(BOQ)
Jumlah Harga
No Uraian Pekerjaan
( Rp )
A PEKERJAAN PERSIAPAN -
B PEKERJAAN TANAH & PEMATANGAN LAHAN -
1 PEKERJAAN TANAH & PEMATANGAN LAHAN -
2 TALUD & PENGAMAN TEBING -
C SARANA UTAMA NURSERI -
1 GREENHOUSE (RUMAH BEDENG TABUR) -
2 SHADING HOUSE (RUMAH NAUNGAN)
3.A RUMAH PRODUKSI DAN GUDANG
3.B MESIN PENGADUK DAN PENGISI MEDIA
D EMPALASEMEN DAN SARANA PENDUKUNG
1 KANTOR NURSERY
2 RUMAH MANAJER (RUMAH TIPE 70)
3 RUMAH PENGAWAS (RUMAH TIPE 45)
4 RUMAH PEKERJA (RUMAH TIPE 36)
5.A RUMAH POMPA 1
5.B POMPA DAN ME RUMAH POMPA 1
6.A RUMAH POMPA 2 (EMBUNG)
6.B POMPA DAN ME RUMAH POMPA 2
7.A RUMAH GENSET
7.B GENSET DAN PANEL LISTRIK
8 SUMUR BOR
9 RESERVOIR
10 EMBUNG
11 WATER TOWER
12 KOLAM AIR LIMBAH
13 SAUNG/GAZEBO
14 TOILET UMUM
15 INSTALASI DISTRIBUSI AIR BERSIH KAWASAN
16 INSTALASI LISTRIK KAWASAN
17 JALAN LINGKUNGAN DAN DRAINASE
18 POS KEAMANAN, GERBANG GAPURA, PAPAN NAMA DAN PAGAR DEPAN
19 PAGAR KELILING
20 PARKIR DAN LANSKAP
21 RENOVASI RUMAH JAGA EKSISTING
22 RENOVASI GEDUNG AULA EKSISTING
E PRASARANA KEBUN INDUK
1 JALAN KEBUN INDUK
2 PENGAIRAN KEBUN INDUK
3 PAGAR KEBUN INDUK
JUMLAH 34,734,519,116.48
PPN 10% 3,473,451,911.65
JUMLAH TOTAL + PPN 38,207,971,028.13
DIBULATKAN 38,207,971,000.00
nilai terbilang :
47,207,971,000.00
46,050,000,000.00
0.83
BILL OF QUANTITY
(BOQ)
A PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Supl.PP.01 1.00 ls 147,540,250.00 147,540,250.00
2 RK3K Konstruksi TOTAL 1.00 ls 62,745,000.00 62,745,000.00
3 Survey dan Pengukuran 6 Ha 2 kali pengukuran Adaptasi T.02.a.1+T.03.b 67,900.00 m² 6,267.25 425,546,275.00
4 Listrik dan Air Kerja Analisa Hitung 9.00 bln 466,655.12 4,199,896.08
5 Direksi Keet A.2.2.1.5 32.00 m² 1,475,133.00 47,204,256.00
6 Gudang Alat dan Bahan A.2.2.1.7 64.00 m² 1,460,761.50 93,488,736.00
7 Penebangan Pohon BM-K-2 250.00 bh 466,655.12 116,663,780.12
PEKERJAAN PERSIAPAN Sub Jumlah A
B PEKERJAAN TANAH & PEMATANGAN LAHAN
B-1 PEKERJAAN TANAH & PEMATANGAN LAHAN
1 Land Clrearing dan Pengupasan Top Soil (± 20 cm) TM.04.a.1+TM.04.b 9,522.00 m³ 37,741.17 359,371,415.03
2 Pekerjaan Galian Tanah (Mekanis) dan Angkut Material Jarak 1 KM TM.04.a.1+TM.04.b 35,624.60 m³ 37,741.17 1,344,514,063.41
3 Pekerjaan Timbunan dan Pemadatan Tanah (Kepadatan 90%) TM.04.c 27,848.60 m³ 42,601.76 1,186,399,314.50
PEKERJAAN TANAH & PEMATANGAN LAHAN Sub Jumlah B-1
B-2 TALUD & PENGAMAN TEBING
1 Pekerjaan Galian Tanah TM.04.a.1+TM.04.b 899.30 m³ 37,741.17 33,940,633.64
2 Pekerjaan Pasangan Batu Kosong BM 6.15d 197.90 m³ 619,168.00 122,533,347.20
3 Pekerjaan Lantai Kerja, Pasir t=5 cm A.2.3.1.11. 104.20 m³ 295,790.00 30,821,318.00
4 Pekerjaan Pasangan Batu BM 7.9.(1) 2,997.50 m³ 1,116,811.89 3,347,643,653.04
5 Granular Backfill 6.15e 532.70 m³ 400,675.00 213,439,572.50
6 Pipa Suling-Suling P.16 800.40 bh 192,236.00 153,865,694.40
7 Geotekstil P.09.b1 4,482.20 m² 24,288.00 108,863,673.60
8 Pasangan bronjong P.06.a.7) 3,150.90 m³ 388,575.00 1,224,360,967.50
9 Buis beton dia 1/2 30 cm (6.10) 565.60 m' 21,951.60 12,415,824.96
10 Pasangan Lempeng Rumput (Sodding) Permen PU no 28 TH 2016 - P.12.a 1,830.00 m2 21,505.00 39,354,150.00
11 Timbunan Tanah Hitam SNI 2835:2008 / PT.6.15c 91.50 m3 288,475.00 26,395,462.50
12 Pekerjaan pupuk kandang (2,5 kg/m3 tanah hitam) Suplemen - Supl.PLSK/LSK.17 228.80 kg 1,750.38 400,485.80
13 Pekerjaan Pupuk NPK (0,5 Kg/m3 Tanah Hitam) Suplemen - Supl.PLSK/LSK.29 45.80 kg 16,655.38 762,816.18
14 Pekerjaan Sekam (2,5 Kg/ m3 Tanah Hitam) Suplemen - Supl.PLSK/LSK.30 228.80 kg 5,655.38 1,293,949.80
TALUD & PENGAMAN TEBING Sub Jumlah B-2
C SARANA UTAMA NURSERI
C-1 GREENHOUSE (RUMAH BEDENG TABUR)
1 Pekerjaan Persiapan
a. Pengukuran dan pemasangan bouwplank A.2.2.1.4. 2,584.00 m' 64,570.00 166,848,880.00
Sub Jumlah C-1-1
2 Pekerjaan Tanah
a. Galian tanah pondasi dan bedengan keliling A.2.3.1.1. 91.80 m³ 86,075.00 7,901,685.00
b. Urugan pasir dipadatkan dibawah pondasi/bedengan A.2.3.1.11. 117.60 m³ 295,790.00 34,784,904.00
c. Lantai kerja beton camp. 1:3:5 B.01.a 27.70 m³ 835,841.60 23,152,812.32
d. Urugan tanah kembali dipadatkan A.2.3.1.9.+A.2.3.1.10 185.10 m³ 65,000.00 12,031,500.00
e. Tanah kompos Suplemen - Supl.PLSK/LSK.17 151.60 m³ 1,750.38 265,356.85
Sub Jumlah C-1-2
3 Pekerjaan Pondasi, Lantai dan Bedengan
a. Besi hollow 40 x 80 tebal 2 mm LA.12.a 636.10 kg 39,479.00 25,112,591.90
b. Pondasi umpak Beton mutu f'c 14,5 Mpa A.4.1.1.5. 9.20 m³ 1,013,688.50 9,325,934.20
c. Paving block t = 6 cm A.4.4.3.64. 802.80 bh 423,905.90 340,311,656.52
d. Pasangan batu 1/2 bata dinding bangunan camp. 1 : 4 A.4.4.1.9 1,368.00 m² 133,417.90 182,515,687.20
e. Plasteran + Acian camp.1:4 A.4.4.2.4.+A.4.4.2.27 2,736.00 m² 109,825.65 300,482,978.40
Sub Jumlah C-1-3
4 Pekerjaan Rangka Struktur Baja
a. Kolom Utama Hollow 50x100, 2 mm thick LA.12.a 2,289.10 kg 39,479.00 90,371,378.90
b. Ring Balok Hollow 40x60, 2 mm thick LA.12.a 1,018.80 kg 39,479.00 40,221,205.20
c. Rangka kuda kuda
Rangka Kuda-Kuda Hollow 40x60, 2 mm thick LA.12.a 5,518.50 kg 39,479.00 217,864,861.50
Pipa Hitam Ø32, 1.8 mm thick A.4.2.1.1 (a) 4,425.70 kg 39,352.50 174,162,359.25
d. Gording Hollow 40x60, 2 mm thick LA.12.a 1,630.10 kg 39,479.00 64,354,717.90
e. Ikatan Angin Atap dan Samping Ø32, 1.8mm thick A.4.2.1.1 (a) 419.80 kg 39,352.50 16,520,179.50
f. Water rail Hollow 50x50, 1.8 mm thick LA.12.a 2,346.30 kg 39,479.00 92,629,577.70
g. Roll up strapping kolom pipa baja 1/2'', 1.8mm thick A.4.2.1.1 (a) 178.40 kg 39,352.50 7,020,486.00
h. Plat dan Mur Penyambung LA.12.a 796.90 kg 39,479.00 31,460,815.10
i. Talang plat 2 mm LA.12.a 2,260.80 kg 39,479.00 89,254,123.20
j. Hot Dip Galvanized Rangka Struktur 21,520.20 kg -
k. Pipa PVC tipe D 4'' A.5.1.1 31.c 156.00 m' -
Sub Jumlah C-1-4
5 Pekerjaan Atap dan Dinding
a. Ventilasi Insect Net Mesh 50, dengan sistem penjepit Spring Clip Supl.PPAP/GH.10 250.60 m² 241,944.88 60,631,387.12
b. Atap Plastik UV 200 mikron, dengan sistem penjepit Spring Clip Supl.PPAP/GH.11 288.00 m² 461,712.45 132,973,184.60
c. Dinding Shading Net 50% (putih) dengan sistem penjepit Spring Clip Supl.PDP/GH.05 816.00 m² 700,599.37 571,689,086.22
d. Plafond Shading Net 50% (hitam) dengan sistem buka tutup, lengkap dengan accessories Hollow Supl.PPAP/GH.09 1,664.00 m² 54,010.70 89,873,805.19
allumunium 40x20x2mm, Kawat Seling PVC 5mm, Turn buckle/span skrup 6mm, Klem Sling
6mm, Monofilament 2mm, S-Hook stainless, Katrol/Kerekan 50mm, Bearing 1,5", Pipa GIP Ø
1,5"x1,8mm, Motor 0,75 kW 3 Phase, Limit Switch
6 Pekerjaan Pintu
a. Pintu sliding 2 daun, 1.9X2.1 m Combine 7 8.00 unit 2,046,200.00 16,369,600.00
Sub Jumlah C-1-6
7 System Penyiraman (Watering/Irrigation System)
a. Nozzle Misting Ex.Naan 7110 atau setara 2,304.00 set
b. Pipa PE Pipe dan Fiting sambungan
1 Pipa PE Fleksibel 16mm, 1,3 mm-T, dan Fiting sambungan 2,328.00 m1
2 Kran PE 16 mm untuk pembilasan 8.00 pcs
3 Kawat Galvanize 4mm, BWG 10 2,304.00 m1
4 Gantungan Pipa PE ke Kawat Galvanize (O-Hanger Clamps) 4,656.00 pcs
5 Klem Seling 4 mm 256.00 pcs
c. Jalur Pipa Distribusi
1 PVC AW Pipa 2" A.5.1.1 29. 512.00 m'
2 PVC Ball Valve 2" (Kran) 8.00 pcs
3 Katup Pelepas Udara (ARV ) 8.00 pcs
4 PVC AW Watermoor 2" 16.00 pcs
d. Jalur Pipa Utama
1 PVC AW Pipa 3" A.5.1.1 31. 480.00 m'
2 GI Gate Valve 3" (Kran Galvanize) 1.00 pcs
3 GI Check Valve 3" 1.00 pcs
4 Meteran Air (Flow Water Meter) 3" 1.00 pcs
5 PVC AW Flange 3" 20.00 pcs
e. Valve untuk Sistem Pengkabutan (Misting System)
1 Valve Solenoid 2" 8.00 pcs
2 Kabel Kontroler 8.00 lots
3 Katup Pengatur Tekanan (PRV) 8.00 pcs
f. Sistem Kontroler
1 Timer Kontroler 1.00 pcs
2 Aksesoris Sistem Kontroler 1.00 lots
g. Sensor Kelembaban & Temperatur 1.00 pcs
Sub Jumlah C-1-7
8 Pekerjaan Elektrikal
a. Panel MCC-Green House Supl.PME.023 1.00 Unit
b. MCC-Green House
1 NYY 3X4mm2 Inv F/R 0,75KW No.1 Supl.PME.044 90.00 Mtr
2 NYY 3X4mm2 Inv F/R 0,75KW No.2 Supl.PME.044 95.00 Mtr
3 NYY 3X4mm2 Inv F/R 0,75KW No.3 Supl.PME.044 100.00 Mtr
c. Grounding Panel DP Green House Supl.PME.001 2.00 set
Kabel NYAF 1x 70 mm2, Grounding Box, Grounding Rod 5/8" 2,4 mtr (Copper Bonding),
Integrasi Grounding plat 3x30 mm2, Klem Kabel 10 Stainless Steel, Cor grounding
Material bantu (isolas & fittings & support, Accessories)
Sub Jumlah C-1-8
GREENHOUSE (RUMAH BEDENG TABUR) Sub Jumlah C-3
C-2 SHADING HOUSE (RUMAH NAUNGAN)
1 Persiapan
a. Pengukuran dan pemasangan bouwplank A.2.2.1.4. 1,840.00 m' 64,570.00 118,808,800.00
Sub Jumlah C-2-1
2 Pekerjaan Tanah
a. Galian tanah pondasi dan bedengan keliling A.2.3.1.1. 895.10 m³ 86,075.00 77,045,732.50
b. Urugan pasir dipadatkan dibawah pondasi/bedengan A.2.3.1.11. 264.70 m³ 295,790.00 78,295,613.00
c. Lantai kerja beton camp. 1:3:5 B.01.a 540.00 m³ 835,841.60 451,354,464.00
d. Batu kerikil, 5cm SNI 2835:2008 / PT.6.15d 688.30 m³ 336,000.00 231,268,800.00
Sub Jumlah C-2-2
3 Pekerjaan Pondasi dan Bedengan
a. Besi hollow 40 x 40 tebal 2 mm LA.12.a 3,133.30 kg 39,479.00 123,699,550.70
b. Beton pondasi umpak mutu f'c 14,5 A.4.1.1.5. 57.00 m³ 1,013,688.50 57,780,244.50
c. Pasangan batu 1/2 bata dinding bangunan camp. 1 : 4 A.4.4.1.9 3,128.30 m² 133,417.90 417,371,216.57
d. Plasteran + Acian camp.1:4 A.4.4.2.4.+A.4.4.2.27 6,722.20 m² 109,825.65 738,269,984.43
e. Pipa Subdrain PVC tipe D 2'' A.5.1.1 31.a 9,200.00 m' -
Sub Jumlah C-2-3
4 Pekerjaan Rangka Struktur Baja
a. Kolom Utama Hollow 50x50, 2 mm thick LA.12.a 11,845.70 kg 39,479.00 467,656,390.30
b. Balok Utama Hollow 50x50, 2 mm thick LA.12.a 27,782.40 kg 39,479.00 1,096,821,369.60
c. Plat dan Mur Penyambung LA.12.a 1,436.30 kg 39,479.00 56,703,687.70
d. Hot Dip Galvanized Rangka Struktur 44,197.50 kg -
Sub Jumlah C-2-4
5 Pekerjaan Atap dan Dinding
a. Dinding shading net 50% (hitam) dengan penjepit spring clip Supl.PDP/GH.07 2,484.00 m² 712,699.37 1,770,345,236.00
b. Atap Shading Net 50% (hitam) dengan sistem buka tutup, lengkap dengan accessories Hollow Supl.PPAP/GH.12 16,560.00 m² 103,384.80 1,712,052,265.00
allumunium 40x20x2mm, Kawat Seling PVC 5mm, Turn buckle/span skrup 6mm, Klem Sling
6mm, Monofilament 2mm, S-Hook stainless, Katrol/Kerekan 50mm, Bearing 1,5", Pipa GIP Ø
1,5"x1,8mm, Motor 0,75 kW 3 Phase, Limit Switch
b. Mesin Pengisi Polybag Lokal Kap. 1m3, 5-8 polybag/menit 10.00 unit
Material Rangka : UNP dan Besi Siku
Sistem Pengisian : Screw Feeder
Penggerak Screw : Dinamo 0,75 HP
Penggerak Mixer Feeder : Dinamo 3 HP
Kapasitas Bak : 1 m3
1 Water Flushing dan Air Jetting Permen PU no 28 TH 2016 - AT.13 64.00 jam
2 Water Jetting dan Air Lif ting Permen PU no 28 TH 2016 - AT.13 64.00 jam
f. Pemeriksaan lab/analisa kualitas air Permen PU no 28 TH 2016 - AT.16 2.00 Ls
g. Bak Kontrol 70x90 cm
1 Galian tanah A.2.3.1.1. 1.00 m3 86,075.00 86,075.00
2 Pasir urug A.2.3.1.11. 0.10 m3 295,790.00 29,579.00
3 Lantai kerja beton camp. 1:3:5 t=5 cm B.01.a 0.10 m3 835,841.60 83,584.16
4 Bekisting A.4.1.1.24 3.80 m2 310,216.50 1,178,822.70
5 Pembesian A.4.1.1.17 105.10 kg 15,594.50 1,638,981.95
6 Beton K175 A.4.1.1.5. 0.70 m3 1,013,688.50 709,581.95
7 Tutup Plat Besi 4mm LA.12.a 39.60 kg 39,479.00 1,563,368.40
Sub Jumlah D-8-1
2 Pekerjaan Pengadaan / Pemasangan Pompa
a. Pengadaan Pompa Kapasitas 21,4 m3 / Hr Head 120 Meter.
1 Pengadaan Pompa Submersible Lengkap Dengan Accessories
- Pompa Submersible Analisa hitung 2.00 Set
- Ac / Dc Elektrik Motor
- Inverter Built In
- Proteksi Over Load Built In
- Proteksi Thermal
- Proteksi Dry Running
2 Flash Arrester Cw Grounding Cable Analisa hitung 2.00 Set
3 Accessories Mekanikal Analisa hitung 2.00 Set
b. Pengadaan Dan Pemasangan Testing Commissoning Dan Training Operator
1 Testing Commissioning Oleh Pabrik Dan Training Operator Analisa hitung 1.00 Lot
Sub Jumlah D-8-2
b. Batu alam susun sirih SNI 7395:2008 / 6.58 26.00 m² 388,236.75 10,094,155.50
c. Acian kolom A.5.1.1 27. 1.80 m² -
Sub Jumlah D-13-4
BILL OF QUANTITY
(BOQ)
5 Pekerjaan Atap
a. Atap Metal Galvalum, Kuda kuda baja ringan SNI 03-3436-2002 / 6.32 14.00 m² 223,454.00 3,128,356.00
b. Bubungan A.4.5.2.36. 16.20 m' 162,200.50 2,627,648.10
c. Listplank papan fiber cement SNI 3434:2008 / 6.21a 28.00 m' 114,565.00 3,207,820.00
Sub Jumlah D-13-5
6 Pekerjaan Plafond
a. Plafon gypsum 9mm rangka furring B.2.6.3.3.10.2 + B.2.6.3.3.10.5 14.00 m² 228,417.75 3,197,848.50
b. List gypsum A.4.5.1.9. 28.00 m 47,756.50 1,337,182.00
Sub Jumlah D-13-6
7 Pekerjaan Lantai
a. Lantai Kerja Rabat beton 1:3:5 B.01.a 0.40 m³ 835,841.60 334,336.64
b. Pasangan HT 30x30 unpolished A.4.4.3.35 5.10 m² 160,545.00 818,779.50
c. Acian A.4.4.2.27. 2.00 m² 41,208.75 82,417.50
e. Lantai Papan LA.11.a.4) 0.70 m² 4,001,116.43 2,800,781.50
Sub Jumlah D-13-7
8 Pekerjaan Listrik
a. MCB plus BOX MCB 1 Pole 2A Supl.PME.047 1.00 Unit -
b. NYM 2X2,5MM2 Supl.PME.045 35.00 m' -
c. Downlight LED OUTBO 24 W Supl.PME.011 2.00 set -
d. Saklar Tunggal Supl.PME.014 1.00 set -
Sub Jumlah D-13-8
9 Pekerjaan Pengecetan
a. Pengecatan plafond A.4.7.1.10. 14.00 m² 36,057.34 504,802.76
b. Pengecatan dinding kolom A.4.7.1.10.a 1.80 m² 39,706.70 71,472.06
c. Pengecatan Lisplank A.4.7.1.5 7.00 m² 65,301.50 457,110.50
Sub Jumlah D-13-9
GAZEBO Sub Jumlah D-13
D-14 TOILET UMUM
1 Pekerjaan Persiapan
a. Pengukuran dan pemasangan bouwplank A.2.2.1.4. 19.00 m' 64,570.00 1,226,830.00
Sub Jumlah D-14-1
2 Pekerjaan Tanah dan Pondasi
a. Galian tanah pondasi A.2.3.1.1. 42.80 m³ 86,075.00 3,684,010.00
b. Urugan pasir dipadatkan dibawah pondasi A.2.3.1.11. 2.50 m³ 295,790.00 739,475.00
c. Lantai Kerja beton camp. 1:3:5 B.01.a 2.50 m³ 835,841.60 2,089,604.00
d. Pas. Batu Kali 1:4 A.3.2.1.2. 20.50 m³ 912,433.50 18,704,886.75
e. Urugan tanah kembali dipadatkan A.2.3.1.9.+A.2.3.1.10 12.30 m³ 65,000.00 799,500.00
f. Urugan tanah timbun 6.15a 2.60 m³ 288,475.00 750,035.00
g. Rolag Bata Supl.PDP.04 4.00 m³ 1,207,434.80 4,829,739.20
Sub Jumlah D-14-2
3 Pekerjaan Beton
a. Balok sloof beton bertulang 20x20
Bekisting untuk sloof A.4.1.1.21 25.20 m² 171,083.00 4,311,291.60
Beton mutu f'c 19,3 Mpa A.4.1.1.7. 1.90 m³ 1,061,611.10 2,017,061.09
Pembesian A.4.1.1.17 242.70 kg 15,594.50 3,784,785.15
b. Kolom beton bertulang 11x11 A.4.1.1.35 47.20 m' 95,180.80 4,492,533.76
c. Balok latei beton bertulang 10x15 A.4.1.1.36 11.50 m' 120,606.20 1,386,971.30
d. Ring Balok Beton bertulang 10x15 A.4.1.1.36 28.50 m' 120,606.20 3,437,276.70
Sub Jumlah D-14-3
4 Pekerjaan Pasangan & Plasteran
a. Pasangan batu 1/2 bata dinding bangunan camp. 1 : 2 A.4.4.1.7. 30.90 m² 140,933.65 4,354,849.79
b. Pasangan batu 1/2 bata dinding bangunan camp. 1 : 4 A.4.4.1.9 54.30 m² 133,417.90 7,244,591.97
c. Plasteran + Acian camp 1:2 A.4.4.2.2.+A.4.4.2.27 47.80 m² 113,555.97 5,427,975.37
d. Plasteran + Acian camp 1:4 A.4.4.2.4.+A.4.4.2.27 170.10 m² 109,825.65 18,681,343.07
e. Acian balok latei A.4.4.2.27. 3.50 m² 41,208.75 144,230.63
Sub Jumlah D-14-4
5 Pekerjaan Pintu
a. P2 Pintu kayu 1 daun swing, kusen aluminium, uk 80x210 Combine 2 2.00 unit 3,470,400.00 6,940,800.00
b. P3 Pintu kayu 1 daun swing, kusen aluminium, uk 70x195 Combine 3 6.00 unit 1,550,000.00 9,300,000.00
Sub Jumlah D-14-5
6 Pekerjaan Atap
a. Atap genteng metal galvalume, kuda-kuda baja ringan SNI 03-3436-2002 / 6.32 26.10 m² 223,454.00 5,832,149.40
b. Bubungan A.4.5.2.36. 14.50 m' 162,200.50 2,351,907.25
c. Listplank papan fiber cement SNI 3434:2008 / 6.21a 21.70 m' 114,565.00 2,486,060.50
Sub Jumlah D-14-6
7 Pekerjaan Plafond
a. Plafon gypsum 9mm rangka furring B.2.6.3.3.10.2 + B.2.6.3.3.10.5 22.00 m² 228,417.75 5,025,190.50
b. List Gypsum A.4.5.1.9. 60.90 m 47,756.50 2,908,370.85
Sub Jumlah D-14-7
8 Pekerjaan Pasangan Keramik
a. Urugan pasir dipadatkan dibawah lantai dalam bangunan dan selasar A.2.3.1.11. 1.30 m³ 295,790.00 384,527.00
b. Lantai Kerja beton camp. 1:3:5 B.01.a 2.60 m³ 835,841.60 2,173,188.16
c. Pasangan keramik KM 25x25 antislip A.4.4.3.36.a 26.00 m² 216,078.50 5,618,041.00
d. Pasangan keramik dinding 25x40 SNI 7395:2008 / PPL.A.4.4.3.54a 58.80 m² 252,960.40 14,874,071.52
Sub Jumlah D-14-8
9 Pekerjaan Listrik
BILL OF QUANTITY
(BOQ)
7 Pekerjaan Plafon
a. Plafon gypsum 9mm rangka furring B.2.6.3.3.10.2 + B.2.6.3.3.10.5 45.80 m² 228,417.75 10,461,532.95
BILL OF QUANTITY
(BOQ)
B. BAHAN PEREKAT
1 Semen Portland @Rp. 1,050.00 Kg
2 Semen Warna @Rp. 1,500.00 Kg
3 Lem Kayu @Rp. 31,428.57 Kg
4 Lem Vinyl / Karet @Rp. 60,000.00 Kg
5 Waterproof seal/coating @Rp. 52,500.00 Kg
6 Air kerja @Rp. 50.00 Ltr
D. KAYU / LANGIT-LANGIT
1 Kayu meranti batu/Kelas II @Rp. 2,000,000.00 m3
2 Kayu balok 5/7 @Rp. 1,800,000.00 M3
3 Kayu kelas III @Rp. 1,800,000.00 M3
4 Kayu Dolken / kayu laut Ø 7,5 - 10 @Rp. 20,000.00 Btg
5 Papan gypsum uk. 120 x 240 cm # 9 mm @Rp. 66,000.00 lbr
6 Kalsi Board uk. 120 x 240 # 3,5mm @Rp. 65,000.00 lbr
7 Plywood 120 x 240 tbl. 9 mm @Rp. 200,000.00 Lbr
8 Plywood 120 x 240 tbl. 6 mm @Rp. 160,000.00 Lbr
9 Plywood 120 x 240 tbl. 4 mm @Rp. 130,000.00 Lbr
10 Papan fiber cement (1 x 20) cm @Rp. 55,000.00 M'
11 Plywood 120 x 240 tbl. 4 mm @Rp. 156,000.00 Lbr
12 list gypsum @Rp. 30,000.00 M'
G. PENUTUP ATAP
1 Atap Genteng Metal/Multi Roof ( 4 tingkat ), t,0,35 mm @Rp. 65,000.00 m2
2 Atap Seng gelombang 8' bjls 20 @Rp. 65,000.00 Lbr
3 Rabung genteng metal @Rp. 26,666.67 m'
4 Nok genteng bitumen @Rp. 80,000.00 M
5 Atap bitumen @Rp. 5,000.00 lbr
6 Underlayer atap bitumen @Rp. 25,000.00 M2
7 Rangka atap baja ringan (siap pasang) @Rp. 98,000.00 M2
8 Ijuk @Rp. 20,000.00 kg
9 Paku hak panjang 15 cm @Rp. 20,000.00 Kg
10 Poly carbonat 5 mm @Rp. 750,000.00 unit
11 Rangka furing metal @Rp. 75,000.00 m2
12 Solar Tuff Corrugated Transparant Polycarbonate Sheet 0.8 mm @Rp. 212,000.00 m2
I. CAT / MINYAK
1 Cat dasar luar bangunan @Rp. 53,120.00 Kg
2 Cat dasar dalam bangunan @Rp. 49,120.00 Kg
3 Cat Minyak @Rp. 35,000.00 Kg
4 Cat Epoxy @Rp. 328,000.00 kg
5 Primer epoxy @Rp. 328,000.00 kg
6 Cat Menie Kayu @Rp. 35,000.00 Kg
7 Cat Menie Besi @Rp. 55,000.00 Kg
8 Cat Penutup luar @Rp. 70,000.00 Kg
9 Cat penutup dalam @Rp. 55,000.00 Kg
10 Plamir @Rp. 22,000.00 Kg
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN NURSERY MODERN PERKEBUNAN
DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN 2022
J. SANITASI / PIPA
1 Buis beton dia 1/2 30 cm @Rp. 0.00 Bh
2 Kloset duduk / monoblok Lengkap tangki @Rp. 0.00 Bh
3 Kloset jongkok @Rp. 0.00 Bh
4 Wastafel lengkap @Rp. 0.00 Bh
5 Urinoir @Rp. 0.00 set
6 Kran air stainless @Rp. 0.00 Bh
7 Bak fibre 0,5 M3 @Rp. 0.00 Bh
8 Bak cuci piring steinless 2 Lobang @Rp. 0.00 Bh
9 Floor Drain Ø 4" stainless standard @Rp. 0.00 Bh
10 Pipa PVC Tipe AW Ø 1/2" @Rp. 0.00 M'
11 Pipa PVC Tipe AW Ø 3/4" @Rp. 0.00 M'
12 Pipa PVC Tipe AW Ø 1" @Rp. 0.00 M'
13 Pipa PVC Tipe AW Ø 1.5" @Rp. 0.00 M'
14 Pipa PVC Tipe AW Ø 2" @Rp. 0.00 M'
15 Pipa PVC Tipe AW Ø 2.5" @Rp. 0.00 M'
16 Pipa PVC Tipe AW Ø 3" @Rp. 0.00 M'
17 Pipa PVC Tipe AW Ø 4" @Rp. 0.00 M'
18 Pipa PVC Tipe D Ø 2" @Rp. 0.00 M'
19 Pipa PVC Tipe D Ø 3" @Rp. 0.00 M'
20 Pipa PVC Tipe D Ø 4" @Rp. 0.00 M'
21 Pipa PVC Tipe D Ø 6" @Rp. 0.00 M'
22 Pipa SGP Ø 3" @Rp. 0.00 M'
23 Lem PVC @Rp. 0.00 M'
24 Pipa HDPE 13/16 @Rp. 0.00 M'
25 Pipa HDPE 3/5 @Rp. 0.00 M'
26 Pipa HDPE 5/7 @Rp. 0.00 M'
27 Air Release Valve 1" @Rp. 0.00 Bh
28 Gate Valve 4" kuningan @Rp. 0.00 Bh
29 Gate Valve 3" kuningan @Rp. 0.00 Bh
30 Gate Valve 2" kuningan @Rp. 0.00 Bh
31 Ball Valve 1" @Rp. 0.00 bh
32 Ball Valve 3/4" @Rp. 0.00 bh
33 Float valve 1" @Rp. 0.00 bh
34 Toren air 2 m3 @Rp. 0.00 bh
35 Fitting Tee AW 2'' x 1" @Rp. 0.00 Bh
36 Tee PVC AW 1" @Rp. 0.00 bh
37 Tee PVC AW 1/2" @Rp. 0.00 bh
38 Tee PVC AW 1 x 1 1/2" @Rp. 0.00 bh
39 Elbow 1" @Rp. 0.00 bh
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN NURSERY MODERN PERKEBUNAN
DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN 2022
Nozzle/Valve Fitting
138 Nozzle Misting @Rp. 0.00 set
139 Mini Wobbler Springkle. SENNINGER @Rp. 0.00 Pcs
140 Katup Pelepas Udara (ARV ) @Rp. 0.00 pcs
141 Katup Pelepas Udara (ARV ) @Rp. 0.00 pcs
142 Katup Pengatur Tekanan (PRV) @Rp. 0.00 pcs
143 GI Gate Valve 3" (Kran Galvanize) @Rp. 0.00 pcs
144 GI Non Return Check Valve 3" (Flange Type) @Rp. 0.00 pcs
145 Meteran Air (Flow Water Meter) 3" @Rp. 0.00 pcs
146 Valve Solenoid 2" @Rp. 0.00 pcs
147 Velve Hisap/Foot Valve (Flange Type) 3" @Rp. 0.00 pcs
148 Saringan Air /Azud Helix Disc Filter 3" @Rp. 0.00 unit
149 Pressure Gauge 2 1/2" (0-2 kg/cm2) + PVC AW Tee Reducer 2" x 3/4", Faucet Socket @Rp. set
3/4", 2 nos PVC AW Valve Socket 3/4", 2 nos PVC Pipe 3/4" (short length), Brass
Reducing Bush 3/4" x 1/4", Chrome Ball Valve 3/4", Rubber Expansion Joint
0.00
150 Pressure Switch/Safety Valve @Rp. 0.00 pcs
151 Pumps Pressure Tanks. Kap. 100 liter @Rp. 0.00 pcs
152 Pumps Pressure Tanks. Kap. 500 liter @Rp. 0.00 pcs
Elektrikal
152 Panel Pompa (Control Automatic Stardelta); 2 x 4,0 kW, 3 Phase @Rp. 0.00 unit
153 Timer Kontroler @Rp. 0.00 pcs
154 Aksesoris Sistem Kontroler @Rp. 0.00 lots
155 Sensor Kelembaban & Temperatur @Rp. 0.00 pcs
156 Kabel Kontroler Greenhouse @Rp. 0.00 lots
157 Kabel Kontroler Shading House @Rp. 0.00 lots
Timer Kontroler
158 Kawat Galvanize 4mm, BWG 10 @Rp. 0.00 m1
159 Gantungan Pipa PE ke Kawat Galvanize (O-Hanger Clamps) @Rp. 0.00 pcs
160 Tali Kabel @Rp. 0.00 pcs
161 Klem Seling 4 mm @Rp. 0.00 pcs
162 Klem Pipa 2 " @Rp. 0.00 pcs
165 Tangki Filter Pasir Air FRP Fiber Glass 600 Vol. 3m3/jam @Rp. 0.00 Unt
166 Tangki Filter Carbon FRP Fiber Glass 600 Vol. 3m3/jam @Rp. 0.00 Unt
167 Tangki Filter Iron Magnesium FRP Fiber Glass 600 Vol. 3m3/jam @Rp. 0.00 Unt
168 Header Pipa c/w Flange, Nut and Bolt, Hanger and Support, GIP dia. 150mm x 3m @Rp. 0.00 set
169 Terpaulin Sheet 0.25 mm @Rp. 0.00 m2
170 Geotekstil tipe B @Rp. 0.00 m2
K. LISTRIK / ACSESORIES
1 MCB Box 4 grup @Rp. 0.00 Unt
2 MCB Box 2 grup @Rp. 0.00 Unt
3 Lampu downlight 18 Watt @Rp. 0.00 Bh
4 Lampu CFL 9 w @Rp. 0.00 Bh
5 Lampu CFL 14 w @Rp. 0.00 Bh
6 Lampu CFL 18 w @Rp. 0.00 Bh
7 Lampu CFL 24 w @Rp. 0.00 Bh
8 Lampu TL 36 Watt @Rp. 0.00 Bh
9 Lampu TKO 1 x 36W @Rp. 0.00 set
10 Lampu TKO 2 x 36W @Rp. 0.00 set
11 Lampu spot light 7 watt @Rp. 0.00 Bh
12 Lampu spot light 30 watt @Rp. 0.00 Bh
13 Lampu TL 2 x 36 Watt grille @Rp. 0.00 bh
14 Lampu sorot 30 Watt @Rp. 0.00 bh
15 Lampu sorot 100 Watt @Rp. 0.00 bh
16 Lampu sorot 150 Watt @Rp. 0.00 bh
17 Stop Kontak Tanam @Rp. 0.00 Bh
18 Stop Kontak AC @Rp. 0.00 Bh
19 Stop kontak 3 lubang @Rp. 0.00 Bh
20 Saklar Tunggal tanam @Rp. 0.00 Bh
21 Saklar Ganda tanam @Rp. 0.00 Bh
22 Saklar cos 40A @Rp. 0.00 Unit
23 Saklat Grid Switch 6 gang @Rp. 0.00 Bh
24 MCB 2 Ampere @Rp. 0.00 Unt
24 MCB 4 Ampere @Rp. 0.00 Unt
25 MCB 6 Ampere @Rp. 0.00 Unt
26 MCB 10 Ampere @Rp. 0.00 Unt
27 Kabel Listrik NYM 3 Ø 2,5 mm @Rp. 0.00 M'
28 Kabel feeder NYY 3 x 2.5 mm2 @Rp. 0.00 M'
29 Kabel feeder NYY 3 x 4 mm2 @Rp. 0.00 M'
30 Kabel feeder NYY 4 x 4 mm2 @Rp. 0.00 M'
31 Kabel feeder NYY 4 x 10 mm2 @Rp. 0.00 M'
32 Kabel feeder NYY 4 x 16 mm2 @Rp. 0.00 M'
33 Kabel Distribusi NYFGbY 4 x 240 mm2 @Rp. 0.00 M'
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN NURSERY MODERN PERKEBUNAN
DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN 2022
66 ESE Min.R 150 c/w Lighting Counter and flash lamp @Rp. 0.00 SET
67 BC draad 70 mm2 a). 1,67 m/kg @Rp. 0.00 m
68 Kawat licin No.12 a). 20 m/kg @Rp. 0.00 m
69 Isolator telur 1/4" @Rp. 0.00 pcs
70 Track Span d 1/2" @Rp. 0.00 pcs
71 tower Triangle @Rp. 0.00 Mtr
tower Triangle 30cm Hot Dip Galvanize Spesifikasi :
* Vertikal tiang Utama besi behl 16mm Full SNI,
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN NURSERY MODERN PERKEBUNAN
DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN 2022
328 - Water Level Control pada GWT WLC (water levOMRON/Setara @Rp. 0.00 Unit
329 Tangki Filter Pasir Air FRP Fiber Glass 600 3m3 PENTA/Setara @Rp. 0.00 Unit
330 Tangki Filter Carbon FRP Fiber Glass 600 3m3 pPENTA/Setara @Rp. 0.00 Unit
331 Tangki Filter iron magnesium FRP Fiber Glass PENTA/Setara @Rp. 0.00 Unit
332 NYY 1x185mm2 SUPREME/Setara @Rp. 0.00 Mtr
333 BC 25 MM2 SUPREME/Setara @Rp. 0.00 Mtr
334 Pompa Booster Sistem 2Pompa Pressure SwitchEBARA/Setara @Rp. 0.00 Unit
Merk : Ebara
Type : CDX 90/10
Power : 0.75Kw/1Hp/1PK
Kapasitas : 80 Liter/Menit
Daya Dorong/Head : 22 Meter
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN NURSERY MODERN PERKEBUNAN
DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN 2022
Roof Tank
335 Type : Fibreglass PENGUIN/Setara @Rp. 0.00 Unit
Bahan : Fibreglass
Kapasitas : 2 m3
Volume: 2000 liter
DiaMeter: 146,5 cm
Tinggi: 179 cm
Berat: 76 kg
Tebal: 10-16 mm
Tutup: 60 cm
Fitting: 1"
344 Pipa Ø100 mm PVC Class-AW 10kg/cm2 RUCIKA/Setara @Rp. 0.00 Mtr
345 Pipa Ø80 mm PVC Class-AW 10kg/cm2 RUCIKA/Setara @Rp. 0.00 Mtr
346 Pipa Ø65 mm PVC Class-AW 10kg/cm2 RUCIKA/Setara @Rp. 0.00 Mtr
347 Pipa Ø50 mm PVC Class-AW 10kg/cm2 RUCIKA/Setara @Rp. 0.00 Mtr
348 Pipa Ø32 mm PVC Class-AW 10kg/cm2 RUCIKA/Setara @Rp. 0.00 Mtr
349 Header Pipa, C/w Flange, Nut & Bolt, Hanger & Support ( Ø100 mm ) Panjang 2 Meter @Rp. 0.00 Set
367 BS-SZB, Kapasitas 3000kg, tegangan 220V, 500W,Dalam kondisi listrik mati tersedia @Rp.
- Unit
GL3000, Controll Unit for BS-SZB, Digital positioning, high precision, easy setting, Intelligent
L. SEWA ALAT/KENDARAAN
1 Waterpass @Rp. 200,000.00 Hari
2 Theodolith @Rp. 300,000.00 Hari
3 Mobil Pick Up @Rp. 500,000.00 Hari
4 Dump Truck 3,5 Ton @Rp. 125,000.00 Jam
5 Dump Truck 6-8 M3 @Rp. 100,000.00 Jam
6 Water Tanker 3000-4500 liter @Rp. 284,086.00 Jam
7 Excavator @Rp. 403,070.00 Jam
8 Bulldozer 100-150 HP @Rp. 668,000.00 Jam
9 Vibratory Roller 5-8 Ton @Rp. 398,000.00 Jam
10 Track Loader @Rp. 333,000.00 Jam
11 Wheel Loader 1.0-1.6 M3 @Rp. 52,500.00 Jam
12 Motor Grader > 100 HP @Rp. 53,125.00 Jam
13 Compressor @Rp. 192,000.00 Jam
14 Water Pump 70-100 mm @Rp. 29,000.00 Jam
15 Three wheel roller @Rp. 144,000.00 Jam
16 Pneumatic tyre roller @Rp. 325,000.00 Jam
17 Asphalt Finisher @Rp. 500,000.00 Jam
18 Asphalt sprayer @Rp. 300,000.00 Jam
19 Tandem Roller @Rp. 347,900.00 Jam
20 Chainsaw @Rp. 50,000.00 Jam
21 Test CBR @Rp. 6,000,000.00 titik
22 Molen 0.3 m3 @Rp. 50,000.00 Hari
23 Asp. Distributor @Rp. 219,000.00 Hari
24 Jack Hammer @Rp. 26,000.00 Hari
O. PEKERJAAN ASPAL
1 Aspal Emulsi CSS-1 atau SS-1 @Rp. 4,993.95 Ltr
3 Agregat Pecah Mesin 0-5 mm @Rp. 198,000.00
4 Agregat Pecah Mesin 5-10 & 10-20 mm @Rp. 198,000.00
5 Aspal @Rp. 4,493.95 Kg
6 Bahan anti pengelupasan @Rp. 500.00 kg
P. PEKERJAAN PAGAR
1 Pagar BRC 120 x 240 8 mm @Rp. 842,000.00 Lbr
Q. PEKERJAAN LANSKAP
1 Bromelia Merah @Rp. 170,000.00
Lidah Mertua, Tinggi 80 dan 90 CM
2 @Rp. 50,000.00
3 Pancing Pentul, Tinggi 60 dan 80 CM @Rp. 125,000.00
4 Pucuk Merah, Tinggi 1 - 1.2 meter @Rp. 120,000.00
5 Kamboja, Tinggi 2 - 2.5 meter @Rp. 650,000.00
6 Pandan Bali, Tinggi 90 - 120 cm @Rp. 200,000.00
7 Palem Raja, Tinggi 1.5 - 2 meter @Rp. 200,000.00
8 Melati mini daun kuning tinggi 40 cm @Rp. 20,000.00
9 Melati mini daun silver tinggi 40 cm @Rp. 25,000.00
10 Brokoli hijau tinggi 20 cm @Rp. 35,000.00
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
RN
PERKE
PEKERJAAN PERSIAPAN BUNA
N
PP.01 Supl.PP.01 Mobilisasi dan Demobilisasi Peralatan 147,540,250.00
Suplemen - Supl.PP.01 = 147,540,250.00
Total Station 1.000 Unit x Rp 500,000.00 = Rp 500,000.00
Waterpass 1.000 Unit x Rp 500,000.00 = Rp 500,000.00
Bulldozer 100-150 HP 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Concrete Mixer 0,3-0,6 m3 2.000 Unit x Rp 2,000,000.00 = Rp 4,000,000.00
Dump Truck 3,5 Ton 1.000 Unit x Rp 750,000.00 = Rp 750,000.00
Dump Truck 10 Ton 0.000 Unit x Rp 750,000.00 = Rp -
Excavator 80-140 HP 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Flat Bed Truck 0.000 Unit x Rp 5,000,000.00 = Rp -
Generator Set 1.000 Unit x Rp 3,000,000.00 = Rp 3,000,000.00
Motor Grader > 100 HP 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Wheel Loader 0.000 Unit x Rp 8,000,000.00 = Rp -
Three Wheel Loader 6-8 Ton 0.000 Unit x Rp 8,000,000.00 = Rp -
Vibratory Roller 5-8 Ton 1.000 Unit x Rp 10,000,000.00 = Rp 10,000,000.00
Concrete Vibrator 2.000 Unit x Rp 500,000.00 = Rp 1,000,000.00
Water Pump 70-100 mm 2.000 Unit x Rp 1,000,000.00 = Rp 2,000,000.00
Water Tanker 3000-4500 liter 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Pedestrian Roller 1.000 Unit x Rp 10,000,000.00 = Rp 10,000,000.00
Tamper 2.000 Unit x Rp 6,550,000.00 = Rp 13,100,000.00
Pneumatic tyre roller 1.000 Unit x Rp 325,000.00 = Rp 325,000.00
Asphalt Finisher 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Asphalt sprayer 1.000 Unit x Rp 8,000,000.00 = Rp 8,000,000.00
Tandem Roller 1.000 Unit x Rp 10,000,000.00 = Rp 10,000,000.00
Jumlah (2) = Rp
Alat Dump Truck 3,5 Ton 0.2982 Jam x Rp 125,000.00 = Rp 37,274.10
Chainsaw 1.0000 Jam x Rp 50,000.00 = Rp 50,000.00
Jumlah (2) = Rp
Alat Bulldozer 100-150 HP 0.0048 jam x Rp 668,000.00 = Rp 3,180.95
Track Loader 0.0048 jam x Rp 333,000.00 = Rp 1,593.02
Dump Truck 6-8 M3 0.0070 jam x Rp 100,000.00 = Rp 700.00
Alat Bantu 1.0000 Ls x Rp 821.10 = Rp 821.10
Jumlah (3) = Rp 6,295.07
Jumlah (1) + (2) + (3) = Rp 12,992.44
Overhead 10% = Rp 1,299.24
Total = Rp 14,291.69
Jumlah (2) = Rp
Alat Excavator 0.0272 Jam x Rp 403,070.00 = Rp 10,963.50
Dump Truck 3,5 Ton 0.0392 Jam x Rp 125,000.00 = Rp 4,893.75
Jumlah (3) = Rp 15,857.25
Jumlah (1) + (2) + (3) = Rp 34,310.15
Overhead 10% = Rp 3,431.02
Total = Rp 37,741.17
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
PTP.02 TM.04.c Pemadatan Tanah di Lokasi
RN Pekerjaan 42,601.76
Permen PU. No 28 TH 2016
PERKE- TM.04.c = 42,601.76
Upah Pekerja BUNA 0.1422 Jam x Rp 100,000.00 = Rp 14,220.00
Mandor N 0.0142 Jam x Rp 130,000.00 = Rp 1,848.60
Jumlah (1) = Rp 16,068.60
Bahan
Jumlah (2) = Rp
Alat Bulldozer 100-150 HP 0.0200 Jam x Rp 668,000.00 = Rp 13,360.00
Water Tanker 0.0078 Jam x Rp 284,086.00 = Rp 2,215.87
Vibratory Roller 5-8 Ton 0.0178 Jam x Rp 398,000.00 = Rp 7,084.40
Jumlah (3) = Rp 22,660.27
Jumlah (1) + (2) + (3) = Rp 38,728.87
Overhead 10% = Rp 3,872.89
Total = Rp 42,601.76
TM.04.a.1+TM.04.b+TM.0
PTP.03 4.c Galian Tanah, Angkut Material dan Pemadatan Tanah 80,342.93
Combinasi Permen PU. No 28 TH 2016 - TM.04.a.1+TM.04.b+TM.04.c = 80,342.93
Bahan Pipa PVC 2'' 1.050 krg x Rp. 150,000.00 = Rp. 157,500.00
Ijuk 0.100 kg x Rp. 20,000.00 = Rp. 2,000.00
Kerikil 0.020 m3 x Rp. 198,000.00 = Rp. 3,960.00
Jumlah (2) = Rp. 163,460.00
Jumlah (1) + (2) = Rp. 174,760.00
Overhead 10% = Rp. 17,476.00
Total = Rp. 192,236.00
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN :PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
PPD.05 P.01.e.3) a Bongkar 1 m3 PasanganRN
Batu dengan Jack hammer 91,740.00
Permen PU no 28 TH 2016 - P.01.e.3) a
PERKE = 91,740.00
Upah Pekerja BUNA 0.600 Oh x Rp. 100,000.00 = Rp. 60,000.00
Mandor N 0.060 Oh x Rp. 130,000.00 = Rp. 7,800.00
Jumlah (1) = Rp. 67,800.00
PPD.06 P.06.a.7) Pasangan Bronjong pabrikasi (tenaga kerja untuk 1 m3 batu bronjong) 388,575.00
Permen PU no 28 TH 2016 - P.06.a.7) = 388,575.00
Upah Pekerja 0.250 Oh x Rp. 100,000.00 = Rp. 25,000.00
Mandor 0.025 Oh x Rp. 130,000.00 = Rp. 3,250.00
Jumlah (1) = Rp. 28,250.00
PBB.02 A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11x11)cm 95,180.80
Permen PU no 28 Tahun 2016 - A.4.1.1.35 = 95,180.80
Bahan Kayu kelas III 0.0020 m3 x Rp. 1,800,000.00 = Rp. 3,600.00
Paku 5 cm - 10 cm 0.0100 Kg x Rp. 20,000.00 = Rp. 200.00
Besi Beton Polos 3.0000 Kg x Rp. 13,000.00 = Rp. 39,000.00
Kawat Beton 0.4500 Kg x Rp. 20,000.00 = Rp. 9,000.00
Semen portland 4.0000 Kg x Rp. 1,050.00 = Rp. 4,200.00
Pasir beton 0.0060 m3 x Rp. 198,000.00 = Rp. 1,188.00
Batu Kerikil 0.0090 m3 x Rp. 280,000.00 = Rp. 2,520.00
= Rp. 59,708.00
PBB.03 A.4.1.1.36 Membuat 1 m' ring balok beton bertulang (10x15)cm 120,606.20
Permen PU no 28 Tahun 2016 - A.4.1.1.35 = 120,606.20
Bahan Kayu kelas III 0.0030 m3 x Rp. 1,800,000.00 = Rp. 5,400.00
Paku 5 cm - 10 cm 0.0200 Kg x Rp. 20,000.00 = Rp. 400.00
Besi Beton Polos 3.6000 Kg x Rp. 13,000.00 = Rp. 46,800.00
Kawat Beton 0.0500 Kg x Rp. 20,000.00 = Rp. 1,000.00
Semen portland 5.5000 Kg x Rp. 1,050.00 = Rp. 5,775.00
Pasir beton 0.0090 m3 x Rp. 198,000.00 = Rp. 1,782.00
Batu Kerikil 0.0150 m3 x Rp. 280,000.00 = Rp. 4,200.00
= Rp. 65,357.00
PBB.05 A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 1,013,688.50
Permen PU no 28 TH 2016 - A.4.1.1.5. = 1,013,688.50
Bahan Semen Portland 326.00 Kg x Rp. 1,050.00 = Rp. 342,300.00
Pasir beton 760.00 Kg x Rp. 132.00 = Rp. 100,320.00
Batu Pecah 2 - 3 cm 1029.00 Kg x Rp. 250.00 = Rp. 257,250.00
Air kerja 215.00 Ltr x Rp. 50.00 = Rp. 10,750.00
= Rp. 710,620.00
PBB.06 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2)cm, w/c = 0,58 1,061,611.10
Permen PU no 28 TH 2016 - A.4.1.1.7. = 1,061,611.10
Bahan Semen Portland 371.00 Kg x Rp. 1,050.00 = Rp. 389,550.00
Pasir beton 698.00 Kg x Rp. 132.00 = Rp. 92,136.00
Batu Pecah 2 - 3 cm 1047.00 Kg x Rp. 250.00 = Rp. 261,750.00
Air kerja 215.00 Ltr x Rp. 50.00 = Rp. 10,750.00
= Rp. 754,186.00
PBB.07 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (12 ± 2)cm 1,196,215.90
Permen PU no 28 TH 2016 - A.4.1.1.12. = 1,196,215.90
Bahan Semen Portland 448.00 Kg x Rp. 1,050.00 = Rp. 470,400.00
Pasir beton 667.00 Kg x Rp. 132.00 = Rp. 88,044.00
Batu Pecah 2 - 3 cm 1000.00 Kg x Rp. 250.00 = Rp. 250,000.00
Air kerja 215.00 Ltr x Rp. 50.00 = Rp. 10,750.00
= Rp. 819,194.00
PPL.05 A.4.4.3.36.a Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm 216,078.50
Permen PU no 28 TH 2016 - A.4.4.3.36.a = 216,078.50
Bahan Keramik 25 x 25 cm 16.000 Bh x Rp. 3,437.50 = Rp. 55,000.00
Semen portland 10.400 Kg x Rp. 1,050.00 = Rp. 10,920.00
Pasir pasang 0.045 M³ x Rp. 198,000.00 = Rp. 8,910.00
Semen warna 1.620 Kg x Rp. 1,500.00 = Rp. 2,430.00
Jumlah (1) = Rp. 77,260.00
PPL.11 LA.11.a.4) 1 M3 Membuat pasangan/kontruksi kayu dari bahan baku kayu kelas II dan/atau III 4,001,116.43
Permen PU no 28 TH 2016 - LA.11.a.4) = 4,001,116.43
Bahan Kayu meranti batu/Kelas II 1.100 M³ x Rp. 2,000,000.00 = Rp. 2,200,000.00
Paku biasa 1" - 3" 0.850 Kg x Rp. 15,000.00 = Rp. 12,750.00
Paku 5 cm - 10 cm 1.200 Kg x Rp. 20,000.00 = Rp. 24,000.00
Lem Kayu 1.000 Kg x Rp. 31,428.57 = Rp. 31,428.57
Jumlah (1) = Rp. 2,268,178.57
PDP.01 A.4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP 140,933.65
Permen PU no 28 TH 2016 - A.4.4.1.7. = 140,933.65
Bahan Batu Bata Biasa 5x10x20 cm 70.000 Bh x Rp. 800.00 = Rp 56,000.00
Semen portland 18.950 Kg x Rp. 1,050.00 = Rp 19,897.50
Pasir pasang 0.038 M³ x Rp. 198,000.00 = Rp 7,524.00
Jumlah (1) = Rp 83,421.50
PDP.08 A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 366,498.00
Permen PU no 28 TH 2016 - A.4.4.1.23 = 366,498.00
Bahan Terawang (Roster) 30.000 Bh x Rp. 9,000.00 = Rp 270,000.00
Semen portland 11.000 Kg x Rp. 1,050.00 = Rp 11,550.00
Pasir pasang 0.035 M³ x Rp. 198,000.00 = Rp 6,930.00
Jumlah (1) = Rp 288,480.00
Jumlah (1) = Rp
PDP.12 Supl.PDP/GH.05 Memasang 1 m2 shading net 50% (White) dengan penjepit spring clip 700,599.37
Suplemen = 700,599.37
Bahan Shading net 50% (White) 1.100 m2 x Rp. 25,000.00 = Rp. 27,500.00
Spring Clip 1.212 m' x Rp. 500,000.00 = Rp. 606,018.52
Jumlah (1) = Rp. 633,518.52
PDP.13 Supl.PDP/GH.06 Memasang 1 m2 Solarweave plastic rollup wall 250 mikron 60,043.50
Suplemen = 60,043.50
Bahan Solarweave Plastic 1.100 m2 x Rp. 45,000.00 = Rp. 49,500.00
PPAP.05 6.21a. Memasang 1 m' lisplank ukuran (1 x 20) cm, papan fiber cement : 114,565.00
SNI 3434:2008 / 6.21a = 114,565.00
Bahan Papan fiber cement (1 x 20) cm 1.2000 M' x Rp. 55,000.00 = Rp. 66,000.00
Paku Biasa 4 - 7" 0.100 Kg x Rp. 20,000.00 = Rp. 2,000.00
= Rp. 68,000.00
B.2.6.3.3.10.2 +
PPAP.08 B.2.6.3.3.10.5 1 m² Plafond Gypsum 9 mm + Rangka Metal Furring 228,417.75
Combinasi - 'B.2.6.3.3.10.2 + B.2.6.3.3.10.5 = 228,417.75
B.2.6.3.3.10.2a +
PPAP.10 B.2.6.3.3.10.5 1 m² Plafond Kalsiboard 3.5 mm + Rangka Metal Furring 227,317.75
Combinasi - ''B.2.6.3.3.10.2a + B.2.6.3.3.10.5 = 227,317.75
PPAP.12 Supl.PPAP/GH.09 Memasang 1 m2 plafon shading net 50% (Black) sistem buka tutup otomatis 54,010.70
Suplemen =
Bahan Shading net 50% (Black) 1.100 m2 x Rp. 35,000.00 = Rp. 38,500.00
Hollow allumunium 40x20x2mm 0.367 m' x Rp. 5,000.00 = Rp. 1,833.33
Kawat Seling PVC 5mm 0.836 m' x Rp. 0.00 = Rp. -
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
Turn buckle/span skrup 6mm
RN 0.011 bh x Rp. 0.00 = Rp. -
Klem Sling 6mm PERKE 0.023 bh x Rp. 0.00 = Rp. -
Monofilament 2mm BUNA 2.338 m' x Rp. 1,200.00 = Rp. 2,805.00
S-Hook stainless N 4.805 bh x Rp. 1,500.00 = Rp. 7,207.29
Katrol/Kerekan 50mm 0.023 bh x Rp. 15,000.00 = Rp. 343.75
Bearing 1,5" 0.009 bh x Rp. 25,000.00 = Rp. 214.84
Pipa GIP Ø 1,5"x1,8mm 0.031 m' x Rp. 101,666.67 = Rp. 3,106.48
Motor 0,75 kW 3 Phase 0.004 unit x Rp. 0.00 = Rp. -
Limit Switch 0.008 unit x Rp. 0.00 = Rp. -
Jumlah (1) = Rp. 54,010.70
PPAP.13 Supl.PPAP/GH.10 Memasang 1 m2 insect net mesh 50 dengan penjepit spring clip 241,944.88
Suplemen = 241,944.88
Bahan Insect Net Mesh 50 1.100 m2 x Rp. 9,000.00 = Rp. 9,900.00
Spring Clip 0.397 m' x Rp. 500,000.00 = Rp. 198,611.11
Wingle Wire 2.683 m' x Rp. 3,000.00 = Rp. 8,048.78
Jumlah (1) = Rp. 216,559.89
PPAP.14 Supl.PPAP/GH.11 Memasang 1 m2 Plastik UV 200 mikron dengan penjepit spring clip 461,712.45
Suplemen =
Bahan Plastik UV 200 mikron 1.100 m2 x Rp. 10,000.00 = Rp. 11,000.00
Spring Clip 0.808 m' x Rp. 500,000.00 = Rp. 404,218.59
Jumlah (1) = Rp. 415,218.59
PEKERJAAN BESI
PKPJ.10 Combine 10 Membuat 1 Unit Jendela kaca aluminium, kusen aluminium, 6 lubang 2 hidup, uk 370x200 (J3) 4,810,200.00
PKPJ.11 Combine 11 Membuat 1 Unit Jendela kaca aluminium, kusen aluminium, 4 lubang;2 hidup, uk 250x200 (J4) 5,010,200.00
PKPJ.12 Combine 12 Membuat 1 Unit Jendela segitiga kaca aluminium, kusen aluminium, uk 290x230 (J5) 9,330,600.00
PKPJ.13 Combine 13 Membuat 1 Unit Jendela GRC cetak motif uk 90x295 (J6) 148,000.00
= Rp. 2,527,750.00
PF.01 A.4.7.1.10. Pengecatan 1 m2 tembok interior baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 36,057.34
Permen PU no 28 TH 2016 - A.4.7.1.10. 36,057.34
Bahan Plamir 0.100 Kg x Rp. 22,000.00 = Rp. 2,200.00
Cat dasar dalam bangunan 0.120 Kg x Rp. 49,120.00 = Rp. 5,894.40
Cat penutup dalam 2x 0.260 Kg x Rp. 55,000.00 = Rp. 14,300.00
Jumlah (1) = Rp. 22,394.40
PF.02 A.4.7.1.10.a Pengecatan 1 m2 tembok exterior baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 39,706.70
Permen PU no 28 TH 2016 - A.4.7.1.10.a 39,706.70
Bahan Plamir 0.100 Kg x Rp. 22,000.00 = Rp. 2,200.00
Cat dasar luar bangunan 0.100 Kg x Rp. 53,120.00 = Rp. 5,312.00
Cat Penutup luar 2x 0.260 Kg x Rp. 70,000.00 = Rp. 18,200.00
Jumlah (1) = Rp. 25,712.00
PF.04 6.20 1M² Pengecatan permukaan baja dengan meni besi 15,070.00
SNI 2002-ABK PC / 6.20 15,070.00
Bahan Cat Menie Besi 0.100 Kg x Rp. 55,000.00 = Rp. 5,500.00
Kuas 0.010 Bh x Rp. 10,000.00 = Rp. 100.00
Jumlah (1) = Rp. 5,600.00
PLSK.06 Supl.PLSK/LSK.22 Penanaman 1 pohon Pucuk Merah, Tinggi 1 - 1.2 meter 133,212.93
Suplemen - Supl.PLSK/LSK.22 133,212.93
Bahan/Alat Pucuk Merah, Tinggi 1 - 1.2 meter 1.000 Phn x Rp. 120,000.00 = Rp. 120,000.00
Mobil Pick Up 0.001 Hr x Rp. 500,000.00 = Rp. 500.00
Jumlah (1) = Rp. 120,500.00
PLSK.09 Supl.PLSK/LSK.25 Penanaman 1 pohon Palem Raja, Tinggi 1.5 - 2 meter 221,212.93
Suplemen - Supl.PLSK/LSK.25 221,212.93
Bahan/Alat Palem Raja, Tinggi 1.5 - 2 meter 1.000 Phn x Rp. 200,000.00 = Rp. 200,000.00
Mobil Pick Up 0.001 Hr x Rp. 500,000.00 = Rp. 500.00
Jumlah (1) = Rp. 200,500.00
PLSK.10 Supl.PLSK/LSK.26 Penanaman 1 pohon Melati mini daun kuning tinggi 40 cm 23,212.93
Suplemen - Supl.PLSK/LSK.26 23,212.93
Bahan/Alat Melati mini daun kuning tinggi 40 cm 1.000 Phn x Rp. 20,000.00 = Rp. 20,000.00
Mobil Pick Up 0.001 Hr x Rp. 500,000.00 = Rp. 500.00
Jumlah (1) = Rp. 20,500.00
PLSK.11 Supl.PLSK/LSK.27 Penanaman 1 pohon Melati mini daun silver tinggi 40 cm 28,712.93
Suplemen - Supl.PLSK/LSK.27 28,712.93
Bahan/Alat Melati mini daun silver tinggi 40 cm 1.000 Phn x Rp. 25,000.00 = Rp. 25,000.00
Mobil Pick Up 0.001 Hr x Rp. 500,000.00 = Rp. 500.00
Jumlah (1) = Rp. 25,500.00
PEKERJAAN PAGAR
Bahan Pagar BRC 120 x 240 8 mm 0.143 lbr x Rp. 842,000.00 = Rp. 120,742.80
Jumlah (2) = Rp. 120,742.80
Alat
PLL.01 Supl.PLL/SNG.19 Pekerjaan Signage, 1 set Channel Letter NURSERY PERKEBUNAN CIANJUR 19,195,000.00
Suplemen - Supl.PLSK/LSK.19 19,195,000.00
Bahan Channel Letter per huruf 120 cm 24.000 huruf x Rp. 650,000.00 = Rp. 15,600,000.00
Jumlah (1) = Rp. 15,600,000.00
Upah Upah kerja 1/3 x bahan 0.333 x Rp. 5,550,000.00 = Rp. 1,850,000.00
Jumlah (2) = Rp. 1,850,000.00
Jumlah (1) + (2) = Rp. 17,450,000.00
Overhead 10% = Rp. 1,745,000.00
Total = Rp. 19,195,000.00
PLL.02 Supl.PLL/SNG.20 Upah dan Bahan Pemasangan 1M2 Aluminium Composite Panel (ACP) dan rangka besi siku 40x40x4 906,196.39
Suplemen - Supl.PLSK/LSK.20 906,196.39
Jumlah (1) = Rp. 350,000.00
Upah Upah kerja borongan 1.000 M2 x Rp. 350,000.00 = Rp. 350,000.00
Bahan Aluinium Composite Panel (ACP) 1.050 m2 x Rp. 250,000.00 = Rp. 262,500.00
Besi siku 40x40x4 8.168 Kg x Rp. 16,875.00 = Rp. 137,840.82
Dianbolt dia 10mm 8.000 bh x Rp. 800.00 = Rp. 6,400.00
Sealant 2.400 m' x Rp. 10,000.00 = Rp. 24,000.00
Alat bantu 1.000 x Rp. 43,074.08 = Rp. 43,074.08
Jumlah (2) = Rp. 473,814.90
Jumlah (1) + (2) = Rp. 823,814.90
Overhead 10% = Rp. 82,381.49
Total = Rp. 906,196.39
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
PLL.03 Supl.PLL/SNG.21 Pekerjaan 1 m2 Metal Cutting
RN Plat Baja 3mm 29,333.33
Suplemen - Supl.PLSK/LSK.21
PERKE 29,333.33
Bahan BUNA
Metal cutting plat baja 3mm 1.000 m2 x Rp. 20,000.00 = Rp. 20,000.00
N
Jumlah (1) = Rp. 20,000.00
Upah Upah kerja 1/3 x bahan 0.333 x Rp. 20,000.00 = Rp. 6,666.67
Jumlah (2) = Rp. 6,666.67
Jumlah (1) + (2) = Rp. 26,666.67
Overhead 10% = Rp. 2,666.67
Total = Rp. 29,333.33
PEKERJAAN JALAN
Bahan
Jumlah (2) = Rp.
Alat Motor Grader > 100 HP 0.002 jam x Rp. 53,125.00 = Rp. 91.44
Vibratory Roller 5-8 Ton 0.024 jam x Rp. 398,000.00 = Rp. 9,719.96
Alat bantu 1.000 ls x Rp. 981.14 = Rp. 981.14
Jumlah (3) = Rp. 10,792.54
Jumlah (1) + (2) + (3) = Rp. 11,356.29
Overhead 10% = Rp. 1,135.63
Total = Rp. 12,491.92
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMB
ANGU
LOKASI : DESA
NAN GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
NURS
TAHUN ANGGARAN : ERY
2022
MODE
PJ.02 5.1.(1) Lapis Fondasi Agregat Kelas
RN A 29,744.27
Permen PU no 28 TH 2016 - 5.1.(1)
PERKE 29,744.27
Upah Pekerja BUNA 0.0779 jam x Rp. 100,000.00 = Rp. 7,789.78
Mandor N 0.0097 jam x Rp. 130,000.00 = Rp. 1,265.84
Jumlah (1) = Rp. 9,055.62
Alat Wheel Loader 1.0-1.6 M3 0.009 jam x Rp. 52,500.00 = Rp. 456.76
Dump Truck 6-8 M3 0.136 jam x Rp. 100,000.00 = Rp. 13,601.60
Motor Grader > 100 HP 0.001 jam x Rp. 53,125.00 = Rp. 50.85
Vibratory Roller 5-8 Ton 0.010 jam x Rp. 398,000.00 = Rp. 3,875.42
Alat Bantu 0.000 Ls x Rp. 3,596.92 = Rp. -
Jumlah (3) = Rp. 17,984.62
Jumlah (1) + (2) + (3) = Rp. 27,040.24
Overhead 10% = Rp. 2,704.02
Total = Rp. 29,744.27
Alat Wheel Loader 1.0-1.6 M3 0.009 jam x Rp. 52,500.00 = Rp. 456.76
Dump Truck 6-8 M3 0.136 jam x Rp. 100,000.00 = Rp. 13,601.60
Motor Grader > 100 HP 0.001 jam x Rp. 53,125.00 = Rp. 50.85
Vibratory Roller 5-8 Ton 0.010 jam x Rp. 398,000.00 = Rp. 3,875.42
Alat Bantu 1.000 Ls x Rp. 1,798.46 = Rp. 1,798.46
Jumlah (3) = Rp. 19,783.08
Jumlah (1) + (2) + (3) = Rp. 409,083.53
Overhead 10% = Rp. 40,908.35
Total = Rp. 449,991.88
Bahan Aspal Emulsi CSS-1 atau SS-1 1.717 liter x Rp. 4,993.95 = Rp. 8,572.94
Bahan Agregat Pecah Mesin 5-10 & 10-20 mm 0.321 M3 x Rp. 198,000.00 = Rp. 63,472.50
Agregat Pecah Mesin 0-5 mm 0.419 M3 x Rp. 198,000.00 = Rp. 83,018.25
Semen Portland 9.682 Kg x Rp. 1,050.00 = Rp. 10,166.10
Aspal 62.315 Kg x Rp. 4,493.95 = Rp. 280,040.29
Alat Wheel Loader 1.0-1.6 M3 0.0054 jam x Rp. 52,500.00 = Rp. 281.88
AMP 0.0201 jam x Rp. 5,187,891.00 = Rp. 104,174.52
Genset 0.0201 jam x Rp. 729,166.67 = Rp. 14,641.90
Dump Truck 6-8 M3 0.0491 jam x Rp. 100,000.00 = Rp. 4,911.84
Asphalt Finisher 0.0125 jam x Rp. 500,000.00 = Rp. 6,263.36
Tandem Roller 0.0128 jam x Rp. 347,900.00 = Rp. 4,437.88
P. Tyre Roller 0.0084 jam x Rp. 250,000.00 = Rp. 2,102.09
Alat Bantu 1.0000 ls x Rp. 13,681.35 = Rp. 13,681.35
Jumlah (3) = Rp. 150,494.80
Jumlah (1) + (2) + (3) = Rp. 609,882.71
Overhead 10% = Rp. 60,988.27
Total = Rp. 670,870.98
= Rp.
= Rp.
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMBANGUNAN NURSERY MODERN PERKEBUNAN
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN : 2022
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
PPS.022 A.5.1.1 19+A.5.1.1 5.Pemasangan 1 buah wastafel+Pemasangan 1 buah kran diameter ½” atau 3/4”
Combinasi Permen PU no 28 TH 2016 - A.5.1.1 19+A.5.1.1 5.
PPS.024 AT.01 1 m' Pengambilan dan deskripsi sampel batuan (dalam laporan)
Permen PU no 28 TH 2016 - AT.01
Bahan Kawat Kasa sampel 0.100 Pkt x Rp. = Rp.
Kotak sampel 0.200 Pkt x Rp. = Rp.
Kantong Plastik (tebal) 0.050 Pkt x Rp. = Rp.
= Rp.
PPS.030 AT.07 1m' Pengadaan dan pemasangan Cassing Pipa Black Steel 6"
Permen PU no 28 TH 2016 - AT.07
Bahan Pipa Black Steel 6" 1.050 m x Rp. = Rp.
Centralizer 0.100 Ls x Rp. = Rp.
= Rp.
= Rp.
PPS.032 AT.09 1m' Pengadaan dan pemasangan cassing pipa Black Steel 8"
Permen PU no 28 TH 2016 - AT.09
Bahan Pipa Black Steel 8" 1.050 m x Rp. = Rp.
Centralizer 0.100 m x Rp. = Rp.
= Rp.
PPS.033 AT.11 1 m' Pengadaan dan pemasangan Pipa Sounding GIP 1"
Permen PU no 28 TH 2016 - AT.11
Bahan Pipa GIP 1'' t = 2mm 1.020 m x Rp. = Rp.
= Rp.
= Rp.
PEKERJAAN ELEKTRIKAL
PME.001 Supl.PME.046 Pasang titik instalasi penerangan dan stop kontak kabel NYM 3x2,5mm2
Suplemen - Supl.PME.046
Bahan Kabel NYM 3x2.5 mm² 10.000 m¹ x Rp. = Rp.
Pipa Listrik PVC 3.000 btg x Rp. = Rp.
Alat bantu 1.000 Ls x Rp. = Rp.
Jumlah (1) = Rp.
PME.006 Supl.PME.003 Tangki Filter Pasir Air FRP Fiber Glass 600 Vol. 3m3/jam
Suplemen - Supl.PME.003
Upah Pekerja 15.000 Oh xRp. = Rp.
Tukang 15.000 Oh xRp. = Rp.
Mandor 1.500 Oh xRp. = Rp.
Kepala Tukang 1.500 Oh xRp. = Rp.
Jumlah (1) = Rp.
Bahan Tangki Filter Pasir Air FRP Fiber Glass 600 Vol. 3m3/jam 1.00 unit x Rp. = Rp.
Jumlah (2) = Rp.
Peralatan x Rp. = Rp.
PME.007 Supl.PME.004 Tangki Filter Carbon FRP Fiber Glass 600 Vol. 3m3/jam
Suplemen - Supl.PME.004
Upah Pekerja 15.000 Oh xRp. = Rp.
Tukang 15.000 Oh xRp. = Rp.
Mandor 1.500 Oh xRp. = Rp.
Kepala Tukang 1.500 Oh xRp. = Rp.
Jumlah (1) = Rp.
Bahan Tangki Filter Carbon FRP Fiber Glass 600 Vol. 3m3/jam 1.00 unit x Rp. = Rp.
Jumlah (2) = Rp.
Peralatan x Rp. = Rp.
PME.008 Supl.PME.005 Tangki Filter Iron Magnesium FRP Fiber Glass 600 Vol. 3m3/jam
Suplemen - Supl.PME.005
Upah Pekerja 15.000 Oh x
Rp. = Rp.
Tukang 15.000 Oh x
Rp. = Rp.
Mandor 1.500 Oh x
Rp. = Rp.
Kepala Tukang 1.500 Oh x
Rp. = Rp.
Jumlah (1) = Rp.
Bahan Tangki Filter Carbon FRP Fiber Glass 600 Vol. 3m3/jam 1.00 unit x Rp. = Rp.
Jumlah (2) = Rp.
Peralatan x Rp. = Rp.
PME.009 Supl.PME.006 AC 1 PK
Suplemen - Supl.PME.006
Upah Pekerja 1.000 Oh x Rp. = Rp.
Tukang 1.000 Oh x Rp. = Rp.
Mandor 1.000 Oh x Rp. = Rp.
Kepala Tukang 1.000 Oh x Rp. = Rp.
Jumlah (1) = Rp.
Bahan AC 1PK DELUXE LOW WATT 1.00 UNIT x Rp. = Rp.
Pipa Refrigerant 1/4" + 3/8" 15.00 MTR x Rp. = Rp.
Kabel NYM 3x 2,5 mm2 15.00 MTR x Rp. = Rp.
16A 1 Gang Kotak Kontak Tipe Schuko 1.00 UNIT x Rp. = Rp.
pipa PVC drain 1 " 15.00 MTR x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
Jumlah (2) = Rp.
Peralatan 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DIGITAL METER SERI DM 6200H 14.00 BH x Rp. = Rp.
CT-SQUARE 250/5A 5VA 6.00 BH x Rp. = Rp.
CT 75/5A 3.00 BH x Rp. = Rp.
CT 50/5A 33.00 BH x Rp. = Rp.
CVS250B MCCB 25KA 3P 175-250A 2.00 BH x Rp. = Rp.
CVS100B MCCB 25KA 3P 56-80A 1.00 BH x Rp. = Rp.
CVS100B MCCB 25KA 3P 35-50A 11.00 BH x Rp. = Rp.
DOMF01106 MCB 4,5KA 1P 6A 42.00 BH x Rp. = Rp.
BOX 400 X210 X 80 CM +WIRING+ACCESSORIES 1 UNIT 1.00 BH x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 BH x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 BH x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DOL 3KW(2)
GV2ME14 MOTOR CB 6-10A 2.00 BH x Rp. = Rp.
LC1D09 CONTACTOR 3P 1NO 9A 2.00 BH x Rp. = Rp.
XA2EVM3LC PILOT LAMP ( R,G) 4.00 BH x Rp. = Rp.
XA2EA42 PUSH BUTTON ( R) N/C 22MM 2.00 BH x Rp. = Rp.
XA2EA31 PUSH BUTTON (G) N/O 22MM 2.00 BH x Rp. = Rp.
TERMINAL BLOCK 6P 25A 2.00 SET x Rp. = Rp.
DOL 2KW(1)
GV2ME10 MOTOR CB 4-6,3A 1.00 BH x Rp. = Rp.
LC1D09 CONTACTOR 3P 1NO 9A 1.00 BH x Rp. = Rp.
XA2EVM3LC PILOT LAMP ( R,G) 2.00 BH x Rp. = Rp.
XA2EA42 PUSH BUTTON ( R) N/C 22MM 1.00 BH x Rp. = Rp.
XA2EA31 PUSH BUTTON (G) N/O 22MM 1.00 BH x Rp. = Rp.
TERMINAL BLOCK 6P 25A 1.00 SET x Rp. = Rp.
DOL 0,37KW(1)
DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2022
PEKERJAAN : PEMBANGUNAN NURSERY MODERN PERKEBUNAN
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
TAHUN ANGGARAN : 2022
DISTRIBUTION :
DOMF01325 MCB 3P 20A 4,5KA 2.00 LS x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01120 MCB 4,5KA 1P 20A 6.00 BH x Rp. = Rp.
BOX 40 X30 X 20 CM +WIRING+ACCESSORIES 1 UNIT OUTD 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01110 MCB 4,5KA 1P 10A 1.00 BH x Rp. = Rp.
DOMF01120 MCB 4,5KA 1P 20A 13.00 BH x Rp. = Rp.
BOX 50 X40 X 25 CM +WIRING+ACCESSORIES 1 UNIT OUTD 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01110 MCB 4,5KA 1P 10A 5.00 BH x Rp. = Rp.
DOMF01120 MCB 4,5KA 1P 20A 7.00 BH x Rp. = Rp.
BOX 50 X40 X 25 CM +WIRING+ACCESSORIES 1 UNIT OUTD 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
EZC100B MCCB 3P 7,5KA 25A 2.00 BH x Rp. = Rp.
BOX 50 X60 X 25 CM +WIRING+ACCESSORIES 1 UNIT OUTD 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01106 MCB 4,5KA 1P 6A 6.00 BH x Rp. = Rp.
BOX 30 X40X 17 CM +WIRING+ACCESSORIES 1 UNIT 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01106 MCB 4,5KA 1P 6A 6.00 BH x Rp. = Rp.
BOX 30 X40X 17 CM +WIRING+ACCESSORIES 1 UNIT 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
DISTRIBUTION :
DOMF01106 MCB 4,5KA 1P 6A 6.00 BH x Rp. = Rp.
BOX 30 X40X 17 CM +WIRING+ACCESSORIES 1 UNIT 1.00 LOT x Rp. = Rp.
Material bantu ( isolasi & fittings & support, Accessories ) 1.00 LS x Rp. = Rp.
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk dan/atau Org 30 1.00 50,000.00 1,500,000.00
Tool Box Meeting) ; setiap hari
Pelatihan K3;
- Bekerja di Ketinggian
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS)
- Analysis Keselamatan Pekerjaan
- Perilaku Berbasis Keselamatan (Budaya K3)
- P3K
d Simulasi K3; Org 30 1.00 100,000.00 3,000,000.00
e Spanduk (banner) ; Lb 5 1.00 500,000.00 2,500,000.00
f Poster; Lb 3 1.00 100,000.00 300,000.00
g Papan Informasi K3. Bh 1 1.00 100,000.00 100,000.00
d Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Kesehatan Kerja (P2K3); Ls 1 ls 500,000.00 500,000.00
7 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls 1 1.00 1,250,000.00 1,250,000.00
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, d Ls 1 1.00 2,500,000.00 2,500,000.00
HARGA SATUAN TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SATUAN WAKTU
(Rp) (Rp)
8 Rambu- Rambu terdiri atas : ls 1 1.00 -
a Rambu Petunjuk; 4 250,000.00 1,000,000.00
b Rambu Larangan; 3 250,000.00 750,000.00
c Rambu Peringatan; 2 250,000.00 500,000.00
d Rambu Kewajiban; 1 250,000.00 250,000.00
e Rambu Informasi; 1 250,000.00 250,000.00
f Rambu Pekerjaan Sementara; 1 250,000.00 250,000.00
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick) ; 1 250,000.00 250,000.00
h Kerucut Lalu Lintas (Traffic Cone) ; 1 250,000.00 250,000.00
i Lampu Putar (Rotary Lamp ); 1 250,000.00 250,000.00
j Lampu Selang Lalu Lintas. 1 250,000.00 250,000.00
TOTAL 62,745,000.00
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1'-8 12.80 12 1,280 - - - - - - 12.80 - - 4.00 1 4.00 51.20 0.888 45.47
B 4-5 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
B 8-8' 0.56 12 56 - - - - - - 0.56 - - 4.00 1 4.00 2.24 0.888 1.99
C 1-8 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1 4.00 48.00 0.888 42.62
D 1-2 1.20 12 120 - - - - - - 1.20 - - 4.00 1 4.00 4.80 0.888 4.26
D 4-5 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
E 1'-8' 13.60 12 1,360 - - - - - - 13.60 - - 4.00 1 4.00 54.40 0.888 48.31
1 A-D 4.50 12 450 - - - - - - 4.50 - - 4.00 1 4.00 18.00 0.888 15.98
2 C-D 1.20 12 120 - - - - - - 1.20 - - 4.00 1 4.00 4.80 0.888 4.26
3 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1 4.00 12.80 0.888 11.37
4 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1 4.00 12.80 0.888 11.37
4 D-E 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
5 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1 4.00 24.00 0.888 21.31
6 A-B 1.80 12 180 - - - - - - 1.80 - - 4.00 1 4.00 7.20 0.888 6.39
7 C-E 2.80 12 280 - - - - - - 2.80 - - 4.00 1 4.00 11.20 0.888 9.95
8 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1 4.00 12.80 0.888 11.37
Subtotal 365.00
Pindahan -
Total 365.00
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1'-8 5.00 10 500 - - - - - - 5.00 - - 4.00 6.00 24.00 120.00 0.617 74.00
B 4-8' 5.00 10 500 - - - - - - 5.00 - - 4.00 4.00 16.00 80.00 0.617 49.33
C 1-8 5.00 10 500 - - - - - - 5.00 - - 4.00 7.00 28.00 140.00 0.617 86.33
D 1-5 5.00 10 500 - - - - - - 5.00 - - 4.00 4.00 16.00 80.00 0.617 49.33
E 2-8' 5.00 10 500 - - - - - - 5.00 - - 4.00 5.00 20.00 100.00 0.617 61.67
Subtotal 454.06
Pindahan -
Total 454.06
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-4 5.50 10 550 - - - - - - 5.50 - - 4.00 1.00 4.00 22.00 0.617 13.57
A 5-6 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
E 2-4 4.30 10 430 - - - - - - 4.30 - - 4.00 1.00 4.00 17.20 0.617 10.61
7 C-E 2.80 10 280 - - - - - - 2.80 - - 4.00 1.00 4.00 11.20 0.617 6.91
8 A-C 3.20 10 320 - - - - - - 3.20 - - 4.00 1.00 4.00 12.80 0.617 7.89
Teras 4.70 10 470 - - - - - - 4.70 - - 4.00 1.00 4.00 18.80 0.617 11.59
Subtotal 80.57
Pindahan -
Total 80.57
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1'-8 12.80 12 1,280 - - - - - - 12.80 - - 4.00 1.00 4.00 51.20 0.888 45.47
B 4-5 1.50 12 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.888 5.33
C 1-8 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1.00 4.00 48.00 0.888 42.62
D 1-2 1.20 12 120 - - - - - - 1.20 - - 4.00 1.00 4.00 4.80 0.888 4.26
D 4-5 1.50 12 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.888 5.33
E 1'-8' 13.60 12 1,360 - - - - - - 13.60 - - 4.00 1.00 4.00 54.40 0.888 48.31
1 A-D 4.50 12 450 - - - - - - 4.50 - - 4.00 1.00 4.00 18.00 0.888 15.98
2 C-D 1.20 12 120 - - - - - - 1.20 - - 4.00 1.00 4.00 4.80 0.888 4.26
3 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1.00 4.00 12.80 0.888 11.37
4 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1.00 4.00 12.80 0.888 11.37
4 D-E 1.50 12 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.888 5.33
5 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.888 21.31
6 A-B 1.80 12 180 - - - - - - 1.80 - - 4.00 1.00 4.00 7.20 0.888 6.39
7 C-E 2.80 12 280 - - - - - - 2.80 - - 4.00 1.00 4.00 11.20 0.888 9.95
8 A-C 3.20 12 320 - - - - - - 3.20 - - 4.00 1.00 4.00 12.80 0.888 11.37
Subtotal 362.07
Pindahan -
Total 362.07
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-4 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
A 5-6 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
E 2-4 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
7 C-E 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
8 A-C 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
Subtotal 45.39
Pindahan -
Total 45.39
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-7 7.50 12 750 - - - - - - 7.50 - - 4.00 1 4.00 30.00 0.888 26.64
B 2-6 6.00 12 600 - - - - - - 6.00 - - 4.00 1 4.00 24.00 0.888 21.31
C 2-3 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
D 1-7 7.50 12 750 - - - - - - 7.50 - - 4.00 1 4.00 30.00 0.888 26.64
F 2-3 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
G 2-6 6.00 12 600 - - - - - - 6.00 - - 4.00 1 4.00 24.00 0.888 21.31
H 1-7 7.50 12 750 - - - - - - 7.50 - - 4.00 1 4.00 30.00 0.888 26.64
1' A-H 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1 4.00 48.00 0.888 42.62
2 A-H 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1 4.00 48.00 0.888 42.62
3 B-C 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
3 F-G 1.50 12 150 - - - - - - 1.50 - - 4.00 1 4.00 6.00 0.888 5.33
4 A-B 3.00 12 300 - - - - - - 3.00 - - 4.00 1 4.00 12.00 0.888 10.66
4 G-H 3.00 12 300 - - - - - - 3.00 - - 4.00 1 4.00 12.00 0.888 10.66
5 B-G 6.00 12 600 - - - - - - 6.00 - - 4.00 1 4.00 24.00 0.888 21.31
6 A-B 3.00 12 300 - - - - - - 3.00 - - 4.00 1 4.00 12.00 0.888 10.66
6 G-H 3.00 12 300 - - - - - - 3.00 - - 4.00 1 4.00 12.00 0.888 10.66
Subtotal 427.07
Pindahan -
Total 427.07
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1'-6 5.00 10 500 - - - - - - 5.00 - - 4.00 4.00 16.00 80.00 0.617 49.33
B 2-6 5.00 10 500 - - - - - - 5.00 - - 4.00 5.00 20.00 100.00 0.617 61.67
C 2-3 5.00 10 500 - - - - - - 5.00 - - 4.00 2.00 8.00 40.00 0.617 24.67
D 1'-5 5.00 10 500 - - - - - - 5.00 - - 4.00 4.00 16.00 80.00 0.617 49.33
F 2-3 5.00 10 500 - - - - - - 5.00 - - 4.00 2.00 8.00 40.00 0.617 24.67
G 2-6 5.00 10 500 - - - - - - 5.00 - - 4.00 5.00 20.00 100.00 0.617 61.67
H 1'-7 5.00 10 500 - - - - - - 5.00 - - 4.00 4.00 16.00 80.00 0.617 49.33
Subtotal 454.06
Pindahan -
Total 454.06
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 B 3-4 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
B 4-5 2.00 10 200 - - - - - - 2.00 - - 4.00 1.00 4.00 8.00 0.617 4.93
C 2-3 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
F 2-3 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
G 3-4 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
G 4-5 2.00 10 200 - - - - - - 2.00 - - 4.00 1.00 4.00 8.00 0.617 4.93
2 A-B 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
2 C-D 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
2 D-F 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
2 G-H 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
5 B-D 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
5 D-G 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
6 A-B 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
6 G-H 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
Teras 10.16 10 1,016 - - - - - - 10.16 - - 4.00 1.00 4.00 40.64 0.617 25.06
Subtotal 158.36
Pindahan -
Total 158.36
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-7 7.50 10 750 - - - - - - 7.50 - - 4.00 1.00 4.00 30.00 0.617 18.50
B 2-6 6.00 10 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.617 14.80
C 2-3 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
D 1-7 7.50 10 750 - - - - - - 7.50 - - 4.00 1.00 4.00 30.00 0.617 18.50
F 2-3 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
G 2-6 6.00 10 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.617 14.80
H 1-7 7.50 10 750 - - - - - - 7.50 - - 4.00 1.00 4.00 30.00 0.617 18.50
1' A-H 12.00 10 1,200 - - - - - - 12.00 - - 4.00 1.00 4.00 48.00 0.617 29.60
2 A-H 12.00 10 1,200 - - - - - - 12.00 - - 4.00 1.00 4.00 48.00 0.617 29.60
3 B-C 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
3 F-G 1.50 10 150 - - - - - - 1.50 - - 4.00 1.00 4.00 6.00 0.617 3.70
4 A-B 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
4 G-H 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
5 B-G 6.00 10 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.617 14.80
6 A-B 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
6 G-H 3.00 10 300 - - - - - - 3.00 - - 4.00 1.00 4.00 12.00 0.617 7.40
Subtotal 337.53
Pindahan -
Total 337.53
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-7 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
B 2-6 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
C 2-3 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
D 1-7 1.70 10 170 - - - - - - 1.70 - - 4.00 1.00 4.00 6.80 0.617 4.19
Subtotal 36.31
Pindahan -
Total 36.31
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
2 Tulangan Utama Atas I 1-6 12.00 16 1,200 - - - - - - 12.00 - - 3.00 1 3.00 36.00 1.579 56.83
1 A-I 30.00 16 3,000 - - - - - - 30.00 - - 3.00 1 3.00 90.00 1.579 142.08
6 A-I 30.00 16 3,000 - - - - - - 30.00 - - 3.00 1 3.00 90.00 1.579 142.08
3 Tulangan Utama Bawah 4 A-C 12.00 16 1,200 - - - - - - 12.00 - - 3.00 1 3.00 36.00 1.579 56.83
4 D-E 30.00 16 3,000 - - - - - - 30.00 - - 3.00 1 3.00 90.00 1.579 142.08
5 A-E 30.00 16 3,000 - - - - - - 30.00 - - 3.00 1 3.00 90.00 1.579 142.08
4 Tulangan Exstra 4 A-C 12.00 12 1,200 - - - - - - 12.00 - - 2.00 1 2.00 24.00 0.888 21.31
4 D-E 30.00 12 3,000 - - - - - - 30.00 - - 2.00 1 2.00 60.00 0.888 53.28
5 A-E 30.00 12 3,000 - - - - - - 30.00 - - 2.00 1 2.00 60.00 0.888 53.28
Subtotal 1,167.28
Pindahan -
Total 1,167.28
Sloof S2
1 Tulangan Sengkang A 1-6 12.00 10 14 19 14 19 5 5 - 0.76 - - 81.00 1 81.00 61.56 0.617 37.96
B 1-4 5.00 10 14 19 14 19 5 5 - 0.76 - - 34.00 1 34.00 25.84 0.617 15.93
D 1-2 2.00 10 14 19 14 19 5 5 - 0.76 - - 14.00 1 14.00 10.64 0.617 6.56
E 1-6 6.00 10 14 19 14 19 5 5 - 0.76 - - 41.00 1 41.00 31.16 0.617 19.22
2 A-E 6.00 10 14 19 14 19 5 5 - 0.76 - - 41.00 1 41.00 31.16 0.617 19.22
4 A-B 2.00 10 14 19 14 19 5 5 - 0.76 - - 14.00 1 14.00 10.64 0.617 6.56
5 A-E 6.00 10 14 19 14 19 5 5 - 0.76 - - 41.00 1 41.00 31.16 0.617 19.22
2 Tulangan Utama A 1-6 12.00 12 1,200 - - - - - - 12.00 - - 2.00 1 2.00 24.00 0.888 21.31
B 1-4 5.00 12 500 - - - - - - 5.00 - - 2.00 1 2.00 10.00 0.888 8.88
D 1-2 2.00 12 200 - - - - - - 2.00 - - 2.00 1 2.00 4.00 0.888 3.55
E 1-6 6.00 12 600 - - - - - - 6.00 - - 2.00 1 2.00 12.00 0.888 10.66
2 A-E 6.00 12 600 - - - - - - 6.00 - - 2.00 1 2.00 12.00 0.888 10.66
4 A-B 2.00 12 200 - - - - - - 2.00 - - 2.00 1 2.00 4.00 0.888 3.55
5 A-E 6.00 12 600 - - - - - - 6.00 - - 2.00 1 2.00 12.00 0.888 10.66
Subtotal 193.93
Pindahan -
Total 193.93
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 2-5 5.45 10 545 - - - - - - 5.45 - - 4.00 4.00 16.00 87.20 0.617 53.77
B 1-4 5.45 10 545 - - - - - - 5.45 - - 4.00 4.00 16.00 87.20 0.617 53.77
C 5-6 5.45 10 545 - - - - - - 5.45 - - 4.00 2.00 8.00 43.60 0.617 26.89
D 1-2 5.45 10 545 - - - - - - 5.45 - - 4.00 2.00 8.00 43.60 0.617 26.89
E 2-5 5.45 10 545 - - - - - - 5.45 - - 4.00 2.00 8.00 43.60 0.617 26.89
Subtotal 268.32
Pindahan -
Total 268.32
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 1-6 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1.00 4.00 48.00 0.888 42.62
B 1-4 5.00 12 500 - - - - - - 5.00 - - 4.00 1.00 4.00 20.00 0.888 17.76
D 1-2 2.00 12 200 - - - - - - 2.00 - - 4.00 1.00 4.00 8.00 0.888 7.10
E 1-6 12.00 12 1,200 - - - - - - 12.00 - - 4.00 1.00 4.00 48.00 0.888 42.62
1 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.888 21.31
2 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.888 21.31
4 A-B 2.00 12 200 - - - - - - 2.00 - - 4.00 1.00 4.00 8.00 0.888 7.10
5 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.888 21.31
6 A-E 6.00 12 600 - - - - - - 6.00 - - 4.00 1.00 4.00 24.00 0.888 21.31
Subtotal 294.34
Pindahan -
Total 294.34
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
1 Tul. Sengkang bawah pondasi 16 18 110 18 - - - - 1.46 - - 16.00 12.0 192.00 280.32 1.579 442.53
2 Tul. Sengkang atas pondasi 16 18 42 28 42 18 - - 1.48 - - 16.00 12.0 192.00 284.16 1.579 448.59
3 Tul. Utama Kolom 16 10 32 232 - - - - 2.74 - - 6.00 12.0 72.00 197.28 1.579 311.44
4 Tul. Sengkang Kolom 2.32 10 25 25 25 25 5 5 - 1.10 - - 16.00 12.0 192.00 211.20 0.617 130.24
Subtotal 1,332.81
Pindahan -
Total 1,332.81
KEMENTERIAN PERTANIAN
PEKERJAAN : DETAIL ENGINEERING DESIGN (DED) PEMBANGUNAN NURSERI MODERN PERKEBUNAN CIANJUR PROVINSI JAWA BARAT
LOKASI : DESA GEKBRONG, KECAMATAN GEKBRONG, KABUPATEN CIANJUR
INSTANSI : DIREKTORAT JENDERAL PERKEBUNAN
Tulangan Utama
2 A 4-5 2.10 10 210 - - - - - - 2.10 - - 4.00 1.00 4.00 8.40 0.617 5.18
A 5-6 2.10 10 210 - - - - - - 2.10 - - 4.00 1.00 4.00 8.40 0.617 5.18
E 4-5 2.10 10 210 - - - - - - 2.10 - - 4.00 1.00 4.00 8.40 0.617 5.18
E 5-6 2.10 10 210 - - - - - - 2.10 - - 4.00 1.00 4.00 8.40 0.617 5.18
1 A-E 1.10 10 110 - - - - - - 1.10 - - 4.00 1.00 4.00 4.40 0.617 2.71
4 A-B 1.10 10 110 - - - - - - 1.10 - - 4.00 1.00 4.00 4.40 0.617 2.71
Subtotal 41.14
Pindahan -
Total 41.14