Anda di halaman 1dari 109

REKAPITULASI

ENGINEER ESTIMATE (EE)


KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA,
PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI
BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN
CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021

NO URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN DAN SITE DEVELOMENT #NAME?


#NAME?

B BANGUNAN KOLAM RENANG


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN FINISHING #NAME?
V PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 510,100,000.00
Err:502

C PEKERJAAN GARASI DAN RUMAH AJUDAN EX.RUMAH GENSE


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI #NAME?
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 9,282,944.00
Err:502

D PEKERJAAN GUEST HOUSE FAMILY


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI #NAME?
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 4,663,972.00
Err:502
NO URAIAN PEKERJAAN JUMLAH HARGA

E PEKERJAAN PAVILIUN PENDOPO


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI #NAME?
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 4,610,944.00
Err:502

F PEKERJAAN GEDUNG SERBAGUNA


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI #NAME?
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 6,687,944.00
Err:502

G PEKERJAAN BANGUNAN GAZEBO 2 UNIT


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP #NAME?
VII PEKERJAAN PENGECATAN #NAME?
Err:502

H PEKERJAAN RUMAH GENSET DAN GUDANG


I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 23,127,106.60
VII PEKERJAAN PENGECATAN #NAME?
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 9,282,944.00
Err:502

I PEKERJAAN TURAP
I PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
Err:502
NO URAIAN PEKERJAAN JUMLAH HARGA

J PEKERJAAN PERBAIKAN PAGAR


I PEKERJAAN STRUKTUR #NAME?
II PEKERJAAN DINDING DAN PLESTERAN #NAME?
III PEKERJAAN PENGECATAN #NAME?
IV PEKERJAAN LAIN - LAIN Rp 1,080,000,000.00
#NAME?

K PEKERJAAN BANGUNAN SAUNA DAN FITTNES


I PEKERJAAN GALIAN ,URUGAN DAN PONDASI Err:502
II PEKERJAAN PANCANG #NAME?
III PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 15,613,075.60
VII PEKERJAAN PENGECATAN #NAME?
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 9,376,296.00
IX PEKERJAAN LAIN - LAIN Rp 91,900,000.00
Err:502
JUMLAH #NAME?
PPN 10% #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?

Terbilang : #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

A PEKERJAAN PERSIAPAN DAN SITE DEVELOMENT


1 Pembuatan Jalan Mobilisasi Material 1.00 Ls - 110,000,000.00 110,000,000.00
2 Pembersihan Lokasi 1.00 Ls - 95,110,000.00 95,110,000.00
3 Perataan Lokasi Dengan Alat Berat 1.00 Ls - 95,200,000.00 95,200,000.00
4 Pembongkaran Bangunan Lama 1.00 Ls - 75,000,000.00 75,000,000.00
5 Administrasi dan Dokumentasi 1.00 Ls 25,000,000.00 25,000,000.00
6 Papan Nama Proyek 1.00 Ls 500,000.00 500,000.00
7 Direksikeet/Sewa 1.00 Ls 10,000,000.00 10,000,000.00
8 Mutual Uji Mutu Beton 1.00 Ls 12,000,000.00 12,000,000.00
9 Pengukuran dan Pemasangan Bowplank 232.40 m1 AHSP A.2.2.1.4 #NAME? #NAME?
10 SMK3 1.00 Ls 20,670,000.00 20,670,000.00
11 Penataan Kawasan Taman Area Dalam
* Pedestrian
1 Pek. Galian Tanah (Pondasi) 17.51 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Pek. Urugan Kembali 4.38 m3 AHSP A.2.3.1.9 Err:502 Err:502
3 Pek. Pasir Urug (Bawah Pondasi) 2.58 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Pek. Pondasi Bt. Kosong 5.16 m3 AHSP A.3.2.1.9 #NAME? #NAME?
5 Pek. Pondasi Bt. Kali 1 : 4 29.24 m3 AHSP A.3.2.1.2 #NAME? #NAME?
6 Pek. Plesteran 1 : 3 54.55 m2 AHSP A.4.4.2.3 #NAME? #NAME?
7 Pek. Acian 46.95 m2 AHSP A.4.4.2.27 #NAME? #NAME?
8 Pek. Lantai Kerja 3.20 m3 AHSP A.4.1.1.4 #NAME? #NAME?
9 Pek. Batu Alam Serit Hitam 15x30 28.38 m2 AHSP 4.4.3.57.a #NAME? #NAME?
10 Pek. Batu Alam Andesit Bintik Bakar 30x30 24.00 m2 AHSP 4.4.3.57.b #NAME? #NAME?
11 Pek. Dinding Batu Alam Cupang Merah 30x30 37.50 m2 AHSP 4.4.3.57.c #NAME? #NAME?
12 Pek. Dinding Batu Alam Andesit Bintik Bakar 30x60 18.75 m2 AHSP 4.4.3.57.e #NAME? #NAME?
13 Pek. Lantai Pedistrian Batu Alam Andesit Polos Bakar 4 39.45 m2 AHSP 4.4.3.57.d #NAME? #NAME?
14 Pek. Lis Plesteran 1 : 2 226.90 m' AHSP A.4.4.2.20 #NAME? #NAME?
15 Pek. Cat Mowilex Luar 34.83 m2 AHSP A.4.7.1.10 #NAME? #NAME?

* Pekerjaan Tanaman
1 Pek. Timbunan 66.64 m3 AHSP A.2.3.1.11.a #NAME? #NAME?
2 Rumput Gajah Mini 122.50 m2 45,000.00 5,512,500.00
3 Adam Hawa 300.00 Pbg 2,500.00 750,000.00
4 Kertas Belimbing tinggi 75-100 cm 9.00 Phn 400,000.00 3,600,000.00
5 Agave 15.00 Pbg 100,000.00 1,500,000.00
6 Sikas 50 - 70 Cm 5.00 Phn 5,000,000.00 25,000,000.00
7 Osmoxylon 150.00 Pbg 25,000.00 3,750,000.00
8 Sansiefera 200.00 Pbg 30,000.00 6,000,000.00
9 Nanas Merah 12.00 Pbg 100,000.00 1,200,000.00
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

A PEKERJAAN PERSIAPAN DAN SITE DEVELOMENT


10 Sambang Dara 120.00 Pbg 75,000.00 9,000,000.00
11 Asoka Daun Kecil 1,200.00 Pbg 10,000.00 12,000,000.00
12 Siklot Sedang 16.00 Pbg 150,000.00 2,400,000.00
13 Sansifera Tiger 25.00 Pbg 75,000.00 1,875,000.00
14 Sansifera Tanduk Rusa 25.00 Pbg 75,000.00 1,875,000.00
15 Hamparan Koral Putih 60.00 krg 125,000.00 7,500,000.00
16 Hamparan Pasir Putih 20.00 krg 125,000.00 2,500,000.00
17 Susun Batu Kali Sedang Ø 15 -20 4.30 M3 135,000.00 580,500.00
JUMLAH PEKERJAAN PERSIAPAN DAN SITE DEVELOMENT #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :
T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

B BANGUNAN KOLAM RENANG


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 336.45 m3 AHSP A.2.3.1.2 Err:502 Err:502
2 Galian Tanah Untuk Kolam Renang 173.15 m3 AHSP A.2.3.1.2 Err:502 Err:502
3 Urugan Pasir Bawah Pondasi 33.80 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Pasir Bawah Lantai dan Kolam 239.80 m3 AHSP A.2.3.1.11 #NAME? #NAME?
5 Urugan Tanah dan Pemadatan Tanah 678.80 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 211.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 54.40 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan pondasi batu gunung 161.20 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Beton K 300 Dinding Penahan 10.95 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembesian Dinding Penahan 1,829.85 kg AHSP A.4.1.1.17.a #NAME? #NAME?
3 Bekisting Dinding Penahan 169.00 m2 AHSP A.4.1.1.25 #NAME? #NAME?
4 Beton Lantai Kerja Bawah Kolam 5cm 26.60 m3 AHSP A.4.1.1.1 #NAME? #NAME?
5 Beton Sloof 15/20 10.65 m3 AHSP A.4.1.1.10 #NAME? #NAME?
6 Pembesian Sloof 15/20 1,802.65 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Bekisting Sloof 15/20 45.20 m2 AHSP A.4.1.1.21 #NAME? #NAME?
8 Beton K 300 Lantai Kolam Renang 40.10 m3 AHSP A.4.1.1.10 #NAME? #NAME?
9 Beton K 300 Dinding Kolam Renang 24.00 m3 AHSP A.4.1.1.10 #NAME? #NAME?
10 Pembesian Lantai Kolam Renang 6,327.25 kg AHSP A.4.1.1.17.a #NAME? #NAME?
11 Pembesian Dinding Kolam Renang 3,225.20 kg AHSP A.4.1.1.17.a #NAME? #NAME?
12 Bekisting Lantai dan Dinding Kolam Renang 245.30 m2 AHSP A.4.1.1.25 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

IV PEKERJAAN FINISHING
1 Water Proofing Kolam Renang 60.10 m2 AHSP A.4.7.1.120 #NAME? #NAME?
2 Pasangan Granit Tile 60 x 60 Unpolish Lantai 10.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
3 Pasangan Granit Tile 60 x 60 Unpolish Dinding 60.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
4 Pasangan Plint Granit Tile 10 x 60 40.00 m1 AHSP A.4.4.3.28 #NAME? #NAME?
5 Pasangan Granit Tile 60 x 60 Unpolish Pinggir 40.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
JUMLAH PEKERJAAN FINISHING #NAME?
V PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Instalasi Listrik Untuk Kolam Renang 14.00 titik 350,000.00 4,900,000.00
2 Pompa Pengurasan dan Pengisian Kolam Renang 1.00 unit 275,000,000.00 275,000,000.00
3 Filter Air Kolam renang 1.00 unit 225,000,000.00 225,000,000.00
4 Lampu Dalam Renang 10.00 titik 520,000.00 5,200,000.00

JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 510,100,000.00


RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

C PEKERJAAN GARASI DAN RUMAH AJUDAN EX.RUMAH GENSET


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 162.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi 18.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Urugan Pasir Bawah Lantai 16.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Tanah dan Pemadatan Tanah 28.10 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 84.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 9.40 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 27.50 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 7.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 185.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 3,276.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 7.70 m3 AHSP A.4.1.1.10 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 76.70 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 3,344.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton ringbalk 15/20 18.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
8 Pembuatan begesting Beton Ringbalk 95.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Beton Ringbalk besi 6 dan 12mm 3,379.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1Pc : 4Pp 286.40 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Pasang dinding bata 1Pc : 2Pp 62.50 m2 AHSP A.4.4.1.7 #NAME? #NAME?
3 Plesteran dinding bata 1Pc : 2Pp 125.00 m2 AHSP A.4.4.2.2 #NAME? #NAME?
4 Plesteran dinding bata 1Pc : 4Pp 572.80 m2 AHSP A.4.4.2.4 #NAME? #NAME?
5 Acian plesteran dinding dan beton 697.80 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pasangan Keramik Unpolished 60/60 45.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
2 Pasang Lantai keramik 40/40 5.50 m2 AHSP A.4.4.3.9 #NAME? #NAME?
3 Pasang lantai keramik 20/20 24.50 m2 AHSP A.4.4.3.54 #NAME? #NAME?
4 Pasang dinding keramik 20/40 24.40 m2 AHSP A.4.4.3.54.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND
1 Rangka atap Baja Ringan 228.80 m2 A. 4.6.1.50 #NAME? #NAME?
2 Pasang Atap 228.80 m2 AHSP A.4.5.2.41.a #NAME? #NAME?
3 Pasang listplank 80.50 m1 A. 4.6.1.21a #NAME? #NAME?
4 Pasang bubungan 26.40 m1 AHSP A.4.5.2.42.a #NAME? #NAME?
5 Pasang rangka plafond 106.50 m2 AHSP A.4.5.1.10 #NAME? #NAME?
6 Pasang Gypsum 106.50 m2 AHSP A.4.5.1.7 #NAME? #NAME?
7 Pasang list plafond gypsum 120.00 m1 AHSP A.4.5.1.11a #NAME? #NAME?
8 Pasang list plafond Kayu 75.00 m1 AHSP A.4.5.1.11 #NAME? #NAME?
9 Pasang talang jurai 17.20 m1 132,000.00 2,270,400.00
JUMLAH PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pasang kusen Pintu Aluminium 98.60 m1 AHSP A.4.2.1.11. #NAME? #NAME?
2 Pasang Pintu Aluminium 6.00 bh AHSP A.4.2.1.12. #NAME? #NAME?
3 Pasang kusen Jendela Aluminium 28.50 m1 AHSP A.4.2.1.11. #NAME? #NAME?
4 Pasang Jendela Aluminium 4.00 bh AHSP A.4.2.1.13. #NAME? #NAME?
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL
1 Pasang Kunci Tanam 4.00 bh AHSP A.4.6.2.1. #NAME? #NAME?
2 Pasang Kunci KM/WC 2.00 bh AHSP A.4.6.2.1. #NAME? #NAME?
3 Pasang kait angin jendela stenlis 4.00 bh AHSP A.4.6.2.9. #NAME? #NAME?
4 Pasang Grendel 4.00 bh AHSP A.4.6.2.10. #NAME? #NAME?
5 Pasang Handel Jendela 4.00 bh AHSP A.4.6.2.9. #NAME? #NAME?
JUMLAH PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 572.80 m2 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 206.50 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI
1 Pasang klosed duduk 2.00 unit AHSP A.5.5.1.1 #NAME? #NAME?
2 Pasang Wastafel 2.00 unit AHSP A.5.5.1.5 #NAME? #NAME?
3 Pasang Kichen Zink 2.00 unit 539,000.00 1,078,000.00
4 Pasang pipa 1/2" 44.00 m1 AHSP A.5.5.1.25 #NAME? #NAME?
5 Pasang pipa 2" 20.00 m1 AHSP A.5.5.1.29 #NAME? #NAME?
6 Pasang pipa 4" 18.00 m1 AHSP A.5.5.1.32 #NAME? #NAME?
7 Pasang Kran 4.00 bh AHSP A.5.5.1.19 #NAME? #NAME?
8 Pasang floordrain 2.00 bh AHSP A.5.5.1.4 #NAME? #NAME?
9 Pembuatan septictank 1.00 bh 5,500,000.00 5,500,000.00
JUMLAH PEKERJAAN SANITASI #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL


1 Pasang stop kontak 6.00 bh 72,324.00 433,944.00
2 Pasang saklar Ganda 2.00 bh 22,500.00 45,000.00
3 Pasang saklar tunggal 4.00 bh 21,000.00 84,000.00
4 Pasang lampu SL 14 watt 8.00 bh 215,000.00 1,720,000.00
5 Instalasi Listrik 20.00 titik 350,000.00 7,000,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 9,282,944.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

D PEKERJAAN GUEST HOUSE FAMILY


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 62.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi 8.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Urugan Pasir Bawah Lantai 45.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Tanah dan Pemadatan Tanah 28.10 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 84.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 9.40 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 27.50 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 6.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 85.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 1,276.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 6.70 m3 AHSP A.4.1.1.10 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 76.70 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 1,344.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton ringbalk 15/20 8.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
8 Pembuatan begesting Beton Ringbalk 95.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Beton Ringbalk besi 6 dan 12mm 1,379.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1Pc : 4Pp 186.40 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Pasang dinding bata 1Pc : 2Pp 62.50 m2 AHSP A.4.4.1.7 #NAME? #NAME?
3 Plesteran dinding bata 1Pc : 2Pp 125.00 m2 AHSP A.4.4.2.2 #NAME? #NAME?
4 Plesteran dinding bata 1Pc : 4Pp 372.80 m2 AHSP A.4.4.2.4 #NAME? #NAME?
5 Acian plesteran dinding dan beton 497.80 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pasangan Keramik Unpolished 60/60 14.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
2 Pasang Lantai keramik 40/40 51.50 m2 AHSP A.4.4.3.9 #NAME? #NAME?
3 Pasang lantai keramik 20/20 4.50 m2 AHSP A.4.4.3.54 #NAME? #NAME?
4 Pasang dinding keramik 20/40 14.40 m2 AHSP A.4.4.3.54.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND
1 Rangka atap Baja Ringan 110.80 m2 A. 4.6.1.50 #NAME? #NAME?
2 Pasang Atap 110.80 m2 AHSP A.4.5.2.41.a #NAME? #NAME?
3 Pasang listplank 40.50 m1 A. 4.6.1.21a #NAME? #NAME?
4 Pasang bubungan 26.40 m1 AHSP A.4.5.2.42.a #NAME? #NAME?
5 Pasang rangka plafond 106.50 m2 AHSP A.4.5.1.10 #NAME? #NAME?
6 Pasang Gypsum 106.50 m2 AHSP A.4.5.1.7 #NAME? #NAME?
7 Pasang list plafond gypsum 120.00 m1 AHSP A.4.5.1.11a #NAME? #NAME?
8 Pasang list plafond Kayu 75.00 m1 AHSP A.4.5.1.11 #NAME? #NAME?
9 Pasang talang jurai 7.20 m1 132,000.00 950,400.00
JUMLAH PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pasang kusen Pintu Aluminium 98.60 m1 AHSP A.4.2.1.11. #NAME? #NAME?
2 Pasang Pintu Aluminium 5.00 bh AHSP A.4.2.1.12. #NAME? #NAME?
3 Pasang kusen Jendela Aluminium 28.50 m1 AHSP A.4.2.1.11. #NAME? #NAME?
4 Pasang Jendela Aluminium 10.00 bh AHSP A.4.2.1.13. #NAME? #NAME?
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL
1 Pasang Kunci Tanam 4.00 bh AHSP A.4.6.2.1. #NAME? #NAME?
2 Pasang Kunci KM/WC 2.00 bh AHSP A.4.6.2.1. #NAME? #NAME?
3 Pasang kait angin jendela stenlis 4.00 bh AHSP A.4.6.2.9. #NAME? #NAME?
4 Pasang Grendel 4.00 bh AHSP A.4.6.2.10. #NAME? #NAME?
5 Pasang Handel Jendela 4.00 bh AHSP A.4.6.2.9. #NAME? #NAME?
JUMLAH PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 372.80 m2 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 106.50 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI
1 Pasang klosed duduk 1.00 unit #NAME? #NAME?
2 Pasang pipa 1/2" 24.00 m1 #NAME? #NAME?
3 Pasang pipa 2" 10.00 m1 #NAME? #NAME?
4 Pasang pipa 4" 8.00 m1 #NAME? #NAME?
5 Pasang Kran Kit 1.00 bh #NAME? #NAME?
6 Pasang floordrain 1.00 bh #NAME? #NAME?
7 Pembuatan septictank 1.00 bh 5,500,000.00 5,500,000.00
JUMLAH PEKERJAAN SANITASI #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL


1 Pasang stop kontak 3.00 bh 72,324.00 216,972.00
2 Pasang saklar Ganda 2.00 bh 22,500.00 45,000.00
3 Pasang saklar tunggal 2.00 bh 21,000.00 42,000.00
4 Pasang lampu SL 14 watt 4.00 bh 215,000.00 860,000.00
5 Instalasi Listrik 10.00 titik 350,000.00 3,500,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 4,663,972.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

E PEKERJAAN PAVILIUN PENDOPO


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 38.40 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi 7.20 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Urugan Pasir Bawah Lantai 3.60 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Tanah dan Pemadatan Tanah 18.10 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAH PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 164.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 19.40 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 47.50 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 7.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 85.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 2,266.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 6.70 m3 AHSP A.4.1.1.10 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 76.70 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 2,514.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton ringbalk 15/20 8.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
8 Pembuatan begesting Beton Ringbalk 95.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Beton Ringbalk besi 6 dan 12mm 2,569.30 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1Pc : 4Pp 94.00 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Pasang dinding bata 1Pc : 2Pp 10.80 m2 AHSP A.4.4.1.7 #NAME? #NAME?
3 Plesteran dinding bata 1Pc : 2Pp 10.80 m2 AHSP A.4.4.2.2 #NAME? #NAME?
4 Plesteran dinding bata 1Pc : 4Pp 94.00 m2 AHSP A.4.4.2.4 #NAME? #NAME?
5 Acian plesteran dinding dan beton 104.80 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pasangan Keramik Unpolished 60/60 72.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
2 Pasang dinding keramik 20/60 10.20 m2 AHSP A.4.4.3.54.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND
1 Rangka atap Baja Ringan 228.00 m2 A. 4.6.1.50 #NAME? #NAME?
2 Pasang Atap 228.00 m2 AHSP A.4.5.2.41.a #NAME? #NAME?
3 Pasang listplank 72.00 m1 A. 4.6.1.21a #NAME? #NAME?
4 Pasang bubungan 20.10 m1 AHSP A.4.5.2.42.a #NAME? #NAME?
5 Pasang rangka plafond 120.00 m2 AHSP A.4.5.1.10 #NAME? #NAME?
6 Pasang Gypsum 120.00 m2 AHSP A.4.5.1.7 #NAME? #NAME?
7 Pasang list plafond gypsum 36.00 m1 AHSP A.4.5.1.11a #NAME? #NAME?
8 Pasang list plafond Kayu 104.00 m1 AHSP A.4.5.1.11 #NAME? #NAME?
9 Pasang talang jurai 7.20 m1 132,000.00 950,400.00
I61JUMLAH PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pasang kusen Pintu Aluminium 98.60 m1 AHSP A.4.2.1.11. #NAME? #NAME?
2 Pasang Pintu Aluminium 5.00 bh AHSP A.4.2.1.12. #NAME? #NAME?
3 Pasang kusen Jendela Aluminium 28.50 m1 AHSP A.4.2.1.11. #NAME? #NAME?
4 Pasang Jendela Aluminium 10.00 bh AHSP A.4.2.1.13. #NAME? #NAME?
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL
1 Pasang Kunci Tanam 2.00 bh AHSP A.4.6.2.1. #NAME? #NAME?
2 Pasang Kaca 5mm 46.00 m2 AHSP A.4.6.2.9. 245,000.00 11,270,000.00
JUMLAH PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 48.00 m2 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 114.00 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI
1 Pasang klosed duduk - unit #NAME? #NAME?
2 Pasang pipa 1/2" - m1 #NAME? #NAME?
3 Pasang pipa 2" - m1 #NAME? #NAME?
4 Pasang pipa 4" - m1 #NAME? #NAME?
5 Pasang Kran Kit - bh #NAME? #NAME?
6 Pasang floordrain - bh #NAME? #NAME?
7 Pembuatan septictank - bh 5,500,000.00 -
JUMLAH PEKERJAAN SANITASI #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL


1 Pasang stop kontak 6.00 bh 72,324.00 433,944.00
2 Pasang saklar Ganda 2.00 bh 22,500.00 45,000.00
3 Pasang saklar tunggal 2.00 bh 21,000.00 42,000.00
4 Pasang lampu SL 14 watt 6.00 bh 215,000.00 1,290,000.00
5 Instalasi Listrik 8.00 titik 350,000.00 2,800,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 4,610,944.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

F PEKERJAAN GEDUNG SERBAGUNA


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 50.40 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi 13.20 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Urugan Pasir Bawah Lantai 6.60 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Tanah dan Pemadatan Tanah 28.10 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAH PEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 194.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 29.40 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 52.50 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 9.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 98.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 3,836.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 12.70 m3 AHSP A.4.1.1.10 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 76.70 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 3,822.90 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton ringbalk 15/20 18.90 m3 AHSP A.4.1.1.10 #NAME? #NAME?
8 Pembuatan begesting Beton Ringbalk 102.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Beton Ringbalk besi 6 dan 12mm 3,872.80 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1Pc : 4Pp 94.00 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Pasang dinding bata 1Pc : 2Pp 10.80 m2 AHSP A.4.4.1.7 #NAME? #NAME?
3 Plesteran dinding bata 1Pc : 2Pp 10.80 m2 AHSP A.4.4.2.2 #NAME? #NAME?
4 Plesteran dinding bata 1Pc : 4Pp 94.00 m2 AHSP A.4.4.2.4 #NAME? #NAME?
5 Acian plesteran dinding dan beton 104.80 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pasangan Keramik Unpolished 60/60 72.00 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
2 Pasang dinding keramik 20/60 10.20 m2 AHSP A.4.4.3.54.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP DAN PLAFOND
1 Rangka atap Baja Ringan 292.00 m2 A. 4.6.1.50 #NAME? #NAME?
2 Pasang Atap 292.00 m2 AHSP A.4.5.2.41.a #NAME? #NAME?
3 Pasang listplank 80.00 m1 A. 4.6.1.21a #NAME? #NAME?
4 Pasang bubungan 24.10 m1 AHSP A.4.5.2.42.a #NAME? #NAME?
5 Pasang rangka plafond 200.00 m2 AHSP A.4.5.1.10 #NAME? #NAME?
6 Pasang Gypsum 200.00 m2 AHSP A.4.5.1.7 #NAME? #NAME?
7 Pasang list plafond gypsum 46.00 m1 AHSP A.4.5.1.11a #NAME? #NAME?
8 Pasang list plafond Kayu 128.00 m1 AHSP A.4.5.1.11 #NAME? #NAME?
9 Pasang talang jurai 10.20 m1 132,000.00 1,346,400.00
I61JUMLAH PEKERJAAN ATAP DAN PLAFOND #NAME?
VII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pasang kusen Pintu Aluminium 82.80 m1 AHSP A.4.2.1.11. #NAME? #NAME?
2 Ornamen Ukiran 64.80 m2 1,950,000.00 126,360,000.00
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA #NAME?
VIII PEKERJAAN KUNCI, ENGSEL & GRENDEL
1 Pasang Kunci Tanam - bh AHSP A.4.6.2.1. #NAME? #NAME?
2 Pasang Kaca 5mm - m2 AHSP A.4.6.2.9. 245,000.00 -
JUMLAH PEKERJAAN KUNCI, ENGSEL & GRENDEL #NAME?
IX PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 61.64 m2 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 187.20 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
X PEKERJAAN SANITASI
1 Pasang klosed duduk 4.00 unit #NAME? #NAME?
2 Pasang pipa 1/2" 60.00 m1 #NAME? #NAME?
3 Pasang pipa 2" 25.00 m1 #NAME? #NAME?
4 Pasang pipa 4" 32.00 m1 #NAME? #NAME?
5 Pasang Kran Kit 4.00 bh #NAME? #NAME?
6 Pasang floordrain 4.00 bh #NAME? #NAME?
7 Pembuatan septictank 1.00 bh 5,500,000.00 5,500,000.00
JUMLAH PEKERJAAN SANITASI #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL


1 Pasang stop kontak 6.00 bh 72,324.00 433,944.00
2 Pasang saklar Ganda 4.00 bh 22,500.00 90,000.00
3 Pasang saklar tunggal 4.00 bh 21,000.00 84,000.00
4 Pasang lampu SL 14 watt 12.00 bh 215,000.00 2,580,000.00
5 Instalasi Listrik 10.00 titik 350,000.00 3,500,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 6,687,944.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

G PEKERJAAN BANGUNAN GAZEBO 2 UNIT


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 6.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi 0.60 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Urugan Pasir Bawah Lantai 0.90 m3 AHSP A.2.3.1.11 #NAME? #NAME?
4 Urugan Tanah dan Pemadatan Tanah 1.80 m3 AHSP A.2.3.1.10 Err:502 Err:502
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 12.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 0.60 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 6.48 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 0.32 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 14.50 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 1,342.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 18.00 m3 AHSP A.4.1.1.10 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 25.00 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 1,321.50 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton ringbalk 15/20 0.32 m3 AHSP A.4.1.1.10 #NAME? #NAME?
8 Pembuatan begesting Beton Ringbalk 14.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Beton Ringbalk besi 6 dan 12mm 5.00 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Acian plesteran dinding dan beton 14.40 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
V PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pasangan Keramik Unpolished 60/60 9.61 m2 AHSP A.4.4.3.13.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN ATAP
1 Rangka atap kayu 8.40 m2 #NAME? #NAME?
I61JUMLAH PEKERJAAN ATAP #NAME?
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 14.40 m2 #NAME? #NAME?
2 Pengecatan Kayu 8.00 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

H PEKERJAAN RUMAH GENSET DAN GUDANG


I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi 124.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Lantai 16.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 84.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Aanstamping Batu Gunung 18.60 m3 AHSP A.3.2.1.9 #NAME? #NAME?
3 Pasangan Pondasi Batu Gunung 54.56 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 3.74 m3 AHSP A.4.1.1.7 #NAME? #NAME?
2 Pembuatan begesting sloof beton 224.80 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 2,274.37 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 0.60 m3 AHSP A.4.1.1.7 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 18.20 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 180.52 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor beton Kolom Utama 30/30 8.10 m3 AHSP A.4.1.1.7 #NAME? #NAME?
8 Pembuatan begesting kolom beton 30/30 216.00 m2 AHSP A.4.1.1.22 #NAME? #NAME?
9 Pembesian kolom besi 6 dan 12mm 1,561.68 kg AHSP A.4.1.1.17 #NAME? #NAME?
10 Pembuatan begesting Beton Ringbalk 108.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
11 Pembesian Beton Ringbalk besi 6 dan 12mm 1,561.68 kg AHSP A.4.1.1.17 #NAME? #NAME?
12 Cor beton balok 20/30 dan 15/20 3.60 m3 AHSP A.4.1.1.7 #NAME? #NAME?
13 Pembuatan begesting balok beton 51.00 m2 AHSP A.4.1.1.23 #NAME? #NAME?
14 Pembesian balok beton besi 10mm 835.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
15 Cor Plat Lantai tebal 10 cm 10.33 m3 AHSP A.4.1.1.7 #NAME? #NAME?
16 Pembuatan begesting lantai beton 6.86 m2 AHSP A.4.1.1.24 #NAME? #NAME?
17 Pembesian plat lantai beton 730.44 kg AHSP A.4.1.1.17 #NAME? #NAME?
18 Cor atap beton 22.20 m3 AHSP A.4.1.1.7 #NAME? #NAME?
19 Pembuatan begesting atap beton 185.60 m2 AHSP A.4.1.1.24 #NAME? #NAME?
20 Pembesian atap beton besi 10 dan 12mm 2,761.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
21 Cor Rabat beton keliling 4.75 m3 AHSP A.4.1.1.7 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1:2 120.00 m2 AHSP A.4.4.1.7 #NAME? #NAME?
2 Pasang dinding bata 1:4 341.02 m2 AHSP A.4.4.1.9 #NAME? #NAME?
3 Plesteran dinding bata 682.04 m2 AHSP A.4.4.2.4 #NAME? #NAME?
4 Acian plesteran dinding 682.04 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Pasang Lantai keramik 40/40 77.25 m2 AHSP A.4.4.3.9 #NAME? #NAME?
2 Urugan Pasir Bawah Lantai 7.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu P1 1.00 unit AHSP A.4.2.1.11. 2,705,051.16 2,705,051.16
2 Pintu P2 3.00 unit AHSP A.4.2.1.12. 5,109,541.08 15,328,623.24
3 Ventilasi V 1 4.00 unit AHSP A.4.2.1.11. 998,358.05 3,993,432.20
4 Exahause fan 2.00 unit AHSP A.4.2.1.13. 550,000.00 1,100,000.00
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA 23,127,106.60
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 372.80 m2 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 106.50 m2 #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Pasang stop kontak 6.00 bh 72,324.00 433,944.00
2 Pasang saklar Ganda 2.00 bh 22,500.00 45,000.00
3 Pasang saklar tunggal 4.00 bh 21,000.00 84,000.00
4 Pasang lampu SL 14 watt 8.00 bh 215,000.00 1,720,000.00
5 Instalasi Listrik 20.00 titik 350,000.00 7,000,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 9,282,944.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

I PEKERJAAN TURAP
I PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah Untuk Pondasi Turap 228.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan Pasir Bawah Pondasi Turap 57.00 m3 AHSP A.2.3.1.11 #NAME? #NAME?
JUMLAHPEKERJAAN GALIAN DAN URUGAN Err:502
II PEKERJAAN PONDASI DAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 450.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
2 Pasangan Pondasi Batu Gunung 666.10 m3 AHSP A.3.2.1.2 #NAME? #NAME?
JUMLAH PEKERJAAN PONDASI DAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 17.10 m3 AHSP A.4.1.1.10 #NAME? #NAME?
2 Pembuatan begesting sloof beton 228.00 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 3,653.70 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

J PEKERJAAN PERBAIKAN PAGAR


I PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 5.46 m3 AHSP A.4.1.1.5 #NAME? #NAME?
2 Pembuatan begesting sloof beton 72.60 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 650.38 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor Kolom Beton 15/20 4.38 m3 AHSP A.4.1.1.5 #NAME? #NAME?
5 Pembuatan Begesting Kolom Beton 58.40 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian Kolom Beton besi 6 dan 12mm 647.72 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Cor Beton Ring balk 13/13 47.19 m2 AHSP A.4.1.1.5 #NAME? #NAME?
8 Pembuatan Begesting Ring Balk 47.19 m2 AHSP A.4.1.1.23 #NAME? #NAME?
9 Pembesian Ring Balk 13/13 820.60 kg AHSP A.4.1.1.17 #NAME? #NAME?
10 Pagar besi Stainless 220.19 m2 850,000.00 187,161,500.00
JUMLAHPEKERJAAN STRUKTUR #NAME?
II PEKERJAAN DINDING DAN PLESTERAN
1 Plesteran Dinding 726.00 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Acian Dinding 726.00 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
III PEKERJAAN PENGECATAN
Pengecatan dinding tembok luar / Cat Exterior 472.80 m2 AHSP A.4.7.1.10 #NAME? #NAME?
Ornamen Pagar Stainless 80.00 unit 350,000.00 28,000,000.00
Relif dinding tipe bulat 30 cm 80.00 unit 225,000.00 18,000,000.00
JUMLAH PEKERJAAN PENGECATAN #NAME?
IV PEKERJAAN LAIN - LAIN
1 Taman Sekitar Pagar 1.00 Ls 570,000,000.00 570,000,000.00
2 Pedestrian Lingkungan 1.00 Ls 510,000,000.00 510,000,000.00
JUMLAH PEKERJAAN LAIN - LAIN 1,080,000,000.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA, PEMBERIAN IZIN


MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG

PEKERJAAN : PENYUSUNAN DED BANGUNAN KAWASAN RUMAH JABATAN WALIKOTA DAN TAMAN CERDAS (APBD-P)
JL RUHUI RAHAYU KOTA SAMARINDA
LOKASI :

T.A : 2021

KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

K PEKERJAAN BANGUNAN SAUNA DAN FITTNES


I PEKERJAAN GALIAN ,URUGAN DAN PONDASI
1 Galian Tanah Pondasi Batu Gunung 54.00 m3 AHSP A.2.3.1.1 Err:502 Err:502
2 Urugan pasir Alas Pondasi Menerus 3.76 m3 AHSP A.2.3.1.11 #NAME? #NAME?
3 Pas. Aanstamping tebal 10 cm 7.52 m3 AHSP A.3.2.1.9 #NAME? #NAME?
4 Pas. Pondasi Batu Gunung 1pc : 4ps 41.35 m3 AHSP A.3.2.1.2 #NAME? #NAME?
5 Urugan Tanah Kembali 15.04 m3 AHSP A.2.3.1.11.a #NAME? #NAME?
JUMLAHPEKERJAAN GALIAN ,URUGAN DAN PONDASI Err:502
II PEKERJAAN PANCANG
1 Pancang Ulin 10 x 10 x 2m 82.00 titik AHSP A.4.2.1.3. b #NAME? #NAME?
JUMLAH PEKERJAAN PANCANG #NAME?
III PEKERJAAN STRUKTUR
1 Cor beton sloof 15/20 5.64 m3 AHSP A.4.1.1.7 #NAME? #NAME?
2 Pembuatan begesting sloof beton 37.59 m2 AHSP A.4.1.1.21 #NAME? #NAME?
3 Pembesian sloof beton besi 6 dan 12mm 591.74 kg AHSP A.4.1.1.17 #NAME? #NAME?
4 Cor beton kolom praktis 13/13 0.46 m3 AHSP A.4.1.1.7 #NAME? #NAME?
5 Pembuatan begesting kolom beton praktis 4.68 m2 AHSP A.4.1.1.22 #NAME? #NAME?
6 Pembesian pondasi kolom besi 6 dan 12mm 161.63 kg AHSP A.4.1.1.17 #NAME? #NAME?
7 Pembuatan begesting Beton Ringbalk 19.05 m2 AHSP A.4.1.1.23 #NAME? #NAME?
8 Pembesian Beton Ringbalk besi 6 dan 12mm 944.00 kg AHSP A.4.1.1.17 #NAME? #NAME?
9 Cor beton balok 20/30 dan 15/20 3.55 m3 AHSP A.4.1.1.7 #NAME? #NAME?
10 Cor Plat Lantai tebal 10 cm 13.95 m3 AHSP A.4.1.1.7 #NAME? #NAME?
11 Pembuatan begesting lantai beton 116.22 m2 AHSP A.4.1.1.24 #NAME? #NAME?
12 Pembesian plat lantai beton 2,866.11 kg AHSP A.4.1.1.17 #NAME? #NAME?
JUMLAH PEKERJAAN STRUKTUR #NAME?
IV PEKERJAAN DINDING DAN PLESTERAN
1 Pasang dinding bata 1:4 180.83 m2 AHSP A.4.4.1.9 #NAME? #NAME?
2 Plesteran dinding bata 361.66 m2 AHSP A.4.4.2.4 #NAME? #NAME?
3 Acian plesteran dinding 361.66 m2 AHSP A.4.4.2.27 #NAME? #NAME?
JUMLAH PEKERJAAN DINDING DAN PLESTERAN #NAME?
KODE
NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA
ANALISA

V PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Urugan pasir Alas lantai T = 10 cm 13.85 m3 AHSP A.2.3.1.11 #NAME? #NAME?
2 Beton Cor Alas lantai T = 8 cm 11.08 m3 AHSP A.4.1.1.7 #NAME? #NAME?
3 Pas. Lantai keramik 40 x 40 cm 134.75 m2 AHSP A.4.4.3.9 #NAME? #NAME?
4 Pas. keramik 20 x 20 cm (Toilet) 3.75 m2 AHSP A.4.4.3.54 #NAME? #NAME?
5 Pas. keramik 20 x 40 cm (Dinding KM/WC) 14.15 m2 AHSP A.4.4.3.54.a #NAME? #NAME?
JUMLAH PEKERJAAN LANTAI DAN DINDING KERAMIK #NAME?
VI PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu P1 2.00 unit AHSP A.4.2.1.11. 2,705,051.16 5,410,102.32
2 Pintu P2 1.00 unit AHSP A.4.2.1.12. 5,109,541.08 5,109,541.08
3 Ventilasi V 1 4.00 unit AHSP A.4.2.1.11. 998,358.05 3,993,432.20
4 Exahause fan 2.00 unit AHSP A.4.2.1.13. 550,000.00 1,100,000.00
JUMLAH PEKERJAAN KUSEN, PINTU DAN JENDELA 15,613,075.60
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok luar / Cat Exterior 361.66 m2 AHSP A.4.7.1.10 #NAME? #NAME?
2 Pengecatan Plafond / Cat Interior 108.33 m2 AHSP A.4.7.1.10.a #NAME? #NAME?
JUMLAH PEKERJAAN PENGECATAN #NAME?
VIII PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Pasang stop kontak 4.00 bh 72,324.00 289,296.00
2 Pasang saklar Ganda 2.00 bh 22,500.00 45,000.00
3 Pasang saklar tunggal 2.00 bh 21,000.00 42,000.00
4 Lampu HE 18 watt + Accessories 8.00 bh 250,000.00 2,000,000.00
5 Instalasi Listrik 20.00 titik 350,000.00 7,000,000.00
JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 9,376,296.00
IX PEKERJAAN LAIN - LAIN
1 Peralatan Pemanas Sauna 1.00 Ls 35,700,000.00 35,700,000.00
2 Interior Ruang Sauna 1.00 Ls 56,200,000.00 56,200,000.00
JUMLAH PEKERJAAN LAIN - LAIN 91,900,000.00
ANALISA HARGA SATUAN PEKERJAAN

AHSP A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

Analisa : AHSP A.2.2.1.2


Item : Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (K3)
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.020 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Dolken Ø 8-10/400 cm #NAME? 1.250 #NAME? #NAME?
Semen @ 40 Kg #NAME? 2.500 #NAME? #NAME?
Seng BJLS 0.20 #NAME? 1.200 #NAME? #NAME?
Pasir Beton #NAME? 0.005 #NAME? #NAME?
Koral Beton M3 0.009 #NAME? #NAME?
Kayu 5/7 M3 0.072 Rp. 3,430,000.00 Rp. 246,960.00
Paku Biasa 5 cm - 10 cm #NAME? 0.060 #NAME? #NAME?
Cat Menie #NAME? 0.450 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.2.2.1.4


Item : Pengukuran dan Pemasangan Bouwplank
Satuan : m1

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu 5/7 M3 0.012 Rp. 4,410,000.00 Rp. 52,920.00
Paku Kayu #NAME? 0.020 #NAME? #NAME?
Papan Kayu Kelas III #NAME? 0.007 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.2.2.1.9
Item : Pembersihan Lapangan dan Perataan
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.2.1.10


Item : Pembuatan Steger/Perancah Dari Bambu (K3)
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.000 Err:502 Err:502
Tukang Kayu Err:502 Err:502 2.000 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.200 Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bambu #NAME? 1.250 #NAME? #NAME?
Ijuk #NAME? 0.186 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.2.2.1.13
Item : Pembongkaran Beton Bertulang
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 13.334 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.666 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.2.1.14


Item : Pembongkaran Dinding Tembok Bata
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 6.667 Err:502 Err:502
Tukang Kayu Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.333 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
AHSP A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

Analisa : AHSP A.2.3.1.1


Item : Menggali Tanah Biasa Sedalam 1 m
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.750 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.025 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.3.1.2


Item : Menggali Tanah Biasa Sedalam 2 m
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
Analisa : AHSP A.2.3.1.3
Item : Menggali Tanah Biasa Sedalam 3 m
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.050 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.067 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.3.1.7


Item : Pengerjaan Stripping Tanah Tebing Setinggi 1 m
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
Analisa : AHSP A.2.3.1.8
Item : (K3) Pembuangan Tanah Sejauh 30 meter
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.330 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.3.1.9


Item : Pengurugan Kembali Galian Tanah
Satuan : m3

Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali Koefisien Pekerjaan Galian
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.500 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
Analisa : AHSP A.2.3.1.10
Item : (K3) Pemadatan Tanah ( Per 20 cm )
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.500 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.2.3.1.11


Item : Pengurukan Dengan Pasir Urug
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pasir Urug #NAME? 1.200 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.2.3.1.11.a
Item : Pengurukan Dengan Tanah Urug
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Tanah Timbun #NAME? 1.200 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.2.3.1.13


Item : Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.150 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Ijuk #NAME? 6.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.2.3.1.14
Item : Pengurukan Sirtu Padat
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Err:502 Err:502 - Err:502 Err:502
Kepala Tukang Err:502 Err:502 - Err:502 Err:502
Mandor Err:502 Err:502 0.025 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pasir Batu (Sirtu) #NAME? 1.200 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

Analisa : AHSP A.3.2.1.2


Item : Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.500 Err:502 Err:502
Tukang Err:502 Err:502 0.750 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.075 Err:502 Err:502
Mandor Err:502 Err:502 0.075 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 1.200 #NAME? #NAME?
Semen @ 40 Kg #NAME? 163.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.520 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.3.2.1.9


Item : Pemasangan Batu Kosong ( Aanstamping )
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.780 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.390 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.039 Err:502 Err:502
Mandor Err:502 Err:502 0.039 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 1.200 #NAME? #NAME?
Pasir Urug #NAME? 0.432 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.3.2.1.10
Item : Pemasangan Pondasi Siklop, 60% Beton Campuran 1 SP : 2 PB : 3 Kr dan 40% Batu Belah
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.400 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.085 Err:502 Err:502
Mandor Err:502 Err:502 0.170 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 0.480 #NAME? #NAME?
Semen @ 40 Kg #NAME? 194.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.312 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.468 #NAME? #NAME?
Besi Beton Polos #NAME? 126.000 #NAME? #NAME?
Kawat Beton #NAME? 1.800 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.3.2.1.11


Item : Pemasangan Pondasi Sumuran, Diameter 100 cm
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.400 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.800 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.080 Err:502 Err:502
Mandor Err:502 Err:502 0.119 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Kali / Batu Belah (Sungai / Gunung) #NAME? 0.450 #NAME? #NAME?
Semen @ 40 Kg #NAME? 194.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.312 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.468 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.2.1.3. b
Item : Pengerjaan 1 titik pancang ulin 10/10 dan kalang ulin
Satuan : titik
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 Err:502 0.245 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.256 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.026 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas I (Seumantok/Ulin/dll) #NAME? 0.021 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.1.1. HARGA SATUAN PEKERJAAN BETON

Analisa : AHSP A.4.1.1.1


Item : Membuat Beton Mutu f'c = 7.4 MPa (K-100), Slump (12 ± 2 ) cm, w/c = 0.87
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 247.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 869.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 999.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.2
Item : Membuat Beton Mutu f'c = 9.8 MPa (K-125), Slump (12 ± 2 ) cm, w/c = 0.78
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 276.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 828.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,012.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.3


Item : Membuat Beton Mutu f'c = 12.2 MPa (K-150), Slump (12 ± 2 ) cm, w/c = 0.72
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 299.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 799.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,017.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.4
Item : Membuat Lantai Kerja Beton Mutu f'c = 7.4 MPa (K-100), Slump (3 - 6 ) cm, w/c = 0.87
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.200 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.060 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 230.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 893.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,027.000 #NAME? #NAME?
Air #NAME? 200.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.5


Item : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 326.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 760.000 #NAME? #NAME?
Kerikil (1350 kg/m3) Kg 1,029.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.6
Item : Membuat Beton Mutu f'c = 16.9 MPa (K-200), Slump (12 ± 2 ) cm, w/c = 0.61
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 352.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 731.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,031.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.7


Item : Membuat Beton Mutu f'c = 19.3 MPa (K-225), Slump (12 ± 2 ) cm, w/c = 0.58
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 371.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 698.000 #NAME? #NAME?
Batu pecah 2-3 cm #NAME? 1,047.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.8
Item : Membuat Beton Mutu f'c = 21.7 MPa (K-250), Slump (12 ± 2 ) cm, w/c = 0.56
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 384.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 692.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,039.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.9


Item : Membuat Beton Mutu f'c = 24.0 MPa (K-275), Slump (12 ± 2 ) cm, w/c = 0.53
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 406.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 684.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,026.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.10
Item : Membuat Beton Mutu f'c = 26.4 MPa (K-300), Slump (12 ± 2 ) cm, w/c = 0.52
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.650 Err:502 Err:502
Tukang Err:502 Err:502 0.275 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.028 Err:502 Err:502
Mandor Err:502 Err:502 0.083 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 413.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 681.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,021.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.11


Item : Membuat Beton Mutu f'c = 28.8 MPa (K-325), Slump (12 ± 2 ) cm, w/c = 0.49
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 439.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 670.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,006.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.12
Item : Membuat Beton Mutu f'c = 31.2 MPa (K-350), Slump (12 ± 2 ) cm, w/c = 0.48
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 448.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) Kg 667.000 #NAME? #NAME?
Batu pecah 2-3 cm Kg 1,000.000 #NAME? #NAME?
Air #NAME? 215.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.13


Item : Membuat Beton Kedap Air Dengan Strorox - 100
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 2.100 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.105 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 400.000 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.480 #NAME? #NAME?
Batu pecah 2-3 cm (1350 Kg/m3) #NAME? 0.800 #NAME? #NAME?
Storox - 100 #NAME? 1.200 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.17
Item : Pembesian 10 Kg Dengan Besi Beton Polos
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.070 Err:502 Err:502
Tukang Err:502 Err:502 0.070 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Polos #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.150 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.17.a


Item : Pembesian 10 Kg Dengan Besi Beton Ulir
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.070 Err:502 Err:502
Tukang Err:502 Err:502 0.070 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Ulir #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.150 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.18.
Item : Pemasangan 10 Kg Kabel Presstressed Polos/Strands
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Polos #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.18.a


Item : Pemasangan 10 Kg Kabel Presstressed Ulir/Strands
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Beton Ulir #NAME? 10.500 #NAME? #NAME?
Kawat Beton #NAME? 0.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.19
Item : Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 5 mm
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.025 Err:502 Err:502
Tukang Err:502 Err:502 0.025 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.001 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wiremesh (Ulir) Dia. 5.0 #NAME? 10.200 #NAME? #NAME?
Kawat Beton #NAME? 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.19.a


Item : Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 6 mm
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.025 Err:502 Err:502
Tukang Err:502 Err:502 0.025 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.001 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wiremesh (Ulir) Dia. 6.0 #NAME? 10.200 #NAME? #NAME?
Kawat Beton #NAME? 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.20
Item : Pemasangan Bekesting Untuk Pondasi
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.520 Err:502 Err:502
Tukang Err:502 Err:502 0.260 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.026 Err:502 Err:502
Mandor Err:502 Err:502 0.026 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.300 #NAME? #NAME?
Minyak Bekesting #NAME? 0.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.21


Item : Pemasangan Bekesting Untuk Sloof
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.520 Err:502 Err:502
Tukang Err:502 Err:502 0.260 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.026 Err:502 Err:502
Mandor Err:502 Err:502 0.026 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.045 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.300 #NAME? #NAME?
Minyak Bekesting #NAME? 0.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.22
Item : Pemasangan Bekesting Untuk Kolom
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.23


Item : Pemasangan Bekesting Untuk Balok
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.018 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.24
Item : Pemasangan Bekesting Untuk Lantai
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.040 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 6.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?

Analisa : AHSP A.4.1.1.25


Item : Pemasangan Bekesting Untuk Dinding
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.030 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.200 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.020 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 3.000 #NAME? #NAME?
Penjaga Jarak Bekesting (Spacer) #NAME? 4.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?
Analisa : AHSP A.4.1.1.26
Item : Pemasangan Bekesting Untuk Tangga
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.660 Err:502 Err:502
Tukang Err:502 Err:502 0.330 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.033 Err:502 Err:502
Mandor Err:502 Err:502 0.033 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas III (Borneo/dll) #NAME? 0.030 #NAME? #NAME?
Paku Biasa 5 cm - 10 cm #NAME? 0.400 #NAME? #NAME?
Minyak Bekesting #NAME? 0.150 #NAME? #NAME?
Kayu Kelas II (Kamper/Kruing/dll) #NAME? 0.015 #NAME? #NAME?
Multipleks 9 mm #NAME? 0.350 #NAME? #NAME?
Kayu Dolken Ø 8-10/400 cm #NAME? 2.000 #NAME? #NAME?
Jumlah Harga Bahan (B) #NAME?
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Untuk 2x Pemakaian #NAME?
H Dibulatkan #NAME?
AHSP A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

Analisa : AHSP A.4.2.1.1


Item : Pemasangan Besi profil
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.060 Err:502 Err:502
Tukang Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Profil #NAME? 1.150 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.2.1.20


Item : Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Err:502 Err:502 0.250 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 3.500 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.2.1.21
Item : Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk Plafond
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.350 Err:502 Err:502
Tukang Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.018 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 4.000 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.2.1.22


Item : (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C75
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.734 Err:502 Err:502
Tukang Err:502 Err:502 0.734 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.073 Err:502 Err:502
Mandor Err:502 Err:502 0.037 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Baja Ringan Canai Dingin C75 kg 3.065 Rp. 11,760.00 Rp. 36,044.40

Jumlah Harga Bahan (B) Rp. 36,044.40


C PERALATAN
Peralatan % 10.000 Rp. 36,044.40 Rp. 3,604.44

Jumlah Harga Alat (C) Rp. 3,604.44


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
Analisa : AHSP A.4.2.1.22.a
Item : (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C125
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.052 Err:502 Err:502
Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Operator Err:502 Err:502 0.010 Err:502 Err:502
Pembantu Operator Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Rangka Baja Ringan m' 1.030 Rp. 119,560.00 Rp. 123,146.80
Alumunium Foil DS m2 1.000 Rp. 15,680.00 Rp. 15,680.00

Jumlah Harga Bahan (B) Rp. 138,826.80


C PERALATAN
Peralatan % 10.000 Rp. 123,146.80 Rp. 12,314.68

Jumlah Harga Alat (C) Rp. 12,314.68


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502

Analisa : AHSP A.4.2.1.23


Item : (K3) Pemasangan atap jurai rangka atap baja canai dingin Profil C75
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.7604 Err:502 Err:502
Tukang Err:502 Err:502 0.7604 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.076 Err:502 Err:502
Mandor Err:502 Err:502 0.038 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Baja Ringan Canai Dingin C75 kg 4.050 Rp. 11,760.00 Rp. 47,628.00

Jumlah Harga Bahan (B) Rp. 47,628.00


C PERALATAN
Peralatan % 10.000 Rp. 47,628.00 Rp. 4,762.80

Jumlah Harga Alat (C) Rp. 4,762.80


D Jumlah ( A + B + C ) Err:502
E Overhead & Profit 10% x D Err:502
F Harga Satuan Pekerjaan ( D + E ) Err:502
G Dibulatkan Err:502
Analisa : AHSP A.4.2.1.11.
Item : Pemasangan 1 m kusen pintu alluminium
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0430 Err:502 Err:502
Tukang Err:502 Err:502 0.0430 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.004 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 1.100 #NAME? #NAME?
Skrup Fixer #NAME? 2.000 #NAME? #NAME?
Sealant #NAME? 0.060 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN
Peralatan % 10.000 #NAME? #NAME?

Jumlah Harga Alat (C) #NAME?


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.2.1.12.


Item : Pemasangan pintu alluminium strip lebar 8 cm
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0850 Err:502 Err:502
Tukang Err:502 Err:502 0.0850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 4.400 #NAME? #NAME?
Aluminium strip #NAME? 14.600 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN
Peralatan % 10.000 #NAME? #NAME?

Jumlah Harga Alat (C) #NAME?


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.2.1.13.
Item : Pemasangan jendela kaca rangka alluminium
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.0850 Err:502 Err:502
Tukang Err:502 Err:502 0.0850 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Profil alluminium #NAME? 2.400 #NAME? #NAME?
Kaca Polos 5mm #NAME? 1.500 #NAME? #NAME?
Sealant 0.270 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN
Peralatan % 10.000 #NAME? #NAME?

Jumlah Harga Alat (C) #NAME?


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

Analisa : AHSP A.4.4.1.1


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 2 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 43.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.080 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.1.2


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 3 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 32.950 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.091 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.1.3
Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 4 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.600 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 140.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 26.550 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.093 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.1.7


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 2 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 18.950 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0380 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.1.8
Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 3 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 14.370 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0400 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.1.9


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 4 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 70.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 11.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.0430 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.1.10
Item : Pemasangan dinding bata ringan T = 10 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bata Ringan Tebal 10 cm #NAME? 8.400 #NAME? #NAME?
Mortar Utama 380 ( 40 kg ) #NAME? 0.063 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.1.10.a


Item : Pemasangan dinding bata ringan T = 7.5 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bata Ringan Tebal 7.5 cm #NAME? 8.400 #NAME? #NAME?
Mortar Utama 380 ( 40 kg ) #NAME? 0.063 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.1.23
Item : Pemasangan Dinding Terawang (Rooster) 12 x 11 x 24 Campuran 1 SP : 4 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Beton Rooster / Kerawang #NAME? 30.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 11.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
ASHP A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

Analisa : AHSP A.4.4.2.2


Item : Pemasangan Plesteran 1 SP : 2 PP Tebal 15 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 10.224 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.020 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.2.3


Item : Pemasangan Plesteran 1 SP : 3 PP Tebal 15 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 7.776 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.023 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.2.4
Item : Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 6.240 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.024 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.2.14


Item : Pemasangan Plesteran 1 SP : 3 PP Tebal 20 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.260 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 10.368 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.031 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.2.15
Item : Pemasangan Plesteran 1 SP : 4 PP Tebal 20 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.400 Err:502 Err:502
Tukang Err:502 Err:502 0.200 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.020 Err:502 Err:502
Mandor Err:502 Err:502 0.020 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 8.320 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.032 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.2.20


Item : Pemasangan Plesteran Skoning 1 SP : 3 PP Tebal 10 mm
Satuan : m1

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.080 Err:502 Err:502
Tukang Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.040 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 50 Kg #NAME? 0.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.013 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.2.23
Item : Pemasangan Plesteran Ciprat 1 SP : 2 PP
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 4.320 #NAME? #NAME?
Pasir Pasang #NAME? 0.006 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.2.27


Item : Pemasangan Acian
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Semen @ 40 Kg #NAME? 3.250 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.2.28
Item : Pemasangan Plesteran Dengan Mortar Siap Pakai (MSP)
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.300 Err:502 Err:502
Tukang Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.015 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Mortar Siap Pakai (MSP) #NAME? 6.240 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.2.29


Item : Pemasangan Plesteran Acian Mortar Siap Pakai (MSP)
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.200 Err:502 Err:502
Tukang Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.010 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Mortar Siap Pakai (MSP) #NAME? 3.250 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Analisa : AHSP A.4.4.3.9


Item : Pemasangan Lantai Ubin Granit Ukuran 40 cm x 40 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.250 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.125 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.013 Err:502 Err:502
Mandor Err:502 Err:502 0.013 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 40 x 40 cm #NAME? 6.630 #NAME? #NAME?
Semen @ 50 Kg #NAME? 9.800 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.300 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.3.13


Item : Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Polished
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.240 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.120 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.012 Err:502 Err:502
Mandor Err:502 Err:502 0.012 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 60 cm Polished #NAME? 3.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 9.600 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.3.13.a
Item : Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Unpolished
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.240 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.120 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.012 Err:502 Err:502
Mandor Err:502 Err:502 0.012 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 60 cm Unpolished #NAME? 3.100 #NAME? #NAME?
Semen @ 40 Kg #NAME? 9.600 #NAME? #NAME?
Semen Warna @ 50 Kg #NAME? 1.500 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.045 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.3.28


Item : Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 60 cm
Satuan : m1

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.090 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plint Keramik Granit 10 x 60 #NAME? 1.700 #NAME? #NAME?
Semen @ 40 Kg #NAME? 1.140 #NAME? #NAME?
Semen @ 50 Kg #NAME? 0.100 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.003 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.3.29
Item : Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 40 cm
Satuan : m1

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.090 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plint Keramik Granit 10 x 40 #NAME? 2.630 #NAME? #NAME?
Semen @ 40 Kg #NAME? 1.140 #NAME? #NAME?
Semen @ 50 Kg #NAME? 0.100 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.003 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.3.54


Item : Pemasangan 1 m2 Dinding Keramik 20 cm x 20 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Keramik 20 x 20 cm bh 26.500 Rp. 2,796.53 Rp. 74,107.99
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.4.3.54.a
Item : Pemasangan 1 m2 Dinding Keramik 20 cm x 40 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Keramik 20 x 40 cm bh 12.500 Rp. 12,536.16 Rp. 156,702.00
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.4.3.54.b


Item : Pemasangan 1 m2 Dinding Granit 60 cm x 120 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Granit Uk. 60 x 120 cm bh 1.400 Rp. 372,400.00 Rp. 521,360.00
Semen @ 40 Kg #NAME? 9.300 #NAME? #NAME?
Semen @ 50 Kg #NAME? 1.940 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.018 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP 4.4.3.57.a
Item : Pemasangan 1 m2 Batu Alam Batu Serit Hitam 15x30
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Serit Hitam 15x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP 4.4.3.57.b


Item : Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar 30x30
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Andesit Bintik Bakar 30x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP 4.4.3.57.c
Item : Pemasangan 1 m2 Batu Alam Cupang Merah 30x30
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Cupang Merah 30x30 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP 4.4.3.57.d


Item : Pemasangan 1 m2 Batu Alam Andesit Polos Bakar 40x40
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Andesit Polos Bakar 40x40 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP 4.4.3.57.e
Item : Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar 30x60
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.900 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.045 Err:502 Err:502
Mandor Err:502 Err:502 0.045 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Alam Andesit Bintik Bakar 30x60 bh 1.100 #NAME? #NAME?
Semen @ 50 Kg #NAME? 11.750 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.035 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Analisa : AHSP A.4.5.1.7


Item : Pemasangan 1 m2 Langit-Langit Gypsum Board Ukuran ( 120 x 240 x 9 ) mm, Tebal 9 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Gypsum ( 120 x 240 cm ) #NAME? 0.364 #NAME? #NAME?
Paku skrup 10 cm #NAME? 0.110 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.5.1.10


Item : Pemasangan 1 m2 Rangka Langit-Langit Besi Hollow 40.40 mm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.350 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.350 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.035 Err:502 Err:502
Mandor Err:502 Err:502 0.018 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Besi Hollow 40.40.2 mm #NAME? 4.000 #NAME? #NAME?
Assesories ( Perkuatan, Las dll ) Kg 100% x Rangka #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.5.1.11
Item : Pemasangan 1 m1 list langit-langit kayu profil
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
List kayu profil #NAME? 1.050 #NAME? #NAME?
Paku Biasa 1/2" - 1" Kg 0.010 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.5.1.11a


Item : Pemasangan 1 m1 list plafond gypsum profil
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 Err:502 0.050 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.050 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.005 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
List gypsum profil #NAME? 1.050 #NAME? #NAME?
Paku Biasa 1/2" - 1" Kg 0.010 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Analisa : AHSP A.4.5.2.7


Item : Pemasangan 1 m2 Roof Light Fibreglass 90 x 180 cm
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.140 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.067 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.007 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Roof Light Fibreglass 90 x 180 cm #NAME? 0.600 #NAME? #NAME?
Paku Biasa 1/2" - 1" #NAME? 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.5.2.34


Item : Pemasangan 1 m2 Atap Sirap Kayu
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.166 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.250 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.025 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Sirap Kayu #NAME? 30.000 #NAME? #NAME?
Paku Biasa 1/2" - 1" #NAME? 0.200 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.5.2.41.a
Item : Pemasangan 1 m2 Atap Aspal Bitumen
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.150 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.750 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.075 Err:502 Err:502
Mandor Err:502 Err:502 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Atap Aspal Bitumen CT3 Lbr 1.050 #NAME? #NAME?
Paku Hak Panjang 15 cm Kg 0.020 Rp. 18,081.00 Rp. 361.62

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.5.2.42.a


Item : Pemasangan 1 m' Nok Atap Aspal Bitumen
Satuan : m1

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.100 Err:502 Err:502
Tukang Kayu Err:502 Err:502 1.000 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.100 Err:502 Err:502
Mandor Err:502 Err:502 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Bubungan Atap Aspal Bitumen Lbr 1.200 #NAME? #NAME?
Paku Hak Panjang 15 cm Kg 0.040 Rp. 18,081.00 Rp. 723.24

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Analisa : AHSP A.4.6.2.1.


Item : Pemasangan 1 buah kunci tanam dua slag
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.060 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.600 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.060 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kunci 2 Slag Lbr 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.6.2.1.


Item : Pemasangan 1 buah kunci kamar mandi
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.005 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.500 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.050 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kunci tanam KM Lbr 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.6.2.9.
Item : Pemasangan 1 buah kait angin jendela
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kait Angin Jendela Lbr 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.6.2.9.


Item : Pemasangan 1 buah handel jendela
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Handle Jendela Lbr 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.6.2.10.
Item : Pemasangan 1 buah grendel jendela
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.015 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.008 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Grendel Jendela Lbr 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

Analisa : AHSP A.4.7.1.10


Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Exterior
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.020 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.063 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0063 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plamur #NAME? 0.100 #NAME? #NAME?
Cat Dasar #NAME? 0.100 #NAME? #NAME?
Cat Penutup Exterior Setara Jotun #NAME? 0.260 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.7.1.10.a


Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Interior
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.020 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.063 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0063 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Plamur #NAME? 0.100 #NAME? #NAME?
Cat Dasar #NAME? 0.100 #NAME? #NAME?
Cat Penutup Interior Setara Jotun #NAME? 0.260 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.4.7.1.11
Item : Pengecatan 1 m2 Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.028 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.042 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0042 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Cat Dasar #NAME? 0.120 #NAME? #NAME?
Cat Penutup Exterior Setara Jotun #NAME? 0.180 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.4.7.1.120


Item : Pengecatan Waterproofing 1 m2
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 Err:502 0.020 Err:502 Err:502
Tukang Kayu Err:502 Err:502 0.063 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0063 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Waterproofing kg 1.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

Analisa : AHSP A.5.5.1.1


Item : Pemasangan 1 Buah Kloset Duduk
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.300 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.01 Err:502 Err:502
Mandor Err:502 Err:502 0.16 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kloset Duduk Keramik #NAME? 1.000 #NAME? #NAME?
Perlengkapan Ls 6% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.2


Item : Pemasangan 1 Buah Kloset Jongkok Porselen
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.000 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.500 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.160 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kloset Jongkok Keramik #NAME? 1.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 6.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.010 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.5
Item : Pemasangan 1 Buah Wastafel
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 1.200 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.450 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.015 Err:502 Err:502
Mandor Err:502 Err:502 0.060 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Wastafel #NAME? 1.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 6.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.010 #NAME? #NAME?
Perlengkapan % 12% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.4


Item : Pemasangan 1 Buah Floor Drain
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.010 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.100 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.010 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Floor Drain Setara Toto #NAME? 1.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.17
Item : Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60 x 60 Tinggi 65 cm
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 3.200 Err:502 Err:502
Tukang Batu Err:502 Err:502 1.150 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.011 Err:502 Err:502
Mandor Err:502 Err:502 0.016 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Batu Bata #NAME? 123.000 #NAME? #NAME?
Semen @ 40 Kg #NAME? 114.000 #NAME? #NAME?
Pasir Pasang (1400 kg/m3) #NAME? 0.184 #NAME? #NAME?
Pasir Beton (1400 kg/m3) #NAME? 0.120 #NAME? #NAME?
Kerikil (1350 kg/m3) #NAME? 0.033 #NAME? #NAME?
Besi Beton Polos #NAME? 4.850 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.18


Item : Pemasangan 1 m' Pipa Galvanis Diameter 1/2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.19
Item : Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.010 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.400 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.040 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kran Air Dia. 1/2" - 3/4" #NAME? 1.000 #NAME? #NAME?
Seal Tape #NAME? 0.025 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.20


Item : Pemasangan 1 m' Pipa Galvanis Diameter 3/4"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.21
Item : Pemasangan 1 m' Pipa Galvanis Diameter 1"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.027 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.22


Item : Pemasangan 1 m' Pipa Galvanis Diameter 1 1/2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.108 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.180 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.018 Err:502 Err:502
Mandor Err:502 Err:502 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.23
Item : Pemasangan 1 m' Pipa Galvanis Diameter 3"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.135 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.225 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.023 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.24


Item : Pemasangan 1 m' Pipa Galvanis Diameter 4"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.135 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.225 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.023 Err:502 Err:502
Mandor Err:502 Err:502 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.25
Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1/2" Kualitas AWE (United) #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.26


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 3/4" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.27
Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.036 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.060 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.006 Err:502 Err:502
Mandor Err:502 Err:502 0.002 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.28


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 1 1/2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.29
Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.054 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.090 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.009 Err:502 Err:502
Mandor Err:502 Err:502 0.003 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.30


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2 1/2"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 2 1/2" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : AHSP A.5.5.1.31
Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 3" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : AHSP A.5.5.1.32


Item : Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 Err:502 0.081 Err:502 Err:502
Tukang Batu Err:502 Err:502 0.135 Err:502 Err:502
Kepala Tukang Err:502 Err:502 0.0135 Err:502 Err:502
Mandor Err:502 Err:502 0.004 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Pipa PVC Ø 4" #NAME? 1.200 #NAME? #NAME?
Perlengkapan % 35% #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
AHSP A.4.6.1. HARGA SATUAN PEKERJAAN KUDA - KUDA

Analisa : A. 4.6.1.13
Item : Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvesional, Kayu Klas II
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 4.000 Err:502 Err:502
Tukang Kayu Err:502 OH 12.000 Err:502 Err:502
Kepala Tukang Err:502 OH 1.2000 Err:502 Err:502
Mandor Err:502 OH 0.200 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Kayu Kelas II (Kamper/Kruing/dll) m3 1.100 #NAME? #NAME?
Besi Strip tebal 5 mm kg 15.000 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 5.600 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : A. 4.6.1.50
Item : Pemasangan 1 m2 Konstruksi Kuda-Kuda Baja Ringan
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 OH 0.200 Err:502 Err:502
Tukang Kayu Err:502 OH 0.450 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0100 Err:502 Err:502
Mandor Err:502 OH 0.050 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Rangka Baja Ringan C75 m3 1.200 #NAME? #NAME?
Baut Kap Ø 1/2 - 8 kg 38.000 #NAME? #NAME?
Dynabolt kg 1.600 #NAME? #NAME?
Reng Atap Baja Ringan m1 3.600 #NAME? #NAME?
Talang Seng Plat m2 0.124 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : A. 4.6.1.51
Item : Pemasangan 1 m2 Metal Roof
Satuan : m2
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA (Rp.)
Pekerja Err:502 OH 0.140 Err:502 Err:502
Tukang Kayu Err:502 OH 0.067 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0067 Err:502 Err:502
Mandor Err:502 OH 0.007 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Atap Metal Roof m3 0.600 #NAME? #NAME?
Paku Seng kg 0.050 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : A. 4.6.1.26a
Item : Pemasangan 1 m2 dinding lambrisering dari papan kayu Klas II
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.600 Err:502 Err:502
Tukang Kayu Err:502 OH 1.800 Err:502 Err:502
Kepala Tukang Err:502 OH 0.1800 Err:502 Err:502
Mandor Err:502 OH 0.030 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Papan Kayu Kelas II m3 0.007 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 0.100 #NAME? #NAME?
Paku skrup 10 cm kg 0.150 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : A. 4.6.1.21a
Item : Pemasangan 1 m' Listplank ukuran (2 x 20) cm, Kayu Klas II
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.100 Err:502 Err:502
Tukang Kayu Err:502 OH 0.200 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0200 Err:502 Err:502
Mandor Err:502 OH 0.005 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Papan Kayu Kelas II m3 0.011 #NAME? #NAME?
Paku Biasa 5 cm - 12 cm kg 0.100 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : A. 4.5.2.39
Item : Pemasangan 1 m' Nok Atap Seng
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.150 Err:502 Err:502
Tukang Kayu Err:502 OH 0.070 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0070 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Seng Plat 3 x kk bjls 30 m3 0.300 #NAME? #NAME?
Paku Seng kg 0.040 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Analisa : A. 4.5.2.38
Item : Pemasangan 1 m2 Atap Seng Gelombang
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.120 Err:502 Err:502
Tukang Kayu Err:502 OH 0.060 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0060 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Seng Plat 3 x kk bjls 30 Lbr 0.700 #NAME? #NAME?
Paku Seng kg 0.020 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Analisa : A. 4.5.2.32a
Item : Pemasangan 1 m2 Atap Zincalume (Spandek)
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja Err:502 OH 0.006 Err:502 Err:502
Tukang Kayu Err:502 OH 0.120 Err:502 Err:502
Kepala Tukang Err:502 OH 0.0600 Err:502 Err:502
Mandor Err:502 OH 0.006 Err:502 Err:502
Jumlah Tenaga Kerja (A) Err:502
B BAHAN
Atap Apandek 0.30 mm m2 1.100 #NAME? #NAME?
Paku skrup + Mur bh 6.000 #NAME? #NAME?

Jumlah Harga Bahan (B) #NAME?


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) #NAME?
E Overhead & Profit 10% x D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
RINCIAN MATA PEMBAYARAN
SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
UNTUK PEKERJAAN GEDUNG

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

SATUAN KUANTI HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN KETERANGAN
UKURAN TAS (Rp) (Rp)
I II III IV V VI VII
1 Penyiapan RKK
a Pembuatan dokumen Rencana Keselamatan Konstruksi

b Pembuatan prosedur dan instrukkerja Set 1.00 1,000,000.00 1,000,000.00

c Penyiapan formulir
A Sub Total Penyiapan RKK 1,000,000.00

2 Sosialisasi, Promosi dan Pelatihan:


a Induksi K3 (Safety Induction) Org 7,500.00 -
b Pengarahan K3 (Safety Briefing) Org -
c Pelatihan K3:
1) Bekerja di ketinggian Org 7,500.00 -
2) Penggunaan bahan kimia (MSDS) Org 7,500.00 -
d Simulasi K3 Org 7,500.00 -
e Spanduk (Banner) Lb 150,000.00 -
f Poster Lb 50,000.00 -
g Papan Informasi K3 Bh 1.00 500,000.00 500,000.00
B Sub Total Sosialisasi, Promosi dan Pelatihan 500,000.00

3 Alat Pelindung Kerja dan Alat Pelindung Diri


a APK Antara Lain:
1) Jaring Pengaman (Safety Net) Ls 15,000,000.00 -
2) Tali Keselamatan (Life Line) Ls 5,000,000.00
3) Pagar Pengaman (Guard Railling) Ls 15,000,000.00 -
4) Pembatas Area (Restricted Area) Ls 1.00 3,000,000.00 3,000,000.00
b APK Antara Lain:
1) Topi Pelindung (Safety Helmet) Bh 20.00 75,000.00 1,500,000.00
2) Pelindung Mata (Goggles,Spectacles) Psg 5.00 25,000.00 125,000.00
3) Tameng Muka (Face Shield) Bh 300,000.00 -
4) Pelindung Pernafasan dan Mulut Masker) Bh 20.00 5,000.00 100,000.00
5) Sarung Tangan (Safety Gloves) Psg 3.00 15,000.00 45,000.00
6) Sepatu Keselamatan (Safety Shoes) Psg 20.00 350,000.00 7,000,000.00
7) Penunjang Seluruh Tubuh (Full Bh 750,000.00 -
8) Body Harness)
Rompi Keselamatan (Safety Vest) Bh 20.00 25,000.00 500,000.00
9) Celemek (Apron/Coveralls) Bh 150,000.00 -
10) Pelindung Jatuh (Fall Arrester) Bh 100,000.00 -
C Sub Total Alat Pelindung Kerja dan Alat Pelindung 12,270,000.00
Diri

4 Asuransi dan Perizinan:


a Asuransi Ls 1.00 800,000.00 800,000.00
D Sub Total Asuransi dan perizinan 800,000.00

5 Personil K3 Konstruksi:
a Ahli K3 Konstruksi OB -
b Petugas K3 Konstruksi OB 1.00 2,500,000.00 2,500,000.00
E Sub Total Personil K3 2,500,000.00
SATUAN KUANTI HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN KETERANGAN
UKURAN TAS (Rp) (Rp)
I II III IV V VI VII
6 Fasilitas, sarana dan prasarana kesehatan:
a Peralatan P3K (Kotak P3K, Tandu,Obat Luka, Perban,dll) Ls 1.00 1,500,000.00 1,500,000.00

b Peralatan Pengasapan (Fogging) Ls 500,000.00 -


F Sub Total Fasilitas, sarana dan prasarana kesehatan 1,500,000.00

7 Rambu- Rambu yang diperlukan:


a Rambu Petunjuk Bh 3.00 75,000.00 225,000.00
b Rambu Larangan Bh 3.00 75,000.00 225,000.00
c Rambu Peringatan Bh 3.00 75,000.00 225,000.00
d Rambu Kewajiban Bh 75,000.00 -
e Rambu Informasi Bh 1.00 75,000.00 75,000.00
f Jalur Evakuasi (Escape Route) Ls 500,000.00 -
G Sub Total Rambu-rambu yang 750,000.00
diperlukan

8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi:

a Ahli K3 Konstruksi OJ - - -
H Sub Total Konsultansi dengan Ahli terkait -
Keselamatan Konstruksi

9 Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi:


a Alat Pemadam Api Ringan (APAR) Bh 2.00 500,000.00 1,000,000.00
b Bendera K3 Bh 1.00 350,000.00 350,000.00
c Program Inspeksi Ls -
d Pelaporan dan Penyelidikan Insiden Ls -
e Pembuatan Kartu Identitas Pekerja Lb -
I (KIP)
Lain- Lain Terkait Pengendalian
Risiko Keselamatan Konstruksi : 1,350,000.00

Total Mata Pembayaran Penyelenggaraan SMKK Pekerjaan Gedung 20,670,000.00


HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

1 Air Liter Rp. 80.36


2 Alluminium Foil DS m2 Rp. 15,680.00
3 Atap Aspal Bitumen CT3 Lembar Rp. 168,560.00
4 Atap Apandek 0.30 mm M2 Rp. 68,600.00
5 Aluminium strip M' Rp. 61,250.00
6 Underlayment Anti Bocor Atap m2 Rp. 62,720.00
7 Bambu Batang Rp. 120,540.00
8 Batu Bata Buah Rp. 686.00
9 Bata Ringan Tebal 7.5 cm Bh Rp. 8,820.00
10 Bata Ringan Tebal 10 cm Bh Rp. 11,760.00
11 Batu Kali / Batu Belah (Sungai / Gunung) M3 Rp. 181,300.00
12 Batang Kelapa Batang Rp. 301,350.00
13 Batu pecah 2-3 cm (1350 Kg/m3) M3 Rp. 323,400.00
14 Batu pecah 2-3 cm Kg Rp. 239.56
15 Batu Granit Kg Rp. 15,680.00
16 Batu Tempel Bh Rp. 16,170.00
17 Batu Serit Hitam 15x30 Bh Rp. 17,640.00
18 Batu Andesit Bintik Bakar 30x30 Bh Rp. 10,921.56
19 Batu Alam Cupang Merah 30x30 Bh Rp. 10,762.18
20 Batu Alam Andesit Polos Bakar 40x40 Bh Rp. 12,010.44
21 Batu Alam Andesit Bintik Bakar 30x60 Bh Rp. 18,015.67
22 Baut Kap Ø 1/2 - 8 Buah Rp. 5,424.30
23 Bensin (Industri) Liter Rp. 12,054.00
24 Besi Beton Polos Kg Rp. 11,760.00
25 Besi Beton Ulir Kg Rp. 13,720.00
26 Besi Hollow 40.40.2 mm m Rp. 21,560.00
27 Besi Profil Kg Rp. 16,366.00
28 Besi Siku L 30.30.3 Kg Rp. 12,250.00
29 Beton Rooster / Kerawang Buah Rp. 3,920.00
30 Bubungan Atap Aspal Bitumen M' Rp. 50,911.00
31 Cat Dasar Kg Rp. 27,440.00
32 Cat Kayu Mengkilat Kg Rp. 69,913.20
33 Cat Menie Kg Rp. 30,135.00
34 Cat Penutup Exterior Setara Jotun Kg Rp. 34,300.00
35 Cat Penutup Interior Setara Jotun Kg Rp. 63,700.00
36 Dempul Kg Rp. 30,135.00
37 Dynabolt Buah Rp. 9,800.00
38 Floor Drain Setara Toto Buah Rp. 274,400.00
39 Gypsum ( 120 x 240 cm ) Lembar Rp. 114,513.00
40 Gravel M3 Rp. 156,800.00
41 Granit Uk. 60 x 60 cm Polished Bh Rp. 84,672.00
42 Granit Uk. 60 x 60 cm Unpolished Bh Rp. 112,896.00
43 Granit Uk. 40 x 40 cm Bh Rp. 54,880.00
44 Granit Uk. 60 x 120 cm Bh Rp. 372,400.00
45 Ijuk Kg Rp. 12,054.00
46 Ijuk m3 Rp. 392,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

47 Kawat Beton Kg Rp. 21,560.00


48 Kawat Las Kg Rp. 18,326.00
49 Kaca Polos 5mm m2 Rp. 245,000.00
50 Kayu Kelas I (Seumantok/Ulin/dll) M3 Rp. 6,629,700.00
51 Kayu Kelas II (Kamper/Kruing/dll) M3 Rp. 5,390,000.00
52 Kayu Kelas III (Borneo/dll) M3 Rp. 4,410,000.00
53 Kayu Kelas IV (Sengon/dll) M3 Rp. 3,430,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

54 Kayu Dolken Ø 8-10/400 cm Batang Rp. 16,660.00


55 Kayu 5 x 7, Kayu Kelas II M3 Rp. 6,629,700.00
56 Kayu Reng, Kayu Kelas II M3 Rp. 6,629,700.00
57 Keramik Uk. 20 x 20 cm (Polished) Bh Rp. 2,796.53
58 Keramik Uk. 30 x 30 cm (Polished) Bh Rp. 6,509.16
59 Keramik Uk. 33 x 33 cm (Polished) Bh Rp. 7,876.08
60 Keramik Uk. 40 x 40 cm (Polished) Bh Rp. 12,536.16
61 Keramik Uk. 20 x 20 cm (Unpolished) Bh Rp. 3,134.04
62 Keramik Uk. 30 x 30 cm (Unpolished) Bh Rp. 7,051.59
63 Keramik Uk. 33 x 33 cm (Unpolished) Bh Rp. 8,532.42
64 Keramik Uk. 40 x 40 cm (Unpolished) Bh Rp. 12,536.16
65 Kerosen / Minyak Tanah (Industri) Liter Rp. 15,067.50
66 Kerosen / Minyak Tanah (Subsidi) Liter Rp. 10,848.60
67 Kertas Amplas Lembar Rp. 6,027.00
68 Kerikil (1350 kg/m3) M3 Rp. 212,660.00
69 Kerikil Kg Rp. 157.53
70 Kunci 2 Slag Bh Rp. 191,590.00
71 Kunci tanam KM Bh Rp. 153,860.00
72 Kait Angin Jendela Bh Rp. 25,970.00
73 Handle Jendela Bh Rp. 22,050.00
74 Grendel Jendela Bh Rp. 22,540.00
75 Kloset Duduk Keramik Buah Rp. 3,214,400.00
76 Kloset Jongkok Keramik Buah Rp. 842,800.00
77 Kitchen Zink + Kran Set Rp. 539,000.00
78 Koral Beton M3 Rp. 137,200.00
79 Kran Air Dia. 1/2" - 3/4" Bh Rp. 109,760.00
80 List kayu profil m' Rp. 14,700.00
81 List gypsum profil m' Rp. 9,800.00
82 Minyak Cat Liter Rp. 29,400.00
83 Minyak Bekesting Liter Rp. 6,370.00
84 Minyak Pelumas Liter Rp. 12,152.00
85 Mortar Siap Pakai (MSP) Kg Rp. 5,880.00
86 Mortar Utama 380 ( 40 kg ) Zak Rp. 27,440.00
87 Multipleks 3 mm Lembar Rp. 54,243.00
88 Multipleks 4 mm Lembar Rp. 78,351.00
89 Multipleks 6 mm Lembar Rp. 102,459.00
90 Multipleks 9 mm Lembar Rp. 132,300.00
91 Atap Metal Roof Lembar Rp. 63,700.00
92 Paku Tripleks Kg Rp. 21,697.20
93 Paku Beton 8" Kotak Rp. 18,032.00
94 Paku Beton 4" Kotak Rp. 23,520.00
95 Paku 12 cm Bh Rp. 147.00
96 Paku Kayu 2" - 3" Kg Rp. 19,600.00
97 Paku Biasa 1/2" - 1" Kg Rp. 19,600.00
98 Paku Biasa 5 cm - 10 cm Kg Rp. 19,600.00
99 Paku Biasa 5 cm - 12 cm Kg Rp. 19,600.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

100 Paku Kayu Kg Rp. 19,600.00


101 Paku Reng Kg Rp. 15,188.04
102 Paku Seng Kg Rp. 18,081.00
103 Paku skrup 10 cm Kg Rp. 34,300.00
104 Paku skrup + Mur Bh Rp. 1,960.00
105 Papan Kayu Kelas I m3 Rp. 6,272,000.00
106 Papan Kayu Kelas II m3 Rp. 5,390,000.00
107 Papan Kayu Kelas III m3 Rp. 3,920,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

108 Papan Kayu Plafond Kelas II m3 Rp. 5,527,200.00


109 Pasir Batu (Sirtu) M3 Rp. 274,400.00
110 Pasir Beton (1400 kg/m3) M3 Rp. 212,660.00
111 Pasir Beton Kg Rp. 151.90
112 Pasir Pasang (1400 kg/m3) M3 Rp. 212,660.00
113 Pasir Pasang Kg Rp. 151.90
114 Pasir Urug M3 Rp. 121,520.00
115 Paving Block M2 Rp. 96,432.00
116 Penjaga Jarak Bekesting (Spacer) bh Rp. 24,500.00
117 Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm m' Rp. 49,220.50
118 Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm m' Rp. 37,566.67
119 Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm m' Rp. 30,135.00
120 Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm m' Rp. 68,306.00
121 Pipa Leiding Ø 2" Galvanis Tebal 3.2 mm m' Rp. 86,387.00
122 Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm m' Rp. 110,495.00
123 Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm m' Rp. 172,774.00
124 Pipa Leiding Ø 6" Galvanis Tebal 3.2 mm m' Rp. 285,278.00
125 Pipa PVC Ø 1" m' Rp. 10,976.00
126 Pipa PVC Ø 1/2" Kualitas AWE (United) m' Rp. 6,174.00
127 Pipa PVC Ø 1 1/2" m' Rp. 19,110.00
128 Pipa PVC Ø 2" m' Rp. 24,500.00
129 Pipa PVC Ø 2 1/2" m' Rp. 35,770.00
130 Pipa PVC Ø 3" m' Rp. 49,000.00
131 Pipa PVC Ø 3/4" m' Rp. 8,134.00
132 Pipa PVC Ø 4" m' Rp. 64,680.00
133 Plamur Kg Rp. 21,560.00
134 Plint Keramik Granit 10 x 40 Bh Rp. 8,428.00
135 Plint Keramik Granit 10 x 60 Bh Rp. 12,544.00
136 Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar Rp. 76,440.00
137 Plywood 6 mm Lembar Rp. 84,280.00
138 Plywood 9 mm Lembar Rp. 132,300.00
139 Profil alluminium m' Rp. 124,950.00
140 Ramset Buah Rp. 343.00
141 Rangka Baja Ringan C75 kg Rp. 11,760.00
142 Rangka Baja Ringan C125 m' Rp. 119,560.00
143 Residu Kg Rp. 8,330.00
144 Roof Light Fibreglass 90 x 180 cm Lbr Rp. 254,800.00
145 Seal Tape Bh Rp. 3,430.00
146 Seng BJLS 0.20 Lbr Rp. 33,320.00
147 Semen @ 40 Kg Zak Rp. 56,840.00
148 Semen @ 40 Kg Kg Rp. 1,421.00
149 Semen @ 50 Kg Zak Rp. 70,560.00
150 Semen @ 50 Kg Kg Rp. 1,411.20
151 Semen Warna @ 50 Kg Zak Rp. 147,000.00
152 Semen Warna @ 50 Kg Kg Rp. 2,940.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

153 Sirap Kayu Bh Rp. 11,760.00


154 Skrup Fixer Bh Rp. 196.00
155 Sealant Tube Rp. 73,500.00
156 Solar (Industri) Liter Rp. 8,820.00
157 Stop Kontak + Instalasi Titik Rp. 72,324.00
158 Storox - 100 Kg Rp. 117,600.00
159 Stut Werk M3 Rp. 2,832,690.00
160 Reng Atap Baja Ringan M1 Rp. 8,575.00
161 Tanah Liat M3 Rp. 39,200.00
162 Tanah Timbun M3 Rp. 68,600.00
163 Tanah Timbun Pilihan - Material Jalan M3 Rp. 137,200.00
164 Talang Seng Plat M1 Rp. 49,000.00
165 Waterproofing m2 Rp. 29,400.00
166 Wastafel Bh Rp. 372,400.00
167 Waterdrain Bh Rp. 44,100.00
168 Waterstop PVC Lebar 150 mm m Rp. 24,010.00
169 Waterstop PVC Lebar 200 mm m Rp. 29,890.00
170 Waterstop Lebar 230 mm - 320 mm m Rp. 37,730.00
171 Wiremesh (Ulir) Dia. 5.0 Kg Rp. 9,800.00
172 Wiremesh (Ulir) Dia. 6.0 Kg Rp. 10,241.00
173 Besi Strip tebal 5 mm Kg Rp. 12,250.00
174 Seng Plat 3 x kk bjls 30 Lbr Rp. 82,320.00
175
176 Rp -
177 Rp -
178 Rp -
179 Rp -
180 Rp -
HARGA DASAR SATUAN UPAH

Harga Satuan (Rp.)


No. Tenaga Kerja Kode Satuan Keterangan
Jam Hari

1 Pekerja L.01 OH Rp. 18,600.00 Rp. 130,500.00


2 Tukang L.02 OH Rp. 21,000.00 Rp. 147,000.00
3 Tukang Gali L.02 OH Rp. 18,600.00 Rp. 130,500.00
4 Tukang Batu L.02 OH Rp. 21,000.00 Rp. 147,000.00
5 Tukang Kayu L.02 OH Rp. 21,000.00 Rp. 147,000.00
6 Tukang Besi L.02 OH Rp. 21,000.00 Rp. 147,000.00
7 Tukang Cat / Pelitur L.02 OH Rp. 21,000.00 Rp. 147,000.00
8 Tukang Pipa / Operator Pompa L.02 OH Rp. 21,000.00 Rp. 147,000.00
9 Tukang Pengayam Bronjong L.02 OH Rp. 21,000.00 Rp. 147,000.00
10 Tukang Tebas L.02 OH Rp. 18,600.00 Rp. 130,500.00
11 Kepala Tukang L.03 OH Rp. 27,800.00 Rp. 195,000.00
12 Mandor L.04 OH Rp. 24,000.00 Rp. 168,000.00
13 Juru Ukur L.05 OH Rp. 22,700.00 Rp. 159,300.00
14 Pembantu Juru Ukur L.06 OH Rp. 22,700.00 Rp. 159,300.00
15 Ahli Alat Berat ( Mekanik ) L.07 OH Rp. 22,700.00 Rp. 159,300.00
16 Operator L.08 OH Rp. 27,800.00 Rp. 195,000.00
17 Pembantu Operator L.09 OH Rp. 22,700.00 Rp. 159,300.00
18 Sopir Truck L.10 OH Rp. 22,700.00 Rp. 159,300.00
19 Kenek Truk L.11 OH Rp. 22,700.00 Rp. 159,300.00
20 Penjaga Malam L.12 OH Rp. 22,700.00 Rp. 159,300.00
21 Juru Gambar (Drafter) L.13 OH Rp. 22,700.00 Rp. 159,300.00
22 Design Engineer L.15 OH Rp. 22,700.00 Rp. 159,300.00
23 Operator Printer/Plotter L.16 OH Rp. 22,700.00 Rp. 159,300.00
TERBILANG RAB 100%

#NAME?
#NAME?

### ### #NAME? rupiah #NAME?


#NAME? #NAME? ### ### ### Err:504 #NAME? ### ######### #NAME?### ### #NAME?
#NAME? #NAME? ### ### ribu ### Err:504 #NAME? ### ######### #NAME?### ### #NAME?
#NAME? #NAME? ### ### juta ### Err:504 #NAME? ### ######### #NAME?### ### #NAME?
#NAME? #NAME? ### ### milyard ### Err:504 #NAME? ### ######### #NAME?### ### #NAME?
#NAME? #NAME? ### ### trilyun ### Err:504 #NAME? ### ######### #NAME?### ### #NAME?
0 0
1 se 1 satu
2 dua 2 dua
3 tiga 3 tiga
4 empat 4 empat
5 lima 5 lima
6 enam 6 enam
7 tujuh 7 tujuh
8 delapan 8 delapan
9 sembilan 9 sembilan
88,000,000.00
26,400,000.00
12,000,000.00
24.96 6.48
20.16
45.12

64.80
28.8 16.2
54 270
82.8
1.08
64.8 291.6

8.10
108