RAB RUJAB Ahsp 2016 Rev
RAB RUJAB Ahsp 2016 Rev
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN
CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
I PEKERJAAN TURAP
I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
Err:502
NO URAIAN PEKERJAAN JUMLAH HARGA
Terbilang : #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
* Pekerjaan Tanaman
1 Pek. Timbunan 66.64 m3 AHSP A.2.3.1.11.a #NAME? #NAME?
2 Rumput Gajah Mini 122.50 m2 45,000.00 5,512,500.00
3 Adam Hawa 300.00 Pbg 2,500.00 750,000.00
4 Kertas Belimbing tinggi 75-100 cm 9.00 Phn 400,000.00 3,600,000.00
5 Agave 15.00 Pbg 100,000.00 1,500,000.00
6 Sikas 50 - 70 Cm 5.00 Phn 5,000,000.00 25,000,000.00
7 Osmoxylon 150.00 Pbg 25,000.00 3,750,000.00
8 Sansiefera 200.00 Pbg 30,000.00 6,000,000.00
9 Nanas Merah 12.00 Pbg 100,000.00 1,200,000.00
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
IV PEKERJAAN FINISHING
1 Water Proofing Kolam Renang 60.10 m2 AHSP A.4.7.1.120 #NAME? #NAME?
2 Pasangan Granit Tile 60 x 60 Unpolish Lantai 10.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
3 Pasangan Granit Tile 60 x 60 Unpolish Dinding 60.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
4 Pasangan Plint Granit Tile 10 x 60 40.00 m1 AHSP A.4.4.3.28 #NAME? #NAME?
5 Pasangan Granit Tile 60 x 60 Unpolish Pinggir 40.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
JUMLAH PEKERJAAN FINISHING #NAME?
V PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Instalasi Listrik Untuk Kolam Renang 14.00 titik 350,000.00 4,900,000.00
2 Pompa Pengurasan dan Pengisian Kolam Renang 1.00 unit 275,000,000.00 275,000,000.00
3 Filter Air Kolam renang 1.00 unit 225,000,000.00 225,000,000.00
4 Lampu Dalam Renang 10.00 titik 520,000.00 5,200,000.00
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
I PEKERJAAN TURAP
I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi Turap 228.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi Turap 57.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 450.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Pondasi Batu Gunung 666.10 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 17.10 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 228.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 3,653.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.020 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Dolken Ø 8-10/400 cm #NAME? 1.250 #NAME? #NAME?
Semen @ 40 Kg #NAME? 2.500 #NAME? #NAME?
Seng BJLS 0.20 #NAME? 1.200 #NAME? #NAME?
Pasir Beton #NAME? 0.005 #NAME? #NAME?
Koral Beton M3 0.009 #NAME? #NAME?
Kayu 5/7 M3 0.072 Rp. 3,430,000.00 Rp. 246,960.00
Paku Biasa 5 cm - 10 cm #NAME? 0.060 #NAME? #NAME?
Cat Menie #NAME? 0.450 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu 5/7 M3 0.012 Rp. 4,410,000.00 Rp. 52,920.00
Paku Kayu #NAME? 0.020 #NAME? #NAME?
Papan Kayu Kelas III #NAME? 0.007 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.000 Err:502 Err:502
Tukang Kayu Err:502 Err:502 2.000 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.200 Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bambu #NAME? 1.250 #NAME? #NAME?
Ijuk #NAME? 0.186 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 13.334 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.666 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 6.667 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.333 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.750 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.025 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.050 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.067 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.330 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali Koefisien Pekerjaan Galian
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.500 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.500 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pasir Urug #NAME? 1.200 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Tanah Timbun #NAME? 1.200 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.150 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Ijuk #NAME? 6.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.025 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pasir Batu (Sirtu) #NAME? 1.200 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.500 Err:502 Err:502
Tukang Err:502 Err:502 0.750 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.075 Err:502 Err:502
Mandor Err:502 Err:502 0.075 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 1.200 #NAME? #NAME?
Semen @ 40 Kg #NAME? 163.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.520 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.780 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.390 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.039 Err:502 Err:502
Mandor Err:502 Err:502 0.039 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 1.200 #NAME? #NAME?
Pasir Urug #NAME? 0.432 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.400 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.085 Err:502 Err:502
Mandor Err:502 Err:502 0.170 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 0.480 #NAME? #NAME?
Semen @ 40 Kg #NAME? 194.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.312 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.468 #NAME? #NAME?
Besi Beton Polos #NAME? 126.000 #NAME? #NAME?
Kawat Beton #NAME? 1.800 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.400 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.800 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.080 Err:502 Err:502
Mandor Err:502 Err:502 0.119 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 0.450 #NAME? #NAME?
Semen @ 40 Kg #NAME? 194.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.312 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.468 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 247.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 869.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 999.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 276.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 828.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,012.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 299.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 799.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,017.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.200 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.060 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 230.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 893.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,027.000 #NAME? #NAME?
Air #NAME? 200.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 326.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 760.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,029.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 352.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 731.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,031.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 371.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 698.000 #NAME? #NAME?
Batu pecah 2-3 cm #NAME? 1,047.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 384.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 692.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,039.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 406.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 684.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,026.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 413.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 681.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,021.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 439.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 670.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,006.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 448.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 667.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,000.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 400.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.480 #NAME? #NAME?
Batu pecah 2-3 cm (1350 Kg/m3) #NAME? 0.800 #NAME? #NAME?
Storox - 100 #NAME? 1.200 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.070 Err:502 Err:502
Tukang Err:502 Err:502 0.070 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Polos #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.150 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.070 Err:502 Err:502
Tukang Err:502 Err:502 0.070 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Ulir #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.150 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Polos #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.100 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Ulir #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.100 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.025 Err:502 Err:502
Tukang Err:502 Err:502 0.025 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.001 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wiremesh (Ulir) Dia. 5.0 #NAME? 10.200 #NAME? #NAME?
Kawat Beton #NAME? 0.050 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.025 Err:502 Err:502
Tukang Err:502 Err:502 0.025 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.001 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wiremesh (Ulir) Dia. 6.0 #NAME? 10.200 #NAME? #NAME?
Kawat Beton #NAME? 0.050 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.520 Err:502 Err:502
Tukang Err:502 Err:502 0.260 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.026 Err:502 Err:502
Mandor Err:502 Err:502 0.026 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.300 #NAME? #NAME?
Minyak Bekesting #NAME? 0.100 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.520 Err:502 Err:502
Tukang Err:502 Err:502 0.260 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.026 Err:502 Err:502
Mandor Err:502 Err:502 0.026 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.045 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.300 #NAME? #NAME?
Minyak Bekesting #NAME? 0.100 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.018 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 6.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.030 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.020 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 3.000 #NAME? #NAME?
Penjaga Jarak Bekesting (Spacer) #NAME? 4.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.030 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.150 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.060 Err:502 Err:502
Tukang Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Profil #NAME? 1.150 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Err:502 Err:502 0.250 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 3.500 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.350 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.018 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 4.000 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.734 Err:502 Err:502
Tukang Err:502 Err:502 0.734 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.073 Err:502 Err:502
Mandor Err:502 Err:502 0.037 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Baja Ringan Canai Dingin C75 kg 3.065 Rp. 11,760.00 Rp. 36,044.40
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.052 Err:502 Err:502
Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Operator Err:502 Err:502 0.010 Err:502 Err:502
Pembantu Operator Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Rangka Baja Ringan m' 1.030 Rp. 119,560.00 Rp. 123,146.80
Alumunium Foil DS m2 1.000 Rp. 15,680.00 Rp. 15,680.00
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.7604 Err:502 Err:502
Tukang Err:502 Err:502 0.7604 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.076 Err:502 Err:502
Mandor Err:502 Err:502 0.038 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Baja Ringan Canai Dingin C75 kg 4.050 Rp. 11,760.00 Rp. 47,628.00
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0430 Err:502 Err:502
Tukang Err:502 Err:502 0.0430 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.004 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 1.100 #NAME? #NAME?
Skrup Fixer #NAME? 2.000 #NAME? #NAME?
Sealant #NAME? 0.060 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0850 Err:502 Err:502
Tukang Err:502 Err:502 0.0850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 4.400 #NAME? #NAME?
Aluminium strip #NAME? 14.600 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0850 Err:502 Err:502
Tukang Err:502 Err:502 0.0850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 2.400 #NAME? #NAME?
Kaca Polos 5mm #NAME? 1.500 #NAME? #NAME?
Sealant 0.270 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 43.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.080 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 32.950 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.091 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 26.550 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.093 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 18.950 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0380 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 14.370 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0400 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 11.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0430 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bata Ringan Tebal 10 cm #NAME? 8.400 #NAME? #NAME?
Mortar Utama 380 ( 40 kg ) #NAME? 0.063 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bata Ringan Tebal 7.5 cm #NAME? 8.400 #NAME? #NAME?
Mortar Utama 380 ( 40 kg ) #NAME? 0.063 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Beton Rooster / Kerawang #NAME? 30.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 11.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 10.224 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.020 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 7.776 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.023 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 6.240 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.024 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.260 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 10.368 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.031 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.400 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.020 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 8.320 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.032 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.080 Err:502 Err:502
Tukang Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.040 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 0.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.013 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 4.320 #NAME? #NAME?
Pasir Pasang #NAME? 0.006 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 3.250 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Mortar Siap Pakai (MSP) #NAME? 6.240 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Mortar Siap Pakai (MSP) #NAME? 3.250 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.125 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.013 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 40 x 40 cm #NAME? 6.630 #NAME? #NAME?
Semen @ 50 Kg #NAME? 9.800 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.300 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.240 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.120 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.012 Err:502 Err:502
Mandor Err:502 Err:502 0.012 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 60 cm Polished #NAME? 3.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 9.600 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.240 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.120 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.012 Err:502 Err:502
Mandor Err:502 Err:502 0.012 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 60 cm Unpolished #NAME? 3.100 #NAME? #NAME?
Semen @ 40 Kg #NAME? 9.600 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.090 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plint Keramik Granit 10 x 60 #NAME? 1.700 #NAME? #NAME?
Semen @ 40 Kg #NAME? 1.140 #NAME? #NAME?
Semen @ 50 Kg #NAME? 0.100 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.003 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.090 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plint Keramik Granit 10 x 40 #NAME? 2.630 #NAME? #NAME?
Semen @ 40 Kg #NAME? 1.140 #NAME? #NAME?
Semen @ 50 Kg #NAME? 0.100 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.003 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Keramik 20 x 20 cm bh 26.500 Rp. 2,796.53 Rp. 74,107.99
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Keramik 20 x 40 cm bh 12.500 Rp. 12,536.16 Rp. 156,702.00
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 120 cm bh 1.400 Rp. 372,400.00 Rp. 521,360.00
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Serit Hitam 15x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Andesit Bintik Bakar 30x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Cupang Merah 30x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Andesit Polos Bakar 40x40 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Andesit Bintik Bakar 30x60 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Gypsum ( 120 x 240 cm ) #NAME? 0.364 #NAME? #NAME?
Paku skrup 10 cm #NAME? 0.110 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.350 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.018 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 4.000 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Kg 100% x Rangka #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.140 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.067 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Roof Light Fibreglass 90 x 180 cm #NAME? 0.600 #NAME? #NAME?
Paku Biasa 1/2" - 1" #NAME? 0.050 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.166 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.250 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Sirap Kayu #NAME? 30.000 #NAME? #NAME?
Paku Biasa 1/2" - 1" #NAME? 0.200 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.150 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.750 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.075 Err:502 Err:502
Mandor Err:502 Err:502 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Atap Aspal Bitumen CT3 Lbr 1.050 #NAME? #NAME?
Paku Hak Panjang 15 cm Kg 0.020 Rp. 18,081.00 Rp. 361.62
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 1.000 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.100 Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bubungan Atap Aspal Bitumen Lbr 1.200 #NAME? #NAME?
Paku Hak Panjang 15 cm Kg 0.040 Rp. 18,081.00 Rp. 723.24
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.060 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.600 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.060 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kunci 2 Slag Lbr 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.005 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.500 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.050 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kunci tanam KM Lbr 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kait Angin Jendela Lbr 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Handle Jendela Lbr 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Grendel Jendela Lbr 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.020 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.063 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0063 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plamur #NAME? 0.100 #NAME? #NAME?
Cat Dasar #NAME? 0.100 #NAME? #NAME?
Cat Penutup Exterior Setara Jotun #NAME? 0.260 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.020 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.063 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0063 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plamur #NAME? 0.100 #NAME? #NAME?
Cat Dasar #NAME? 0.100 #NAME? #NAME?
Cat Penutup Interior Setara Jotun #NAME? 0.260 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.028 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.042 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0042 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Cat Dasar #NAME? 0.120 #NAME? #NAME?
Cat Penutup Exterior Setara Jotun #NAME? 0.180 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.300 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.01 Err:502 Err:502
Mandor Err:502 Err:502 0.16 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kloset Duduk Keramik #NAME? 1.000 #NAME? #NAME?
Perlengkapan Ls 6% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.000 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.500 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.160 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kloset Jongkok Keramik #NAME? 1.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 6.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.010 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.200 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.060 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wastafel #NAME? 1.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 6.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.010 #NAME? #NAME?
Perlengkapan % 12% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.010 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Floor Drain Setara Toto #NAME? 1.000 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.200 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.011 Err:502 Err:502
Mandor Err:502 Err:502 0.016 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 123.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 114.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.184 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.120 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.033 #NAME? #NAME?
Besi Beton Polos #NAME? 4.850 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.010 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.040 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kran Air Dia. 1/2" - 3/4" #NAME? 1.000 #NAME? #NAME?
Seal Tape #NAME? 0.025 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.108 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.180 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.018 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.135 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.225 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.023 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.135 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.225 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.023 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1/2" Kualitas AWE (United) #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 3/4" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1 1/2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 2 1/2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 3" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 4" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?
Analisa : A. 4.6.1.13
Item : Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvesional, Kayu Klas II
Satuan : m3
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 4.000 Err:502 Err:502
Tukang Kayu Err:502 OH 12.000 Err:502 Err:502
Kepala Tukang Err:502 OH 1.2000 Err:502 Err:502
Mandor Err:502 OH 0.200 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) m3 1.100 #NAME? #NAME?
Besi Strip tebal 5 mm kg 15.000 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 5.600 #NAME? #NAME?
Analisa : A. 4.6.1.50
Item : Pemasangan 1 m2 Konstruksi Kuda-Kuda Baja Ringan
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 OH 0.200 Err:502 Err:502
Tukang Kayu Err:502 OH 0.450 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0100 Err:502 Err:502
Mandor Err:502 OH 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Rangka Baja Ringan C75 m3 1.200 #NAME? #NAME?
Baut Kap Ø 1/2 - 8 kg 38.000 #NAME? #NAME?
Dynabolt kg 1.600 #NAME? #NAME?
Reng Atap Baja Ringan m1 3.600 #NAME? #NAME?
Talang Seng Plat m2 0.124 #NAME? #NAME?
Analisa : A. 4.6.1.26a
Item : Pemasangan 1 m2 dinding lambrisering dari papan kayu Klas II
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.600 Err:502 Err:502
Tukang Kayu Err:502 OH 1.800 Err:502 Err:502
Kepala Tukang Err:502 OH 0.1800 Err:502 Err:502
Mandor Err:502 OH 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Papan Kayu Kelas II m3 0.007 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 0.100 #NAME? #NAME?
Paku skrup 10 cm kg 0.150 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.100 Err:502 Err:502
Tukang Kayu Err:502 OH 0.200 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0200 Err:502 Err:502
Mandor Err:502 OH 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Papan Kayu Kelas II m3 0.011 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 0.100 #NAME? #NAME?
Analisa : A. 4.5.2.39
Item : Pemasangan 1 m' Nok Atap Seng
Satuan : m'
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.150 Err:502 Err:502
Tukang Kayu Err:502 OH 0.070 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0070 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Seng Plat 3 x kk bjls 30 m3 0.300 #NAME? #NAME?
Paku Seng kg 0.040 #NAME? #NAME?
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.120 Err:502 Err:502
Tukang Kayu Err:502 OH 0.060 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0060 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Seng Plat 3 x kk bjls 30 Lbr 0.700 #NAME? #NAME?
Paku Seng kg 0.020 #NAME? #NAME?
Analisa : A. 4.5.2.32a
Item : Pemasangan 1 m2 Atap Zincalume (Spandek)
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.006 Err:502 Err:502
Tukang Kayu Err:502 OH 0.120 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0600 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Atap Apandek 0.30 mm m2 1.100 #NAME? #NAME?
Paku skrup + Mur bh 6.000 #NAME? #NAME?
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
c Penyiapan formulir
A Sub Total Penyiapan RKK 1,000,000.00
5 Personil K3 Konstruksi:
a Ahli K3 Konstruksi OB -
b Petugas K3 Konstruksi OB 1.00 2,500,000.00 2,500,000.00
E Sub Total Personil K3 2,500,000.00
SATUAN KUANTI HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN KETERANGAN
UKURAN TAS (Rp) (Rp)
I II III IV V VI VII
6 Fasilitas, sarana dan prasarana kesehatan:
a Peralatan P3K (Kotak P3K, Tandu,Obat Luka, Perban,dll) Ls 1.00 1,500,000.00 1,500,000.00
a Ahli K3 Konstruksi OJ - - -
H Sub Total Konsultansi dengan Ahli terkait -
Keselamatan Konstruksi
#NAME?
#NAME?
64.80
28.8 16.2
54 270
82.8
1.08
64.8 291.6
8.10
108