DEPT ENGINERING
FOREMAN FOREMAN
SUBFOREMAN SUBFOREMAN
- Menyiapkan FOCS N1
- Menyiapkan Check Sheet THICKNESS
3. DEPT QA INSPECTION
- Menyiapkan Alat Ukur pendukung
- Menyiapkan Hasil Data N1 ( FOCS ) & Hasil Check Sheet Thickness
- Menyiapkan IRD untuk Dept Machining
4. DEPT MACHINING
- Menyiapkan Mesin Produksi
- Menyiapkan Hasil Data N5 ( IRD )
TARGET PENGUKURAN
PAN ASSY OIL #4
IN THE DEPT QA INSPECTION
- CMM
- Surfcomp
- Roncomp
- Heigh Gauge
- Verneir Caliper
- Radius Gauge
- Depth Gauge
- Inside Caliper
- Caliper Gauge
- Dll
PROSES MACHINING
LINE PRODUKSI PROSES OP1 PROSES OP2
L
L
1
1
2
2 THICKNESS
3
3
E D C B A 1 3
2
L'
1
3 DEPT CASTING
L'
1 2 3
JUDGEMENT
P.O.C DEPT
OK DEPT
ENGINERING
OK
OK
DIRECTOR
PENGIRIMAN
TERIMA KASIH
BY SUGENG RIYADI
APPOVED
PAN ASSY OIL #4
TO PRODUKSI IN THE MACHINING
Dokumen pendukung :
DATA SETTING MACHINING
●
DATA IRD N5
●