OUTLINE SPESIFIKASI

PEKERJAAN STRUKTUR
PEKERJAAN :PEMBANGUNAN GEDUNG FAKULTAS ILMU KEOLAHRAGAAN
MALANG -JAWA TIMUR
LOKASI : KAMPUS UNIVERSITAS NEGERI MALANG

DOKUMEN KONTRAK
NO URAIAN PEKERJAAN KETERANGAN
JENIS/ TYPE MEREK/ PRODUCT
1 Bonding Agent Febond PVA FEB
Sikatop 77D Sika
Barra Emulsion 57 Meynadier
Daraweld C Grace
Bonding Agent 9910 Cormix
2 Waterproofing (Sheet) by Arsitek by Arsitek by Arsitek

3 Minyak Bekisting (Form Oil) Febstrike WB FEB


a Beton Sika
MRA 1 Cormix
Form Shield Grace
4 Semen Ordinary PC (Type I) Gresik

5 Pasir Lumajang
6 Split Pandaan
7 Besi Beton BJTP 24 < 10 mm Krakatau Steel
BJTP 40 ≥ 10 mm Krakatau Steel standard SNI & RKS

8 Baja Profil ST 37 Krakatau Steel Steel Frame atap


9 Batu Kali Belah Batu Kali yg di belah ex. Lokal Pondasi dangkal & Turap
10 Rangka/ Perkuatan Bekesting Meranti 5/7, 6/10 & 6/12
Papan Bekisting Multiplex 12 mm ex. Lokal
11 Stut Werk Pipa-pipa Baja/ Metal
12 Beton Readymix ex. Lokal merk-merk lain yang sesuai
(K350, fc' 30 Mpa) ; (K300, fc'=25 Mpa) dengan standard SNI & RKS
13 Perkuatan Bekisting Beton Form Tie ex. Lokal Dipasang sebanyak 4 buah/m²
14 Bored Pile K300, fc=25 MPa. slump 16 -18 ; Pall Bp.60cm = 125 Ton
Dia 80 cm ( Gedung FIK )
Pall Bp. 80cm = 225 ton, Auger mampu menembus tanah N-SPT > 50

15 Bekisting batu bata Bata merah/Batako lokal bekisting pile cap, Tiebeam dan dinidng semi basemen