Anda di halaman 1dari 5

LAPORAN PERBAIKAN FASILITAS TERMINAL

PT. ANGKASA PURA II (PERSERO)


CABANG UTAMA BANDARA SOEKARNO-HATTA BANDARA SOEKARNO - HATTA
UNIT MECHANICAL FACILITY - T3 PERIODE JULI 2023

Hari / Tanggal : Minggu, 30 Juli 2023


Shift : Malam (19:00 - 07:00)
Petugas AP II 1. Haryanto / +62 812-9906-2964
2. Ana Wilda / +62 856-4789-0141

Petugas O&M 1 .Bobby Zubaeri ( 083804077548 )


APS 2. Wawan Darmawan ( 0812-1022-2720 )
Group 2 3. Hadi Mulyanto / ( 0857-7055-0858 )
4. Abdu Wasik / ( 0858-1726-2241 )

(19:00) Serah terima tugas, dari shift M ke shift PS


(19:00 - 07:00) Monitoring peralatan dan fasilitas mechanical Terminal 3.

HASIL PEMERIKSAAN SUHU TERMINAL 3


(KESEJUKAN RUANG)

PEMERIKSAAN (AREA) °C
NO Area / Lokasi Domestik Domestik Internasional Internasional

1 Security Check Point 2 (SCP2)


2 Mezzanine
3 Garuda Lounge Pengecekan Temperatur tidak ada
4 Arrival Hall
5 Arrival Pier
6 Transit
7 Baggage Claim
8 Udara Luar

PEMERIKSAAN (AREA) °C
NO Area / Lokasi Boarding Boarding

1 Gate 1
2 Gate 2
3 Gate 3
4 Gate 4
5 Gate 5
6 Gate 6
7 Gate 7
8 Gate 8
9 Gate 9
10 Gate 10
11 Gate 11
12 Gate 12
13 Gate 13
14 Gate 14
15 Gate 15
16 Gate 16
17 Gate 17
18 Gate 18
19 Gate 19
20 Gate 20
21 Gate 21
22 Gate 22
23 Gate 23
24 Gate 24
25 Gate 25
26 Gate 26
27 Gate 27
28 Gate 28

PERIKSAAN TEMP. °C
NO Area / Lokasi Check In

1 Check In Island A
2 Check In Island B
3 Check In Island C
4 Check In Island D
5 Check In Island E
6 Check In Island F

MECHANICAL FACILITY - T3
MONITORING OPERASIONAL PERALATAN DAN FASILITAS MECHANICAL TERMINAL 3
JAM

NO. PERALATAN TANGGAL LOKASI Permasalahan Tindak Lanjut Dokumentasi


Mulai Selesai

Release safety switch error 17 , Selesai pekerjaan unit


1 Travelator 03/08/2023 Domestik 19:47 19:52 Travelator DO.PZ.4.T off, Kondisi error 17.
operasi kembali

Tinjut ke lokasi, Di temukan roller dalam kondisi


2 ATD 03/08/2023 Internasional 22:33 22:45 ATD ME 1 Dalam kondisi off Rusak, di Lakukan penggantian roller, selesai unit
normal kembali.

Pemasangan exhaust 245kw. Pada toilet IF 05 N inter.


3 Exhaust Fan 03/08/2023 Internasional 22:34 23:48 Travelator I1.G.4.T off,
Setelah pemasangan unit oprasi normal

Cek ke lokasi, unit off tanpa indikasi kerusakan, riset


4 Travelator 03/08/2023 Internasional 23:26 23:33 Travelator I1.G.4.T off,
Kunci, selesai unit normal kembali.

Tindak lanjut : pergantian rumah kunci E-Stop , Unit


5 Eskalator 03/08/2023 Domestik 23:27 23:50 rumah kunci E-Stop dan push button rusak
ops kembali.

Tindak lanjut : penggantian fen inverter sebanyak


6 Eskalator 03/08/2023 Domestik 23:35 23:55 Fen inverter rusak/mati
1pcs, Pekerjaan selesai unit ops kmbali

Cek ke lokasi, unit off tanpa indikasi kerusakan, riset


7 ATD 03/08/2023 Internasional 04:20 4:35 pintu otomatis ramp out 8 Internasional dalam keadaan eror
power, selesai unit normal kembali.
KEGIATAN TEAM PREVENTIVE DAN MAINTENANCE UNIT MEKANIKAL T3

JAM
NO. PERALATAN TANGGAL LOKASI Permasalahan Tindak Lanjut Dokumentasi
Mulai Selesai

LAPORAN MAINTENANCE/OPERASIONAL
GARBARATA TERMINAL 3 SOEKARNO-HATTA

Dinas : Malam
Hari/tgl : Kamis,3-08-2023

Kegiatan :
1 Garbarata 03/08/2023 Internasional / Domestik 21.00 23.50 Visual cek # Visual cek harian Garbarata

- Test operasional auto level


- Test operasionl SDS (safety door shoe)
- Pengecekan Canopy
- Pengecekan Cabin Rotation & Floor
- Pengecekan Limit switch
- Pengecekan lift column

PREVENTIVE MAINTENANCE ESCALATOR DAN


TRAVELATOR BULANAN

1. Escalator (D0.PZ.3E)

meliputi :
- Cleaning (PIT ROOM) up and bottom
- Cleaning all component as required
- Check barricade for maintenance safety
- Check and replacement nut/Screw body
- Inspect automatic oiller step and chain motor
- Check, Inspect and Reposition switch safety device
- Check & inspect step rute to center
- Check condition motor
- Check & Adjust tension Coil break
- Check & Adjust tension chain step
- Check & Adjust tension chain motor and pully Drive
- Check condition oil gearbox.
- Check Newel Noise
PREVENTIVE MAINTENANCE ESCALATOR DAN TRAVELATOR
2 Travelator 30/07/2023 D1.F.19.T / Domestik 21.00 03.00
BULANAN

Pengecekan Ampere motor pada unit escalator


D0.PZ.3E
Ampere motor :
R : 12'9A
S : 13'7A
T : 13'2A. Pengecekan Main Source panel pada
unit escalator DO.PZ.3E :
R : 404,8 V
S : 406,0 V
T : 402,3 V

KEGIATAN :
~Cleaning Fin Coil
~Cleaning Fillter
Airside GATE 14-15
3 AC 03/08/2023 21.00 02.00 PREVENTIVE MAINTENANCE ~Vacum Pipa & Bak Drain
AC SLPIT DUCT PEDESTAL
~Cover Body
~Chek Panel Unit
~Cleaning Area sekitar

Penggantian part yellow line 1pc dan. yellow comb 3


4 Eskalator 03/08/2023 D0.PZ.3.E./ Domestik 23.00 23.35 Penggantian parts
pc

Tindak lanjut : penggantian rollerpres sebanyak


5 Eskalator 03/08/2023 DO.SC.2.E / Domestik 00.10 01.15 Perbaikan, karet rollerpres terkikis/habis
1 set
KEGIATAN : ```
1. Cleaning Filter
2. Cleaning Fin Coil
3. Cleaning Area sekitar
4. Cleaning Pipa Drainase
5. Cleaning Panel AHU
Ruang AHU AS 127 A
6. Cek V Belt Motor AHU
6 AHU 03/08/2023 - AHU. GF 1.22 21:00 03:40 PREVENTIVE MAINTENANCE
7. Cleaning Blower dan Motor
- AHU. 1.33 8.Pengecekan Air flow
9..Pemberian Chemical
10.Pemberian Grease pada motor & blower AHU

Keterangan :
- Unit Normal dan Kembali Beroperasi.

PREVENTIVE MAINTENANCE ESCALATOR DAN


TRAVELATOR BULANAN

1. Escalator (I0.PZ.3E)

meliputi :
- Cleaning (PIT ROOM) up and bottom
- Cleaning all component as required
- Check barricade for maintenance safety
- Check and replacement nut/Screw body
- Inspect automatic oiller step and chain motor
- Check, Inspect and Reposition switch safety
device
- Check & inspect step rute to center
- Check condition motor
- Check & Adjust tension Coil break
- Check & Adjust tension chain step
- Check & Adjust tension chain motor and pully
Drive
- Check condition oil gearbox.
7 Eskalator 03/08/2023 Escalator (I0.PZ.3E) Domestik 21:00 04:00 PREVENTIVE MAINTENANCE - Check Newel Noise

Pengecekan Ampere motor pada unit escalator


I0.PZ.3E
Ampere motor :
R : 15,45A
S : 16,01A
T : 15,98A. Pengecekan
Main Source panel pada unit escalator IO.PZ.3E :
R : 402,9 V
S : 399,6 V
T : 402,8 V

Program 3 bulanan pada escalator IO.PZ.3E


Meliputi :
- Cleaning electrical panel,
- Resetting all connection cable,
- Check all component electrical,
8 Eskalator 03/08/2023 IO.PZ.3E / Internasional 20:00 04:00 PREVENTIVE MAINTENANCE
- Check, inspect & reposition safety device
- Cleaning chain
- Cleaning roller newel

Pekerjaan selesai, unit operasi normal.

MECHANICAL FACILITY - T3
HASIL PEMERIKSAAN UNIT COOLING TOWER

DOMESTIK PIER 1

No Unit No Fan Pompa No Unit No Fan A Fan B

1 Cooling Tower 1 Standby Standby 1 Cooling Tower 1 ON ON

2 Cooling Tower 2 Standby Standby 2 Cooling Tower 2 Standby Standby

3 Cooling Tower 3 ON ON 3 Cooling Tower 3 Standby Standby

4 Cooling Tower 4 ON ON 4 Cooling Tower 4 Standby Standby

5 Cooling Tower 5 ON ON 5 Cooling Tower 5 ON ON

HASIL PEMERIKSAAN UNIT POMPA

DOMESTIK PIER 1

No Nama Peralatan Kapasitas Ampere (A) Frequensi (Hz) Power (kW) No Nama Peralatan Status

1 CHWPp -1 90 kW Standby 1 CHWPp -1 15KW Standby

2 CHWPp -2 90 kW Standby 2 CHWPp -2 15 KW Standby

3 CHWPp -3 90 kW 159 50 98 3 CHWPp -3 15 KW ON

4 CHWPp -4 90 kW 159 50 98 4 CHWPp -4 15 KW ON

5 CHWPp -5 90 kW Standby 5 CHWPp -5 15 KW Standby

6 CWP -1 185 kW Standby 6 CWPp -1 30 KW Standby

7 CWP -2 185 kW 186 40 87 7 CWPp -2 30 KW Standby

8 CWP -3 185 kW Standby 8 CWPp -3 30 KW ON

9 CWP -4 185 kW 198 40 88 9 CWPp -4 30 KW ON

10 CWP -5 185 kW Standby 10 CWPp -5 30 KW Standby

11 CHWPS (Z2A&2B)-1 335 kW 318 25 42 11 CHWPS -1 (45 KW) Standby

12 CHWPS (Z2A&2B)-2 335 kW Standby 12 CHWPS -2 (45 KW) Standby

13 CHWPS (Z2A&2B)-3 335 kW Standby 13 CHWPS -3 (45 KW) Standby

14 CHWPS (Z1).1 150 kW 137 30 35 14 CHWPS -4 (45 KW) ON

15 CHWPS (Z1).1-1 150 kW Standby 15 CHWPS -5 (45 KW) ON

16 CHWPS (Z3&4).1 250 kW 195 30 68

17 CHWPS (Z3&4).1-1 250 kW Standby

HASIL PEMERIKSAAN UNIT CHILLER

DOMESTIK PIER 1
Chiller No.1 : Run 2 Comp, Monitor dalam perbaikan Chiller No.1 Off / Standby
Temp. Evaporator in Temp. Evaporator in :
Temp. Evaporator Out Temp. Evaporator Out :
Temp. Condensor in Temp. Condensor in :
Temp. Condensor Out Temp. Condensor Out :

Chiller No.2 : STANDBY Chiller No.2 Off / Standby


Temp. Evaporator in Temp. Evaporator in :
Temp. Evaporator Out Temp. Evaporator Out :
Temp. Condensor in Temp. Condensor in :
Temp. Condensor Out Temp. Condensor Out :

Chiller No.3 : STANDBY Chiller No.3 Off / Standby


Temp. Evaporator in Temp. Evaporator in :
Temp. Evaporator Out Temp. Evaporator Out :
Temp. Condensor in Temp. Condensor in :
Temp. Condensor Out Temp. Condensor Out :
RLA Comp 1 : 75%
RLA Comp 2 : 75% Chiller No.4 Off / Standby
Temp. Evaporator in :
Chiller No.4 : STANDBY Temp. Evaporator Out :
Temp. Evaporator in Temp. Condensor in :
Temp. Evaporator Out Temp. Condensor Out :
Temp. Condensor in
Temp. Condensor Out Chiller No.5 Operasi / ON 3 Compressor
Temp. Evaporator in : 13,0 °C
Chiller No.5 : Run 2 Comp, Monitor dalam perbaikan Temp. Evaporator Out : 10,4°C
Temp. Evaporator in Temp. Condensor in : 29,5 °C
Temp. Evaporator Out Temp. Condensor Out : 34,9 °C
Temp. Condensor in
Temp. Condensor Out

MECHANICAL FACILITY - T3