REKAPITULASI

PAKET PEKERJAAN STRUKTUR, ARSITEKTUR, MEKANIKAL ELEKTRIKAL DAN PLUMBING


PROYEK NUANSA CILANGKAP (RUMAH SUSUN DP 0)
JAKARTA TIMUR
NO URAIAN PEKERJAAN NILAI TOTAL

I DAFTAR - 1 PEKERJAAN PERSIAPAN Rp 18,605,217,935

II DAFTAR - 2 PEKERJAAN STRUKTUR

2.1 PEKERJAAN PONDASI Rp 18,225,409,495


2.2 PEKERJAAN STRUKTUR BETON Rp 50,440,663,774

III DAFTAR - 3 PEKERJAAN ARSITEKTUR 62,234,034,703

IV DAFTAR - 4 PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING Rp 45,672,432,000

Rp 7,937,280,000
V DAFTAR - 5 PEKERJAAN EXTERNAL

VI DAFTAR - 6 PROV-SUM Rp

SUB TOTAL
PPN 10%
NILAI TOTAL
PEMBULATAN
TERBILANG :
(Sudah termasuk PPN 10%)
NILAI TOTAL

Rp 18.605.217.935

Rp 68.666.073.269

Rp 62.234.034.703

Rp 45.672.432.000

Rp 7.937.280.000

Rp -

Rp 203.115.037.906
Rp 20.311.503.791
Rp 223.426.541.697
Rp 223.426.542.000