DAFTAR KUANTITAS DAN HARGA

KEGIATAN : Perencanaan Teknis Menara Masjid Darurrahman


Unit Kerja : Masjid Darurrahman
LOKASI : Perumahan Bumi Asih Permai RT.17, Kel. Pasir Panjang
TAHUN : 2023

No Uraian Tenaga Kerja Satuan Kode Harga Upah

1 2 3 4 5

A. UPAH
1 Mandor Lapangan Orang/Hari L 061 ###
2 Kepala Tukang Orang/Hari L 073 ###
3 Tukang Orang/Hari L 079 ###
4 Buruh Lapangan Tak Terlatih Orang/Hari L 101 ###
5 Buruh Lapangan Agak Terlatih Orang/Hari L 103 ###
6 Buruh Lapangan Terlatih Orang/Hari L 106 ###

No Uraian Bahan Satuan Kode Harga Bahan

1 2 3 4 5

B. BAHAN PENGISI
1 Batu Pecah 1-2 cm M³ M.025 ###
2 Pasir Kasar M³ M.040 ###
3 Pasir Halus M³ ###
4 Semen PC Zak M.080 97,900.00
5 Bataco 15 x 30 x 7 cm Bh - 1,600.00
6 Keramik 30 x 30 cm Kotak - 77,100.00

C. BAHAN KAYU
1 Ky. Belian Tidak Ketam Uk. 8/8 - 4 m M³ - ###
2 Ky. Belian Tidak Ketam Uk. 4/8 - 4 m M³ - ###
3 Ky. Belian Ketam Uk. 7/7 - 4 m M³ - ###
4 Ky. Klas II Uk. 7/7 - 4 m ( Ketam ) M³ - ###
5 Ky. Klas II Uk. 4/6 - 4 m ( Tidak Ketam M³ - ###
6 Ky. Klas II Uk. 5/7 - 4 m ( Tidak Ketam M³ - ###
7 Ky. Klas II Uk. 5/10 - 4 m ( Tidak Ketam M³ - ###
8 Ky. Klas II Uk. 3/5 - 4 m ( Tidak Ketam M³ - ###
9 Ky. Klas III Uk. 3/5 - 4 m ( Tidak Ketam M³ - ###
10 Ky. Klas III Uk. 4/6 - 4 m ( Tidak Ketam M³ - ###
11 Papan Kayu Klas II Ketam M³ M.181.k ###
12 Papan Mal Klas III M³ M.181.l ###
13 Kayu Cerucuk / Dolken ø 4 - 6 - Pj. 4 Btg - 6,600.00
14 Kayu Cerucuk / Dolken ø 6 - 8 - Pj. 4 Btg - 12,100.00
15 Kayu Cerucuk / Dolken ø 8 - 10 - Pj. 4 Btg - 15,900.00
16 Alas Laci Btg - 12,100.00

D. BAHAN CAT
1 Amplas Lbr - 3,900.00
2 Minyak Cat Kg - 32,900.00
3 Cat Kilat Kg - 53,000.00
4 Plamur Kg - 34,500.00
5 Cat Dasar Kg - 55,600.00
6 Cat Tembok Kg - 66,500.00
7 Dempul Kg - 42,900.00
8 Thiner Ltr M.090.f 30,300.00
9 Thiner ND Ltr - 37,600.00
10 Meni Kg - 75,100.00
11 Oker Kg - 15,000.00
12 Kuas 4" Bh - 23,900.00

E. BAHAN BESI DAN ALUMUNIUM


1 Besi Wire Mesh Kg - 17,300.00
2 Kawat Baja / Bendrat Kg M.168 22,800.00
3 Simpai Roll Kg - 26,800.00
4 Kawat Simpai Kg - 63,000.00
5 Baut Dia. 4/8 " Pj = 20 cm Btg M.163 9,600.00
6 Talang Alumunium setengah linkaran t = 0,3 mm l = 30 cm ###

F. BAHAN PENGGANTUNG
1 Kait Angin Bh - 18,800.00
2 Handle Jendela Bh - 20,500.00
3 Handle Pintu Bh - ###
4 Engsel Jendela Bh - 30,400.00
5 Engsel Pintu Bh - 40,300.00
6 Slot Pintu Bh - 25,300.00
7 Slot Jendela Bh - 19,000.00
8 Kunci Tanam Biasa Bh - ###
9 Paku Seng Kg M.166.a 30,200.00
10 Paku Campuran 1" - 5 " Kg M.166.b 25,900.00
11 Paku Beton Kg - 33,800.00
12 Paku Atap Seng Kg M.166.c 34,200.00
13 Paku Triplek Kg - 35,900.00
14 Paku GRC Kg - 35,900.00

G. BAHAN ATAP
1 Genteng Metal 0.25 Lbr - 64,600.00
2 Seng Plat Bjls 20 Lbr - 63,400.00
3 Plat Datar Color 0.35 Lbr - 72,300.00
H. BAHAN KACA
3 Kaca Rayben, t = 5 mm M² - ###

I. BAHAN TRIPLEK
1 Panel GRC 120 x 240 x 40 Lbr - 91,500.00

J. BAHAN SANITASI
1 Kran Air Uk. 1/2" Bh - 44,300.00
2 Pipa Paralon Dia. 1/2" Btg - 20,900.00
3 Fiber Glass 1 m³ M³ - ###

K. BAHAN LISTRIK

1 Saklar Outbow Double Btg 19,300.00


2 Stop Kontak Bh 15,300.00
3 MCB + Box Bh 75,000.00
4 Lampu SL 18 watt Bh 61,100.00
5 Armatur Lampu Bh 15,000.00