REKAMAN PLANNING

No. PLAN DO

DOKUMEN & MELENGKAPI PRO. YANG


1
PROSEDUR BELUM ADA

TPS 01 - DOKUMEN

TPS 02 - MOTORAN
2 5R (RINGKAS) TPS 03 - BESI RE-USE

TPS 04 - MS. BREAKDOWN

TPS 05 - GENSET

TPS 06 - LIMBAH B3

PENANDAAN AREA
PRODUKSI KASSA

PENANDAAN GUDANG
PENANDAAN KAPAS

3 5R (RAPI)
PENANDAAN TENUN

PENANDAAN AREA UMUM

LAY-OUT

4 5R (RESIK) PEMBUATAN JADWAL PIKET

5 5R (RAWAT) ON PROGRESS

AKTIFASI KEMBALI DAN


6 IPAL
PERAPIHAN
AKTIFASI KEMBALI DAN
6 IPAL
PERAPIHAN

PEMASANGAN TEMPAT CUCI


TANGAN/WASTAFEL

PROGRAM SABUN CUCI TANGAN


7
HYGIENE
HANDSANITAZER

PRO. CUCI TANGAN


KOTAK P3K
8 PROGRAM K3
TIM P3K
CAT PAGAR
CAT PARKIRAN

9 FASILITAS UMUM PAPAN NAMA PERUSAHAAN

PENGENDALIAN HAMA

PROGRAM SWAB ANTIGEN


10 COVID-19
PROGRAM VAKSINASI
REKAMAN PLANNING GA & K3

CHECK ACT % SEKARANG

PENGGABUNGAN PRO.
ON PROGRESS 70%
HRD&GA
(-) PRO. MEMASUKI WILAYAH
SEDANG DIBUAT BANNER 70%
PERUSAHAAN
PINDAH B3 PADAT
(ELEKTRONIK&BEKAS LAB) SEDANG MERAPIKAN TPS 06
70%
KE TPS 06 KARENA TERMASUK (LIMBAH B3)
B3
OK DIRAPIHKAN KEMBALI 90%
OK DIRAPIHKAN KEMBALI 90%

KURANG INVENTARIS SEDANG DIINVENTARIS 70%

OK DIRAPIHKAN KEMBALI 90%


SAMPING BATUBARA SEDANG
ON PROGRESS 70%
DIRAPIHKAN

(-) SPANRAM ON PROGRESS 60%

(-) PROSES/OBAT ON PROGRESS 60%

OK PEMANTAUAN 95%
OK PEMANTAUAN 95%
(-) TENUNAN ON PROGRESS 60%
(-) WARPING ON PROGRESS 60%
(-) PALETAN ON PROGRESS 60%
(-) SIZING ON PROGRESS 60%
SUDAH DIPESAN,
(-) MUSHOLLA (1), TOILET (1) 70%
MENUNGGU PEMBELIAN
(-) KASSA LIPATAN ON PROGRESS 60%
(-) TENUNAN ON PROGRESS 60%
(-) SPANRAM ON PROGRESS 60%

(-) SUDAH ADA JADWAL PIKET,


PENGAWASAN 90%
BUTUH PENGAWASAN

(-) STANDARISASI DENGAN


ON PROGRESS
PAMFLET/BANNER
BELUM MENCAPAI BAKU
SEDANG DICOBA 50%
MUTU
PERBANDINGAN IN OUT JAUH PEMIONDAHAN BAK 50%

MENUNGGU PLAN DARI


KURANG DI BAGIAN PROSES 90%
MAINTENANCE
SUDAH DIPESAN,
KURANG SEMUANYA 0%
MENUNGGU PEMBELIAN
SUDAH DIPESAN,
KURANG SEMUANYA 0%
MENUNGGU PEMBELIAN
OK OK 100%
OK OK 100%
OK OK 100%
BARU GERBANG DALEM ON PROGRESS 60%
BARU GARIS AWAL ON PROGRESS 50%

OK OK 90%

OK PEMANTAUAN 100%
OK PEMANTAUAN 90%
PROBLEM TARGET

DESIGN

TERLALU BANYAK
BARANG/MESIN

-
-
TERLALU BANYAK
BARANG/MESIN
-
TERLALU BANYAK
BARANG/MESIN
MENUNGGU DI
PLESTER (LANTAI)
BANGUNAN
MENUNGGU DI
PLESTER (LANTAI)
BANGUNAN
-
-
MENUNGGU PERKAP
MENUNGGU PERKAP
MENUNGGU PERKAP
MENUNGGU PERKAP

-
20 SEPTEMBER 2021

MENUNGGU PERKAP
MENUNGGU PERKAP
MENUNGGU PERKAP

DESIGN

BUTUH PIHAK KE III


20 SEPT
BUTUH PIHAK KE III

-
-
-
MUSIM HUJAN
MUSIM HUJAN

ADA PROBLEM BARU,


YAITU SARANG LEBAH

-
-

PARAF

RAFLI AULIA PRATAMA