TAHUN : 2017
Jakarta, Desember 2017
Nomor : 040/CGM/XII/Lap-akhir/2017
Kepada Yth,
Perencana Pemb. Ekstensi Hotel Golden Tulip
di Tempat
Dengan Hormat,
Hormat kami
PT.Carina Griya Mandiri
SIGIT PREMANA
Direktur II
PROYEK : RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
LOKASI : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG
PROVINSI : KEPULAUAN BANGKA BELITUNG
DAFTAR ISI
I PENDAHULUAN Halaman
II LINGKUP PEKERJAAN
IV HASIL PENYELIDIKAN
I. PENDAHULUAN
Pemohon :
“ Perencana Pembangunan Ekstensi Hotel Golden Tulip “
I. SIFAT-SIFAT PENGENAL :
(Index Properties)
1 Kekuatan Geser Langsung ASTM D–3080-79 Kohesi, Sudut geser dalam C, Kg/cm, derajat
(Direct Shear)
2 Triaxial ASTM D–2850-70 Kohesi, Sudut geser dalam C, Kg/cm, derajat
3 Kuat Tekan Bebas ASTM D–2166-72 Tekanan silinder bebas qu Kg/cm
(Unconfined Compressive Strength)
4 Consolidation (Konsolidasi) ASTM D–2435-70 Compression Index Cc -
Coefficient of Cv cm/second
Consolidation
Hasil Penyelidikan dari 2 (dua) titik Bor Dalam (Deep Boring), hasil nya adalah
sebagai berikut :
Surface : - 0,00 m Elevasi ( 0,00) m diambil dari Muka Tanah Setempat (MTS).
Lapisan-1
Macam tanah : Pasir (Sand), coklat putihan dengan
Konsistensi : sedang (medium) atau dengan
- 0,00 - 3,50 m Nilai N SPT : berkisar antara : N = 14 Blows
Contoh : I (- 1,50 - 2,00) m.
SPT 1 (- 2,00 - 2,45) m, nilai N = 14 Blows, atau dengan
Konsistensi : sedang (medium)
Lapisan -2
Macam tanah : Pasir (Sand), coklat putihan dengan
Konsistensi : sedang (medium) atau dengan
- 3,50 m - 6,00 m Nilai N SPT : berkisar antara : N = 16 blows
Contoh : II (- 3,50 - 4,00) m.
SPT 2 (- 4,00 - 4,45) m, nilai N = 16 Blows, dengan
Konsistensi : sedang (medium)
Lapisan -3
Macam tanah : batu granit dengan
Konsistensi : sangat keras (very hard) atau dengan
- 6,00 m - 8,00 m Nilai N SPT : berkisar antara : N > 60 blows
SPT 3 (- 6,00 - 6,03) m, nilai N > 60 Blows, dengan
Konsistensi : sangat keras (very hard
Lapisan -4
Macam tanah : Pasir (Sand), coklat putihan dengan
Konsistensi : sangat padat (very dense) atau dengan
Nilai N SPT : berkisar antara : N > 60 blows
Surface : - 0,00 m Elevasi ( 0,00) m diambil dari Muka Tanah Setempat (MTS).
Lapisan-1
Macam tanah : Pasir (Sand) halus, coklat dengan
Konsistensi : padat (dense) atau dengan
Nilai N SPT : berkisar antara : N = 44 s/d 45 Blows
- 0,00 - 6,00 m
SPT 1 (- 2,00 - 2,45) m, nilai N = 45 Blows, atau dengan
Konsistensi : padat (dense)
SPT 2 (- 4,00 - 4,45) m, nilai N = 44 Blows, dengan
Konsistensi : padat (dense)
Lapisan -2
Macam tanah : batu granit dengan
Konsistensi : sangat keras (very hard) atau dengan
- 6,00 m - 8,00 m Nilai N SPT : berkisar antara : N > 60 blows
SPT 3 (- 6,00 - 6,04) m, nilai N > 60 Blows, dengan
Konsistensi : sangat keras (very hard
Lapisan -3
Macam tanah : Pasir (Sand), putih dengan
Konsistensi : sangat padat (very dense) atau dengan
Nilai N SPT : berkisar antara : N > 60 blows
B
2
dimana : qa = kapasitas dukung ijin netto untuk penurunan 1” (kN/m )
Kd= (1+0,33 D/B) = faktor kedalaman pondasi, maks Kd=1,33
B = lebar pondasi (m), D = kedalaman pondasi (m)
q allowable = q ull / SF ; dimana : SF = Safety Factor = 3,0
N = diambil nilai rata-rata pada zona 0,50 B diatas pondasi dan 2B di bawah
dasar pondasi, N adalah setelah dikoreksi.
b) Bila data Bor diambil pada lapisan keras atau nilai N > 50 blows
maka dapat perkiraan ke dalaman pondasi adalah sebagai berikut :
Penyelidikan Deep Boring.
Titik Ketebalan Pengambilan
Kedalaman keras N-SPT
Penyelidikan Lapisan keras kedalaman
BH-1 - 6,50 s/d 12,50 m. 6,00 m > 50 blows - 7,00 m
Penyelidikan Kedalaman Daya Dukung Ijin Pondasi Bore Pile (Q netto) ton
Bor Dalam (m) [] 30 cm2 [] 35 cm2 [] 40 cm2
Dari data penyelidikan lapangan, Bor Dalam (Deep Boring) dan hasil pengujian
laboratorium dapat disimpulkan adalah sebagai berikut :
6.3. Kondisi lapisan tanah keras dan Muka Air Tanah (MAT);
Kedalaman lapisan keras dan Muka Air Tanah (MAT) adalah sebagai berikut :
Hasil Penyelidikan Boring :
1,50 ≈ 2,00 N = 45 - - -
Bore Hole (BH-2)
3,50 ≈ 4,00 N = 44 - - -
6.6. Saran ;
1) Bila tiang pancang yang digunakan, maka perlu ditinjau daya dukung
terhadap daya dukung tiang kelompok (Pile Group) dan daya dukung
tiang terhadap gaya horizontal.
2) Dan dalam pelaksanaan pemasangan pondasi tiang pancang agar
mepertimbangkan syarat sebagai berikut :
Jarak antara dua tiang dalam kelompok tiang (spacing)
atau S.2,5 D < S < 3D ; dimana : D diameter tiang ( penampang tiang)
S minimum = 0,60 m. ; S maximum = 2,00 m.
LAMPIRAN
PETA SITUASI
BH-1 BH-2
(Bore Hole-1) (Bore Hole-2)
Keterangan :
BORING
Proyek : Rencana Pembangunan Stadion Kawasan ITERA (Tribun Barat)
Lokasi : Desa Suka Rame , Bandar Lampung, Sumatra Selatan
DOKUMENTASI
( GAMBAR /FOTO )
Bore Hole-1&2
( BH-1 & BH-2 )
BORE-LOG
( BORING PROFILE )
HASIL PENYELIDIKAN LAPANGAN
BOR DALAM (DEEP BORING)
Bore Hole-1&2
( BH-1 & BH-2 )
MAT : - 1,00 M
- 3.50
Contoh : II (- 3,50 º - 4,00) m
5 / 15 7 / 15 9 / 15 N = 16 SPT : 2 (- 4,00 º - 4,45) m
Pasir, coklat
- 6.00
60 / 3 - - N > 60 SPT : 3 (- 6,00 º - 6,03) m
Batu granit
- 8.00
18 / 15 27 / 15 41 / 15 N > 60 SPT : 4 (- 8,00 º - 8,45) m
12 Des 17
KETERANGAN :
Muka Air Tanah (MAT)
dijumpai pada kedalaman : - 1,00 M
PROJECT : RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP BORING NO : BH-2 (dua)
LOCATION : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Kordinat : X = 699032.685
14 Des 17 Y = 9254360.302
Z = 490.042
± 0.00
MAT : - 1,50 M
- 6.00
60 / 4 - - N > 60 SPT : 3 (- 6,00 º - 6,04) m
Batu granit
- 8.00
14 / 15 25 / 15 39 / 15 N > 60 SPT : 4 (- 8,00 º - 8,45) m
Pasir, putih
Pasir, putih
14 Des 17
KETERANGAN :
Muka Air Tanah (MAT)
dijumpai pada kedalaman : - 1,50 M
Proyek : Rencana Pembangunan Stadion Kawasan ITERA (Tribun Barat)
Lokasi : Desa Suka Rame , Bandar Lampung, Sumatra Selatan
Bore Hole-1&2
( BH-1 & BH-2 )
Water Passing
Hydrometer Atterberg Limit Classification Triaxial Unconfined Consolidation
SAMPLING DEPTH Content Specific
Bulk sieve ( # ) ( qu )
BORE HOLE SAMPLE DESCRIPTIONS ( Wn ) Gravity
Density No. 200 Gravel Sand Silt Clay LL PL PI Direct Shear k
(Gs) USCS AASHTO Cc Cv
( meter ) (UDS) (%) (%) (%) (%) (%) (%) (%) (%) (%) ø (DEGREE) C (kg/cm )2 2
( kg/cm )
PROJECT : RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP TESTING DATE : 14-Dec-17
LOCATION : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG TESTED BY : Iwan K. Cs
PROVINCE : KEPULAUAN BANGKA BELITUNG CHECKED BY : Sigit Premana
DEEP BORING : BORE HOLE (BH-1)
ELEVATION : ± 0,00 m (dari MTS)
Sample Description Pasir (sand), coklat putihan Pasir (sand), coklat. Lempung (Clay), coklat kuningan Pasir lanauan
Pycnometer No. P1 P5 P3 P4 28 29 18
Weight of Pycnometer + dry soil ( W2 ) gram 88.35 94.66 96.66 98.86 68.47 62.04 21.95
Weight of Pycnometer ( W1 ) gram 69.39 71.39 65.85 62.82 35.71 20.51 18.07
Weight of dry soil ( W2-W1 ) gram 18.96 23.27 30.81 36.04 32.76 41.53 3.88
Temperatur ( T ) degree 28 28 28 28 28 28 28
o
Weight of Pycnometer + Water at ( 25 ) C ( W4 ) gram 172.43 172.77 167.87 164.62 135.71 123.59 66.95
Weight of Pycnometer + water + dry soil at ( T ) °C ( W3 ) gram 184.32 187.37 187.20 187.25 156.20 149.56 69.44
Volume of soil at ( T ) Co
( W2-W1 ) + ( W4-W3 ) cc 7.07 8.67 11.48 13.41 12.27 15.56 1.39
(W 2 W1)
Specific gravity of soil at ( T ) ° C (W 2 W1) (W 4 W 3) 2.677 2.679 2.679 2.683 2.665 2.664 2.787
Sample Description Pasir (sand), coklat putihan Pasir (sand), coklat. Lempung (Clay), coklat kuningan Pasir lanauan
Wt. Container + Wet Soil g 48.10 49.22 51.92 51.25 51.55 51.86 47.04
Wt. Container + Dry Soil g 40.35 41.55 43.21 42.65 41.45 41.67 37.45
Date : 14-Dec-17
Bore Hole No. : BORE HOLE (BH-1) Tested By : Iwan K. Cs
Sample Type : Undisturbed Sample (UDS) Checked By : Sigit Premana
{ UDS-1 }
SAND
CLAY SILT Fine Medium Coarse GRAVEL
0,002 # 200 0,074 # 40 0,425 # 10 2,00 # 4 4,75 3" 76,2
100 0
90 10
80 20
70 30
Percent Finer By Weight
50 50
40 60
30 70
20 80
10 90.
0 100
0.001 0.01 0.1 1 10
Diameter D (mm)
LOCATION : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG 109.607 -46
PROVINCE : KEPULAUAN BANGKA BELITUNG 5 77
DEEP BORING : BORE HOLE (BH-1) 100 17
ELEVATION : : ± 0,00 m (dari MTS) TEST OF DATE : 24-Nov-17 ##
SAMPLE TYPE : UDS-1 TESTED BY : Iwan K. -15
DEPTH : - 1,50 ÷ - 2,00 M. CHECKED BY : Sigit Premana -15
SOIL DESCRIPTION : Pasir (Sand), coklat putihan
:
LIQUID LIMIT PLASTIC LIMIT
TEST No. 1 2 3 4
Number Of Blows 35 27 21 11
Tare No. 150 201 204 206 203 151
Weight Of Wet Soil + Tare gr 44.55 44.72 42.23 42.73 27.01 24.82
Weight Of Dry Soil + Tare gr 35.53 34.83 32.62 31.41 23.70 21.79
Weight Of Tare gr 11.44 12.74 12.87 12.94 12.88 11.84
Weight Of Water gr 9.02 9.89 9.61 11.32 3.31 3.03
Weight Of Dry Soil gr 24.09 22.09 19.75 18.47 10.82 9.95
Water Content % 37.44 44.77 48.66 61.29 30.59 30.45
30.52
160
LIQUID LIMITS, LL ( % )
140 45.13
100 30.52
80 PLASTIC INDEX, PI ( % )
60 14.60
40 AASHTO
45.13
A-7-5
20
0 U.S.C.S
25 ML
5 100
Number of Blows
60 80
CL
PLASTIC INDEX
70
LIQUID LIMIT
50
A line =0.73(wl-20) 60 A-7-6
40 50
30 40
OH/MH 30
20
A-4
20
10 0L/ML 10 A-7
CL/ML A-6
0 0
0 20 40 60 80 100 120 140 0 20 40 60 80 100
LIQUID LIMIT wl PLASTIC INDEX
( ASTM D-3080-79 )
:
PROJECT RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
NUMBER OF SPECIMEN 1 2 3
Specimen Diameter cm 6.3 6.3 6.3
Specimen Hight cm 2.25 2.25 2.25
W. of Sample + Ring gr 170.88 170.89 170.90
Weight of Ring gr 53.06 53.06 53.06
Normal Forse kg 5 10 15
Elapsed StraIn P.R. P.R. P.R.
Time In Dial In Dial In Dial In Dial In
min 0.01mm 0.01mm 0.01mm 0.01mm
0.00 0.0000 0.0 0.0 0.0
0.25 30.000 3.2 4.9 6.4
0.50 60.000 6.4 9.8 12.7
0.75 90.000 7.8 11.9 15.5
1.00 120.00 8.6 13.0 17.0
1.25 150.00 9.3 14.1 18.4
1.50 180.00 10.0 15.2 19.8
1.75 210.00 14.6 22.2 29.0
2.00 240.00 16.8 25.5 33.2
2.25 270.00 17.5 26.6 34.6
2.50 300.00 17.8 27.1 35.3
2.75 330.00 18.5 28.2 36.7
3.00 360.00 18.9 28.7 37.5
3.25 390.00 19.6 29.8 38.9
3.50 420.00
3.75 450.00
4.00 480.00
4.25 510.00
4.50 540.00
4.75 570.00
5.00 600.00
5.25 630.00
5.50 660.00
5.75 690.00
6.00 720.00
( ASTM D-3080-79 )
Elapsed StraIn P.R. Shear Shear P.R. Shear Shear P.R. Shear Shear
Time In Dial In Dial In Force Stress Dial In Force Stress Dial In Force Stress
min 0.01mm 0.01mm kg kg/cm2 0.01mm kg kg/cm2 0.01mm kg kg/cm2
0.00 0.0000 0.0000 0.0000 0.0000 0.00 0.0000 0.0000 0.00 0.0000 0.0000
0.25 30.000 3.2084 0.8214 0.0263 4.88 1.2484 0.0400 6.36 1.6280 0.0522
0.50 60.000 6.4168 1.6427 0.0527 9.75 2.4968 0.0801 12.72 3.2560 0.1044
0.75 90.000 7.8428 2.0078 0.0644 11.92 3.0516 0.0979 15.55 3.9796 0.1276
1.00 120.00 8.5558 2.1903 0.0702 13.00 3.3291 0.1068 16.96 4.3413 0.1392
1.25 150.00 9.2688 2.3728 0.0761 14.09 3.6065 0.1156 18.37 4.7031 0.1508
1.50 180.00 9.9817 2.5553 0.0819 15.17 3.8839 0.1245 19.78 5.0649 0.1624
1.75 210.00 14.6161 3.7417 0.1200 22.22 5.6872 0.1824 28.97 7.4164 0.2378
2.00 240.00 16.7551 4.2893 0.1375 25.47 6.5194 0.2091 33.21 8.5018 0.2726
2.25 270.00 17.4680 4.4718 0.1434 26.55 6.7969 0.2180 34.62 8.8636 0.2842
2.50 300.00 17.8245 4.5631 0.1463 27.09 6.9356 0.2224 35.33 9.0444 0.2900
2.75 330.00 18.5375 4.7456 0.1522 28.18 7.2130 0.2313 36.74 9.4062 0.3016
3.00 360.00 18.9125 4.8416 0.1553 28.75 7.3589 0.2360 37.49 9.5965 0.3077
3.25 390.00 19.6344 5.0264 0.1612 29.84 7.6398 0.2450 38.92 9.9628 0.3195
3.50 420.00
3.75 450.00
4.00 480.00
4.25 510.00
4.50 540.00
4.75 570.00
5.00 600.00
5.25 630.00
5.50 660.00
5.75 690.00
6.00 720.00
1.20
UNIT WEIGHT
3
(ton/m )
NORMAL STRESS (kg/cm2)
1.679
0.80
ANGEL OF INTERNAL
FRICTION (º)
0.40 26
COHESION
2
(kg/cm )
0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.084
SHEAR STRESS (kg/cm2)
GRAPHICAL U C S TEST
:
Project : RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
District : JALAN SEROJA NO. A88, TANJUNG PANDAN
:
Location : KABUPATEN BELITUNG
:
Province : KEPULAUAN BANGKA BELITUNG
:
1.600
1.200
Stress - s (kg/cm2)
0.800
0.400
0.000
0 2 4 6 8 10 12 14 16 18 20
Strain - e (%)
50
1.30
40
1.20 30
Cv, m²/year
20
1.10
10
0
void ratio
1.00
0.01 0.10 1.00 10.00
pressure (kg/cm²)
0.90
0.100
0.080
0.80
mv, cm²/kg
0.060
0.70 0.040
0.020
0.60 0.000
0.01 0.10 1.00 10.00 0.01 0.10 1.00 10.00
pressure (kg/cm²) pressure (kg/cm²)
Project RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
Location JALAN SEROJA NO. A88 TANJUNG PANDAN, KAB. BELITUNG
Hole No. Bore Hole (BH-1) Depth - 1,50 ÷ - 2,00 M. Sample ID UDS-1 Soil Description Pasir (Sand), coklat putihan
Apparatus No.
Diameter 5.00 cm Water Content 39.11 % Weight of soild, Ws 49.92 gram Liquid limit 45.13 %
Height 2.00 cm Wet density 1.769 gr/cm³ Solid height, 2Ho 0.95 cm Plastic limit 30.52 %
Area 19.63 cm² Dry Density 1.271 gr/cm³ Sample Height 2.00 cm Plasticity Index 14.61 %
Weight of soil sample 69.45 gram Specific Gravity 2.678 Initial Void ratio 1.106 Classification MH
Degree of saturation 94.66 %
(kg/cm²) (x 0.01mm) (cm) (cm) (cm) (minute) (sec) (m²/year) (cm²/kg) (cm²/kg)
Bore Hole-1
( BH-1 )
{ UDS-2 }
LOCATION : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG TESTING DATE 24-Nov-17
PROVINCE : KEPULAUAN BANGKA BELITUNG TESTED BY Iwan K.
Deep Boring No BORE HOLE (BH-1) CHECK BY Sigit Premana
SAND
CLAY SILT Fine Medium Coarse GRAVEL
0,002 # 200 0,074 # 40 0,425 # 10 2,00 # 4 4,75 3" 76,2
100 0
90 10
80 20
70 30
Percent Finer By Weight
50 50
40 60
30 70
20 80
10 90.
0 100
0.001 0.01 0.1 1 10
Diameter D (mm)
LOCATION : JALAN SEROJA NO. A88, TANJUNG PANDAN, KAB. BELITUNG 106.428 -44
PROVINCE : KEPULAUAN BANGKA BELITUNG 5 76
DEEP BORING : BORE HOLE (BH-1) 100 18
ELEVATION : : ± 0,00 m (dari MTS) TEST OF DATE : 24-Nov-17 ##
SAMPLE TYPE : UDS-2 TESTED BY : Iwan K. -15
DEPTH : - 3,50 ÷ - 4,00 M. CHECKED BY : Sigit Premana -15
SOIL DESCRIPTION : Pasir (Sand) halus, coklat
:
LIQUID LIMIT PLASTIC LIMIT
TEST No. 1 2 3 4
Number Of Blows 45 32 19 11
Tare No. 111 112 114 113 116 115
Weight Of Wet Soil + Tare gr 39.15 40.11 40.82 42.55 27.05 23.87
Weight Of Dry Soil + Tare gr 32.39 32.46 31.48 31.29 23.67 21.20
Weight Of Tare gr 12.93 12.90 12.71 12.88 12.72 12.56
Weight Of Water gr 6.76 7.65 9.34 11.26 3.38 2.67
Weight Of Dry Soil gr 19.46 19.56 18.77 18.41 10.95 8.64
Water Content % 34.74 39.11 49.76 61.16 30.87 30.90
30.89
160
LIQUID LIMITS, LL ( % )
140 44.95
100 30.89
80 PLASTIC INDEX, PI ( % )
60 14.06
40 AASHTO
44.95
A-7-5
20
0 U.S.C.S
25 MH
5 100
Number of Blows
60 80
CL
PLASTIC INDEX
70
LIQUID LIMIT
50
A line =0.73(wl-20) 60 A-7-6
40 50
30 40
OH/MH 30
20
A-4
20
10 0L/ML 10 A-7
CL/ML A-6
0 0
0 20 40 60 80 100 120 140 0 20 40 60 80 100
LIQUID LIMIT wl PLASTIC INDEX
( ASTM D-3080-79 )
:
PROJECT RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
NUMBER OF SPECIMEN 1 2 3
Specimen Diameter cm 6.3 6.3 6.3
Specimen Hight cm 2.25 2.25 2.25
W. of Sample + Ring gr 178.26 178.27 178.28
Weight of Ring gr 53.06 53.06 53.06
Normal Forse kg 5 10 15
Elapsed StraIn P.R. P.R. P.R.
Time In Dial In Dial In Dial In Dial In
min 0.01mm 0.01mm 0.01mm 0.01mm
0.00 0.0000 0.0 0.0 0.0
0.25 30.000 3.9 5.9 7.6
0.50 60.000 7.8 11.7 15.3
0.75 90.000 9.6 14.4 18.6
1.00 120.00 10.5 15.7 20.3
1.25 150.00 11.3 17.0 22.0
1.50 180.00 12.2 18.3 23.7
1.75 210.00 17.9 26.8 34.8
2.00 240.00 20.5 30.7 39.8
2.25 270.00 21.4 32.0 41.5
2.50 300.00 21.8 32.6 42.4
2.75 330.00 22.7 33.9 44.1
3.00 360.00 23.1 34.6 45.0
3.25 390.00 24.0 35.9 46.7
3.50 420.00
3.75 450.00
4.00 480.00
4.25 510.00
4.50 540.00
4.75 570.00
5.00 600.00
5.25 630.00
5.50 660.00
5.75 690.00
6.00 720.00
( ASTM D-3080-79 )
Elapsed StraIn P.R. Shear Shear P.R. Shear Shear P.R. Shear Shear
Time In Dial In Dial In Force Stress Dial In Force Stress Dial In Force Stress
min 0.01mm 0.01mm kg kg/cm2 0.01mm kg kg/cm2 0.01mm kg kg/cm2
0.00 0.0000 0.0000 0.0000 0.0000 0.00 0.0000 0.0000 0.00 0.0000 0.0000
0.25 30.000 3.9218 1.0040 0.0322 5.87 1.5035 0.0482 7.63 1.9530 0.0626
0.50 60.000 7.8436 2.0080 0.0644 11.75 3.0069 0.0964 15.26 3.9060 0.1253
0.75 90.000 9.5866 2.4542 0.0787 14.36 3.6752 0.1179 18.65 4.7740 0.1531
1.00 120.00 10.4581 2.6773 0.0859 15.66 4.0093 0.1286 20.34 5.2080 0.1670
1.25 150.00 11.3296 2.9004 0.0930 16.97 4.3434 0.1393 22.04 5.6420 0.1809
1.50 180.00 12.2011 3.1235 0.1002 18.27 4.6775 0.1500 23.73 6.0761 0.1948
1.75 210.00 17.8660 4.5737 0.1467 26.75 6.8492 0.2196 34.75 8.8971 0.2853
2.00 240.00 20.4805 5.2430 0.1681 30.67 7.8515 0.2518 39.84 10.1991 0.3271
2.25 270.00 21.3520 5.4661 0.1753 31.97 8.1856 0.2625 41.54 10.6331 0.3410
2.50 300.00 21.7878 5.5777 0.1789 32.63 8.3526 0.2678 42.38 10.8501 0.3479
2.75 330.00 22.6593 5.8008 0.1860 33.93 8.6867 0.2786 44.08 11.2841 0.3618
3.00 360.00 23.1176 5.9181 0.1898 34.62 8.8625 0.2842 44.97 11.5124 0.3692
3.25 390.00 24.0000 6.1440 0.1970 35.94 9.2007 0.2950 46.69 11.9518 0.3833
3.50 420.00
3.75 450.00
4.00 480.00
4.25 510.00
4.50 540.00
4.75 570.00
5.00 600.00
5.25 630.00
5.50 660.00
5.75 690.00
6.00 720.00
UNIT WEIGHT
3
(ton/m )
NORMAL STRESS (kg/cm2)
0.80
1.784
ANGEL OF INTERNAL
FRICTION (º)
0.40
30
COHESION
2
(kg/cm )
0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.106
SHEAR STRESS (kg/cm2)
GRAPHICAL U C S TEST
:
Project : RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
District : JALAN SEROJA NO. A88, TANJUNG PANDAN
:
Location : KABUPATEN BELITUNG
:
Province : KEPULAUAN BANGKA BELITUNG
:
1.600
1.200
Stress - s (kg/cm2)
0.800
0.400
0.000
0 2 4 6 8 10 12 14 16 18 20
Strain - e (%)
50
1.30
40
1.20 30
Cv, m²/year
20
1.10
10
0
void ratio
1.00
0.01 0.10 1.00 10.00
pressure (kg/cm²)
0.90
0.100
0.080
0.80
mv, cm²/kg
0.060
0.70 0.040
0.020
0.60 0.000
0.01 0.10 1.00 10.00 0.01 0.10 1.00 10.00
pressure (kg/cm²) pressure (kg/cm²)
Project RENCANA PEMBANGUNAN EKSTENSI HOTEL GOLDEN TULIP
Location JALAN SEROJA NO. A88 TANJUNG PANDAN, KAB. BELITUNG
Hole No. Bore Hole (BH-1) Depth - 3,50 ÷ - 4,00 M. Sample ID UDS-2 Soil Description Pasir (Sand) halus, coklat
Apparatus No.
Diameter 5.00 cm Water Content 38.85 % Weight of soild, Ws 50.46 gram Liquid limit 44.95 %
Height 2.00 cm Wet density 1.784 gr/cm³ Solid height, 2Ho 0.96 cm Plastic limit 30.89 %
Area 19.63 cm² Dry Density 1.285 gr/cm³ Sample Height 2.00 cm Plasticity Index 14.06 %
Weight of soil sample 70.06 gram Specific Gravity 2.681 Initial Void ratio 1.087 Classification MH
Degree of saturation 95.86 %
(kg/cm²) (x 0.01mm) (cm) (cm) (cm) (minute) (sec) (m²/year) (cm²/kg) (cm²/kg)