Anda di halaman 1dari 3

Kelas : A

Nama : Rizky Perdana


Npm : 2004028 GENAP
Prodi : Teknik Pertambangan Batubara
Tanggal Nomor Unit Produksi Batubara (ton) Tanggal Total Produksi
1 Dec 2018 Excavator 01 500 1 Dec 2018 2200
1 Dec 2018 Excavator 02 700 2 Dec 2018 1200
1 Dec 2018 Excavator 03 600 3 Dec 2018 2600
1 Dec 2018 Excavator 04 400 4 Dec 2018 1300
2 Dec 2018 Excavator 01 300 5 Dec 2018 1800
2 Dec 2018 Excavator 02 500 6 Dec 2018 2000
2 Dec 2018 Excavator 03 400 7 Dec 2018 1200
3 Dec 2018 Excavator 01 600
3 Dec 2018 Excavator 02 800
3 Dec 2018 Excavator 03 700
3 Dec 2018 Excavator 04 500
4 Dec 2018 Excavator 01 600
4 Dec 2018 Excavator 02 400
4 Dec 2018 Excavator 03 300
5 Dec 2018 Excavator 01 500
5 Dec 2018 Excavator 02 600
5 Dec 2018 Excavator 03 400
5 Dec 2018 Excavator 04 300
6 Dec 2018 Excavator 01 700
6 Dec 2018 Excavator 02 600
6 Dec 2018 Excavator 03 400
6 Dec 2018 Excavator 04 300
7 Dec 2018 Excavator 01 500
7 Dec 2018 Excavator 02 400
7 Dec 2018 Excavator 03 300
Produksi Excavator 01 3700
Produksi Excavator 02 4000
Produksi Excavator 03 3100
Produksi Excavator 04 1500
Total Produksi 12300
12300
GENAP jawaban
1. Tentukan Total Produksi 12300
2. Hitung Total Produksi Tanggal 3 Des 2018 2600
3. Hitung Total Produksi Excavator 04 1500
4. Hitung Berapa hari Excavator 03 beroperasi 7
5. Excavator Mana yang paling banyak berproduksi Excavator 02
6. Excavator Mana yang paling sedikit berproduksi Excavator 04
7. Buat Grafik Produksi Untuk masing-masing Excavator

Total Produksi
4500
4000
4000 3700
3500
Produksi Batubara (ton)

3100
3000
2500
2000
1500
1500
1000
500
0
Excavator 01 Excavator 02 Excavator 03 Excavator 04
Nomor Unit
1500

vator 04

Anda mungkin juga menyukai