Anda di halaman 1dari 4

Volume = A x t

= 418.00 x 0.15 = 62.70 m3 (sore)

18-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.00 s/d 17.30 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 3.00 = 16.85 m3 (sore)
19-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.25 s/d 18.00 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 3.00 = 16.85 m3 (sore)

21-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.15 s/d 17.50 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 3.00 = 16.85 m3 (sore)

23-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 15.45 s/d 18.00 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 4.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 4.00 = 22.46 m3 (sore)

Lampiran I - 1
Volume = A x t
= 418.00 x 0.15 = 62.70 m3 (sore)

18-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.00 s/d 17.30 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 3.00 = 16.85 m3 (sore)
19-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.25 s/d 18.00 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah
Volume = P x L x t x n
= 1.30 x 0.90 x 4.80 x 3.00 = 16.85 m3 (sore)

21-Apr-16 1. Pengecoran kolom upper ground floor (K1) ( pukul 16.15 s/d 17.50 )
Diketahui:
Panjang penampang kolom (P) = 1.30 m
Lebar penampang kolom (L) = 0.90 m
Tinggi kolom (t) = 4.80 m
Jumlah kolom (n) = 3.00 buah

Lampiran I - 2
Lihat pada proses
perhitungan (Lampiran
I)

C : Volume pekerjaan pada pagi hari 0.667


D : Volume pekerjaan pada sore hari
E : Volume pekerjaan pada malam hari
pada malam hari