PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

ELEVASI TIMBUNAN PILIHAN 50 CM

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 2 STA. 0 S/D 135

PLAN : SURVEY

DATE : 2/2/2021

BENCH MARK : X : 777906.221 Y: 9874351.653 Z: 10.166


ELEVASI
TEBAL LEBAR
STA TITIK AWAL (a) AKHIR (b) KETERANGAN

(m) (m) t=(b-a) (m)


1 9.455 9.969 0.514

0+000 2 9.480 10.002 0.522 5.20

3 9.444 9.943 0.499


4 9.470 9.979 0.509

0+025 5 9.561 10.086 0.525 5.20

6 9.482 9.999 0.517


7 9.811 10.327 0.516

0+050 8 9.910 10.437 0.527 5.15

9 9.913 10.427 0.514


10 10.974 11.482 0.508

0+075 11 11.060 11.570 0.510 5.10

12 11.093 11.591 0.498


13 11.101 11.599 0.498

0+100 14 11.214 11.741 0.527 5.10

15 11.140 11.642 0.502


16 11.155 11.650 0.495

0+125 17 11.152 11.681 0.529 5.20

18 11.156 11.679 0.523


19 11.562 12.070 0.508

0+135 20 11.655 12.167 0.512 5.05

21 11.607 12.104 0.497

Tebal Dan Lebar Rata - Rata 0.51 5.14

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas
PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

ELEVASI BOULDER STONE BATU BELAH HITAM 35 CM

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 2 STA. 0 S/D 135

PLAN : SURVEY

DATE : 19/02/2021

BENCH MARK : X : 777906.221 Y: 9874351.653 Z: 10.166


ELEVASI
TEBAL LEBAR
STA TITIK AWAL (a) AKHIR (b) KETERANGAN

(m) (m) t=(b-a) (m)


1 9.969 10.323 0.354

0+000 2 10.002 10.367 0.365 5.10

3 9.943 10.303 0.360


4 9.979 10.330 0.351

0+025 5 10.086 10.449 0.363 5.00

6 9.999 10.349 0.350


7 10.327 10.679 0.352

0+050 8 10.437 10.803 0.366 5.00

9 10.427 10.786 0.359


10 11.482 11.836 0.354

0+075 11 11.570 11.932 0.362 5.00

12 11.591 11.949 0.358


13 11.599 11.953 0.354

0+100 14 11.741 12.104 0.363 5.00

15 11.642 11.996 0.354


16 11.650 12.014 0.364

0+125 17 11.681 12.049 0.368 5.00

18 11.679 12.043 0.364


19 12.070 12.429 0.359

0+135 20 12.167 12.541 0.374 5.00

21 12.104 12.451 0.347

Tebal Dan Lebar Rata - Rata 0.36 5.01

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas
PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

SKETSA PENGUKURAN

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 2 STA. 0 S/D 135

PLAN : SURVEY

DATE :
BENCH MARK : X : 777906.221 Y: 9874351.653 Z: 10.166

ST
A0
1

+0
00
2

ST
A0
+0
25
4
6

STA 0 + 05
8

0
9
10

S
TA 0 + 07
11

5
12
13

STA 0 +
14

100
15
16
17

TA 0 S
18

+ 125
19

STA
0+1
35

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas
PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

ELEVASI TIMBUNAN PILIHAN 50 CM

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 1 STA. 0 S/D 192

PLAN : SURVEY

DATE : 18/02/2021

BENCH MARK : X : 777906.221 Y: 9874351.653 Z: 10.166


ELEVASI
TEBAL LEBAR
STA TITIK AWAL (a) AKHIR (b) KETERANGAN

(m) (m) t=(b-a) (m)


1 9.950 10.463 0.513

0+000 2 9.985 10.516 0.531 5.30

3 9.906 10.393 0.487


4 10.545 11.050 0.505

0+025 5 10.808 11.343 0.535 5.20

6 10.552 11.064 0.512


7 10.061 10.578 0.517

0+050 8 10.281 10.811 0.530 5.10

9 10.155 10.667 0.512


10 14.257 14.756 0.499

0+075 11 14.405 14.933 0.528 5.10

12 14.343 14.833 0.490


13 16.986 17.510 0.524

0+100 14 17.044 17.582 0.538 5.00

15 17.395 17.890 0.495


16 16.485 16.997 0.512

0+125 17 16.607 17.127 0.520 5.05

18 16.574 17.087 0.513


19 14.229 14.729 0.500

0+150 20 14.143 14.667 0.524 5.20

21 14.002 14.501 0.499


22 12.238 12.758 0.520

0+175 23 12.434 12.966 0.532 5.05

24 12.409 12.910 0.501


25 12.083 12.598 0.515

0+192 26 12.197 12.719 0.522 5.20

27 12.179 12.669 0.490

Tebal Dan Lebar Rata - Rata 0.51 5.13

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas
PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

ELEVASI BOULDER STONE BATU BELAH HITAM 35 CM

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 1 STA. 0 S/D 192

PLAN : SURVEY

DATE :
BENCH MARK : X : 778019.988 Y: 9874473.070 Z: 10.166
ELEVASI
TEBAL LEBAR
STA TITIK AWAL (a) AKHIR (b) KETERANGAN

(m) (m) t=(b-a) (m)


K1 10.463 10.807 0.344

0+000 AS 10.516 10.876 0.360 5.10

K2 10.393 10.733 0.340


K1 11.050 11.400 0.350

0+025 AS 11.343 11.721 0.378 5.10

K2 11.064 11.414 0.350


K1 10.578 10.935 0.357

0+050 AS 10.811 11.190 0.379 5.00

K2 10.667 11.016 0.349


K1 14.756 15.115 0.359

0+075 AS 14.933 15.292 0.359 5.00

K2 14.833 15.182 0.349


K1 17.510 17.870 0.360

0+100 AS 17.582 17.970 0.388 5.00

K2 17.890 18.238 0.348


K1 16.997 17.341 0.344

0+125 AS 17.127 17.501 0.374 5.00

K2 17.087 17.452 0.365


K1 14.729 15.093 0.364

0+150 AS 14.667 15.044 0.377 5.10

K2 14.501 14.847 0.346


K1 12.758 13.098 0.340

0+175 AS 12.966 13.336 0.370 5.05

K2 12.910 13.263 0.353


K1 12.598 12.967 0.369

0+192 AS 12.719 13.088 0.369 5.00

K2 12.669 13.022 0.353

Tebal Dan Lebar Rata - Rata 0.36 5.04

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas
PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

SKETSA PENGUKURAN

OWNER/CLIENT : PT. PERTAMNA EP ASSET 4 FIELD

CONTRACTOR : PT. RAMAI JAYA ABADI

PROJECT : PERBAIKAN AKSES SUMUR KLAMONO TAHAP II PAPUA FIELD

LOCATION : SP 4 SEGMENT 1 STA. 0 S/D 192

PLAN : SURVEY

DATE :
BENCH MARK : X : 778019.988 Y: 9874473.070 Z: 10.166

ST
A0
+
2

000
3

TA S
4

+0 0
25
6 5
ST
0+ A
7

050
8
9

STA 0 + 075
10
11

12

STA 0 + 100
13

14
15

STA 0
16

+ 125
17

STA
18

0+
150
19
20

21

ST
A0
22

+1
75
23

ST
A
24

0
+
19
2

Di buat oleh : Mengetahui :


Disetujui Oleh :
PT.RAMAI JAYA ABADI PT. PERTAMINA EP ASSET 4 FIELD

M. Ramadhan Akhmad Heryanto Firman Priatna


Site Manager PMC Pengawas