SUMMARY

PERUMAHAN RIVERA RESIDENCE


PERUMAHAN RIVERA LOKASI CLUSTER RIO
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

NO LINGKUP PEKERJAAN TOTAL


(IDR)

A BIA 5,030,000,000.00

A.1 PEM 5,000,000,000.00


A.2 PERIZINAN CLUSTER RIO - Include Lahan
A.3 SARANA BRANDING PERUMAHAN CLUSTER RIO 30,000,000.00

B BIA 8,310,884,148.67

PEKERJAAN INFRASTRUKTUR LANJUTAN RIVERA RESIDENCE 1,320,573,388.67


B.1 PEKERJAAN PERSIAPAN 40,000,000.00
B.2 PEKERJAAN INFRASTRUKTUR GERBANG 267,410,138.67
B.3 PEKERJAAN INFRASTRUKTUR LISTRIK JARINGAN 700,000,000.00
B.4 PEKERJAAN INFRASTRUKTUR AKSES JALAN UTAMA 246,864,000.00
B.5 PEKERJAAN LANDSCAPE 66,299,250.00

PEKERJAAN INFRASTRUKTUR LANJUTAN CLUSTER RIO 943,294,520.00


B.1 PEKERJAAN PERSIAPAN 50,000,000.00
B.2 PEKERJAAN INFRASTRUKTUR GERBANG CLUSTER RIO 113,750,000.00
B.3 PEKERJAAN INFRASTRUKTUR LAMPU JALAN CLUSTER RIO 45,000,000.00
B.4 PEKERJAAN INFRASTRUKTUR JALAN, DRAINASE DAN PAGAR 686,881,800.00
B.5 PEKERJAAN LANDSCAPE 47,662,720.00

PEKERJAAN PEMBANGUNAN 106 UNIT RUMAH TIPE 36 (KAPASITAS 93 UNIT) 6,047,016,240.00


PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36 65,021,680.00
B.1 PEKERJAAN PERSIAPAN 690,000.00
B.2 PEKERJAAN TANAH DAN PONDASI 2,501,190.00
B.3 PEKERJAAN BETON DAN DINDING 25,630,000.00
B.4 PEKERJAAN KUSEN PINTU DAN JENDELA 4,855,000.00
B.5 PEKERJAAN ATAP 10,125,950.00
B.6 PEKERJAAN PLAFON 5,112,000.00
B.7 PEKERJAAN LANTAI 7,203,040.00
B.8 PEKERJAAN ELEKTRIKAL 1,250,000.00
B.9 PEKERJAAN PENGECATAN 4,316,000.00
B.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR 3,338,500.00

PEKERJAAN PEMBANGUNAN LANJUTAN 34 UNIT RUMAH TIPE 36 (34 UNIT) -


PEKERJAAN PEMBANGUNAN LANJUTAN 1 UNIT RUMAH TIPE 36 -
B.1 PEKERJAAN PERSIAPAN - Finish
B.2 PEKERJAAN TANAH DAN PONDASI - Finish
B.3 PEKERJAAN BETON DAN DINDING -
B.4 PEKERJAAN KUSEN PINTU DAN JENDELA -
B.5 PEKERJAAN ATAP - Finish
B.6 PEKERJAAN PLAFON -
B.7 PEKERJAAN LANTAI -
B.8 PEKERJAAN ELEKTRIKAL -
B.9 PEKERJAAN PENGECATAN -
B.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR -

C PEN 19,113,500,000.00

C.1 PENJUALAN 127 UNIT RUMAH CLUSTER RIO 19,113,500,000.00


HARGA JUAL 150,500,000,- (Seratus lima puluh juta lima ratus ribu rupiah)

TOTAL BIAYA PEMBELIAN LAHAN DAN RODUKSI (A + B) 13,340,884,148.67


TOTAL PENJUALAN PERUMAHAN CLUSTER RIO 140 UNIT (C) 19,113,500,000.00
PROFIT PENDAPATAN / KEUNTUNGAN (C)-(A+B) 5,772,615,851.33
PEMBULATAN 5,772,600,000.00
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN INFRASTRUKTUR LANJUTAN KAWASAN RIVERA RESIDENCE
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN INFRASTRUKTUR LANJUTAN RIVERA RESIDENCE


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi awal dan akhir 1.00 Ls 40,000,000.00 40,000,000.00
- Mobilisasi dan demobilisasi
TOTAL A.1 40,000,000.00
A.2 PEKERJAAN INFRASTRUKTUR GERBANG
1 Pek. Coring beton 12.00 Ttk 250,000.00 3,000,000.00
2 Pek. Chemical angkur 72.00 Ttk 170,000.00 12,240,000.00
- Material :
- Anchor Hilti HIT-C-8.8 M20x240
- Menggunakan Lem chemenical beton
3 Base plate t=22 mm, uk 300x300x2 unit 342.18 Kg 20,000.00 6,843,648.00
4 Stiffener t=12 mm & t=16 mm 300.81 Kg 20,000.00 6,016,224.00
5 Pek. kolom pedestal 25 x 40 x 30cm 0.29 M3 3,000,000.00 864,000.00
- Material : Beton K225 Pembesian struktur
6 Baja WF 200.100.5,5.8 2,446.93 Kg 20,000.00 48,938,666.67
7 Sambungan Profil Baja Dengan Las :
- Plat Joint Profil Baja WF 100 - Hbeam - WF 200 dengan plat joint 10mm dan 6mm 22.68 Kg 20,000.00 453,600.00
8 Mur baut rata-rata 72.00 Bh 30,000.00 2,160,000.00
9 Pengecatan zinchromate untuk semua rangka baja 1.00 Ls 2,000,000.00 2,000,000.00
10 Pek. Rangka Besi stall buish 40x40 244.20 M2 45,000.00 10,989,000.00
11 Pek. Cover ACP gerbang 244.20 M2 550,000.00 134,310,000.00
- Ex. Seven tipe by owner
- (termasuk rangka stallbuish/besi kotak, elemen penjepit & silicont sealent)

INSTALASI PENERANGAN
1 Pengadaan lampu Down Light DN027 / 17 W / D175 setara Philips 12.00 Bh 185,000.00 2,220,000.00
2 Instalasi Penerangan 12.00 Ttk 250,000.00 3,000,000.00
- Material :
- menggunakan kabel NYM 2x2,5 sqmm dengan merk kabel 4 besar
- (Supreme, Tranka, Kabel Metal, Kabelindo)
- dengan protector PVC (Pipa Conduit)

CHANNEL LETTER
1 Pek. Pengadaan dan pasang channel letter 1.00 Unit 18,750,000.00 18,750,000.00
- Spesifikasi:
- bagian belakang huruf dan logo plat galvanil 1,2 mm finishing duco,
- bagian depan huruf menggunakan acrylic warna biru 3mm dan logo
- menggunakan acrylic col by owner
Letter : RIVERA RESIDENCE
- Tinggi Huruf (tinggi 40cm)
- Lampu LED huruf "mandiri" jenis diamon/coin SMD, 1 lampu = 0,24 watt
- Rangka dan braket hollow 30x30x1,8mm
- Swicthing 10A, 12 volt

POS SECURITY
1 Pek. Pembuatan Pos Security 6.25 M2 2,500,000.00 15,625,000.00
TOTAL A.2 267,410,138.67
A.3 PEKERJAAN INFRASTRUKTUR LISTRIK JARINGAN
1 Pengadaan dan Pasang listrik jaringan PLN 1.00 Ls 700,000,000.00 700,000,000.00
- lokasi pemasangan dari gerbang depan sampai dengan cluster rio
- Lengkap dengan intaslasi dan pemasangan
TOTAL A.3 700,000,000.00
A.4 PEKERJAAN INFRASTRUKTUR AKSES JALAN UTAMA
1 Pek. Bekisting 75.00 M2 135,000.00 10,125,000.00
2 Pek. Penghamparan Beton K-225 fc 24.90 mpa Tb 10 cm (Ready Mix) lebar 6m 150.00 M3 950,000.00 142,500,000.00
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

PEKERJAAN DRAINASE
1 Pek. Drainase/ saluran utama riol kota 169.80 M1 555,000.00 94,239,000.00
- uk 120x 80x80cm
TOTAL A.4 246,864,000.00
A.5 PEKERJAAN LANDSCAPE
1 Pek. Pengecatan kansteen 1.00 Ls 5,000,000.00 5,000,000.00
2 Media Tanam Soil Mix (Pasir alam,Tanah subur, pupuk 1:1:1) t = 15cm 102.45 M3 165,000.00 16,904,250.00
3 Tanaman rumput gajah mini lengkap dengan pupuk tanaman 683.00 M2 65,000.00 44,395,000.00
TOTAL A.5 66,299,250.00
TOTAL PEKERJAAN INFRASTRUKTUR LANJUTAN RIVERA RESIDENCE 1,320,573,388.67
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN INFRASTRUKTUR LANJUTAN KAWASAN CLUSTER RIO
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN INFRASTRUKTUR LANJUTAN CLUSTER RIO


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi awal dan akhir 1.00 Ls 40,000,000.00 40,000,000.00
- Mobilisasi dan demobilisasi

PEKERJAAN SURVEYOR
1 Penyelidikan tanah ,Pengukuran dan Mapping kavling 1.00 Ls 10,000,000.00 10,000,000.00
- Shop drawing & Engineering
TOTAL A.1 50,000,000.00
A.2 PEKERJAAN INFRASTRUKTUR GERBANG CLUSTER RIO
1 Pek. Pembuatan Gerbang Cluster RIO 1.00 Ls 100,000,000.00 100,000,000.00

CHANNEL LETTER
1 Pek. Pengadaan dan pasang channel letter 1.00 Unit 13,750,000.00 13,750,000.00
- Spesifikasi:
- bagian belakang huruf dan logo plat galvanil 1,2 mm finishing duco,
- bagian depan huruf menggunakan acrylic warna biru 3mm dan logo
- menggunakan acrylic col by owner
Letter : CLUSTER RIO
- Tinggi Huruf (tinggi 40cm)
- Lampu LED huruf "mandiri" jenis diamon/coin SMD, 1 lampu = 0,24 watt
- Rangka dan braket hollow 30x30x1,8mm
- Swicthing 10A, 12 volt
TOTAL A.2 113,750,000.00
A.3 PEKERJAAN INFRASTRUKTUR LAMPU JALAN CLUSTER RIO
1 Pengadaan dan Pasang tiang lampu jalan (sementara) 15.00 Titik 3,000,000.00 45,000,000.00
- Lengkap dengan intslasi dan pemasangan
2 Pengadaan dan Pasang listrik jaringan cluster rio - Titik - - TBC
- Lengkap dengan intslasi dan pemasangan
TOTAL A.3 45,000,000.00
A.4 PEKERJAAN INFRASTRUKTUR JALAN, DRAINASE DAN PAGAR
1 Pek. Bekisting 305.40 M2 135,000.00 41,229,000.00
2 Pek. Penghamparan Beton K-225 fc 24.90 mpa Tb 10 cm (Ready Mix) 294.50 M3 950,000.00 279,775,000.00

PEKERJAAN TIMBUNAN JALAN CLUSTER RIO


1 Pek. Cut and Fill jalan cluster rio tanah merah 20cm 589.00 M3 110,000.00 64,790,000.00

PEKERJAAN DRAINASE
1 Pek. Drainase/ saluran type S1 998.28 M1 185,000.00 184,681,800.00

PEKERJAAN PAGAR KELILING


1 Pek. Pagar keliling tinggi 150cm 258.68 M1 450,000.00 116,406,000.00

TOTAL A.4 686,881,800.00


A.5 PEKERJAAN LANDSCAPE
1 Media Tanam Soil Mix (Pasir alam,Tanah subur, pupuk 1:1:1) t = 15cm 75.65 M3 165,000.00 12,481,920.00
2 Tanaman rumput gajah mini lengkap dengan pupuk tanaman 504.32 M2 65,000.00 32,780,800.00
3 Pohon ketapang kencana tinggi 2m s/d 3m 8.00 Bh 300,000.00 2,400,000.00
TOTAL A.5 47,662,720.00
TOTAL PEKERJAAN INFRASTRUKTUR LANJUTAN CLUSTER RIO 943,294,520.00
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEMBELIAN LAHAN TANAH DAN PERIZINAN CLUSTER RIO
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEMBELIAN LAHAN, PERIZINAN DAN SARANA BRANDING CLUSTER RIO


A.1 PEMBELIAN LAHAN TANAH 2 HEKTAR
1 Pembelian Lahan Tahan 2 Ha (20.000 M2) 20,000.00 M2 250,000.00 5,000,000,000.00

TOTAL A.1 5,000,000,000.00


A.2 PERIZINAN CLUSTER RIO
1 SHM 1.00 Ls - - Include Lahan
2 Pemecahan Sertifikat & BBN + Pengukuran kavling 1.00 Ls - - Include Lahan
3 Advice Planning 1.00 Ls - - Include Lahan
4 Izin Prinsip dari Bupati 1.00 Ls - - Include Lahan
5 Pengesahan Site Plan 1.00 Ls - - Include Lahan
6 Izin Perubahan Penggunaan lahan 1.00 Ls - - Include Lahan
7 Biaya UPL / UKL 1.00 Ls - - Include Lahan
8 Biaya aprisal lahan 1.00 Ls - - Include Lahan
9 IMB Rumah Type 36 1.00 Ls - - Include Lahan
TOTAL A.2 - Include Lahan
A.3 SARANA BRANDING PERUMAHAN CLUSTER RIO
1 Branding rumah cluster rio 1.00 Ls 30,000,000.00 30,000,000.00
- Brosur
- Umbul umbul
- Banner
- Billboard
TOTAL A.3 30,000,000.00
TOTAL PEMBELIAN LAHAN, PERIZINAN DAN SARANA BRANDING CLUSTER RIO 5,030,000,000.00
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls - -
2 Pengukuran dan Bowplank 32.00 M1 - -
TOTAL A.1 -
A.2 PEKERJAAN TANAH DAN PONDASI
1 Galian Pondasi Menerus 2.41 M3 - -
2 Urug Pasir Bawah Pondasi 0.30 M3 - -
3 Pasangan Pondasi Batu Bata Menerus AD 1 : 5 2.88 M3 - -
5 Urug Kembali Bekas Galian 0.90 M3 - -
6 Pasangan Pondasi Batu Bata Teras AD 1 : 5 2.90 M1 - -
TOTAL A.2 -
A.3 PEKERJAAN BETON DAN DINDING
1 Pek. Sloof 10x15cm 0.54 M3 - -
2 Pek. Kolom Praktis 10x10cm 0.53 M3 - -
3 Pek. Ring Balok 10x15cm 0.54 M3 - -
4 Pek. Cor Topi Ped Beton (Teras) 0.18 M3 - -
5 Pek. Pasang Batu Bata jumbo 125.50 M2 - -
6 Pek. Pleteran dinding AD 1 : 4 251.00 M2 - -
7 Pek. Plamiran dinding Luar Dan Dalam 251.00 M2 - -
TOTAL A.3 -
A.4 PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu + Kusen ( Type Satu Daun) 2.00 Set - -
2 Pintu double plywood + Kusen ( Type Satu Daun) 2.00 Set - -
3 Jendela + Kusen ( Type Dua Daun) 2.00 Set - -
4 Jendela + Kusen ( Type Satu Daun) 2.00 Set - -
5 Ventilasi Lobang Angin 5.00 Set - -
TOTAL A.4 -
A.5 PEKERJAAN ATAP
1 Rangka Baja Ringan + Skoor + Reng 53.95 M2 - -
2 Lisplank grc lebar 20cm 26.20 M1 - -
3 Penutup Atap genteng Metal 53.95 M2 - -
4 Nok Atap Genteng Metal 6.00 M1 - -
TOTAL A.5 -
A.6 PEKERJAAN PLAFON
1 Plafon gypsum board + rangka hollow 36.00 M2 - -
2 Pengecatan plafon 36.00 M2 - -
TOTAL A.6 -
A.7 PEKERJAAN LANTAI
1 Urug Pasir tanah bawah lantai tebal 40cm 14.40 M3 - -
2 Urug Pasir Bawah lantai tebal 5cm 1.80 M3 - -
2 Pasang Keramik Lantai 40 x 40cm 36.00 M2 - -
3 Pasang Keramik Toilet 20 x 20cm 2.25 M2 - -
4 Pasang Dinding Keramik Toilet 20 x 25cm 6.65 M2 - -
TOTAL A.7 -
A.8 PEKERJAAN ELEKTRIKAL
1 Stop kontak + Instalasi 4.00 Titik - -
2 Lampu Penerangan + Instalasi 6.00 Titik - -
3 Box Skring + MCB 1.00 Set - -
TOTAL A.8 -
A.9 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Rumah 187.00 M2 - -
2 Pengecatan Kayu + Kusen Pintu dan Jendela 25.00 M2 - -
TOTAL A.9 -

A.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR


1 Pasang Pipa PVC dia 1/2" inch 14.00 M1 - -
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

2 Pasang Kran air dia 1/2" inch 1.00 Bh - -


3 Pipa Air kotor PVC dia 4" inch 4.00 M1 - -
4 Pipa Air Glontor PVC Dia 3" inch 12.00 M1 - -
5 Closet Jongkok 1.00 Bh - -
6 Bak Air Fiber 1.00 Bh - -
7 Saringan Air Toilet/ Floor Drain 1.00 Bh - -
8 Pek. Pembuatan Septiktank 1.00 Unit - -
9 Pek. Pembuatan Sumur gali kedalaman 5m 1.00 Unit - -
TOTAL A.10 -
TOTAL PEMBANGUNAN 1 UNIT RUMAH TYPE 36 -
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls 50,000.00 50,000.00
2 Pengukuran dan Bowplank 32.00 M1 20,000.00 640,000.00
TOTAL A.1 690,000.00
A.2 PEKERJAAN TANAH DAN PONDASI
1 Galian Pondasi Menerus 2.41 M3 80,000.00 192,800.00
2 Urug Pasir Bawah Pondasi 0.30 M3 277,800.00 83,340.00
3 Pasangan Pondasi Batu Bata Menerus AD 1 : 5 2.88 M3 725,000.00 2,088,000.00
5 Urug Kembali Bekas Galian 0.90 M3 97,500.00 87,750.00
6 Pasangan Pondasi Batu Bata Teras AD 1 : 5 2.90 M1 17,000.00 49,300.00
TOTAL A.2 2,501,190.00
A.3 PEKERJAAN BETON DAN DINDING
1 Pek. Sloof 10x15cm 0.54 M3 2,750,000.00 1,485,000.00
2 Pek. Kolom Praktis 10x10cm 0.53 M3 2,750,000.00 1,457,500.00
3 Pek. Ring Balok 10x15cm 0.54 M3 2,750,000.00 1,485,000.00
4 Pek. Cor Topi Ped Beton (Teras) 0.18 M3 2,750,000.00 495,000.00
5 Pek. Pasang Batu Bata jumbo 125.50 M2 80,000.00 10,040,000.00
6 Pek. Pleteran dinding AD 1 : 4 251.00 M2 30,000.00 7,530,000.00
7 Pek. Plamiran dinding Luar Dan Dalam 251.00 M2 12,500.00 3,137,500.00
TOTAL A.3 25,630,000.00
A.4 PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu + Kusen ( Type Satu Daun) 2.00 Set 720,000.00 1,440,000.00
2 Pintu double plywood + Kusen ( Type Satu Daun) 2.00 Set 515,000.00 1,030,000.00
2 Jendela + Kusen ( Type Dua Daun) 3.00 Set 585,000.00 1,755,000.00
3 Jendela + Kusen ( Type Satu Daun) 1.00 Set 390,000.00 390,000.00
4 Boven Toilet 1.00 Set 150,000.00 150,000.00
5 Ventilasi Lobang Angin 6.00 Set 15,000.00 90,000.00
TOTAL A.4 4,855,000.00
A.5 PEKERJAAN ATAP
1 Rangka Baja Ringan + Skoor + Reng 53.95 M2 125,000.00 6,743,750.00
2 Lisplank grc lebar 20cm 26.20 M1 27,500.00 720,500.00
3 Penutup Atap genteng Metal 53.95 M2 46,000.00 2,481,700.00
4 Nok Atap Genteng Metal 6.00 M1 30,000.00 180,000.00
TOTAL A.5 10,125,950.00
A.6 PEKERJAAN PLAFON
1 Plafon gypsum board + rangka hollow 36.00 M2 120,000.00 4,320,000.00
2 Pengecatan plafon 36.00 M2 22,000.00 792,000.00
TOTAL A.6 5,112,000.00
A.7 PEKERJAAN LANTAI
1 Urug Pasir tanah bawah lantai tebal 40cm 14.40 M3 110,000.00 1,584,000.00
2 Urug Pasir Bawah lantai tebal 10cm 1.80 M3 277,800.00 500,040.00
2 Pasang Keramik Lantai 40 x 40cm 36.00 M2 115,000.00 4,140,000.00
3 Pasang Keramik Toilet 20 x 20cm 2.25 M2 110,000.00 247,500.00
4 Pasang Dinding Keramik Toilet 20 x 25cm 6.65 M2 110,000.00 731,500.00
TOTAL A.7 7,203,040.00
A.8 PEKERJAAN ELEKTRIKAL
1 Stop kontak + Instalasi 4.00 Titik 110,000.00 440,000.00
2 Lampu Penerangan + Instalasi 6.00 Titik 110,000.00 660,000.00
3 Box Skring + MCB 1.00 Set 150,000.00 150,000.00
TOTAL A.8 1,250,000.00
A.9 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Rumah 187.00 M2 18,000.00 3,366,000.00
2 Pengecatan Kayu + Kusen Pintu dan Jendela 25.00 M2 38,000.00 950,000.00
TOTAL A.9 4,316,000.00
A.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR
1 Pasang Pipa PVC dia 1/2" inch 14.00 M1 17,500.00 245,000.00
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

2 Pasang Kran air dia 1/2" inch 1.00 Bh 28,500.00 28,500.00


3 Pipa Air kotor PVC dia 4" inch 4.00 M1 32,000.00 128,000.00
4 Pipa Air Glontor PVC Dia 3" inch 12.00 M1 38,500.00 462,000.00
5 Closet Jongkok 1.00 Bh 170,000.00 170,000.00
6 Bak Air Fiber 1.00 Bh 190,000.00 190,000.00
7 Saringan Air Toilet/ Floor Drain 1.00 Bh 15,000.00 15,000.00
8 Pek. Pembuatan Septiktank 1.00 Unit 850,000.00 850,000.00
9 Pek. Pembuatan Sumur gali kedalaman 5m 1.00 Unit 1,250,000.00 1,250,000.00
TOTAL A.10 3,338,500.00
TOTAL PEMBANGUNAN 1 UNIT RUMAH TYPE 36 65,021,680.00
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN PEMBANGUNAN LANJUTAN 1 UNIT RUMAH TIPE 36


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls - - Finish
2 Pengukuran dan Bowplank 34.00 M1 - - Finish
TOTAL A.1 - Finish
A.2 PEKERJAAN TANAH DAN PONDASI
1 Galian Pondasi Menerus 2.41 M3 - - Finish
2 Urug Pasir Bawah Pondasi 0.30 M3 - - Finish
3 Pasangan Pondasi Batu Bata Menerus AD 1 : 5 2.88 M3 - - Finish
4 Urug Kembali Bekas Galian 0.90 M3 - - Finish
5 Penimbunan Tanah Dalam Rumah 21.60 M3 - - Finish
6 Pasangan Pondasi Batu Bata Teras AD 1 : 5 2.90 M1 - - Finish
TOTAL A.2 - Finish
A.3 PEKERJAAN BETON DAN DINDING
1 Pek. Sloof 10x15cm 0.54 M3 - - Finish
2 Pek. Kolom Praktis 10x10cm 0.53 M3 - - Finish
3 Pek. Ring Balok 10x15cm 0.54 M3 - - Finish
4 Pek. Cor Topi Ped Beton (Teras) 0.18 M3 - - Finish
5 Pek. Pasang Batu Bata 125.50 M2 - - Finish
6 Pek. Pleteran dinding AD 1 : 4 251.00 M2 - -
7 Pek. Plamiran dinding Luar Dan Dalam 251.00 M2 - -
TOTAL A.3 -
A.4 PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu + Kusen ( Type Satu Daun) 4.00 Set - -
2 Jendela + Kusen ( Type Dua Daun) 3.00 Set - -
3 Jendela + Kusen ( Type Satu Daun) 1.00 Set - -
4 Boven Toilet 1.00 Set - -
5 Ventilasi Lobang Angin 6.00 Set - -
TOTAL A.4 -
A.5 PEKERJAAN ATAP
1 Rangka Baja Ringan 76/65 + Skoor + Reng 53.95 M2 - - Finish
2 Lisplank grc lebar 20cm 26.20 M1 - - Finish
3 Penutup Atap genteng Metal 53.95 M2 - - Finish
4 Nok Atap Genteng Metal 6.00 M1 - - Finish
TOTAL A.5 - Finish
A.6 PEKERJAAN PLAFON
1 Plafon gypsum board + rangka hollow 36.00 M2 - -
2 Pengecatan plafon 36.00 M2 - -
TOTAL A.6 -
A.7 PEKERJAAN LANTAI
1 Urug Pasir Bawah lantai tebal 5cm 1.80 M3 - -
2 Pasang Keramik Lantai 40 x 40cm 36.00 M2 - -
3 Pasang Keramik Toilet 20 x 20cm 2.25 M2 - -
4 Pasang Dinding Keramik Toilet 20 x 25cm 6.65 M2 - -
TOTAL A.7 -
A.8 PEKERJAAN ELEKTRIKAL
1 Stop kontak + Instalasi 2.00 Titik - -
2 Lampu Penerangan + Instalasi 6.00 Titik - -
3 Box Skring + MCB 1.00 Set - -
TOTAL A.8 -
A.9 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Rumah 187.00 M2 - -
2 Pengecatan Kayu + Kusen Pintu dan Jendela 25.00 M2 - -
TOTAL A.9 -
A.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR
1 Pasang Pipa PVC dia 1/2" inch 14.00 M1 - - Finish
2 Pasang Kran air dia 1/2" inch 1.00 Bh - -
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

3 Pipa Air kotor PVC dia 4" inch 4.00 M1 - - Finish


4 Pipa Air Glontor PVC Dia 3" inch 12.00 M1 - - Finish
5 Closet Jongkok 1.00 Bh - -
6 Bak Air Fiber 1.00 Bh - -
7 Saringan Air Toilet/ Floor Drain 1.00 Bh - -
8 Pek. Pembuatan Septiktank 1.00 Unit - -
TOTAL A.10 -
TOTAL PEMBANGUNAN LANJUTAN 1 UNIT RUMAH TYPE 36 -
BILL OF QUANTITY (BOQ)
PERUMAHAN RIVERA RESIDENCE PALEMBANG
PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36
Jl. Mata Merah Kelurahan Karya mulya kec. Sematang borang

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN PEMBANGUNAN 1 UNIT RUMAH TIPE 36


A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls 50,000.00 50,000.00
2 Pengukuran dan Bowplank 34.00 M1 40,000.00 1,360,000.00
TOTAL A.1 1,410,000.00
A.2 PEKERJAAN TANAH DAN PONDASI
1 Galian Pondasi Menerus 2.41 M3 130,000.00 313,300.00
2 Urug Pasir Bawah Pondasi 0.30 M3 97,500.00 29,250.00
3 Pasangan Pondasi Batu Bata Menerus AD 1 : 5 2.88 M3 725,000.00 2,088,000.00
4 Urug Kembali Bekas Galian 0.90 M3 97,500.00 87,750.00
5 Penimbunan Tanah Dalam Rumah 21.60 M3 80,000.00 1,728,000.00
6 Pasangan Pondasi Batu Bata Teras AD 1 : 5 2.90 M1 17,000.00 49,300.00
TOTAL A.2 4,295,600.00
A.3 PEKERJAAN BETON DAN DINDING
1 Pek. Sloof 10x15cm 0.54 M3 2,635,000.00 1,422,900.00
2 Pek. Kolom Praktis 10x10cm 0.53 M3 2,635,000.00 1,396,550.00
3 Pek. Ring Balok 10x15cm 0.54 M3 2,635,000.00 1,422,900.00
4 Pek. Cor Topi Ped Beton (Teras) 0.18 M3 2,635,000.00 474,300.00
5 Pek. Pasang Batu Bata 125.50 M2 105,000.00 13,177,500.00
6 Pek. Pleteran dinding AD 1 : 4 251.00 M2 28,000.00 7,028,000.00
7 Pek. Plamiran dinding Luar Dan Dalam 251.00 M2 12,500.00 3,137,500.00
TOTAL A.3 28,059,650.00
A.4 PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu + Kusen ( Type Satu Daun) 4.00 Set 675,000.00 2,700,000.00
2 Jendela + Kusen ( Type Dua Daun) 3.00 Set 815,000.00 2,445,000.00
3 Jendela + Kusen ( Type Satu Daun) 1.00 Set 400,000.00 400,000.00
4 Boven Toilet 1.00 Set 150,000.00 150,000.00
5 Ventilasi Lobang Angin 6.00 Set 15,000.00 90,000.00
TOTAL A.4 5,785,000.00
A.5 PEKERJAAN ATAP
1 Rangka Baja Ringan 76/65 + Skoor + Reng 53.95 M2 100,000.00 5,395,000.00
2 Lisplank grc lebar 20cm 26.20 M1 19,500.00 510,900.00
3 Penutup Atap genteng Metal 53.95 M2 47,500.00 2,562,625.00
4 Nok Atap Genteng Metal 6.00 M1 28,000.00 168,000.00
TOTAL A.5 8,636,525.00
A.6 PEKERJAAN PLAFON
1 Plafon gypsum board + rangka hollow 36.00 M2 95,000.00 3,420,000.00
2 Pengecatan plafon 36.00 M2 21,000.00 756,000.00
TOTAL A.6 4,176,000.00
A.7 PEKERJAAN LANTAI
1 Urug Pasir Bawah lantai tebal 5cm 1.80 M3 300,000.00 540,000.00
2 Pasang Keramik Lantai 40 x 40cm 36.00 M2 155,000.00 5,580,000.00
3 Pasang Keramik Toilet 20 x 20cm 2.25 M2 155,000.00 348,750.00
4 Pasang Dinding Keramik Toilet 20 x 25cm 6.65 M2 155,000.00 1,030,750.00
TOTAL A.7 7,499,500.00
A.8 PEKERJAAN ELEKTRIKAL
1 Stop kontak + Instalasi 2.00 Titik 100,000.00 200,000.00
2 Lampu Penerangan + Instalasi 6.00 Titik 115,000.00 690,000.00
3 Box Skring + MCB 1.00 Set 125,000.00 125,000.00
TOTAL A.8 1,015,000.00
A.9 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Rumah 187.00 M2 11,500.00 2,150,500.00
2 Pengecatan Kayu + Kusen Pintu dan Jendela 25.00 M2 30,000.00 750,000.00
TOTAL A.9 2,900,500.00
A.10 PEKERJAAN SANITASI DAN AIR BERSIH/ KOTOR
1 Pasang Pipa PVC dia 1/2" inch 14.00 M1 12,500.00 175,000.00
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

2 Pasang Kran air dia 1/2" inch 1.00 Bh 12,500.00 12,500.00


3 Pipa Air kotor PVC dia 4" inch 4.00 M1 32,000.00 128,000.00
4 Pipa Air Glontor PVC Dia 3" inch 12.00 M1 29,000.00 348,000.00
5 Closet Jongkok 1.00 Bh 170,000.00 170,000.00
6 Bak Air Fiber 1.00 Bh 190,000.00 190,000.00
7 Saringan Air Toilet/ Floor Drain 1.00 Bh 15,000.00 15,000.00
8 Pek. Pembuatan Septiktank 1.00 Unit 800,000.00 800,000.00
TOTAL A.10 1,838,500.00
TOTAL PEMBANGUNAN 1 UNIT RUMAH TYPE 36 65,616,275.00
RENCANA ANGGARAN BIAYA (RAB)
PT. BANK MANDIRI (Persero) Tbk. REGION II SUMATERA 2 PALEMBANG
PEKERJAAN RENOVASI POOLING ATM REGION II SUMATERA 2 PALEMBANG
Jl. Kapten A. Rivai No.1008, Lorok Pakjo, Kec. Ilir Bar. I, Kota Palembang, Sumatera Selatan 30126

HARGA SATUAN TOTAL


NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

A PEKERJAAN PERSIAPAN
A.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi awal dan akhir 1.00 Ls 2,000,000.00 2,000,000.00
2 Marking/Pengukuran site 22.42 M2 10,000.00 224,200.00
3 Listrik dan Air kerja 2.00 Bln 1,000,000.00 2,000,000.00
Peralatan dan Material Bantu ( Scafolding, terpal Plastik, exhaust/blower dll ) untuk dalam
4 ruangan, termasuk dinding pembatas darurat 1.00 Ls 2,500,000.00 2,500,000.00
Pengangkutan/Pembuangan puing bekas bongkaran dan pekerjaan perbaikan/perapihan
5 keluar lokasi 10.00 Rit 550,000.00 5,500,000.00
6 Pengaman barang di lokasi (sesuai dengan ketentuan building management) 2.00 Bln 1,000,000.00 2,000,000.00
TOTAL A.1 14,224,200.00
A.2 PEKERJAAN PEMBONGKARAN DAN RELOKASI BARANG
1 Pek. Bongkaran plafon gypsum dan rangka existing 32.77 M2 40,000.00 1,310,800.00
2 Pek. Bongkaran lantai granit existing 32.77 M2 40,000.00 1,310,800.00
3 Pek. Bongkaran partisi dinding 1 muka existing 27.57 M2 40,000.00 1,102,680.00
4 Pek. Bongkaran partisi dinding 2muka existing 7.29 M2 80,000.00 583,200.00
5 Pek. Bongkaran Casing ATM modular dan divider ATM 2.00 Unit 500,000.00 1,000,000.00
6 Pek. Bongkaran partisi kaca frameless ATM 9.10 M2 120,000.00 1,091,880.00
7 Pek. Bongkaran pintu frameless ATM 2.00 Unit 500,000.00 1,000,000.00
8 Pek. Bongkaran Allumunium Composite rangka besi stallbuist 19.97 M2 150,000.00 2,995,800.00
9 Pek. Relokasi Mesin ATM 2.00 Unit - - By Owner
TOTAL A.2 10,395,160.00
TOTAL A 24,619,360.00

B PEKERJAAN ARSITEKTUR DAN INTERIOR RUMAH ATM


B.1 PEKERJAAN LANTAI
1 Pemasangan Homogeneous Tile - General 36.97 M2 937,777.78 34,669,644.44
- Material : Ex Quadra Granite ukuran 120x120cm, Cortina Bianco pholised
- Lokasi : Sesuai petunjuk gambar
2 Pek. Leveling lantai/screeding halus 32.77 M2 125,000.00 4,096,250.00
- Material : 1:3 mortar cement mixture
- Lokasi : Sesuai petunjuk gambar
3 Pemasangan Waterproofing
Material :
- tipe Membrane (Bitutine 3000) + screeding termasuk test rendam 3 x 24 jam
- tipe Coating ex Sika top 2 komponen + screeding termasuk test rendam 3 x 24 jam 32.77 M2 175,000.00 5,734,750.00
- Lokasi : Sesuai petunjuk gambar
TOTAL B.1 44,500,644.44
B.2 PEKERJAAN PLAFOND
1 Pek. Pasangan Plafond 23.02 M2 140,000.00 3,222,800.00
- Rencana tinggi : + 270cm (Kode PL2)
- Plafon : gipsum board 9 mm, ex. Jayaboard, Knauf
- Rangka : besi hollow galvanil 40/40 dan 20/20
- Corner bead pada sudut-sudut luar
- Shadow line
- Lokasi : Lantai
Sesuai karpet
detail dan spesifikasi di gambar
2 Pek. Pasangan Plafond Up ceiling 9.75 M2 140,000.00 1,365,000.00
- Rencana tinggi : + 250cm (Kode DC)
- Plafon : gipsum board 9 mm, ex. Jayaboard, Knauf
- Rangka : besi hollow galvanil 40/40 dan 20/20
- Corner bead pada sudut-sudut luar
- Shadow line
- Lokasi : Lantai
Sesuai karpet
detail dan spesifikasi di gambar
3 Pek. Pasangan Plafond ornamen Grill kayu 5x10cm jarak 8cm 9.75 M2 450,000.00 4,387,500.00
- Rencana tinggi : + 262cm (Kode PO)
- Plafon : Plywood
Finishing : lapis HPL Ex. TACO Motif By User
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

- Rangka : besi hollow galvanil 40/40 dan 20/20


- Corner bead pada sudut-sudut luar
- Shadow line
-PLokasi : Lantai
Sesuai karpet
detail dan spesifikasi di gambar
a TOTAL B.2 8,975,300.00
B.3 nPEKERJAAN KUSEN, PINTU DAN JENDELA
e
1 Pek.
l Pemasangan ulang Pintu Kaca Frameless Existing 2.00 Unit 1,000,000.00 2,000,000.00
- Daun pintu kaca 1 daun, kaca tempered 12 mm (Existing)
P
- spesifikasi Hardware :
i
- Floor Hinge ex. Dekkson
n 2.00 Unit 2,250,000.00 4,500,000.00
t- Pull Handle; Handle Door Solid Wood Fin. Natural, Close Pore 2.00 Unit 1,850,000.00 3,700,000.00
u
- Top/ buttom Pivot ex. Dekkson PT 24 4.00 Unit 850,000.00 3,400,000.00
-C Patch fitting ex. Dekkson PT 10 & PT 20, Patch Lock US 10/PSS + PC 91 2.00 Unit 1,750,000.00 3,500,000.00
o
- Lokasi : Sesuai detail dan spesifikasi di gambar
2 vPek. Pasangan partisi kaca bening frameless tempered 12 mm 9.10 M2 975,000.00 8,871,525.00
e
-r Ex Asahimas
-- Ditanam dengan U Channel allumunium tebal 0,8mm
A
- Lokasi : Sesuai detail dan spesifikasi di gambar
T
3 P Pintu Kamuplase (pintu maintenante CSM CRM)
M 1.00 Unit 2,000,000.00 2,000,000.00
l- Uk. 600 x 2400 mm
y
u
-wDouble plywood 18mm fin. laminate sewarna dengan laminate dinding + cutting sticker
k
o
-. Skirting H60mm stainless steel plate 0.8mm hairline
o
-d Lokasi : Sesuai detail dan spesifikasi di gambar
1
0 TOTAL B.3 27,971,525.00
B.4 0 1
PEKERJAAN DINDING BATA DAN PARTISI
8
1 0 Pek. Partisi gypsum satu muka tanpa insulasi - tinggi hingga ceiling 43.20 M2 145,000.00 6,264,000.00
-x Gypsum 12 mm, 1 sisi
m
m
- Rangka besi hollow 40 x 40 x 0.5mm
2
c-4 termasuk : paper tape, compound, external angle metal galvanize/corner bead, etc.
-0 Lokasi : Sesuai detail dan spesifikasi di gambar
o
2 0 vPek. Partisi plywood satu muka tanpa insulasi 12.47 M2 570,000.00 7,110,180.00
e
m
-r Tinggi hingga ceiling t = 2700 mm
m
- ( posisi logo livin dan Panel screen TV Promo )
H
:- Plywood 12mm, Plywood 3mm
P
L-P Fin HPL col. Wood (LM-2) HPL Walnut Affodel A 8610 ex. Arborite
l- Rangka besi hollow 40 x 40 x 0.5mm
ym
- Lokasi : Sesuai detail dan spesifikasi di gambar
a
3 w tPek. Partisi plywood dua muka tanpa insulasi 19.44 M2 700,000.00 13,608,000.00
o
e-o Tinggi hingga ceiling t = 2700 mm
d
- Plywood 12mm, Plywood 3mm
n
-a Fin laminate col. Blue (LM-3) HPL mate nautical - SHG 1124 ex. Lamitax
1
u
- Rangka besi hollow 40 x 40 x 0.5mm
8
t
-i Lokasi : Sesuai detail dan spesifikasi di gambar
m
4 cPek. M2
m Pasangan glasstone 12.02 1,140,000.00 13,697,100.00
a- lapis partisi laminate col. Blue
lc
- Lokasi : Sesuai detail dan spesifikasi di gambar
o
5 Plint -v / Skirting Stainless steel 9.85 M1 145,000.00 1,428,250.00
-e Backing plywood 12mm ; stainless steel plate 0.8mm hairline
Sr
.HSeluruh area lt 1 kecuali toilet dan partisi kaca
6 G Booth
H CRM - uk. 880 x 1600 x 3000 mm 2.00 Unit 15,933,750.00 31,867,500.00
- CRM di ruang ATM & samping lounge
P
L1
-1 Rangka besi hollow 40 x 40 x 0.5mm / rangka plywood 18mm
2
mSuper Graphic , cutting & digital printing on opaque sticker paper , UV Coating clear
4
a Channel letter , laser cutting solid acrilic 10 mm & 5 mm col. Yellow
t- Inside Body ATM adjuster plywood 18 mm , duco paint warna biru finishing glossy
ee
x- ATM booth plywood 18 mm fin. Laminate col. White
.- Indirect lamp warna : warm white
n
a- Skirting H60mm plywood 18mm ; stainless steel plate 0.8mm hairline
Lu
a-t include accessories terpasang: engsel, lock case
7 m iPanel Screen (QR Scanner/Front Display) 1.00 Unit 6,562,500.00 6,562,500.00
ic
t-a uk. 950 x 3000 x 200 mm
al- Rangka besi hollow 40 x 40 x 0.5mm / rangka plywood 18mm
x
- Plywood fin. Laminate col. Wood HPL Walnut Affodel A 8610 ex. Arborite /
-
/
S
H
M
G
a
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

HPL Giselle hemavan Ash-WG 5254 D ex.Lamitax


- Bagian tengah posisi Panel TV: Plywood 18 mm fin. Laminate col. Blue (LM-3)
- HPL mate nautical - SHG 1124 ex. Lamitax / Marine blue - 7914 UN ex.Formica
- TV touchscreen & bracket supply by owner
- Box electrikal power plywood 18 mm fin. Laminate col. Blue HPL mate nautical
- SHG 1124 ex. Lamitax w/maintenance door kamuflase
- Electrikal outlet and data outlet
- Skirting H60mm plywood 18mm ; stainless steel plate 0.8mm hairline
8 Logo Backdrop Mandiri Livin 1.00 Unit 6,875,000.00 6,875,000.00
- Logo Ukuran Sedang panjang 850 mm
- text : LIVIN h.45 mm
- channel letter : galvanil plate fin. Duco col. As logo + milky acrylic 5mm
- Backligted LED lamp. Col warm white
- include support structure
- text : by Mandiri h.70 mm
- channel letter : Cutting MDF fin. Duco col. As logo
- include support structure
9 Logo Backdrop Mandiri Kopra 1.00 Unit 6,875,000.00 6,875,000.00
- Logo Ukuran Sedang panjang 750 mm
- text : KOPRA h.41 mm
- channel letter : galvanil plate fin. Duco col. As logo + milky acrylic 5mm
- Backligted LED lamp. Col warm white
- include support structure
- text : by Mandiri h.50 mm
- channel letter : Cutting MDF fin. Duco col. As logo
- include support structure

EXTERIOR
10 Pek. cliding dinding panel Allumunium Composite 48.47 M2 975,000.00 47,259,712.50
- Ex Seven Dark Blue Glossy QS 3236, rangka besi stallbuist 20x20x1,2 mm
- Sealent maxbond warna hitam
11 Pek. cliding dinding panel Allumunium Composite (lis ACP Kuning) 5.56 M2 1,250,000.00 6,955,000.00
- Ex Seven motif by user, rangka besi stallbuist 20x20x1,2 mm
- Finishing lapis acrylic lengkap dengan lampu LED Strip 3 baris
- Sealent maxbond warna hitam
12 Neon box poster ukuran 95x200 cm (dinding samping kanan dan kiri) 1.00 Unit 4,750,000.00 4,750,000.00
- Rangka besi stallbuis 20x20
- Backing poster plywood 15 mm
- Plat stainless bagian atas bawah dan samping kiri kanan
- Lampu TL 36 watt
- Acrylic clear 3mm u/ poster + acrylic susu
- Pengadaan Poster (sofcopy by owner) UK. 85 x 190 cm
14 Pek. cliding dinding panel Allumunium Composite 6.00 M2 650,000.00 3,900,000.00
- Ex Seven Dark Blue Glossy QS 3236, rangka besi stallbuist existing
- Sealent maxbond warna hitam
- Lokasi : Sisi samping kiri pooling ATM
15 Neon box poster ukuran 95x200 cm (dinding samping kanan dan kiri) 1.00 Unit 4,750,000.00 4,750,000.00
- Rangka besi stallbuis 20x20
- Backing poster plywood 15 mm
- Plat stainless bagian atas bawah dan samping kiri kanan
- Lampu TL 36 watt
- Acrylic clear 3mm u/ poster + acrylic susu
- Pengadaan Poster (sofcopy by owner) UK. 85 x 190 cm
- Lokasi : Sisi samping kiri pooling ATM
16 Pek. Modifikasi chanel letter berikut logo pita Bank Mandiri 1.00 Unit 7,394,400.00 7,394,400.00
- Spesifikasi:
- bagian belakang huruf dan logo plat galvanil 1,2 mm finishing duco,
- bagian depan huruf menggunakan acrylic warna biru 3mm dan logo
- menggunakan acrylic warna kuning 3mm.
a. m,a,n,i,r,i (tinggi 40cm)
b. d (tinggi 58,2cm)
c. Logo mandiri (panjang 194 cm)
d. Lampu LED huruf "mandiri" jenis diamon/coin SMD, 1 lampu = 0,24 watt
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

e. Lampu LED logo jenis diamon/coin SMD, 3 lampu = 0,72 watt


f. Rangka dan braket hollow 30x30x1,8mm
g. Swicthing 10A, 12 volt
TOTAL B.4 169,296,642.50
B.5 PEKERJAAN FINISHING
1 Finishing dinding Emulsion Paint 24.30 M2 28,500.00 692,550.00
- Ex. Dulux 30BG 72/017 col. Swiss White
2 Finishing dinding bagian luar 50.51 M2 32,500.00 1,641,412.50
- Ex. Dulux weathershield
3 Super Graphic Sticker 13.64 M2 350,000.00 4,772,250.00
- Super Graphic , cutting & digital printing on opaque sticker paper
- UV Coating clear
4 Cutting Sticker on glass Partition 9.00 M2 450,000.00 4,050,000.00
- Transparant Sticker ex. Ritrama
- UV Printing + Laser cutting
TOTAL B.5 11,156,212.50
TOTAL B 261,900,324.44

C PEKERJAAN FURNITURE DAN PENGADAAN BARANG


C.1 PEKERJAAN FURNITURE DAN FURNISHING
1 General waiting sofa tunggu 1.00 Unit 5,500,000.00 5,500,000.00
- custom high foam density dan finsih fabric
TOTAL C.1 5,500,000.00
TOTAL C 5,500,000.00

D PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING


D.1 INSTALASI PENERANGAN DAN STOP KONTAK
1 Pengadaan lampu Down Light DN027 / 17 W / D175 setara Philips 14.00 Bh 185,000.00 2,590,000.00
2 Lampu isi 2 di dalam up ceilling ,track light 4000 K 10.00 Bh 250,000.00 2,500,000.00
- seal A 4000 K white 10 watt setara Philips
3 Saklar double 10A ex. Broco 8.00 Bh 95,000.00 760,000.00
4 Saklar tunggal 10A ex. Broco 5.00 Bh 85,000.00 425,000.00
5 Stop kontak 1 gang 13A ex. Broco 3.00 Bh 85,000.00 255,000.00
6 Stop kontak Ac Ex Broco 3.00 Bh 95,000.00 285,000.00
7 Pengadaan Exhaust fan 2.00 Bh 550,000.00 1,100,000.00
- Material :
- Panasonic FV25TGU Ceiling Exhaust Fan 10 Inch
8 Instalasi Penerangan 24.00 Ttk 250,000.00 6,000,000.00
- Material :
- menggunakan kabel NYM 2x2,5 sqmm dengan merk kabel 4 besar
- (Supreme, Tranka, Kabel Metal, Kabelindo)
- dengan protector PVC (Pipa Conduit)
9 Instalasi Stop kontak 3.00 Ttk 250,000.00 750,000.00
- Material :
- menggunakan kabel NYM 3x2,5 sqmm dengan merk kabel 4 besar
- (Supreme, Tranka, Kabel Metal, Kabelindo)
- dengan protector PVC (Pipa Conduit)
10 Instalasi Stop kontak AC 3.00 Ttk 250,000.00 750,000.00
- Material :
- menggunakan kabel NYM 3x2,5 sqmm dengan merk kabel 4 besar
- (Supreme, Tranka, Kabel Metal, Kabelindo)
- dengan protector PVC (Pipa Conduit)
11 Instalasi Exhaust fan 2.00 Ttk 250,000.00 500,000.00
- Material :
- menggunakan kabel NYM 3x2,5 sqmm dengan merk kabel 4 besar
- (Supreme, Tranka, Kabel Metal, Kabelindo)
- dengan protector PVC (Pipa Conduit)
TOTAL D.1 15,915,000.00
D.2 SISTEM TATA UDARA
1 AC split wall 2 PK 18.000 BTUH, remote timer on-off 1.00 Unit 12,500,000.00 12,500,000.00
- Ex. Daikin
- Pipa refrigerant 1/4"
- Drain AC : pipa pvc 1/2 " ex. Wavin
HARGA SATUAN TOTAL
NO LINGKUP PEKERJAAN VOLUME
(IDR) (IDR)

- Kabel power NYM 3 x 2,5 mm2 ex. Eterna (setara) + conduit


2 AC split wall 1 PK 9.000 BTUH, remote timer on-off 1.00 Unit 7,800,000.00 7,800,000.00
- Ex. Daikin
- Pipa refrigerant 1/4"
- Drain AC : pipa pvc 1/2 " ex. Wavin
- Kabel power NYM 3 x 2,5 mm2 ex. Eterna (setara) + conduit
TOTAL D.2 20,300,000.00
TOTAL D 36,215,000.00

E PEKERJAAN LANDSCAPE
E.1 PEKERJAAN HARDSCAPE ATM DRIVE THRU
1 Pek. bongkar Conblock / Paving block existing 50.00 M2 40,000.00 2,000,000.00
2 Pek. penggantian dan pemasangan Conblock / Paving block (baru) 50.00 M2 165,000.00 8,250,000.00
- Pasir urug berikut pemadatan t=10 cm 2.50 M3 700,000.00 1,750,000.00
3 Pek. Pembuatan ramp beton akses masuk ATM Drive thru 0.50 M3 2,500,000.00 1,250,000.00
4 Pek. Pengecatan kanstin jalan 1.00 Ls 1,000,000.00 1,000,000.00
5 Pek. Pengerokan dan pengecatan ulang dinding ATM Drive Thru 1.00 Ls 1,500,000.00 1,500,000.00
TOTAL E.1 15,750,000.00
TOTAL E 15,750,000.00