Anda di halaman 1dari 10

BAB 4.

HASIL PENELITIAN

4.1 Data Praktikum


Adapun data praktikum yang diperlukan pada acara 2 antara lain sebagai berikut:
4.1.1 Data Material PT. ILY
Tabel 4.1 Data material
Level Komponen Jumlah Lead Time Sumber Harga (Rp)
0 Sarden 1 1 Buat
1 Ikan sarden 2 4 Buat
2 Garam 1 2 Beli 13.000/kg
1 Bumbu 2 2 Buat
2 Cabai 2 1 Beli 22.000/kg
2 Tomat 1 1 Beli 15.000/kg
2 Gula 2 1 Beli 25.000/kg
2 Penyedap 1 1 Beli 9000/kg
4.1.2 Data Permintaan PT. ILY
Tabel 4.2 Data permintaan
Periode Jumlah (pcs)
1 8000
2 9990
3 7250
4 9110
5 9150
6 8700
4.1.3 Data Bill of Material
Sarden
(1)

Ikan Sarden Bumbu


(2) (2)

Garam Cabai Tomat Gula Penyedap


(1) (2) (1) (2) (1)
Gambar 4.1 Bill of material
4.1.4 Grafik Lead Time

Gambar 4.2 Grafik lead time


4.1.5 Number of Last Period

-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6

1 2 3 4 5 6 7 8 9 10 11 12

Gambar 4.3 Number of last period


4.1.6 Harga Komponen
Tabel 4.3 Harga komponen bahan per kg
Komponen Harga per kg
Garam Rp. 13.000
Cabai Rp. 22.000
Tomat Rp. 15.000
Gula Rp. 25.000
Penyedap Rp. 9.000
4.1.7 Biaya Pemesanan
Tabel 4.4 Biaya pemesanan
Komponen Biaya Pemesanan

Garam Rp. 1.300


Cabai Rp. 2.200
Tomat Rp. 1.500
Gula Rp. 2.500
Penyedap Rp. 900
4.1.8 Biaya Penyimpanan
Tabel 4.5 Biaya penyimpanan
Komponen Biaya Penyimpanan

Garam Rp. 650


Cabai Rp. 1.100
Tomat Rp. 750
Gula Rp. 1.250
Penyedap Rp. 450
4.2 Data Hasil Praktikum
4.2.1 Data Hasil MRP
Tabel 4.6 Data hasil MRP
Item
name Pd 0
(low and
level) before pd1 pd2 pd3 pd4 pd5 pd6 pd7 pd8 pd9 pd10 pd11 pd12
-6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6
Sarden
(0)
TOT REQ 8000 9900 7250 9110 9150 8700
SchdREC.
ON
HAND
ON
8000 9900 7250 9110 9150 8700
NET REQ HAND
PlanREC 8000 9900 7250 9110 9150 8700
ORD 8000 9900 7250 9110 9150 8700
REL.
Ikan
Sarden
(1)
TOT.REQ. 1600 19800 14500 18220 18300 17400
0
SchdREC.
ON
HAND
NET REQ 1600 19800 14500 18220 18300 17400
0
PlanREC 1600 19800 14500 18220 18300 17400
0
ORD 16000 19800 14500 18220 1830 17400
REL. 0
Bumbu
(1)
TOT.REQ. 1600 19800 14500 18220 18300 17400
0
SchdREC.
ON
HAND
NET REQ 1600
0 19800 14500 18220 18300 17400
PlanREC 1600
0 19800 14500 18220 18300 17400
ORD 16000 19800 1450 18220 18300 17400
REL. 0
Garam
(2)
TOT.REQ. 16000 19800 14500 18220 1830 17400
0
SchdREC.
ON
HAND
NET REQ 16000 19800 14500 18220 1830 17400
0
PlanREC 19800 14500 18220 1830 17400
16000 0
ORD 16000 19800 14500 18220 18300 17400
REL.
Cabai (2)
TOT.REQ. 39600 2900 36440 36600 34800
32000 0
SchdREC.
ON
HAND
NET REQ 32000 39600 2900 36440 36600 34800
0
PlanREC 32000 39600 2900 36440 36600 34800
0
ORD 32000 39600 29000 3644 36600 34800
REL. 0
Tomat (2)
TOT.REQ. 16000 19800 1450 18220 18300 17400
0
SchdREC.
ON
HAND
NET REQ 16000 19800 1450 18220 18300 17400
0
PlanREC 16000 19800 1450 18220 18300 17400
0
ORD 16000 19800 14500 1822 18300 17400 16000
REL. 0
Gula ( 2)
32000 39600 2900 36440 36600 34800
TOT.REQ. 0
SchdREC.
ON
HAND
NET REQ 32000 39600 2900 36440 36600 34800
0
PlanREC 32000 39600 2900 36440 36600 34800
0
ORD 32000 39600 29000 3644 36600 34800
REL. 0
Penyedap
( 2)
TOT.REQ. 16000 19800 1450 18220 18300 17400
0
SchdREC.
ON
HAND
NET REQ 16000 19800 1450 18220 18300 17400
0
PlanREC 16000 19800 1450 18220 18300 17400
0
ORD 16000 19800 14500 1822 18300 17400
REL. 0
4.2.2 Data Hasil Lot Sizing
Tabel 4.7 Data hasil lot sizing
Komponen LFL EOQ
Garam 7800 449800
Cabai 13200 1311200
Tomat 9000 519000
Gula 15000 1490000
Penyedap 5400 311400
Total cost 50400 4081400

Anda mungkin juga menyukai