Anda di halaman 1dari 4

PROYEK PEMBANGUNAN JARINGAN GAS

BUMI DI STATION GAS TANGGULANGIN


WARU-RUNGKUT

T. KOMSHA PT. ECHO ZORRO

DOCUMENT TITLE : DOCUMENT NO : REV.


0
WR-00-PR-002
PROSEDUR SPECIFICATION
BASE LINE CORROSION
TANGGAL:
25 MARET 2010

DAFTAR ISI TABLE

1.0 LINGKUP.
2.0 PROSEDUR OPERASI.
3.0 SURVEY.

REVISION RECORDS
PT. ECHO ZORRO CLIENT
PT. KAC
81
REV. DATE DESCRIPTION Prepare Check App’d Rev’d App’d
By By By By By
0 25/03/10 Issued for Approval Ars IB

DISTRIBUTION REMARKS
1 Quality & Safety Department ORIGINAL
2 Project Manager
3 Site Manager
4 DCC
PROSEDURE SPECIFICATION
Doc No: WR-00-PR-002 Rev :0
Date : 25 Feb-2010 Page :1/3
BASE LINE CORROSION

1.0 LINGKUP 1.0 COVERAGE


1.1 Spesifikasi ini mencakup persyaratan 1.1 This specification covers minimum
minimum untuk persiapan pekerjaan baseline requirements of the work preparation of the
corrosion survey pipeline dan geographical baseline corrosion survey of pipeline and
survey pada Proyek Pembangunan Transmisi geographical survey at Gas Transmission
Jaringan Gas Bumi di Gas Stasiun Waru. Development Project in Gas Station WARU.

2.0 PROSEDUR OPERASI 2.0 OPERATION PROCEDURES


2.1 Sebelum mobilisasi peralatan untuk 2.1 Prior to mobilization of the equipment for
pelaksanaan inspeksi,Kontraktor harus inspection Contractor shall conduct a
melakukan pemeriksaan terhadap peralatan verification of the equipment and show a
tersebut serta menunjukan sertifikat hasil test certificate of calibration test result from an
kalibrasi dari instansi yang berwenang. authorized institutions.

2.2 Kontraktor harus memeriksa peralatan yang 2.2 Contractor shall check the equipment to be
akan digunakan untuk meyakinkan bahwa used to ensure that they are safe for
peralatan tersebut aman untuk dioperasikan. operation.

2.3 Kontraktor harus mematuhi dan 2.3 Contractor shall adhere to and implement
melaksanakan semua peraturan keselamatan every safety regulation.
kerja.

2.4 Semua kegiatan persiapan dan survey harus 2.4 Every activity of the preparation and survey
tercatat dan dilaporkan kepada Pemilik shall be recorded and reported to Owner.
Proyek.

2.5 Cara kerja dan spesifikasi peralatan yang 2.5 Work procedures and specifications of
akan digunakan untuk pelaksanaan pekerjaan equipment to be used for the above
diatas harus diajukan kepada Pemilik Proyek mentioned work shall be submitted to Owner
untuk persetujuan. for approval.

2.6 Data sheet dan umur battery dari peralatan 2.6 Data sheets and ages of batteries of survey
survey harus cukup untuk pelaksanaan instruments shall be appropriate for work
pekerjaan tiap segment. execution of every segment.

2.7 Pig launcher dan pig receiver yang 2.7 Contractor shall be responsible for the pig
diperlukan dalam pekerjaan ini menjadi launchers and pig receivers required for this
tanggung jawab dari kontraktor. work.

3 SURVEY. 3.0 SURVEY.

Corrosion Detection Pig (CDP) dan The Corrosion Detection Pig (CDP) and
Geographical Pipe Line Survey (GPS) Geographical Pipe Line Survey (GPS) shall
dilaksanakan setelah gas masuk dan selesai be executed upon the gas intake and the
pelaksanaan hydrotest, dewatering, drying execution of hydro-test, de-watering, drying
dan purging. Peralatan CDP dan GPS harus and purging. The CDP and GPS instruments
dapat merekam posisi pipa secara tiga shall be capable of recording three-
dimensi, baik positioning, leveling maupun dimensional positioning, leveling and
kontur dari pipe line. Data tersebut sangat contour of the pipeline. The data is needed as
diperlukan untuk referensi awal yang akan initial reference in subsequent surveys.
digunakan untuk acuan pada survey
selanjutnya.
PROSEDURE SPECIFICATION
Doc No: WR-00-PR-002 Rev :0
Date : 25 Feb-2010 Page :2/3
BASE LINE CORROSION

3.1 Meskipun pembersihan dan gauging pipeline 3.1 Even though cleaning and gauging of the
telah dilakukan dan hasilnya baik, tetapi pipeline have been carried out with
pelaksanaan gauging pig, magnet pig dan satisfactorily results, the execution of
caliper pig tetap harus dilakukan. Hal gauging pig, magnet pig and caliper shall
tersebut diperlukan untuk meyakinkan bahwa still be pursued. These activities are needed
tidak ada hambatan sepanjang jalur dan aman to ensure that the line is obstacle-free all the
untuk pelaksanaan Corrosion Detection Pig way long and is safe for the execution of
(CDP) dan Geographical Pipe Line Survey Corrosion Detection Pig (CDP) and
(GPS). Adapun hal-hal yang harus Geographical Pipe Line Survey (GPS). To
dilaksanakan untuk mendapatkan data dalam obtain data the following matter are needed
melaksanakan pekerjaan ini tetapi tidak be carried out but not limited to:
terbatas pada:

 Meluncurkan BIDI Gauge Plate.  Launching BIDI Gauge Plate.

 Meluncurkan BIDI Magnet Pig.  Launching BIDI Magnet Pig.

 Meluncurkan BIDI Wheels dan Gauge  Launching BIDI Wheels dan Gauge
Plate. Plate.
 Launching Geometry Pig.
 Meluncurkan Geometry Pig.
 Launching Corrosion Detection Pig.
 Meluncurkan Corrosion Detection Pig.

3.2 Memasang marker pada interval tertentu 3.2 To place markers at certain interval
sesuai dengan ketentuan dan kondisi dari according to requirements and conditions of
instalasi pipe line seperti posisi valve, pipe the pipeline installation, such as the valve
line marker dll. position, pipeline marker, etc.

3.3 Dalam melaksanakan pekerjaan ini 3.3 Upon the work execution Contractor shall
kontraktor harus mendapatkan data obtain the overall thickness and the contour
ketebalan dan kontur pipe line secara of the pipeline by launching proper pigs with
keseluruhan dan kontur pipe line secara certain speed and dimension.
dengan meluncurkan pig yang sesuai dan
dengan kecepatan serta ukuran tertentu.

3.4 Data data hasil survey harus diserahkan ke 3.4 The data resulting from the survey shall be
Pemilik Proyek dan dijelaskan secara terinci submitted to Owner's and shall describe in
hasil dari survey tersebut mengenai detail the thickness and contour of the
ketebalan dan kontur pipeline. pipeline.

3.5 Sebelum data hasil survey dan rekomendasi 3.5 In pursuant to the stipulation prior
diserahkan kontraktor harus menyerahkan submission of the data resulting from the
Preliminary analysis report kepada Pemilik survey and the recommendations Contractor
Proyek sesuai dengan ketentuan. shall submit a Preliminary Analysis Report
to Owner’s.

3.6 Kontraktor harus membuat laporan final 3.6 Contractor shall prepare the final report
yang mencakup semua seksi pipeline dari covering all sections of the pipeline from the
ujung louncher trap s/d receiver trap dan tip of the launcher trap up to the receiver trap
kerusakan pipa dimana kerusakan ekivalen and pipe damages of at least 5% of the pipe
5% dari ketebalan pipa harus dilaporkan. thickness. The pipeline surface, such as tee,
PROSEDURE SPECIFICATION
Doc No: WR-00-PR-002 Rev :0
Date : 25 Feb-2010 Page :3/3
BASE LINE CORROSION

Permukaan pipeline seperti tee, valve, bend valve, bend and marker joint and their
marker joint serta gambar harus dilaporkan. description shall be reported as well.
Kontraktor harus membuat rekomendasi Contractor shall make comprehensive
tentang kondisi metal loss, pitting corrosion, recommendation on overcoming metal loss
general corrosion, dan kontur pipeline condition, pitting corrosion general
secara menyeluruh dan disetujui oleh corrosion, as well as the overall contour of
Pemilik Proyek. the pipeline to be approved by Owner's.

3.7 Laporan harus meliputi informasi sebagai 3.7 The report shall contain the following
berikut : information:

 Ringkasan dari kerusakan metal dan • Summary of metal defects and special
kondisi khusus pipa. condition of the pipes.
• Ukuran dari kerusakan pipa (panjang, lebar • Dimension of defects of pipes (length, width
dan dalam korosi) and depth of corrosion)
• Penyimpangan ukuran didalam dan diluar • Size deviation inside and outside the pipes .
dari pipa. • Level of defects of pipes.
• Tingkat kerusakan pipa. • The position of metal defects at the pipe
• Posisi kerusakan metal pada lingkaran pipa rim.
• Jarak metal yang rusak dari ujung pipa. • The distance of the metal defects from the
• Jarak metal yang rusak dari posisi pipe ends.
sambungan las pipa. • The distance of the metal defects from the
• Jarak metal yang rusak dari marker point pipe weld line.
suatu lokasi pipa. • The distance of the metal defects from a
• Uraian dan rekomendasi dari kerusakan marker point of a pipe location .
metal dan kondisi khusus dari pipa. • Description and solution recommendation of
metal defects and special condition of the
pipes.