Alam 5.25 m² 372,100.00
8 Pek. Pas. Lantai concrete Stamp 29.96 m² 409,100.00
9 Pek. Pas. Pipa Stainles Steel dia. 2.5 Inchi t = 1 mm 34.50 m' 333,200.00
10 Pek. Urugan Tanah Urug 22.08 m³ 144,100.00
11 Pek. Pengecatan 18.90 m² 46,100.00
12 Logo Kota Serang (Double) 2.00 Buah 1,020,000.00
13 Penamaan Huruf Double Akrilik TAMAN SARI + Besi Penopang 9.00 Huruf 840,000.00
Jumlah 7
8 PEKERJAAN MONUMEN PAKU BANTEN
1 Pek. Galian Tanah Biasa < 1 m 22.30 m³ 76,700.00
2 Pek. Pondasi Pas. Batu ad. 1:5 19.11 m³ 1,030,500.00
3 Pek. Pas. Sloof
- Pek. Pas. Bekisting 2 x Pakai 19.11 m² 155,800.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 804.72 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 1.91 m³ 1,066,600.00
4 Pek. Pas. Kolom
- Pek. Pas. Bekisting 2 x Pakai 9.18 m² 245,000.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 199.30 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 0.46 m³ 1,066,600.00
5 Pek. Pas. Bata 120.54 m² 126,000.00
6 Pek. Plesteran + Acian 211.18 m² 103,000.00
7 Pek. Profil Dinding 90.79 m' 130,000.00
8 Pek. Pas. Lantai Granite 40 cm x 40 cm 61.21 m² 277,200.00
9 Pek. Pas. Pilar ACP + Rangka 8.00 Unit 2,320,000.00
10 Pek. Pas. Tugu Monumen Paku Banten + Dudukan Monumen 1.00 Unit 133,000,000.00
11 Pek. Lantai Concrete Stamp 106.76 m² 409,100.00
12 Pek. Urugan Tanah Urug 634.57 m³ 144,100.00
13 Pek. Pengecatan 72.71 m² 46,100.00
14 Penamaan Huruf Double Akrilik TAMAN SARI KOTA SERANG 19.00 Huruf 840,000.00
Jumlah 8
9 PEKERJAAN TAMAN BUNDAR = 3 UNIT
1 Pek. Galian Tanah Biasa < 1 m 50.74 m³ 76,700.00
2 Pek. Pondasi Pas. Batu ad. 1:5 43.49 m³ 1,030,500.00
3 Pek. Pas. Sloof
- Pek. Pas. Bekisting 2 x Pakai 31.01 m² 155,800.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 938.31 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 3.10 m³ 1,066,600.00
4 Pek. Pas. Kolom
- Pek. Pas. Bekisting 2 x Pakai 36.96 m² 245,000.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 802.40 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 1.85 m³ 1,066,600.00
5 Pek. Pas. Bata 87.14 m² 126,000.00
6 Pek. Plesteran + Acian 55.28 m² 103,000.00
7 Pek. Pas. Batu Alam + Cat Vernis Batu Alam 71.54 m² 372,100.00
8 Pek. Pas. Lantai Granite 40 cm x 40 cm 80.73 m² 277,200.00
9 Pek. Urugan Tanah Urug 97.29 m³ 144,100.00
Jumlah 9
10 PEKERJAAN ISOMETRI FOUNTAIN
1 Pek. Galian Tanah < 1 m 3.70 m³ 76,700.00
2 Pek. Pondasi Rollag ad. 1:4 18.51 m² 263,200.00
3 Pek. Pas. Sloof 15 cm x 30 cm
- Pek. Pas. Bekisting 2 x Pakai 18.51 m² 155,800.00
- Pek. Pembesian T. Ø 12 ", S. Ø 8" 438.36 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 2.78 m³ 1,066,600.00
4 Pek. Pas. Batu Alam 55.52 m² 314,600.00
5 Pek. Pas. Instalasi Air Pipa PVC Ø 1/2 Inchi + Acsesories 108.00 m' 30,000.00
6 Pek. Pas. Instalasi Air Pipa PVC Ø 1 Inchi + Acsesories 36.00 m' 38,400.00
7 Pek. Pas. Mesin Pendorong Merk. Sek. Shimitzu 3.00 Unit 840,000.00
8 Pek. Urugan Tanah Urug 3.35 m³ 144,100.00
9 Pek. Pas. Isometri Fountain 3.00 Unit 6,450,000.00
Jumlah 10
11 PEKERJAAN AUNING DAN RETORIKA CONTAINER KULINER
1 Pek. Pas. Rangka Baja Ringan Auning SNI T= 0.8 mm + Tiang 46.03 m² 240,900.00
2 Pek. Pas. Bata + Plesteran Acian (Dudukan Tiang Auning 20 x 2 6.40 m² 229,000.00
3 Pek. Pas. Atap Auning Spandek Berpasir 46.03 m² 121,200.00
4 Pek. Pas. Dinding Auning Kayu Bermotif 135.20 m² 238,700.00
5 Pek. Pas. Meja Kayu Kompor + Meja Hidang Auning 10.00 Unit 1,910,000.00
6 Pek. Pengadaan Payung + Meja Kursi Kayu Cafe Out Door 21.00 Unit 1,820,000.00
Jumlah 11
12 PEKERJAAN PERBAIKAN PAGAR + KOLAM PATUNG PAHLAWAN
1 Pek. Plesteran + Acian Kolom Pagar Eksisting 155.32 m² 103,000.00
2 Pek. Mengganti Pagar Besi Motif Sesuai Eksisting 393.79 m² 346,000.00
3 Pek. Pengecatan Kolom Pagar dan Gapura Pagar 238.96 m² 46,100.00
4 Pek. Perbaikan Kolam Patung Pahlawan (Lantai + Dinding + Pa 1.00 Ls 53,495,500.00
5 Pek. Perbaikan/Mengganti Instalasi Air + Mesin Pancur Kolam 1.00 Ls 17,300,000.00
Jumlah 12
13 PEKERJAAN JEMBATAN
1 Pek. Plate Duiker T = 20 cm
- Pek. Pas. Bekisting Lantai 11.20 m² 331,300.00
- Pek. Pembesian T. Ø 12 " 265.22 Kg 15,400.00
- Pek. Pengecoran ad. 1:3:5 2.24 m³ 1,066,600.00
2 Pek. Pas. Railing Jembatan Stainless Steel Ø 2,5 Inchi 6.00 m' 1,180,000.00
3 Pek. Concrete Stamp Lantai Jembatan 11.20 m² 409,100.00
Jumlah 13
14 PEKERJAAN DAN LAIN-LAIN
1 Pek. Pembersihan Setelah Pekerjaan 1.00 Ls 3,750,000.00
Jumlah 14
Grand Total Fisik dan Non Fisik
JUMLAH (Rp.)
167,300.00
109,701,120.00
21,091,462.00
130,959,882.00
2,400,000.00
3,400,000.00
1,000,000.00
300,000.00
150,000.00
1,250,000.00
1,000,000.00
1,000,000.00
2,500,000.00
1,000,000.00
1,200,000.00
200,000.00
2,693,465.64
100,000.00
3,500,000.00
1,900,000.00
3,000,000.00
26,593,465.64
157,553,347.64
17,181,870.00
8,000,000.00
4,307,840.00
4,799,916.00
34,289,626.00
85,687,016.00
41,502,162.00
127,189,178.00
161,478,804.00
589,056.00
8,983,016.00
6,743,520.00
6,925,488.00
11,404,008.00
12,450,466.00
4,477,187.00
51,572,741.00
842,166.00
12,844,160.00
8,302,140.00
8,526,166.00
8,720,712.00
19,103,614.00
3,294,126.00
61,633,084.00
62,526,891.00
384,103,990.00
446,630,881.00
559,836,706.00
72,899,640.00
72,899,640.00
5,872,075.00
13,621,080.00
1,720,000.00
18,525,000.00
9,450,000.00
2,232,500.00
6,509,000.00
3,924,000.00
2,870,000.00
5,940,000.00
11,822,000.00
1,020,000.00
1,955,000.00
11,431,800.00
16,875,000.00
113,767,455.00
167,973.00
191,988.00
638,176.00
223,986.00
602,700.00
655,270.00
266,650.00
2,746,743.00
17,700,000.00
1,545,505.00
3,503,500.00
156,000.00
46,000.00
80,000.00
2,500,000.00
200,000.00
3,320,000.00
2,602,260.00
12,740,000.00
44,393,265.00
47,140,008.00
500,851.00
5,441,040.00
616,968.00
2,565,640.00
426,640.00
529,200.00
722,106.00
117,326.00
3,161,340.00
2,250,550.00
1,953,525.00
12,256,636.00
11,495,400.00
3,181,728.00
871,290.00
2,040,000.00
7,560,000.00
55,690,240.00
1,710,410.00
19,692,855.00
2,977,338.00
12,392,688.00
2,037,206.00
2,249,100.00
3,069,220.00
490,636.00
15,188,040.00
21,751,540.00
11,802,700.00
16,967,412.00
18,560,000.00
133,000,000.00
43,675,516.00
91,441,537.00
3,351,931.00
15,960,000.00
416,318,129.00
3,891,758.00
44,816,445.00
4,831,358.00
14,449,974.00
3,306,460.00
9,055,200.00
12,356,960.00
1,973,210.00
10,979,640.00
5,693,840.00
26,620,034.00
22,378,356.00
14,019,489.00
174,372,724.00
283,790.00
4,871,832.00
2,883,858.00
6,750,744.00
2,965,148.00
17,466,592.00
3,240,000.00
1,382,400.00
2,520,000.00
482,735.00
19,350,000.00
62,197,099.00
11,088,627.00
1,465,600.00
5,578,836.00
32,272,240.00
19,100,000.00
38,220,000.00
107,725,303.00
15,997,960.00
136,251,340.00
11,016,056.00
53,495,500.00
17,300,000.00
234,060,856.00
3,710,560.00
4,084,388.00
2,389,184.00
7,080,000.00
4,581,920.00
21,846,052.00
3,750,000.00
3,750,000.00
2,188,636,363.64
ANALISA HARGA SATUAN
Pek. Acian
Satuan : m2
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 0.200 85,000.00 17,000.00
Tukang Batu OH 0.100 100,000.00 10,000.00
Kepala Tukang OH 0.010 110,000.00 1,100.00
Mandor OH 0.010 120,000.00 1,200.00
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Satuan : m3
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 1.650 85,000.00 140,250.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Kepala Tukang OH 0.028 110,000.00 3,080.00
Mandor OH 0.083 120,000.00 9,960.00
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Satuan : m2
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 0.060 85,000.00 5,100.00
Tukang Besi OH 0.060 100,000.00 6,000.00
Kepala Tukang OH 0.012 110,000.00 1,320.00
Mandor OH 0.003 120,000.00 360.00
Pembesian
Satuan : kg
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 0.007 85,000.00 595.00
Tukang Besi OH 0.007 100,000.00 700.00
Kepala Tukang OH 0.001 110,000.00 77.00
Mandor OH 0.000 120,000.00 48.00
Pek. Pengecatan
Satuan : m2
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 0.020 85,000.00 1,700.00
Tukang Cat OH 0.063 100,000.00 6,300.00
Kepala Tukang OH 0.006 110,000.00 693.00
Mandor OH 0.003 120,000.00 360.00
Pek. Pas Rangka Baja Ringan Auning SNI T=0.8 mm + Tiang Auning
Satuan : m2
NO Uraian Satuan Koefisien Satuan Harga Jumlah Harga
A UPAH
Pekerja OH 0.734 85,000.00 62,390.00
Tukang Besi OH 0.734 100,000.00 73,400.00
Kepala Tukang OH 0.073 110,000.00 8,030.00
Mandor OH 0.037 120,000.00 4,440.00
NO URAIAN SAT
A Upah
1 Pekerja OH
2 Tukang Kayu OH
3 Tukang Batu OH
4 Tukang Besi OH
5 Tukang Cat OH
6 Tukang Pipa OH
7 Tukang Listrik OH
8 Tukang Las OH
9 Tukang Allumunium OH
10 Operator Alat Berat OH
11 Mekanik OH
12 Kepala Tukang OH
13 Mandor OH
B BAHAN
1 Air liter
2 Tanah Merah m3
3 Batu Belah m3
4 Besi Beton Polos / Ulir Kg
5 Kawat Beton Kg
6 Bata merah bh
7 Pasir Beton m3
8 Pasir pasang m3
9 Semen portland kg
10 Semen Warna kg
11 Koral beton m3
12 Batu Pecah/Split (Pecah Mesin) ukr. 2 - 3 cm m3
13 Paving Block Hexagonal T = 8 cm K-300 m2
14 Kansteen 15 x 20 x 40 bh
15 Concrete Stamp m2
16 Batu Alam m2
17 Granite uk. 40 cm x 40 cm bh
18 Baja Ringan Auning SNI T=0.8 mm + Tiang Auning m'
19 Seng gelombang lbr
20 Atap Auning Spandek Berpasir m2
21 Dinding Auning Kayu Bermotif m2
22 Kaso Kayu Meranti Uk 5 x 7 x 400 m3
23 Kayu kelas III m3
24 Balok kayu kelas II m3
25 Minyak Bekisting ltr
26 Dolken kayu Ø 8-10/400 cm btg
27 Plywood 9 mm lbr
28 Paku biasa kg
29 Besi Hollow GI 2 cm x 4 cm x 1 mm m`
30 Cat Dasar Setara Dulux kg
31 Plamur Tembok Setara Matek/Metrolite kg
32 Cat Tembok (exterior) ICI/Dulux A922 Warna kg
33 Meni besi kg
34 Cat Besi kg
35 Kuas bh
36 Pengencer ltr
37 Coating Batu Alam m2
38 Kabel NYM 3X2.5mm2 m`
39 Digital printing Bahan Spanduk m2
40 Pipa stainless steel 2 1/2" m'
41 Pipa PVC Ø 1 Inch m'
42 Pipa PVC Ø 1/2 Inch m'
43 Solar lot
C SEWA ALAT
1 Excavator Standar, Catervilar jam
2 Vibrating Compactor 10 - 22 Ton jam
WA ALAT
HARGA
(Rp.)
85,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
110,000.00
120,000.00
50.00
80,000.00
320,000.00
11,200.00
15,000.00
700.00
240,000.00
225,000.00
1,250.00
12,000.00
180,000.00
260,000.00
115,000.00
50,000.00
295,000.00
135,000.00
25,100.00
20,000.00
75,000.00
78,000.00
167,000.00
1,500,000.00
2,500,000.00
3,200,000.00
5,000.00
25,000.00
75,000.00
19,000.00
56,870.00
60,000.00
30,000.00
85,000.00
80,000.00
60,000.00
12,000.00
30,000.00
50,000.00
12,500.00
62,000.00
175,000.00
14,500.00
10,000.00
16,000.00
230,000.00
150,000.00