Hasil Telly Tronton7
Hasil Telly Tronton7
Tanggal : 14/03/2021
Depo : Bali
Truk : DK 8468 GW
Supplier : Abdi Putra Nuryanto
P.260 cm
20-24 2.1254 Rp. 1,225,000 Rp. 2,603,616
25-29 1.8341 Rp. 1,325,000 Rp. 2,430,183
30-39 2.3814 Rp. 1,425,000 Rp. 3,393,495
40-49 0.1785 Rp. 1,525,000 Rp. 272,213
50-Up 0.0000 Rp. 1,625,000 0
TOTAL M3 6.5194 Rp. 8,699,506
Jml Btg 67
G.Ttl M3 20.0540 Rp. 23,293,616
AN