Anda di halaman 1dari 116

REKAPITULASI

ENGINEER'S ESTIMATE (EE)

PEKERJAAN : PEREMAJAAN JARINGAN PIPA PDAM KECAMATAN TEMBILAHAN DAN KECAMATAN TEMBILAHAN HULU
LOKASI : KABUPATEN INDRAGIRI HILIR

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3

1 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) Rp. 31,600,000.00


2 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN 55% Rp. 1,398,929,000.00
3 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN HULU 55% Rp. 598,950,000.00
4 PENGADAAN DAN PEMASANGAN PLATE SETTLER DAN GUTTER IPA KAP. 180 LTR/DTK Rp. 440,000,000.00
5 PENGADAAN DAN PEMASANGAN MEDIA FILTER UNTUK IPA KAP. 180 LTR/DTK Rp. 558,712,250.00
6 PENGADAAN DAN PEMASANGAN ATAP IPA KAP. 180 LTR/DTK Rp. 1,300,000,000.00
7 PENGADAAN DAN PEMASANGAN WATER METER IPA KAP. 180 LTR/DTK Rp. 491,400,000.00
8 PENGADAAN DAN PEMASANGAN WASHOUT DAN AKSESORIS IPA KAP. 180 LTR/DTK Rp. 54,330,000.00
9 PEMBANGUNAN PAGAR PENGAMAN IPA PULAU PALAS DAN BOOSTER PARIT 7 Rp. 82,080,000.00

JUMLAH TOTAL Rp. 4,956,001,250.00


PPN 10% Rp. 495,600,125.00
JUMLAH SETELAH PAJAK Rp. 5,451,601,375.00
PEMBULATAN Rp. 5,451,601,000.00

NUWSP INHIL 2021 REKAP (2022-2) 1


REKAPITULASI
ENGINEER'S ESTIMATE (EE)

PEKERJAAN : PEREMAJAAN JARINGAN PIPA PDAM KECAMATAN TEMBILAHAN DAN KECAMATAN TEMBILAHAN HULU
LOKASI : KABUPATEN INDRAGIRI HILIR

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3

1 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) Rp. 31,600,000.00


2 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN 55% Rp. 1,353,475,000.00
3 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN HULU 55% Rp. 598,950,000.00
4 PENGADAAN DAN PEMASANGAN PLATE SETTLER DAN GUTTER IPA KAP. 180 LTR/DTK Rp. 440,000,000.00
5 PENGADAAN DAN PEMASANGAN MEDIA FILTER UNTUK IPA KAP. 180 LTR/DTK Rp. 558,712,250.00
6 PENGADAAN DAN PEMASANGAN ATAP IPA KAP. 180 LTR/DTK Rp. 1,800,000,000.00
7 PENGADAAN DAN PEMASANGAN WATER METER IPA KAP. 180 LTR/DTK Rp. 491,400,000.00
8 PENGADAAN DAN PEMASANGAN WASHOUT DAN AKSESORIS IPA KAP. 180 LTR/DTK Rp. 54,330,000.00
9 PEMBANGUNAN PAGAR PENGAMAN IPA PULAU PALAS DAN BOOSTER PARIT 7 Rp. 82,080,000.00

JUMLAH TOTAL Rp. 5,410,547,250.00


PPN 10% Rp. 541,054,725.00
JUMLAH SETELAH PAJAK Rp. 5,951,601,975.00
PEMBULATAN Rp. 5,951,601,000.00

NUWSP INHIL 2021 REKAP (2022-1) 2


REKAPITULASI
ENGINEER'S ESTIMATE (EE)

PEKERJAAN : PEREMAJAAN JARINGAN PIPA PDAM KECAMATAN TEMBILAHAN DAN KECAMATAN TEMBILAHAN HULU
LOKASI : KABUPATEN INDRAGIRI HILIR

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3

1 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) Rp. 31,600,000.00


2 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN Rp. 1,829,925,000.00
3 JARINGAN DISTRIBUSI PELAYANAN KEC. TEMBILAHAN HULU Rp. 790,359,000.00
4 PEMBANGUNAN RUMAH JAGA (IPA PULAU PALAS) #REF!
5 REHABILITASI RESERVOIR Kap. 1.000 M3 (IPA PULAU PALAS) #REF!
6 PEMBANGUNAN SALURAN PEMBUANGAN (IPA PULAU PALAS) #NAME?
7 REHABILITASI JARINGAN DISTRIBUSI UTAMA Rp. 50,000,000.00
8 PENGADAAN IPA FILTER Kap. 50 Ltr/dtk Rp. 100,000,000.00
9 PENGADAAN AKSESORIS IPA DAN RESERVOIR (IPA PULAU PALAS) Rp. 54,330,000.00

JUMLAH TOTAL #REF!


PPN 10% #REF!
JUMLAH SETELAH PAJAK #REF!
PEMBULATAN #REF!

NUWSP INHIL 2021 REKAP (2021) 3


PT. BPR GEMILANG (PERSERO) BANK
PERKEREDITAN RAKYAT

ENGINEER'S ESTIMATE (EE)

PROGRAM : -

KEGIATAN :

SUB KEGIATAN :

PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN


RAKYAT

LOKASI : TEMBILAHAN

ANGGARAN : Rp 1,400,000,000

TAHUN : 2022

CV.MOMENT TEKNIK
JASA PERENCANAAN, PENGAWASAN & REKAYASA TEKNIK
JL. Kembang No. 76 Tembilahan Kabupaten Indragiri Hilir - Riau
REKAPITULASI
ENGINEER'S ESTIMATE (EE)

PROGRAM :
KEGIATAN :
SUB KEGIATAN :
PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN RAKYAT
LOKASI : TEMBILAHAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3
1 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp. 31,600,000.00
2 PEMBANGUNAN GEDUNG PT. BPR GEMILANG
I PEKERJAAN PERSIAPAN Rp. 37,262,971.67
II PEKERJAAN STRUKTUR Rp. 969,728,895.46
III PEKERJAAN ARSITEKTURAL Rp. 220,677,536.80
IV PEKERJAAN LAIN - LAIN Rp. 2,000,000.00

JUMLAH TOTAL Rp. 1,261,269,403.94


PPN 11% Rp. 138,739,634.43
JUMLAH SETELAH PAJAK Rp. 1,400,009,038.37
PEMBULATAN Rp. 1,400,000,000.00

Terbilang : Satu Milyar Empat Ratus Juta Rupiah

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
PT. BPR GEMILANG (Persero) CV. MOMENT TEKNIK
Bank Perkereditan Rakyat Konsultan Perencanaan,

………………………… HIKMATULLAH, ST
Direktur Direktur
REKAPITULASI
ENGINEER'S ESTIMATE (EE)

PROGRAM : PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
KEGIATAN :
SUB KEGIATAN : PEMBANGUNAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN
PEKERJAAN : IPA FILTER DESA PULAU PALAS KEC. TEMBILAHAN HULU
LOKASI : KABUPATEN INDRAGIRI HILIR

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3

1 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) Rp. 31,600,000.00

2 PEMBANGUNAN GEDUNG IPA FILTER NANO KAP. 50 LTR/DTK Rp. 1,008,991,867.14

3 PENGADAAN DAN PEMASANGAN IPA FILTER NANO KAP. 50 LTR/DTK #REF!

JUMLAH TOTAL #REF!


PPN 10% #REF!
JUMLAH SETELAH PAJAK #REF!
PEMBULATAN #REF!

#NAME?

Tembilahan, 2022
Disetujui oleh: Dihitung oleh:
CV. MOMENT TEKNIK CV. MOMENT TEKNIK
Konsultan Perencanaan, Konsultan Perencanaan,

HIKMATULLAH, ST Ir. ADRIL


Direktur Team Leader

Diketahui oleh: Disetujui oleh:


PERUMDA TIRTA INDRAGIRI PEJABAT PEMBUAT KOMITMEN
KAB. INDRAGIRI HILIR (PPK)

Ir. AHMAD HAFIS ARIF GUNAWAN, ST


Direktur NIP. 19840830 201001 1 006

IPA FILTER 2021 REKAP 7


ENGINEER'S ESTIMATE (EE)

PROGRAM : 0
KEGIATAN : 0
SUB KEGIATAN : 0
PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN RAKYAT
LOKASI : TEMBILAHAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.) (Rp.)

1 2 3 4 5 6 7=4x6
1 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
I PENYIAPAN RKK 1.00 set 4,000,000.00 4,000,000.00
1 Pembuatan dokumen SMKK (RKK, RMPK, RKPPL, RMLLP)
2 Pembuatan prosedur dan instruksi kerja
3 Penyusunan pelaporan SMKK

II SOSIALISASI, PROMOSI DAN PELATIHAN


1 Spanduk (banner) 1.00 lbr 350,000.00 350,000.00
2 Poster 1.00 lbr 350,000.00 350,000.00
3 Papan Informasi Keselamatan Konstruksi 1.00 bh 350,000.00 350,000.00

III ALAT PELINDUNG KERJA


1 Pembatas area (restricted area) 1.00 ls 1,000,000.00 1,000,000.00

IV ALAT PELINDUNG DIRI


1 Topi pelindung (safety helmet) 20.00 bh 25,000.00 500,000.00
2 Pelindung pernafasan dan mulut (masker) 5.00 ktk 50,000.00 250,000.00
3 Sarung tangan (safety gloves) 20.00 psg 15,000.00 300,000.00
4 Sepatu keselamatan (safety shoes) 20.00 psg 500,000.00 10,000,000.00
5 Rompi keselamatan (safety vest); 20.00 bh 30,000.00 600,000.00

VI PERSONIL KESELAMATAN KONSTRUKSI


1 Petugas Keselamatan Konstruksi 6.00 org/bulan 1,500,000.00 9,000,000.00

VII FASILITAS, SARANA DAN PRASARANA KESEHATAN


1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 ls 2,500,000.00 2,500,000.00
2 Biaya protokol kesehatan (sarana pembersih tangan, desinfektan) 1.00 ls 1,000,000.00 1,000,000.00

VIII RAMBU DAN PERLENGKAPAN LALU LINTAS YANG DIPERLUKAN ATAU MANAJEMEN LALU LINTAS
1 Rambu petunjuk 1.00 bh 85,000.00 85,000.00
2 Rambu larangan 1.00 bh 85,000.00 85,000.00
3 Rambu peringatan 1.00 bh 85,000.00 85,000.00
4 Rambu kewajiban 1.00 bh 85,000.00 85,000.00
5 Rambu informasi 1.00 bh 85,000.00 85,000.00
6 Rambu pekerjaan sementara 1.00 bh 85,000.00 85,000.00
7 Tongkat pengatur lalu lintas (warning lights stick) 2.00 bh 75,000.00 150,000.00
8 Kerucut lalu lintas (traffic cone) 2.00 bh 100,000.00 200,000.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.) (Rp.)

1 2 3 4 5 6 7=4x6
X LAIN-LAIN TERKAIT PENGENDALIAN RISIKO K3
1 Bendera K3 6.00 ls 90,000.00 540,000.00

JUMLAH TOTAL 31,600,000.00

Tembilahan, 2022
Disetujui oleh: Dihitung oleh:
PT. BPR GEMILANG (Persero) CV. MOMENT TEKNIK
Bank Perkereditan Rakyat Konsultan Perencanaan,

………………………… HIKMATULLAH, ST
Direktur Team Leader
ENGINEER'S ESTIMATE (EE)

PEKERJAAN : IPA FILTER DESA PULAU PALAS KEC. TEMBILAHAN HULU


LOKASI : KABUPATEN INDRAGIRI HILIR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)

1 2 3 4 5 6
#NAME?
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi #REF! #REF! Rp 9,000.00 #REF!
2 Pek. Pengukuran / Pas. Bowplank #REF! #REF! Rp 40,426.93 #REF!
JUMLAH I #REF!
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi #REF! #REF! Rp 33,250.00 #REF!
2 Pek. Pasang Cerocok Bakau Pjg. 6 m #REF! #REF! Rp 60,675.00 #REF!
3 Pek. Pasang Cerocok Teras Bakau Pjg. 3 m #REF! #REF! Rp 30,337.50 #REF!
4 Pek. Urugan Pasir Bawah Pondasi tbl 10 cm #REF! #REF! Rp 192,997.00 #REF!
5 Pek. Cor Lantai Kerja 1:3:5, tbl 5 cm #REF! #REF! #REF! #REF!
6 Pek. Cor Tapak Pondasi camp. 1:2:3 #REF! #REF! #REF! #REF!
7 Pek. Cor Tapak Teras camp. 1:2:3 #REF! #REF! #REF! #REF!
8 Pek. Cor Tiang Pondasi 20/20 camp. 1:2:3 #REF! #REF! #REF! #REF!
9 Pek. Pembesian Tapak
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
10 Pek. Pembesian Tiang Poer
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
- Beugel Besi Ulir dia. 8 mm #REF! #REF! Rp 15,276.17 #REF!
11 Pek. Pembesian Balok dan Lantai
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
- Beugel Besi Ulir dia. 8 mm #REF! #REF! Rp 15,276.17 #REF!
12 Pek. Bekisting Tapak Pondasi #REF! #REF! Rp 145,432.56 #REF!
13 Pek. Bekisting Tiang Pondasi #REF! #REF! Rp 277,873.33 #REF!
14 Pek. Bekisting Balok #REF! #REF! Rp 156,864.36 #REF!
15 Pek. Urugan Kembali Bekas Galian #REF! #REF! Rp 16,110.00 #REF!
JUMLAH II #REF!
III PEKERJAAN LANTAI
1 Pek. Pembesian Lantai
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
2 Pek. Bekisting Lantai #REF! #REF! Rp 313,875.17 #REF!
3 Pek. Cor Lantai camp. 1:2:3, Tbl. 10 cm #REF! #REF! #REF! #REF!
4 Pek. Pembesian Lantai Dag
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 156,864.36 #REF!
5 Pek. Bekisting Lantai Dag #REF! #REF! Rp 313,875.17 #REF!
6 Pek. Cor Lantai Dag #REF! #REF! #REF! #REF!
JUMLAH III #REF!
IV PEKERJAAN STRUKTUR
1 Pek. Cor Kolom 12/12 camp. 1:2:3 #REF! #REF! #REF! #REF!
2 Pek. Pembesian Kolom
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
- Beugel Besi Ulir dia. 8 mm #REF! #REF! Rp 15,276.17 #REF!
3 Pek. Bekisting Kolom #REF! #REF! Rp 298,175.17 #REF!
4 Pek. Cor Ring Balok 12/15, camp. 1:2:3 #REF! #REF! #REF! #REF!
5 Pek. Pembesian Ring Balok
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
- Beugel Besi Ulir dia. 8 mm #REF! #REF! Rp 15,276.17 #REF!
6 Pek. Cor Tangga, camp. 1:2:3 #REF! #REF! Rp 298,175.17 #REF!
7 Pek. Pembesian Tangga
- Tulangan Pokok Besi Ulir dia. 10 mm #REF! #REF! Rp 15,276.17 #REF!
- Beugel Besi Ulir dia. 8 mm #REF! #REF! Rp 15,276.17 #REF!
8 Pek. Bekisting Tangga #REF! #REF! Rp 27,200.00 #REF!
JUMLAH IV #REF!
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)

1 2 3 4 5 6
V PEKERJAAN DINDING DAN KUZEN
1 Pek. Pasangan Bata Dinding camp. 1:4 #REF! #REF! Rp 145,048.00 #REF!
2 Pek. Pasangan Batu Alam #REF! #REF! Rp 224,548.00 #REF!
3 Pek. Plesteran Dinding camp. 1:3 #REF! #REF! Rp 39,874.69 #REF!
4 Pek. Kusen Pintu Kayu Klas II #REF! #REF! Rp 10,668,972.05 #REF!
5 Pek. Kusen Jendela Kayu Klas II #REF! #REF! Rp 10,668,972.05 #REF!
6 Pek. Ventilasi Kusen Kayu Klas II #REF! #REF! Rp 10,668,972.05 #REF!
JUMLAH V #REF!
VI PEKERJAAN PINTU, JENDELA DAN KACA
1 Pek. Pengadaan dan pemasangan Pintu P1 #REF! #REF! Rp 1,500,000.00 #REF!
2 Pek. Pengadaan dan pemasangan Pintu P2 #REF! #REF! Rp 500,000.00 #REF!
3 Pek. Pengadaan dan pemasangan Jendela J1 Lengkap #REF! #REF! Rp 375,000.00 #REF!
4 Pek. Pengadaan dan pemasangan Jendela J2 #REF! #REF! Rp 750,000.00 #REF!
5 Pek. Pengadaan dan pemasangan Ventilasi V1 #REF! #REF! Rp 100,000.00 #REF!
JUMLAH VI #REF!
VII PEKERJAAN PLAFOND
1 Pek. Rangka Plafond #REF! #REF! Rp 183,805.42 #REF!
2 Pek. Plafond Gypsum Board Tebal 9 mm #REF! #REF! Rp 102,177.50 #REF!
JUMLAH VII #REF!
VIII PEKERJAAN KERAMIK
1 Pek. Pemasangan Keramik Lantai 40 x 40 #REF! #REF! Rp 160,577.03 #REF!
2 Pek. Pemasangan Keramik Lantai teras dan tangga 30 x 30 #REF! #REF! Rp 195,719.98 #REF!
3 Pek. Pemasangan Keramik Lantai WC 30 x 30 #REF! #REF! Rp 195,719.98 #REF!
4 Pek. Pemasangan Keramik Dinding WC 30 x 30 #REF! #REF! Rp 269,020.98 #REF!
JUMLAH VIII #REF!
IX PEKERJAAN PENGECATAN
1 Pek. Cat Air #REF! #REF! Rp 48,254.00 #REF!
2 Pek. Cat Minyak #REF! #REF! Rp 35,945.82 #REF!
JUMLAH IX #REF!
X PEKERJAAN ALAT LISTRIK DAN ACCESSORIES
1 Instalasi Titik Lampu #REF! #REF! Rp 250,000.00 #REF!
2 Saklar Ganda #REF! #REF! Rp 250,000.00 #REF!
3 Saklar Tunggal #REF! #REF! Rp 200,000.00 #REF!
4 Stop Kontak #REF! #REF! Rp 200,000.00 #REF!
5 Lampu SL 18 watt Sekelas Philip #REF! #REF! Rp 35,000.00 #REF!
6 MCB 2 A #REF! #REF! Rp 140,000.00 #REF!
JUMLAH X #REF!
XI PEKERJAAN ATAP
1 Pek. Pasang Kuda-kuda Baja Ringan #REF! #REF! Rp 159,830.80 #REF!
2 Pek. Pasang Atap Spandek Zincalume 0,25 mm #REF! #REF! Rp 88,850.00 #REF!
JUMLAH XI #REF!
XII PEKERJAAN INTALASI AIR DAN SEPTIK TANK
1 Pek. Galian Tanah #REF! #REF! Rp 33,250.00 #REF!
2 Pek. Cerucuk Bakau Pj 3 M #REF! #REF! Rp 30,337.50 #REF!
3 Pek. Tangki Septik Tank Bio #REF! #REF! Rp 3,500,000.00 #REF!
3 Pek. Pemasangan Kloset #REF! #REF! Rp 2,400,000.00 #REF!
4 Pek. Bak Air Fiber #REF! #REF! Rp 1,200,000.00 #REF!
5 Pek. Pemasangan Stop Kran #REF! #REF! Rp 50,000.00 #REF!
6 Pek. Pemasangan Pipa 3/4" #REF! #REF! Rp 20,000.00 #REF!
7 Pek. Pemasangan Pipa 3" #REF! #REF! Rp 45,000.00 #REF!
JUMLAH XII #REF!
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)

1 2 3 4 5 6
XIII PEKERJAAN LAIN - LAIN
1 Pek Pembersihan Akhir #REF! #REF! Rp 2,300,000.00 #REF!
JUMLAH XIII #REF!
TOTAL JUMLAH #REF!
TOTAL JUMLAH 2 Unit #REF!
Tembilahan, April 2021
Diperiksa oleh : Disiapkan oleh :
PERUMDA Air Minum Tirta Indragiri Konsultan Individual
Kasubag Perencanaan

SAPRIZAL ANDI KURNIAWANSYAH


NIK. 040073

Disetujui oleh : Diketahui oleh :


PERUMDA Air Minum Tirta Indragiri Dinas Pekerjaan Umum dan Tata Raung
Direktur Kepala Bidang Cipta Karya Kab. Indragiri Hilir

Ir. AHMAD HAFIZ ARIF GUNAWAN, ST.


NIP. 19840830 201001 1 006
ENGINEER'S ESTIMATE (EE)

PROGRAM : 0
KEGIATAN : 0
SUB KEGIATAN : 0
PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN RAKYAT
LOKASI : TEMBILAHAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6 7=4x6
2 PEMBANGUNAN GEDUNG PT. BPR GEMILANG
I PEKERJAAN PERSIAPAN
1 Pek. Pasang Papan Nama Kegiatan - 1.00 bh Rp 450,000.00 Rp 450,000.00
2 Pek. Pembongkaran Bangunan Lama A.2.2.1.14.a 50.00 m2 Rp 564,877.01 Rp 28,243,850.50
3 Pek. Pengukuran/Pasang Bowplank 1.7.5.e (c) 58.00 m' Rp 57,305.88 Rp 3,323,741.17
4 Pek. Pembersihan Lokasi 1.1.f 210.00 m2 Rp 24,978.00 Rp 5,245,380.00
SUB JUMLAH Rp 37,262,971.67
II PEKERJAAN STRUKTUR
A PEKERJAAN STRUKTUR BAWAH
1 Pek. Galian Tanah Lumpur 1.7.1.a 54.40 m' Rp 124,867.00 Rp 6,792,764.80
2 Pek. Pasang Cerucuk, Pjg. 7 m F.02 1,297.00 btg Rp 31,078.04 Rp 40,308,222.51
3 Pek. Urugan Pasir Tebal 10 cm 1.7.2.d 32.00 m³ Rp 346,405.30 Rp 11,084,969.60
4 Pek. Lantai Kerja Beton Campuran 1 : 3 : 5 Tebal 5 cm A.4.1.1.1 8.00 m³ Rp 1,874,628.88 Rp 14,997,031.04
5 Pek. Pondasi Setempat Beton Bertulang
- Pek. Beton K-225 A.4.1.1.7 64.00 m³ Rp 2,154,023.54 Rp 137,857,506.83
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 7,921.00 kg Rp 32,514.60 Rp 257,548,157.74
- Pek. Bekisting A.4.1.1.18 160.00 m² Rp 270,407.53 Rp 43,265,204.32
6 Pek. Tiang Umpak Beton Bertulang Ukuran 25/25 cm
- Pek. Beton K-225 A.4.1.1.7 29.69 m³ Rp 2,154,023.54 Rp 63,947,573.97
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 2,150.60 kg Rp 32,514.60 Rp 69,925,901.78
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 1,078.35 kg Rp 32,514.60 Rp 35,062,120.43
- Pek. Bekisting (2x) A.4.1.1.20 228.00 m² Rp 247,988.70 Rp 56,541,422.86
7 Pek. Balok Sloof Beton Bertulang Ukuran 20/40 cm
- Pek. Beton K-225 A.4.1.1.7 8.42 m³ Rp 2,154,023.54 Rp 18,128,262.15
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 374.51 kg Rp 32,514.60 Rp 12,177,108.40
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 271.74 kg Rp 32,514.60 Rp 8,835,654.35
- Pek. Bekisting (2x) A.4.1.1.20 28.05 m² Rp 247,988.70 Rp 6,956,909.57
8 Pek. Balok Lantai Beton Bertulang Ukuran 20/40 cm
- Pek. Beton K-225 A.4.1.1.7 8.88 m³ Rp 2,154,023.54 Rp 19,127,729.07
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 710.46 kg Rp 32,514.60 Rp 23,100,401.75
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 286.84 kg Rp 32,514.60 Rp 9,326,524.03
- Pek. Bekisting (2x) A.4.1.1.19 56.24 M2 Rp 142,873.49 Rp 8,035,204.92

B PEKERJAAN STRUKTUR ATAS


1 Pek. Tiang Kolom K1 20x20 cm
- Pek. Beton K-225 A.4.1.1.7 5.68 m³ Rp 2,154,023.54 Rp 12,226,237.64
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 575.65 kg Rp 32,514.60 Rp 18,717,095.33
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 219.25 kg Rp 32,514.60 Rp 7,128,784.09
- Pek. Bekisting (2x) A.4.1.1.20 30.27 m² Rp 247,988.70 Rp 7,507,113.83
2 Pek. Tiang Kolom K2 15x15 cm
- Pek. Beton K-225 A.4.1.1.7 0.58 m³ Rp 2,154,023.54 Rp 1,250,410.67
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 104.66 kg Rp 32,514.60 Rp 3,403,108.24
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 26.12 kg Rp 32,514.60 Rp 849,196.85
- Pek. Bekisting A.4.1.1.20 7.74 m² Rp 247,988.70 Rp 1,919,432.51
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6 7=4x6
3 Pek. Tiang Kolom K3 20x20 cm
- Pek. Beton K-225 A.4.1.1.7 2.64 m³ Rp 2,154,023.54 Rp 5,686,622.16
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 277.68 kg Rp 32,514.60 Rp 9,028,654.52
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 105.39 kg Rp 32,514.60 Rp 3,426,583.78
- Pek. Bekisting A.4.1.1.20 26.40 m² Rp 247,988.70 Rp 6,546,901.59
4 Pek. Reng Balok 20x20 cm
- Pek. Beton K-225 A.4.1.1.7 5.50 m³ Rp 2,154,023.54 Rp 11,855,745.59
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 494.13 kg Rp 32,514.60 Rp 16,066,374.96
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 210.31 kg Rp 32,514.60 Rp 6,838,269.38
- Pek. Bekisting A.4.1.1.21 27.52 m² Rp 255,954.28 Rp 7,043,861.81
5 Pek. Reng Balok Latey 15x20 cm
- Pek. Beton K-225 A.4.1.1.7 0.60 m³ Rp 2,154,023.54 Rp 1,292,414.13
- Pek. Pembesian Besi Ulir Ø 12 mm 2.2.6.1.d.(a) 75.47 kg Rp 32,514.60 Rp 2,453,942.00
- Pek. Pembesian Besi Ulir Ø 8 mm 2.2.6.1.d.(a) 20.11 kg Rp 32,514.60 Rp 653,979.18
- Pek. Bekisting A.4.1.1.21 11.00 m² Rp 255,954.28 Rp 2,815,497.09
SUB JUMLAH Rp 969,728,895.46
III PEKERJAAN ARSITEKTURAL
A PEKERJAAN LANTAI
1 Pek. Timbunan Pasir 1.7.2.d 91.73 m³ Rp 346,405.30 Rp 31,775,325.16
2 Pek. Cor Lantai Tebal 12 cm A.4.1.1.7 19.01 m³ Rp 2,154,023.54 Rp 40,943,679.53
- Pek. Pembesian Besi Ulir Ø 10 mm 2.2.6.1.d.(a) 1,298.78 kg Rp 32,514.60 Rp 42,229,183.96
- Pek. Bekisting A.4.1.1.22 225.00 m² Rp 255,954.28 Rp 57,589,713.23

B PEKERJAAN DINDING
1 Pek. Pas. Dinding Pondasi Bata Merah 1 Bata A.4.4.1.3 39.80 m² Rp 538,758.69 Rp 21,445,020.17
2 Pek. Plasteran Dinding Pondasi 1:4 3.2.2.(c) 57.90 m² Rp 97,549.38 Rp 5,648,109.38
3 Pek. Pas. Dinding Bata Merah 1/2 Bata A.4.4.1.9 79.61 m² Rp 264,373.44 Rp 21,046,505.38
SUB JUMLAH Rp 220,677,536.80
IV PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir - 1.00 ls Rp 2,000,000.00 Rp 2,000,000.00
SUB JUMLAH Rp 2,000,000.00
JUMLAH TOTAL Rp 1,008,991,867.14

Tembilahan, 2022
Disetujui oleh: Dihitung oleh:
PT. BPR GEMILANG (Persero) CV. MOMENT TEKNIK
Bank Perkereditan Rakyat Konsultan Perencanaan,

………………………… HIKMATULLAH, ST
Direktur Team Leader
ENGINEER'S ESTIMATE (EE)

REKAPITULASI
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PROGRAM : 0
KEGIATAN : 0
SUB KEGIATAN : 0
PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN RAKYAT
LOKASI : TEMBILAHAN

NO URAIAN PEKERJAAN KODE ANALISA SATUAN JUMLAH HARGA

1 2 3 4 5
1 Pengukuran kembali/uitzet T.02.a 1 M' Rp. 4,590.80
2 Papan Nama Pekerjaan 1.1.4.b.(a) 1 Buah Rp. 683,365.74
3 Pengukuran dan pemasangan bouwplank 1.7.5.e (c) 1 M' Rp. 57,305.88
4 Pembersihan lapangan dan perataan 1.1.f 1 M² Rp. 24,978.00
5 Pembongkaran cor beton A.2.2.1.14.a 1 M² Rp. 564,877.01
6 Galian Tanah Biasa sedalam 1 M' 1.7.1.a 1 M³ Rp. 124,867.00
7 Galian Tanah Lumpur sedalam 1 M' 1.7.1.b 1 M³ Rp. 200,679.60
8 Urugan Kembali 1.7.2.a 1 M³ Rp. 89,194.00
9 Pemadatan Tanah 1.7.2.c 1 M³ Rp. 89,194.00
10 Urugan Pasir 1.7.2.d 1 M³ Rp. 346,405.30
11 Penetrasi Tiang Pancang Kayu atau Dolken 8-10 cm F.02 1 M' Rp. 31,078.04
12 Penetrasi Tiang Pancang Pipa Baja menggunakan ponton F.03 1 M' Rp. 128,751.13
13 Penetrasi Tiang Pancang Beton menggunakan ponton F.04.d 1 M' Rp. 284,285.98
14 Lantai Kerja Beton Mutu f'c=7,4 Mpa, slum (3-6) cm, w/c = 0,87 (K100) A.4.1.1.1 1 M³ Rp. 1,874,628.88
15 Beton Mutu f'c=14,5 MPa, slum (120±20) mm (K175) A.4.1.1.5 1 M³ Rp. 2,052,288.26
16 Beton Mutu f'c=16,9 MPa (K200) A.4.1.1.6 1 M³ Rp. 2,107,571.21
17 Beton Mutu f'c=19,3 MPa (K225) A.4.1.1.7 1 M³ Rp. 2,154,023.54
18 Beton Mutu f'c=26,4 MPa (K300) A.4.1.1.10 1 M³ Rp. 2,233,064.96
19 Beton Kedap Air dengan Strorox-100 A.4.1.1.13 1 M³ Rp. 2,430,161.60
20 Pembesian dengan Besi Beton 2.2.6.1.d.(a) 10 Kg Rp. 325,146.01
21 Pemasangan Jaring Kawat Baja (Wiremesh) M6-M8 A.4.1.1.17 10 Kg Rp. 156,528.04
22 Pemasangan Bekisting Pondasi A.4.1.1.18 1 M² Rp. 270,407.53
23 Pemasangan Bekisting Sloof A.4.1.1.19 1 M² Rp. 285,746.97
24 Pemasangan Bekisting Kolom A.4.1.1.20 1 M² Rp. 495,977.39
25 Pemasangan Bekisting Balok A.4.1.1.21 1 M² Rp. 511,908.56
26 Pemasangan Bekisting Lantai A.4.1.1.22 1 M² Rp. 560,800.59
27 Pemasangan Bekisting Dinding A.4.1.1.23 1 M² Rp. 524,156.25
28 Pemasangan Bekisting Tangga A.4.1.1.25 1 M² Rp. 463,646.52
29 Pemasangan Bata Merah Tebal 1 Batu Camp. 1PC : 4PS A.4.4.1.3 1 M² Rp. 538,758.69
30 Pemasangan Bata Merah Tebal ½ Batu Camp. 1PC : 4PS A.4.4.1.9 1 M² Rp. 264,373.44
31 Pemasangan Dinding Terawang (Rooster) Camp. 1PC : 4PS A.4.4.1.23 1 M² Rp. 826,879.10
32 Pemasangan Dinding Glass Block Camp. 1PC : 4PS A.4.4.1.23.a 1 M² Rp. 1,448,350.02
33 Plesteran Camp. 1PC : 4PS Tebal 15 mm 3.2.2.(c) 1 M² Rp. 97,549.38
34 Pemasangan Lantai Ubin Warna ukuran 40 x 40 cm A.4.4.3.7 1 M² Rp. 208,420.96
35 Pemasangan Lantai Ubin Granit ukuran 40 x 40 cm A.4.4.3.9 1 M² Rp. 349,273.30
36 Pemasangan Lantai Keramik Ukuran 30 x 30 cm A.4.4.3.35 1 M² Rp. 227,378.89
37 Pemasangan Lantai Keramik Ukuran 20 x 20 cm A.4.4.3.35 1 M² Rp. 227,378.89
38 Pemasangan Keramik Dinding Ukuran 20 x 20 cm A.4.4.3.53 1 M² Rp. 371,767.57
39 Pemasangan Dinding Batu Tempel Hitam A.4.4.3.57 1 M² Rp. 521,675.10
40 Pemasangan Floor Hardener A.4.4.3.60 1 M² Rp. 76,242.24
41 Pekerjaan Plafond Gypsum Board Tebal 9 mm A.4.5.1.7 1 M² Rp. 70,106.60
42 Pekerjaan Rangka Besi Hollow 1 x 40.40.2, Modul 60 x 60 cm A.4.2.1.21 1 M² Rp. 466,929.44
43 Pekerjaan Pemasangan Kuda-Kuda Baja Ringan untuk atap Spandek A.4.2.1.23 1 M² Rp. 216,187.12
44 Pekerjaan Pemasangan Atap Seng A.4.5.2.40 1 M² Rp. 79,254.83
NO URAIAN PEKERJAAN KODE ANALISA SATUAN JUMLAH HARGA

1 2 3 4 5
45 Pekerjaan Pemasangan Nok Atap Seng A.4.5.2.41 1 M' Rp. 39,753.48
46 Pembuatan dan Pemasangan Kusen pintu dan Kusen Jendela, Kayu Kelas II A.4.6.1.2 1 M³ Rp. 12,380,111.39
47 Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Kelas II A.4.6.1.5 1 M² Rp. 975,572.83
48 Pembuatan dan Pemasangan Pintu dan Jendela Kaca, Kayu Kelas II A.4.6.1.6 1 M² Rp. 697,001.57
49 Pemasangan Lisplank (3x20), Kayu Kelas II A.4.6.1.21 1 M² Rp. 128,753.41
50 Pemasangan Kunci Tanam Biasa A.4.6.2.2 1 Buah Rp. 614,973.20
51 Pemasangan Kunci Kamar Mandi A.4.6.2.3 1 Buah Rp. 136,532.14
52 Pemasangan Engsel Pintu A.4.6.2.5 1 Buah Rp. 51,765.48
53 Pemasangan Engsel Kupu-Kupu A.4.6.2.6 1 Buah Rp. 36,009.84
54 Pemasangan Kait Angin A.4.6.2.9 1 Buah Rp. 60,525.54
55 Pemasangan Kunci Slot A.4.6.2.11 1 Buah Rp. 75,866.88
56 Pemasangan Kaca 5 mm A.4.6.2.17 1 M² Rp. 281,549.80
57 Pengecatan Bidang Kayu/Besi Baru (1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup) 3.3.4.(c) 1 M² Rp. 97,537.89
58 Pengecatan Tembok Baru (1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup) 3.3.10.(c) 1 M² Rp. 49,174.18
59 Pemasangan Closet Duduk/Monoblock A.5.1.1.1 1 Set Rp. 3,445,524.55
60 Pemasangan Closet Jongkok A.5.1.1.2 1 Buah Rp. 851,899.76
61 Pemasangan Floor Drain A.5.1.1.36 1 Buah Rp. 45,636.60
62 Pemasangan Kran Air Diameter ½" atau ¾" A.5.1.1.35 1 Buah Rp. 113,693.31
63 Pemasangan pipa PVC tipe AW Diameter ¾" A.5.1.1.26 1 M' Rp. 93,424.79
64 Pemasangan pipa PVC tipe AW Diameter 1" A.5.1.1.27 1 M' Rp. 131,968.88
65 Pemasangan pipa PVC tipe AW Diameter 3" A.5.1.1.31 1 M' Rp. 619,545.65
66 Pemasangan Elbow 22.5⁰ HDPE ø250 mm A.8.4.3.17.a 1 Buah Rp. 2,075,707.45
67 Pemasangan Elbow 22.5⁰ HDPE ø315 mm A.8.4.3.18.a 1 Buah Rp. 3,292,596.28
68 Pemasangan Elbow 45⁰ HDPE ø110 mm A.8.4.3.15.a 1 Buah Rp. 425,492.03
69 Pemasangan Elbow 90⁰ HDPE ø 63 mm A.8.4.3.18.b 1 Buah Rp. 669,148.66
70 Pemasangan Elbow 90⁰ HDPE ø 90 mm A.8.4.3.15.b 1 Buah Rp. 622,257.03
71 Pemasangan Elbow 90⁰ HDPE ø250 mm A.8.4.3.17.b 1 Buah Rp. 1,777,587.20
72 Pemasangan Elbow 90⁰ HDPE ø315 mm A.8.4.3.18.c 1 Buah Rp. 5,296,219.66
73 Pemasangan TEE HDPE ø63 mm 4.3.15.(c) 1 Buah Rp. 299,560.74
74 Pemasangan TEE HDPE ø90 mm 4.3.16.(c) 1 Buah Rp. 641,420.32
75 Pemasangan TEE HDPE ø110 mm A.8.4.3.18.d 1 Buah Rp. 1,492,836.16
76 Pemasangan REDUCER TEE HDPE ø110 x 63 mm A.8.4.3.17.c 1 Buah Rp. 1,610,722.20
77 Pemasangan REDUCER TEE HDPE ø 90 x 63 mm A.8.4.3.18.e 1 Buah Rp. 890,821.28
78 Pemasangan REDUCER HDPE ø 90 x 63 mm A.8.4.3.18.f 1 Buah Rp. 637,318.16
78 Pemasangan Pipa HDPE PN 10 ø110 MM A.8.4.1.18 1 M' Rp. 200,655.22
79 Pemasangan Pipa HDPE PN 10 ø63 MM 4.1.22.(c) 1 M' Rp. 183,929.39
80 Pemasangan Pipa HDPE PN 10 ø90 MM 4.1.23.(c) 1 M' Rp. 341,183.61
81 Pemasangan Pipa HDPE PN 10 ø355 MM A.8.4.1.23.a 1 M' Rp. 106,656.29
82 Pemasangan Gate Valve ø110 MM A.8.4.3.1.a 1 Unit Rp. 3,825,702.70
83 Pemasangan Gate Valve ø250 MM 4.3.3.(c) 1 Unit Rp. 34,172,940.92
84 Pemasangan Gate Valve ø300 MM 4.3.4.(c) 1 Unit Rp. 37,898,148.23
85 Pemasangan Stub Flange ø110 MM A.8.4.3.15.c 1 Set Rp. 674,949.49
86 Pemasangan Stub Flange ø250 MM A.8.4.3.17.d 1 Set Rp. 2,777,359.25
87 Pemasangan Stub Flange ø300 MM A.8.4.3.18.f 1 Set Rp. -
88 Pemasangan Stub Flange ø400 MM A.8.4.3.19.a 1 Set Rp. 5,989,077.64
89 Penyambungan pipa baru ke pipa yang ada ø300 MM A.8.4.4.6 1 Buah Rp. 3,473,079.81
90 Penyambungan pipa baru ke pipa yang ada ø400 MM 4.4.7.(c) 1 Buah Rp. 4,368,289.26
91 Pemasangan Dismantling Joint CS Galvanis PN 10 ø110 MM A.8.4.3.1.b 1 Unit Rp. 1,004,459.45
92 Pemasangan Dismantling Joint CS Galvanis PN 10 ø250 MM A.8.4.3.3.b 1 Unit Rp. 3,127,788.17
93 Pemasangan Dismantling Joint CS Galvanis PN 10 ø315 MM A.8.4.3.4.b 1 Unit Rp. 3,360,305.75
94 Pemasangan Pipa Galvanis ø2 inchi A.5.1.1.22.a 1 M' Rp. 288,358.26
95 Pemasangan Pipa GIP ø6 inchi 4.1.36.(c) 1 M' Rp. 130,952.34
96 Pemasangan Pipa GIP ø8 inchi 4.1.37.(c) 1 M' Rp. 205,963.16
97 Pemasangan Pipa GIP ø10 inchi 4.1.38.(c) 1 M' Rp. 2,383,171.62
98 Pemasangan Pipa GIP SCH 40 ø16 inchi 4.1.40.(c) 1 M' Rp. 4,567,293.43
NO URAIAN PEKERJAAN KODE ANALISA SATUAN JUMLAH HARGA

1 2 3 4 5
99 Pemasangan Pipa GIP ø20 inchi 4.1.42.(c) 1 M' Rp. 5,731,840.27
100 Pemasangan Pipa Baja ø6 inchi 4.1.67.(c) 1 M' Rp. 1,477,586.55
101 Pemasangan Pipa Baja ø8 inchi 4.1.68.(c) 1 M' Rp. 2,255,674.30
102 Pengecatan Permukaan Baja Galvanis secara Manual Sistem 1 lapis Cat Mutakhir A.4.7.1.19 1 M² Rp. 55,029.22
103 Pemasangan Besi Profil A.4.2.1.1 1 Kg Rp. 44,480.39
104 Pemasangan Besi Profil I A.4.2.1.1.a 1 M' Rp. 3,428,811.23
105 Pemasangan Besi Plat A.4.2.1.1.b 1 M² Rp. 1,008,373.84
106 Pengelasan dengan Las Listrik 3.1.1.(c) 10 Cm' Rp. 50,326.30
107 Pemasangan Kusen Pintu Aluminium A.4.2.1.24 1 M' Rp. 159,509.46
108 Pemasangan Pintu Aluminium Strip Lebar 8 cm A.4.2.1.25 1 M² Rp. 1,341,708.50
109 Pemasangan Pintu Kaca Rangka Aluminium A.4.2.1.26 1 M² Rp. 628,101.87
110 Pengetesan Pipa ø250 mm A.8.4.5.6 1 M' Rp. 4,019.87
111 Pengetesan Pipa ø300 mm A.8.4.5.7 1 M' Rp. 4,646.85
112 Pengetesan Pipa ø355 mm A.8.4.5.7.a 1 M' Rp. 5,430.58
113 Pengetesan Pipa ø400 mm A.8.4.5.8 1 M' Rp. 6,214.31
114 Pemasangan Titik Lampu A.8.4.6.1 1 Buah Rp. 330,970.00
115 Pemasangan Stop Kontak 1 Phase A.8.4.6.2.a 1 Buah Rp. 205,620.00
116 Pemasangan Stop Kontak 3 Phase A.8.4.6.2.b 1 Buah Rp. 688,315.25

Tembilahan, 2022
Disetujui oleh: Dihitung oleh:
PT. BPR GEMILANG (Persero) CV. MOMENT TEKNIK
Bank Perkereditan Rakyat Konsultan Perencanaan,

………………………… HIKMATULLAH, ST
Direktur Team Leader
ENGINEER'S ESTIMATE (EE)

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PROGRAM : 0
KEGIATAN : 0
SUB KEGIATAN : 0
PEKERJAAN : PEMBANGUNAN GEDUNG PT. BPR GEMILANG (PERSERO) BANK PERKEREDITAN RAKYAT
LOKASI : TEMBILAHAN

Jenis Pekerjaan : Pengukuran kembali/uitzet T.02.a


Satuan Pembayaran : 1 M'
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja OH 0.0120 139,600.00 1,675.20
2 Pembantu Juru Ukur OH 0.0040 139,600.00 558.40
3 Juru Ukur OH 0.0040 139,600.00 558.40

Jumlah Harga Tenaga 2,792.00

B BAHAN

Jumlah Harga Bahan -

C PERALATAN
1 Waterpass Hari 0.0040 75,000.00 300.00
2 Theodolith Hari 0.0040 225,000.00 900.00

Jumlah Harga Peralatan 1,200.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,992.00


E OVERHEAD & PROFIT 15 % x D 598.80
F JUMLAH TOTAL ( D + E ) 4,590.80

Jenis Pekerjaan : Papan Nama Pekerjaan 1.1.4.b.(a)


Satuan Pembayaran : 1 Buah
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja OH 0.7500 139,600.00 104,700.00
2 Tukang OH 0.7500 139,600.00 104,700.00
3 Kepala Tukang OH 0.1000 155,200.00 15,520.00
4 Mandor OH 0.0750 155,200.00 11,640.00

Jumlah Harga Tenaga 236,560.00

B BAHAN
1 Plywood Tebal 9 mm lbr 0.1800 175,630.00 31,613.40
2 Tiang kayu 5/7 kelas II, tinggi 3 m' m³ 0.0210 5,852,730.00 122,907.33
3 Frame allumunium kg 0.1000 20,000.00 2,000.00
4 Banner plastik ukuran 0,6x0,8 m² m² 0.4800 50,000.00 24,000.00
5 Paku Biasa / Campur kg 1.2500 28,654.60 35,818.25
6 Cat minyak kg 1.5000 94,221.40 141,332.10

Jumlah Harga Bahan 357,671.08

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 594,231.08


E OVERHEAD & PROFIT 15 % x D 89,134.66
F JUMLAH TOTAL ( D + E ) 683,365.74
Jenis Pekerjaan : Pengukuran dan pemasangan bouwplank 1.7.5.e (c)
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1000 139,600.00 13,960.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 30,248.00

B BAHAN
1 Kayu 5/7 m³ 0.0120 28,000.00 336.00
2 Paku Biasa / Campur kg 0.0200 28,654.60 573.09
3 Papan Bekisting m³ 0.0070 2,667,730.00 18,674.11

Jumlah Harga Bahan 19,583.20

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 49,831.20


E OVERHEAD & PROFIT 15 % x D 7,474.68
F JUMLAH TOTAL ( D + E ) 57,305.88

Jenis Pekerjaan : Pembersihan lapangan dan perataan 1.1.f


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1000 139,600.00 13,960.00
2 Mandor OH 0.0500 155,200.00 7,760.00
Jumlah Harga Tenaga 21,720.00

B JUMLAH TENAGA 21,720.00


C OVERHEAD & PROFIT 15 % x B 3,258.00
D JUMLAH TOTAL ( B + C ) 24,978.00

Jenis Pekerjaan : Pembongkaran cor beton A.2.2.1.14.a


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 3.3335 139,600.00 465,356.60
2 Mandor OH 0.1665 155,200.00 25,840.80

Jumlah Harga Tenaga 491,197.40

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 491,197.40


E OVERHEAD & PROFIT 15 % x D 73,679.61
F JUMLAH TOTAL ( D + E ) 564,877.01
Jenis Pekerjaan : Galian Tanah Biasa sedalam 1 M' 1.7.1.a
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7500 139,600.00 104,700.00
2 Mandor OH 0.0250 155,200.00 3,880.00
Jumlah Harga Tenaga 108,580.00

B JUMLAH TENAGA 108,580.00


C OVERHEAD & PROFIT 15 % x B 16,287.00
D JUMLAH TOTAL ( B + C ) 124,867.00

Jenis Pekerjaan : Galian Tanah Lumpur sedalam 1 M' 1.7.1.b


Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.2000 139,600.00 167,520.00
2 Mandor OH 0.0450 155,200.00 6,984.00
Jumlah Harga Tenaga 174,504.00

B JUMLAH TENAGA 174,504.00


C OVERHEAD & PROFIT 15 % x B 26,175.60
D JUMLAH TOTAL ( B + C ) 200,679.60

Jenis Pekerjaan : Urugan Kembali 1.7.2.a


Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5000 139,600.00 69,800.00
2 Mandor OH 0.0500 155,200.00 7,760.00
Jumlah Harga Tenaga 77,560.00

B JUMLAH TENAGA 77,560.00


C OVERHEAD & PROFIT 15 % x B 11,634.00
D JUMLAH TOTAL ( B + C ) 89,194.00

Jenis Pekerjaan : Pemadatan Tanah 1.7.2.c


Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5000 139,600.00 69,800.00
2 Mandor OH 0.0500 155,200.00 7,760.00
Jumlah Harga Tenaga 77,560.00

B JUMLAH TENAGA 77,560.00


C OVERHEAD & PROFIT 15 % x B 11,634.00
D JUMLAH TOTAL ( B + C ) 89,194.00
Jenis Pekerjaan : Urugan Pasir 1.7.2.d
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Mandor OH 0.0100 155,200.00 1,552.00

Jumlah Harga Tenaga 43,432.00

B BAHAN
1 Pasir Urug m³ 1.2000 214,825.00 257,790.00

Jumlah Harga Bahan 257,790.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 301,222.00


E OVERHEAD & PROFIT 15 % x D 45,183.30
F JUMLAH TOTAL ( D + E ) 346,405.30

Jenis Pekerjaan : Penetrasi Tiang Pancang Kayu atau Dolken 8-10 cm F.02
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0750 139,600.00 10,470.00
2 Tukang OH 0.0250 139,600.00 3,490.00
3 Mandor OH 0.0080 155,200.00 1,241.60

Jumlah Harga Tenaga 15,201.60

B BAHAN
1 Cerocok Kayu Bulat m' 1.0000 3,772.79 3,772.79

Jumlah Harga Bahan 3,772.79

C PERALATAN
1 Tripod tinggi 5 m sewa/hari 0.0250 175,000.00 4,375.00
2 Alat Pancang + Hammer 0.5 Ton sewa/hari 0.0250 147,000.00 3,675.00

Jumlah Harga Peralatan 8,050.00


D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 27,024.39
E OVERHEAD & PROFIT 15 % x D 4,053.66
F JUMLAH TOTAL ( D + E ) 31,078.04
Jenis Pekerjaan : Penetrasi Tiang Pancang Pipa Baja menggunakan ponton F.03
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2000 139,600.00 27,920.00
2 Tukang OH 0.0400 139,600.00 5,584.00
3 Tukang Las OH 0.0400 139,600.00 5,584.00
4 Mandor OH 0.0200 155,200.00 3,104.00

Jumlah Harga Tenaga 42,192.00

B BAHAN
1 Kawat Las kg 0.1500 40,250.00 6,037.50
2 BBM non subsidi ltr 0.0800 15,600.00 1,248.00

Jumlah Harga Bahan 7,285.50

C PERALATAN
1 Ponton sewa/hari 0.0400 345,000.00 13,800.00
2 Tug Boat sewa/hari 0.0400 230,000.00 9,200.00
3 Tripod tinggi 7 m sewa/hari 0.0400 245,000.00 9,800.00
4 Alat Pancang + Hammer 1 Ton sewa/hari 0.0400 252,000.00 10,080.00
5 Las listrik 250 A diesel sewa/hari 0.0400 490,000.00 19,600.00

Jumlah Harga Peralatan 62,480.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 111,957.50


E OVERHEAD & PROFIT 15 % x D 16,793.63
F JUMLAH TOTAL ( D + E ) 128,751.13

Jenis Pekerjaan : Penetrasi Tiang Pancang Beton menggunakan ponton F.04.d


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.1100 139,600.00 15,356.00
3 Mandor OH 0.0660 155,200.00 10,243.20

Jumlah Harga Tenaga 117,735.20

B BAHAN

Jumlah Harga Bahan -

C PERALATAN
1 Ponton sewa/hari 0.1100 345,000.00 37,950.00
2 Tug Boat sewa/hari 0.1100 230,000.00 25,300.00
3 Tripod tinggi 7 m sewa/hari 0.1100 245,000.00 26,950.00
4 Alat Pancang + Hammer 2 Ton sewa/hari 0.1100 357,000.00 39,270.00

Jumlah Harga Peralatan 129,470.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 247,205.20


E OVERHEAD & PROFIT 15 % x D 37,080.78
F JUMLAH TOTAL ( D + E ) 284,285.98
Jenis Pekerjaan : Lantai Kerja Beton Mutu f'c=7,4 Mpa, slum (3-6) cm, w/c = 0,87 (K100) A.4.1.1.1
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.6500 139,600.00 230,340.00
2 Tukang OH 0.2750 139,600.00 38,390.00
3 Kepala Tukang OH 0.0275 155,200.00 4,268.00
4 Mandor OH 0.0825 155,200.00 12,804.00

Jumlah Harga Tenaga 285,802.00

B BAHAN
1 Semen PC (50 Kg) kg 247.0000 2,107.30 520,503.10
2 Pasir Cor (Agregat Halus) kg 869.0000 271.84 236,228.34
3 Batu Kerikil kg 999.0000 582.83 582,250.50
4 Air ltr 215.0000 24.78 5,328.13

Jumlah Harga Bahan 1,344,310.07

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,630,112.07


E OVERHEAD & PROFIT 15 % x D 244,516.81
F JUMLAH TOTAL ( D + E ) 1,874,628.88

Jenis Pekerjaan : Beton Mutu f'c=14,5 MPa, slum (120±20) mm (K175) A.4.1.1.5
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.6500 139,600.00 230,340.00
2 Tukang OH 0.2750 139,600.00 38,390.00
3 Kepala Tukang OH 0.0280 155,200.00 4,345.60
4 Mandor OH 0.0830 155,200.00 12,881.60

Jumlah Harga Tenaga 285,957.20

B BAHAN
1 Semen PC (50 Kg) kg 326.0000 2,107.30 686,979.80
2 Pasir Cor (Agregat Halus) kg 760.0000 271.84 206,597.86
3 Batu Kerikil kg 1,029.0000 582.83 599,735.50
4 Air ltr 215.0000 24.78 5,328.13

Jumlah Harga Bahan 1,498,641.29

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,784,598.49


E OVERHEAD & PROFIT 15 % x D 267,689.77
F JUMLAH TOTAL ( D + E ) 2,052,288.26
Jenis Pekerjaan : Beton Mutu f'c=16,9 MPa (K200) A.4.1.1.6
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.6500 139,600.00 230,340.00
2 Tukang OH 0.2750 139,600.00 38,390.00
3 Kepala Tukang OH 0.0280 155,200.00 4,345.60
4 Mandor OH 0.0830 155,200.00 12,881.60

Jumlah Harga Tenaga 285,957.20

B BAHAN
1 Semen PC (50 Kg) kg 352.0000 2,107.30 741,769.60
2 Pasir Cor (Agregat Halus) kg 731.0000 271.84 198,714.52
3 Batu Kerikil kg 1,031.0000 582.83 600,901.17
4 Air ltr 215.0000 24.78 5,328.13

Jumlah Harga Bahan 1,546,713.41

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,832,670.61


E OVERHEAD & PROFIT 15 % x D 274,900.59
F JUMLAH TOTAL ( D + E ) 2,107,571.21

Jenis Pekerjaan : Beton Mutu f'c=19,3 MPa (K225) A.4.1.1.7


Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.6500 139,600.00 230,340.00
2 Tukang OH 0.2750 139,600.00 38,390.00
3 Kepala Tukang OH 0.0280 155,200.00 4,345.60
4 Mandor OH 0.0830 155,200.00 12,881.60

Jumlah Harga Tenaga 285,957.20

B BAHAN
1 Semen PC (50 Kg) kg 371.0000 2,107.30 781,808.30
2 Pasir Cor (Agregat Halus) kg 698.0000 271.84 189,743.82
3 Batu Kerikil kg 1,047.0000 582.83 610,226.50
4 Air ltr 215.0000 24.78 5,328.13

Jumlah Harga Bahan 1,587,106.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,873,063.95


E OVERHEAD & PROFIT 15 % x D 280,959.59
F JUMLAH TOTAL ( D + E ) 2,154,023.54
Jenis Pekerjaan : Beton Mutu f'c=26,4 MPa (K300) A.4.1.1.10
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.6500 139,600.00 230,340.00
2 Tukang OH 0.2750 139,600.00 38,390.00
3 Kepala Tukang OH 0.0280 155,200.00 4,345.60
4 Mandor OH 0.0830 155,200.00 12,881.60

Jumlah Harga Tenaga 285,957.20

B BAHAN
1 Semen PC (50 Kg) kg 413.0000 2,107.30 870,314.90
2 Pasir Cor (Agregat Halus) kg 681.0000 271.84 185,122.55
3 Batu Kerikil kg 1,021.0000 582.83 595,072.83
4 Air ltr 215.0000 24.78 5,328.13

Jumlah Harga Bahan 1,655,838.42

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,941,795.62


E OVERHEAD & PROFIT 15 % x D 291,269.34
F JUMLAH TOTAL ( D + E ) 2,233,064.96

Jenis Pekerjaan : Beton Kedap Air dengan Strorox-100 A.4.1.1.13


Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 2.1000 139,600.00 293,160.00
2 Tukang OH 0.3500 139,600.00 48,860.00
3 Kepala Tukang OH 0.0350 155,200.00 5,432.00
4 Mandor OH 0.1050 155,200.00 16,296.00

Jumlah Harga Tenaga 363,748.00

B BAHAN
1 Semen PC (50 Kg) kg 400.0000 2,107.30 842,920.00
2 Pasir Cor (Agregat Halus) m³ 0.4800 380,575.00 182,676.00
3 Batu Kerikil m³ 0.8000 786,825.00 629,460.00
4 Strorox-100 kg 1.2000 78,650.00 94,380.00

Jumlah Harga Bahan 1,749,436.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,113,184.00


E OVERHEAD & PROFIT 15 % x D 316,977.60
F JUMLAH TOTAL ( D + E ) 2,430,161.60
Jenis Pekerjaan : Pembesian dengan Besi Beton 2.2.6.1.d.(a)
Satuan Pembayaran : 10 Kg

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1600 139,600.00 22,336.00
2 Tukang OH 0.1600 139,600.00 22,336.00
3 Kepala Tukang OH 0.0160 155,200.00 2,483.20
4 Mandor OH 0.0160 155,200.00 2,483.20

Jumlah Harga Tenaga 49,638.40

B BAHAN
1 Besi Beton kg 10.5000 21,333.00 223,996.50
2 Kawat Pengikat kg 0.2800 32,502.73 9,100.76

Jumlah Harga Bahan 233,097.26

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 282,735.66


E OVERHEAD & PROFIT 15 % x D 42,410.35
F JUMLAH TOTAL ( D + E ) 325,146.01

Jenis Pekerjaan : Pemasangan Jaring Kawat Baja (Wiremesh) M6-M8 A.4.1.1.17


Satuan Pembayaran : 10 Kg

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0250 139,600.00 3,490.00
2 Tukang OH 0.0250 139,600.00 3,490.00
3 Kepala Tukang OH 0.0250 155,200.00 3,880.00
4 Mandor OH 0.0010 155,200.00 155.20

Jumlah Harga Tenaga 11,015.20

B BAHAN
1 Jaring Kawat Baja dilas (wiremesh) kg 10.2000 12,105.00 123,471.00
2 Kawat Pengikat kg 0.0500 32,502.73 1,625.14

Jumlah Harga Bahan 125,096.14

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 136,111.34


E OVERHEAD & PROFIT 15 % x D 20,416.70
F JUMLAH TOTAL ( D + E ) 156,528.04
Jenis Pekerjaan : Pemasangan Bekisting Pondasi A.4.1.1.18
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5200 139,600.00 72,592.00
2 Tukang OH 0.2600 139,600.00 36,296.00
3 Kepala Tukang OH 0.0260 155,200.00 4,035.20
4 Mandor OH 0.0260 155,200.00 4,035.20

Jumlah Harga Tenaga 116,958.40

B BAHAN
1 Papan Bekisting m³ 0.0400 2,667,730.00 106,709.20
2 Paku Biasa / Campur kg 0.3000 28,654.60 8,596.38
3 Minyak Bekisting ltr 0.1000 28,730.00 2,873.00
Jumlah Harga Bahan 118,178.58

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 235,136.98


E OVERHEAD & PROFIT 15 % x D 35,270.55
F JUMLAH TOTAL ( D + E ) 270,407.53

Jenis Pekerjaan : Pemasangan Bekisting Sloof A.4.1.1.19


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5200 139,600.00 72,592.00
2 Tukang OH 0.2600 139,600.00 36,296.00
3 Kepala Tukang OH 0.0260 155,200.00 4,035.20
4 Mandor OH 0.0260 155,200.00 4,035.20

Jumlah Harga Tenaga 116,958.40

B BAHAN
1 Papan Bekisting m³ 0.0450 2,667,730.00 120,047.85
2 Paku Biasa / Campur kg 0.3000 28,654.60 8,596.38
3 Minyak Bekisting Ltr 0.1000 28,730.00 2,873.00
Jumlah Harga Bahan 131,517.23

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 248,475.63


E OVERHEAD & PROFIT 15 % x D 37,271.34
F JUMLAH TOTAL ( D + E ) 285,746.97
Jenis Pekerjaan : Pemasangan Bekisting Kolom A.4.1.1.20
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.3300 139,600.00 46,068.00
3 Kepala Tukang OH 0.0330 155,200.00 5,121.60
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 148,447.20

B BAHAN
1 Papan Bekisting m³ 0.0400 2,667,730.00 106,709.20
2 Paku Biasa / Campur kg 0.4000 28,654.60 11,461.84
3 Minyak Bekisting ltr 0.2000 28,730.00 5,746.00
4 Balok Kayu Persegi Klas III m³ 0.0150 4,617,730.00 69,265.95
5 Plywood Tebal 9 mm lbr 0.3500 175,630.00 61,470.50
6 Perancah dolken ø8-10 cm panjang 4 m btg 2.0000 14,092.00 28,184.00
Jumlah Harga Bahan 282,837.49

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 431,284.69


E OVERHEAD & PROFIT 15 % x D 64,692.70
F JUMLAH TOTAL ( D + E ) 495,977.39

Jenis Pekerjaan : Pemasangan Bekisting Balok A.4.1.1.21


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.3300 139,600.00 46,068.00
3 Kepala Tukang OH 0.0330 155,200.00 5,121.60
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 148,447.20

B BAHAN
1 Papan Bekisting m³ 0.0400 2,667,730.00 106,709.20
2 Paku Biasa / Campur kg 0.4000 28,654.60 11,461.84
3 Minyak Bekisting ltr 0.2000 28,730.00 5,746.00
4 Balok Kayu Persegi Klas III m³ 0.0180 4,617,730.00 83,119.14
5 Plywood Tebal 9 mm lbr 0.3500 175,630.00 61,470.50
6 Perancah dolken ø8-10 cm panjang 4 m btg 2.0000 14,092.00 28,184.00
Jumlah Harga Bahan 296,690.68

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 445,137.88


E OVERHEAD & PROFIT 15 % x D 66,770.68
F JUMLAH TOTAL ( D + E ) 511,908.56
Jenis Pekerjaan : Pemasangan Bekisting Lantai A.4.1.1.22
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.3300 139,600.00 46,068.00
3 Kepala Tukang OH 0.0330 155,200.00 5,121.60
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 148,447.20

B BAHAN
1 Papan Bekisting m³ 0.0400 2,667,730.00 106,709.20
2 Paku Biasa / Campur kg 0.4000 28,654.60 11,461.84
3 Minyak Bekisting ltr 0.2000 28,730.00 5,746.00
4 Balok Kayu Persegi Klas III m³ 0.0150 4,617,730.00 69,265.95
5 Plywood Tebal 9 mm lbr 0.3500 175,630.00 61,470.50
6 Perancah dolken ø8-10 cm panjang 4 m btg 6.0000 14,092.00 84,552.00
Jumlah Harga Bahan 339,205.49

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 487,652.69


E OVERHEAD & PROFIT 15 % x D 73,147.90
F JUMLAH TOTAL ( D + E ) 560,800.59

Jenis Pekerjaan : Pemasangan Bekisting Dinding A.4.1.1.23


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.3300 139,600.00 46,068.00
3 Kepala Tukang OH 0.0330 155,200.00 5,121.60
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 148,447.20

B BAHAN
1 Papan Bekisting m³ 0.0300 2,667,730.00 80,031.90
2 Paku Biasa / Campur kg 0.4000 28,654.60 11,461.84
3 Minyak Bekisting ltr 0.2000 28,730.00 5,746.00
4 Balok Kayu Persegi Klas III m³ 0.0200 4,617,730.00 92,354.60
5 Plywood Tebal 9 mm lbr 0.3500 175,630.00 61,470.50
6 Perancah dolken ø8-10 cm panjang 4 m btg 3.0000 14,092.00 42,276.00
7 Formasi/ Penjaga Jarak Bekisting bh 4.0000 3,500.00 14,000.00
Jumlah Harga Bahan 307,340.84

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 455,788.04


E OVERHEAD & PROFIT 15 % x D 68,368.21
F JUMLAH TOTAL ( D + E ) 524,156.25
Jenis Pekerjaan : Pemasangan Bekisting Tangga A.4.1.1.25
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6600 139,600.00 92,136.00
2 Tukang OH 0.3300 139,600.00 46,068.00
3 Kepala Tukang OH 0.0330 155,200.00 5,121.60
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 148,447.20

B BAHAN
1 Papan Bekisting m³ 0.0300 2,667,730.00 80,031.90
2 Paku Biasa / Campur kg 0.4000 28,654.60 11,461.84
3 Minyak Bekisting ltr 0.1500 28,730.00 4,309.50
4 Balok Kayu Persegi Klas III m³ 0.0150 4,617,730.00 69,265.95
5 Plywood Tebal 9 mm lbr 0.3500 175,630.00 61,470.50
6 Perancah dolken ø8-10 cm panjang 4 m btg 2.0000 14,092.00 28,184.00
Jumlah Harga Bahan 254,723.69

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 403,170.89


E OVERHEAD & PROFIT 15 % x D 60,475.63
F JUMLAH TOTAL ( D + E ) 463,646.52

Jenis Pekerjaan : Pemasangan Bata Merah Tebal 1 Batu Camp. 1PC : 4PS A.4.4.1.3
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6000 139,600.00 83,760.00
2 Tukang OH 0.2000 139,600.00 27,920.00
3 Kepala Tukang OH 0.0200 155,200.00 3,104.00
4 Mandor OH 0.0300 155,200.00 4,656.00

Jumlah Harga Tenaga 119,440.00

B BAHAN
1 Bata Merah bh 140.0000 1,977.30 276,822.00
2 Semen PC (50 Kg) kg 26.5500 2,107.30 55,948.82
3 Pasir Pasang m³ 0.0930 175,000.00 16,275.00

Jumlah Harga Bahan 349,045.82

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 468,485.82


E OVERHEAD & PROFIT 15 % x D 70,272.87
F JUMLAH TOTAL ( D + E ) 538,758.69
Jenis Pekerjaan : Pemasangan Bata Merah Tebal ½ Batu Camp. 1PC : 4PS A.4.4.1.9
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0150 155,200.00 2,328.00

Jumlah Harga Tenaga 59,720.00

B BAHAN
1 Bata Merah bh 70.0000 1,977.30 138,411.00
2 Semen PC (50 Kg) kg 11.5000 2,107.30 24,233.95
3 Pasir Pasang m³ 0.0430 175,000.00 7,525.00

Jumlah Harga Bahan 170,169.95

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 229,889.95


E OVERHEAD & PROFIT 15 % x D 34,483.49
F JUMLAH TOTAL ( D + E ) 264,373.44

Jenis Pekerjaan : Pemasangan Dinding Terawang (Rooster) Camp. 1PC : 4PS A.4.4.1.23
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0150 155,200.00 2,328.00

Jumlah Harga Tenaga 59,720.00

B BAHAN
1 Rooster (Lubang Angin) Bh 35.0000 18,000.00 630,000.00
2 Semen PC (50 Kg) kg 11.0000 2,107.30 23,180.30
3 Pasir Pasang m³ 0.0350 175,000.00 6,125.00

Jumlah Harga Bahan 659,305.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 719,025.30


E OVERHEAD & PROFIT 15 % x D 107,853.80
F JUMLAH TOTAL ( D + E ) 826,879.10
Jenis Pekerjaan : Pemasangan Dinding Glass Block Camp. 1PC : 4PS A.4.4.1.23.a
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0150 155,200.00 2,328.00

Jumlah Harga Tenaga 59,720.00

B BAHAN
1 Glass Block Bh 30.0000 39,013.65 1,170,409.50
2 Semen PC (50 Kg) kg 11.0000 2,107.30 23,180.30
3 Pasir Pasang m³ 0.0350 175,000.00 6,125.00

Jumlah Harga Bahan 1,199,714.80

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,259,434.80


E OVERHEAD & PROFIT 15 % x D 188,915.22
F JUMLAH TOTAL ( D + E ) 1,448,350.02

Jenis Pekerjaan : Plesteran Camp. 1PC : 4PS Tebal 15 mm 3.2.2.(c)


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Tukang OH 0.1500 139,600.00 20,940.00
3 Kepala Tukang OH 0.0150 155,200.00 2,328.00
4 Mandor OH 0.0150 155,200.00 2,328.00

Jumlah Harga Tenaga 67,476.00

B BAHAN
1 Semen PC (50 Kg) kg 6.2400 2,107.30 13,149.55
2 Pasir Pasang m³ 0.0240 175,000.00 4,200.00

Jumlah Harga Bahan 17,349.55

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 84,825.55


E OVERHEAD & PROFIT 15 % x D 12,723.83
F JUMLAH TOTAL ( D + E ) 97,549.38
Jenis Pekerjaan : Pemasangan Lantai Ubin Warna ukuran 40 x 40 cm A.4.4.3.7
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2500 139,600.00 34,900.00
2 Tukang OH 0.1250 139,600.00 17,450.00
3 Kepala Tukang OH 0.0125 155,200.00 1,940.00
4 Mandor OH 0.0125 155,200.00 1,940.00

Jumlah Harga Tenaga 56,230.00

B BAHAN
1 Keramik 40 x 40 Kualitas Standar (Ex. Garuda) Bh 6.6300 14,108.25 93,537.70
2 Semen PC (50 Kg) kg 9.8000 2,107.30 20,651.54
3 Semen Warna kg 0.6000 4,902.30 2,941.38
4 Pasir Pasang m³ 0.0450 175,000.00 7,875.00

Jumlah Harga Bahan 125,005.62

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 181,235.62


E Overhead & profit (15%) x D 27,185.34
F HARGA SATUAN PEKERJAAN (D+E) 208,420.96

Jenis Pekerjaan : Pemasangan Lantai Ubin Granit ukuran 40 x 40 cm A.4.4.3.9


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2500 139,600.00 34,900.00
2 Tukang OH 0.1250 139,600.00 17,450.00
3 Kepala Tukang OH 0.0125 155,200.00 1,940.00
4 Mandor OH 0.0125 155,200.00 1,940.00

Jumlah Harga Tenaga 56,230.00

B BAHAN
1 Granit 40 x 40 Kualitas Standar (Ex. Garuda) Bh 6.6300 32,581.90 216,018.00
2 Semen PC (50 Kg) kg 9.8000 2,107.30 20,651.54
3 Semen Warna kg 0.6000 4,902.30 2,941.38
4 Pasir Pasang m³ 0.0450 175,000.00 7,875.00

Jumlah Harga Bahan 247,485.92

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 303,715.92


E Overhead & profit (15%) x D 45,557.39
F HARGA SATUAN PEKERJAAN (D+E) 349,273.30
Jenis Pekerjaan : Pemasangan Lantai Keramik Ukuran 30 x 30 cm A.4.4.3.35
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7000 139,600.00 97,720.00
2 Tukang OH 0.3500 139,600.00 48,860.00
3 Kepala Tukang OH 0.0350 155,200.00 5,432.00
4 Mandor OH 0.0350 155,200.00 5,432.00

Jumlah Harga Tenaga 157,444.00

B BAHAN
1 Keramik 30 x 30 Kualitas Standar (Ex. Garuda) Dus 1.0500 8,374.60 8,793.33
2 Semen PC (50 Kg) kg 10.0400 2,107.30 21,157.29
3 Pasir Pasang m³ 0.0450 175,000.00 7,875.00
4 Semen Warna kg 0.5000 4,902.30 2,451.15

Jumlah Harga Bahan 40,276.77

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 197,720.77


E Overhead & profit (15%) x D 29,658.12
F HARGA SATUAN PEKERJAAN (D+E) 227,378.89

Jenis Pekerjaan : Pemasangan Lantai Keramik Ukuran 20 x 20 cm A.4.4.3.35


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7000 139,600.00 97,720.00
2 Tukang OH 0.3500 139,600.00 48,860.00
3 Kepala Tukang OH 0.0350 155,200.00 5,432.00
4 Mandor OH 0.0350 155,200.00 5,432.00

Jumlah Harga Tenaga 157,444.00

B BAHAN
1 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) Dus 1.0500 3,407.30 3,577.67
2 Semen PC (50 Kg) kg 10.0400 2,107.30 21,157.29
3 Pasir Pasang m³ 0.0450 175,000.00 7,875.00
4 Semen Warna kg 0.5000 4,902.30 2,451.15

Jumlah Harga Bahan 35,061.11

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 192,505.11


E Overhead & profit (15%) x D 28,875.77
F HARGA SATUAN PEKERJAAN (D+E) 221,380.87
Jenis Pekerjaan : Pemasangan Keramik Dinding Ukuran 20 x 20 cm A.4.4.3.53
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.9000 139,600.00 125,640.00
2 Tukang OH 0.4500 139,600.00 62,820.00
3 Kepala Tukang OH 0.0450 155,200.00 6,984.00
4 Mandor OH 0.0450 155,200.00 6,984.00

Jumlah Harga Tenaga 202,428.00

B BAHAN
1 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) Bh 26.0000 3,407.30 88,589.80
2 Semen PC (50 Kg) kg 9.3000 2,107.30 19,597.89
3 Pasir Pasang m³ 0.0180 175,000.00 3,150.00
4 Semen Warna kg 1.9400 4,902.30 9,510.46

Jumlah Harga Bahan 120,848.15

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 323,276.15


E Overhead & profit (15%) x D 48,491.42
F HARGA SATUAN PEKERJAAN (D+E) 371,767.57

Jenis Pekerjaan : Pemasangan Dinding Batu Tempel Hitam A.4.4.3.57


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7000 139,600.00 97,720.00
2 Tukang OH 0.3500 139,600.00 48,860.00
3 Kepala Tukang OH 0.0350 155,200.00 5,432.00
4 Mandor OH 0.0350 155,200.00 5,432.00

Jumlah Harga Tenaga 157,444.00

B BAHAN
1 Batu Tempel (ex : Candi 20 x 20) m² 1.1000 241,182.50 265,300.75
2 Semen PC (50 Kg) kg 11.7500 2,107.30 24,760.78
3 Pasir Pasang m³ 0.0350 175,000.00 6,125.00

Jumlah Harga Bahan 296,186.53

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 453,630.53


E OVERHEAD & PROFIT 15 % x D 68,044.58
F JUMLAH TOTAL ( D + E ) 521,675.10
Jenis Pekerjaan : Pemasangan Floor Hardener A.4.4.3.60
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1200 139,600.00 16,752.00
2 Tukang OH 0.1200 139,600.00 16,752.00
3 Kepala Tukang OH 0.0120 155,200.00 1,862.40
4 Mandor OH 0.0060 155,200.00 931.20

Jumlah Harga Tenaga 36,297.60

B BAHAN
1 Pengeras Lantai (Floor Harderner) kg 5.0000 6,000.00 30,000.00

Jumlah Harga Bahan 30,000.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 66,297.60


E OVERHEAD & PROFIT 15 % x D 9,944.64
F JUMLAH TOTAL ( D + E ) 76,242.24

Jenis Pekerjaan : Pekerjaan Plafond Gypsum Board Tebal 9 mm A.4.5.1.7


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1000 139,600.00 13,960.00
2 Tukang OH 0.0500 139,600.00 6,980.00
3 Kepala Tukang OH 0.0050 155,200.00 776.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 22,492.00

B BAHAN
1 Gypsum Board 9 mm lbr 0.3640 105,365.00 38,352.86
2 Paku Sekrup kg 0.1100 1,067.30 117.40
Jumlah Harga Bahan 38,470.26

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 60,962.26


E OVERHEAD & PROFIT 15 % x D 9,144.34
F JUMLAH TOTAL ( D + E ) 70,106.60
Jenis Pekerjaan : Pekerjaan Rangka Besi Hollow 1 x 40.40.2, Modul 60 x 60 cm A.4.2.1.21
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3500 139,600.00 48,860.00
2 Tukang OH 0.3500 139,600.00 48,860.00
3 Kepala Tukang OH 0.0350 155,200.00 5,432.00
4 Mandor OH 0.0180 155,200.00 2,793.60

Jumlah Harga Tenaga 105,945.60

B BAHAN
1 Pipa Hollow Galv 40x40 2 mm m' 4.0000 60,016.00 240,064.00
2 Assesories (Perkuatan,las,dll) (100%xrangka) ls 1.0000 60,016.00 60,016.00
Jumlah Harga Bahan 300,080.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 406,025.60


E OVERHEAD & PROFIT 15 % x D 60,903.84
F JUMLAH TOTAL ( D + E ) 466,929.44

Jenis Pekerjaan : Pekerjaan Pemasangan Kuda-Kuda Baja Ringan untuk atap Spandek A.4.2.1.23
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2000 139,600.00 27,920.00
2 Tukang OH 0.3000 139,600.00 41,880.00
3 Kepala Tukang OH 0.0300 155,200.00 4,656.00
4 Mandor OH 0.0100 155,200.00 1,552.00

Jumlah Harga Tenaga 76,008.00

B BAHAN
1 C-75 , 0.8 M 1.488 15,000.00 22,320.00
2 C-75 , 0.6 M 2.232 13,400.00 29,908.80
3 Baut (screw driver) BH 28.000 450.00 12,600.00
4 Dynabolt BH 1.600 10,000.00 16,000.00
5 Reng M 3.600 7,000.00 25,200.00
6 Talang jurai M 0.124 48,000.00 5,952.00

Jumlah Harga Bahan 111,980.80

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 187,988.80


E OVERHEAD & PROFIT 15 % x D 28,198.32
F JUMLAH TOTAL ( D + E ) 216,187.12
Jenis Pekerjaan : Pekerjaan Pemasangan Atap Seng A.4.5.2.40
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1200 139,600.00 16,752.00
2 Tukang OH 0.0600 139,600.00 8,376.00
3 Kepala Tukang OH 0.0060 155,200.00 931.20
4 Mandor OH 0.0060 155,200.00 931.20

Jumlah Harga Tenaga 26,990.40

B BAHAN
1 Atap Spandek Zinculume Lbr 0.7000 59,865.00 41,905.50
2 Paku Atap Kg 0.0200 1,067.30 21.35

Jumlah Harga Bahan 41,926.85

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 68,917.25


E OVERHEAD & PROFIT 15 % x D 10,337.59
F JUMLAH TOTAL ( D + E ) 79,254.83

Jenis Pekerjaan : Pekerjaan Pemasangan Nok Atap Seng A.4.5.2.41


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1500 139,600.00 20,940.00
2 Tukang OH 0.0700 139,600.00 9,772.00
3 Kepala Tukang OH 0.0070 155,200.00 1,086.40
4 Mandor OH 0.0060 155,200.00 931.20

Jumlah Harga Tenaga 32,729.60

B BAHAN
1 Nok Spndek Zinculume Lbr 0.0300 59,865.00 1,795.95
2 Paku Atap Kg 0.0400 1,067.30 42.69

Jumlah Harga Bahan 1,838.64

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 34,568.24


E OVERHEAD & PROFIT 15 % x D 5,185.24
F JUMLAH TOTAL ( D + E ) 39,753.48
Jenis Pekerjaan : Pembuatan dan Pemasangan Kusen pintu dan Kusen Jendela, Kayu Kelas II A.4.6.1.2
Satuan Pembayaran : 1 M³

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 6.0000 139,600.00 837,600.00
2 Tukang OH 18.0000 139,600.00 2,512,800.00
3 Kepala Tukang OH 1.8000 155,200.00 279,360.00
4 Mandor OH 0.3000 155,200.00 46,560.00

Jumlah Harga Tenaga 3,676,320.00

B BAHAN
1 Balok Kayu m³ 1.2000 5,852,730.00 7,023,276.00
2 Paku 10 cm kg 1.2500 28,654.60 35,818.25
3 Lem Kayu kg 1.0000 29,900.00 29,900.00

Jumlah Harga Bahan 7,088,994.25

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 10,765,314.25


E OVERHEAD & PROFIT 15 % x D 1,614,797.14
F JUMLAH TOTAL ( D + E ) 12,380,111.39

Jenis Pekerjaan : Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Kelas II A.4.6.1.5
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.0000 139,600.00 139,600.00
2 Tukang OH 3.0000 139,600.00 418,800.00
3 Kepala Tukang OH 0.3000 155,200.00 46,560.00
4 Mandor OH 0.0500 155,200.00 7,760.00

Jumlah Harga Tenaga 612,720.00

B BAHAN
1 Papan Kayu m³ 0.0400 5,852,730.00 234,109.20
2 Lem Kayu kg 0.0500 29,900.00 1,495.00

Jumlah Harga Bahan 235,604.20

C PERALATAN

Jumlah Harga Peralatan -


D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 848,324.20
E OVERHEAD & PROFIT 15 % x D 127,248.63
F JUMLAH TOTAL ( D + E ) 975,572.83
Jenis Pekerjaan : Pembuatan dan Pemasangan Pintu dan Jendela Kaca, Kayu Kelas II A.4.6.1.6
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.8000 139,600.00 111,680.00
2 Tukang OH 2.4000 139,600.00 335,040.00
3 Kepala Tukang OH 0.0240 155,200.00 3,724.80
4 Mandor OH 0.0400 155,200.00 6,208.00

Jumlah Harga Tenaga 456,652.80

B BAHAN
1 Papan Kayu m³ 0.0240 5,852,730.00 140,465.52
2 Lem Kayu kg 0.3000 29,900.00 8,970.00

Jumlah Harga Bahan 149,435.52

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 606,088.32


E OVERHEAD & PROFIT 15 % x D 90,913.25
F JUMLAH TOTAL ( D + E ) 697,001.57

Jenis Pekerjaan : Pemasangan Lisplank (3x20), Kayu Kelas II A.4.6.1.21


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1000 139,600.00 13,960.00
2 Tukang OH 0.2000 139,600.00 27,920.00
3 Kepala Tukang OH 0.0200 155,200.00 3,104.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 45,760.00

B BAHAN
1 Papan Kayu m³ 0.0108 5,852,730.00 63,209.48
2 Lem Kayu kg 0.1000 29,900.00 2,990.00

Jumlah Harga Bahan 66,199.48

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 111,959.48


E OVERHEAD & PROFIT 15 % x D 16,793.92
F JUMLAH TOTAL ( D + E ) 128,753.41
Jenis Pekerjaan : Pemasangan Kunci Tanam Biasa A.4.6.2.2
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0100 139,600.00 1,396.00
2 Tukang OH 0.5000 139,600.00 69,800.00
3 Kepala Tukang OH 0.0500 155,200.00 7,760.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 79,732.00

B BAHAN
1 Kunci Tanam Biasa Bh 1.0000 455,027.30 455,027.30
Jumlah Harga Bahan 455,027.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 534,759.30


E OVERHEAD & PROFIT 15 % x D 80,213.90
F JUMLAH TOTAL ( D + E ) 614,973.20

Jenis Pekerjaan : Pemasangan Kunci Kamar Mandi A.4.6.2.3


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0050 139,600.00 698.00
2 Tukang OH 0.5000 139,600.00 69,800.00
3 Kepala Tukang OH 0.0500 155,200.00 7,760.00
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 78,723.60

B BAHAN
1 Kunci Kamar Mandi Bh 1.0000 40,000.00 40,000.00
Jumlah Harga Bahan 40,000.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 118,723.60


E OVERHEAD & PROFIT 15 % x D 17,808.54
F JUMLAH TOTAL ( D + E ) 136,532.14
Jenis Pekerjaan : Pemasangan Engsel Pintu A.4.6.2.5
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0150 139,600.00 2,094.00
2 Tukang OH 0.1500 139,600.00 20,940.00
3 Kepala Tukang OH 0.0150 155,200.00 2,328.00
4 Mandor OH 0.0008 155,200.00 124.16

Jumlah Harga Tenaga 25,486.16

B BAHAN
1 Engsel Pintu Bh 1.0000 19,527.30 19,527.30
Jumlah Harga Bahan 19,527.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 45,013.46


E OVERHEAD & PROFIT 15 % x D 6,752.02
F JUMLAH TOTAL ( D + E ) 51,765.48

Jenis Pekerjaan : Pemasangan Engsel Kupu-Kupu A.4.6.2.6


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0100 139,600.00 1,396.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0005 155,200.00 77.60

Jumlah Harga Tenaga 16,985.60

B BAHAN
1 Engsel Kupu-Kupu Bh 1.0000 14,327.30 14,327.30
Jumlah Harga Bahan 14,327.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 31,312.90


E OVERHEAD & PROFIT 15 % x D 4,696.94
F JUMLAH TOTAL ( D + E ) 36,009.84
Jenis Pekerjaan : Pemasangan Kait Angin A.4.6.2.9
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0150 139,600.00 2,094.00
2 Tukang OH 0.1500 139,600.00 20,940.00
3 Kepala Tukang OH 0.0150 155,200.00 2,328.00
4 Mandor OH 0.0080 155,200.00 1,241.60

Jumlah Harga Tenaga 26,603.60

B BAHAN
1 Kait Angin Bh 1.0000 26,027.30 26,027.30
Jumlah Harga Bahan 26,027.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 52,630.90


E OVERHEAD & PROFIT 15 % x D 7,894.64
F JUMLAH TOTAL ( D + E ) 60,525.54

Jenis Pekerjaan : Pemasangan Kunci Slot A.4.6.2.11


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0200 139,600.00 2,792.00
2 Tukang OH 0.2000 139,600.00 27,920.00
3 Kepala Tukang OH 0.0200 155,200.00 3,104.00
4 Mandor OH 0.0010 155,200.00 155.20

Jumlah Harga Tenaga 33,971.20

B BAHAN
1 Kunci Slot Bh 1.0000 32,000.00 32,000.00
Jumlah Harga Bahan 32,000.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 65,971.20


E OVERHEAD & PROFIT 15 % x D 9,895.68
F JUMLAH TOTAL ( D + E ) 75,866.88
Jenis Pekerjaan : Pemasangan Kaca 5 mm A.4.6.2.17
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0150 139,600.00 2,094.00
2 Tukang OH 0.1500 139,600.00 20,940.00
3 Kepala Tukang OH 0.0150 155,200.00 2,328.00
4 Mandor OH 0.0008 155,200.00 124.16

Jumlah Harga Tenaga 25,486.16

B BAHAN
1 Kaca Tebal 5 mm m² 1.1000 197,047.50 216,752.25
2 Sealant kg 0.0500 51,750.00 2,587.50
Jumlah Harga Bahan 219,339.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 244,825.91


E OVERHEAD & PROFIT 15 % x D 36,723.89
F JUMLAH TOTAL ( D + E ) 281,549.80

Jenis Pekerjaan : Pengecatan Bidang Kayu/Besi Baru (1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup) 3.3.4.(c)
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0700 139,600.00 9,772.00
2 Tukang OH 0.0090 139,600.00 1,256.40
3 Kepala Tukang OH 0.0060 155,200.00 931.20
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 12,425.20

B BAHAN
1 Cat Menie kg 0.2000 38,507.30 7,701.46
2 Plamuur kg 0.1500 16,315.00 2,447.25
3 Cat Dasar kg 0.1700 55,932.50 9,508.53
4 Cat Penutup kg 0.2600 111,865.00 29,084.90
5 Kuas kg 0.0100 12,000.00 120.00
6 Pengecer kg 0.0300 38,507.30 1,155.22
7 Ampelas kg 0.2000 111,865.00 22,373.00
Jumlah Harga Bahan 72,390.35

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 84,815.55


E OVERHEAD & PROFIT 15 % x D 12,722.33
F JUMLAH TOTAL ( D + E ) 97,537.89
Jenis Pekerjaan : Pengecatan Tembok Baru (1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat penutup) 3.3.10.(c)
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2000 139,600.00 27,920.00
2 Tukang OH 0.0630 139,600.00 8,794.80
3 Kepala Tukang OH 0.0063 155,200.00 977.76
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 38,158.16

B BAHAN
1 Plamuur kg 0.1000 28,730.00 2,873.00
2 Cat Dasar kg 0.1000 17,290.00 1,729.00
3 Cat Penutup kg 0.2600 - -
Jumlah Harga Bahan 4,602.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 42,760.16


E OVERHEAD & PROFIT 15 % x D 6,414.02
F JUMLAH TOTAL ( D + E ) 49,174.18

Jenis Pekerjaan : Pemasangan Closet Duduk/Monoblock A.5.1.1.1


Satuan Pembayaran : 1 Set

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 3.3000 139,600.00 460,680.00
2 Tukang OH 1.1000 139,600.00 153,560.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.1600 155,200.00 24,832.00

Jumlah Harga Tenaga 640,624.00

B BAHAN
1 Closet Duduk Unit 1.0000 2,222,155.00 2,222,155.00
2 Perlengkapan Ls 6% x Closet 133,329.30 133,329.30
Jumlah Harga Bahan 2,355,484.30

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,996,108.30


E OVERHEAD & PROFIT 15 % x D 449,416.25
F JUMLAH TOTAL ( D + E ) 3,445,524.55
Jenis Pekerjaan : Pemasangan Closet Jongkok A.5.1.1.2
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.0000 139,600.00 139,600.00
2 Tukang OH 1.5000 139,600.00 209,400.00
3 Kepala Tukang OH 0.1500 155,200.00 23,280.00
4 Mandor OH 0.0500 155,200.00 7,760.00

Jumlah Harga Tenaga 380,040.00

B BAHAN
1 Closet Jongkok Set 1.0000 332,507.50 332,507.50
2 Semen PC (50 Kg) kg 6.0000 2,107.30 12,643.80
3 Pasir Pasang m³ 0.0100 175,000.00 1,750.00
4 Bata Merah buah 7.0000 1,977.30 13,841.10
Jumlah Harga Bahan 360,742.40

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 740,782.40


E OVERHEAD & PROFIT 15 % x D 111,117.36
F JUMLAH TOTAL ( D + E ) 851,899.76

Jenis Pekerjaan : Pemasangan Bak Air Fiberglass vol. 1 m³ A.5.1.1.11


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3000 139,600.00 41,880.00
2 Tukang OH 0.4500 139,600.00 62,820.00
3 Kepala Tukang OH 0.0450 155,200.00 6,984.00
4 Mandor OH 0.0150 155,200.00 2,328.00

Jumlah Harga Tenaga 114,012.00

B BAHAN
1 Bak Air Fiberglass vol. 1 m³ unit 1.0000 371,507.50 371,507.50
Perlengkapan % 12.0000 371,507.50 44,580.90

Jumlah Harga Bahan 416,088.40

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 530,100.40


E OVERHEAD & PROFIT 15 % x D 79,515.06
F JUMLAH TOTAL ( D + E ) 609,615.46
Jenis Pekerjaan : Pemasangan Floor Drain A.5.1.1.36
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0100 139,600.00 1,396.00
2 Tukang OH 0.1000 139,600.00 13,960.00
3 Kepala Tukang OH 0.0100 155,200.00 1,552.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 17,684.00

B BAHAN
1 Floor Drain unit 1.0000 22,000.00 22,000.00

Jumlah Harga Bahan 22,000.00

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 39,684.00


E OVERHEAD & PROFIT 15 % x D 5,952.60
F JUMLAH TOTAL ( D + E ) 45,636.60

Jenis Pekerjaan : Pemasangan Kran Air Diameter ½" atau ¾" A.5.1.1.35
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0100 139,600.00 1,396.00
2 Tukang OH 0.4000 139,600.00 55,840.00
3 Kepala Tukang OH 0.0400 155,200.00 6,208.00
4 Mandor OH 0.0050 155,200.00 776.00

Jumlah Harga Tenaga 64,220.00

B BAHAN
1 Kran Air ¾" Kualitas Baik Bh 1.0000 34,500.00 34,500.00
2 Sealtape Bh 0.0250 5,750.00 143.75
Jumlah Harga Bahan 34,643.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 98,863.75


E OVERHEAD & PROFIT 15 % x D 14,829.56
F JUMLAH TOTAL ( D + E ) 113,693.31
Jenis Pekerjaan : Pemasangan pipa PVC tipe AW Diameter ¾" A.5.1.1.26
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0360 139,600.00 5,025.60
2 Tukang OH 0.0600 139,600.00 8,376.00
3 Kepala Tukang OH 0.0060 155,200.00 931.20
4 Mandor OH 0.0020 155,200.00 310.40

Jumlah Harga Tenaga 14,643.20

B BAHAN
1 Pipa PVC tipe AW ø¾" Bh 1.2000 42,965.00 51,558.00
2 Perlengkapan % 35.0000 42,965.00 15,037.75
Jumlah Harga Bahan 66,595.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 81,238.95


E OVERHEAD & PROFIT 15 % x D 12,185.84
F JUMLAH TOTAL ( D + E ) 93,424.79

Jenis Pekerjaan : Pemasangan pipa PVC tipe AW Diameter 1" A.5.1.1.27


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0540 139,600.00 7,538.40
2 Tukang OH 0.0900 139,600.00 12,564.00
3 Kepala Tukang OH 0.0090 155,200.00 1,396.80
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 21,964.80

B BAHAN
1 Pipa PVC tipe AW ø1" Bh 1.2000 59,865.00 71,838.00
2 Perlengkapan % 35.0000 59,865.00 20,952.75
Jumlah Harga Bahan 92,790.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 114,755.55


E OVERHEAD & PROFIT 15 % x D 17,213.33
F JUMLAH TOTAL ( D + E ) 131,968.88
Jenis Pekerjaan : Pemasangan pipa PVC tipe AW Diameter 3" A.5.1.1.31
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0810 139,600.00 11,307.60
2 Tukang OH 0.1350 139,600.00 18,846.00
3 Kepala Tukang OH 0.0135 155,200.00 2,095.20
4 Mandor OH 0.0040 155,200.00 620.80

Jumlah Harga Tenaga 32,869.60

B BAHAN
1 Pipa PVC tipe AW ø3" Bh 1.2000 326,365.00 391,638.00
2 Perlengkapan % 35.0000 326,365.00 114,227.75
Jumlah Harga Bahan 505,865.75

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 538,735.35


E OVERHEAD & PROFIT 15 % x D 80,810.30
F JUMLAH TOTAL ( D + E ) 619,545.65

Jenis Pekerjaan : Pemasangan Elbow 22.5⁰ HDPE ø250 mm A.8.4.3.17.a


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3260 139,600.00 45,509.60
2 Tukang OH 0.1630 139,600.00 22,754.80
3 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 73,386.00

B BAHAN
1 Elbow 22.5° ø250 mm Bh 1.0000 1,716,835.00 1,716,835.00

Jumlah Harga Bahan 1,716,835.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0390 378,000.00 14,742.00

Jumlah Harga Peralatan 14,742.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,804,963.00


E OVERHEAD & PROFIT 15 % x D 270,744.45
F JUMLAH TOTAL ( D + E ) 2,075,707.45
Jenis Pekerjaan : Pemasangan Elbow 22.5⁰ HDPE ø315 mm A.8.4.3.18.a
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.4360 139,600.00 60,865.60
2 Tukang OH 0.2180 139,600.00 30,432.80
3 Mandor OH 0.0440 155,200.00 6,828.80

Jumlah Harga Tenaga 98,127.20

B BAHAN
1 Elbow 45° ø315 mm Bh 1.0000 2,576,000.00 2,576,000.00

Jumlah Harga Bahan 2,576,000.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,863,127.20


E OVERHEAD & PROFIT 15 % x D 429,469.08
F JUMLAH TOTAL ( D + E ) 3,292,596.28

Jenis Pekerjaan : Pemasangan Elbow 45⁰ HDPE ø110 mm A.8.4.3.15.a


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1453 139,600.00 20,288.53
2 Tukang OH 0.0727 139,600.00 10,144.27
3 Mandor OH 0.0147 155,200.00 2,276.27

Jumlah Harga Tenaga 32,709.07

B BAHAN
1 Elbow 45⁰ Hdpe ø110 mm Bh 1.0000 326,700.00 326,700.00

Jumlah Harga Bahan 326,700.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0280 378,000.00 10,584.00

Jumlah Harga Peralatan 10,584.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 369,993.07


E OVERHEAD & PROFIT 15 % x D 55,498.96
F JUMLAH TOTAL ( D + E ) 425,492.03
Jenis Pekerjaan : Pemasangan Elbow 90⁰ HDPE ø 63 mm A.8.4.3.18.b
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5460 139,600.00 76,221.60
2 Tukang OH 0.2730 139,600.00 38,110.80
3 Mandor OH 0.0550 155,200.00 8,536.00

Jumlah Harga Tenaga 122,868.40

B BAHAN
1 Elbow 90⁰ Hdpe ø 63 mm Bh 1.0000 270,000.00 270,000.00

Jumlah Harga Bahan 270,000.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 581,868.40


E OVERHEAD & PROFIT 15 % x D 87,280.26
F JUMLAH TOTAL ( D + E ) 669,148.66

Jenis Pekerjaan : Pemasangan Elbow 90⁰ HDPE ø 90 mm A.8.4.3.15.b


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1453 139,600.00 20,288.53
2 Tukang OH 0.0727 139,600.00 10,144.27
3 Mandor OH 0.0147 155,200.00 2,276.27

Jumlah Harga Tenaga 32,709.07

B BAHAN
1 Elbow 90⁰ Hdpe ø 90 mm BH 1.0000 497,800.00 497,800.00

Jumlah Harga Bahan 497,800.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0280 378,000.00 10,584.00

Jumlah Harga Peralatan 10,584.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 541,093.07


E OVERHEAD & PROFIT 15 % x D 81,163.96
F JUMLAH TOTAL ( D + E ) 622,257.03
Jenis Pekerjaan : Pemasangan Elbow 90⁰ HDPE ø250 mm A.8.4.3.17.b
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3260 139,600.00 45,509.60
2 Tukang OH 0.1630 139,600.00 22,754.80
3 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 73,386.00

B BAHAN
1 Elbow 90° ø250 mm BH 1.0000 1,457,600.00 1,457,600.00

Jumlah Harga Bahan 1,457,600.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0390 378,000.00 14,742.00

Jumlah Harga Peralatan 14,742.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,545,728.00


E OVERHEAD & PROFIT 15 % x D 231,859.20
F JUMLAH TOTAL ( D + E ) 1,777,587.20

Jenis Pekerjaan : Pemasangan Elbow 90⁰ HDPE ø315 mm A.8.4.3.18.c


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5460 139,600.00 76,221.60
2 Tukang OH 0.2730 139,600.00 38,110.80
3 Mandor OH 0.0550 155,200.00 8,536.00

Jumlah Harga Tenaga 122,868.40

B BAHAN
1 Elbow 90⁰ Hdpe ø355 mm Bh 1.0000 4,293,540.00 4,293,540.00

Jumlah Harga Bahan 4,293,540.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,605,408.40


E OVERHEAD & PROFIT 15 % x D 690,811.26
F JUMLAH TOTAL ( D + E ) 5,296,219.66
Jenis Pekerjaan : Pemasangan TEE HDPE ø63 mm 4.3.15.(c)
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1060 139,600.00 14,797.60
2 Tukang OH 0.0530 139,600.00 7,398.80
3 Mandor OH 0.0110 155,200.00 1,707.20

Jumlah Harga Tenaga 23,903.60

B BAHAN
1 TEE HDPE ø63 mm Bh 1.0000 226,000.00 226,000.00

Jumlah Harga Bahan 226,000.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0280 378,000.00 10,584.00

Jumlah Harga Peralatan 10,584.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 260,487.60


E OVERHEAD & PROFIT 15 % x D 39,073.14
F JUMLAH TOTAL ( D + E ) 299,560.74

Jenis Pekerjaan : Pemasangan TEE HDPE ø90 mm 4.3.16.(c)


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2160 139,600.00 30,153.60
2 Tukang OH 0.1080 139,600.00 15,076.80
3 Mandor OH 0.0220 155,200.00 3,414.40

Jumlah Harga Tenaga 48,644.80

B BAHAN
1 TEE HDPE ø90 mm Bh 1.0000 498,150.00 498,150.00

Jumlah Harga Bahan 498,150.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0290 378,000.00 10,962.00

Jumlah Harga Peralatan 10,962.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 557,756.80


E OVERHEAD & PROFIT 15 % x D 83,663.52
F JUMLAH TOTAL ( D + E ) 641,420.32
Jenis Pekerjaan : Pemasangan TEE HDPE ø110 mm A.8.4.3.18.d
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5460 139,600.00 76,221.60
2 Tukang OH 0.2730 139,600.00 38,110.80
3 Mandor OH 0.0550 155,200.00 8,536.00

Jumlah Harga Tenaga 122,868.40

B BAHAN
1 TEE HDPE ø110 mm Bh 1.0000 986,250.00 986,250.00

Jumlah Harga Bahan 986,250.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,298,118.40


E OVERHEAD & PROFIT 15 % x D 194,717.76
F JUMLAH TOTAL ( D + E ) 1,492,836.16

Jenis Pekerjaan : Pemasangan REDUCER TEE HDPE ø110 x 63 mm A.8.4.3.17.c


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3260 139,600.00 45,509.60
2 Tukang OH 0.1630 139,600.00 22,754.80
3 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 73,386.00

B BAHAN
1 REDUCER TEE HDPE PN 10 ø250 x 110 mm Bh 1.0000 1,312,500.00 1,312,500.00

Jumlah Harga Bahan 1,312,500.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0390 378,000.00 14,742.00

Jumlah Harga Peralatan 14,742.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,400,628.00


E OVERHEAD & PROFIT 15 % x D 210,094.20
F JUMLAH TOTAL ( D + E ) 1,610,722.20
Jenis Pekerjaan : Pemasangan REDUCER TEE HDPE ø 90 x 63 mm A.8.4.3.18.e
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.4360 139,600.00 60,865.60
2 Tukang OH 0.2180 139,600.00 30,432.80
3 Mandor OH 0.0440 155,200.00 6,828.80

Jumlah Harga Tenaga 98,127.20

B BAHAN
1 REDUCER TEE HDPE PN 10 ø90 x 63 mm Bh 1.0000 487,500.00 487,500.00

Jumlah Harga Bahan 487,500.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 774,627.20


E OVERHEAD & PROFIT 15 % x D 116,194.08
F JUMLAH TOTAL ( D + E ) 890,821.28

Jenis Pekerjaan : Pemasangan REDUCER HDPE ø 90 x 63 mm A.8.4.3.18.f


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.4360 139,600.00 60,865.60
2 Tukang OH 0.2180 139,600.00 30,432.80
3 Mandor OH 0.0440 155,200.00 6,828.80

Jumlah Harga Tenaga 98,127.20

B BAHAN
1 REDUCER HDPE PN 10 ø90 x 63 mm Bh 1.0000 267,062.50 267,062.50

Jumlah Harga Bahan 267,062.50

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 554,189.70


E OVERHEAD & PROFIT 15 % x D 83,128.46
F JUMLAH TOTAL ( D + E ) 637,318.16
Jenis Pekerjaan : Pemasangan Pipa HDPE PN 10 ø110 MM A.8.4.1.18
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0400 139,600.00 5,584.00
2 Tukang OH 0.0200 139,600.00 2,792.00
3 Mandor OH 0.0040 155,200.00 620.80

Jumlah Harga Tenaga 8,996.80

B BAHAN
1 Pipa HDPE PE 100 PN 10 SDR 17 ø110 mm M1 1.0000 158,304.00 158,304.00

Jumlah Harga Bahan 158,304.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0190 378,000.00 7,182.00

Jumlah Harga Peralatan 7,182.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 174,482.80


E OVERHEAD & PROFIT 15 % x D 26,172.42
F JUMLAH TOTAL ( D + E ) 200,655.22

Jenis Pekerjaan : Pemasangan Pipa HDPE PN 10 ø63 MM 4.1.22.(c)


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1330 139,600.00 18,566.80
2 Tukang OH 0.0670 139,600.00 9,353.20
3 Mandor OH 0.0130 155,200.00 2,017.60

Jumlah Harga Tenaga 29,937.60

B BAHAN
1 Pipa HDPE PE 100 PN 10 SDR 17 ø63 mm M1 1.0000 114,125.00 114,125.00

Jumlah Harga Bahan 114,125.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0420 378,000.00 15,876.00

Jumlah Harga Peralatan 15,876.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 159,938.60


E OVERHEAD & PROFIT 15 % x D 23,990.79
F JUMLAH TOTAL ( D + E ) 183,929.39
Jenis Pekerjaan : Pemasangan Pipa HDPE PN 10 ø90 MM 4.1.23.(c)
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1700 139,600.00 23,732.00
2 Tukang OH 0.0850 139,600.00 11,866.00
3 Mandor OH 0.0170 155,200.00 2,638.40

Jumlah Harga Tenaga 38,236.40

B BAHAN
1 Pipa HDPE PE 100 PN 10 SDR 17 ø90 mm M1 1.0000 233,875.00 233,875.00

Jumlah Harga Bahan 233,875.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0650 378,000.00 24,570.00

Jumlah Harga Peralatan 24,570.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 296,681.40


E OVERHEAD & PROFIT 15 % x D 44,502.21
F JUMLAH TOTAL ( D + E ) 341,183.61

Jenis Pekerjaan : Pemasangan Pipa HDPE PN 10 ø355 MM A.8.4.1.23.a


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.2300 139,600.00 32,108.00
2 Tukang OH 0.1150 139,600.00 16,054.00
3 Mandor OH 0.0230 155,200.00 3,569.60

Jumlah Harga Tenaga 51,731.60

B BAHAN
1 Pipa HDPE PE 100 PN 10 SDR 17 ø355 mm M1 1.0000 - -

Jumlah Harga Bahan -

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.1085 378,000.00 41,013.00

Jumlah Harga Peralatan 41,013.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 92,744.60


E OVERHEAD & PROFIT 15 % x D 13,911.69
F JUMLAH TOTAL ( D + E ) 106,656.29
Jenis Pekerjaan : Pemasangan Gate Valve ø110 MM A.8.4.3.1.a
Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.9530 139,600.00 133,038.80
2 Tukang OH 0.4770 139,600.00 66,589.20
3 Mandor OH 0.0950 155,200.00 14,744.00

Jumlah Harga Tenaga 214,372.00

B BAHAN
1 Gate Valve ø110 mm bh 1.0000 3,087,000.00 3,087,000.00

Jumlah Harga Bahan 3,087,000.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0670 378,000.00 25,326.00

Jumlah Harga Peralatan 25,326.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,326,698.00


E OVERHEAD & PROFIT 15 % x D 499,004.70
F JUMLAH TOTAL ( D + E ) 3,825,702.70

Jenis Pekerjaan : Pemasangan Gate Valve ø250 MM 4.3.3.(c)


Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.7140 139,600.00 239,274.40
2 Tukang OH 0.8570 139,600.00 119,637.20
3 Mandor OH 0.1710 155,200.00 26,539.20

Jumlah Harga Tenaga 385,450.80

B BAHAN
1 Gate Valve ø250 mm bh 1.0000 29,178,950.00 29,178,950.00

Jumlah Harga Bahan 29,178,950.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.4000 378,000.00 151,200.00

Jumlah Harga Peralatan 151,200.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 29,715,600.80


E OVERHEAD & PROFIT 15 % x D 4,457,340.12
F JUMLAH TOTAL ( D + E ) 34,172,940.92
Jenis Pekerjaan : Pemasangan Gate Valve ø300 MM 4.3.4.(c)
Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 2.0000 139,600.00 279,200.00
2 Tukang OH 1.0000 139,600.00 139,600.00
3 Mandor OH 0.2000 155,200.00 31,040.00

Jumlah Harga Tenaga 449,840.00

B BAHAN
1 Gate Valve ø315 mm bh 1.0000 32,316,071.50 32,316,071.50

Jumlah Harga Bahan 32,316,071.50

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 32,954,911.50


E OVERHEAD & PROFIT 15 % x D 4,943,236.73
F JUMLAH TOTAL ( D + E ) 37,898,148.23

Jenis Pekerjaan : Pemasangan Stub Flange ø110 MM A.8.4.3.15.c


Satuan Pembayaran : 1 Set

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.1060 139,600.00 14,797.60
2 Tukang OH 0.0530 139,600.00 7,398.80
4 Mandor OH 0.0110 155,200.00 1,707.20

Jumlah Harga Tenaga 23,903.60

B BAHAN
1 Stube End HDPE PN 10 ø110 mm Bh 1.0000 196,960.00 196,960.00
2 Flange CS Galvanis PN 10 ø110 mm Bh 1.0000 355,465.00 355,465.00

Jumlah Harga Bahan 552,425.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0280 378,000.00 10,584.00

Jumlah Harga Peralatan 10,584.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 586,912.60


E OVERHEAD & PROFIT 15 % x D 88,036.89
F JUMLAH TOTAL ( D + E ) 674,949.49
Jenis Pekerjaan : Pemasangan Stub Flange ø250 MM A.8.4.3.17.d
Satuan Pembayaran : 1 Set

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.3260 139,600.00 45,509.60
2 Tukang OH 0.1630 139,600.00 22,754.80
4 Mandor OH 0.0330 155,200.00 5,121.60

Jumlah Harga Tenaga 73,386.00

B BAHAN
1 Stube End HDPE PN 10 ø250 mm Bh 1.0000 1,251,970.00 1,251,970.00
2 Flange CS Galvanis PN 10 ø250 mm Bh 1.0000 1,074,997.00 1,074,997.00

Jumlah Harga Bahan 2,326,967.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.0390 378,000.00 14,742.00

Jumlah Harga Peralatan 14,742.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,415,095.00


E OVERHEAD & PROFIT 15 % x D 362,264.25
F JUMLAH TOTAL ( D + E ) 2,777,359.25

Jenis Pekerjaan : Pemasangan Stub Flange ø300 MM A.8.4.3.18.f


Satuan Pembayaran : 1 Set

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.4360 139,600.00 60,865.60
2 Tukang OH 0.2180 139,600.00 30,432.80
3 Mandor OH 0.0440 155,200.00 6,828.80

Jumlah Harga Tenaga 98,127.20

B BAHAN
1 Stube End HDPE PN 10 ø315 mm Bh 1.0000 1,822,991.00 1,822,991.00
2 Flange CS Galvanis PN 10 ø315 mm Bh 1.0000 1,267,657.00 1,267,657.00

Jumlah Harga Bahan 3,090,648.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,377,775.20


E OVERHEAD & PROFIT 15 % x D 506,666.28
F JUMLAH TOTAL ( D + E ) 3,884,441.48
Jenis Pekerjaan : Pemasangan Stub Flange ø400 MM A.8.4.3.19.a
Satuan Pembayaran : 1 Set

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.6560 139,600.00 91,577.60
2 Tukang OH 0.3280 139,600.00 45,788.80
3 Mandor OH 0.0660 155,200.00 10,243.20

Jumlah Harga Tenaga 147,609.60

B BAHAN
1 Stube End HDPE PN 10 ø400 mm Bh 1.0000 3,012,240.00 3,012,240.00
2 Flange CS Galvanis PN 10 ø400 mm Bh 1.0000 1,859,044.00 1,859,044.00

Jumlah Harga Bahan 4,871,284.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 5,207,893.60


E OVERHEAD & PROFIT 15 % x D 781,184.04
F JUMLAH TOTAL ( D + E ) 5,989,077.64

Jenis Pekerjaan : Penyambungan pipa baru ke pipa yang ada ø300 MM A.8.4.4.6
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 3.4460 139,600.00 481,061.60
2 Tukang OH 1.7230 139,600.00 240,530.80
3 Mandor OH 0.3450 155,200.00 53,544.00

Jumlah Harga Tenaga 775,136.40

B BAHAN
1 Pipa HDPE PN 10 ø315 mm Bh 1.0000

Jumlah Harga Bahan -

C PERALATAN
1 Cilinder saw Hari 1.0900 315,000.00 343,350.00
2 Genset 1500 watt Hari 0.9990 420,000.00 419,580.00
3 Pompa Submersible 3 m³/jam Hari 2.1780 442,500.00 963,765.00
4 Tripot/Trackel & Handle Crane 2 Ton Hari 1.3710 378,000.00 518,238.00

Jumlah Harga Peralatan 2,244,933.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,020,069.40


E OVERHEAD & PROFIT 15 % x D 453,010.41
F JUMLAH TOTAL ( D + E ) 3,473,079.81
Jenis Pekerjaan : Penyambungan pipa baru ke pipa yang ada ø400 MM 4.4.7.(c)
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 4.3460 139,600.00 606,701.60
2 Tukang OH 2.1730 139,600.00 303,350.80
3 Mandor OH 0.4350 155,200.00 67,512.00

Jumlah Harga Tenaga 977,564.40

B BAHAN
1 Pipa HDPE PN 10 ø355 mm Bh 1.0000

Jumlah Harga Bahan -

C PERALATAN
1 Cilinder saw Hari 1.3100 315,000.00 412,650.00
2 Genset 1500 watt Hari 1.4190 420,000.00 595,980.00
3 Pompa Submersible 3 m³/jam Hari 2.7280 442,500.00 1,207,140.00
4 Tripot/Trackel & Handle Crane 2 Ton Hari 1.6010 378,000.00 605,178.00

Jumlah Harga Peralatan 2,820,948.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,798,512.40


E OVERHEAD & PROFIT 15 % x D 569,776.86
F JUMLAH TOTAL ( D + E ) 4,368,289.26

Jenis Pekerjaan : Pemasangan Dismantling Joint CS Galvanis PN 10 ø110 MM A.8.4.3.1.b


Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.9530 139,600.00 133,038.80
2 Tukang OH 0.4770 139,600.00 66,589.20
3 Mandor OH 0.0950 155,200.00 14,744.00

Jumlah Harga Tenaga 214,372.00

B BAHAN
1 Dismantling Joint CS Galvanis PN 10 ø110 mm Bh 1.0000 533,197.00 533,197.00

Jumlah Harga Bahan 533,197.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.3330 378,000.00 125,874.00

Jumlah Harga Peralatan 125,874.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 873,443.00


E OVERHEAD & PROFIT 15 % x D 131,016.45
F JUMLAH TOTAL ( D + E ) 1,004,459.45
Jenis Pekerjaan : Pemasangan Dismantling Joint CS Galvanis PN 10 ø250 MM A.8.4.3.3.b
Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.7140 139,600.00 239,274.40
2 Tukang OH 0.8570 139,600.00 119,637.20
3 Mandor OH 0.1710 155,200.00 26,539.20

Jumlah Harga Tenaga 385,450.80

B BAHAN
1 Dismantling Joint CS Galvanis PN 10 ø250 mm Bh 1.0000 2,183,165.00 2,183,165.00

Jumlah Harga Bahan 2,183,165.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.4000 378,000.00 151,200.00

Jumlah Harga Peralatan 151,200.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,719,815.80


E OVERHEAD & PROFIT 15 % x D 407,972.37
F JUMLAH TOTAL ( D + E ) 3,127,788.17

Jenis Pekerjaan : Pemasangan Dismantling Joint CS Galvanis PN 10 ø315 MM A.8.4.3.4.b


Satuan Pembayaran : 1 Unit

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 2.0000 139,600.00 279,200.00
2 Tukang OH 1.0000 139,600.00 139,600.00
3 Mandor OH 0.2000 155,200.00 31,040.00

Jumlah Harga Tenaga 449,840.00

B BAHAN
1 Dismantling Joint CS Galvanis PN 10 ø315 mm Bh 1.0000 2,283,165.00 2,283,165.00

Jumlah Harga Bahan 2,283,165.00

C PERALATAN
1 Tripot/Trackel & Handle Crane 2 Ton Hari 0.5000 378,000.00 189,000.00

Jumlah Harga Peralatan 189,000.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,922,005.00


E OVERHEAD & PROFIT 15 % x D 438,300.75
F JUMLAH TOTAL ( D + E ) 3,360,305.75
Jenis Pekerjaan : Pemasangan Pipa Galvanis ø2 inchi A.5.1.1.22.a
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0945 139,600.00 13,192.20
2 Tukang OH 0.1575 139,600.00 21,987.00
3 Kepala Tukang OH 0.0160 155,200.00 2,483.20
4 Mandor OH 0.0170 155,200.00 2,638.40

Jumlah Harga Tenaga 40,300.80

B BAHAN
1 Pipa GIP SCH 40 ø2" m' 1.2000 135,771.30 162,925.56
Perlengkapan % 35.0000 135,771.30 47,519.96

Jumlah Harga Bahan 210,445.52

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 250,746.32


E OVERHEAD & PROFIT 15 % x D 37,611.95
F JUMLAH TOTAL ( D + E ) 288,358.26

Jenis Pekerjaan : Pemasangan Pipa GIP ø6 inchi 4.1.36.(c)


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.5060 139,600.00 70,637.60
2 Tukang OH 0.2530 139,600.00 35,318.80
3 Mandor OH 0.0510 155,200.00 7,915.20

Jumlah Harga Tenaga 113,871.60

B BAHAN
1 Pipa GIP SCH 40 ø6" M1 1.0000 -

Jumlah Harga Bahan -

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton m' - 378,000.00 -

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 113,871.60


E OVERHEAD & PROFIT 15 % x D 17,080.74
F JUMLAH TOTAL ( D + E ) 130,952.34
Jenis Pekerjaan : Pemasangan Pipa GIP ø8 inchi 4.1.37.(c)
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7960 139,600.00 111,121.60
2 Tukang OH 0.3980 139,600.00 55,560.80
3 Mandor OH 0.0800 155,200.00 12,416.00

Jumlah Harga Tenaga 179,098.40

B BAHAN
1 Pipa GIP SCH 40 ø8" M1 1.0000 -

Jumlah Harga Bahan -

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton Jam - 378,000.00 -

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 179,098.40


E OVERHEAD & PROFIT 15 % x D 26,864.76
F JUMLAH TOTAL ( D + E ) 205,963.16

Jenis Pekerjaan : Pemasangan Pipa GIP ø10 inchi 4.1.38.(c)


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.9490 139,600.00 132,480.40
2 Tukang OH 0.4750 139,600.00 66,310.00
3 Mandor OH 0.0950 155,200.00 14,744.00

Jumlah Harga Tenaga 213,534.40

B BAHAN
1 Pipa GIP SCH 40 ø10" M1 1.0000 1,858,788.75 1,858,788.75

Jumlah Harga Bahan 1,858,788.75

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton Jam - 378,000.00 -

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,072,323.15


E OVERHEAD & PROFIT 15 % x D 310,848.47
F JUMLAH TOTAL ( D + E ) 2,383,171.62
Jenis Pekerjaan : Pemasangan Pipa GIP SCH 40 ø16 inchi 4.1.40.(c)
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.2120 139,600.00 169,195.20
2 Tukang OH 0.6060 139,600.00 84,597.60
3 Mandor OH 0.1210 155,200.00 18,779.20

Jumlah Harga Tenaga 272,572.00

B BAHAN
1 Pipa GIP SCH 40 ø16" M1 1.0000 3,698,987.50 3,698,987.50

Jumlah Harga Bahan 3,698,987.50

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton Jam - 378,000.00 -

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,971,559.50


E OVERHEAD & PROFIT 15 % x D 595,733.93
F JUMLAH TOTAL ( D + E ) 4,567,293.43

Jenis Pekerjaan : Pemasangan Pipa GIP ø20 inchi 4.1.42.(c)


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.4690 139,600.00 205,072.40
2 Tukang OH 0.7350 139,600.00 102,606.00
3 Mandor OH 0.1470 155,200.00 22,814.40

Jumlah Harga Tenaga 330,492.80

B BAHAN
1 Pipa GIP SCH 40 ø20" M1 1.0000 4,653,716.13 4,653,716.13

Jumlah Harga Bahan 4,653,716.13

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton Jam - 378,000.00 -

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,984,208.93


E OVERHEAD & PROFIT 15 % x D 747,631.34
F JUMLAH TOTAL ( D + E ) 5,731,840.27
Jenis Pekerjaan : Pemasangan Pipa Baja ø6 inchi 4.1.67.(c)
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.7080 139,600.00 98,836.80
2 Tukang OH 0.1420 139,600.00 19,823.20
3 Mandor OH 0.0710 155,200.00 11,019.20

Jumlah Harga Tenaga 129,679.20

B BAHAN
1 Pipa Baja Hitam SCH 40 ø6" m' 1.0000 1,153,666.67 1,153,666.67

Jumlah Harga Bahan 1,153,666.67

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton hari 0.0040 378,000.00 1,512.00

Jumlah Harga Peralatan 1,512.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,284,857.87


E OVERHEAD & PROFIT 15 % x D 192,728.68
F JUMLAH TOTAL ( D + E ) 1,477,586.55

Jenis Pekerjaan : Pemasangan Pipa Baja ø8 inchi 4.1.68.(c)


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.1130 139,600.00 155,374.80
2 Tukang OH 0.2230 139,600.00 31,130.80
3 Mandor OH 0.1110 155,200.00 17,227.20

Jumlah Harga Tenaga 203,732.80

B BAHAN
1 Pipa Baja Hitam SCH 40 ø8" M1 1.0000 1,756,211.11 1,756,211.11

Jumlah Harga Bahan 1,756,211.11

C PERALATAN
Tripot/Trackel & Handle Crane 2 Ton Jam 0.0040 378,000.00 1,512.00

Jumlah Harga Peralatan 1,512.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,961,455.91


E OVERHEAD & PROFIT 15 % x D 294,218.39
F JUMLAH TOTAL ( D + E ) 2,255,674.30
Jenis Pekerjaan : Pengecatan Permukaan Baja Galvanis secara Manual Sistem 1 lapis Cat Mutakhir A.4.7.1.19
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0600 139,600.00 8,376.00
2 Tukang OH 0.0600 139,600.00 8,376.00
3 Kepala Tukang OH 0.0120 155,200.00 1,862.40
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 19,080.00

B
1 Cat Minyak kg 0.3000 94,221.40 28,266.42
2 Kuas buah 0.0100 12,000.00 120.00
3 Minyak Cat / Thinner kg 0.0100 38,507.30 385.07

Jumlah Harga Bahan 28,771.49

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 47,851.49


E OVERHEAD & PROFIT 15 % x D 7,177.72
F JUMLAH TOTAL ( D + E ) 55,029.22

Jenis Pekerjaan : Pemasangan Besi Profil A.4.2.1.1


Satuan Pembayaran : 1 Kg

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0600 139,600.00 8,376.00
2 Tukang Las OH 0.0600 139,600.00 8,376.00
3 Kepala Tukang OH 0.0060 155,200.00 931.20
4 Mandor OH 0.0030 155,200.00 465.60

Jumlah Harga Tenaga 18,148.80

B BAHAN
1 Besi Profil kg 1.1500 17,852.00 20,529.80

Jumlah Harga Bahan 20,529.80

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 38,678.60


E OVERHEAD & PROFIT 15 % x D 5,801.79
F JUMLAH TOTAL ( D + E ) 44,480.39
Jenis Pekerjaan : Pemasangan Besi Profil I A.4.2.1.1.a
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 1.7760 139,600.00 247,929.60
2 Tukang Las OH 1.7760 139,600.00 247,929.60
3 Kepala Tukang OH 0.1776 155,200.00 27,563.52
4 Mandor OH 0.0888 155,200.00 13,781.76

Jumlah Harga Tenaga 537,204.48

B BAHAN
1 Baja Profil I m' 1.1000 2,222,155.00 2,444,370.50

Jumlah Harga Bahan 2,444,370.50

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,981,574.98


E OVERHEAD & PROFIT 15 % x D 447,236.25
F JUMLAH TOTAL ( D + E ) 3,428,811.23

Jenis Pekerjaan : Pemasangan Besi Plat A.4.2.1.1.b


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0080 139,600.00 1,116.80
2 Mandor OH 0.0008 155,200.00 124.16
Jumlah Harga Tenaga 1,240.96

B BAHAN
1 Besi Plat t m² 1.2000 634,497.00 761,396.40
Jumlah Harga Bahan 761,396.40

C PERALATAN 114,209.46 114,209.46


Jumlah Harga Peralatan 114,209.46

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 876,846.82


E OVERHEAD & PROFIT 15 % x D 131,527.02
F JUMLAH TOTAL ( D + E ) 1,008,373.84
Jenis Pekerjaan : Pengelasan dengan Las Listrik 3.1.1.(c)
Satuan Pembayaran : 10 Cm'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0400 139,600.00 5,584.00
2 Tukang Las OH 0.0200 139,600.00 2,792.00
3 Kepala Tukang OH 0.0020 155,200.00 310.40
4 Mandor OH 0.0020 155,200.00 310.40

Jumlah Harga Tenaga 8,996.80

B BAHAN
1 Kawat Las Listrik kg 0.4000 40,250.00 16,100.00
2 Solar liter 0.3000 15,600.00 4,680.00
3 Minyak Pelumas liter 0.0400 52,130.00 2,085.20

Jumlah Harga Bahan 22,865.20

C PERALATAN
1 Sewa Alat Jam 0.1700 70,000.00 11,900.00

Jumlah Harga Peralatan 11,900.00

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 43,762.00


E OVERHEAD & PROFIT 15 % x D 6,564.30
F JUMLAH TOTAL ( D + E ) 50,326.30

Jenis Pekerjaan : Pemasangan Kusen Pintu Aluminium A.4.2.1.24


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0430 139,600.00 6,002.80
2 Tukang Aluminium OH 0.0430 139,600.00 6,002.80
3 Kepala Tukang OH 0.0043 155,200.00 667.36
4 Mandor OH 0.0021 155,200.00 325.92

Jumlah Harga Tenaga 12,998.88

B BAHAN
1 Profil Aluminium m 1.1000 110,000.00 121,000.00
2 Skrup fixer buah 2.0000 800.00 1,600.00
3 Sealant tube 0.0600 51,750.00 3,105.00

Jumlah Harga Bahan 125,705.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 138,703.88


E OVERHEAD & PROFIT 15 % x D 20,805.58
F JUMLAH TOTAL ( D + E ) 159,509.46
Jenis Pekerjaan : Pemasangan Pintu Aluminium Strip Lebar 8 cm A.4.2.1.25
Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0850 139,600.00 11,866.00
2 Tukang Aluminium OH 0.0850 139,600.00 11,866.00
3 Kepala Tukang OH 0.0085 155,200.00 1,319.20
4 Mandor OH 0.0042 155,200.00 651.84

Jumlah Harga Tenaga 25,703.04

B BAHAN
1 Profil Aluminium m' 4.4000 110,000.00 484,000.00
2 Aluminium Strip m' 14.6000 45,000.00 657,000.00

Jumlah Harga Bahan 1,141,000.00

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,166,703.04


E OVERHEAD & PROFIT 15 % x D 175,005.46
F JUMLAH TOTAL ( D + E ) 1,341,708.50

Jenis Pekerjaan : Pemasangan Pintu Kaca Rangka Aluminium A.4.2.1.26


Satuan Pembayaran : 1 M²

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0850 139,600.00 11,866.00
2 Tukang Aluminium OH 0.0850 139,600.00 11,866.00
3 Kepala Tukang OH 0.0085 155,200.00 1,319.20
4 Mandor OH 0.0042 155,200.00 651.84

Jumlah Harga Tenaga 25,703.04

B BAHAN
1 Profil Aluminium m 4.4000 110,000.00 484,000.00
2 Profil Kaca m 4.5000 5,000.00 22,500.00
3 Sealant tube 0.2700 51,750.00 13,972.50

Jumlah Harga Bahan 520,472.50

C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 546,175.54


E OVERHEAD & PROFIT 15 % x D 81,926.33
F JUMLAH TOTAL ( D + E ) 628,101.87
Jenis Pekerjaan : Pengetesan Pipa ø250 mm A.8.4.5.6
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0080 139,600.00 1,116.80
2 Mandor OH 0.0008 155,200.00 124.16

Jumlah Harga Tenaga 1,240.96

B BAHAN
1 Air Test (Air Bersih) m³ 0.0490 24,782.00 1,214.32
2 Solar Non Subsidi liter 0.0600 15,600.00 936.00
3 Pelumas / Oli liter 0.0020 52,130.00 104.26

Jumlah Harga Bahan 2,254.58


C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,495.54


E OVERHEAD & PROFIT 15 % x D 524.33
F JUMLAH TOTAL ( D + E ) 4,019.87

Jenis Pekerjaan : Pengetesan Pipa ø300 mm A.8.4.5.7


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0080 139,600.00 1,116.80
2 Mandor OH 0.0008 155,200.00 124.16
Jumlah Harga Tenaga 1,240.96

B BAHAN
1 Air Test (Air Bersih) m³ 0.0710 24,782.00 1,759.52
2 Solar Non Subsidi liter 0.0600 15,600.00 936.00
3 Pelumas / Oli liter 0.0020 52,130.00 104.26
Jumlah Harga Bahan 2,799.78
C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,040.74


E OVERHEAD & PROFIT 15 % x D 606.11
F JUMLAH TOTAL ( D + E ) 4,646.85
Jenis Pekerjaan : Pengetesan Pipa ø355 mm A.8.4.5.7.a
Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0080 139,600.00 1,116.80
2 Mandor OH 0.0008 155,200.00 124.16
Jumlah Harga Tenaga 1,240.96

B BAHAN
1 Air Test (Air Bersih) m³ 0.0985 24,782.00 2,441.03
2 Solar Non Subsidi liter 0.0600 15,600.00 936.00
3 Pelumas / Oli liter 0.0020 52,130.00 104.26
Jumlah Harga Bahan 3,481.29
C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,722.25


E OVERHEAD & PROFIT 15 % x D 708.34
F JUMLAH TOTAL ( D + E ) 5,430.58

Jenis Pekerjaan : Pengetesan Pipa ø400 mm A.8.4.5.8


Satuan Pembayaran : 1 M'

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Pekerja OH 0.0080 139,600.00 1,116.80
2 Mandor OH 0.0008 155,200.00 124.16
Jumlah Harga Tenaga 1,240.96

B BAHAN
1 Air Test (Air Bersih) m³ 0.1260 24,782.00 3,122.53
2 Solar Non Subsidi liter 0.0600 15,600.00 936.00
3 Pelumas / Oli liter 0.0020 52,130.00 104.26
Jumlah Harga Bahan 4,162.79
C PERALATAN

Jumlah Harga Peralatan -

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 5,403.75


E OVERHEAD & PROFIT 15 % x D 810.56
F JUMLAH TOTAL ( D + E ) 6,214.31
Jenis Pekerjaan : Pemasangan Titik Lampu A.8.4.6.1
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Upah % 100 143,900.00 143,900.00

Jumlah Harga Tenaga 143,900.00

B BAHAN
1 Pipa Listrik 5/8" batang 3.00 2,000.00 6,000.00
2 Kabel NYA 2.5 mm m' 24.00 4,000.00 96,000.00
3 T Dus buah 3.00 800.00 2,400.00
4 L Bow buah 4.00 500.00 2,000.00
5 Las Dop buah 3.00 300.00 900.00
6 Klem buah 24.00 150.00 3,600.00
7 Mongkok buah 1.00 3,000.00 3,000.00
8 Saklar buah 1.00 15,000.00 15,000.00
9 Fitting buah 1.00 15,000.00 15,000.00

Jumlah Harga Bahan 143,900.00

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 287,800.00


E OVERHEAD & PROFIT 15 % x D 43,170.00
F JUMLAH TOTAL ( D + E ) 330,970.00

Jenis Pekerjaan : Pemasangan Stop Kontak 1 Phase A.8.4.6.2.a


Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Upah % 100 89,400.00 89,400.00

Jumlah Harga Tenaga 89,400.00

B BAHAN
1 Pipa Listrik 5/8" batang 3.00 2,000.00 6,000.00
2 Kabel NYA 2.5 mm m' 15.00 4,000.00 60,000.00
3 T Dus buah 1.00 800.00 800.00
4 L Bow buah 2.00 500.00 1,000.00
5 Klem buah 24.00 150.00 3,600.00
6 Mongkok buah 1.00 3,000.00 3,000.00
7 Stop Kontak Biasa buah 1.00 15,000.00 15,000.00

Jumlah Harga Bahan 89,400.00

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 178,800.00


E OVERHEAD & PROFIT 15 % x D 26,820.00
F JUMLAH TOTAL ( D + E ) 205,620.00
Jenis Pekerjaan : Pemasangan Stop Kontak 3 Phase A.8.4.6.2.b
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)

A TENAGA
1 Upah

Jumlah Harga Tenaga -

B BAHAN
1 Kabel Power NYY 4x2.5 mm m' 5.00 29,707.00 148,535.00
2 Stop Kontak 3 Phase buah 1.00 450,000.00 450,000.00

Jumlah Harga Bahan 598,535.00

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 598,535.00


E OVERHEAD & PROFIT 15 % x D 89,780.25
F JUMLAH TOTAL ( D + E ) 688,315.25

Jenis Pekerjaan : -
Satuan Pembayaran : 1 Buah

Harga Satuan Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Upah

Jumlah Harga Tenaga -

B BAHAN
1 Kabel Power NYY 4x2.5 mm m' 5.00 -
2 Stop Kontak 3 Phase buah 1.00 -

Jumlah Harga Bahan -

C PERALATAN

Jumlah Harga Peralatan

D JUMLAH TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E OVERHEAD & PROFIT 15 % x D -
F JUMLAH TOTAL ( D + E ) -
ENGINEER'S ESTIMATE (EE)

DAFTAR HARGA SATUAN BAHAN DAN UPAH

PROGRAM :
KEGIATAN :
SUB KEGIATAN :
PEKERJAAN :
LOKASI :

HARGA SATUAN
No. UPAH KODE SATUAN KET
(Rp)
1 2 3 4 5 6

1 Pekerja L.01 OH 139,600.00

adalah 7 Jam
2 Tukang L.02 OH 139,600.00

Kerja Efektif Sehari


3 Tukang Las L.02 OH 139,600.00
4 Tukang Aluminium L.02 OH 139,600.00
5 Kepala Tukang L.03 OH 155,200.00

Asumsi
6 Mandor L.04 OH 155,200.00
7 Penjaga / pembantu L.05 OH 100,000.00

HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

I. MATERIAL ALAM
1 Pasir Pasang M.001 m³ 175,000.00
2 Pasir Urug M.002 m³ 214,825.00
3 Pasir Cor (Agregat Halus) M.003 m³ 380,575.00
4 Bata Merah M.004 bh 1,977.30
5 Rooster (Lubang Angin) M.005 bh 18,000.00
6 Batu Kerikil M.006 m³ 786,825.00
7 Batu Pecah / Split (Agregat Kasar) M.007 m³ 1,046,825.00
8 Batu Tempel (ex : Candi 20 x 20) M.008 m² 241,182.50
9 Air M.009 m³ 24,782.00

II. MATERIAL BESI


1 Besi Beton M.010 kg 21,333.00
2 Kawat Pengikat M.011 kg 32,502.73
3 Paku Biasa / Campur M.012 kg 28,654.60
4 Paku putih M.013 kg 36,454.60
5 Paku Beton M.014 kg 48,236.50
6 Paku Sekrup M.015 kg 1,067.30
7 Baut 3/4" Panjang 4" M.016 Buah 11,077.30
8 Baut 1/2" Panjang 4" M.017 Buah 9,127.30
9 C-7 , 0.8 M.018 m' 15,000.00
10 C-75, 0.6 M.019 bh 13,400.00
11 Reng M.020 m' 7,000.00
12 Talang Juray M.021 m' 48,000.00
13 Kawat Las M.022 kg 40,250.00
14 Besi Profil M.023 kg 17,852.00
15 Besi Plat Strip M.024 kg 7,106.00
16 Besi Plat 120 x 240 cm M.025 lbr 634,497.00
17 Atap Genteng Spandek Metal Zincalume 0,30 mm M.026 m² 59,865.00
18 Perabung Panjang 80 cm M.027 m' 52,682.50
19 Aluminium Foil M.028 m² 15,000.00
20 Profil Aluminium M.029 m' 110,000.00
21 Profil Kaca M.030 m' 5,000.00
22 Aluminium Strip M.031 m' 45,000.00
23 Frame allumunium M.032 kg 20,000.00
24 Screw cteks 12-4 x 50 M.033 bh 1,300.00
25 Screw cteks 10 x 16 -16 M.034 bh 2,300.00
26 Baut Moor M.035 bh 2,500.00
HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

27 Skrup Fixer M.036 bh 800.00


28 Plat Strip 8 mm (100 x 150) M.037 bh 1,500,000.00
29 Baut Putih 5/8 x 3" M.038 bh 15,000.00
30 Baut dan mur Ø19 mm M.039 bh 7,000.00
31 Baut dan mur Ø23 mm M.040 bh 8,500.00
32 Baut dan mur Ø27 mm M.041 bh 12,500.00
33 Baja Profil I (12 m) M.042 m' 350,000.00
34 Baja Profil UNP (6 m) M.043 m' 120,000.00
35 Pipa Baja Hitam SCH 40 ø6" M.044 m' 1,153,666.67
36 Pipa Baja Hitam SCH 40 ø8" M.045 m' 1,756,211.11
37 Clam Pengikat Pipa Besi M.046 bh 10,000.00
38 Pipa Hollow Galv 30x30 1,7 mm M.047 m' 26,133.00
39 Pipa Hollow Galv 40x40 2 mm M.048 m' 60,016.00
40 Jaring Kawat Baja dilas (wiremesh) M.049 kg 12,105.00
41 Dynabolt M.050 bh 10,000.00
42 Lantai expanded M.051 m² 520,000.00
43 Pintu Besi Plat Rangkap + Rangka Besi Siku + Aksesoris M.052 unit 2,500,000.00
44 Plat dan Baut Penyangga Pipa M.053 set 50,000.00
45 Pengaduk Kimia (Pipa GIP SCH 40 ø20 inchi+Plat Pengaduk) M.054 unit 8,000,000.00
46 Tangga Plat Besi M.055 unit 3,000,000.00
47 Kusen dan Daun Pintu Besi M.056 m² 1,500,000.00
48 Ventilasi Besi M.057 m² 600,000.00

III. MATERIAL CAMPURAN


1 Semen PC (50 Kg) M.058 kg 2,107.30
2 Semen Grouting M.059 kg 1,950.00
3 Semen Warna M.060 kg 4,902.30
4 Pengeras Lantai (Floor Harderner) M.061 kg 6,000.00
5 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) M.062 bh 3,407.30
6 Keramik 30 x 30 Kualitas Standar (Ex. Garuda) M.063 bh 8,374.60
7 Keramik 40 x 40 Kualitas Standar (Ex. Garuda) M.064 bh 14,108.25
8 Granit 40 x 40 Kualitas Standar (Ex. Garuda) M.065 bh 32,581.90
9 Keramik 20 x 40 cm (Motif Batu Alam) M.066 bh 9,500.00
10 Glass Block M.067 bh 39,013.65
11 Plamir / Dempul M.068 kg 16,315.00
12 Cat Dasar M.069 kg 55,932.50
13 Cat Penutup M.070 kg 111,865.00
14 Cat Menie M.071 kg 38,507.30
15 Cat Minyak M.072 kg 94,221.40
16 Minyak Cat / Thinner M.073 kg 38,507.30
17 Kuas M.074 kg 12,000.00
18 Lem Kayu M.075 kg 29,900.00
19 Kaca Tebal 5 mm M.076 m² 197,047.50
20 Sealant M.077 btl 51,750.00
21 Tangki Septictank Bio M.078 unit 3,500,000.00
22 Closet Duduk M.079 unit 2,222,155.00
23 Closet Jongkok M.080 unit 332,507.50
24 Bak Mandi Plastik (Persegi) 20 Liter M.081 unit 371,507.50
25 Floor drain M.082 bh 22,000.00
26 Penahan Pipa Beton K250 (Precast Uk. ø36x120 cm) M.083 bh 842,400.00
27 Kerekan Rantai Listrik dengan Troli Kap. 2 ton M.084 unit 36,380,500.00
28 Kerekan Rantai Kap. 2 ton M.085 unit 1,755,520.00
29 Kerekan Rantai Kap. 2 ton dengan Tripod 3 m' M.086 unit 8,000,000.00
30 Alat Ukur Tinggi Muka Air Sungai Pjg. 8 m' M.087 unit 4,000,000.00
31 Alat Ukur Tinggi Muka Air Sungai Pjg. 8 m' M.088 unit 4,000,000.00
32 Banner Plastik M.089 m² 50,000.00
33 Tiang Pancang Beton Pratekan ø35 cm M.090 m' 482,000.00

IV. MATERIAL MINYAK


1 Solar Non Subsidi M.091 ltr 15,600.00
HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

2 Bensin / Premium M.092 ltr 11,115.00


3 Pelumas / Oli M.093 ltr 52,130.00
4 Minyak Bekisting M.094 ltr 28,730.00
5 Minyak Tanah Non Subsidi M.095 ltr 17,290.00

V. MATERIAL KUNCI DAN ALAT PENGGANTUNG


1 Kunci Tanam 2 Slaagh Kualitas Standart M.096 bh 455,027.30
2 Kunci Tanam Bulat Kualitas Standar M.097 bh 40,000.00
3 Engsel Kuningan 4" M.098 bh 19,527.30
4 Engsel Kupu-kupu M.099 bh 14,327.30
5 Kunci Slot M.100 bh 32,000.00
6 Kait Angin M.101 bh 26,027.30

VI. MATERIAL KAYU


1 Kayu Persegi Klas II (Meranti) M.102 m³ 5,852,730.00
2 Kayu Persegi Punak M.103 m³ 5,852,730.00
3 Kayu bakar M.104 m³ 350,000.00
4 Kayu 5/7 M.105 btg 28,000.00
5 Cerocok Kayu Bulat M.106 m' 3,772.79
6 Kayu Pandal Penyirih ø12-15 cm M.107 btg 22,509.50
7 Bantalan Melting M.108 m' 65,409.50
8 Perancah dolken ø8-10 cm panjang 4 m M.109 btg 14,092.00
9 Balok Kayu Persegi Klas II M.110 m³ 5,852,730.00
10 Balok Kayu Persegi Punak M.111 m³ 5,852,730.00
11 Balok Kayu Persegi Klas III M.112 m³ 4,617,730.00
12 Kayu Ikat M.113 ikat 158,047.50
13 Papan Klas II M.114 m³ 5,852,730.00
14 Papan Klas III M.115 m³ 4,617,730.00
15 Papan Punak M.116 m³ 5,852,730.00
16 Papan Bekisting M.117 m³ 2,667,730.00
17 Formasi/ Penjaga Jarak Bekisting M.118 bh 3,500.00
18 Plywood Tebal 9 mm M.119 lbr 175,630.00
19 Gypsum Board Tebal 9 mm M.120 lbr 105,365.00

VII. MATERIAL PERPIPAAN DAN AKSESORIS


1 Pipa HDPE PE 100 PN 10 SDR 17 ø20 mm M.121 m' 11,440.00
2 Pipa HDPE PE 100 PN 10 SDR 17 ø110 mm M.122 m' 158,304.00
3 Pipa HDPE PE 100 PN 10 SDR 17 ø63 mm M.123 m' 114,125.00
4 Pipa HDPE PE 100 PN 10 SDR 17 ø90 mm M.124 m' 233,875.00
5 Pipa HDPE PE 100 PN 10 SDR 17 ø250 mm M.125 m' 794,492.00
6 Pipa HDPE PE 100 PN 10 SDR 17 ø315 mm M.126 m' 1,255,400.00
7 Pipa HDPE PE 100 PN 10 SDR 17 ø355 mm M.127 m' 1,588,058.00
8 Elbow 22.5° ø160 mm M.128 unit 585,200.00
9 Elbow 22.5° ø200 mm M.129 unit 694,000.00
10 Elbow 22.5° ø250 mm M.130 unit 1,716,835.00
11 Elbow 22.5° ø315 mm M.131 unit 2,208,000.00
12 Elbow 90° ø63mm M.132 unit 270,000.00
13 Elbow 22.5° ø160 mm M.133 unit 326,700.00
14 Elbow 22.5° ø160 mm M.134 unit 443,000.00
15 Elbow 45° ø200 mm M.135 unit 653,400.00
16 Elbow 45° ø250 mm M.136 unit 1,163,400.00
17 Elbow 45° ø315 mm M.137 unit 2,576,000.00
18 Elbow 45° ø355 mm M.138 unit 3,556,625.00
19 Elbow 90° ø110 mm M.139 unit 414,400.00
20 Elbow 90° ø160 mm M.140 unit 569,400.00
21 Elbow 90° ø200 mm M.141 unit 828,800.00
22 Elbow 90° ø250 mm M.142 unit 1,457,600.00
23 Elbow 90° ø315 mm M.143 unit 3,338,300.00
24 Elbow 90° ø355 mm M.144 unit 4,293,540.00
25 TEE HDPE PN 10 ø 63 mm M.145 unit 226,000.00
HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

26 TEE HDPE PN 10 ø 90 mm M.146 unit 498,150.00


27 TEE HDPE PN 10 ø110 mm M.147 unit 986,250.00
28 TEE HDPE PN 10 ø315 mm M.148 unit 3,456,100.00
29 TEE HDPE PN 10 ø355 mm M.149 unit 5,585,665.00
30 REDUCER TEE HDPE PN 10 ø110 x 63 mm M.150 unit 1,312,500.00
31 REDUCER TEE HDPE PN 10 ø90 x 63 mm M.151 unit 487,500.00
32 REDUCER HDPE PN 10 ø90 x 63 mm M.152 unit 267,062.50
32 REDUCER TEE HDPE PN 10 ø200 x 110 mm M.152 unit 1,844,025.00
33 REDUCER TEE HDPE PN 10 ø200 x 160 mm M.153 unit 1,614,025.00
34 REDUCER TEE HDPE PN 10 ø250 x 110 mm M.154 unit 2,116,829.00
35 REDUCER TEE HDPE PN 10 ø315 x 110 mm M.155 unit 2,511,509.00
36 Stube End HDPE PN 10 ø63 mm M.156 bh 97,784.00
37 Stube End HDPE PN 10 ø110 mm M.157 bh 196,960.00
38 Stube End HDPE PN 10 ø160 mm M.158 bh 340,285.00
39 Stube End HDPE PN 10 ø200 mm M.159 bh 813,395.00
40 Stube End HDPE PN 10 ø250 mm M.160 bh 1,251,970.00
41 Stube End HDPE PN 10 ø315 mm M.161 bh 1,822,991.00
42 Stube End HDPE PN 10 ø355 mm M.162 bh 2,512,922.00
43 Stube End HDPE PN 10 ø400 mm M.163 bh 3,012,240.00
44 Pipa GIP SCH 40 ø2" M.164 m' 135,771.30
45 Pipa GIP SCH 40 ø3" M.165 m' 282,122.40
46 Pipa GIP SCH 40 ø4" M.166 m' 401,173.50
47 Pipa GIP SCH 40 ø6" M.167 m' 768,654.25
48 Pipa GIP SCH 40 ø8" M.168 m' 1,173,575.00
49 Pipa GIP SCH 40 ø10" M.169 m' 1,858,788.75
50 Pipa GIP SCH 40 ø12" M.170 m' 2,330,098.00
51 Pipa GIP SCH 40 ø16" M.171 m' 3,698,987.50
52 Pipa GIP SCH 40 ø20" M.172 m' 4,653,716.13
53 Gate Valve ø110 mm M.173 unit 3,087,000.00
54 Gate Valve ø160 mm M.174 unit 10,370,700.00
55 Gate Valve ø200 mm M.175 unit 18,897,375.00
56 Gate Valve ø250 mm M.176 unit 29,178,950.00
57 Gate Valve ø315 mm M.177 unit 32,316,071.50
58 Gate Valve ø355 mm M.178 unit 35,453,193.00
59 Gate Valve ø400 mm M.179 unit 53,179,790.00
60 Gate Valve ø500 mm M.180 unit 79,769,685.00
61 Butterfly Valve ø6" M.181 unit 2,500,000.00
62 Check Valve ø6" M.182 bh 1,500,000.00
63 Foot Valve ø6" M.183 bh 5,635,000.00
64 Air Valve DI ø110 mm M.184 bh 17,640,000.00
65 Bar Meter M.185 bh 690,000.00
66 Meteran Air M.186 bh 485,000.00
67 Flange Socket Rubbering PVC ø6" M.187 bh 550,000.00
68 Flange Socket Rubbering PVC ø4" M.188 bh 450,000.00
69 Flange Socket Rubbering PVC ø3" M.189 bh 300,000.00
70 Flange Spigot Socket ø6" PVC M.190 bh 1,457,600.00
71 Flange Spigot Socket ø4" PVC M.191 bh 475,000.00
72 Flange Spigot Socket ø3" PVC M.192 bh 300,000.00
73 Flange ø6" Gip M.193 bh 747,000.00
74 Flange ø4" Gip M.194 bh 600,000.00
75 Flange ø3" Gip M.195 bh 550,000.00
76 Flange CS Galvanis PN 10 ø63 mm M.196 bh 186,397.00
77 Flange CS Galvanis PN 10 ø110 mm M.197 bh 355,465.00
78 Flange CS Galvanis PN 10 ø160 mm M.198 bh 608,718.00
79 Flange CS Galvanis PN 10 ø200 mm M.199 bh 777,911.00
80 Flange CS Galvanis PN 10 ø250 mm M.200 bh 1,074,997.00
81 Flange CS Galvanis PN 10 ø315 mm M.201 bh 1,267,657.00
82 Flange CS Galvanis PN 10 ø355 mm M.202 bh 1,588,776.00
83 Flange CS Galvanis PN 10 ø400 mm M.203 bh 1,859,044.00
84 Flange CS Galvanis PN 10 ø500 mm M.204 bh 2,991,408.00
85 Blind Flange CS Galvanis PN 10 ø110 mm M.205 bh 608,718.00
86 Blind Flange CS Galvanis PN 10 ø250 mm M.206 bh 1,267,656.00
87 Blind Flange CS Galvanis PN 10 ø500 mm M.207 bh 2,991,408.00
88 Dismantling Joint CS Galvanis PN 10 ø110 mm M.208 bh 533,197.00
HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

89 Dismantling Joint CS Galvanis PN 10 ø250 mm M.209 bh 2,183,165.00


90 Dismantling Joint CS Galvanis PN 10 ø315 mm M.210 bh 2,283,165.00
91 Dismantling Joint CS Galvanis PN 10 ø355 mm M.211 bh 2,383,165.00
92 Dismantling Joint CS Galvanis PN 10 ø500 mm M.212 bh 3,574,747.50
93 Kran Air ¾" Kualitas Baik M.213 bh 34,500.00
94 Sealtape M.214 bh 5,750.00
95 Pipa PVC tipe AW ø½" M.215 m' 35,165.00
96 Pipa PVC tipe AW ø¾" M.216 m' 42,965.00
97 Pipa PVC tipe AW ø1" M.217 m' 59,865.00
98 Pipa PVC tipe AW ø1½" M.218 m' 89,765.00
99 Pipa PVC tipe AW ø3" M.219 m' 326,365.00
100 Tee HDPE ø6" M.220 bh 393,700.00
101 Tee GI ø6" M.221 bh 400,000.00
102 Tee GI ø4" M.222 bh 350,000.00
103 Tee GI ø3" M.223 bh 300,000.00
104 Bend All Flange 22.5° ø6" M.224 bh 936,000.00
105 Bend All Flange 45° ø6" M.225 bh 962,000.00
106 Bend All Flange 90° ø6" M.226 bh 988,000.00
107 Bend All Flange 22.5° ø10" M.227 bh 1,404,000.00
108 Bend All Flange 45° ø10" M.228 bh 1,482,000.00
109 Bend All Flange 90° ø10" M.229 bh 1,560,000.00
110 Bend All Flange 22.5° ø16" M.230 bh 1,872,000.00
111 Bend All Flange 45° ø16" M.231 bh 2,246,400.00
112 Bend All Flange 90° ø16" M.232 bh 2,695,680.00
113 Reducer Tee All Socket W/ Flange ø14x4 inchi M.233 bh 1,872,000.00
114 Reducer Tee All Socket W/ Flange ø16x4 inchi M.234 bh 2,145,000.00
115 Reducer Tee All Socket W/ Flange ø20x16 inchi M.235 bh 4,290,000.00
116 Flexible Rubber Joint ø6" M.236 bh 2,012,500.00
117 Rubber Packing tbl. 3 mm M.237 bh 104,000.00
118 Water Meter Induk ø16 inchi Lengkap M.238 bh 54,600,000.00
119 Tangki Hydro kap. 5.000 liter M.239 bh 150,000,000.00
120 Pompa Submarsible 60 ltr/dtk, Head 15 m, 1.450 rpm M.240 bh 780,000,000.00
121 Pompa Centrifugal 60 ltr/dtk, Head 60 m, 1.450 rpm M.241 bh 870,000,000.00
122 Pompa Centrifugal 70 ltr/dtk, Head 100 m, 1.450 rpm M.242 bh 895,000,000.00
123 Mixer Kimia 0.37 kw 0.5 HP With Gearbox M.243 unit 27,074,000.00
124 Pompa Dosing kap. 240 liter/jam M.244 unit 47,121,000.00
125 Tangki kap. 1.000 liter M.245 bh 1,950,000.00
126 Tangki kap. 3.000 liter M.246 bh 5,559,000.00
HARGA SATUAN
No. BAHAN / MATERIAL KODE SATUAN KET
(Rp)
1 2 3 3 4 5

VIII. MATERIAL ELEKTRIKAL


1 Pipa Listrik 5/8" M.247 btg 2,000.00
2 Kabel NYA 2.5 mm M.248 m' 4,000.00
3 Kabel Power NYY 4 X 70 mm M.249 m' 517,066.00
4 Kabel Power NYY 4x25 mm M.250 m' 235,589.00
5 Kabel Power NYY 4x16 mm M.251 m' 163,815.00
6 Kabel Power NYY 4x2.5 mm M.252 m' 29,707.00
7 T Dus M.253 bh 800.00
8 L Bow M.254 bh 500.00
9 Las Dop M.255 bh 300.00
10 Klem M.256 bh 150.00
11 Mongkok M.257 bh 3,000.00
12 Saklar M.258 bh 15,000.00
13 Fitting M.259 bh 15,000.00
14 Stop Kontak Biasa M.260 bh 15,000.00
15 Stop Kontak 3 Phase M.261 bh 450,000.00
16 Lampu SL 20 watt ex. Philips M.262 bh 105,000.00
17 Lampu DL 18 watt ex. Philips M.263 bh 105,000.00
18 Lampu Sorot 200 watt Solar Panel (LED) M.264 unit 1,650,000.00
19 Lampu Panel Surya 45 W M.265 unit 437,000.00
20 Panel LV-MDV Lengkap M.266 unit 580,000,000.00
21 Panel Pompa (Start Delta) Lengkap M.267 unit 26,000,000.00
22 Panel Sub Distribusi/SDP/Panel Penerangan Lengkap M.268 unit 11,534,500.00
23 Inverter 126 KVA M.269 unit 126,000,000.00
24 Capasitor Bank 8 Grup 75 KVA M.270 unit 16,000,000.00
25 Kabel Tray 50x3000 mm Elektro Galvanis M.271 m' 35,300.00
26 Kabel Tray 100x3000 mm Elektro Galvanis M.272 m' 112,959.00
27 Tiang Lampu ø2" Panjang 3 meter M.273 unit 500,000.00
IX. HARGA SEWA ALAT
1 Concrete Mixer 0,3 - 0,6 m³ E.01 Jam 75,000.00
2 Pile Driver + Hammer E.02 Jam 328,598.70
3 Crane 10 -15 Ton E.03 Jam 614,539.30
4 Las listrik 250 A diesel E.04 sewa/hari 490,000.00
5 Genset 1500 watt E.05 sewa/hari 420,000.00
6 Pompa Submersible 3 m³/jam E.06 sewa/hari 442,500.00
7 Cilinder Saw E.07 sewa/hari 315,000.00
8 Tripod tinggi 5 m E.08 sewa/hari 175,000.00
9 Tripod tinggi 7 m E.09 sewa/hari 245,000.00
10 Tripot/Trackel & Handle Crane 2 Ton E.10 sewa/hari 378,000.00
11 Alat Pancang + Hammer 0.5 Ton E.11 sewa/hari 147,000.00
12 Alat Pancang + Hammer 1 Ton E.12 sewa/hari 252,000.00
13 Alat Pancang + Hammer 2 Ton E.13 sewa/hari 357,000.00
14 Ponton E.14 Jam 345,000.00
15 Tug Boat E.15 Jam 230,000.00
16 Waterpass E.16 sewa/hari 75,000.00
17 Theodolith E.17 sewa/hari 225,000.00

Tembilahan, 2022
Disetujui oleh: Dibuat oleh:
PT. BPR GEMILANG (Persero) CV. MOMENT TEKNIK
Bank Perkereditan Rakyat Konsultan Perencanaan,

………………………… HIKMATULLAH, ST
Direktur Direktur
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
WILAYAH KABUPATEN INDRAGIRI HILIR
UNTUK TAHUN ANGGARAN 2022

LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
UPAH
1 Mandor Orang/Hari Rp 155,204.22
2 Pekerja Orang/Hari Rp 139,683.80
3 Tukang Gali Orang/Hari Rp 139,683.80
4 Tukang Batu Orang/Hari Rp 139,683.80
5 Tukang Kayu Orang/Hari Rp 139,683.80
6 Tukang Besi Orang/Hari Rp 139,683.80
7 Tukang Meubel Orang/Hari Rp 139,683.80
8 Tukang Ledeng Orang/Hari Rp 139,683.80
9 Tukang Listrik Orang/Hari Rp 139,683.80
10 Tukang Cat / Dempul Orang/Hari Rp 139,683.80
11 Tukang Pelitur Orang/Hari Rp 139,683.80
12 Kepala Tukang Gali Orang/Hari Rp 155,204.22
13 Kepala Tukang Batu Orang/Hari Rp 155,204.22
14 Kepala Tukang Kayu Orang/Hari Rp 155,204.22
15 Kepala Tukang Besi Orang/Hari Rp 155,204.22
16 Kepala Tukang Meubel Orang/Hari Rp 155,204.22
17 Kepala Tukang Ledeng Orang/Hari Rp 155,204.22
18 Kepala Tukang Listrik Orang/Hari Rp 155,204.22
19 Kepala Tukang Cat / Dempul Orang/Hari Rp 155,204.22
20 Penjaga Malam Orang/Hari Rp 100,000.00
21 Mekanik Orang/Hari Rp 155,204.22
22 Mekanik Pembantu Orang/Hari Rp 139,683.80
23 Operator Terlatih Orang/Hari Rp 155,204.22
24 Operator Kurang Terlatih Orang/Hari Rp 139,683.80
25 Pembantu Operator Orang/Hari Rp 125,715.42
26 Supir Material / Truck Orang/Hari Rp 155,204.22
27 Supir Personil Orang/Hari Rp 139,683.80
28 Pembantu Supir / Knek Orang/Hari Rp 125,715.42
29 Buruh Terlatih Orang/Hari Rp 139,683.80
30 Buruh Kurang Terlatih Orang/Hari Rp 125,715.42
MATERIAL ALAM
1 Tanah Timbun (Lokal) Tembilahan M3 Rp 136,825.00
2 Tanah Timbun (Didatangkan) Tembilahan M3 Rp 364,325.00
3 Pasir Urug Tembilahan M3 Rp 214,825.00
4 Pasir Cor (Agregat Halus) Tembilahan M3 Rp 380,575.00
5 Batu Kerikil Tembilahan M3 Rp 786,825.00
6 Batu Pecah / Split (Agregat Kasar) Tembilahan M3 Rp 1,046,825.00
7 Asphalt Esso Penetration 60/70 Pekanbaru Drum Rp 1,250,000.00
8 Asphalt Iran Penetration 60/70 Pekanbaru Drum Rp 1,200,000.00
9 Asphalt Shell Penetration 60/70 Pekanbaru Drum Rp 1,250,000.00
10 Asphalt Pertamina Penetration 60/70 Pekanbaru Drum Rp 1,150,000.00
11 Asphalt AC 60/70 Tembilahan Kilogram Rp 31,295.55
12 Asphalt Emulsi (Dingin) Tembilahan Kilogram Rp 32,595.55
13 Filler (Agregat Halus) Tembilahan M3 Rp 1,165,125.00
14 Batu Kali Tembilahan M3 Rp 593,190.00
15 Sirtu / Urugan Pilihan Tembilahan M3 Rp 381,940.00
16 Base-A Tanjung Pinang M3 Rp 786,240.00
17 Base-B Tanjung Pinang M3 Rp 704,340.00
18 Base-C Tanjung Pinang M3 Rp 581,490.00
MATERIAL BESI
1 Kawat Pengikat Tembilahan Kilogram Rp 32,502.73
2 Kawat Berduri Tembilahan Rol Rp 162,502.73
3 Besi Beton Polos Tembilahan Kilogram Rp 21,723.00
4 Besi Beton Ulir Tembilahan Kilogram Rp 21,333.00
5 Besi Warmes Uk. 150x150x50m Ǿ 8 MI Tembilahan Rol Rp 4,600,000.00
6 Besi Warmes Uk. 150x150x50m Ǿ 6 MI Tembilahan Rol Rp 4,300,000.00
7 Paku Biasa / Campur Tembilahan Kilogram Rp 28,654.60
8 Paku Putih Tembilahan Kilogram Rp 36,454.60
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
9 Paku Tripleks Tembilahan Kilogram Rp 29,954.60
10 Paku Beton Tembilahan Kilogram Rp 48,236.50
11 Paku Seng Tembilahan Kilogram Rp 41,654.60
12 Paku Asbes Tembilahan Kilogram Rp 39,136.50
13 Paku Sekrup Tembilahan Buah Rp 1,067.30
14 Baut 3/4" Panjang 4" Tembilahan Buah Rp 11,077.30
15 Baut 1/2" Panjang 4" Tembilahan Buah Rp 9,127.30
16 Teralis Besi Plat / Siku Tembilahan M2 Rp 470,730.00
17 Kawat Las Tembilahan Kilogram Rp 53,436.50
18 Besi Plat Strip Tembilahan Kilogram Rp 9,886.50
19 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 13,136.50
20 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 15,086.50
21 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 17,036.50
22 Geotextile Non Woven GTR 150 Gr Pekanbaru M2 Rp 10,000.00
23 Geotextile Non Woven GTR 200 Gr Pekanbaru M2 Rp 11,500.00
24 Geotextile Non Woven GTR 250 Gr Pekanbaru M2 Rp 12,500.00
25 Geotextile Non Woven GTR 300 Gr Pekanbaru M2 Rp 15,500.00
26 Geotextile Non Woven GTR 400 Gr Pekanbaru M2 Rp 17,000.00
27 Geotextile Non Woven GTR 500 Gr Pekanbaru M2 Rp 19,500.00
28 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 13,500.00
29 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 18,000.00
30 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 24,500.00
31 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 30,000.00
MATERIAL CAMPURAN
1 Semen PC (50 KG) Tembilahan Kilogram Rp 2,107.30
2 Semen Putih/Warna Tembilahan Kilogram Rp 4,902.30
3 Lem Fox Putih Tembilahan Kilogram Rp 44,213.65
4 Lem Fox Kuning Tembilahan Kilogram Rp 50,809.20
5 Batu Bata Pres (5 x 11 x 22) Tembilahan Buah Rp 2,394.60
6 Batu Bata Biasa (8 x 8 x 18) Tembilahan Buah Rp 1,977.30
7 Batako Tembilahan Buah Rp 2,400.06
8 Beton Ready Mix K 175 Tembilahan M³ Rp 1,250,000.00
9 Beton Ready Mix K 250 Tembilahan M³ Rp 1,350,000.00
10 Beton Ready Mix K 350 Tembilahan M³ Rp 1,450,000.00
11 Paving Block Tembilahan Buah Rp 3,263.65
12 Paving Block Tebal 8cm K225 (Natural) Pekanbaru M2 Rp 115,000.00
13 Paving Block Tebal 8cm K225 (Motif Warna) Pekanbaru M2 Rp 150,000.00
14 Paving Block Tebal 8cm K225 (Dominan Warna) Pekanbaru M2 Rp 160,000.00
15 Paving Block Tebal 8cm K225 (List Warna) Pekanbaru M2 Rp 140,000.00
16 Paving Block Tebal 8cm K300 (Natural) Pekanbaru M2 Rp 145,000.00
17 Paving Block Tebal 8cm K300 (Motif Warna) Pekanbaru M2 Rp 165,000.00
18 Paving Block Tebal 8cm K300 (Dominan Warna) Pekanbaru M2 Rp 185,000.00
19 Paving Block Tebal 8cm K300 (List Warna) Pekanbaru M2 Rp 155,000.00
20 Kawat Harmonika Gaas Tembilahan M2 Rp 19,609.20
21 Kawat Nyamuk / Kasa Besi Tembilahan M2 Rp 35,209.20
22 Kawat Nyamuk / Kasa Plastik Tembilahan M2 Rp 32,609.20
23 Plastik Terpal Hitam Tembilahan Kilogram
24 Glass Block Tembilahan Buah Rp 39,013.65

Tiang Pancang Bulat Sentrifugal Ø 300 mm, P. 6/8 M Kls. A,


24 Batam M' Rp 353,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 300 mm, P. 6/8 M Kls. A,


25 Batam M' Rp 380,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 350 mm, P. 6/8 M Kls. A,


26 Batam M' Rp 444,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 350 mm, P. 6/8 M Kls. A,


27 Batam M' Rp 482,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 400 mm, P. 6/8 M Kls. A,


28 Batam M' Rp 576,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 400 mm, P. 6/8 M Kls. A,


29 Batam M' Rp 627,000.00
Middle
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

Tiang Pancang Bulat Sentrifugal Ø 450 mm, P. 6/8 M Kls. A,


30 Batam M' Rp 742,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 450 mm, P. 6/8 M Kls. A,


31 Batam M' Rp 804,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 500 mm, P. 6/8 M Kls. A,


32 Batam M' Rp 936,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 500 mm, P. 6/8 M Kls. A,


33 Batam M' Rp 1,019,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 600 mm, P. 6/8 M Kls. A,


34 Batam M' Rp 1,236,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 600 mm, P. 6/8 M Kls. A,


35 Batam M' Rp 1,334,000.00
Middle

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


36 Batam M' Rp 422,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


37 Batam M' Rp 499,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


38 Batam M' Rp 422,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


39 Batam M' Rp 570,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


40 Batam M' Rp 661,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


41 Batam M' Rp 570,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


42 Batam M' Rp 770,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


43 Batam M' Rp 905,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


44 Batam M' Rp 770,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


45 Batam M' Rp 971,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


46 Batam M' Rp 1,129,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


47 Batam M' Rp 971,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


48 Batam M' Rp 1,222,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


49 Batam M' Rp 1,424,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


50 Batam M' Rp 1,222,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


51 Batam M' Rp 1,473,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


52 Batam M' Rp 1,694,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


53 Batam M' Rp 1,473,000.00
Kls. A, Upper
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


54 Batam M' Rp 1,050,000.00
CSSP) W-325 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


55 Batam M' Rp 1,220,000.00
CSSP) W-350 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


56 Batam M' Rp 1,326,000.00
CSSP) W-400 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


57 Batam M' Rp 1,505,000.00
CSSP) W-450 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


58 Batam M' Rp 1,607,000.00
CSSP) W-500 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


59 Batam M' Rp 1,847,000.00
CSSP) W-600 P. 6/8 Kls. A

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


60 Batam M' Rp 663,000.00
FPC) FPC - 220 Kls. 6S - A Ø 9.53 MM P. 4/9 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


61 Batam M' Rp 689,000.00
FPC) FPC - 220 Kls. 8S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


62 Batam M' Rp 713,000.00
FPC) FPC - 220 Kls. 10S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


63 Batam M' Rp 923,000.00
FPC) FPC - 320 Kls. 6S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


64 Batam M' Rp 948,000.00
FPC) FPC - 320 Kls. 8S - A Ø 9.53 MM P. 4/11 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


65 Batam M' Rp 972,000.00
FPC) FPC - 320 Kls. 10S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


66 Batam M' Rp 997,000.00
FPC) FPC - 320 Kls. 12S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


67 Batam M' Rp 1,021,000.00
FPC) FPC - 320 Kls. 14S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


68 Batam M' Rp 1,045,000.00
FPC) FPC - 320 Kls. 16S - A Ø 9.53 MM P. 4/13 M

Beton U- Ditch U.600.800.1200 P. 1200mm, Tbl. 70mm,


69 Batam Unit Rp 1,309,000.00
(Dimensi Dalam L. 600 T. 800)

Beton U- Ditch U.600.800.1200 P. 1200mm, Tbl. 90mm,


70 Batam Unit Rp 2,368,000.00
(Dimensi Dalam L. 1000 T. 1000)

71 Parit Beton U, Uk. 30x30 P. 80cm Pekanbaru Unit Rp 170,000.00

72 Parit Beton U, Uk. 27x40 P. 80cm Pekanbaru Unit Rp 165,000.00

73 Parit Beton U, Uk. 40x40 P. 60cm Pekanbaru Unit Rp 145,000.00

74 Parit Beton U, Uk. 40x40 P. 80cm Pekanbaru Unit Rp 175,000.00

75 Parit Beton U, Uk. 40x60 P. 100cm Pekanbaru Unit Rp 285,000.00

76 Parit Beton U, Uk. 50x50 P. 60cm Pekanbaru Unit Rp 165,000.00

77 Parit Beton U, Uk. 50x50 P. 100cm Pekanbaru Unit Rp 310,000.00


LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

78 Parit Beton U, Uk. 60x60 P. 100cm Pekanbaru Unit Rp 530,000.00

79 Parit Beton U, Uk. 60x80 P. 100cm Pekanbaru Unit Rp 675,000.00

80 Box Culvert 40x40 P. 120cm Pekanbaru Unit Rp 510,000.00

81 Box Culvert 50x50 P. 100cm Pekanbaru Unit Rp 750,000.00

82 Box Culvert 60x60 P. 100cm Pekanbaru Unit Rp 1,220,000.00

83 Tutup Parit 8 x 55 x 85 Pekanbaru Unit Rp 110,000.00

Beton Box Culvert BC.1000.1000.1200 P. 1200mm, Tbl.


84 Batam Unit Rp 6,078,000.00
120mm (Dimensi Dalam L. 1000 T. 1000)

Beton Box Culvert BC.1000.1000.1200 P. 1200mm, Tbl.


85 Batam Unit Rp 21,928,000.00
250mm (Dimensi Dalam L. 2000 T. 2000)

MINYAK
1 Minyak Solar/ Dexlite Tembilahan Liter Rp 15,600.00
2 Minyak Bensin / Premium Tembilahan Liter Rp 11,115.00
3 Minyak Pertailite Tembilahan Liter Rp 12,675.00
4 Minyak Pertamax Tembilahan Liter Rp 14,950.00
5 Oli Hidrolik Tembilahan Liter Rp 52,130.00
6 Oli Mesin (40) Tembilahan Liter Rp 48,230.00
7 Minyak Bekisting Tembilahan Liter Rp 28,730.00
8 Minyak Tanah / Kerosene Tembilahan Liter Rp 17,290.00
9 Minyak Pelumas / Gemuk Tembilahan Liter Rp 28,730.00
MATERIAL LANTAI
1 Keramik 10 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 1,573.65
2 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 3,407.30
3 Keramik 20 x 25 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 4,590.95
4 Keramik 30 x 30 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 8,374.60
5 Keramik 40 x 40 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 14,108.25
6 Keramik 60 x 60 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 32,581.90
7 Keramik 10 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 2,353.65
8 Keramik 20 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 4,577.30
9 Keramik 20 x 25 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 5,760.95
10 Keramik 30 x 30 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 11,234.60
11 Keramik 40 x 40 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 14,758.25
12 Keramik 60 x 60 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 35,236.50
13 Keramik 10 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 3,277.30
14 Keramik 20 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 6,397.30
15 Keramik 20 x 25 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 13,040.95
16 Keramik 30 x 30 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 24,754.60
17 Keramik 40 x 40 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 55,968.25
18 Keramik 60 x 60 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 58,581.90
19 Granit 30 x 30 (Ex. GRANITO) Tembilahan Buah Rp 31,418.40
20 Granit 40 x 40 (Ex. GRANITO) Tembilahan Buah Rp 58,718.40
21 Granit 60 x 60 (Ex. GRANITO) Tembilahan Buah Rp 71,527.30
22 Batu Tempel (ex : Candi 20 x 20) Tembilahan M2 Rp 241,182.50
MATERIAL KAYU
1 Kayu Ulin Panjang 1,5 M Tembilahan Batang Rp 91,409.50
2 Kayu Ulin Panjang 2 M Tembilahan Batang Rp 143,409.50
3 Kayu Ulin Panjang 3 M Tembilahan Batang Rp 221,409.50
4 Kayu Ulin Panjang 4 M Tembilahan Batang Rp 286,409.50
5 Kayu Ulin Panjang 5 M Tembilahan Batang Rp 351,409.50
6 Kayu Persegi Klas II Tembilahan M3 Rp 5,852,730.00
7 Kayu Persegi Kelas I Tembilahan M3 Rp 8,387,730.00
8 Kayu Persegi Klas III Tembilahan M3 Rp 4,617,730.00
9 Kayu Ikat Tembilahan Ikat Rp 158,047.50
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
10 Papan Klas II Tembilahan M3 Rp 5,852,730.00
11 Papan Kelas I Tembilahan M3 Rp 8,387,730.00
12 Papan Klas III Tembilahan M3 Rp 4,617,730.00
13 Papan Bekisting Tembilahan M3 Rp 2,667,730.00
14 Bantalan Melting Lokasi Setempat M' Rp 65,409.50
15 Kayu Pandal Penyirih Ø 12-15 CM Tembilahan Batang Rp 22,509.50
16 Cerocok Bakau Panjang 5 M Tembilahan Batang Rp 12,109.50
17 Cerocok Bakau Panjang 6 M Tembilahan Batang Rp 19,909.50
18 Cerocok Bakau Panjang 7 M Tembilahan Batang Rp 26,409.50
19 Perancah / Dolken Ø 8-10 Panjang 4 M' Tembilahan Batang Rp 14,092.00
BAHAN PELAPIS / PENUTUP PLAFOND
1 Gypsum Tembilahan Lembar Rp 105,365.00
2 List Gypsum Tembilahan Batang Rp 40,365.00
3 Plywood 4 mm Tembilahan Lembar Rp 86,547.50
4 Plywood 6 mm Tembilahan Lembar Rp 119,047.50
5 Plywood 9 mm Tembilahan Lembar Rp 175,630.00
6 Plywood 12 mm Tembilahan Lembar Rp 236,730.00
7 Plywood 15 mm Tembilahan Lembar Rp 295,230.00
8 Grc Tembilahan Lembar Rp 106,730.00
9 Plafound PVC Glossy P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 72,930.00
10 Plafound PVC Doff P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 117,130.00
11 List Kecil P. 4M (Putih,Coklat,Polos) Tembilahan Batang Rp 65,130.00
12 List Sedang P. 4M (Putih,Motif,Gold) Tembilahan Batang Rp 75,530.00
13 List Besar P. 4M (Gold,Silver,Polos) Tembilahan Batang Rp 96,330.00
14 Furing Tembilahan Batang Rp 18,980.00
15 Teakwood (megajati) Tembilahan Lembar Rp 164,547.50
16 List Profil Tembilahan M' Rp 17,582.50
PENUTUP ATAP
1 Seng Gelombang BJLS 20 KI Tembilahan Lembar Rp 59,865.00
2 Seng Plat BJLS 20 KI Tembilahan Lembar Rp 71,773.00
3 Baja Ringan Canal Taso 65/75 Tembilahan Batang Rp 144,365.00
4 Baja Ringan Canal Abadi 65/75 Tembilahan Batang Rp 98,865.00
5 Baja Ringan Taso 7565 Pekanbaru Batang Rp 112,000.00
6 Baja Ringan Taso 7575 Pekanbaru Batang Rp 122,000.00
7 Baja Ringan Joli Trus 7565 Pekanbaru Batang Rp 94,000.00
8 Baja Ringan Joli Trus 7575 Pekanbaru Batang Rp 107,000.00
9 Baja Ringan Fh Trus 7565 Pekanbaru Batang Rp 84,000.00
10 Baja Ringan K Steel 7565 Pekanbaru Batang Rp 99,000.00
11 Baja Ringan K Steel 7575 Pekanbaru Batang Rp 109,000.00
12 Baja Ringan Tera Trus 7565 Pekanbaru Batang Rp 85,000.00
13 Baja Ringan Tera Trus 7575 Pekanbaru Batang Rp 100,000.00
14 Reng Taso Tembilahan Batang Rp 76,765.00
15 Reng Abadi Tembilahan Batang Rp 53,365.00
16 Atap Genteng Metal Zincalume 0,25 mm Tembilahan Lembar Rp 49,465.00
17 Atap Genteng Metal Zincalume 0,30 mm Tembilahan Lembar Rp 59,865.00
18 Atap Genteng Metal Zincalume 0,35 mm Tembilahan Lembar Rp 75,465.00
19 Atap Genteng Metal Zincalume 0,45 mm Tembilahan Lembar Rp 105,365.00
20 Perabung Raja Metal Zincalume Panjang 80 cm Tembilahan Lembar Rp 52,682.50
MATERIAL KUNCI DAN ALAT PENGGANTUNG
1 Engsel Standar 3" Tembilahan Buah Rp 14,327.30
2 Engsel Standar 4" Tembilahan Buah Rp 19,527.30
3 Grendel Jendela Standar Tembilahan Buah Rp 13,027.30
4 Grendel Pintu Standar Tembilahan Buah Rp 23,427.30
5 Engsel Kuningan 3" Tembilahan Buah Rp 32,527.30
6 Engsel Kuningan 4" Tembilahan Buah Rp 26,027.30
7 Grendel Jendela Kuningan Tembilahan Buah Rp 19,527.30
8 Grendel Pintu Kuningan Tembilahan Buah Rp 29,927.30
9 Kait Angin Kualitas Standar Tembilahan Buah Rp 19,527.30
10 Kait Angin Kualitas Baik Tembilahan Buah Rp 26,027.30
11 Door Closer Tembilahan Buah Rp 247,027.30
12 Door Holder (Pegangan Pintu) Tembilahan Pasang Rp 253,527.30
13 Kunci Tanam Bulat Kualitas Standar Tembilahan Buah Rp 71,527.30
14 Kunci Tanam Bulat Kualitas Sedang Tembilahan Buah Rp 97,527.30
15 Kunci Tanam Bulat Kualitas Baik Tembilahan Buah Rp 169,027.30
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
16 Kunci Tanam 1 Slaagh Kualitas Standart Tembilahan Buah Rp 117,027.30
17 Kunci Tanam 2 Slaagh Kualitas Standart Tembilahan Buah Rp 195,027.30
18 Kunci Tanam 1 Slaagh Kualitas Baik Tembilahan Buah Rp 325,027.30
19 Kunci Tanam 2 Slaagh Kualitas Baik Tembilahan Buah Rp 455,027.30
MATERIAL KACA
1 Kaca Bening 3 mm Tembilahan M2 Rp 132,047.50
2 Kaca Bening 5 mm Tembilahan M2 Rp 197,047.50
3 Kaca Bening 8 mm Tembilahan M2 Rp 483,047.50
4 Kaca Rayban 3 mm Tembilahan M2 Rp 138,547.50
5 Kaca Rayban 5 mm Tembilahan M2 Rp 203,547.50
6 Kaca Rayban 8 mm Tembilahan M2 Rp 489,547.50
7 Nacco / Bingkai 5 Daun Kaca Bening 3 mm Tembilahan Set Rp 125,547.50
8 Nacco / Bingkai 7 Daun Kaca Bening 3 mm Tembilahan Set Rp 151,547.50
9 Nacco / Bingkai 8 Daun Kaca Bening 3 mm Tembilahan Set Rp 164,547.50
10 Nacco / Bingkai 5 Daun Kaca Bening 5 mm Tembilahan Set Rp 113,847.50
11 Nacco / Bingkai 7 Daun Kaca Bening 5 mm Tembilahan Set Rp 156,097.50
12 Nacco / Bingkai 8 Daun Kaca Bening 5 mm Tembilahan Set Rp 177,547.50
13 Nacco / Bingkai 5 Daun Kaca Rayban 3 mm Tembilahan Set Rp 115,797.50
14 Nacco / Bingkai 7 Daun Kaca Rayban 3 mm Tembilahan Set Rp 158,697.50
15 Nacco / Bingkai 8 Daun Kaca Rayban 3 mm Tembilahan Set Rp 180,147.50
16 Nacco / Bingkai 5 Daun Kaca Rayban 5 mm Tembilahan Set Rp 122,947.50
17 Nacco / Bingkai 7 Daun Kaca Rayban 5 mm Tembilahan Set Rp 167,797.50
18 Nacco / Bingkai 8 Daun Kaca Rayban 5 mm Tembilahan Set Rp 190,547.50
19 Bingkai Alumanium Kusen Jendela Kualitas Standart Tembilahan M' Rp 652,047.50
20 Bingkai Alumanium Kusen Pintu Kualitas Standart Tembilahan M' Rp 782,047.50
21 Kusen Jendela Alumanium Kualitas Standart (Silver) Tembilahan M' Rp 327,047.50
22 Kusen Jendela Alumanium Kualitas Standart (Coklat) Tembilahan M' Rp 405,047.50
23 Pintu Alumanium (Lengkap) Tembilahan Unit Rp 2,602,047.50
PERALATAN SANITAIR
1 Bak Mandi Fiber 20 Liter Tembilahan Buah Rp 358,507.50
2 Bak Mandi Plastik (Persegi) 20 Liter Tembilahan Buah Rp 371,507.50
3 Bak Mandi Plastik (Sudut) 20 Liter Tembilahan Buah Rp 365,007.50
4 Kloset Jongkok Keramik Tembilahan Buah Rp 332,507.50
5 Kloset Duduk Keramik (Standart) Tembilahan Buah Rp 2,217,507.50
6 Kloset Duduk Keramik (Monoblok) Tembilahan Buah Rp 2,607,507.50
7 Urinoir Keramik Tembilahan Buah Rp 917,507.50
8 Washtafel Keramik (Lengkap) Tembilahan Buah Rp 592,507.50
9 Bak Cuci Piring Logam (2 Lubang) Tembilahan Buah Rp 501,507.50
10 Bak Cuci Piring Logam (1 Lubang) Tembilahan Buah Rp 215,507.50
11 Saringan Air Lantai (Floor Drain) Kuningan Tembilahan Buah Rp 59,507.50
12 Saringan Air Lantai (Floor Drain) Plastik Tembilahan Buah Rp 33,507.50
13 Pompa Air Tangan Tembilahan Buah Rp 462,507.50
14 Tangki Air Plastik Kapasitas 500 Liter (SNI) Tembilahan Buah Rp 982,507.50
15 Tangki Air Plastik Kapasitas 1050 Liter (SNI) Tembilahan Buah Rp 1,762,507.50
16 Kran Air 1/2" Kualitas Standart (Plastik) Tembilahan Buah Rp 23,427.30
17 Kran Air 1/2" Kualitas Baik (Plastik) Tembilahan Buah Rp 36,427.30
18 Kran Air 3/4" Kualitas Standart (Plastik) Tembilahan Buah Rp 20,827.30
19 Kran Air 3/4" Kualitas Baik (Plastik) Tembilahan Buah Rp 33,182.50
20 Seal Tape Tembilahan Buah Rp 13,027.30
21 Pompa Sumersible Tembilahan Buah Rp 2,860,546.00
PERPIPAAN DAN ACCESSORIES
1 Pipa PVC Ukuran1/2" TEBAL Tembilahan Batang Rp 35,165.00
2 Pipa PVC Ukuran 1/4" TEBAL Tembilahan Batang Rp 48,165.00
3 Pipa PVC Ukuran 3/4" TEBAL Tembilahan Batang Rp 42,965.00
4 Pipa PVC Ukuran 1" TEBAL Tembilahan Batang Rp 59,865.00
5 Pipa PVC Ukuran 1,5" TEBAL Tembilahan Batang Rp 89,765.00
6 Pipa PVC Ukuran 2" TEBAL Tembilahan Batang Rp 124,865.00
7 Pipa PVC Ukuran 2,5" TEBAL Tembilahan Batang Rp 209,365.00
8 Pipa PVC Ukuran 3" TEBAL Tembilahan Batang Rp 326,365.00
9 Pipa PVC Ukuran 4" TEBAL Tembilahan Batang Rp 388,765.00
10 Pipa PVC Ukuran 6" TEBAL Tembilahan Batang Rp 430,365.00
11 Pipa PVC Ukuran 8" TEBAL Tembilahan Batang Rp 729,365.00
12 Pipa PVC Ukuran 10" TEBAL Tembilahan Batang Rp 1,145,365.00
13 Pipa PVC Ukuran 12" TEBAL Tembilahan Batang Rp 1,626,365.00
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
14 Pipa Galvanis 1/2" TIPIS Tembilahan Batang Rp 63,830.00
15 Pipa Galvanis 1/2" TEBAL Tembilahan Batang Rp 123,630.00
16 Pipa Galvanis 3/4" TIPIS Tembilahan Batang Rp 84,630.00
17 Pipa Galvanis 3/4" TEBAL Tembilahan Batang Rp 187,330.00
18 Pipa Galvanis 1" TIPIS Tembilahan Batang Rp 88,530.00
19 Pipa Galvanis 1" TEBAL Tembilahan Batang Rp 221,130.00
20 Pipa Galvanis 1,5" TIPIS Tembilahan Batang Rp 140,530.00
21 Pipa Galvanis 1,5" TEBAL Tembilahan Batang Rp 283,530.00
22 Pipa Galvanis 2,5" TIPIS Tembilahan Batang Rp 405,730.00
23 Pipa Galvanis 2,5" TEBAL Tembilahan Batang Rp 464,230.00
24 Pipa Galvanis 3" TIPIS Tembilahan Batang Rp 503,230.00
25 Pipa Galvanis 3" TEBAL Tembilahan Batang Rp 561,730.00
26 Pipa HDPE Uk. 20 SDR 21 (PN 8) Jakarta M'
27 Pipa HDPE Uk. 25 SDR 21 (PN 8) Jakarta M'
28 Pipa HDPE Uk. 32 SDR 21 (PN 8) Jakarta M'
29 Pipa HDPE Uk. 40 SDR 21 (PN 8) Jakarta M' Rp 18,150.00
30 Pipa HDPE Uk. 50 SDR 21 (PN 8) Jakarta M' Rp 28,850.00
31 Pipa HDPE Uk. 63 SDR 21 (PN 8) Jakarta M' Rp 44,100.00
32 Pipa HDPE Uk. 75 SDR 21 (PN 8) Jakarta M' Rp 63,150.00
33 Pipa HDPE Uk. 90 SDR 21 (PN 8) Jakarta M' Rp 90,550.00
34 Pipa HDPE Uk. 110 SDR 21 (PN 8) Jakarta M' Rp 135,500.00
35 Pipa HDPE Uk. 160 SDR 21 (PN 8) Jakarta M' Rp 282,400.00
36 Pipa HDPE Uk. 200 SDR 21 (PN 8) Jakarta M' Rp 458,900.00
37 Pipa HDPE Uk. 250 SDR 21 (PN 8) Jakarta M' Rp 708,000.00
38 Pipa HDPE Uk. 315 SDR 21 (PN 8) Jakarta M' Rp 1,121,800.00
39 Pipa HDPE Uk. 355 SDR 21 (PN 8) Jakarta M' Rp 1,425,550.00
40 Pipa HDPE Uk. 400 SDR 21 (PN 8) Jakarta M' Rp 1,818,550.00
41 Pipa HDPE Uk. 450 SDR 21 (PN 8) Jakarta M' Rp 2,297,000.00
42 Pipa HDPE Uk. 500 SDR 21 (PN 8) Jakarta M' Rp 2,831,250.00
43 Pipa HDPE Uk. 630 SDR 21 (PN 8) Jakarta M' Rp 4,473,850.00
44 Pipa HDPE Uk. 710 SDR 21 (PN 8) Jakarta M' Rp 5,885,200.00
45 Pipa HDPE Uk. 800 SDR 21 (PN 8) Jakarta M' Rp 7,446,700.00
46 Pipa HDPE Uk. 20 SDR 17 (PN 10) Jakarta M'
47 Pipa HDPE Uk. 25 SDR 17 (PN 10) Jakarta M'
48 Pipa HDPE Uk. 32 SDR 17 (PN 10) Jakarta M' Rp 14,400.00
49 Pipa HDPE Uk. 40 SDR 17 (PN 10) Jakarta M' Rp 22,700.00
50 Pipa HDPE Uk. 50 SDR 17 (PN 10) Jakarta M' Rp 34,450.00
51 Pipa HDPE Uk. 63 SDR 17 (PN 10) Jakarta M' Rp 54,900.00
52 Pipa HDPE Uk. 75 SDR 17 (PN 10) Jakarta M' Rp 77,400.00
53 Pipa HDPE Uk. 90 SDR 17 (PN 10) Jakarta M' Rp 111,050.00
54 Pipa HDPE Uk. 110 SDR 17 (PN 10) Jakarta M' Rp 164,750.00
55 Pipa HDPE Uk. 160 SDR 17 (PN 10) Jakarta M' Rp 343,400.00
56 Pipa HDPE Uk. 200 SDR 17 (PN 10) Jakarta M' Rp 558,550.00
57 Pipa HDPE Uk. 250 SDR 17 (PN 10) Jakarta M' Rp 867,600.00
58 Pipa HDPE Uk. 315 SDR 17 (PN 10) Jakarta M' Rp 1,379,600.00
59 Pipa HDPE Uk. 355 SDR 17 (PN 10) Jakarta M' Rp 1,757,200.00
60 Pipa HDPE Uk. 400 SDR 17 (PN 10) Jakarta M' Rp 2,217,750.00
61 Pipa HDPE Uk. 450 SDR 17 (PN 10) Jakarta M' Rp 2,808,950.00
62 Pipa HDPE Uk. 500 SDR 17 (PN 10) Jakarta M' Rp 3,460,300.00
63 Pipa HDPE Uk. 630 SDR 17 (PN 10) Jakarta M' Rp 5,493,050.00
64 Pipa HDPE Uk. 710 SDR 17 (PN 10) Jakarta M' Rp 7,219,800.00
65 Pipa HDPE Uk. 800 SDR 17 (PN 10) Jakarta M' Rp 9,150,650.00
66 Pipa HDPE Uk. 20 SDR 13,6 (PN 12,5) Jakarta M'
67 Pipa HDPE Uk. 25 SDR 13,6 (PN 12,5) Jakarta M' Rp 11,000.00
68 Pipa HDPE Uk. 32 SDR 13,6 (PN 12,5) Jakarta M' Rp 17,900.00
69 Pipa HDPE Uk. 40 SDR 13,6 (PN 12,5) Jakarta M' Rp 27,150.00
70 Pipa HDPE Uk. 50 SDR 13,6 (PN 12,5) Jakarta M' Rp 41,950.00
71 Pipa HDPE Uk. 63 SDR 13,6 (PN 12,5) Jakarta M' Rp 66,450.00
72 Pipa HDPE Uk. 75 SDR 13,6 (PN 12,5) Jakarta M' Rp 92,550.00
73 Pipa HDPE Uk. 90 SDR 13,6 (PN 12,5) Jakarta M' Rp 132,750.00
74 Pipa HDPE Uk. 110 SDR 13,6 (PN 12,5) Jakarta M' Rp 199,250.00
75 Pipa HDPE Uk. 160 SDR 13,6 (PN 12,5) Jakarta M' Rp 417,300.00
76 Pipa HDPE Uk. 200 SDR 13,6 (PN 12,5) Jakarta M' Rp 678,100.00
77 Pipa HDPE Uk. 250 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,060,750.00
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
78 Pipa HDPE Uk. 315 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,683,650.00
79 Pipa HDPE Uk. 355 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,134,150.00
80 Pipa HDPE Uk. 400 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,704,600.00
81 Pipa HDPE Uk. 450 SDR 13,6 (PN 12,5) Jakarta M' Rp 3,426,250.00
82 Pipa HDPE Uk. 500 SDR 13,6 (PN 12,5) Jakarta M' Rp 4,223,450.00
83 Pipa HDPE Uk. 630 SDR 13,6 (PN 12,5) Jakarta M'
84 Pipa HDPE Uk. 710 SDR 13,6 (PN 12,5) Jakarta M'
85 Pipa HDPE Uk. 800 SDR 13,6 (PN 12,5) Jakarta M'
86 Pipa HDPE Uk. 20 SDR 11 (PN 16) Jakarta M' Rp 8,800.00
87 Pipa HDPE Uk. 25 SDR 11 (PN 16) Jakarta M' Rp 12,550.00
88 Pipa HDPE Uk. 32 SDR 11 (PN 16) Jakarta M' Rp 21,700.00
89 Pipa HDPE Uk. 40 SDR 11 (PN 16) Jakarta M' Rp 32,650.00
90 Pipa HDPE Uk. 50 SDR 11 (PN 16) Jakarta M' Rp 51,000.00
91 Pipa HDPE Uk. 63 SDR 11 (PN 16) Jakarta M' Rp 80,250.00
92 Pipa HDPE Uk. 75 SDR 11 (PN 16) Jakarta M' Rp 110,150.00
93 Pipa HDPE Uk. 90 SDR 11 (PN 16) Jakarta M' Rp 159,400.00
94 Pipa HDPE Uk. 110 SDR 11 (PN 16) Jakarta M' Rp 240,500.00
95 Pipa HDPE Uk. 160 SDR 11 (PN 16) Jakarta M' Rp 505,950.00
96 Pipa HDPE Uk. 200 SDR 11 (PN 16) Jakarta M' Rp 823,050.00
97 Pipa HDPE Uk. 250 SDR 11 (PN 16) Jakarta M' Rp 1,282,150.00
98 Pipa HDPE Uk. 315 SDR 11 (PN 16) Jakarta M'
99 Pipa HDPE Uk. 355 SDR 11 (PN 16) Jakarta M'
100 Pipa HDPE Uk. 400 SDR 11 (PN 16) Jakarta M'
101 Pipa HDPE Uk. 450 SDR 11 (PN 16) Jakarta M'
102 Pipa HDPE Uk. 500 SDR 11 (PN 16) Jakarta M'
103 Pipa HDPE Uk. 630 SDR 11 (PN 16) Jakarta M'
104 Pipa HDPE Uk. 710 SDR 11 (PN 16) Jakarta M'
105 Pipa HDPE Uk. 800 SDR 11 (PN 16) Jakarta M'
106 Elbo PVC 1/2" Tembilahan Buah Rp 3,926.00
107 Elbo PVC 1/4" Tembilahan Buah Rp 5,746.00
108 Elbo PVC 3/4" Tembilahan Buah Rp 4,446.00
109 Elbo PVC 1" Tembilahan Buah Rp 7,696.00
110 Elbo PVC 1,5" Tembilahan Buah Rp 8,996.00
111 Elbo PVC 2" Tembilahan Buah Rp 12,896.00
112 Elbo PVC 2,5" Tembilahan Buah Rp 19,396.00
113 Elbo PVC 3" Tembilahan Buah Rp 25,896.00
114 Elbo Galvanis 1/2" Tembilahan Buah Rp 16,932.50
115 Elbo Galvanis 1/4" Tembilahan Buah Rp 20,832.50
116 Elbo Galvanis 3/4" Tembilahan Buah Rp 18,232.50
117 Elbo Galvanis 1" Tembilahan Buah Rp 27,332.50
118 Elbo Galvanis 1,5" Tembilahan Buah Rp 45,532.50
119 Elbo Galvanis 2" Tembilahan Buah Rp 74,782.50
120 Elbo Galvanis 2,5" Tembilahan Buah Rp 124,832.50
121 Elbo Galvanis 3" Tembilahan Buah Rp 195,682.50
122 Socket PVC 1/2" Tembilahan Buah Rp 3,796.00
123 Socket PVC 3/4" Tembilahan Buah Rp 4,446.00
124 Socket PVC 1" Tembilahan Buah Rp 5,746.00
125 Socket PVC 1,5" Tembilahan Buah Rp 6,396.00
126 Socket PVC 2" Tembilahan Buah Rp 7,046.00
127 Socket Galvanis 1/2" Tembilahan Buah Rp 12,382.50
128 Socket Galvanis 3/4" Tembilahan Buah Rp 16,282.50
129 Socket Galvanis 1" Tembilahan Buah Rp 22,782.50
130 Socket Galvanis 1,5" Tembilahan Buah Rp 33,182.50
131 Socket Galvanis 2" Tembilahan Buah Rp 98,182.50
132 Reducer PVC 1/2" - 3/4" Tembilahan Buah Rp 4,446.00
133 Reducer PVC 1/2" - 1" Tembilahan Buah Rp 5,096.00
134 Reducer PVC 1" - 1,5" Tembilahan Buah Rp 13,546.00
135 Reducer PVC 1,5" - 2" Tembilahan Buah Rp 21,346.00
136 Reducer Galvanis 1/2" - 3/4" Tembilahan Buah Rp 24,082.50
137 Reducer Galvanis 3/4" - 1" Tembilahan Buah Rp 26,682.50
138 Reducer Galvanis 1" - 1,5" Tembilahan Buah Rp 33,182.50
139 Reducer Galvanis 1,5" - 2" Tembilahan Buah Rp 37,082.50
140 Elbow 90 PN10 Ukuran 63 Tembilahan Buah Rp 156,682.50
141 Elbow 90 PN10 Ukuran 75 Tembilahan Buah Rp 260,682.50
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
142 Elbow 90 PN10 Ukuran 90 Tembilahan Buah Rp 395,882.50
143 Elbow 90 PN10 Ukuran 110 Tembilahan Buah Rp 488,182.50
144 Tee Equal PN10 Ukuran 63 Tembilahan Buah Rp 343,882.50
145 Tee Equal PN10 Ukuran 75 Tembilahan Buah Rp 427,082.50
146 Tee Equal PN10 Ukuran 90 Tembilahan Buah Rp 337,382.50
147 Tee Equal PN10 Ukuran 110 Tembilahan Buah Rp 440,082.50
148 Tee Ukuran 1/2" Tembilahan Buah Rp 5,232.50
149 Tee Ukuran 1/4" Tembilahan Buah Rp 7,182.50
150 Tee Ukuran 3/4" Tembilahan Buah Rp 6,532.50
151 Tee Ukuran 1" Tembilahan Buah Rp 11,082.50
152 Tee Ukuran 1,5" Tembilahan Buah Rp 13,682.50
153 Tee Ukuran2" Tembilahan Buah Rp 16,282.50
154 Tee Ukuran 2,5" Tembilahan Buah Rp 26,682.50
155 Tee Ukuran 3" Tembilahan Buah Rp 37,082.50
156 Tee Ukuran 4” Tembilahan Buah Rp 61,782.50
157 Tee Ukuran 5” Tembilahan Buah Rp 91,682.50
158 Tee Ukuran 6” Tembilahan Buah Rp 163,182.50
159 Tee Ukuran 8” Tembilahan Buah Rp 338,682.50
160 Dop Ukuran 1/2" Tembilahan Buah Rp 3,282.50
161 Dop Ukuran 1/4" Tembilahan Buah Rp 7,182.50
162 Dop Ukuran 3/4" Tembilahan Buah Rp 4,582.50
163 Dop Ukuran 1" Tembilahan Buah Rp 7,182.50
164 Dop Ukuran 1,5" Tembilahan Buah Rp 11,082.50
165 Dop Ukuran 2" Tembilahan Buah Rp 13,682.50
166 Dop Ukuran 2,5" Tembilahan Buah Rp 16,282.50
167 Dop Ukuran 3" Tembilahan Buah Rp 20,182.50
168 Dop Ukuran 4” Tembilahan Buah Rp 37,082.50
169 Coupler Ukuran 20 mm Tembilahan Buah Rp 17,842.50
170 Coupler Ukuran 25 mm Tembilahan Buah Rp 23,562.50
171 Coupler Ukuran 32 mm Tembilahan Buah Rp 37,862.50
172 Coupler Ukuran 40 mm Tembilahan Buah Rp 80,762.50
173 Coupler Ukuran 50 mm Tembilahan Buah Rp 97,922.50
174 Coupler Ukuran 63 mm Tembilahan Buah Rp 165,132.50
175 Coupler Ukuran 90 mm Tembilahan Buah Rp 361,042.50
176 Coupler Ukuran 110 mm Tembilahan Buah Rp 909,018.50
177 Reducer Ukuran 25 mm Tembilahan Buah Rp 26,422.50
178 Reducer Ukuran 32 mm Tembilahan Buah Rp 30,712.50
179 Reducer Ukuran 40 mm Tembilahan Buah Rp 72,182.50
180 Reducer Ukuran 50 mm Tembilahan Buah Rp 113,652.50
181 Reducer Ukuran 63 mm Tembilahan Buah Rp 147,972.50
182 Reducer Ukuran 90 mm Tembilahan Buah Rp 315,282.50
183 Reducer Tee Ukuran 25 mm Tembilahan Buah Rp 40,722.50
184 Reducer Tee Ukuran 32 mm Tembilahan Buah Rp 52,162.50
185 Reducer Tee Ukuran 40 mm Tembilahan Buah Rp 149,402.50
186 Reducer Tee Ukuran 90 mm Tembilahan Buah Rp 881,562.50
187 Male Adaptor Ukuran 20 mm Tembilahan Buah Rp 14,982.50
188 Male Adaptor Ukuran 25 mm Tembilahan Buah Rp 15,554.50
189 Male Adaptor Ukuran 32 mm Tembilahan Buah Rp 30,712.50
190 Male Adaptor Ukuran 40 mm Tembilahan Buah Rp 55,594.50
191 Male Adaptor Ukuran 50 mm Tembilahan Buah Rp 76,186.50
192 Male Adaptor Ukuran 63 mm Tembilahan Buah Rp 93,632.50
193 Male Adaptor Ukuran 90 mm Tembilahan Buah Rp 252,362.50
194 Male Elbow Ukuran 20 mm Tembilahan Buah Rp 16,412.50
195 Male Elbow Ukuran 25 mm Tembilahan Buah Rp 20,702.50
196 Male Elbow Ukuran 32 mm Tembilahan Buah Rp 33,572.50
197 Male Elbow Ukuran 40 mm Tembilahan Buah Rp 66,462.50
198 Male Elbow Ukuran 90 mm Tembilahan Buah Rp 355,322.50
199 Male Tee Ukuran 20 mm Tembilahan Buah Rp 29,282.50
200 Male Tee Ukuran 25 mm Tembilahan Buah Rp 33,572.50
201 Male Tee Ukuran 32 mm Tembilahan Buah Rp 46,442.50
202 Male Tee Ukuran 40 mm Tembilahan Buah Rp 107,932.50
203 Male Tee Ukuran 90 mm Tembilahan Buah Rp 584,122.50
204 Famale Tee Ukuran 20 mm Tembilahan Buah Rp 26,422.50
205 Famale Tee Ukuran 25 mm Tembilahan Buah Rp 37,862.50
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
206 Famale Tee Ukuran 32 mm Tembilahan Buah Rp 55,022.50
207 Famale Tee Ukuran 90 mm Tembilahan Buah Rp 584,122.50
208 Famale Adaptor Ukuran 20 mm Tembilahan Buah Rp 13,552.50
209 Famale Adaptor Ukuran 25 mm Tembilahan Buah Rp 22,132.50
210 Famale Adaptor Ukuran 32 mm Tembilahan Buah Rp 27,852.50
211 Famale Adaptor Ukuran 50 mm Tembilahan Buah Rp 65,032.50
212 Famale Adaptor Ukuran 63 mm Tembilahan Buah Rp 112,222.50
213 Famale Elbow Ukuran 20 mm Tembilahan Buah Rp 16,412.50
214 Famale Elbow Ukuran 25 mm Tembilahan Buah Rp 24,992.50
215 Famale Elbow Ukuran 32 mm Tembilahan Buah Rp 37,862.50
216 Clamp Saddle Ukuran 32 mm Tembilahan Buah Rp 38,434.50
217 Clamp Saddle Ukuran 40 mm Tembilahan Buah Rp 46,442.50
218 Clamp Saddle Ukuran 50 mm Tembilahan Buah Rp 48,730.50
219 Clamp Saddle Ukuran 63 mm Tembilahan Buah Rp 60,170.50
220 Clamp Saddle Ukuran 90 mm Tembilahan Buah Rp 155,122.50
221 Clamp Saddle Ukuran 110 mm Tembilahan Buah Rp 165,418.50
222 Clamp Saddle Ukuran 160 mm Tembilahan Buah Rp 275,242.50
223 CAP Ukuran 20 mm Tembilahan Buah Rp 10,120.50
224 CAP Ukuran 25 mm Tembilahan Buah Rp 14,267.50
225 CAP Ukuran 32 mm Tembilahan Buah Rp 23,562.50
226 CAP Ukuran 40 mm Tembilahan Buah Rp 44,154.50
227 CAP Ukuran 50 mm Tembilahan Buah Rp 51,018.50
228 CAP Ukuran 63 mm Tembilahan Buah Rp 106,502.50
229 CAP Ukuran 90 mm Tembilahan Buah Rp 219,472.50
230 Lem PVC Tube / Botol Tembilahan Buah Rp 13,682.50
231 Lem PVC Kaleng 500 Gr Tembilahan Kaleng Rp 39,682.50
232 Mesin Pompa Air Tembilahan Buah Rp 650,682.50
233 Water Meter PE 1/2" Tembilahan Buah Rp 260,682.50
234 Water Meter Brass Onda 1/2" Jakarta 1 Pcs/Kotak Rp 655,600.00
235 Water Meter Brass Onda 3/4" Jakarta 1 Pcs/Kotak Rp 1,190,200.00
236 Water Meter Flange 2-1/2" Jakarta 1 Pcs/Dus Rp 2,397,175.00
237 Water Meter flange 3" Jakarta 1 Pcs/Dus Rp 2,806,100.00
238 Water Meter Flange 4" Jakarta 1 Pcs/Dus Rp 3,142,700.00
239 Water Meter Flange 6" Jakarta ! Pcs/Dus Rp 4,376,900.00
240 Water Meter Flange 8" Jakarta 1 Pcs/Dus Rp 5,731,550.00
241 Water Meter Flange 10" Jakarta 1 Pcs/Dus Rp 18,757,200.00
242 Water Meter flange 12" Jakarta 1 Pcs/Dus Rp 23,446,500.00
ALAT LISTRIK DAN ACCESSORIES
1 Titik Lampu + Instalasi Tembilahan Titik Rp 104,054.60
2 Stop kontak + Instalasi Tembilahan Titik Rp 123,527.30
3 Sakelar Tunggal (Biasa) Tembilahan Buah Rp 19,527.30
4 Saklera Ganda (Biasa) Tembilahan Buah Rp 26,027.30
5 Zekering Kas Lokal 1 Group Tembilahan Buah Rp 10,427.30
6 Zekering Kas Lokal 2 Group Tembilahan Buah Rp 16,623.75
7 Tool Listrik Tembilahan Set Rp 2,991,365.00
8 Gerinda Tembilahan Buah Rp 391,365.00
9 Mesin Bor Listrik Tembilahan Buah Rp 365,365.00
10 Alat Las Tembilahan Buah Rp 261,365.00
11 Multitester Tembilahan Buah Rp 1,041,365.00
12 Tang Ampere Tembilahan Buah Rp 326,365.00
13 Kabel Tuistik 2 X 10 mm Tembilahan Unit Rp 10,465.00
14 Kabel Nym 2 X 2,5 mm Tembilahan M2 Rp 20,865.00
15 Klem Percing Tembilahan M2 Rp 37,765.00
16 Klem Week Tembilahan Unit Rp 18,265.00
17 Lampu Led Strip 2835 Kelap Kelip Merah P. 100 M Tembilahan M Rp 27,365.00
18 Lampu Led Strip 2835 Kelap Kelip Kuning P. 100 M Tembilahan M Rp 27,365.00
19 Lampu Led Strip 2835 Kelap Kelip Hijau P. 100 M Tembilahan M Rp 27,365.00
20 Lampu Led Strip 2835 Kelap Kelip Biru P. 100 M Tembilahan M Rp 27,365.00
21 Adaptor / Mesin Lampu Strip 220 V Tembilahan Buah Rp 105,365.00
22 Lampu Sorot Vl 6100 50 Watt Tembilahan Buah Rp 261,365.00
23 Time Switch / Theben Tembilahan Buah Rp 495,365.00
24 Kabel Ties 200 mm Tembilahan Buah Rp 2,015.00
25 Ncb 10 A Tembilahan Buah Rp 92,365.00
26 Mesin Genset Tembilahan Buah Rp 3,901,365.00
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
27 Mesin Diesel 12 KVA Tembilahan Buah Rp 65,001,365.00
28 Isolasi Tembilahan Buah Rp 14,365.00
CAT DAN PENGAWET
1 Cat Air Kualitas Standar Tembilahan Kilogram Rp 23,465.00
2 Cat Air Kualitas Sedang Tembilahan Kilogram Rp 37,765.00
3 Cat Air Kualitas Baik Tembilahan Kilogram Rp 111,865.00
4 Cat Minyak Kualitas Standar Tembilahan Kilogram Rp 81,217.50
5 Cat Minyak Kualitas Sedang Tembilahan Kilogram Rp 94,221.40
6 Cat Minyak Kualitas Baik Tembilahan Kilogram Rp 112,793.20
7 Cat Dasar Kayu Tembilahan Kilogram Rp 38,507.30
8 Plamir / Dempul Tembilahan Kilogram Rp 16,315.00
9 Cat Menie Tembilahan Kilogram Rp 38,507.30
10 Teer / Residu Tembilahan Kilogram Rp 27,365.00
11 Minyak Cat / Thinner Tembilahan Liter Rp 36,465.00
12 Cat Marka Jalan (Thermo Plastic) Tembilahan Kilogram Rp 72,865.00
13 Blass Bit Tembilahan Kilogram Rp 59,865.00
PERALATAN KERJA
1 Cangkul Tembilahan Buah Rp 53,365.00
2 Parang Tembilahan Buah Rp 235,365.00
3 Gunting Pangkas Tembilahan Buah Rp 92,365.00
4 Gunting Setek Tembilahan Buah Rp 53,365.00
5 Sendok Dempol/ Sekrap Tembilahan Buah Rp 7,865.00
6 Garu/ Garpu Tembilahan Buah Rp 131,365.00
7 Gerobak Sorong Tembilahan Buah Rp 781,365.00
8 Kaca Mata Pengaman Tembilahan Buah Rp 66,365.00
9 Plang Rambu Tembilahan M Rp 66,365.00
10 Sekop Tembilahan Buah Rp 105,365.00
11 Pakaian Kerja THL (Setelan) Tembilahan Buah Rp 196,365.00
12 Sepatu Bot Karet Tembilahan Pasang Rp 131,365.00
13 Sarung Tangan Karet Tembilahan Buah Rp 66,365.00
14 Helm Tembilahan Buah Rp 66,365.00
15 Sarung Tangan 20 KV Tembilahan Buah Rp 651,365.00
16 Rompi Scotlight Tembilahan Buah Rp 66,365.00
17 Sepatu Safety Tembilahan Buah Rp 521,365.00
18 Tali Safety Tembilahan Set Rp 456,365.00
HARGA SEWA ALAT
1 Asphalt Mixing Plant Jam Rp 4,265,013.00
2 Asphalt Finisher Jam Rp 1,055,618.83
3 Asphalt Sprayer Jam Rp 316,841.10
4 Buldozer 100 -150 HP Jam Rp 546,145.86
5 Compressor 4000 - 6500 L/M Jam Rp 276,795.80
6 Concrete Mixer 0,3 - 0,6 M3 Jam Rp 75,000.00
7 Crane 10 -15 Ton Jam Rp 614,539.30
8 Dump Truck 3 - 4 M3 Jam Rp 294,430.00
9 Dump Truck Jam Rp 560,934.35
10 Excavator 80 - 140 HP Jam Rp 697,044.11
11 Flat Bed Truck 3 - 4 M3 Jam Rp 346,404.15
12 Generator Set Jam Rp 462,863.00
13 Motor Grader > 100 HP Jam Rp 928,857.51
14 Track Loader 75 - 100 HP Jam Rp 604,495.20
15 Wheel Loader 1,0 - 1,6 M3 Jam Rp 797,751.89
16 Three Wheel Roller 6 - 8 T Jam Rp 236,410.10
17 Tandem Roller 6 - 8 T Jam Rp 583,048.61
18 Tire Roller 8 - 10 T Jam Rp 638,974.27
19 Vibratory Roller 5 - 8 T Jam Rp 385,205.22
20 Concrete Vibrator Jam Rp 39,935.00
21 Stone Crusher Jam Rp 788,020.25
22 Water Pump 70 - 100 mm Jam Rp 29,934.00
23 Water Tanker 3000 - 4500 L Jam Rp 251,385.00
24 Pedestrian Roller Jam Rp 72,599.50
25 Tamper Jam Rp 48,180.40
26 Jack Hammer Jam Rp 42,236.05
27 Fulvi Mixer Jam Rp 241,202.15
28 Concrete Pump Jam Rp 355,629.45
LOKASI

HARGA
LOKASI STANDAR ENOK
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN
BAHAN (TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
29 Trailer 20 Ton Jam Rp 761,218.35
30 Pile Driver + Hammer Jam Rp 328,598.70
31 Crane On Track 35 Ton Jam Rp 459,843.60
32 Welding Set Jam Rp 295,884.65
33 Bore Pile Machine Jam Rp 1,128,331.70
34 Ponton Jam Rp 345,000.00
35 Tug Boat Jam Rp 230,000.00

Direkap Oleh :
Panitia Penyusunan Standar
Bahan dan Upah (HSBU)
Sekretaris,

H. SUDARTO, SE
NIP. 19740905 199403 1 006

Disetujui Oleh :
Kepala Dinas Pekerjaan Umum dan Tata Ruang
Kabupaten Indragiri Hilir
Pelindung,

UMAR, ST, MT
NIP. 19681010 200003 1 005
BACK UP VOLUME PEKERJAAN

:
:
:

Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
2 PEMBANGUNAN GEDUNG PT. BPR GEMILANG
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.000 Ls
Pek. Pembersihan Lokasi 1.000 Ls
2 Pek. Pengukuran dan Pemasangan Bouwplank 1.000 Ls
Pek. Pengukuran dan Pemasangan Bouwplank 1.000 Ls
3 Pek. Papan Nama Kegiatan 1.000 1.000 Unit
Pek. Papan Nama Kegiatan 1.000 Unit
4 Pek. Penyelenggaraan K3 (Alat Pelindung Diri)
a. Topi Pelindung (Safety Helmet) 2.000 2.000 Bh
b. Sarung Tangan (Safety Gloves) 2.000 2.000 Psg
c. Sepatu Keselamatan (Rubber Safety Shoes An Toe Cap) 2.000 2.000 Psg
d. Rompi Keselamatan (Safety Vest) 2.000 2.000 Bh
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah Lumpur
Pondasi Setempat 80 x 80 cm 0.80 0.800 0.850 500.000 272.000 M3
Pek. Galian Tanah Lumpur 272.000 M3
2 Pek. Pasang Cerucuk, Pjg. 7 m Titik Pjk Crck Byk Tpk
Pondasi Setempat 80 x 80 cm 13.00 7.000 80.000 7,280.000 M'
Pek. Pasang Cerucuk, Pjg. 7 m 7,280.000 M'
Pondasi Lajur 18.00 7.000 9.000 1,134.000 M'
11.00 7.000 6.000 462.000 M'
7.00 7.000 3.000 147.000 M'
4.00 7.000 2.000 56.000 M'
Pek. Pasang Cerucuk, Pjg. 7 m 1,799.000 M'
Total Pasangan Cerucuk 9,079.000 M'
3 Pek. Urugan Pasir Tebal 10 cm
Pondasi Setempat 80 x 80 cm 0.80 0.800 0.100 500.000 32.000 M3
Pek. Urugan Pasir Tebal 10 cm 32.000 M3
4 Pek. Lantai Kerja Beton Campuran 1 : 3 : 5 Tebal 5 cm
Pondasi Setempat 80 x 80 cm 0.80 0.800 0.050 500.000 16.000 M3
Pek. Lantai Kerja Beton Campuran 1 : 3 : 5 Tebal 5 cm 16.000 M3
5 Pek. Pondasi Setempat Beton Bertulang Ukuran 80/80/20 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR
Pondasi Setempat 80 x 80 cm 0.80 0.800 0.200 500.000 64.000 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 64.000 M3
b. Tulangan Pokok dia. 12 mm
Panjang 1.78 500.000 890.000 M
Panjang Total Tulangan Pokok 890.000 M
Jumlah Tulangan Pokok 10.00 x 890.000 8,900.000 m
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 8,900.00 7,921.000 Kg
Jadi Berat Total Tulangan Pokok 7,921.000 Kg
c. Bekisting Pondasi Tinggi
Panjang 3.20 x 0.200 500.000 320.000 M2
Jumlah Total Luas Bekisting Pondasi 320.000 M2
Pemggunaan Bekisting Pondasi 1 Kali Pakai 320.00 x 1.000 320.000 M2
Jumlah Total Luas Bekisting Pondasi 320.000 M2
6 Pek. Urugan Kembali Tanah Bekas Galian Volume Galian x 1/3 272.000 90.667 M3
Pek. Urugan Kembali Tanah Bekas Galian 90.667 M3
III PEKERJAAN LANTAI
1 Pek. Tiang Umpak Beton Bertulang Ukuran 25/25 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR
0.25 0.250 0.950 500.000 29.688 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 29.688 M3
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
b. Tulangan Pokok Ulir 6 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 1.55 1.550 M
Jumlah Tulangan Pokok 1 Kolom 6.00 x 1.550 9.300 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 9.300 x 500.000 4,138.500 Kg
Jadi Berat Total Tulangan Pokok 4,138.500 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 0.95 / 0.150 + 1.000 7.000 Bh
Panjang Tulangan Beugel 1 Bh 0.78 0.780 M
Panjang Satu Tulangan Bagi 1 Kolom 0.78 x 7.000 5.460 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 5.46 x 0.395 x 500.000 1,078.350 Kg
Jadi Berat Total Tulangan Beugel 1,078.350 Kg
d. Bekisting Tiang Umpak Tinggi
Luas Bekisting Kolom 1 Baris 1.20 x 0.950 x 500.000 570.000 M2
570.000 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 570.00 x 0.800 456.000 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 456.000 M2
2 Pek. Balok Sloof Beton Bertulang Ukuran 20/40 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR
Melintang 105.20 0.200 0.400 1.000 8.416 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 8.416 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulanagn Pokok 1 Batang 105.20 105.200 M
Jumlah Panjang Total Tulangan Pokok 4.00 x 105.200 x 1.000 420.80 m
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 420.8 374.51 Kg
Jadi Berat Total Tulangan Pokok 374.51 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm Jrk Antara
Panjang 105.20 1.000 105.200 M
Jumlah Tulangan Bagi 105.20 / 0.150 + 1.000 702.00 Bh
Panjang Satu Tulangan Bagi 0.98 m
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 702.00 x 0.980 x 0.395 271.744 Kg
Jadi Berat Total Tulangan Beugel 271.744 Kg
d. Bekisting Balok Sloof
Panjang 105.20 x 0.250 2.000 52.600 M2

Jumlah Total Bekisting Balok Air 52.600 M2


Penggunaan Bekisting 2 Kali Pakai 52.60 x 0.800 42.080 M2
Jumlah Total Bekisting Balok Air 42.080 M2
3 Pek. Balok Lantai Beton Bertulang Ukuran 20/40 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR
Memanjang 111.00 0.200 0.400 1.000 8.880 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 8.880 M3
b. Tulangan Pokok Ulir 8 Btg dia. 12 mm
Panjang 111.02 1.000 111.020 M
Panjang Tulangan Pokok 111.020 M
Jumlah Tulangan Pokok 8.00 x 111.02 888.16 m
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 888.2 790.46 Kg
Jadi Berat Total Tulangan Pokok 790.46 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm Jrk Antara
Panjang 111.00 1.000 111.000 M
Panjang Kebutuhan Tulangan Bagi 111.000 M
Jumlah Tulangan Bagi 111.00 / 0.150 + 1.000 741.00 Bh
Panjang Satu Tulangan Bagi 0.98 m
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 741.00 x 0.980 x 0.395 286.841 Kg
Jadi Berat Total Tulangan Beugel 286.841 Kg
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
d. Bekisting Balok Lantai
Panjang 111.00 x 0.250 1.000 27.750 M2
111.00 x 0.350 2.000 77.700 M2
Jumlah Total Bekisting Balok Lantai 105.450 M2
Penggunaan Bekisting 2 Kali Pakai 105.45 X 0.800 84.360 M2
Jumlah Total Bekisting Balok Lantai 84.360 M2
4 Pek. Lantai
a. Pek. Timbunan Pasir 11.75 x 10.750 x 0.680 85.893 M3
1.75 x 5.750 x 0.580 5.836 M3
Pek. Timbunan Pasir 91.729 M3
b. Pek. Cor Lantai Tebal 12 cm
12.00 x 11.000 x 0.120 15.840 M3
2.00 x 6.000 x 0.120 1.440 M3
Pek. Cor Lantai Tebal 12 cm 17.280 M3
c. Tulangan Lantai Besi dia. 10 mm
Memanjang 11.20 75.000 840.000 M
Melintang 12.20 80.000 976.000 M
Memanjang 2.20 14.000 30.800 M
Melintang 6.20 40.000 248.000 M
Panjang Tulangan Pokok 2,094.800 M
Jumlah Tulangan Pokok 1.00 x 2,094.80 2,094.80 M
Berat Besi 10 per meter lari 0.62 Kg/m'
Jadi Berat Total Tulangan Pokok 0.62 x 2,094.8 1,298.78 Kg
Jadi Berat Total Tulangan Pokok 1,298.78 Kg
5 Pek. Pas. Keramik Lantai 60x60 cm
Luas 1 4.00 x 12.000 1.000 48.000 M
Luas 2 2.00 x 6.000 1.000 12.000 M
Pek. Pas. Keramik Lantai 60x60 cm 60.00 M
IV PEKERJAAN DINDING
1 Pek. Tiang Kolom K1 20x20 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR 0.20 0.200 4.300 11.000 1.892 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 1.892 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 4.90 4.900 M
Jumlah Tulangan Pokok 1 Kolom 4.00 x 4.900 19.600 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 19.600 x 11.000 191.884 Kg
Jadi Berat Total Tulangan Pokok 191.884 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 4.30 / 0.150 + 1.000 29.000 Bh
Panjang Tulangan Beugel 1 Bh 0.58 0.580 M
Panjang Satu Tulangan Bagi 1 Kolom 0.58 x 29.000 16.820 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 16.82 x 0.395 x 11.000 73.083 Kg
Jadi Berat Total Tulangan Beugel 73.083 Kg
d. Bekisting Tiang Kolom Tinggi
0.80 x 4.300 x 11.000 37.840 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 37.84 x 0.800 30.272 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 30.272 M2
2 Pek. Tiang Kolom K2 15x15 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR 0.15 0.150 4.300 2.000 0.194 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 0.194 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 4.90 4.900 M
Jumlah Tulangan Pokok 1 Kolom 4.00 x 4.900 19.600 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 19.600 x 2.000 34.888 Kg
Jadi Berat Total Tulangan Pokok 34.888 Kg
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 4.30 / 0.150 + 1.000 29.000 Bh
Panjang Tulangan Beugel 1 Bh 0.38 0.380 M
Panjang Satu Tulangan Bagi 1 Kolom 0.38 x 29.000 11.020 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 11.02 x 0.395 x 2.000 8.706 Kg
Jadi Berat Total Tulangan Beugel 8.706 Kg
d. Bekisting Tiang Kolom Tinggi
0.60 x 4.300 x 2.000 5.160 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 5.16 x 0.500 2.580 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 2.580 M2
3 Pek. Tiang Kolom K3 20x20 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR 0.20 0.200 3.300 2.000 0.264 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 0.264 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 3.90 3.900 M
Jumlah Tulangan Pokok 1 Kolom 4.00 x 3.900 15.600 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 15.600 x 2.000 27.768 Kg
Jadi Berat Total Tulangan Pokok 27.768 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 3.30 / 0.150 + 1.000 23.000 Bh
Panjang Tulangan Beugel 1 Bh 0.58 0.580 M
Panjang Satu Tulangan Bagi 1 Kolom 0.58 x 23.000 13.340 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 13.34 x 0.395 x 2.000 10.539 Kg
Jadi Berat Total Tulangan Beugel 10.539 Kg
d. Bekisting Tiang Kolom Tinggi
0.80 x 3.300 x 2.000 5.280 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 5.28 x 0.500 2.640 M2
Penggunaan Bekisting Kolom 2 Kali Pakai 2.640 M2
4 Pek. Reng Balok 20x20 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR 0.20 0.200 68.800 1.000 2.752 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 2.752 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 69.40 69.400 M
Jumlah Tulangan Pokok 1 Kolom 4.00 x 69.400 277.600 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 277.600 x 1.000 247.064 Kg
Jadi Berat Total Tulangan Pokok 247.064 Kg
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 68.80 / 0.150 + 1.000 459.000 Bh
Panjang Tulangan Beugel 1 Bh 0.58 0.580 M
Panjang Satu Tulangan Bagi 1 Kolom 0.58 x 459.000 266.220 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 266.22 x 0.395 x 1.000 105.157 Kg
Jadi Berat Total Tulangan Beugel 105.157 Kg
d. Bekisting Tiang Kolom Tinggi
0.60 x 68.800 x 1.000 41.280 M2
Penggunaan Bekisting Kolom 1 Kali Pakai 41.28 x 1.000 41.280 M2
Penggunaan Bekisting Kolom 1 Kali Pakai 41.280 M2
5 Pek. Reng Balok Latey 15x20 cm
a. Beton Campuran 1 PC : 2 PS : 2,5 KR 0.15 0.200 10.000 1.000 0.300 M3
Beton Campuran 1 PC : 2 PS : 2,5 KR 0.300 M3
b. Tulangan Pokok Ulir 4 Btg dia. 12 mm
Panjang Tulangan Pokok 1 BH 10.60 10.600 M
Jumlah Tulangan Pokok 1 Kolom 4.00 x 10.600 42.400 M
Berat Besi 12 per meter lari 0.89 Kg/m'
Jadi Berat Total Tulangan Pokok 0.89 x 42.400 x 1.000 37.736 Kg
Jadi Berat Total Tulangan Pokok 37.736 Kg
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
c. Tulangan Beugel Polos dia. 8 mm Jarak 15 cm
Jumlah Tulangan Bagi 10.00 / 0.150 + 1.000 67.000 Bh
Panjang Tulangan Beugel 1 Bh 0.38 0.380 M
Panjang Satu Tulangan Bagi 1 Kolom 0.38 x 67.000 25.460 M
Berat Besi 8 per meter lari 0.40 Kg/m'
Jadi Berat Total Tulangan Beugel 25.46 x 0.395 x 1.000 10.057 Kg
Jadi Berat Total Tulangan Beugel 10.057 Kg
d. Bekisting Tiang Kolom Tinggi
0.55 x 10.000 x 1.000 5.500 M2
Penggunaan Bekisting Kolom 1 Kali Pakai 5.50 x 1.000 5.500 M2
Penggunaan Bekisting Kolom 1 Kali Pakai 5.500 M2
6 Pek. Plat Lantai Dag
a. Pek. Plat Lantai T = 10 cm 7.60 x 2.800 x 0.100 2.128 M3
Pek. Plat Lantai T = 10 cm 2.128 M3
b. Tulangan Lantai Besi dia. 10 mm
Memanjang 7.60 51.000 387.600 M
Melintang 2.80 19.000 53.200 M
0.150 440.800 M
Jumlah Tulangan Pokok 1.00 x 440.80 440.80 M
Berat Besi 10 per meter lari 0.62 Kg/m'
Jadi Berat Total Tulangan Pokok 0.62 x 440.8 273.30 Kg
Jadi Berat Total Tulangan Pokok 273.30 Kg
c. Bekisting Plat dag Tinggi
7.60 x 2.800 x 1.000 21.280 M2
Penggunaan Bekisting Kolom 1 Kali Pakai 21.28 x 1.000 21.280 M2
7 Pek. Pas. Batu Bata 1/2 Bata
Luas Total
a. Luas 1 5.80 x 4.300 x 5.000 124.700 M2
b. Luas 2 4.80 x 4.300 x 6.000 123.840 M2
c. Luas 3 2.80 x 4.300 x 2.000 24.080 M2
d. Luas 4 5.80 x 0.200 x 1.000 1.160 M2
e. Luas 5 1.80 x 0.200 x 1.000 0.360 M2
274.140 M2
Luas Pintu, Jendela
a. Luas 1 2.15 x 1.600 x 1.000 3.440 M2
b. Luas 2 0.50 x 1.600 x 1.000 0.800 M2
c. Luas 3 2.15 x 0.800 x 3.000 5.160 M2
d. Luas 3 1.50 x 0.700 x 2.000 2.100 M2
e. Luas 3 1.34 x 1.950 x 2.000 5.226 M2
f. Luas 3 1.34 x 0.600 x 4.000 3.216 M2
g. Luas 3 2.64 x 0.600 x 3.000 4.752 M2
24.694 M2
Luas Total Pasangan Bata 249.446 M2
8 Pek. Pelesteran 1:4 Jumlah 498.892 M2
9 Pek. Pas. Batu Bata 1 Bata
Luas Total
a. Luas 1 3.75 x 0.650 x 2.000 4.875 M2
b. Luas 2 2.75 x 0.650 x 2.000 3.575 M2
c. Luas 3 1.75 x 0.600 x 2.000 2.100 M2
d. Luas 4 5.75 x 0.650 x 4.000 14.950 M2
e. Luas 5 5.75 x 0.600 x 1.000 3.450 M2
Luas Total Pasangan Bata 28.950 M2
10 Pek. Pelesteran 1:4 Jumlah 57.900 M2
9 Pek. Kunsen P1 Kayu Kls II 1 10.10 x 0.050 x 0.120 0.061 M3
10 Pek. Kunsen P2 Kayu Kls II 1 5.10 x 0.050 x 0.120 0.031 M3
11 Pek. Kunsen J1 Kayu Kls II 3 7.40 x 0.050 x 0.120 0.133 M3
12 Pek. Kunsen J2 Kayu Kls II 2 11.85 x 0.050 x 0.120 0.142 M3
13 Pek. Kunsen V1 Kayu Kls II 2 4.18 x 0.050 x 0.120 0.050 M3
14 Pek. Kunsen V2 Kayu Kls II 4 7.78 x 0.050 x 0.120 0.187 M3
0.603 M3
15 Pek. Pintu P1 Kayu Kls II 3.200 M2
- Engsel 4 Inci 6.000 Bh
- Kunci 2 Slegh 1.000 Bh
- Gerendel 2.000 Bh
16 Pek. Pintu P2 Kayu Kls II 3.200 M2
- Engsel 4 Inci 6.000 Bh
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
- Kunci 2 Slegh 2.000 Bh
- Gerendel 2.000 Bh
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
17 Pek. Jendela J1 Kayu Kls II
- Jendela Kaca Mati 1.080 M2
- Jendela Kaca Bingkai 1.620 M2
- Engsel 3 Inci 18.000 Bh
- Gerendel 18.000 Bh
- Kait Angin 18.000 Bh
18 Pek. Jendela J2 Kayu Kls II
- Jendela Kaca Mati 1.080 M2
- Jendela Kaca Bingkai 1.080 M2
- Engsel 3 Inci 16.000 Bh
- Gerendel 16.000 Bh
- Kait Angin 16.000 Bh
19 Pek. Ventelasi Jalusi V1 Kayu Kls II
- Jendela Kaca Bingkai 1.200 M2
- Engsel 3 Inci 8.000 Bh
- Gerendel 8.000 Bh
20 Pek. Ventelasi Jalusi V2 Kayu Kls II
- Jendela Kaca Bingkai 4.800 M2
- Engsel 3 Inci 32.000 Bh
- Gerendel 20.000 Bh
V PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan Pabrikasi
a. Rangka Atap 14.87 x 5.700 2.000 169.518 M2
6.00 x 9.300 2.000 111.600 M3
4.00 x 5.700 2.000 45.600 M4
Rangka Atap 326.718 M2
b. Atas Spandek 0,3 MM 326.718 M2
Atas Spandek 0,3 MM 326.718 M2
c. Prabung Spandek 0,3 MM 19.08 + 6.000 25.080 M1
Prabung Spandek 0,3 MM 25.080 M1
2 Pek. Lisplank Papan Kayu Kls II
a. Lisplank Papan Kls II 72.00 x 1.000 1.000 72.000 M1
Lisplank Papan Kls II 72.000 M1
3 Pek. Lembayung
a. Lembayung 4.00 x 1.000 1.000 4.000 Bh
Lembayung 4.000 Bh
VI PEKERJAAN PELAFOND
1 Pek. Pelafond PVC
a. Pek. Rangka Pelafon PVC 11.80 x 10.800 1.000 127.440 M2
b. Pek. Pelafon PVC 11.80 x 10.800 1.000 127.440 M2
c. Pek. Lis Pelafon PVC 44.79 + 20.000 1.000 64.790 M1
2 Pek. Peri -Peri Kayu Papan Kls II
a. Pek. Rangka Peri - Peri 50.00 x 1.000 1.000 50.000 M2
b. Pek. Peri - Peri 50.00 x 1.000 1.000 50.000 M2
VII PEKERJAAN INSTALASI LISTRIK
1 Pek. Titik Lampu Donlead+ Instalasi 8.00 x 1.000 1.000 8.000 Bh
2 Pek. Stop kontak + Instalasi 4.00 x 1.000 1.000 4.000 Bh
3 Pek. Sakelar Tunggal (Biasa) 4.00 x 1.000 1.000 4.000 Bh
4 Pek. Pengadaan dan Pemasangan Lampu Donleght 8.00 x 1.000 1.000 8.000 Bh
5 Pek. Pengadaan dan Pemasangan Lampu Pilip 20 Wat 8.00 x 1.000 1.000 8.000 Bh
VIII PEKERJAAN DRAENASE
A Pek. Draenase LD 30 T 50
1 Pek. Galian Tanah 0.50 x 0.200 66.000 6.600 M3
2 Pek. Cerocok Kayu Bulat 0.50 x 330.000 1.000 165.000 M1
3 Pek. Cor Tapak Tebal 12 Cm
- Beton Campuran 1 PC : 2 PS : 2,5 KR 0.50 - 0.100 66.000 3.300 M3
- Besi Ø 10 mm 4.00 - 66.000 0.620 163.680 Kg
- Bekisting 0.50 - 66.000 1.000 33.000 M2
4 Pek. Cor Dinding Drainase Tebal 12 Cm
- Beton Campuran 1 PC : 2 PS : 2,5 KR 0.80 - 0.100 66.000 5.280 M3
- Besi Ø 12 mm 8.00 - 66.000 0.620 327.360 Kg
- Bekisting 2.00 - 66.000 1.000 66.000 M2
Perhitungan Volume
No Uraian Kegiatan
Panjang Lebar 1 Lebar 2 Tinggi banyak Volume Sat
1 2 3 4 5 6 7 8 9
5 Pek. Balok Skor 12/15 Cm
- Beton Campuran 1 PC : 2 PS : 2,5 KR 0.15 0.120 0.400 13.000 0.780 M3
- Besi Ø 12 mm 5.20 20.800 0.620 67.059 Kg
- Besi Ø 8 mm 30.00 0.400 0.400 4.800 Kg
- Bekisting 5.20 0.420 1.000 1.000 5.200 M2
6 Pek. Pipa PVC 2" 3.000 3.000 M1
VIII PEKERJAAN RABAT BETON
1 Pek. Timbunan Pair 5 cm 46.69 x 0.100 1.000 4.669 M3
2 Pek. Cor Rabat Tebal 12 Cm K - 225 46.69 x 0.120 1.000 5.603 M3
IX PEKERJAAN PENGECATAN
1 Pek. Cat Air 498.892 M2
2 Pek. Cat Minya 168.410 M2
X PEKERJAAN LAIN - LAIN
1 Pek. Pembuatan Tangga Beton 0.40 0.400 6.000 1.000 0.960 M3
0.20 0.400 6.000 1.000 0.480 M3
1.440 M3
2 Pek. Pembersiahan Akhir 1.000 Ls
DAFTAR HARGA SATUAN BAHAN, UPAH DAN SEWA ALAT
WILAYAH KABUPATEN INDRAGIRI HILIR
UNTUK TAHUN ANGGARAN 2022

LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

UPAH
1 Mandor Orang/Hari Rp 155,204.22
2 Pekerja Orang/Hari Rp 139,683.80
3 Tukang Gali Orang/Hari Rp 139,683.80
4 Tukang Batu Orang/Hari Rp 139,683.80
5 Tukang Kayu Orang/Hari Rp 139,683.80
6 Tukang Besi Orang/Hari Rp 139,683.80
7 Tukang Meubel Orang/Hari Rp 139,683.80
8 Tukang Ledeng Orang/Hari Rp 139,683.80
9 Tukang Listrik Orang/Hari Rp 139,683.80
10 Tukang Cat / Dempul Orang/Hari Rp 139,683.80
11 Tukang Pelitur Orang/Hari Rp 139,683.80
12 Kepala Tukang Gali Orang/Hari Rp 155,204.22
13 Kepala Tukang Batu Orang/Hari Rp 155,204.22
14 Kepala Tukang Kayu Orang/Hari Rp 155,204.22
15 Kepala Tukang Besi Orang/Hari Rp 155,204.22
16 Kepala Tukang Meubel Orang/Hari Rp 155,204.22
17 Kepala Tukang Ledeng Orang/Hari Rp 155,204.22
18 Kepala Tukang Listrik Orang/Hari Rp 155,204.22
19 Kepala Tukang Cat / Dempul Orang/Hari Rp 155,204.22
20 Penjaga Malam Orang/Hari Rp 100,000.00
21 Mekanik Orang/Hari Rp 155,204.22
22 Mekanik Pembantu Orang/Hari Rp 139,683.80
23 Operator Terlatih Orang/Hari Rp 155,204.22
24 Operator Kurang Terlatih Orang/Hari Rp 139,683.80
25 Pembantu Operator Orang/Hari Rp 125,715.42
26 Supir Material / Truck Orang/Hari Rp 155,204.22
27 Supir Personil Orang/Hari Rp 139,683.80
28 Pembantu Supir / Knek Orang/Hari Rp 125,715.42
29 Buruh Terlatih Orang/Hari Rp 139,683.80
30 Buruh Kurang Terlatih Orang/Hari Rp 125,715.42
MATERIAL ALAM
1 Tanah Timbun (Lokal) Tembilahan M3 Rp 141,050.00
2 Tanah Timbun (Didatangkan) Tembilahan M3 Rp 368,550.00
3 Pasir Urug Tembilahan M3 Rp 219,050.00
4 Pasir Cor (Agregat Halus) Tembilahan M3 Rp 384,800.00
5 Batu Kerikil Tembilahan M3 Rp 791,050.00
6 Batu Pecah / Split (Agregat Kasar) Tembilahan M3 Rp 1,051,050.00
7 Asphalt Esso Penetration 60/70 Pekanbaru Drum Rp 1,250,000.00
8 Asphalt Iran Penetration 60/70 Pekanbaru Drum Rp 1,200,000.00
9 Asphalt Shell Penetration 60/70 Pekanbaru Drum Rp 1,250,000.00
10 Asphalt Pertamina Penetration 60/70 Pekanbaru Drum Rp 1,150,000.00
11 Asphalt AC 60/70 Tembilahan Kilogram Rp 31,354.70
12 Asphalt Emulsi (Dingin) Tembilahan Kilogram Rp 32,654.70
13 Filler (Agregat Halus) Tembilahan M3 Rp 1,169,350.00
14 Batu Kali Tembilahan M3 Rp 598,260.00
15 Sirtu / Urugan Pilihan Tembilahan M3 Rp 387,010.00
16 Base-A Tanjung Pinang M3 Rp 791,310.00
17 Base-B Tanjung Pinang M3 Rp 709,410.00
18 Base-C Tanjung Pinang M3 Rp 586,560.00
MATERIAL BESI
1 Kawat Pengikat Tembilahan Kilogram Rp 32,504.42
2 Kawat Berduri Tembilahan Rol Rp 162,504.42
3 Besi Beton Polos Tembilahan Kilogram Rp 21,892.00
4 Besi Beton Ulir Tembilahan Kilogram Rp 21,502.00
5 Besi Warmes Uk. 150x150x50m Ǿ 8 MI Tembilahan Rol Rp 4,600,000.00
6 Besi Warmes Uk. 150x150x50m Ǿ 6 MI Tembilahan Rol Rp 4,300,000.00
7 Paku Biasa / Campur Tembilahan Kilogram Rp 28,688.40
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
8 Paku Putih Tembilahan Kilogram Rp 36,488.40
9 Paku Tripleks Tembilahan Kilogram Rp 29,988.40
10 Paku Beton Tembilahan Kilogram Rp 48,321.00
11 Paku Seng Tembilahan Kilogram Rp 41,688.40
12 Paku Asbes Tembilahan Kilogram Rp 39,221.00
13 Paku Sekrup Tembilahan Buah Rp 1,084.20
14 Baut 3/4" Panjang 4" Tembilahan Buah Rp 11,094.20
15 Baut 1/2" Panjang 4" Tembilahan Buah Rp 9,144.20
16 Teralis Besi Plat / Siku Tembilahan M2 Rp 472,420.00
17 Kawat Las Tembilahan Kilogram Rp 53,521.00
18 Besi Plat Strip Tembilahan Kilogram Rp 9,971.00
19 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 13,221.00
20 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 15,171.00
21 Geotextile Woven GTW 150 Gr Pekanbaru M2 Rp 17,121.00
22 Geotextile Non Woven GTR 150 Gr Pekanbaru M2 Rp 10,000.00
23 Geotextile Non Woven GTR 200 Gr Pekanbaru M2 Rp 11,500.00
24 Geotextile Non Woven GTR 250 Gr Pekanbaru M2 Rp 12,500.00
25 Geotextile Non Woven GTR 300 Gr Pekanbaru M2 Rp 15,500.00
26 Geotextile Non Woven GTR 400 Gr Pekanbaru M2 Rp 17,000.00
27 Geotextile Non Woven GTR 500 Gr Pekanbaru M2 Rp 19,500.00
28 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 13,500.00
29 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 18,000.00
30 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 24,500.00
31 Geotextile Non Woven GTPP 200 Gr Pekanbaru M2 Rp 30,000.00
MATERIAL CAMPURAN
1 Semen PC (50 KG) Tembilahan Kilogram Rp 2,124.20
2 Semen Putih/Warna Tembilahan Kilogram Rp 4,919.20
3 Lem Fox Putih Tembilahan Kilogram Rp 44,222.10
4 Lem Fox Kuning Tembilahan Kilogram Rp 50,876.80
5 Batu Bata Pres (5 x 11 x 22) Tembilahan Buah Rp 2,428.40
6 Batu Bata Biasa (8 x 8 x 18) Tembilahan Buah Rp 1,994.20
7 Batako Tembilahan Buah Rp 2,437.24
8 Beton Ready Mix K 175 Tembilahan M³ Rp 1,250,000.00
9 Beton Ready Mix K 250 Tembilahan M³ Rp 1,350,000.00
10 Beton Ready Mix K 350 Tembilahan M³ Rp 1,450,000.00
11 Paving Block Tembilahan Buah Rp 3,272.10
12 Paving Block Tebal 8cm K225 (Natural) Pekanbaru M2 Rp 115,000.00
13 Paving Block Tebal 8cm K225 (Motif Warna) Pekanbaru M2 Rp 150,000.00
14 Paving Block Tebal 8cm K225 (Dominan Warna) Pekanbaru M2 Rp 160,000.00
15 Paving Block Tebal 8cm K225 (List Warna) Pekanbaru M2 Rp 140,000.00
16 Paving Block Tebal 8cm K300 (Natural) Pekanbaru M2 Rp 145,000.00
17 Paving Block Tebal 8cm K300 (Motif Warna) Pekanbaru M2 Rp 165,000.00
18 Paving Block Tebal 8cm K300 (Dominan Warna) Pekanbaru M2 Rp 185,000.00
19 Paving Block Tebal 8cm K300 (List Warna) Pekanbaru M2 Rp 155,000.00
20 Kawat Harmonika Gaas Tembilahan M2 Rp 19,676.80
21 Kawat Nyamuk / Kasa Besi Tembilahan M2 Rp 35,276.80
22 Kawat Nyamuk / Kasa Plastik Tembilahan M2 Rp 32,676.80
23 Plastik Terpal Hitam Tembilahan Kilogram
24 Glass Block Tembilahan Buah Rp 39,022.10

Tiang Pancang Bulat Sentrifugal Ø 300 mm, P. 6/8 M Kls. A,


24 Batam M' Rp 353,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 300 mm, P. 6/8 M Kls. A,


25 Batam M' Rp 380,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 350 mm, P. 6/8 M Kls. A,


26 Batam M' Rp 444,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 350 mm, P. 6/8 M Kls. A,


27 Batam M' Rp 482,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 400 mm, P. 6/8 M Kls. A,


28 Batam M' Rp 576,000.00
Bottom
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

Tiang Pancang Bulat Sentrifugal Ø 400 mm, P. 6/8 M Kls. A,


29 Batam M' Rp 627,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 450 mm, P. 6/8 M Kls. A,


30 Batam M' Rp 742,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 450 mm, P. 6/8 M Kls. A,


31 Batam M' Rp 804,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 500 mm, P. 6/8 M Kls. A,


32 Batam M' Rp 936,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 500 mm, P. 6/8 M Kls. A,


33 Batam M' Rp 1,019,000.00
Middle

Tiang Pancang Bulat Sentrifugal Ø 600 mm, P. 6/8 M Kls. A,


34 Batam M' Rp 1,236,000.00
Bottom

Tiang Pancang Bulat Sentrifugal Ø 600 mm, P. 6/8 M Kls. A,


35 Batam M' Rp 1,334,000.00
Middle

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


36 Batam M' Rp 422,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


37 Batam M' Rp 499,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 250 x 250 mm, P. 6/10 M


38 Batam M' Rp 422,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


39 Batam M' Rp 570,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


40 Batam M' Rp 661,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 300 x 300 mm, P. 6/11 M


41 Batam M' Rp 570,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


42 Batam M' Rp 770,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


43 Batam M' Rp 905,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 350 x 350 mm, P. 6/11 M


44 Batam M' Rp 770,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


45 Batam M' Rp 971,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


46 Batam M' Rp 1,129,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 400 x 400 mm, P. 6/12 M


47 Batam M' Rp 971,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


48 Batam M' Rp 1,222,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


49 Batam M' Rp 1,424,000.00
Kls. A, Middle

Tiang Pancang Kotak Segiempat 450 x 450 mm, P. 6/12 M


50 Batam M' Rp 1,222,000.00
Kls. A, Upper

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


51 Batam M' Rp 1,473,000.00
Kls. A, Bottom

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


52 Batam M' Rp 1,694,000.00
Kls. A, Middle
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

Tiang Pancang Kotak Segiempat 600 x 600 mm, P. 6/13 M


53 Batam M' Rp 1,473,000.00
Kls. A, Upper

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


54 Batam M' Rp 1,050,000.00
CSSP) W-325 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


55 Batam M' Rp 1,220,000.00
CSSP) W-350 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


56 Batam M' Rp 1,326,000.00
CSSP) W-400 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


57 Batam M' Rp 1,505,000.00
CSSP) W-450 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


58 Batam M' Rp 1,607,000.00
CSSP) W-500 P. 6/8 Kls. A

Turap Beton Bergelombang ( Corrugated Concrete Sheet Pile/


59 Batam M' Rp 1,847,000.00
CSSP) W-600 P. 6/8 Kls. A

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


60 Batam M' Rp 663,000.00
FPC) FPC - 220 Kls. 6S - A Ø 9.53 MM P. 4/9 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


61 Batam M' Rp 689,000.00
FPC) FPC - 220 Kls. 8S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


62 Batam M' Rp 713,000.00
FPC) FPC - 220 Kls. 10S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


63 Batam M' Rp 923,000.00
FPC) FPC - 320 Kls. 6S - A Ø 9.53 MM P. 4/10 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


64 Batam M' Rp 948,000.00
FPC) FPC - 320 Kls. 8S - A Ø 9.53 MM P. 4/11 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


65 Batam M' Rp 972,000.00
FPC) FPC - 320 Kls. 10S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


66 Batam M' Rp 997,000.00
FPC) FPC - 320 Kls. 12S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


67 Batam M' Rp 1,021,000.00
FPC) FPC - 320 Kls. 14S - A Ø 9.53 MM P. 4/12 M

Turap Beton Persegi (Flat Sheet Pile Prestressed Concrete/


68 Batam M' Rp 1,045,000.00
FPC) FPC - 320 Kls. 16S - A Ø 9.53 MM P. 4/13 M

Beton U- Ditch U.600.800.1200 P. 1200mm, Tbl. 70mm,


69 Batam Unit Rp 1,309,000.00
(Dimensi Dalam L. 600 T. 800)

Beton U- Ditch U.600.800.1200 P. 1200mm, Tbl. 90mm,


70 Batam Unit Rp 2,368,000.00
(Dimensi Dalam L. 1000 T. 1000)

71 Parit Beton U, Uk. 30x30 P. 80cm Pekanbaru Unit Rp 170,000.00

72 Parit Beton U, Uk. 27x40 P. 80cm Pekanbaru Unit Rp 165,000.00

73 Parit Beton U, Uk. 40x40 P. 60cm Pekanbaru Unit Rp 145,000.00

74 Parit Beton U, Uk. 40x40 P. 80cm Pekanbaru Unit Rp 175,000.00

75 Parit Beton U, Uk. 40x60 P. 100cm Pekanbaru Unit Rp 285,000.00

76 Parit Beton U, Uk. 50x50 P. 60cm Pekanbaru Unit Rp 165,000.00


LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5

77 Parit Beton U, Uk. 50x50 P. 100cm Pekanbaru Unit Rp 310,000.00

78 Parit Beton U, Uk. 60x60 P. 100cm Pekanbaru Unit Rp 530,000.00

79 Parit Beton U, Uk. 60x80 P. 100cm Pekanbaru Unit Rp 675,000.00

80 Box Culvert 40x40 P. 120cm Pekanbaru Unit Rp 510,000.00

81 Box Culvert 50x50 P. 100cm Pekanbaru Unit Rp 750,000.00

82 Box Culvert 60x60 P. 100cm Pekanbaru Unit Rp 1,220,000.00

83 Tutup Parit 8 x 55 x 85 Pekanbaru Unit Rp 110,000.00

Beton Box Culvert BC.1000.1000.1200 P. 1200mm, Tbl.


84 Batam Unit Rp 6,078,000.00
120mm (Dimensi Dalam L. 1000 T. 1000)

Beton Box Culvert BC.1000.1000.1200 P. 1200mm, Tbl.


85 Batam Unit Rp 21,928,000.00
250mm (Dimensi Dalam L. 2000 T. 2000)

MINYAK
1 Minyak Solar/ Dexlite Tembilahan Liter Rp 17,290.00
2 Minyak Bensin / Premium Tembilahan Liter Rp 12,805.00
3 Minyak Pertailite Tembilahan Liter Rp 14,365.00
4 Minyak Pertamax Tembilahan Liter Rp 16,640.00
5 Oli Hidrolik Tembilahan Liter Rp 53,820.00
6 Oli Mesin (40) Tembilahan Liter Rp 49,920.00
7 Minyak Bekisting Tembilahan Liter Rp 30,420.00
8 Minyak Tanah / Kerosene Tembilahan Liter Rp 18,980.00
9 Minyak Pelumas / Gemuk Tembilahan Liter Rp 30,420.00
MATERIAL LANTAI
1 Keramik 10 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 1,582.10
2 Keramik 20 x 20 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 3,424.20
3 Keramik 20 x 25 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 4,616.30
4 Keramik 30 x 30 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 8,408.40
5 Keramik 40 x 40 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 14,150.50
6 Keramik 60 x 60 Kualitas Standar (Ex. Garuda) Tembilahan Buah Rp 32,632.60
7 Keramik 10 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 2,362.10
8 Keramik 20 x 20 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 4,594.20
9 Keramik 20 x 25 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 5,786.30
10 Keramik 30 x 30 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 11,268.40
11 Keramik 40 x 40 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 14,800.50
12 Keramik 60 x 60 Kualitas Sedang (Ex. KIA/IKAD) Tembilahan Buah Rp 35,321.00
13 Keramik 10 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 3,294.20
14 Keramik 20 x 20 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 6,414.20
15 Keramik 20 x 25 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 13,066.30
16 Keramik 30 x 30 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 24,788.40
17 Keramik 40 x 40 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 56,010.50
18 Keramik 60 x 60 Kualitas Baik (Ex. ROMAN) Tembilahan Buah Rp 58,632.60
19 Granit 30 x 30 (Ex. GRANITO) Tembilahan Buah Rp 31,553.60
20 Granit 40 x 40 (Ex. GRANITO) Tembilahan Buah Rp 58,853.60
21 Granit 60 x 60 (Ex. GRANITO) Tembilahan Buah Rp 71,544.20
22 Batu Tempel (ex : Candi 20 x 20) Tembilahan M2 Rp 241,605.00
MATERIAL KAYU
1 Kayu Ulin Panjang 1,5 M Tembilahan Batang Rp 91,663.00
2 Kayu Ulin Panjang 2 M Tembilahan Batang Rp 143,663.00
3 Kayu Ulin Panjang 3 M Tembilahan Batang Rp 221,663.00
4 Kayu Ulin Panjang 4 M Tembilahan Batang Rp 286,663.00
5 Kayu Ulin Panjang 5 M Tembilahan Batang Rp 351,663.00
6 Kayu Persegi Klas II Tembilahan M3 Rp 5,854,420.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
7 Kayu Persegi Kelas I Tembilahan M3 Rp 8,389,420.00
8 Kayu Persegi Klas III Tembilahan M3 Rp 4,619,420.00
9 Kayu Ikat Tembilahan Ikat Rp 159,315.00
10 Papan Klas II Tembilahan M3 Rp 5,854,420.00
11 Papan Kelas I Tembilahan M3 Rp 8,389,420.00
12 Papan Klas III Tembilahan M3 Rp 4,619,420.00
13 Papan Bekisting Tembilahan M3 Rp 2,669,420.00
14 Bantalan Melting Lokasi Setempat M' Rp 65,663.00
15 Kayu Pandal Penyirih Ø 12-15 CM Tembilahan Batang Rp 22,763.00
16 Cerocok Bakau Panjang 5 M Tembilahan Batang Rp 12,363.00
17 Cerocok Bakau Panjang 6 M Tembilahan Batang Rp 20,163.00
18 Cerocok Bakau Panjang 7 M Tembilahan Batang Rp 26,663.00
19 Perancah / Dolken Ø 8-10 Panjang 4 M' Tembilahan Batang Rp 14,768.00
BAHAN PELAPIS / PENUTUP PLAFOND
1 Gypsum Tembilahan Lembar Rp 106,210.00
2 List Gypsum Tembilahan Batang Rp 41,210.00
3 Plywood 4 mm Tembilahan Lembar Rp 87,815.00
4 Plywood 6 mm Tembilahan Lembar Rp 120,315.00
5 Plywood 9 mm Tembilahan Lembar Rp 177,320.00
6 Plywood 12 mm Tembilahan Lembar Rp 238,420.00
7 Plywood 15 mm Tembilahan Lembar Rp 296,920.00
8 Grc Tembilahan Lembar Rp 108,420.00
9 Plafound PVC Glossy P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 74,620.00
10 Plafound PVC Doff P.4M, L.20CM, T. 8MM (Mengkilat) Tembilahan Lembar Rp 118,820.00
11 List Kecil P. 4M (Putih,Coklat,Polos) Tembilahan Batang Rp 66,820.00
12 List Sedang P. 4M (Putih,Motif,Gold) Tembilahan Batang Rp 77,220.00
13 List Besar P. 4M (Gold,Silver,Polos) Tembilahan Batang Rp 98,020.00
14 Furing Tembilahan Batang Rp 20,670.00
15 Teakwood (megajati) Tembilahan Lembar Rp 165,815.00
16 List Profil Tembilahan M' Rp 18,005.00
PENUTUP ATAP
1 Seng Gelombang BJLS 20 KI Tembilahan Lembar Rp 60,710.00
2 Seng Plat BJLS 20 KI Tembilahan Lembar Rp 71,942.00
3 Baja Ringan Canal Taso 65/75 Tembilahan Batang Rp 145,210.00
4 Baja Ringan Canal Abadi 65/75 Tembilahan Batang Rp 99,710.00
5 Baja Ringan Taso 7565 Pekanbaru Batang Rp 112,000.00
6 Baja Ringan Taso 7575 Pekanbaru Batang Rp 122,000.00
7 Baja Ringan Joli Trus 7565 Pekanbaru Batang Rp 94,000.00
8 Baja Ringan Joli Trus 7575 Pekanbaru Batang Rp 107,000.00
9 Baja Ringan Fh Trus 7565 Pekanbaru Batang Rp 84,000.00
10 Baja Ringan K Steel 7565 Pekanbaru Batang Rp 99,000.00
11 Baja Ringan K Steel 7575 Pekanbaru Batang Rp 109,000.00
12 Baja Ringan Tera Trus 7565 Pekanbaru Batang Rp 85,000.00
13 Baja Ringan Tera Trus 7575 Pekanbaru Batang Rp 100,000.00
14 Reng Taso Tembilahan Batang Rp 77,610.00
15 Reng Abadi Tembilahan Batang Rp 54,210.00
16 Atap Genteng Metal Zincalume 0,25 mm Tembilahan Lembar Rp 50,310.00
17 Atap Genteng Metal Zincalume 0,30 mm Tembilahan Lembar Rp 60,710.00
18 Atap Genteng Metal Zincalume 0,35 mm Tembilahan Lembar Rp 76,310.00
19 Atap Genteng Metal Zincalume 0,45 mm Tembilahan Lembar Rp 106,210.00
20 Perabung Raja Metal Zincalume Panjang 80 cm Tembilahan Lembar Rp 53,105.00
MATERIAL KUNCI DAN ALAT PENGGANTUNG
1 Engsel Standar 3" Tembilahan Buah Rp 14,344.20
2 Engsel Standar 4" Tembilahan Buah Rp 19,544.20
3 Grendel Jendela Standar Tembilahan Buah Rp 13,044.20
4 Grendel Pintu Standar Tembilahan Buah Rp 23,444.20
5 Engsel Kuningan 3" Tembilahan Buah Rp 32,544.20
6 Engsel Kuningan 4" Tembilahan Buah Rp 26,044.20
7 Grendel Jendela Kuningan Tembilahan Buah Rp 19,544.20
8 Grendel Pintu Kuningan Tembilahan Buah Rp 29,944.20
9 Kait Angin Kualitas Standar Tembilahan Buah Rp 19,544.20
10 Kait Angin Kualitas Baik Tembilahan Buah Rp 26,044.20
11 Door Closer Tembilahan Buah Rp 247,044.20
12 Door Holder (Pegangan Pintu) Tembilahan Pasang Rp 253,544.20
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
13 Kunci Tanam Bulat Kualitas Standar Tembilahan Buah Rp 71,544.20
14 Kunci Tanam Bulat Kualitas Sedang Tembilahan Buah Rp 97,544.20
15 Kunci Tanam Bulat Kualitas Baik Tembilahan Buah Rp 169,044.20
16 Kunci Tanam 1 Slaagh Kualitas Standart Tembilahan Buah Rp 117,044.20
17 Kunci Tanam 2 Slaagh Kualitas Standart Tembilahan Buah Rp 195,044.20
18 Kunci Tanam 1 Slaagh Kualitas Baik Tembilahan Buah Rp 325,044.20
19 Kunci Tanam 2 Slaagh Kualitas Baik Tembilahan Buah Rp 455,044.20
MATERIAL KACA
1 Kaca Bening 3 mm Tembilahan M2 Rp 133,315.00
2 Kaca Bening 5 mm Tembilahan M2 Rp 198,315.00
3 Kaca Bening 8 mm Tembilahan M2 Rp 484,315.00
4 Kaca Rayban 3 mm Tembilahan M2 Rp 139,815.00
5 Kaca Rayban 5 mm Tembilahan M2 Rp 204,815.00
6 Kaca Rayban 8 mm Tembilahan M2 Rp 490,815.00
7 Nacco / Bingkai 5 Daun Kaca Bening 3 mm Tembilahan Set Rp 126,815.00
8 Nacco / Bingkai 7 Daun Kaca Bening 3 mm Tembilahan Set Rp 152,815.00
9 Nacco / Bingkai 8 Daun Kaca Bening 3 mm Tembilahan Set Rp 165,815.00
10 Nacco / Bingkai 5 Daun Kaca Bening 5 mm Tembilahan Set Rp 115,115.00
11 Nacco / Bingkai 7 Daun Kaca Bening 5 mm Tembilahan Set Rp 157,365.00
12 Nacco / Bingkai 8 Daun Kaca Bening 5 mm Tembilahan Set Rp 178,815.00
13 Nacco / Bingkai 5 Daun Kaca Rayban 3 mm Tembilahan Set Rp 117,065.00
14 Nacco / Bingkai 7 Daun Kaca Rayban 3 mm Tembilahan Set Rp 159,965.00
15 Nacco / Bingkai 8 Daun Kaca Rayban 3 mm Tembilahan Set Rp 181,415.00
16 Nacco / Bingkai 5 Daun Kaca Rayban 5 mm Tembilahan Set Rp 124,215.00
17 Nacco / Bingkai 7 Daun Kaca Rayban 5 mm Tembilahan Set Rp 169,065.00
18 Nacco / Bingkai 8 Daun Kaca Rayban 5 mm Tembilahan Set Rp 191,815.00
19 Bingkai Alumanium Kusen Jendela Kualitas Standart Tembilahan M' Rp 653,315.00
20 Bingkai Alumanium Kusen Pintu Kualitas Standart Tembilahan M' Rp 783,315.00
21 Kusen Jendela Alumanium Kualitas Standart (Silver) Tembilahan M' Rp 328,315.00
22 Kusen Jendela Alumanium Kualitas Standart (Coklat) Tembilahan M' Rp 406,315.00
23 Pintu Alumanium (Lengkap) Tembilahan Unit Rp 2,603,315.00
PERALATAN SANITAIR
1 Bak Mandi Fiber 20 Liter Tembilahan Buah Rp 363,155.00
2 Bak Mandi Plastik (Persegi) 20 Liter Tembilahan Buah Rp 376,155.00
3 Bak Mandi Plastik (Sudut) 20 Liter Tembilahan Buah Rp 369,655.00
4 Kloset Jongkok Keramik Tembilahan Buah Rp 337,155.00
5 Kloset Duduk Keramik (Standart) Tembilahan Buah Rp 2,222,155.00
6 Kloset Duduk Keramik (Monoblok) Tembilahan Buah Rp 2,612,155.00
7 Urinoir Keramik Tembilahan Buah Rp 922,155.00
8 Washtafel Keramik (Lengkap) Tembilahan Buah Rp 597,155.00
9 Bak Cuci Piring Logam (2 Lubang) Tembilahan Buah Rp 506,155.00
10 Bak Cuci Piring Logam (1 Lubang) Tembilahan Buah Rp 220,155.00
11 Saringan Air Lantai (Floor Drain) Kuningan Tembilahan Buah Rp 64,155.00
12 Saringan Air Lantai (Floor Drain) Plastik Tembilahan Buah Rp 38,155.00
13 Pompa Air Tangan Tembilahan Buah Rp 467,155.00
14 Tangki Air Plastik Kapasitas 500 Liter (SNI) Tembilahan Buah Rp 987,155.00
15 Tangki Air Plastik Kapasitas 1050 Liter (SNI) Tembilahan Buah Rp 1,767,155.00
16 Kran Air 1/2" Kualitas Standart (Plastik) Tembilahan Buah Rp 23,444.20
17 Kran Air 1/2" Kualitas Baik (Plastik) Tembilahan Buah Rp 36,444.20
18 Kran Air 3/4" Kualitas Standart (Plastik) Tembilahan Buah Rp 20,844.20
19 Kran Air 3/4" Kualitas Baik (Plastik) Tembilahan Buah Rp 33,605.00
20 Seal Tape Tembilahan Buah Rp 13,044.20
21 Pompa Sumersible Tembilahan Buah Rp 2,860,884.00
PERPIPAAN DAN ACCESSORIES
1 Pipa PVC Ukuran1/2" TEBAL Tembilahan Batang Rp 36,010.00
2 Pipa PVC Ukuran 1/4" TEBAL Tembilahan Batang Rp 49,010.00
3 Pipa PVC Ukuran 3/4" TEBAL Tembilahan Batang Rp 43,810.00
4 Pipa PVC Ukuran 1" TEBAL Tembilahan Batang Rp 60,710.00
5 Pipa PVC Ukuran 1,5" TEBAL Tembilahan Batang Rp 90,610.00
6 Pipa PVC Ukuran 2" TEBAL Tembilahan Batang Rp 125,710.00
7 Pipa PVC Ukuran 2,5" TEBAL Tembilahan Batang Rp 210,210.00
8 Pipa PVC Ukuran 3" TEBAL Tembilahan Batang Rp 327,210.00
9 Pipa PVC Ukuran 4" TEBAL Tembilahan Batang Rp 389,610.00
10 Pipa PVC Ukuran 6" TEBAL Tembilahan Batang Rp 431,210.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
11 Pipa PVC Ukuran 8" TEBAL Tembilahan Batang Rp 730,210.00
12 Pipa PVC Ukuran 10" TEBAL Tembilahan Batang Rp 1,146,210.00
13 Pipa PVC Ukuran 12" TEBAL Tembilahan Batang Rp 1,627,210.00
14 Pipa Galvanis 1/2" TIPIS Tembilahan Batang Rp 65,520.00
15 Pipa Galvanis 1/2" TEBAL Tembilahan Batang Rp 125,320.00
16 Pipa Galvanis 3/4" TIPIS Tembilahan Batang Rp 86,320.00
17 Pipa Galvanis 3/4" TEBAL Tembilahan Batang Rp 189,020.00
18 Pipa Galvanis 1" TIPIS Tembilahan Batang Rp 90,220.00
19 Pipa Galvanis 1" TEBAL Tembilahan Batang Rp 222,820.00
20 Pipa Galvanis 1,5" TIPIS Tembilahan Batang Rp 142,220.00
21 Pipa Galvanis 1,5" TEBAL Tembilahan Batang Rp 285,220.00
22 Pipa Galvanis 2,5" TIPIS Tembilahan Batang Rp 407,420.00
23 Pipa Galvanis 2,5" TEBAL Tembilahan Batang Rp 465,920.00
24 Pipa Galvanis 3" TIPIS Tembilahan Batang Rp 504,920.00
25 Pipa Galvanis 3" TEBAL Tembilahan Batang Rp 563,420.00
26 Pipa HDPE Uk. 20 SDR 21 (PN 8) Jakarta M'
27 Pipa HDPE Uk. 25 SDR 21 (PN 8) Jakarta M'
28 Pipa HDPE Uk. 32 SDR 21 (PN 8) Jakarta M'
29 Pipa HDPE Uk. 40 SDR 21 (PN 8) Jakarta M' Rp 18,150.00
30 Pipa HDPE Uk. 50 SDR 21 (PN 8) Jakarta M' Rp 28,850.00
31 Pipa HDPE Uk. 63 SDR 21 (PN 8) Jakarta M' Rp 44,100.00
32 Pipa HDPE Uk. 75 SDR 21 (PN 8) Jakarta M' Rp 63,150.00
33 Pipa HDPE Uk. 90 SDR 21 (PN 8) Jakarta M' Rp 90,550.00
34 Pipa HDPE Uk. 110 SDR 21 (PN 8) Jakarta M' Rp 135,500.00
35 Pipa HDPE Uk. 160 SDR 21 (PN 8) Jakarta M' Rp 282,400.00
36 Pipa HDPE Uk. 200 SDR 21 (PN 8) Jakarta M' Rp 458,900.00
37 Pipa HDPE Uk. 250 SDR 21 (PN 8) Jakarta M' Rp 708,000.00
38 Pipa HDPE Uk. 315 SDR 21 (PN 8) Jakarta M' Rp 1,121,800.00
39 Pipa HDPE Uk. 355 SDR 21 (PN 8) Jakarta M' Rp 1,425,550.00
40 Pipa HDPE Uk. 400 SDR 21 (PN 8) Jakarta M' Rp 1,818,550.00
41 Pipa HDPE Uk. 450 SDR 21 (PN 8) Jakarta M' Rp 2,297,000.00
42 Pipa HDPE Uk. 500 SDR 21 (PN 8) Jakarta M' Rp 2,831,250.00
43 Pipa HDPE Uk. 630 SDR 21 (PN 8) Jakarta M' Rp 4,473,850.00
44 Pipa HDPE Uk. 710 SDR 21 (PN 8) Jakarta M' Rp 5,885,200.00
45 Pipa HDPE Uk. 800 SDR 21 (PN 8) Jakarta M' Rp 7,446,700.00
46 Pipa HDPE Uk. 20 SDR 17 (PN 10) Jakarta M'
47 Pipa HDPE Uk. 25 SDR 17 (PN 10) Jakarta M'
48 Pipa HDPE Uk. 32 SDR 17 (PN 10) Jakarta M' Rp 14,400.00
49 Pipa HDPE Uk. 40 SDR 17 (PN 10) Jakarta M' Rp 22,700.00
50 Pipa HDPE Uk. 50 SDR 17 (PN 10) Jakarta M' Rp 34,450.00
51 Pipa HDPE Uk. 63 SDR 17 (PN 10) Jakarta M' Rp 54,900.00
52 Pipa HDPE Uk. 75 SDR 17 (PN 10) Jakarta M' Rp 77,400.00
53 Pipa HDPE Uk. 90 SDR 17 (PN 10) Jakarta M' Rp 111,050.00
54 Pipa HDPE Uk. 110 SDR 17 (PN 10) Jakarta M' Rp 164,750.00
55 Pipa HDPE Uk. 160 SDR 17 (PN 10) Jakarta M' Rp 343,400.00
56 Pipa HDPE Uk. 200 SDR 17 (PN 10) Jakarta M' Rp 558,550.00
57 Pipa HDPE Uk. 250 SDR 17 (PN 10) Jakarta M' Rp 867,600.00
58 Pipa HDPE Uk. 315 SDR 17 (PN 10) Jakarta M' Rp 1,379,600.00
59 Pipa HDPE Uk. 355 SDR 17 (PN 10) Jakarta M' Rp 1,757,200.00
60 Pipa HDPE Uk. 400 SDR 17 (PN 10) Jakarta M' Rp 2,217,750.00
61 Pipa HDPE Uk. 450 SDR 17 (PN 10) Jakarta M' Rp 2,808,950.00
62 Pipa HDPE Uk. 500 SDR 17 (PN 10) Jakarta M' Rp 3,460,300.00
63 Pipa HDPE Uk. 630 SDR 17 (PN 10) Jakarta M' Rp 5,493,050.00
64 Pipa HDPE Uk. 710 SDR 17 (PN 10) Jakarta M' Rp 7,219,800.00
65 Pipa HDPE Uk. 800 SDR 17 (PN 10) Jakarta M' Rp 9,150,650.00
66 Pipa HDPE Uk. 20 SDR 13,6 (PN 12,5) Jakarta M'
67 Pipa HDPE Uk. 25 SDR 13,6 (PN 12,5) Jakarta M' Rp 11,000.00
68 Pipa HDPE Uk. 32 SDR 13,6 (PN 12,5) Jakarta M' Rp 17,900.00
69 Pipa HDPE Uk. 40 SDR 13,6 (PN 12,5) Jakarta M' Rp 27,150.00
70 Pipa HDPE Uk. 50 SDR 13,6 (PN 12,5) Jakarta M' Rp 41,950.00
71 Pipa HDPE Uk. 63 SDR 13,6 (PN 12,5) Jakarta M' Rp 66,450.00
72 Pipa HDPE Uk. 75 SDR 13,6 (PN 12,5) Jakarta M' Rp 92,550.00
73 Pipa HDPE Uk. 90 SDR 13,6 (PN 12,5) Jakarta M' Rp 132,750.00
74 Pipa HDPE Uk. 110 SDR 13,6 (PN 12,5) Jakarta M' Rp 199,250.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
75 Pipa HDPE Uk. 160 SDR 13,6 (PN 12,5) Jakarta M' Rp 417,300.00
76 Pipa HDPE Uk. 200 SDR 13,6 (PN 12,5) Jakarta M' Rp 678,100.00
77 Pipa HDPE Uk. 250 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,060,750.00
78 Pipa HDPE Uk. 315 SDR 13,6 (PN 12,5) Jakarta M' Rp 1,683,650.00
79 Pipa HDPE Uk. 355 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,134,150.00
80 Pipa HDPE Uk. 400 SDR 13,6 (PN 12,5) Jakarta M' Rp 2,704,600.00
81 Pipa HDPE Uk. 450 SDR 13,6 (PN 12,5) Jakarta M' Rp 3,426,250.00
82 Pipa HDPE Uk. 500 SDR 13,6 (PN 12,5) Jakarta M' Rp 4,223,450.00
83 Pipa HDPE Uk. 630 SDR 13,6 (PN 12,5) Jakarta M'
84 Pipa HDPE Uk. 710 SDR 13,6 (PN 12,5) Jakarta M'
85 Pipa HDPE Uk. 800 SDR 13,6 (PN 12,5) Jakarta M'
86 Pipa HDPE Uk. 20 SDR 11 (PN 16) Jakarta M' Rp 8,800.00
87 Pipa HDPE Uk. 25 SDR 11 (PN 16) Jakarta M' Rp 12,550.00
88 Pipa HDPE Uk. 32 SDR 11 (PN 16) Jakarta M' Rp 21,700.00
89 Pipa HDPE Uk. 40 SDR 11 (PN 16) Jakarta M' Rp 32,650.00
90 Pipa HDPE Uk. 50 SDR 11 (PN 16) Jakarta M' Rp 51,000.00
91 Pipa HDPE Uk. 63 SDR 11 (PN 16) Jakarta M' Rp 80,250.00
92 Pipa HDPE Uk. 75 SDR 11 (PN 16) Jakarta M' Rp 110,150.00
93 Pipa HDPE Uk. 90 SDR 11 (PN 16) Jakarta M' Rp 159,400.00
94 Pipa HDPE Uk. 110 SDR 11 (PN 16) Jakarta M' Rp 240,500.00
95 Pipa HDPE Uk. 160 SDR 11 (PN 16) Jakarta M' Rp 505,950.00
96 Pipa HDPE Uk. 200 SDR 11 (PN 16) Jakarta M' Rp 823,050.00
97 Pipa HDPE Uk. 250 SDR 11 (PN 16) Jakarta M' Rp 1,282,150.00
98 Pipa HDPE Uk. 315 SDR 11 (PN 16) Jakarta M'
99 Pipa HDPE Uk. 355 SDR 11 (PN 16) Jakarta M'
100 Pipa HDPE Uk. 400 SDR 11 (PN 16) Jakarta M'
101 Pipa HDPE Uk. 450 SDR 11 (PN 16) Jakarta M'
102 Pipa HDPE Uk. 500 SDR 11 (PN 16) Jakarta M'
103 Pipa HDPE Uk. 630 SDR 11 (PN 16) Jakarta M'
104 Pipa HDPE Uk. 710 SDR 11 (PN 16) Jakarta M'
105 Pipa HDPE Uk. 800 SDR 11 (PN 16) Jakarta M'
106 Elbo PVC 1/2" Tembilahan Buah Rp 4,264.00
107 Elbo PVC 1/4" Tembilahan Buah Rp 6,084.00
108 Elbo PVC 3/4" Tembilahan Buah Rp 4,784.00
109 Elbo PVC 1" Tembilahan Buah Rp 8,034.00
110 Elbo PVC 1,5" Tembilahan Buah Rp 9,334.00
111 Elbo PVC 2" Tembilahan Buah Rp 13,234.00
112 Elbo PVC 2,5" Tembilahan Buah Rp 19,734.00
113 Elbo PVC 3" Tembilahan Buah Rp 26,234.00
114 Elbo Galvanis 1/2" Tembilahan Buah Rp 17,355.00
115 Elbo Galvanis 1/4" Tembilahan Buah Rp 21,255.00
116 Elbo Galvanis 3/4" Tembilahan Buah Rp 18,655.00
117 Elbo Galvanis 1" Tembilahan Buah Rp 27,755.00
118 Elbo Galvanis 1,5" Tembilahan Buah Rp 45,955.00
119 Elbo Galvanis 2" Tembilahan Buah Rp 75,205.00
120 Elbo Galvanis 2,5" Tembilahan Buah Rp 125,255.00
121 Elbo Galvanis 3" Tembilahan Buah Rp 196,105.00
122 Socket PVC 1/2" Tembilahan Buah Rp 4,134.00
123 Socket PVC 3/4" Tembilahan Buah Rp 4,784.00
124 Socket PVC 1" Tembilahan Buah Rp 6,084.00
125 Socket PVC 1,5" Tembilahan Buah Rp 6,734.00
126 Socket PVC 2" Tembilahan Buah Rp 7,384.00
127 Socket Galvanis 1/2" Tembilahan Buah Rp 12,805.00
128 Socket Galvanis 3/4" Tembilahan Buah Rp 16,705.00
129 Socket Galvanis 1" Tembilahan Buah Rp 23,205.00
130 Socket Galvanis 1,5" Tembilahan Buah Rp 33,605.00
131 Socket Galvanis 2" Tembilahan Buah Rp 98,605.00
132 Reducer PVC 1/2" - 3/4" Tembilahan Buah Rp 4,784.00
133 Reducer PVC 1/2" - 1" Tembilahan Buah Rp 5,434.00
134 Reducer PVC 1" - 1,5" Tembilahan Buah Rp 13,884.00
135 Reducer PVC 1,5" - 2" Tembilahan Buah Rp 21,684.00
136 Reducer Galvanis 1/2" - 3/4" Tembilahan Buah Rp 24,505.00
137 Reducer Galvanis 3/4" - 1" Tembilahan Buah Rp 27,105.00
138 Reducer Galvanis 1" - 1,5" Tembilahan Buah Rp 33,605.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
139 Reducer Galvanis 1,5" - 2" Tembilahan Buah Rp 37,505.00
140 Elbow 90 PN10 Ukuran 63 Tembilahan Buah Rp 157,105.00
141 Elbow 90 PN10 Ukuran 75 Tembilahan Buah Rp 261,105.00
142 Elbow 90 PN10 Ukuran 90 Tembilahan Buah Rp 396,305.00
143 Elbow 90 PN10 Ukuran 110 Tembilahan Buah Rp 488,605.00
144 Tee Equal PN10 Ukuran 63 Tembilahan Buah Rp 344,305.00
145 Tee Equal PN10 Ukuran 75 Tembilahan Buah Rp 427,505.00
146 Tee Equal PN10 Ukuran 90 Tembilahan Buah Rp 337,805.00
147 Tee Equal PN10 Ukuran 110 Tembilahan Buah Rp 440,505.00
148 Tee Ukuran 1/2" Tembilahan Buah Rp 5,655.00
149 Tee Ukuran 1/4" Tembilahan Buah Rp 7,605.00
150 Tee Ukuran 3/4" Tembilahan Buah Rp 6,955.00
151 Tee Ukuran 1" Tembilahan Buah Rp 11,505.00
152 Tee Ukuran 1,5" Tembilahan Buah Rp 14,105.00
153 Tee Ukuran2" Tembilahan Buah Rp 16,705.00
154 Tee Ukuran 2,5" Tembilahan Buah Rp 27,105.00
155 Tee Ukuran 3" Tembilahan Buah Rp 37,505.00
156 Tee Ukuran 4” Tembilahan Buah Rp 62,205.00
157 Tee Ukuran 5” Tembilahan Buah Rp 92,105.00
158 Tee Ukuran 6” Tembilahan Buah Rp 163,605.00
159 Tee Ukuran 8” Tembilahan Buah Rp 339,105.00
160 Dop Ukuran 1/2" Tembilahan Buah Rp 3,705.00
161 Dop Ukuran 1/4" Tembilahan Buah Rp 7,605.00
162 Dop Ukuran 3/4" Tembilahan Buah Rp 5,005.00
163 Dop Ukuran 1" Tembilahan Buah Rp 7,605.00
164 Dop Ukuran 1,5" Tembilahan Buah Rp 11,505.00
165 Dop Ukuran 2" Tembilahan Buah Rp 14,105.00
166 Dop Ukuran 2,5" Tembilahan Buah Rp 16,705.00
167 Dop Ukuran 3" Tembilahan Buah Rp 20,605.00
168 Dop Ukuran 4” Tembilahan Buah Rp 37,505.00
169 Coupler Ukuran 20 mm Tembilahan Buah Rp 18,265.00
170 Coupler Ukuran 25 mm Tembilahan Buah Rp 23,985.00
171 Coupler Ukuran 32 mm Tembilahan Buah Rp 38,285.00
172 Coupler Ukuran 40 mm Tembilahan Buah Rp 81,185.00
173 Coupler Ukuran 50 mm Tembilahan Buah Rp 98,345.00
174 Coupler Ukuran 63 mm Tembilahan Buah Rp 165,555.00
175 Coupler Ukuran 90 mm Tembilahan Buah Rp 361,465.00
176 Coupler Ukuran 110 mm Tembilahan Buah Rp 909,441.00
177 Reducer Ukuran 25 mm Tembilahan Buah Rp 26,845.00
178 Reducer Ukuran 32 mm Tembilahan Buah Rp 31,135.00
179 Reducer Ukuran 40 mm Tembilahan Buah Rp 72,605.00
180 Reducer Ukuran 50 mm Tembilahan Buah Rp 114,075.00
181 Reducer Ukuran 63 mm Tembilahan Buah Rp 148,395.00
182 Reducer Ukuran 90 mm Tembilahan Buah Rp 315,705.00
183 Reducer Tee Ukuran 25 mm Tembilahan Buah Rp 41,145.00
184 Reducer Tee Ukuran 32 mm Tembilahan Buah Rp 52,585.00
185 Reducer Tee Ukuran 40 mm Tembilahan Buah Rp 149,825.00
186 Reducer Tee Ukuran 90 mm Tembilahan Buah Rp 881,985.00
187 Male Adaptor Ukuran 20 mm Tembilahan Buah Rp 15,405.00
188 Male Adaptor Ukuran 25 mm Tembilahan Buah Rp 15,977.00
189 Male Adaptor Ukuran 32 mm Tembilahan Buah Rp 31,135.00
190 Male Adaptor Ukuran 40 mm Tembilahan Buah Rp 56,017.00
191 Male Adaptor Ukuran 50 mm Tembilahan Buah Rp 76,609.00
192 Male Adaptor Ukuran 63 mm Tembilahan Buah Rp 94,055.00
193 Male Adaptor Ukuran 90 mm Tembilahan Buah Rp 252,785.00
194 Male Elbow Ukuran 20 mm Tembilahan Buah Rp 16,835.00
195 Male Elbow Ukuran 25 mm Tembilahan Buah Rp 21,125.00
196 Male Elbow Ukuran 32 mm Tembilahan Buah Rp 33,995.00
197 Male Elbow Ukuran 40 mm Tembilahan Buah Rp 66,885.00
198 Male Elbow Ukuran 90 mm Tembilahan Buah Rp 355,745.00
199 Male Tee Ukuran 20 mm Tembilahan Buah Rp 29,705.00
200 Male Tee Ukuran 25 mm Tembilahan Buah Rp 33,995.00
201 Male Tee Ukuran 32 mm Tembilahan Buah Rp 46,865.00
202 Male Tee Ukuran 40 mm Tembilahan Buah Rp 108,355.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
203 Male Tee Ukuran 90 mm Tembilahan Buah Rp 584,545.00
204 Famale Tee Ukuran 20 mm Tembilahan Buah Rp 26,845.00
205 Famale Tee Ukuran 25 mm Tembilahan Buah Rp 38,285.00
206 Famale Tee Ukuran 32 mm Tembilahan Buah Rp 55,445.00
207 Famale Tee Ukuran 90 mm Tembilahan Buah Rp 584,545.00
208 Famale Adaptor Ukuran 20 mm Tembilahan Buah Rp 13,975.00
209 Famale Adaptor Ukuran 25 mm Tembilahan Buah Rp 22,555.00
210 Famale Adaptor Ukuran 32 mm Tembilahan Buah Rp 28,275.00
211 Famale Adaptor Ukuran 50 mm Tembilahan Buah Rp 65,455.00
212 Famale Adaptor Ukuran 63 mm Tembilahan Buah Rp 112,645.00
213 Famale Elbow Ukuran 20 mm Tembilahan Buah Rp 16,835.00
214 Famale Elbow Ukuran 25 mm Tembilahan Buah Rp 25,415.00
215 Famale Elbow Ukuran 32 mm Tembilahan Buah Rp 38,285.00
216 Clamp Saddle Ukuran 32 mm Tembilahan Buah Rp 38,857.00
217 Clamp Saddle Ukuran 40 mm Tembilahan Buah Rp 46,865.00
218 Clamp Saddle Ukuran 50 mm Tembilahan Buah Rp 49,153.00
219 Clamp Saddle Ukuran 63 mm Tembilahan Buah Rp 60,593.00
220 Clamp Saddle Ukuran 90 mm Tembilahan Buah Rp 155,545.00
221 Clamp Saddle Ukuran 110 mm Tembilahan Buah Rp 165,841.00
222 Clamp Saddle Ukuran 160 mm Tembilahan Buah Rp 275,665.00
223 CAP Ukuran 20 mm Tembilahan Buah Rp 10,543.00
224 CAP Ukuran 25 mm Tembilahan Buah Rp 14,690.00
225 CAP Ukuran 32 mm Tembilahan Buah Rp 23,985.00
226 CAP Ukuran 40 mm Tembilahan Buah Rp 44,577.00
227 CAP Ukuran 50 mm Tembilahan Buah Rp 51,441.00
228 CAP Ukuran 63 mm Tembilahan Buah Rp 106,925.00
229 CAP Ukuran 90 mm Tembilahan Buah Rp 219,895.00
230 Lem PVC Tube / Botol Tembilahan Buah Rp 14,105.00
231 Lem PVC Kaleng 500 Gr Tembilahan Kaleng Rp 40,105.00
232 Mesin Pompa Air Tembilahan Buah Rp 651,105.00
233 Water Meter PE 1/2" Tembilahan Buah Rp 261,105.00
234 Water Meter Brass Onda 1/2" Jakarta 1 Pcs/Kotak Rp 655,600.00
235 Water Meter Brass Onda 3/4" Jakarta 1 Pcs/Kotak Rp 1,190,200.00
236 Water Meter Flange 2-1/2" Jakarta 1 Pcs/Dus Rp 2,397,175.00
237 Water Meter flange 3" Jakarta 1 Pcs/Dus Rp 2,806,100.00
238 Water Meter Flange 4" Jakarta 1 Pcs/Dus Rp 3,142,700.00
239 Water Meter Flange 6" Jakarta ! Pcs/Dus Rp 4,376,900.00
240 Water Meter Flange 8" Jakarta 1 Pcs/Dus Rp 5,731,550.00
241 Water Meter Flange 10" Jakarta 1 Pcs/Dus Rp 18,757,200.00
242 Water Meter flange 12" Jakarta 1 Pcs/Dus Rp 23,446,500.00
ALAT LISTRIK DAN ACCESSORIES
1 Titik Lampu + Instalasi Tembilahan Titik Rp 104,088.40
2 Stop kontak + Instalasi Tembilahan Titik Rp 123,544.20
3 Sakelar Tunggal (Biasa) Tembilahan Buah Rp 19,544.20
4 Saklera Ganda (Biasa) Tembilahan Buah Rp 26,044.20
5 Zekering Kas Lokal 1 Group Tembilahan Buah Rp 10,444.20
6 Zekering Kas Lokal 2 Group Tembilahan Buah Rp 17,257.50
7 Tool Listrik Tembilahan Set Rp 2,992,210.00
8 Gerinda Tembilahan Buah Rp 392,210.00
9 Mesin Bor Listrik Tembilahan Buah Rp 366,210.00
10 Alat Las Tembilahan Buah Rp 262,210.00
11 Multitester Tembilahan Buah Rp 1,042,210.00
12 Tang Ampere Tembilahan Buah Rp 327,210.00
13 Kabel Tuistik 2 X 10 mm Tembilahan Unit Rp 11,310.00
14 Kabel Nym 2 X 2,5 mm Tembilahan M2 Rp 21,710.00
15 Klem Percing Tembilahan M2 Rp 38,610.00
16 Klem Week Tembilahan Unit Rp 19,110.00
17 Lampu Led Strip 2835 Kelap Kelip Merah P. 100 M Tembilahan M Rp 28,210.00
18 Lampu Led Strip 2835 Kelap Kelip Kuning P. 100 M Tembilahan M Rp 28,210.00
19 Lampu Led Strip 2835 Kelap Kelip Hijau P. 100 M Tembilahan M Rp 28,210.00
20 Lampu Led Strip 2835 Kelap Kelip Biru P. 100 M Tembilahan M Rp 28,210.00
21 Adaptor / Mesin Lampu Strip 220 V Tembilahan Buah Rp 106,210.00
22 Lampu Sorot Vl 6100 50 Watt Tembilahan Buah Rp 262,210.00
23 Time Switch / Theben Tembilahan Buah Rp 496,210.00
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
24 Kabel Ties 200 mm Tembilahan Buah Rp 2,860.00
25 Ncb 10 A Tembilahan Buah Rp 93,210.00
26 Mesin Genset Tembilahan Buah Rp 3,902,210.00
27 Mesin Diesel 12 KVA Tembilahan Buah Rp 65,002,210.00
28 Isolasi Tembilahan Buah Rp 15,210.00
CAT DAN PENGAWET
1 Cat Air Kualitas Standar Tembilahan Kilogram Rp 24,310.00
2 Cat Air Kualitas Sedang Tembilahan Kilogram Rp 38,610.00
3 Cat Air Kualitas Baik Tembilahan Kilogram Rp 112,710.00
4 Cat Minyak Kualitas Standar Tembilahan Kilogram Rp 82,062.50
5 Cat Minyak Kualitas Sedang Tembilahan Kilogram Rp 95,066.40
6 Cat Minyak Kualitas Baik Tembilahan Kilogram Rp 113,638.20
7 Cat Dasar Kayu Tembilahan Kilogram Rp 39,352.30
8 Plamir / Dempul Tembilahan Kilogram Rp 17,160.00
9 Cat Menie Tembilahan Kilogram Rp 39,352.30
10 Teer / Residu Tembilahan Kilogram Rp 28,210.00
11 Minyak Cat / Thinner Tembilahan Liter Rp 37,310.00
12 Cat Marka Jalan (Thermo Plastic) Tembilahan Kilogram Rp 73,710.00
13 Blass Bit Tembilahan Kilogram Rp 60,710.00
PERALATAN KERJA
1 Cangkul Tembilahan Buah Rp 54,210.00
2 Parang Tembilahan Buah Rp 236,210.00
3 Gunting Pangkas Tembilahan Buah Rp 93,210.00
4 Gunting Setek Tembilahan Buah Rp 54,210.00
5 Sendok Dempol/ Sekrap Tembilahan Buah Rp 8,710.00
6 Garu/ Garpu Tembilahan Buah Rp 132,210.00
7 Gerobak Sorong Tembilahan Buah Rp 782,210.00
8 Kaca Mata Pengaman Tembilahan Buah Rp 67,210.00
9 Plang Rambu Tembilahan M Rp 67,210.00
10 Sekop Tembilahan Buah Rp 106,210.00
11 Pakaian Kerja THL (Setelan) Tembilahan Buah Rp 197,210.00
12 Sepatu Bot Karet Tembilahan Pasang Rp 132,210.00
13 Sarung Tangan Karet Tembilahan Buah Rp 67,210.00
14 Helm Tembilahan Buah Rp 67,210.00
15 Sarung Tangan 20 KV Tembilahan Buah Rp 652,210.00
16 Rompi Scotlight Tembilahan Buah Rp 67,210.00
17 Sepatu Safety Tembilahan Buah Rp 522,210.00
18 Tali Safety Tembilahan Set Rp 457,210.00
HARGA SEWA ALAT
1 Asphalt Mixing Plant Jam Rp 4,265,013.00
2 Asphalt Finisher Jam Rp 1,055,618.83
3 Asphalt Sprayer Jam Rp 316,841.10
4 Buldozer 100 -150 HP Jam Rp 546,145.86
5 Compressor 4000 - 6500 L/M Jam Rp 276,795.80
6 Concrete Mixer 0,3 - 0,6 M3 Jam Rp 75,000.00
7 Crane 10 -15 Ton Jam Rp 614,539.30
8 Dump Truck 3 - 4 M3 Jam Rp 294,430.00
9 Dump Truck Jam Rp 560,934.35
10 Excavator 80 - 140 HP Jam Rp 697,044.11
11 Flat Bed Truck 3 - 4 M3 Jam Rp 346,404.15
12 Generator Set Jam Rp 462,863.00
13 Motor Grader > 100 HP Jam Rp 928,857.51
14 Track Loader 75 - 100 HP Jam Rp 604,495.20
15 Wheel Loader 1,0 - 1,6 M3 Jam Rp 797,751.89
16 Three Wheel Roller 6 - 8 T Jam Rp 236,410.10
17 Tandem Roller 6 - 8 T Jam Rp 583,048.61
18 Tire Roller 8 - 10 T Jam Rp 638,974.27
19 Vibratory Roller 5 - 8 T Jam Rp 385,205.22
20 Concrete Vibrator Jam Rp 39,935.00
21 Stone Crusher Jam Rp 788,020.25
22 Water Pump 70 - 100 mm Jam Rp 29,934.00
23 Water Tanker 3000 - 4500 L Jam Rp 251,385.00
24 Pedestrian Roller Jam Rp 72,599.50
25 Tamper Jam Rp 48,180.40
LOKASI

HARGA
LOKASI STANDAR
NO. JENIS UPAH/BAHAN/SEWA ALAT SATUAN GAUNG
BAHAN
(TERMASUK
OVER HEAD +
KEUNTUNGAN)

1 2 3 4 5
26 Jack Hammer Jam Rp 42,236.05
27 Fulvi Mixer Jam Rp 241,202.15
28 Concrete Pump Jam Rp 355,629.45
29 Trailer 20 Ton Jam Rp 761,218.35
30 Pile Driver + Hammer Jam Rp 328,598.70
31 Crane On Track 35 Ton Jam Rp 459,843.60
32 Welding Set Jam Rp 295,884.65
33 Bore Pile Machine Jam Rp 1,128,331.70
34 Ponton Jam Rp 345,000.00
35 Tug Boat Jam Rp 230,000.00

Direkap Oleh :
Panitia Penyusunan Standar
Bahan dan Upah (HSBU)
Sekretaris,

H. SUDARTO, SE
NIP. 19740905 199403 1 006

Disetujui Oleh :
Kepala Dinas Pekerjaan Umum dan Tata Ruang
Kabupaten Indragiri Hilir
Pelindung,

UMAR, ST, MT
NIP. 19681010 200003 1 005

Anda mungkin juga menyukai