WORK INSTRUCTION
Approved Checked Prepared
Machine Number Number :- Process : Production
PT. SINAR AGUNG SELALU SUKSES Valid from : 1-Feb-18 Line : Die Casting Line
TOYO
Engineering Dept. Revise :0 0 PIC : Operator Die Casting A. Eva. D Widhi. P K. Lilik
AKTIVITAS PIC FAKTOR-FAKTOR YANG DIPERHATIKAN ILUSTRASI
I. PERSIAPAN KERJA I. PERSIAPAN KERJA GAMBAR 1
1) SIAPKAN DIE SESUAI SCHEDULE 1) LIHAT LAPORAN HARIAN PRODUKSI (LHP)
2) SIAPKAN MESIN 2) LIHAT PETUNJUK OPERASI MESIN
3) SETTING DIE MOULDING PADA MESIN OP 3) PASTIKAN BAUT & PERLENGKAPAN DIE SUDAH
TERPASANG DENGAN BENAR & BAIK
4) SIAPKAN ALAT UKUR & CHECK SHEET 4) PASTIKAN ALAT UKUR SUDAH SESUAI DENGAN PRODUK
YANG AKAN DIUKUR
5) SIAPKAN ALAT KERJA & ALAT 5) LIHAT PADA DAFTAR ALAT KERJA & ALAT PENGAMAN
PENGAMAN
II. PROSES KERJA II. PROSES KERJA
A. PROSES CASTING A. PROSES CASTING
1) BERSIHKAN MOULDING DENGAN 1) A. PASTIKAN KAPASITAS LADLE SESUAI DENGAN GAMBAR 2
CAIRAN DIELUBE (GAMBAR 1) VOLUME PART YANG DI CASTING
B. PASTIKAN SUHU CAIRAN SESUAI DENGAN
STANDART PROSES
C. PASTIKAN CAIRAN SUDAH PENUH SESUAI
VOLUME STANDART
2) START MESIN DENGAN MENEKAN
TOMBOL ON OP 2) A. PASTIKAN COVER PADA MESIN TERTUTUP
SEBELUM MENEKAN TOMBOL START
B. PASTIKAN WAKTU HOLD CASTING SESUAI
DENGAN STANDART PROSES FUNGSI : UNTUK MEN-SETTING MESIN
3) SETELAH PROSES CASTING SELESAI 3) PADA SAAT DIE MEMBUKA PASTIKAN PRODUK TIDAK KET: 1. MODE MESIN (MANUAL, AUTOMATIC)
DAN DIE TERBUKA, AMBIL PRODUK LENGKET DI DIE 2. MOVE CLAMP MUNDUR
DARI DIE 3. MOVE CLAMP MAJU
4. EJECTOR MAJU
5. EJECTOR MUNDUR
6. SCREW NOZZLE MAJU
B. PROSES INSPEKSI B. PROSES INSPEKSI (MENGELUARKAN BAHAN DARI NOZZLE)
7. SCREW NOZZLE MUNDUR
1) PERIKSA HASIL PRODUKSI SESUAI 1) A. JIKA OK LANJUTKAN PROSES SELANJUTNYA (MENGISI BAHAN KEDALAM SCREW)
CHECK POINT DAN WARNING SIGN B. JIKA NG BERI MARKING CAT MERAH ATAU 8. NOZZLE MAJU
MASUKKAN KE BOX MERAH SERTA MEMBERI 9. NOZZLE MUNDUR
INFORMASI KE QC 10. TOMBOL EMERGENCY
GAMBAR 3
III. AKHIR KERJA III. AKHIR KERJA
1) BERSIHKAN MESIN DARI KOTORAN 1) PASTIKAN AREA KERJA SUDAH BENAR-BENAR BERSIH
DAN BERSIHKAN LINGKUNGAN SEKITAR
OP .
2) KEMBALIKAN PERALATAN KERJA 2) PASTIKAN SEMUA ALAT YANG DI GUNAKAN LENGKAP
PADA TEMPAT YANG TELAH DAN KEMBALIKAN DENGAN RAPI KE TEMPAT YANG
DITENTUKAN TELAH DI TENTUKAN
SAFETY SIGN (must be worn while operating this machine)
APABILA TERJADI
ABNORMAL PROSES
STOP CALL WAIT
LAPOR ATAU MENUNGGU HELMET / HATS EYE PROTECTION EAR PLUG MASK GLOVES
HENTIKAN INFORMASI
PROSES INFORMASI SELANJUTNYA
SECEPATNYA KEPADA ATASAN DARI ATASAN
DOKUMEN PENDUKUNG
EHS
NO DESCRIPTION
1 Laporan Harian Produksi ( LHP )
2 Petunjuk Operasi Mesin
3
4 FACE VISOR WELDING MASK APPRON SAFETY HARNESS SAFETY SHOES
5