HANDOVER KEGIATAN OPERASI LHD UNIT 1,2 & 3,4

Shift / Reg : Malam / Regu 2


Personil : Eddy Wongkar, Rocky, Glen, Desmon, Adnan
Hari/Tanggal : Senin, 1 Maret 2021

KEGIATAN HARI INI


PIC STATUS PEKERJAAN
JAM KEGIATAN URAIAN KEGIATAN
Unit - 1,2 Unit - 3,4 Lanjut Hold Selesai

Eddy W, Rocky, Serah terima tugas control room 1,2 & 3,4 dari dinas Sore ke
23:00 Pergantian shift
Glen
Desmon, Adnan
dinas Malam √

Monitoring parameter operasional suplai uap unit 1 2 3 4


23:30 Monitoring Control Room Eddy W Adnan
melalui HMI control room 1.2 & 3.4. √
Total kWh Unit 1 = kWh / Rata - rata = MW (Shutdown)
Total kWh Unit 2 = 384.473 kWh / 16,02 MW
Total kWh Unit 3 = kWh / Rata - rata = MW (Shutdown)
00:00 Pencatatan KWH Unit 1,2 &3,4 Rocky Desmon Total kWh Unit 4 = 397.540 kWh / 16,56 MW

782.013 + 47.033.985 = 47.815.998 : 463.345.436 x 100% = 10,32%

Monitoring fasilitas & parameter suplai uap,kerja kompresor


00.20 Monitoring rutin Rocky, Glen Desmon
& genset area control room 1&2,3&4 pompa √
Monitor Pompa Reinjeksi Cluster
00.30
4,13,24,37
Rocky, Glen Desmon Monitoring kinerja pompa injeksi CL 4,13,24 & 37 √

01:00 Manufer pompa cluster 13 Rocky, Glen Operasikan pompa Zulser cluster 13 level balong 20cm √

01.3 Manufer pompa cluster 24 Rocky, Glen Operasikan pompa B cluster 24 level balong 20 cm √
Input data PURe dan Pencatatan Realisasi
01.00
unit 1,2 & 3,4
Glen Adnan Input data PURe dan Pencatatan Realisasi unit 1,2 & 3,4 √
Monitoring fasilitas & parameter suplai uap,kerja kompresor
06:30 Monitoring rutin Rocky, Glen Desmon
& genset area control room 1&2,3&4 pompa √

Monitor Pompa Reinjeksi Cluster


06:40
4,13,24,37
Rocky, Glen Desmon Monitoring kinerja pompa injeksi CL 4,13,24 & 37 √

06:40 Manufer pompa cluster 37 Desmon Matikan pompa KSB No.1 level balong 165 cm

Input data dan Pencatatan Deklarasi unit


07:00
1,2 & 3,4
Eddy W, Glen Input data dan Pencatatan Deklarasi unit 1,2 & 3,4 √
Backup data unit 1,2,3,4 dan kirim data pembangkitan melalui
07:25 Input data laporan pembangkitan Eddy W, Glen Adnan
WA. √
Eddy W, Rocky, Serah terima tugas control room 1,2&3,4 dari dinas Malam Ke
08:00 Pergantian shift
Glen
Desmon, Adnan
dinas Pagi √

CONCERN FOR NEXT SHIFT

PIC STATUS PEKERJAAN


Jam KEGIATAN KETERANGAN
Unit - 1,2 Unit - 3,4 Lanjut Hold Selesai

1 Pompa Griswold Cls 37 Pompa GW 2 Standby , Level Balong 125 cm √


2 Pompa KSB Cls 37 Pompa Ksb 1 Operasi √
3 Pompa Cluster-13 Pompa Sulzer Standby, level balong 100 cm √
4 Pompa Cluster-24 Pompa Operasi, level balong 40 cm √
5 Pompa Cluster-4 Pompa Standby Level balong 50 cm √
6 Sippon Cluster-P /53 Operasi Level balong 10 cm √
7 NaOH cluster 24 Pompa A standby, Level Tangki 120 cm √
8 NaOH cluster 5 Pompa Standby, Level 0 cm √
TEMUAN
1 Kaca Differential Pressure pompa sulzer cluster 13 pecah
2
3
Shift SUPERVISOR SHIFT PRODUCTION TANDA TANGAN
MALAM Eddy Wongkar
PAGI Eddy Wongkar
97.86

146.3
HANDOVER KEGIATAN OPERASI LHD UNIT 1,2 & 3,4
Shift / Regu Pagi / 3

Personil : Hery Ilat , Martua , Nawawi , Ramdhan , Goan

Hari/Tanggal : Minggu, 28 February 2021

PIC STATUS PEKERJAAN


Jam KEGIATAN KETERANGAN
Unit - 1 2 Unit - 3 4 Selesai Hold Lanjut

Herry , Martua , Serah terima tugas control room 1,2 & 3,4
08:00 Pergantian shift Ramdhan, Goan √
Nawawi dari dinas malam ke dinas pagi

Monitoring parameter operasional suplai uap


08:20 Monitoring Control Room Nawawi Ramdhan unit 1 2 3 4 melalui HMI control room 1.2 & √
3.4.
Monitor fasilitas & parameter suplai
Monitor Sumur Dan fasilitas produksi
08:30 Herry , Martua Goan uap,kerja kompresor & genset area control √
Cluster 04,13,24 dan 5
room 1,2 & 3,4, pompa

Monitor Pompa Reinjeksi Cluster Monitoring kinerja pompa Reinjeksi CL 4, 13,


08:40 4,13,24,37
Herry , Martua Goan
24 & 37

Monitoring parameter operasional suplai uap


Herry , Martua ,
12:00 Monitoring Control Room
Nawawi
Ramdhan , Goan unit 1 2 3 4 melalui HMI control room 1.2 & √
3.4.

Monitoring fasilitas & parameter suplai


14:05 Monitoring rutin Herry , Martua Goan uap,kerja kompresor & genset area control √
room 1&2,3&4 pompa

Monitor fasilitas & parameter suplai


Monitor Sumur Dan fasilitas produksi
14:10 Cluster 04,13,24 dan 5,37
Herry , Martua Goan uap,kerja kompresor & genset area control √
room 1,2 & 3,4, pompa

Monitor Pompa Reinjeksi Cluster Monitoring kinerja pompa Reinjeksi CL 4, 13,


14:15 4,13,24,37
Herry , Martua Goan
24 & 37

Backup data unit 1,2,3,4 dan kirim data


15:00 Input data Nawawi Ramdhan
pembangkitan melalui WA.

Herry , Martua , Serah terima tugas control room 1,2 & 3,4
16:00 Pergantian shift
Nawawi
Ramdhan , Goan
dari dinas Pagi Ke dinas Sore

CONCERN FOR NEXT SHIFT

PIC STATUS PEKERJAAN


Jam KEGIATAN KETERANGAN
Unit - 1,2 Unit - 3,4 Selesai Hold Lanjut
1 Pompa Griswold Cls 37 √ Pompa Griswold 2 Standby, LB 220 cm √
2 Pompa KSB CLS 37 √ Pompa Ksb 1 Standby √
3 Pompa Cluster-13 √ Pompa Sulzer Operasi, Level balong 20 cm √
5 Pompa Cluster-24 √ Pompa C Operasi, Level balong 10 cm √
6 Pompa Cluster-4 √ Pompa Standby, Level balong 50 cm √
7 Sippon Cluster-P / 53 √ Operasi / Level balong 30 cm √
8 NaOH cluster 24 √ Level NaOh 120 cm, Pompa NaOH Standby √
9 NaOH cluster 5 √ Level NaOh 0 cm, Pompa NaOH Standby √

TEMUAN
1 Kaca Differential Pressure pompa sulzer cluster 13 pecah

SUPERVISOR SHIFT PRODUCTION TANDA TANGAN

Pagi Herry Ilat

Sore Ricci L
97.86

-
HANDOVER KEGIATAN OPERASI LHD UNIT 1,2 & 3,4
Shift / Regu Sore / 1 (Satu)

Personil :Ricci Lenak, Edi Sumitro, Refly Wuisan, Merwin Talib, Ramdan Oyano

Hari/Tanggal :Minggu, 28 Februari 2021

KEGIATAN HARI INI


PIC STATUS PEKERJAAN
Jam KEGIATAN KETERANGAN
Unit - 1 2 Unit - 3 4 Lanjut Hold Selesai

Ricci L, Edi S, Refly Merwin T, Serah terima tugas control room 1,2 & 3,4 dari dinas
16.00 Pergantian Shift
W Ramdan O pagi ke dinas Sore. √
Monitoring parameter operasional suplai uap unit 1,2 &
16:10 Monitoring control room Edi S Merwin T
3,4 melalui HMI control room 1,2 & 3,4. √

16:22 Monitor Compresor unit 1,2,3,4 Ricci L, Refly W Ramdan O Supplay udara ke tabung angin unit 1,2,3,4, √
Monitor Sumur Dan fasilitas produksi Monitor fasilitas & parameter suplai uap,kerja
17:00
Cluster 04,13,24 dan 5
Ricci L, Refly W Ramdan O
kompresor & genset area control room 1,2 & 3,4, pompa √
Monitor Pompa Reinjeksi Cluster Monitoring dan maintain fasilitas pompa reinjeksi Cl.
17:15
4,13,24,37
Ricci L, Refly W Ramdan O
4,13,24,37 √
Ricci L, Edi S, Refly Merwin T, Monitoring parameter operasional suplai uap unit 1 2 3
18:00 Monitoring Control room
W Ramdan O 4 melalui HMI control room 1.2 & 3.4. √

Monitor Sumur Dan fasilitas produksi Monitor fasilitas & parameter suplai uap,kerja
20:40
Cluster 04,13,24 dan 5
Refly W Ramdan O
kompresor & genset area control room 1,2 & 3,4, pompa √

Monitor Pompa Reinjeksi Cluster


20:50
4,13,24,37
Refly W Ramdan O Monitoring kinerja pompa Reinjeksi CL 4, 13, 24 & 36 √

20:55 Manufer Pompa Cluster 13 Refly W Matikan pompa Zulser cluster 13 level balong 60 cm √

21:0 Manufer Pompa Cluster 24 Refly W Matikan pompa B cluster 24 level balong 60 cm √

22:10 Input data Ricci L, Edi S Merwin T Backup data unit 1,2 & 3,4 dan kirim data pembangkitan √
Ricci L, Edi S, Refly Merwin T, Serah terima tugas control room 1,2 & 3,4 dari dinas
23.00 Pergantian Shift
W Ramdan O Sore ke dinas Malam. √

CONCERN FOR NEXT SHIFT


PIC STATUS PEKERJAAN
Jam KEGIATAN KETERANGAN
Unit - 1,2 Unit - 3,4 Lanjut Hold Selesai

1 Pompa Griswold Cls 37 √ Pompa Griswold no.2 Standby, level balong 50 cm √


2 Pompa KSB CLS 37 √ Pompa Ksb 1 Operasi √
3 Pompa Cluster-13 √ Pompa Sulzer Standby, level balong 60 cm √
5 Pompa Cluster-24 √ Pompa B Standby , Level balong 60 cm √
6 Pompa Cluster-4 √ Pompa Standby, Level balong 50 cm √
7 Sippon Cluster-P / 53 √ Operasi / Level balong 10 cm √
8 NaOH cluster 24 √ Level Naoh = 120 cm √
9 NaOH cluster 5 √ Pompa standby, Level 0 cm √

TEMUAN
1 Kaca Differential Pressure pompa sulzer cluster 13 pecah

SUPERVISOR SHIFT PRODUCTION TANDA TANGAN

Sore Ricci Lenak

Malam Abdul Somad

.
97.86

-672.2