1 : TINGKAT KOMPONEN DALAM NEGERI UNTUK BAHAN BAKU (BAHAN BAKU LANGSUNG / TIDAK LANGSUNG)
1 As Besi Ø15.875 mm x 5000 mm Pcs Indonesia PT Camellia Metal Indonesia 50% 0.3 Rp116,520.00 17,478.00 17,478.00
PT Anugerah Bintang Buana
2 Plat Besi 3 x 30 mm x 6 m Btg Indonesia
Abadi
50% 0.0083 Rp40,000.00 166.00 166.00
3 HCL Kg Indonesia PT Cahaya Wangsa Jaya 30% 0.06 Rp2,000.00 36.00 84.00
4 Sodium Sianida Kg Indonesia PT Samdan Vivon Jaya 0% 0.019 Rp125,000.00 - 2,375.00
5 Phosporized Copper Kg Indonesia PT Samdan Vivon Jaya 0% 0.024 Rp164,000.00 - 3,936.00
6 Asam Sulfat Kg Indonesia PT Samdan Vivon Jaya 0% 0.06 Rp3,300.00 - 198.00
7 Copper Sulfat Kg Indonesia PT Sinarkimia Utama 0% 0.06 Rp34,300.00 - 2,058.00
8 Cupronas CU 195 Kg Indonesia PT Bintang Permata Semesta 30% 0.08 Rp100,000.00 2,400.00 5,600.00
9 Laque Nikasan Laquare Kg Indonesia PT Samdan Vivon Jaya 0% 0.005 Rp145,000.00 - 725.00
10 Booster CS 6-05 Kg Indonesia PT Dutakimia Berjaya 50% 0.00041 Rp32,000.00 6.56 6.56
- -
- -
TOTAL 20,086.56 32,626.56
BAKU LANGSUNG / TIDAK LANGSUNG)
Biaya (Rp)
Total
(10)
KDN + KLN
34,956.00
332.00
120.00
2,375.00
3,936.00
198.00
2,058.00
8,000.00
725.00
13.12
-
-
52,713.12
FORMULIR 1.2. : TINGKAT KOMPONEN DALAM NEGERI UNTUK BAHAN BAKU (JASA-JASA TERKAIT)
Biaya (Rp)
Total
(8)
KDN + KLN
5,271.31
-
-
-
-
-
-
-
-
5,271.31
FORMULIR 1.3. : TINGKAT KOMPONEN DALAM NEGERI UNTUK TENAGA KERJA LANGSUNG
Biaya (Rp)
KLN Total
(8)
(100%-(4)) x (5) x (6) x (7) KDN + KLN
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,466,186.00
- 4,566,186.00
- 58,160,418.00
250,000
- 232.64
FORMULIR 1.4 : TINGKAT KOMPONEN DALAM NEGERI UNTUK TENAGA KERJA LANGSUNG (UNTUK BIAYA TERKAIT LAINNYA)
Biaya (Rp)
8,919,888.60
14,140,274.00
-
-
-
-
-
-
-
-
23,060,162.60
250,000
92.24
FORMULIR 1.5 : TINGKAT KOMPONEN DALAM NEGERI UNTUK BIAYA TIDAK LANGSUNG PABRIK (TENAGA KERJA TIDAK LANGSUNG / MANAJEMEN)
Biaya (Rp)
Total
(8)
KDN + KLN
5,036,186.00
3,060,000.00
3,196,330.20
5,355,000.00
-
-
-
-
-
16,647,516.20
250,000
66.59
FORMULIR 1.6 : TINGKAT KOMPONEN DALAM NEGERI UNTUK BIAYA TIDAK LANGSUNG PABRIK (UNTUK MESIN / ALAT KERJA YANG DIMILIKI SENDIRI)
1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
TOTAL - - -
Kapasitas normal per bulan
Biaya produksi per 1 (satu) satuan produk - - -
FORMULIR 1.8 : TINGKAT KOMPONEN DALAM NEGERI UNTUK BIAYA TIDAK LANGSUNG PABRIK (UNTUK JASA-JASA TERKAIT)
Biaya (Rp)
Total
(8)
KDN + KLN
45,820,214.00
1,133,839.00
879,682.67
61,007,248.00
16,056,220.00
2,845,271.00
127,742,474.67
250,000
510.97
FORMULIR 1.9 : REKAPITULASI PENILAIAN
TINGKAT KOMPONEN DALAM NEGERI ( BARANG )
Biaya
TKDN
Uraian
(%)
KDN KLN Total
Formulasi Perhitungan :